CONTRUCTION PROCESS OF

PRECAST CONCRETE STAIRS

1. Mark the perimeter where concrete stair will 2. Cut the stringer into 7890mm length 3. Cut the riser board into 1200mm length, 4. Erect the stringers to the wall by using 5. Use screw and power drills to attach
be construct. and 4290mm height. 165mm height. hanger . each riser board to the stringers.

10. Transfer the concrete into the form using 9. Mix the cement , sand and granular by ratio 8. Pour the granular fill to the ground to act as a 7. Connect it with wire tiles , the top of the 6. Build rebar cage into the form with 23.44 mm
shovel. 1:2:4 into concrete mixer. sub base for the concrete rebar cage is 125 mm in diameter.

11. Use Concrete vibrator to remove air bubble 12. Run a length of string between the stairs around the perimeter 13. Flatten the surface of the concrete using the a screeding tool 14. Brush the concrete by using stiff bristled 15. Use Stanley water level to ensure the staircase
to verify it is aligned properly. which is long wooden plank.
from concrete. push broom to improve traction is flat.

20. Insert the baluster into the bas flange and tighten the
baluster with the correspond set screw.
19. Mark the location of the base flange on the 18. Then, cutting the iron baluster using a 17. Measure and cut the iron baluster 16. Wait for one or two days for the
tread and drill the holes using masonry bit. metal cutter machine.
to the height of 860mm. concrete to dry.

21. Fitting PVC cover between the 22. Install the wooden handrail of 23. Check it all whether it is installed correctly. 24. Putting tiles to the stairs orderly . 25. Let the stairs fully dried and left for
baluster for safety reason. 3445mm long to the baluster. about 28 days