Sunteți pe pagina 1din 124

RESUMEN PLANILLA DE METRADOS

OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA -
AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

PARTIDA DESCRIPCION UND. METRADO


01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA 3.60 x 2.40 m BANNER und 2.00
01.01.02 CASETA DE GUARDIANIA Y ALMACEN PROVISIONAL PARA LA OBRA m2 30.00
1.02 SEGURIDAD Y SALUD EN OBRA
01.02.01 ELABORACION, IMPLENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRA glb 1.00
01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL mes 3.00
01.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD TEMPORAL glb 1.00
01.02.04 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00
01.02.05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRAB glb 1.00
´02 TRANSITABILIDAD VEHICULAR Y PEATONAL
02.01 PAVIMENTO ADOQUIN DE CONCRETO
02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 LIMPIEZA Y DEFORESTACION ha 0.21
02.01.01.02 TRAZO NIVELACION Y REPLANTEO km 3.39
02.01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS (CARRETERAS) glb 3,155.0
02.01.02 DEMOLICIONES, REMOCIONES Y RETIROS
02.01.02.01 DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLE m3 5.68
02.01.02.02 DEMOLICION DE ELEMENTOS DE CONCRETO ARMADO m3 3.31
02.01.02.03 DEMOLICION DE ELEMENTOS DE MAMPOSTERIA DE PIEDRA m3 7.13
02.01.02.04 DEMOLICION DE ELEMENTOS PIRCADOS EN PIEDRA m3 136.86
02.01.02.05 RETIRO DE ARBOLES und 13.00
02.01.02.06 REUBICACION DE POSTES DE ALUMBRADO und 7.00
02.01.02.07 REUBICACION CERCO DE CALAMINA m2 73.88
02.01.02.08 ELIMINACION DE DESMONTES m3 191.23
02.01.03 EXPLANACIONES
02.01.03.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 12,592.07
02.01.03.02 CORTE DE PLATAFORMA EN ROCA SUELTA CON EXPLOSIVOS m3 19,062.23
02.01.03.03 CORTE DE PLATAFORMA EN ROCA FIJA CON EXPLOSIVOS m3 4,669.20
02.01.03.04 RELLENO CON MATERIAL PROPIO DE CORTE m3 16,813.27
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP m2 23,299.80
02.01.03.06 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 19,510.24
02.01.04 PAVIMENTO
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA m3 3,645.53
02.01.04.02 MATERIAL CHANCADO PARA BASE PUESTO EN OBRA m3 911.38
02.01.04.03 BASE GRANULAR E=0.20 m m2 22,647.83
02.01.04.04 CAMA DE ARENA H=4.00 cm, m2 22,647.83
02.01.04.05 ACARREO INTERNO DE ADOQUINES und 1,132,391.50
02.01.04.06 ADOQUINES DE CONCRETO H=0.06 m, f'c=420 kg/cm2 m2 22,647.83
02.01.04.07 SELLADO Y COMPACTACION ADOQUIN DE CONCRETO m2 22,647.83
02.01.04.08 SARDINEL SUMERGIDO 0.15 x 0.35m. f´c=175 kg/cm2 m 3,382.05
02.01.05 SEÑALIZACION Y SEGURIDAD VIAL
02.01.05.01 PINTADO DE MARCAS PAVIMEMTO (LÍNEA DISCONTINUA e=0.125 m.) m 3,224.20
02.01.05.02 PINTADO DE MARCAS PAVIMEMTO (LÍNEA CONTINUA e=0.125 m.) m 6,774.40
02.01.05.03 PINTADO DE SIMBOLO LETRAS Y ZONAL m2 65.94
02.01.05.04 SEÑALES REGLAMENTARIA 60 X 90 cm. und 2.00
02.01.05.05 SEÑALES PREVENTIVAS Y REGLAMENTARIAS 60 X 60 cm. und 35.00
02.01.05.06 POSTES KILOMETRICOS und 3.00
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA m2 5,466.94
02.02.01.02 LIMPIEZA DEL TERRENO MANUAL m2 5,466.94
02.02.02 PAVIMENTO DE CICLOVIA
02.02.02.01 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP m2 5,466.94
02.02.02.02 BASE GRANULAR E=0.15 m C/EQUIPO EN CICLOVIA m2 5,466.94
02.02.02.03 IMPRIMACION ASFALTICA MC-30 m2 4,911.30
02.02.02.04 CARPETA ASFALTICA EN FRIO (e=0.05 m) m2 4,911.30
02.02.03 CONCRETO SIMPLE
02.02.03.01 SARDINEL BURBUJA f'c= 175 kg/cm2 m 3,135.75
02.02.03.02 SARDINEL SUMERGIDO 0.15 x 0.35m. f´c=175 kg/cm2 m 183.30
02.03 VEREDAS, GRADAS, RAMPAS Y MARTILLOS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA m2 4,781.24
02.03.01.02 LIMPIEZA DEL TERRENO MANUAL m2 4,781.24
02.03.02 CONCRETO SIMPLE
02.03.02.01 CONCRETO EN VEREDAS, RAMPAS PEATONALES f'c=175 kg/cm2, x 9cm, Pulido 1:2 x 1cm, INC/B m2 3,956.88
RESUMEN PLANILLA DE METRADOS

OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA -
AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

