Documente Academic
Documente Profesional
Documente Cultură
PACKAGES
Rev :P0
PROJECT : POWDER PLANT & ASSOCIATED RAW MATERIAL
FACILITIES OF PHWR FUEL FABRICATION FACILITY
PACKAGE / ITEM : TILTING AND DRUM TRANSFER SYSTEM Sheet:1 of 2
ATTACHMENT-2
Notes: 1) TPL’ Scope shall be indicated as ’T’, End Client’ Scope shall be indicated as ’C’ and Vendor/Bidder scope
shall be indicated as ‘V’, “
Scope
Inputs Super Commiss Remarks
for Design vision ioning
Sl.No. Description design & of
Supply Erection
& Engg. Com
Engg. miss
ioning
1 Field Instruments. including the V V V V V V
erection hardware and
mounting accessories
ATTACHMENT-2
Notes: 1) TPL’ Scope shall be indicated as ’T’, End Client’ Scope shall be indicated as ’C’ and Vendor/Bidder scope
shall be indicated as ‘V’, “
Scope
Inputs Super Commiss Remarks
for Design vision ioning
Sl.No. Description design & of
Supply Erection
& Engg. Com
Engg. miss
ioning
12. Datasheets and other V V V V V V
documents related to Field
Instruments, Control Valves,
Analyzers etc.