21 1/4" 2K PSI Cameron Stack For STATOIL Exploration Wells

RIG 284.
Important Notes:

Bottom of Rotary Beam


6.28 meters

Bottom of BOP Hoist Beam


5.70 meters

3.19 meter

Height of stack above GL Stack heights

Hydril 21 1/4" 2K
3.09 meter Type "GK"
1.15 meter

21 1/4" 2M
21 1/4" 2M 4.15 meter 5.59 meter

7 1/4" 5M
Drilling Spool
with outlet

1.5 meter
Rig Sub 1.44 3.0 meter Rig Sub
structure 21 1/4" 2M structure
meter
36" 21 1/4" 2M 36"
0.92 m 2.5 meter 1.5 meter 0.92 m
3.0 meter 3.0 meter
2.0
meter
Adapter Spool

Cellar
3.44 meter depth: 20 3/4" 3M
3.0 meter 2.5 meter Centraliser DSA 0.2 meter

Section A
0.94 meter

0.3 meter
0.3 meter
30" conductor Cut off 0.3m

Data Cellar depth: -2.5 Meters


30" conductor -2.20 0.30
Section A -1.26 0.94
Casing centraliser -1.06 0.20
Adapter spool 0.44 1.50
Drilling spool with outlet 1.94 1.50
Annular 3.09 1.15
Bell Nipple 6.28 3.19

METERS BELOW THE CONCRETE PAD

Details and diamensions to be re-affirmed by Nabors Drilling

This above drawing is for initial viewing only and will be subject to change according to requirement of client requests
13 5/8" 5K PSI Cameron Stack
RIG F - 21
Important Notes:
Drilling phase: 8 1/2" & 6"
Bottom of Rotary Beam
meters

4.21 m
Bottom of BOP Hoist Beam
meters

m
Height of stack above GL
6.34 meters Σ = 9.3 m

Hydril 13 5/8" 5K 1.37 m


Type "GK"
#1 - manual kill 3 1/8"
#2 - HCR kill 3 1/8" #4 - manual choke
#3 - check valve 4 1/16"
#5 - HCR choke
Pipe Rams 4 1/16"
Type U - 10M
1.47 m
Blind Rams
Type U - 10M

kill line 2 1 Mud Cross 4 5 Choke Line 4 1/16" x 3" - 10K


32
3
0.58 m
13 5/8" - 5 K
1.38 m Rig Sub Rig Sub 1.38 m
structure Section D structure
58" 13 5/8" - 5 K 0.73 m 58"
1.38 m 11" x 13 5/8" - 5 K 1.38 m
adapter 0.15 m
11" - 5 K

Section C 0.67 m
0.71 m
13 5/8" - 5 K
13 5/8" - 5 K
1.3 m
Section B 0.73 m

Sonatrach equipment 20 3/4" - 3 K


Nabors equipment 20 3/4" - 3 K
Section A 0.62 m

0. m
30" conductor Cut off 0.3 m
Data Cellar Depth: -2.5 Meters

30" conductor -2.20 0.30


Section A -1.26 0.94
Section B -0.64 0.62
Section C (Clamp means clamped and flanged connection at the same time) 0.14 0.78
Drilling Adapter (13 5/8"-10K Clamp x 13 5/8 Flanged-10K) 0.62 0.48
Spacer Spool 1.20 0.58 0.89
Lower Pipe Rams 2.06 0.86
Mud Cross 2.76 0.70
Double Ram 4.44 1.68
DSA (13 5/8" 10K x 13 5/8" 5K) 4.64 0.20
Annular 6.06 1.42

METERS BELOW THE CONCRETE PAD

Details and dimensions to be re-affirmed by Nabors Drilling

This above drawing is for initial viewing only and will be subject to change according to requirement of client requests
requests
13 5/8" 5K PSI Cameron Stack
RIG F - 21
Important Notes:
Drilling phase: 16" & 12 1/4"

Bottom of Rotary Beam


meters

4.3 m
Bottom of BOP Hoist Beam
meters

m
Height of stack above GL
6.25 meters Σ = 9.3 m

Hydril 13 5/8" 5K 1.37 m


Type "GK"
#1 - manual kill 3 1/8"
#2 - HCR kill 3 1/8" #4 - manual choke
#3 - check valve 4 1/16"
#5 - HCR choke
Pipe Rams 4 1/16"
Type U - 10M
1.47 m
Blind Rams
Type U - 10M

kill line 2 1 Mud Cross 4 5 Choke Line 4 1/16" x 3" - 10K


32
3
0.58 m
13 5/8" - 5 K
1.38 m Rig Sub Rig Sub 1.38 m
structure Section D structure
58" 0.73 m 58"
13 5/8" - 5 K
1.38 m 1.38 m
13 5/8" - 5 K

Section C 0.73 m
0.71 m
13 5/8" - 5 K
13 5/8" - 5 K
1.3 m
Section B 0.73 m

Sonatrach equipment 20 3/4" - 3 K


Nabors equipment 20 3/4" - 3 K
Section A 0.62 m

0. m
30" conductor Cut off 0.3 m
Data Cellar Depth: -2.5 Meters

30" conductor -2.20 0.30


Section A -1.26 0.94
Section B -0.64 0.62
Section C (Clamp means clamped and flanged connection at the same time) 0.14 0.78
Drilling Adapter (13 5/8"-10K Clamp x 13 5/8 Flanged-10K) 0.62 0.48
Spacer Spool 1.20 0.58 0.89
Lower Pipe Rams 2.06 0.86
Mud Cross 2.76 0.70
Double Ram 4.44 1.68
DSA (13 5/8" 10K x 13 5/8" 5K) 4.64 0.20
Annular 6.06 1.42

METERS BELOW THE CONCRETE PAD

Details and dimensions to be re-affirmed by Nabors Drilling

This above drawing is for initial viewing only and will be subject to change according to requirement of client requests
13 5/8" 5K PSI Cameron Stack
RIG F - 21
Important Notes:

Bottom of Rotary Beam


meters

4.3 m
Bottom of BOP Hoist Beam
meters

Hydril 13 5/8" 5K 1.52 m


Height of stack above GL Type "GK"

Pipe Rams
Type U - 10M
1.44 m
Blind Rams
Type U - 10M total - 9.3 m

kill line Mud Cross Choke Line CoFlexip 7" Dia.

0.6 m
Clamp 13 5/8 10K
Rig Sub Rig Sub
Section D
structure structure
36" 0.72 m 36"
1.38 m 13 5/8"-5K 1.38 m
Clamp 13 5/8 10K

Section C
0.72 m
13 5/8"-5K
13 5/8"-5K

Section B 0. m

20 3/4"-3K
20 3/4"-3K
Section A
0. m

0. m
30" conductor Cut off 0.3m
Data Cellar Depth: -2.5 Meters

30" conductor -2.20 0.30


Section A -1.26 0.94
Section B -0.64 0.62
Section C (Flamp means clamped and flanged connection at the same time) 0.14 0.78
Drilling Adapter (13 5/8"-10K Clamp x 13 5/8 Flanged-10K) 0.62 0.48
Spacer Spool 1.20 0.58 0.89
Lower Pipe Rams 2.06 0.86
Mud Cross 2.76 0.70
Double Ram 4.44 1.68
DSA (13 5/8" 10K x 13 5/8" 5K) 4.64 0.20
Annular 6.06 1.42

METERS BELOW THE CONCRETE PAD

Details and diamensions to be re-affirmed by Nabors Drilling

This above drawing is for initial viewing only and will be subject to change according to requirement of client requests