PARTIDA DESCRIPCION UND. METRADO


02.03.02.02 CONCRETO SIMPLE f'c= 175 kg/cm2 EN GRADAS SOBRE TERRENO NATURAL m3 17.44
02.03.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS SOBRE TERRENO m2 9.84
02.03.03 VARIOS
02.03.03.01 JUNTAS ASFALTICAS m 1,336.80
02.03.03.02 BRUÑAS DE 1 x 1 cm. m 10,691.20
03 MUROS DE CONTENCION
03.01 OBRAS PRELIMINARES
03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA m2 1,368.08
03.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1,368.08
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 470.64
02.01.03.01 CORTE DE PLATAFORMA EN ROCA SUELTA CON EXPLOSIVOS m3 670.27
02.01.03.02 CORTE DE PLATAFORMA EN ROCA FIJA CON EXPLOSIVOS m3 470.29
02.01.03.04 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO MANUAL m3 371.57
02.01.03.06 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 123.83
03.02 CONCRETO SIMPLE
03.02.01 CONCRETO SOLADO h = 4" ; 1:12 ; C:H m2 206.47
´03.03 MUROS DE MAMPOSTERIA DE PIEDRA
03.03.01 MUROS EN MAMPOSTERIA DE PIEDRA m3 2,108.42
03.04 CONCRETO ARMADO
03.04.01 MUROS DE CONTENCION
03.04.01.01 CONCRETO f'c=210 kg/cm2 EN MUROS DE CONTENCION m3 186.81
03.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION m2 612.41
03.04.01.03 ACERO DE REFUERZO f'y=4200 kg/cm2 EN MUROS DE CONTENCION kg 15,829.93
´03.05 VARIOS
03.05.01 JUNTAS DE DILATACION E=1" m2 20.69
04.00. OBRAS DE DRENAJE E HIDRAULICA
4.01 OBRAS PRELIMINARES
04.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA m2 251.55
04.01.02 LIMPIEZA DEL TERRENO MANUAL m2 251.55
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 181.16
04.02.02 EXAVACION A MANO EN ROCA SUELTA m3 89.05
04.02.03 EXCAVACION EN ROCA FIJA m3 46.44
04.02.04 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO MANUAL m3 149.83
04.02.05 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 39.17
4.03 ALCANTARILLA TIPO MARCO
04.03.01 CONCRETO f'c=210 kg/cm2 EN ALCANTARILLA m3 35.95
04.03.02 ENCOFRADO Y DESENCOFRADO EN ALCANTARILLA m2 254.19
04.03.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN ALCANTARILLA kg 2,023.65
04.03.04 MAMPOSTERIA DE PIEDRA ALCANTARILLAS m3
4.04 PASES DE AGUA TIPO MARCO
04.03.01 CONCRETO f'c=210 kg/cm2 EN CANALES m3 72.30
04.03.02 ENCOFRADO Y DESENCOFRADO EN CANAL m2 458.31
04.03.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN CANAL kg 3,535.17
4.04 CANAL DE CONCRETO ARMADO TIPO MARCO
04.04.01 CONCRETO f'c=210 kg/cm2 EN CANALES m3 47.85
04.04.02 ENCOFRADO Y DESENCOFRADO EN CANAL m2 307.54
04.04.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN CANAL kg 2,041.27
4.05 CANAL DE MAMPOSTERIA DE PIEDRA
04.05.01 MAMPOSTERIA DE PIEDRA CANALES m3 49.50
4.06 CUNETAS
04.06.01 CUNETA REVESTIDA DE PIEDRA m2 3,071.28
05 AFECTACION DE TERRENOS DE TERCEROS
4.01 OBRAS PRELIMINARES
04.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA m2 1,342.64
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 40.76
04.02.05 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 50.95
´03.03 MUROS DE MAMPOSTERIA DE PIEDRA
03.03.01 MUROS EN MAMPOSTERIA DE PIEDRA m3 152.83
4.02 VIAS DE ACCESO A VIVIENDAS
04.02.01 ACCESO A VIVIENDA (RAMPA COMPACTADA) A=3.50 M. m 354.50
4.02 VARIOS
04.02.01 REUNIONES Y TRAMITES CON PROPIETARIOS DE VIVIENDAS AFECTADAS est 1.00
06 CONSERVACION DEL MEDIO AMBIENTE
06.01 CAPACITACION A LA POBLACION glb 4.00
RESUMEN PLANILLA DE METRADOS

OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA -
AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

PARTIDA DESCRIPCION UND. METRADO


06.02 CONFORMACION DE BOTADERO m2 500.00
06.03 REMOCION DE SUELO CONTAMINADO PARQUE DE MAQUINAS m2 225.00
06.04 IMPLEMENTACION PLAN DE MANEJO AMBIENTAL glb 1.00
06.05 RIEGO Y CONTROL DE POLVOS mes 4.00
01.01 OBRAS PROVISIONALES

01.01.01 CARTEL DE OBRA 3.60 x 2.40 m BANNER


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

DIMENSIONES Nº DE
DESCRIPCIÓN UBICACIÓN KM.
LETRERO LETREROS
Lugar estratégico en el ingreso a Vía 0+000 3.60 X 2.40 M. 2.00
2.00

01.01.02 CASETA DE GUARDIANIA Y ALMACEN PROVISIONAL PARA LA OBRA


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA TECHADA
Nº DE
DESCRIPCIÓN UBICACIÓN KM. CAMPAMENTO
CAMPAMENTOS
M2

Oficinas, Almacen, Casetas y otros 1+880 30.00 30.00


30.00
01.02 SEGURIDAD Y SALUD EN OBRA

MUNICIPALIDAD DISTRITAL DE SOCABAYA

OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

Dimensiones
Ítem Descripción # de veces Largo Ancho Altura Parcial Total Unidad
M M M
1.02 SEGURIDAD Y SALUD EN OBRA

ELABORACION, IMPLENTACION Y ADMINISTRACION DEL


01.02.01 1 1.00 - - 1.00 1.00 glb
PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL 1 1.00 - - 1.00 1.00 glb

01.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD TEMPORAL 1 3.00 - - 3.00 3.00 mes

