TEE96-54-REV3

Sta 2+347.16
2 Plain End
(bevel typical)

Plain End
26.23 in 26.86 in (bevel typical)
76.3 in

Flow
90.64° FIELD LAMINATED
FROM INSIDE
54.8 in 53.2 in
1.5 in
1 - 96" PIPE WITH
℄ 96" ℄ 96" CUT OUTS FOR 54"
STUBS.
FIELD LAMINATED
76.3 in

(91.01°) FROM INSIDE 2 - 54" STUBS TO


SHIP LOOSE.

26.04 in 27.05 in
1

℄ 96"

20.3 in 21.84 in
Elevation View
Notes:
1. Concrete Encasement or similar (designed by others) is to resist all finished fitting deformations.
2. See HOBAS Tee Base Manhole System Technical Advise Sheets for additional information, on 
similar application.
3. All linear dimensions are +/‐0.50".
PARTS LIST
ITEM QTY PART No. DESCRIPTION
1 1 Solid16 P96-25-0046-FP-FWCE-PE
2 1 Solid39 P54-25-0046-FP-FWCE-PE
3 1 Solid40 P54-25-0046-FP-FWCE-PE
4 1 FWC - 96
Project: Cockburn & Calrossie Contract 5 PART NO.: 1888-01
Winnipeg, MB, Canada
CONTRACTOR: Dibco Underground Ltd.

Description:
HOBAS
Nominal Dia. Pipe 96" (99.5" OD) SN46, PN 25 DRWN. BY REV
Nominal Dia. Lateral 54" (57.1" OD) SN46, PN 25
IZH 3
Angle of Deflection 0°