Technical Specification on

Developers Infrastructure

New Housing Development:


FTTH Design
Content

1. Design for Residential Landed Building

2. Design for Residential High Rise Building

3. Design for Business Building

4. In – Premise Cabling

5. Testing Procedure
Content

1. Design for Residential Landed Building

2. Design for Residential High Rise Building

3. Design for Business Building

4. In – Premise Cabling

5. Testing Procedure
Design 1: Landed - Pole Type
Premise owner responsibility TM responsibility

Network
Boundary 1

FTB
Internal
FTB : Fibre Termination Box
Fibre
Drop cable – by TM FWS : Fibre Wall
FWS Socket

To be prepared by Developer
1. Infra Supply by TM
ƒ FTB: with 1 SC/UPC adaptor at backlane, easy access, TM approval 1. Drop cable from FTB to Fibre DP
type 2. Optical Network Unit (ONU)
ƒ FWS: at Living room, position: follow existing RJ11 socket standard, 3. Residential Gateway (RG) – wifi router
1 SC/UPC adaptor 4. Cat5 & Cat3 for RG & Telephone ( ~
ƒ AC power near FWS ( 2 outlet) – min 1 2m)
2. Cabling between FTB & FWS 5. Wireless Dect Phone
ƒ 2 core single mode fibre : TM approval type 6. Set Top Box (STB) for IPTV Service
ƒ Total IL < 1.5 dB
3. Other Cabling (optional)
ƒ RJ45 / Cat 5 cabling: between FWS to any other terminal
ƒ RJ11 / Cat 3 cabling : between FWS to any Phone terminal (parallel)
Basic Rules

The things that changes


1. Cabling Type : Copper → fibre
2. Piping / trunking Spec
a. Minimum size = 50mm Radius
b. Minimum bending radius = 20x Trunking Radius Size

The things that unchanged / remained


1. Infrastructure
2. Telecommunication Room
3. Responsibility
4. Any others thing that may not related to Cabling Type
Design 2: Landed – U/G Type

Drop Cable
• Coil inside M/H Legend:
• Covered with Cap FTB : Fibre Termination Box
FWS : Fibre Wall Socket
• Length = Pipe length + 2 meter
FTB
Internal
Pedestal
Fibre DP

FWS Intermediate Pipe


Manhole Plinth

Pedestal DP
Network
Pit linked Manhole Boundary 2
To be prepared by Developer
1. Infra
ƒ FTB: with 1 SC/UPC adaptor at backlane, easy access, TM approval type, patched between drop cable & Internal Fibre
ƒ FWS: at Living room, position: follow existing RJ11 socket spec, 1 SC/UPC adaptor
ƒ AC power near FWS ( 2 outlet) – min 1
ƒ Pit, Manhole & ducting between FTB and Pedestal DP
ƒ Pedestal DP plinth
2. Cabling
ƒ Drap Cable:
- Pedestal DP to FTB: 2 core single mode fibre : TM approval type
- Coiled inside Pedestal DP linked M/H with pedestal DP
ƒ FTB to FWS: 2 core single mode fibre : TM approval type
ƒ Total IL < 2.1 dB.
3. Other Cabling (optional)
ƒ RJ45 / Cat 5 cabling: between FWS to any other terminal
ƒ RJ11 / Cat 3 cabling : between FWS to any Phone terminal (parallel)
Design 3: Landed Individual Bungalow Lot or
Renovation House – U/G Type
Legend:
FTB : Fibre Termination Box
FWS : Fibre Wall Socket