01.02.04 CAPACITACION EN SEGURIDAD Y SALUD 1 1.00 - - 1.00 1.00 glb

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN


01.02.05
SEGURIDAD Y SALUD DURANTE EL TRABAJO
1 1.00 - - 1.00 1.00 glb
TRANSITABILIDAD VEHICULAR Y PEATONAL

02.01 PAVIMENTO ADOQUIN DE CONCRETO


02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 LIMPIEZA Y DEFORESTACION
MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
OBRA :
PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

LONGITUD ANCHO TOTAL


DESCRIPCION INICIO FINAL
m m m2
arboles 0 + 010 0 + 020 10.00 1.00 10.00
arboles 0 + 290 0 + 300 10.00 1.00 10.00
arboles 0 + 480 0 + 490 10.00 1.00 10.00
arboles 0 + 517 0 + 527 10.20 1.00 10.20
arboles 0 + 620 0 + 650 30.00 4.00 120.00
arboles 0 + 650 0 + 660 10.00 2.00 20.00
arboles 0 + 660 0 + 670 10.00 1.00 10.00
arboles 0 + 740 0 + 800 60.00 1.00 60.00
arboles 0 + 780 0 + 790 10.00 1.00 10.00
arboles 0 + 820 0 + 830 10.00 1.00 10.00
arboles 0 + 860 0 + 870 10.00 2.00 20.00
arboles 0 + 890 0 + 925 35.00 2.00 70.00
arboles 0 + 910 0 + 936 26.00 2.00 52.00
arboles 0 + 940 0 + 960 20.00 1.00 20.00
arboles 0 + 960 0 + 980 20.00 1.00 20.00
arboles 0 + 960 1 + 200 240.00 1.00 240.00
pircados de piedra 0 + 518 0 + 545 27.00 2.00 54.00
pircados de piedra 0 + 660 0 + 690 30.00 3.00 90.00
pircados de piedra 0 + 730 0 + 820 90.00 4.00 360.00
pircados de piedra 0 + 925 0 + 940 15.00 5.00 75.00
pircados de piedra 0 + 940 1 + 040 100.00 6.00 600.00

PROG.2+760 arbol 0.00 2.00 0.00


PROG 2+740 a 2+790 pirca 2 + 740 2 + 790 50.00 1.00 50.00
PROG.2+800 A 2+840 pirca 2 + 800 2 + 840 40.00 1.00 40.00
PROG 2+910 a 2+960 pirca 2 + 910 2 + 960 50.00 1.00 50.00
PROG 2+960 a 3+000 pirca 2 + 960 3 + 000 40.00 1.00 40.00
PROG.3+000 a 3+040 pirca 3 + 000 3 + 040 40.00 1.00 40.00
PROG 2+910 a 2+960 pirca 2 + 910 2 + 960 50.00 1.00 50.00
TOTAL Ha : 0.21

02.01.01.02 TRAZO NIVELACION Y REPLANTEO


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

TOTAL
ITEM ACTIVIDAD INICIO FINAL
km.

Trazo Nivelación y Replanteo permanente de carretera y ciclovía. 0 + 000 3 + 387 3.39

TOTAL Km : 3.39
02.01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS (CARRETERAS)
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

MAQUINARIA TRANSPORTADA POR SUS PROPIOS MEDIOS

Costo Hora Total Costo total


Equipo
S/. hrs S/.
01 Cisterna 4 x 2 (Agua) 122 HP, 2,000 gls. 90.00 1.00 90.00
01 Camion Imprimador 210 HP, 1,800 gls 95.00 1.00 95.00
03 Camión Volquete 350-400 HP, 15 M3. 115.00 3.00 345.00
5.00 530.00

MAQUINARIA TRANSPORTADA POR PLATAFORMA 4 x 2, 300 HP, 19 TN

Equipo Costo Hora Total hrs Costo total


Plataforma Plataf. Plataf.
01 Tractores Sobre Oruga 140 - 160 HP 250.00 1.50 375.00
01 Cargadores Sobre Llantas 125 - 155 HP, 3.0 Yd3 250.00 1.50 375.00
01 Motoniveladora 125 HP 250.00 1.50 375.00
01 Rodillo Liso Vibratorio Autopopulsado 70 - 100 HP, 7 - 9 Tm. 250.00 1.50 375.00
01 Rodillo Neumatico Autopopuldado 81 - 100 HP., 5.5 - 20 Tm. 250.00 1.50 375.00
01 Rodillo Tandem Autopopulsado 111 - 130 HP., 9 - 11 Tm. 250.00 1.50 375.00
01 Pavimentadora sobre Oruga 69 HP., 10 Pulg. 250.00 1.50 375.00
10.50 2,625.00

TOTAL Glb. : 1.00 3,155.00


DEMOLICIONES, REMOCIONES Y RETIROS

02.01.02.01DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLE


OBRA MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA -
META FISICA: AREQUIPA
0+000 @ - 3+387
AREQUIPA

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
Nº VECES (M3)
LONGITUD ANCHO ALTURA
DCS-1 0+010.00 Muro de concreto simple 1.00 7.80 0.47 0.65 2.38 2.38
Muros de canal 2.00 13.77 0.40 0.20 2.20
DCS-2 1+842.00 3.30
Piso de canal 1.00 13.77 0.40 0.20 1.10
TOTAL : 5.68

02.01.02.02 DEMOLICION DE ELEMENTOS DE CONCRETO ARMADO


META FISICA: 0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
(M3)
Nº VECES LONGITUD ANCHO ALTURA
0+490.00 Columna vivienda 1.00 0.33 0.33 3.50 0.37 0.37
DCA-1
0+490.00 Muro de contencion 1.00 5.70 0.20 1.50 1.71 1.71
DCA-2 1+846.00 Tapa Alcantarilla de C. A. 1.00 Area 8.23 0.15 1.23 1.23
TOTAL : 3.31

