PP Transport Request and their IMG Path

Master Data
1) Define Distribution Keys
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Material List > Item Data >
Item Data from related areas > Define Distribution Keys -done
2) Determine Person responsible for Resource
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Determine
Person responsible - done
3) Define Planner Group-
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner
-done
4) Define Capacity Planner
IMG > Production Planning for Process Industries > Master Data > Resource > Capacity Requirement Planning
> Determine Capacity Planner - done
5) Determine Standard Value Parameter
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Standard Value >
Define Parameter -done
6) Define Setup Groups and Setup Group Categories
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for operations and
phases > Define set up groups and set up group categories - not done
7) Define copy setting between plants-Process
IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting
between plantsnot done
8) Define Set up Control Recipe destination
IMG > Production Planning for Process Industries > Process Management > Control Recipe/PI sheet > Set up
control recipe destinationnot done
9) Define MRP controller
IMG > Material Management > Consumption based Planning > Master Data > Define MRP controller -done
10) Special Procurement
IMG > Material Management > Consumption based Planning > Master Data > Define Special procurement
types -done
11) Define Floats (Scheduled Margin Key)-
IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin
Key) -done
12) Define Splitting of Forecast requirements for MRP-
IMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splitting of
forecast requirements of MRP -not done
13) Maintain Correction Factors for Forecast
IMG > Material Management > Consumption based Planning > Planning > Procurement > Maintain Correction
factors for forecast -not done
14) Carry out Overall Maintenance of Plant Parameters
Maintaining plant parameters in MRP
IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out overall
maintenance of plant parameters -done
15) Define Planning Horizon
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define Planning
Horizon -done
16) Activate Requirement planning
IMG > Material Management > Consumption based Planning > Planning > Activate Requirement Planning
-done
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
Range of coverage profile
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define range of
coverage profile (Dynamic Safety Stock) -done
18) Define Stock in Transfer and Blocked Stock Availability
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define
Stock in transfer and blocked stock -done
19) Define MRP Areas
IMG > Material Management > Consumption based Planning > Master Data > MRP areas > Define MRP areas -
done
20) Carry out maintenance of MRP groups
IMG > Material Management > Consumption based Planning > MRP groups> Carry out maintenance of MRP
groups -done
21) Define Scope of total Planning - MRP
IMG > Material Management > Consumption based Planning > Planning > Define Scope of total Planning- not
done

Transaction Data (PP-PI)

22 Define Order Types


IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type
-done
23) Define Order Type Dependent parameters
IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type
Dependent parameters - done
24) Define Production Scheduler
IMG > Production Planning for Process Industries > Process Order > Master Data > Bill of Material > Define
Production Scheduler -done
25) Define Checking Control - Process Order
Define Availability Check Define Checking Control
IMG > Production Planning for Process Industries > Process Order > Operations > Availability Check > Define
Checking Control - done
26) Define Checking Rule for backorder processing
IMG > Production Planning for Process Industries > Process Order > Operations > Availability Check > Define
Checking rule for back order processing -done
27) Define Stock and batch determination for good movement
IMG > Production Planning for Process Industries > Process Order > Operations > Define Stock and batch
determination for good movement -done
28) Specify Scheduling Parameters
IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Specify
Scheduling Parameters -done
29) Define Reduction Strategies
IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Resource data
> Define Reduction Strategy -done
30) Define Confirmation Parameters
IMG > Production Planning for Process Industries > Process Order > Operations >
Confirmation > Define Confirmation Parameters - done
31) Define Valuation of Goods Received
IMG > Production Planning for Process Industries > Process Order > Integration > Define Valuation of goods
received -done
32) MRP creation indicator
IMG > Material Management > Consumption based Planning > Planning > Define creation indicator - done
33) Define safety stock
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define
Safety Stocks - done
34) Define alternative determination of Production
IMG > Production Planning for Process Industries > Process Order > Operations > BOM selection > Define
alternate determination of production -done
35) Define no. ranges
IMG > Production Planning for Process Industries > Process Order > Master data > Order > Number Ranges >
Define number ranges for orders