Premise Fence

FTB
Internal Fibre
“String” or Drop Cable

FWS Common Access Point

2’’ Piping with min 30mm radius Pit Drain/Manhole

Developer / Owner to provide “string” or Drop Cable between FTB up to


“common access point” or nearest access manhole .
Content

1. Design for Residential Landed Building

2. Design for Residential High Rise Building

3. Design for Business Building

4. In – Premise Cabling

5. Testing Procedure
Design 4 : < 5High Rise Type or w/o TR

Space to locate new FTB


TM’S
40cm Fibre FTB
DP
30cm

FWS FTB Internal


Fibre
Pit
TM Exchange/
TM Network

FTB
Design 4 : < 5High Rise Type w/o TR
FTB

Network
Boundary 4

Space to locate new FTB


Network
Boundary 3 TM’S
40cm Fibre FTB
DP
30cm

FWS FTB Internal Fibre


Pit Trunking between “pit” & Fibre DP
To be prepared by Developer
1. Infra
ƒ FTB: with SC/UPC adaptor, easy access, TM approval type, no. of Supply by TM
adaptors are some with no. of premise (1 to 1 connection) 1. Fibre DP
ƒ FWS: position -follow existing RJ11 socket standard, 1 SC/UPC adaptor 2. Optical Network Unit (ONU)
ƒ AC power near FWS ( 2 outlet) – min 1 3. Residential Gateway (RG) – wifi router
ƒ Pit, Trunking from pit to TM’s DP 4. Cat5 & Cat3 for RG & Telephone ( ~
ƒ Space to locate TM’s Fibr 2m)
2. Cabling between FTB & FWS 5. Wireless Dect Phone
ƒ core single mode fibre for each premises 6. Set Top Box (STB) for IPTV Service
ƒ TM approval type
ƒ Total IL < 1.5 dB
3. Other Cabling (optional)
ƒ RJ45 / Cat 5 cabling: between FWS to any other terminal
ƒ RJ11 / Cat 3 cabling : between FWS to any Phone terminal (parallel)
Design 5 : High rise > 5 Floor
FWS: Fibre Wall Socket
• Locate inside each premise
• Proposed at living room
FWS FWS FWS FWS • 1x SC/UPC adaptor inside
• Comply TM Spec
Riser FTB
Horizontal • For floor > 5 recommend to have
Cable • 1 to 1 core connection for Horizontal &
FWS FWS FWS FWS
Vertical Cable
• SC/UPC adaptor inside
Network • Comply TM Spec
Riser Boundary 4
Main Fibre Termination Box
F • Termination point for each premise
T
• SC/UPC adaptor inside
B
• Clearly labeled & tagged with each
premised information
Riser FTB FWS FWS FWS • Comply TM Spec

Network Vertical Cable


Boundary 3 • For floor > 5 recommend to differentiate
between “horizontal” & “vertical”
Horizontal Cable
FWS FWS FWS • No. of core = same as no. of premise
• Recommended to have 20% spare cores
for maintenance & future expansion
SDF Room
• Comply TM Spec
F
T Horizontal Cable
T
M • No. of core = total of 2 cores for
B
each of premise
• Comply TM Spec
TM’s equipment
TM’s cable
Cabling for High Rise with Multiple Block

Internal
Horizontal
Cable

Fibre Wall
Socket
(FWS)
Riser FTB

Internal
Vertical
Cable
Telecommunicat FTB by
ion Room Developer
NFP
Equipment
N F F
F T T
P B B
NFP Cable

Campus Backbone Cable


Cabling for High Rise with CMDF and multiple SDF/Telco TR

¾ Total no. of cores required for each


unit = 2 cores.
Internal ¾ Inter-Tie Cabling:
Horizontal
Cable 9 Prepared by Developer
9 No. of cores = 2 x No. of Unit
Fibre Wall
Socket ¾ FTB in CMDF, TR1 and TR2 prepared
(FWS)
by Developer
Riser FTB
¾ Interface in FTB inside TR must use
Internal SC/UPC adaptor
Vertical
Cable ¾ Each NFP is allocated with different
CMDF F Manhole to connect with each TR
T
Inter-Tie B
within that property area
Cabling
TR 1 TR 2
¾ Insertion Loss ( IL) Requirement
NFP N N
Equipment F F F F 9 FWS – CMDF FTB = 1.5 dB
P T T P
1 B B 1 9 CMDF FTB – TR FTB = 1.0 dB
M/H1 M/H2 9 Total FWS-TR FTB = 2.5dB
NFP1 Cable NFP2 Cable
Sample 1 of Internal Cabling Design for High Rise Building