01.02.04 DEMOLICION DE MURO DE SILLAR


META FISICA: 0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
(M3)
Nº VECES LONGITUD ANCHO ALTURA
DMS-1 0+490.00 Muro de sillar cerco 1 5.70 0.20 1.40 1.60 1.60
DMS-2 0+540.00 Muro de sillar 1 19.16 0.40 1.75 13.41 13.41
DMP-6 1+645.00 Alcantarilla Mamposteria de P. 1 2.74 0.30 1.20 0.99 0.99
TOTAL : 15.99

02.01.02.03 DEMOLICION DE ELEMENTOS DE MAMPOSTERIA DE PIEDRA


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
(M3)
Nº VECES LONGITUD ANCHO ALTURA
DMP-1 0+530.00 Alcantarilla Mamposteria de P. 1 2.55 0.30 1.20 0.92 0.92
DMP-2 0+670.00 Alcantarilla Mamposteria de P. 1 24.88 0.30 0.70 5.22 5.22
DMP-6 1+645.00 Alcantarilla Mamposteria de P. 1 2.74 0.30 1.20 0.99 0.99
TOTAL : 7.13

02.01.02.04 DEMOLICION DE ELEMENTOS PIRCADOS EN PIEDRA


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
Nº VECES LONGITUD ANCHO ALTURA (M3)
DPP-1 0+520.00 Muro seco de piedra 1.00 28.88 0.40 1.30 15.02 15.02
DPP-2 0+670.00 Muro seco de piedra 1.00 24.88 0.40 0.70 6.97 6.97
DPP-3 0+780.00 Muro seco de piedra 1.00 88.60 0.40 1.20 42.53 42.53
DPP-4 0+930.00 Muro seco de piedra 1.00 11.99 0.40 1.00 4.80 4.80
DPP-5 0+970.00 Muro seco de piedra 1.00 100.37 0.40 1.20 48.18 48.18
MPIR-7 2+799.00 Muro seco de piedra 1.00 33.54 0.40 0.40 5.37 5.37
MPIR-9 2+966.00 Muro seco de piedra 1.00 38.92 0.40 0.60 9.34 9.34
MPIR-14 3+270.00 Muro seco de piedra 1.00 13.67 0.40 0.85 4.65 4.65
TOTAL : 136.86

02.01.02.05 RETIRO DE ARBOLES


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
Nº VECES LONGITUD ANCHO ALTURA (M3)
RA-1 0+010.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-2 0+290.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-3 0+480.00 Arbol existente 1.00 6.00 - - 6.00 6.00
RA-4 0+516.80 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-5 0+620.00 Arbol existente 2.00 1.00 - - 2.00 2.00
RA-6 0+650.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-7 0+660.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-8 0+740.00 Arbol existente 3.00 1.00 - - 3.00 3.00
RA-9 0+780.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-10 0+820.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-11 0+860.00 Arbol existente 1.00 1.00 - - 1.00 1.00
RA-12 0+890.00 Arbol existente 2.00 1.00 - - 2.00 2.00
RA-13 0+910.00 Arbol existente 2.00 1.00 - - 2.00 2.00
RA-14 0+940.00 Arbol existente 2.00 1.00 - - 2.00 2.00
RA-15 0+960.00 Arbol existente 3.00 1.00 - - 3.00 3.00
RA-16 0+960.00 Arbol existente 3.00 1.00 - - 3.00 3.00
TOTAL : 13.00

02.01.02.06 REUBICACION DE POSTES DE ALUMBRADO


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
Nº VECES LONGITUD ANCHO ALTURA (UND)
RUP-1 0+110.00 Poste electrico 1.00 1.00 - - 1.00 1.00
RUP-2 0+310.00 Poste electrico 1.00 1.00 - - 1.00 1.00
RUP-3 0+350.00 Poste electrico 1.00 1.00 - - 1.00 1.00
RUP-4 0+410.00 Poste electrico 1.00 1.00 - - 1.00 1.00
RUP-5 0+470.00 Poste electrico 1.00 1.00 - - 1.00 1.00
RUP-6 0+550.00 Poste electrico 2.00 1.00 - - 2.00 2.00
RUP-7 0+650.00 Poste de media tension 1.00 1.00 - - 1.00 1.00
RUP-8 0+670.00 Poste de media tension 1.00 1.00 - - 1.00 1.00
RUP-9 0+707.00 Poste de media tension 1.00 1.00 - - 1.00 1.00
RUP-10 0+800.00 Poste de media tension 1.00 1.00 - - 1.00 1.00
RUP-11 0+890.00 Poste de media tension 1.00 1.00 - - 1.00 1.00
RUP-12 0+940.00 Poste de media tension 1.00 1.00 - - 1.00 1.00
TOTAL : 7.00

02.01.02.07 REUBICACION CERCO DE CALAMINA


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

DIMENSIONAMIENTO SUB TOTAL


N° PROGRESIVA DESCRIPCION PARCIAL
Nº VECES LONGITUD ANCHO ALTURA (M2)
RUC-1 0+400.00 Cerco de Calamina vivienda 1.00 24.12 - 2.40 57.89 57.89
RUC-2 0+310.00 Poste electrico 1.00 1.00 - - 1.00 1.00
RUC-3 0+350.00 Poste electrico 1.00 1.00 - - 1.00 1.00
MPIR-9 2+966.00 Muro seco de piedra 1.00 38.92 0.40 0.60 9.34 9.34
MPIR-14 3+270.00 Muro seco de piedra 1.00 13.67 0.40 0.85 4.65 4.65
TOTAL : 73.88