Following Number ranges, you need to define


In OPPQ you need to define Number Ranges for: done
Planned Orders
Reservations / Dependent Requirements
Purchase Requisitions
MRP Lists
Simulative Dependent Requirements
Similarly, you need to define Number Range for:
Production Order in CO82
Confirmations in CO80
Reservations in CO83
Operations in CO81
Capacity Requirements in CO84
First need to transfer Number range object through Transport Request.
PP Configuration Manual
1. Factory Calendar -not done
2. Configuring SAP calendar - not done
3. Define Public Holidays -not done
4. Define Holiday Calendar -not done
5. Creation of Factory Calendar -not done
6. Basic Data
7. Bill of Material -done
8. Define Modification Parameters -done
9. Define BOM Usages -done
10. Define Material Types for BOM Header -done
11. Define Item Categories used for Item Data -done
12. Define allowed Material Types for BOM Items -done
13. Define Order of priority for alternative BOM usages -done
14. Work center -done
15. Define WorkCentre Category -done
16. Define Field Selection for Work Center
17. Define Task List Usage for Work centers
18. Define Parameters for Standard Value Key
19. Define Standard Value Key
20. Define Person Responsible for work Centers
21. Define Move time Matrix
22. Define Default Work Center
23. Default Control Keys
24. Define Capacity Categories
25. Define Capacity Planners
26. Define Shift Sequence
27. Define WorkCentre Formulas
28. Define Work Center Formulas for Costing
29. Routing
30. Define Number Ranges for Routings
31. Define Field Selection
32. Define Material Type Assignments
33. Select Automatically (Routing Selection)
34. Define Task List Usage
35. Configure Planner Group
36. Configure Control Keys
37. Define Reduction Strategy
38. Define Relevancy to Costing
39. Define (Standard) Trigger Point Usage
40. Define Automatic Selection of Routings
41. Production Planning
42. Demand Management
43. Define number ranges for planned independent requirements
44. Configuring Requirement Types and Requirement Classes
45. Define Strategy
46. Define Strategy Group
47. Define version numbers
48. Maintain consumption mode and period of adjustment
49. CRP Define layout keys
50. Define layout
51. Define profile for capacity planning table
52. Define Overall profile
53. Material Requirement Planning Plant Parameters
54. Carry Out Overall Maintenance of Plant Parameters
55. Scheduling Parameters for Purchasing
56. Number Range for Planned orders
57. Number Range for Purchase Requisitions
58. Define MRP Controllers
59. Define Missing Parts MRP Controller
60. Define Special Procurement Type
61. Maintain Planning Calendar
62. Define MRP Areas
63. Define Scope of Planning for Total Planning
64. Define Planning Horizon
65. Activate BOM Explosion characteristics
66. Define Planning Time Fence and Roll Forward Period
67. Define Floats (Scheduling Margin Key)
68. Define parallel processing for MRP
69. Define Receipt days’ Supply
70. Parameters for Determining the Basic Dates
71. Define scheduling parameters for planned orders
72. Define availability stock in Transfer/Blocked stock/Restricted stock
73. Define External Procurement
74. Define BOM Explosion Control
75. Define BOM Explosion for Sales Orders
76. Define BOM and Routing Selection
77. Activate MRP and Set Up Planning File
78. Define Planning File Entries for Goods Movements
79. Convert Planning File Entries for MRP Areas
SFG Data (PP)
1. Shop Floor Control Master Data
2. Define Order Types
3. Define order type-dependent parameters
4. Production Status Profile
5. Define number ranges for orders
6. Define number ranges for confirmations
7. Define number ranges for reservations
8. Define production scheduler
9. Define production scheduling profile
10. Define Confirmation Parameters
11. Define Time for Confirmation Processes
12. Define Reasons for Variances
13. Define single screen entry
14. Define Field Selection for Confirmation
15. Define Reduction Strategies
16. Define Print Control
17. Batch Status Management
18. Batch Search Strategy to Production
19. Activate Batch Management
20. Availability Check
21. Define Checking Group
22. Define Checking Rule
23. Define Scope of Check
24. Define Checking Control
25. Checking Rule for Back order Processing
26. Scheduling
27. Specify Scheduling Type
28. Define Scheduling Parameters for Planned Orders
29. Define Scheduling Parameters for Production Orders