AEC Infrastucture Services

Bill of Quantity for Preparation of Design & Drawings including all type of Field Work for EPC Project in Tripura state
Name Consultant:
Address & Contact No.:
PAN & GSTIN No.:

Work Rate Instruments/Softwar


S. No Type of Work Unit Quantity Rate (INR) Amount (INR)
(km/day) e to be used

Detailed Topographical Survey of the Road


including all features within with ROW (45m for
Urban & 60m for Rural & as per required for
1 realignment stretches).
(As per IRC & MoRTH specifications & standard
practice)

a) DGPS Survey with Pillaring @5km Km -


b) Traversing with TBM Pillaring @200m Km -
c) Detailed Survey with CS @10m within required
ROW with Detailed Survey Drawings. Km -

d) Utility Survey (Electric Pole, Telephone Poll,


Houses, Well, TW, HT lines, Water Pipes, Drains Km -
etc.) and Utility Drawings

2 Traffic Survey work with Traffic Report


a) CTVC for 7 Days @24 hours No. -
b) Turning Moment Survey for 1 Day @24 hours No. -
c) OD Survey for 1 Day @24 hours No. -
d) Axle Load Survey with double axle for 2 Days No. -
@24 hours
e) Traffic Report as per requirements No. -
3 Pavement Investigation Survey
a) Trail Pit @500m interval zigzag side of 1mx1m
size (50% on CW & 50% on shoulder) of required No. -
depth as per site conditions

b) Lab Test of Trail Pit materials of 50% sample for


determination LL,PL, MC, CBR ets as per No. -
IRC/MoRTH specifications & site requirements

BBD Test with Report as per IRC/MoRTH


4
specifications & standard practice
a) BBD Test. -
5 Inventory & Condition Survey with Report
a) Inventory & Condition Survey of Road & Road
Km -
side details with proper photographs
b) Inventory & Condition Survey of Culverts with
No. -
proper photographs
c) Inventory & Condition Survey of Bridges with
proper photographs No. -

Geo-Technical Survey of Bridges & other Structures


6 with Report included the recommendations of
foundations
a) For Determination of Safe Bearing Capacity at
depth 1.5m,3.0m & 6.0m No. -

b) For determination of Capacity of Pile up to 30m


No. -
depth
Preparation of Design work including Detailed
7
Drawings

a) Highway Design (vertical & Horizontal Curve


Report) & Drawings including Location Map, Km -
Google Plan, Plan & Profiles, Typical Cross Sections,
Detailed Cross Sections etc & BOQ.

b) Other Drawings like Junctions, Road Marking &


Km -
Traffic Signs, Drains etc.
AEC Infrastucture Services

Bill of Quantity for Preparation of Design & Drawings including all type of Field Work for EPC Project in Tripura state
Name Consultant:
Address & Contact No.:
PAN & GSTIN No.:

Work Rate Instruments/Softwar


S. No Type of Work Unit Quantity Rate (INR) Amount (INR)
(km/day) e to be used
c) GAD & Detailed Drawings (with Reinforcement
No. -
drawings) of Culverts including BOQ & BBS.
d) GAD & Detailed Drawings (with Reinforcement
drawings) of Bridges including BOQ & BBS. No. -

d) GAD & Detailed Drawings (with Reinforcement


drawings) of other Structures (Return Wall, Breast m -
Wall etc) including BOQ & BBS.
Total (INR): -

Note:
1. Rate as mentioned at BOQ is tentative and may change subject to the location/condition of the road
2. All Field Data & Design Drawings should be clarified by Contractor/Authority/Engineer in Charge

(Name & Sign of Authorised Signatory)