02.01.02.08 ELIMINACION DE DESMONTES


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

CANTIDAD ESPONJ. TOTAL


ITEM ACTIVIDAD ESPONJ. %
(M3) (M3) (M3)
02.01.02.01 DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLE 5.68 25.00 1.42 7.10
02.01.02.02 DEMOLICION DE ELEMENTOS DE CONCRETO ARMADO 3.31 25.00 0.83 4.14
02.01.02.03 DEMOLICION DE ELEMENTOS DE MAMPOSTERIA DE PIEDRA 7.13 25.00 1.78 8.91
02.01.02.04 DEMOLICION DE ELEMENTOS PIRCADOS EN PIEDRA 136.86 25.00 34.22 171.08
TOTAL : 152.98 38.25 191.23
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

0+000.000 0 0.00 0.00 0.00 0.00


0+000.000 10.00 2.80 1.05 2.80 7.00 2.63 5.60 1.40 0.00 2.63 0.00
0+010.000 10.00 5.80 1.88 5.80 43.00 14.65 34.40 8.60 0.00 14.65 0.00
0+020.000 10.00 2.41 6.45 2.41 41.05 41.65 32.84 8.21 0.00 4.71 36.95 4.71
0+040.000 20.00 3.24 0.33 3.24 56.50 67.80 45.20 11.30 0.00 16.95 50.85 16.95
0+060.000 20.00 7.76 0.00 7.76 110.00 1.65 88.00 22.00 0.00 0.00 1.65 0.00
0+080.000 20.00 8.59 0.00 8.59 163.50 0.00 130.80 32.70 0.00 0.00 0.00 0.00
0+100.000 20.00 13.71 0.00 13.71 223.00 0.00 178.40 44.60 0.00 0.00 0.00 0.00
0+120.000 20.00 20.44 0.00 20.44 341.50 0.00 102.45 136.60 102.45 0.00 0.00 0.00
0+130.000 10.00 20.32 0.36 20.32 203.80 0.90 61.14 81.52 61.14 0.00 0.90 0.00
0+140.000 10.00 16.76 1.33 16.76 185.40 8.45 55.62 74.16 55.62 0.00 8.45 0.00
0+150.000 10.00 12.69 0.74 12.69 147.25 10.35 44.18 58.90 44.18 0.00 10.35 0.00
0+160.000 10.00 11.52 0.25 11.52 121.05 4.95 36.32 48.42 36.32 0.00 4.95 0.00
0+180.000 20.00 10.00 0.00 10.00 215.20 1.25 64.56 86.08 64.56 0.00 1.25 0.00
0+190.000 10.00 10.26 0.00 10.26 101.30 0.00 30.39 40.52 30.39 0.00 0.00 0.00
0+200.000 10.00 13.48 0.00 13.48 118.70 0.00 35.61 47.48 35.61 0.00 0.00 0.00
0+220.000 20.00 17.33 0.00 17.33 308.10 0.00 92.43 123.24 92.43 0.00 0.00 0.00
0+240.000 20.00 17.58 0.16 17.58 349.10 0.80 104.73 139.64 104.73 0.00 0.80 0.00
0+250.000 10.00 13.50 1.51 13.50 155.40 8.35 46.62 62.16 46.62 0.00 8.35 0.00
0+260.000 10.00 6.92 2.56 6.92 102.10 20.35 30.63 40.84 30.63 0.00 20.35 0.00
0+270.000 10.00 5.09 3.96 5.09 60.05 32.60 18.02 24.02 18.02 2.58 30.03 2.58
0+280.000 10.00 3.67 5.07 3.67 43.80 45.15 13.14 17.52 13.14 23.25 21.90 23.25
0+290.000 10.00 5.12 3.68 5.12 43.95 43.75 13.19 17.58 13.19 21.78 21.98 21.78
0+300.000 10.00 5.33 3.07 5.33 52.25 33.75 15.68 20.90 15.68 7.63 26.13 7.63
0+310.000 10.00 6.91 1.89 6.91 61.20 24.80 18.36 24.48 18.36 0.00 24.80 0.00
0+320.000 10.00 8.24 1.59 8.24 75.75 17.40 22.73 30.30 22.73 0.00 17.40 0.00
0+340.000 20.00 18.35 0.10 18.35 265.90 16.90 79.77 106.36 79.77 0.00 16.90 0.00
0+360.000 20.00 13.15 3.39 13.15 315.00 34.90 94.50 126.00 94.50 0.00 34.90 0.00
0+370.000 10.00 9.53 4.44 9.53 113.40 39.15 34.02 45.36 34.02 0.00 39.15 0.00
0+380.000 10.00 17.61 0.50 17.61 135.70 24.70 40.71 54.28 40.71 0.00 24.70 0.00
0+390.000 10.00 28.05 0.00 28.05 228.30 1.25 68.49 91.32 68.49 0.00 1.25 0.00
0+400.000 10.00 28.26 28.26 281.55 0.00 84.47 112.62 84.47 0.00 0.00 0.00
0+420.000 20.00 25.04 25.04 533.00 0.00 213.20 319.80 0.00 0.00 0.00 0.00
0+440.000 20.00 13.36 13.36 384.00 0.00 153.60 230.40 0.00 0.00 0.00 0.00
0+450.000 10.00 8.11 13.61 8.11 107.35 34.03 42.94 64.41 0.00 0.00 34.03 0.00
0+460.000 10.00 7.81 3.71 7.81 79.60 86.60 31.84 47.76 0.00 30.88 55.72 30.88
0+480.000 20.00 9.58 2.24 9.58 173.90 59.50 104.34 69.56 0.00 0.00 59.50 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

0+490.000 10.00 5.14 3.35 5.14 73.60 27.95 44.16 29.44 0.00 0.00 27.95 0.00
0+500.000 10.00 5.75 3.24 5.75 54.45 32.95 32.67 21.78 0.00 0.00 32.95 0.00
0+510.000 10.00 5.93 1.87 5.93 58.40 25.55 35.04 23.36 0.00 0.00 25.55 0.00
0+520.000 10.00 6.73 1.55 6.73 63.30 17.10 37.98 25.32 0.00 0.00 17.10 0.00
0+530.000 10.00 7.88 1.99 7.88 73.05 17.70 43.83 29.22 0.00 0.00 17.70 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

