Sunteți pe pagina 1din 2

SCOPE OF CONTROL & INSTRUMENTATION FOR MECHANICAL

PACKAGES
Rev :P0
PROJECT : POWDER PLANT & ASSOCIATED RAW MATERIAL
FACILITIES OF PHWR FUEL FABRICATION FACILITY
PACKAGE / ITEM : TILTING AND DRUM TRANSFER SYSTEM Sheet:1 of 2

ATTACHMENT-2
Notes: 1) TPL’ Scope shall be indicated as ’T’, End Client’ Scope shall be indicated as ’C’ and Vendor/Bidder scope
shall be indicated as ‘V’, “

Scope
Inputs Super Commiss Remarks
for Design vision ioning
Sl.No. Description design & of
Supply Erection
& Engg. Com
Engg. miss
ioning
1 Field Instruments. including the V V V V V V
erection hardware and
mounting accessories

2 Field Junction Boxes and Local V V V V V V


Control Panel (if required)
3 Cables and Cable Tray
3.1 Field Instruments/Valves to V V V V V V
Junction Box/ Local Control
Panel
3.2 Junction Box to Control System V C C C V C
3.3 MCC to Marshalling cabinet of T T T T T T
control system
3.4 Power distribution along with V V V V V V
cables to bidder supplied
equipment
3.5 Branch Cable tray/conduit with V V V V V V
supports for all C&I cables
supplied by bidders
4 Control System V C C C V/T C Vendor to provide
necessary inputs for
control system
5 UPS and UPS DB V C C C C C Input requirement shall
be specified by Vendor
6 Mandatory Spares V V V - - -
7. Recommended Spares V V V - - -
8. Start up and Commissioning V V V - - -
Spares
9. Preparation of Operation and V V V V V V
Control Philosophy, Logics

10. Cable routing drawing as V V V V V V


applicable

11. Interconnection cable schedule V V V V V V


and Cable Schedule (in
Purchaser Format)

Engineering Group: Projects Group:


PRPD CHKD RVWD APPD REVIEWED APPROVED
DE LE EPEE PE HEAD-ENGG
Sign Sign
Name Name
Designation Designation
Date Date
Std Format No. Provisional No.21 Rev P0 Dt
SCOPE OF CONTROL & INSTRUMENTATION FOR MECHANICAL
PACKAGES
Rev :P0
PROJECT : POWDER PLANT & ASSOCIATED RAW MATERIAL
FACILITIES OF PHWR FUEL FABRICATION FACILITY
PACKAGE / ITEM : TILTING AND DRUM TRANSFER SYSTEM Sheet:2 of 2

ATTACHMENT-2
Notes: 1) TPL’ Scope shall be indicated as ’T’, End Client’ Scope shall be indicated as ’C’ and Vendor/Bidder scope
shall be indicated as ‘V’, “

Scope
Inputs Super Commiss Remarks
for Design vision ioning
Sl.No. Description design & of
Supply Erection
& Engg. Com
Engg. miss
ioning
12. Datasheets and other V V V V V V
documents related to Field
Instruments, Control Valves,
Analyzers etc.

13. All Engineering and As-built V V V V V V


Documents pertaining to bidder
scope

14. Statutory approval if any V V V V V V


required for E&I equipment

Engineering Group: Projects Group:


PRPD CHKD RVWD APPD REVIEWED APPROVED
DE LE EPEE PE HEAD-ENGG
Sign Sign
Name Name
Designation Designation
Date Date
Std Format No. Provisional No.21 Rev P0 Dt

S-ar putea să vă placă și