Sunteți pe pagina 1din 1

1 2 3 4 5 6 7 8

PART MATERIAL DESCRIPTION SIZE ITEM CODE QTY. SPEC


No

FABRICATION MATERIALS
N
1 Threaded flange, CL150, 25 FACAHABZZAADABQZZUS 2 B10
Raised-face flanged end,
ASME-B16.5, A105, Galvanised
A PIPE SUPPORTS A
2 Design Pipe Assembly 25 DesignPipeH_5 10 B10
ERECTION MATERIALS
3 Pipe, MTE, Galvanized, 25 PAAZZBNAEABAABOAAZZUS 17.6 M
ASME-B36.10M, A53-B, Seamless,
S-40
4 Coupling, Female threaded end, 25 MAKAWBUAEAAGABQZZUS 2 B10
Galvanized,ASME-B16.11, A105,
CL 3000
5 45 degree elbow, Female 25 MBWAWBUAEAAGABQZZUS 2 B10
threaded end,
Galvanized,ASME-B16.11, A105,
CL 3000 SEE SHT
11PCB58BR001 SHT 01
6 90 degree elbow, Female 25 MCKAWBUAEAAGABQZZUS 2 B10 E 383450
threaded end, N 287405
Galvanized,ASME-B16.11, A105, S2 EL -595
B CL 3000
<7> 3 27 11PCB58BQ008 B
8
7 Spiral wound, CL150, 4.5mm, 25 GMAHAOAABFMUS 2 B10 158 6 66
ASME-B16.20, SS316 (Asbestos EL +199
Free) 5 FOR FIN TUBE WASHIING UNIT #11
68 00 DN
8 Stud Bolt, ASME-B18.2.1, ASTM 1/2 BAZZZZZZAAYBFZZZUS 8 B10
127 27 E 371159 20 25
F1 G7 B8 173 N 295349
A193-B7, hot dip galvanized, With 2 5
85

<6> 3
EL +199 1
heavy Hex nuts A194 Gr.2H and 1
194 S2 S2
2 washers - 75 mm Length 00

741
SCREWED END 11PCB58BQ001 20 11PCB58BQ010

795
9 Globe valve, CL150, Raised 25 VALAHBUAEAAFABQZZZZUS 1 B10
Face Flange end, Galvanized, <8> 3 S2 S2 S2
11PCB58BQ014 11PCB58BQ006 5
ASME-B16.10, A105 25DN 27 <5
> 72 11PCB58BQ012
3 S2
F1 G7 B8 16 11PCB58BQ007 0 S2
10 7542 84
27 35 11PCB58BQ015
739 1339 52 25
45.0° 1593 1342 1333 1087 16
6 26 16
13 15
C 36 25 3 C
9 <2> <1> 3
STEM UP 4
11PCB58AA001 4 <3> 3 S2 5
<4> 3 11PCB58BQ017
5 S2
11PCB58BQ018
16

53
31 34
53

D D

E E
8 194 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS
7 330 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS
6 741 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS OWNER
5 2571 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS
4 3671 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS DISTRIBUTION W/C
3 3814 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS MATRIX
2 840 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS
1 5393 25 SCREWED SCREWED PAAZZBNAEABAABOAAZZUS NOTES:- EPC
PIECE
NO
LENGTH
MM
SIZE
MM
END PREP END PREP ITEM CODE
1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
2. FINISHED GROUND LEVEL (FGL) OF PLANT IS (-)0.300 WHICH
CORRESPONDS TO MSL (+)8.50M
PESCO
3. FOR PAINTING & SURFACE PREPARATION DETAILS REFER "TECHNICAL
SPECIFICATION FOR PAITING" DOC NO. TCE.11191A-SP-3903 MAIN PLANT EQUIPMENT SUPPLIER
4. FOR INSULATION DETAILS REFER "TECHNICAL SPECIFICATION FOR
INSULATION" DOC NO. TCE.11191A-SP-3902
5. ALL ELEVATIONS INDICATED ARE CENTER LINE OF PIPES UNLESS
OTHERWISE NOTED. PROJECT NAME
6. SMALL BORE PIPING (DN 50 & BELOW) ARE FIELD RUN. ISOMETRICS
ISSUED FOR THE SAME IS INDICATIVE AND MAY BE ADJUSTED TO SUIT ADEN POWER PLANT - PHASE 1
F SITE CONDITIONS. F
7. FOR SUPPORT ARRANGEMENT, REFER TYPICAL STANDARD SKETCH
DRAWING - TCE.11191A-D-4909 DRAWING TITLE ISOMETRICS FOR RAW WATER AND SERVICE
8. VICTAULIC PIPE FITTINGS SHALL NOT REST ON SUPPORTS AND SHALL
R0
WATER DISTRIBUTION SYSTEM
HAVE AMPLE CLEARANCE FROM SUPPORT.
11PCB58BR001 02 of 02
P&ID NO. ENGINEERING JOB No. DRAWING NUMBER REV
PIPING LAYOUT DRAWING NO. No. DATE REVISION DESCRIPTION BY CHK APPR Civil Mech Elect I/C PIP HSE PROS
11191A TCE.11191A-D-4916 R0
FILE NAME 11PCB58BR001.SHA DATE : DESIGNED : DRAWN : CHEF ENGR : TATA CONSULTING ENGINEERS LIMITED