0+540.000 10.00 7.61 2.48 7.61 77.45 22.35 46.47 30.98 0.00 0.00 22.35 0.00
0+550.000 10.00 8.02 2.42 8.02 78.15 24.50 46.89 31.26 0.00 0.00 24.50 0.00
0+560.000 10.00 9.48 2.45 9.48 87.50 24.35 52.50 35.00 0.00 0.00 24.35 0.00
0+570.000 10.00 9.31 4.38 9.31 93.95 34.15 56.37 37.58 0.00 0.00 34.15 0.00
0+580.000 10.00 10.76 3.90 10.76 100.35 41.40 60.21 40.14 0.00 0.00 41.40 0.00
0+600.000 20.00 15.07 0.42 15.07 258.30 43.20 154.98 103.32 0.00 0.00 43.20 0.00
0+620.000 20.00 22.12 0.00 22.12 371.90 2.10 223.14 148.76 0.00 0.00 2.10 0.00
0+630.000 10.00 23.42 0.00 23.42 227.70 0.00 136.62 91.08 0.00 0.00 0.00 0.00
0+640.000 10.00 24.27 0.00 24.27 238.45 0.00 143.07 95.38 0.00 0.00 0.00 0.00
0+660.000 20.00 18.54 0.00 18.54 428.10 0.00 256.86 171.24 0.00 0.00 0.00 0.00
0+680.000 20.00 11.63 0.00 11.63 301.70 0.00 181.02 120.68 0.00 0.00 0.00 0.00
0+690.000 10.00 11.72 0.00 11.72 116.75 0.00 70.05 46.70 0.00 0.00 0.00 0.00
0+700.000 10.00 9.81 0.00 9.81 107.65 0.00 64.59 43.06 0.00 0.00 0.00 0.00
0+710.000 10.00 8.94 0.00 8.94 93.75 0.00 56.25 37.50 0.00 0.00 0.00 0.00
0+720.000 10.00 5.58 0.72 5.58 72.60 1.80 43.56 29.04 0.00 0.00 1.80 0.00
0+730.000 10.00 3.54 2.19 3.54 45.60 14.55 27.36 18.24 0.00 0.00 14.55 0.00
0+740.000 10.00 3.12 4.60 3.12 33.30 33.95 19.98 13.32 0.00 7.31 26.64 7.31
0+750.000 10.00 1.89 5.10 1.89 25.05 48.50 15.03 10.02 0.00 28.46 20.04 28.46
0+760.000 10.00 1.30 11.60 1.30 15.95 83.50 9.57 6.38 0.00 70.74 12.76 70.74
0+770.000 10.00 1.46 6.02 1.46 13.80 88.10 8.28 5.52 0.00 77.06 11.04 77.06
0+780.000 10.00 1.14 6.15 1.14 13.00 60.85 7.80 5.20 0.00 50.45 10.40 50.45
0+800.000 20.00 0.25 5.92 0.25 13.90 120.70 8.34 5.56 0.00 109.58 11.12 109.58
0+810.000 10.00 0.13 5.38 0.13 1.90 56.50 1.14 0.76 0.00 54.98 1.52 54.98
0+820.000 10.00 1.66 3.44 1.66 8.95 44.10 5.37 3.58 0.00 36.94 7.16 36.94
0+840.000 20.00 3.81 1.71 3.81 54.70 51.50 38.29 16.41 0.00 5.01 46.50 5.01
0+860.000 20.00 5.26 0.10 5.26 90.70 18.10 63.49 27.21 0.00 0.00 18.10 0.00
0+880.000 20.00 15.64 0.00 15.64 209.00 0.50 146.30 62.70 0.00 0.00 0.50 0.00
0+890.000 10.00 19.82 0.00 19.82 177.30 0.00 124.11 53.19 0.00 0.00 0.00 0.00
0+900.000 10.00 18.17 0.00 18.17 189.95 0.00 132.97 56.99 0.00 0.00 0.00 0.00
0+920.000 20.00 20.74 0.00 20.74 389.10 0.00 272.37 116.73 0.00 0.00 0.00 0.00
0+940.000 20.00 22.21 0.00 22.21 429.50 0.00 300.65 128.85 0.00 0.00 0.00 0.00
0+950.000 10.00 21.28 0.00 21.28 217.45 0.00 152.22 65.24 0.00 0.00 0.00 0.00
0+960.000 10.00 17.33 1.00 17.33 193.05 2.50 135.14 57.92 0.00 0.00 2.50 0.00
0+980.000 20.00 18.14 0.00 18.14 354.70 5.00 248.29 106.41 0.00 0.00 5.00 0.00
1+000.000 20.00 13.63 0.00 13.63 317.70 0.00 222.39 95.31 0.00 0.00 0.00 0.00
SUBTOTAL DEL Km. 0+00 AL 1+000 11,719.35 1,621.71 5,994.22 4,517.41 1,207.73 548.29 1,073.43 548.29 0.00
1+020.000 20.00 7.80 0.00 7.80 214.30 0.00 150.01 64.29 0.00 0.00 0.00 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

1+040.000 20.00 2.55 0.18 2.55 103.50 0.90 72.45 31.05 0.00 0.00 0.90 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