F
T
12 B 8 Unit/Floor
F
T
11 B 8 Unit/Floor
FTB with 16 termination
F
T
with
10 B 8 Unit/Floor Adaptor = SC/UPC
F
Or Splice type
T
9 B 8 Unit/Floor
F
T
8 B 8 Unit/Floor F
T FWS FWS FWS 8unit x 2c
F B
T
2c 2c 2c
7 B 8 Unit/Floor
F
T
6 B 8 Unit/Floor

F
T
5 B 8 Unit/Floor
F 16c
4
T
B 8 Unit/Floor
Vertical cable
= 8 unit x 2 Cores
F
T
= 16 cores
3 B 8 Unit/Floor
F
T
2 B 8 Unit/Floor
F Sample BoM
T
1 B 8 Unit/Floor 1. Vertical Cable = 12 x 16 cores
2. Horizontal = 96 x 2cores
G 3. Riser FTB with 16 termination = 12 unit
Main 4. Main FTB with 192 termination = 1 unit
FTB Main FTB Capacity
= 8 Unit x 12 Floor x 2 cores
= 192 Termination
Sample 2 of Internal Cabling Design for High Rise Building

12 8 Unit/Floor
F
T
11 B 8 Unit/Floor
FTB with 48 termination
with
10 8 Unit/Floor Adaptor = SC/UPC 8unit x 2c
FWS FWS FWS
Or Splice type
2c 2c 2c
9 8 Unit/Floor
F
T F
8 B 8 Unit/Floor T
B FWS FWS FWS 8unit x 2c
2c 2c 2c
7 8 Unit/Floor

6 8 Unit/Floor
F FWS FWS FWS 8unit x 2c
T
5 B 8 Unit/Floor 2c 2c 2c
48c
4 8 Unit/Floor

3 8 Unit/Floor
Vertical cable
= 8 unit x 3 Floor x 2 Cores
F
T
= 48 cores
2 B 8 Unit/Floor

Sample BoM
1 8 Unit/Floor 1. Vertical Cable = 4 x 48 cores
2. Horizontal = 96 x 2cores
G 3. Riser FTB with 48 termination = 4 unit
Main 4. Main FTB with 192 termination = 1 unit
FTB Main FTB Capacity
= 8 Unit x 12 Floor x 2 cores
= 192 Termination
Sample 3 of Internal Cabling Design for High Rise Building

F
T
12 B 8 Unit/Floor
F
T
11 B 8 Unit/Floor
FTB with 16 termination
F
T
with
10 B 8 Unit/Floor Adaptor = SC/UPC
F
Or Splice type
T
9 B 8 Unit/Floor
F
T
8 B 8 Unit/Floor F
T FWS FWS FWS 8unit x 2c
F B
T
2c 2c 2c
7 B 8 Unit/Floor
F
T
6 B 8 Unit/Floor

F
T
5 B 8 Unit/Floor
F 8 x 2c
4
T
B 8 Unit/Floor
Vertical cable
= 8 unit x 2 Cores
F
T
= 16 cores
3 B 8 Unit/Floor
F
T
2 B 8 Unit/Floor
F Sample BoM
T
1 B 8 Unit/Floor 1. Vertical Cable & Horizontal = 96 x 2cores
2. Riser FTB with 16 termination = 12 unit
G 3. Main FTB with 192 termination = 1 unit
Main
FTB Main FTB Capacity
= 8 Unit x 12 Floor x 2 cores
= 192 Termination
Content

1. Design for Residential Landed Building

2. Design for Residential High Rise Building

3. Design for Business Building

4. In – Premise Cabling

5. Testing Procedure
Design 6 : Office Building

FWS FWS FWS FWS

Horizontal
Cable FWS FWS FWS FWS

Riser

Riser FTB FWS FWS FWS

Horizontal Cable
FWS FWS FWS

SDF Room
F
T
T
M B
Setup on Office Building: (proposal)
Cat3/5

Cat5
Cat5

X IP RG ONU

FWS
PABX

Single Mode
Fibre

IP PABX Configuration:
9 1 channel required 128 Kbps
9 30 channel = 4 Mbps
9 Max no. of channel / PABX = depend on PABX Spec
9 IP PABX provided by end customer
9 Package available after year 2012
Setup on Office Building: (proposal)