1+050.000 10.00 2.32 0.61 2.32 24.35 3.95 17.05 7.31 0.00 0.00 3.95 0.00
1+060.000 10.00 1.64 0.91 1.64 19.80 7.60 13.86 5.94 0.00 0.00 7.60 0.00
1+070.000 10.00 1.47 0.44 1.47 15.55 6.75 10.89 4.67 0.00 0.00 6.75 0.00
1+080.000 10.00 2.70 0.07 2.70 20.85 2.55 14.60 6.26 0.00 0.00 2.55 0.00
1+100.000 20.00 13.13 0.00 13.13 158.30 0.35 110.81 47.49 0.00 0.00 0.35 0.00
1+110.000 10.00 18.53 0.00 18.53 158.30 0.00 110.81 47.49 0.00 0.00 0.00 0.00
1+120.000 10.00 19.88 0.00 19.88 192.05 0.00 134.44 57.62 0.00 0.00 0.00 0.00
1+130.000 10.00 10.97 0.00 10.97 154.25 0.00 107.98 46.28 0.00 0.00 0.00 0.00
1+140.000 10.00 4.19 0.40 4.19 75.80 1.00 15.16 60.64 0.00 1.00 0.00
1+150.000 10.00 4.68 0.57 4.68 44.35 4.85 8.87 35.48 0.42 4.44 0.42
1+160.000 10.00 3.56 1.13 3.56 41.20 8.50 8.24 32.96 4.38 4.12 4.38
1+180.000 20.00 0.00 6.31 0.00 17.80 74.40 3.56 14.24 72.62 1.78 72.62
1+200.000 20.00 0.06 6.40 0.06 0.30 127.10 0.06 0.24 127.07 0.03 127.07
1+220.000 20.00 1.95 5.53 1.95 20.10 119.30 4.02 16.08 117.29 2.01 117.29
1+240.000 20.00 1.07 6.39 1.07 30.20 119.20 15.10 15.10 0.00 96.55 22.65 96.55
1+250.000 10.00 1.08 5.47 1.08 10.75 59.30 5.38 5.38 0.00 51.24 8.06 51.24
1+260.000 10.00 2.16 3.71 2.16 16.20 45.90 8.10 8.10 0.00 33.75 12.15 33.75
1+270.000 10.00 2.89 3.01 2.89 25.25 33.60 12.63 12.63 0.00 14.66 18.94 14.66
1+280.000 10.00 5.57 2.13 5.57 42.30 25.70 21.15 21.15 0.00 0.00 25.70 0.00
1+290.000 10.00 10.18 1.38 10.18 78.75 17.55 39.38 39.38 0.00 0.00 17.55 0.00
1+300.000 10.00 11.41 0.45 11.41 107.95 9.15 53.98 53.98 0.00 0.00 9.15 0.00
1+310.000 10.00 15.40 0.00 15.40 134.05 1.13 67.03 67.03 0.00 0.00 1.13 0.00
1+320.000 10.00 16.00 0.00 16.00 157.00 0.00 78.50 78.50 0.00 0.00 0.00 0.00
1+330.000 10.00 15.38 0.00 15.38 156.90 0.00 78.45 78.45 0.00 0.00 0.00 0.00
1+340.000 10.00 17.49 0.60 17.49 164.35 1.50 82.18 82.18 0.00 0.00 1.50 0.00
1+350.000 10.00 15.37 0.28 15.37 164.30 4.40 82.15 82.15 0.00 0.00 4.40 0.00
1+360.000 10.00 11.21 0.59 11.21 132.90 4.35 66.45 66.45 0.00 0.00 4.35 0.00
1+370.000 10.00 8.63 0.35 8.63 99.20 4.70 49.60 49.60 0.00 0.00 4.70 0.00
1+380.000 10.00 4.76 0.39 4.76 66.95 3.70 33.48 33.48 0.00 0.00 3.70 0.00
1+390.000 10.00 6.80 0.00 6.80 57.80 0.98 28.90 28.90 0.00 0.00 0.98 0.00
1+400.000 10.00 6.53 0.14 6.53 66.65 0.35 33.33 33.33 0.00 0.00 0.35 0.00
1+410.000 10.00 3.25 1.49 3.25 48.90 8.15 24.45 24.45 0.00 0.00 8.15 0.00
1+420.000 10.00 3.30 2.99 3.30 32.75 22.40 16.38 16.38 0.00 0.00 22.40 0.00
1+430.000 10.00 2.97 3.72 2.97 31.35 33.55 15.68 15.68 0.00 10.04 23.51 10.04
1+440.000 10.00 2.87 6.32 2.87 29.20 50.20 14.60 14.60 0.00 28.30 21.90 28.30
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

1+450.000 10.00 2.75 8.77 2.75 28.10 75.45 14.05 14.05 0.00 54.38 21.08 54.38
1+460.000 10.00 4.69 9.03 4.69 37.20 89.00 14.88 22.32 0.00 62.96 26.04 62.96
1+470.000 10.00 8.81 7.93 8.81 67.50 84.80 27.00 40.50 0.00 37.55 47.25 37.55
1+480.000 10.00 14.59 4.18 14.59 117.00 60.55 46.80 70.20 0.00 0.00 60.55 0.00
1+490.000 10.00 23.10 2.17 23.10 188.45 31.75 75.38 113.07 0.00 0.00 31.75 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