Cat3

Cat5
Max =4 ATA
Cat5

ATA RG ONU

FWS
Max voice ATA Single Mode
Fibre
services via 1 SM
fibre Core = 4 X 4
= 16 terminal ATA
Content

1. Design for Residential Landed Building

2. Design for Residential High Rise Building

3. Design for Business Building

4. In – Premise Cabling

5. Testing Procedure
In Premise Cabling

Web
cam
Wi-Fi USB
RJ45
Ethernet RJ45 IPTV

STB
RG

RJ45
PC

4 ports
RJ45 IP Phone

Fiber RJ45
BTU
CPE Ethernet Cordless
RJ11 Phone

RJ11
Wireless
Devices
WIFI Notebook WiFi Router WiFi IP Camera
BTU / ONU
RG

Dect Phone IPTV Set Top Box


Utility Box Concept

RG ONU SM Fibre adaptor


ONU RJ45 Output Port
ONU RJ11 Output Port
RG R45 Intput Port
RG RJ45 Output Port
FWS
R45 Port Terminal Input
Utility Box/ ONU
Rack/ RJ11 Port Terminal Inpu
Store room AC Power Socket
Design 1-a : FTB near Utility Box ( Pole Type)
* To be applied only to almost completed premises

Fibre
Hole to DP
lay fibre
RJ11 RJ45
Cat 3

Cat 5
FTB
RJ45 FWS
Drop Cable
ON
U
RJ11 RG Utility
Cat 5 Rack/Box

To be prepared by Developer
1. Infra Supply by TM
ƒ AC power for ONU ( 2 outlet) – min 1 1. Drop cable from FTB to Fibre DP
ƒ AC power at Living Room (RG location) – min 2 2. Fibre Termination Box (FTB)
ƒ Space to locate ONU – min: 400mm(L) X 200mm(H) X 300mm(D) 3. Optical Network Unit (ONU)
ƒ Hole to lay fibre between FTB & Utility Room/Space 4. Residential Gateway (RG) – wifi router
2. Cabling 5. Cat5 & Cat3 for RG & Telephone
ƒ Cat 5 : between ONU & FWS 6. Wireless Dect Phone
ƒ Cat 3 : between ONU & any RJ11 socket 7. Set Top Box (STB) for IPTV Service
3. Socket
ƒ 2 x RJ45 : 1 at ONU location & 1 at living room (RG location)
ƒ 2 x RJ11 : 1 at ONU location & 1 at living room or any other location
(must parallel)
Design 1-b : Empty Pipe Between FTB-Utility Box
* To be applied only to almost completed premises

RJ45
RJ11

Cat 3
Cat 5
• Piping from M/H
Utility up to FTB or Utility
Room FWS Box
RJ45
Cat 3 • With pull rope
ON
U inside
RG
RJ11 Cat 5

Manhole
To be prepared by Developer Piping for fibre
1. Infra Supply by TM
ƒ AC power for ONU ( 2 outlet) – min 1 1. Drop cable from FTB to Fibre DP
ƒ AC power at Living Room (RG location) – min 2 2. Fibre Termination Box (FTB)
ƒ Space to locate ONU – min: 400mm(L) X 200mm(H) X 300mm(D) 3. Optical Network Unit (ONU)
ƒ Piping for Fibre between FTB & Utility Room 4. Residential Gateway (RG) – wifi router
2. Cabling 5. Cat5 & Cat3 for RG & Telephone
ƒ Cat 5 : between ONU & FWS 6. Wireless Dect Phone
ƒ Cat 3 : between ONU & any RJ11 socket 7. Set Top Box (STB) for IPTV Service
3. Socket
ƒ 2 x RJ45 : 1 at ONU location & 1 at living room (RG location)
ƒ 2 x RJ11 : 1 at ONU location & 1 at living room or any other location
(must parallel)
Multi-Terminal Triple Play Design

Design for Multiple 3-Play Services

1. For Future proof cabling system


2. Concept :
a. Utility Box / Room for ONU
b. In Building Cat5 Cabling with multiple termination point
for Data & IPTV services
c. Cat3 Cabling for voice or Cat5 with RJ11 Termination
for voice
Design a : RG & ONU Located at Same Place

G Floor 1st. Floor

TV
2
STB 2

1
STB TV Master Bedroom
2

2 RG
Living Room
1 STB TV
1 ONU
FTB 1 1
Single Mode Fibre

RJ11 Socket ( optional) – paralle


Drop Cable by TM RJ45 Socket ( optional)
Fibre Wall Socket
Design b : RG & ONU Located at Diff. Place
4
STB TV
3
RG G Floor 1st. Floor
2 Living Room
2 TV
4
STB 4

1 Master Bedroom
ONU
1
STB TV
1
Single Mode Fibre FTB 3 3

RJ11 Socket ( optional) – parallel


RJ45 Socket ( optional)
Fibre Wall Socket
Drop Cable by TM
Sample Picture of In-Building Cabling System
Fibre Termination Box (FTB)
Closed View Opened View

SC/UPC
Connector & Adaptor
Fibre Wall Socket (FWS)

Closed Bottom View Opened


View ‐ Inlet Shutter View
Medium Size of FTB

Closed View

Opened View
Medium & Large Capacity of FTB
High Rise Medium Termination

High Rise with Large Termination
FTB for Shop Lots

600 mm
Reserved Internal Cable
Space connect to FWS
For NFP at each unit

600 mm FTB

Closed View

Opened View
Riser FTB
Internal Vertical Cable

Riser FTB Adaptor

Adaptor
for splice

Splicing Tray
Internal Horizontal Cable
Internal Vertical Cable Internal Horizontal Cable

FTTH BTU: Optical Network Unit (ONU)


RJ11 Port RJ45 Port
Single Mode Fibre
Input
Content

1. Design for Residential Landed Building

2. Design for Residential High Rise Building

3. Design for Business Building

4. In – Premise Cabling

5. Testing Procedure
Labeling of Internal Cabling
Front Label Info
Vertical Cable Code_C#core no./Floor/Premise No.
Example:  FV001_C1/10/A‐10‐12

Rear Label Info
FTB Rack No./FTB Sub‐Rack No./FTB Port No.
Example:  Rack 1/1/55

Front Label Info
Vertical Cable Code_C#core no./ Horizontal Cable Code_C#core no.
Example:  FV001_C1/FH010_C12
Rear Label Info
FTB Port No./Premise No.
Example:  Port 1/ A‐10‐12
Testing Procedure: OLTS
SC/UPC Adaptor
SC/UPC Connector

FWS Riser Intermediate Main FTB /


FTB FTB Single FTB OLTS
OLTS

Internal Fibre Measuring Point B
Measuring Point A

No. Propery Type Test Point A Test Point B Max IL


1 Landed Residential ‐ Pole Type In‐Premises FWS FTB Outside The Premises 1.6 dB
2 Landed Residential ‐ U/G Type  In‐Premises FWS TM's Pedestal DP Linked Manhole 2.3 dB
3 Landed Residential ‐ U/G Type  In‐Premises FWS FTB Outside The Premises 1.6dB
4 High Rise > 5 Floor with TR Type In‐Premises FWS FTB at Telecommunication Room(TR) 2.3 dB
5 High Rise < 5 Floor with out TR Type In‐Premises FWS FTB at Common Place 1.6 dB
Testing Procedure : OTDR
SC/UPC Adaptor
SC/UPC Connector

FWS Riser Intermediate Main FTB /


FTB FTB Single FTB OTDR

Internal Fibre Measuring Point 

No. Propery Type Test Point A Test Point B Max IL


1 Landed Residential ‐ Pole Type In‐Premises FWS FTB Outside The Premises 1.6 dB
2 Landed Residential ‐ U/G Type  In‐Premises FWS TM's Pedestal DP Linked Manhole 2.3 dB
3 Landed Residential ‐ U/G Type  In‐Premises FWS FTB Outside The Premises 1.6dB
4 High Rise > 5 Floor with TR Type In‐Premises FWS FTB at Telecommunication Room(TR) 2.3 dB
5 High Rise < 5 Floor with out TR Type In‐Premises FWS FTB at Common Place 1.6 dB
Thank You