1+500.000 10.00 24.65 0.36 24.65 238.75 12.65 95.50 143.25 0.00 0.00 12.65 0.00
1+520.000 20.00 18.31 2.06 18.31 429.60 24.20 171.84 257.76 0.00 0.00 24.20 0.00
1+540.000 20.00 13.06 5.45 13.06 313.70 75.10 125.48 188.22 0.00 0.00 75.10 0.00
1+560.000 20.00 8.43 9.24 8.43 214.90 146.90 85.96 128.94 0.00 0.00 146.90 0.00
1+580.000 20.00 7.73 1.62 7.73 161.60 108.60 16.16 48.48 96.96 68.20 40.40 68.20
1+600.000 20.00 7.23 1.59 7.23 149.60 32.10 14.96 44.88 89.76 0.00 32.10 0.00
1+620.000 20.00 8.96 1.05 8.96 161.90 26.40 16.19 48.57 97.14 0.00 26.40 0.00
1+640.000 20.00 11.53 1.20 11.53 204.90 22.50 20.49 61.47 122.94 0.00 22.50 0.00
1+660.000 20.00 8.41 3.52 8.41 199.40 47.20 19.94 59.82 119.64 0.00 47.20 0.00
1+680.000 20.00 3.67 5.56 3.67 120.80 90.80 12.08 36.24 72.48 60.60 30.20 60.60
1+690.000 10.00 4.49 7.10 4.49 40.80 63.30 4.08 12.24 24.48 53.10 10.20 53.10
1+700.000 10.00 6.03 5.95 6.03 52.60 65.25 5.26 15.78 31.56 52.10 13.15 52.10
1+720.000 20.00 6.76 3.14 6.76 127.90 90.90 12.79 38.37 76.74 58.93 31.98 58.93
1+740.000 20.00 2.58 4.44 2.58 93.40 75.80 9.34 28.02 56.04 52.45 23.35 52.45
1+750.000 10.00 1.34 6.03 1.34 19.60 52.35 1.96 5.88 11.76 47.45 4.90 47.45
1+760.000 10.00 2.90 8.81 2.90 21.20 74.20 2.12 6.36 12.72 68.90 5.30 68.90
1+780.000 20.00 3.04 5.68 3.04 59.40 144.90 5.94 17.82 35.64 130.05 14.85 130.05
1+800.000 20.00 4.02 6.30 4.02 70.60 119.80 7.06 21.18 42.36 102.15 17.65 102.15
1+810.000 10.00 4.80 6.67 4.80 44.10 64.85 22.05 22.05 0.00 31.78 33.08 31.78
1+820.000 10.00 5.14 5.86 5.14 49.70 62.65 24.85 24.85 0.00 25.38 37.28 25.38
1+830.000 10.00 6.25 5.14 6.25 56.95 55.00 28.48 28.48 0.00 12.29 42.71 12.29
1+840.000 10.00 5.01 0.97 5.01 56.30 30.55 28.15 28.15 0.00 0.00 30.55 0.00
1+850.000 10.00 5.01 0.60 5.01 50.10 7.85 25.05 25.05 0.00 0.00 7.85 0.00
1+860.000 10.00 2.33 4.10 2.33 36.70 23.50 18.35 18.35 0.00 0.00 23.50 0.00
1+870.000 10.00 5.40 2.31 5.40 38.65 32.05 19.33 19.33 0.00 3.06 28.99 3.06
1+880.000 10.00 5.98 3.38 5.98 56.90 28.45 28.45 28.45 0.00 0.00 28.45 0.00
1+900.000 20.00 1.69 8.55 1.69 76.70 119.30 38.35 38.35 0.00 61.78 57.53 61.78
1+920.000 20.00 0.80 13.80 0.80 24.90 223.50 12.45 12.45 0.00 204.83 18.68 204.83
1+930.000 10.00 1.74 5.30 1.74 12.70 95.50 6.35 6.35 0.00 85.98 9.53 85.98
1+940.000 10.00 4.87 0.56 4.87 33.05 29.30 16.53 16.53 0.00 4.51 24.79 4.51
1+960.000 20.00 11.30 0.00 11.30 161.70 2.80 80.85 80.85 0.00 0.00 2.80 0.00
1+980.000 20.00 11.32 0.00 11.32 226.20 0.00 113.10 113.10 0.00 0.00 0.00 0.00
1+990.000 10.00 10.17 0.00 10.17 107.45 0.00 53.73 53.73 0.00 0.00 0.00 0.00
2+000.000 10.00 5.21 0.03 5.21 76.90 38.45 38.45 0.00 0.00 0.00
SUBTOTAL DEL Km. 1+000 AL 2+000 7,142.40 3,192.86 2,929.49 3,163.06 1,049.86 1,834.71 1,358.15 1,834.71
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

2+020.000 20.00 0.00 2.70 0.00 26.05 27.30 13.03 13.03 0.00 7.76 19.54 7.76
2+040.000 20.00 0.00 5.29 0.00 0.00 79.90 0.00 0.00 0.00 79.90 0.00 79.90
2+060.000 20.00 0.00 3.28 0.00 0.00 85.70 0.00 0.00 0.00 85.70 0.00 85.70
2+070.000 10.00 0.14 0.16 0.14 0.35 17.20 0.18 0.18 0.00 16.94 0.26 16.94
2+080.000 10.00 3.01 0.00 3.01 15.75 0.40 7.88 7.88 0.00 0.00 0.40 0.00
2+090.000 10.00 6.74 0.00 6.74 48.75 0.00 9.75 19.50 19.50 0.00 0.00 0.00
2+100.000 10.00 10.60 0.00 10.60 86.70 0.00 17.34 34.68 34.68 0.00 0.00 0.00
2+110.000 10.00 12.95 0.00 12.95 117.75 0.00 23.55 47.10 47.10 0.00 0.00 0.00
2+120.000 10.00 16.70 0.00 16.70 148.25 0.00 29.65 59.30 59.30 0.00 0.00 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

2+130.000 10.00 19.43 0.00 19.43 180.65 0.00 36.13 72.26 72.26 0.00 0.00 0.00
2+140.000 10.00 19.16 0.00 19.16 192.95 0.00 38.59 77.18 77.18 0.00 0.00 0.00
2+150.000 10.00 17.45 0.00 17.45 183.05 0.00 36.61 73.22 73.22 0.00 0.00 0.00
2+160.000 10.00 14.97 0.00 14.97 162.10 0.00 16.21 48.63 97.26 0.00 0.00 0.00
2+170.000 10.00 14.10 0.00 14.10 145.35 0.00 14.54 43.61 87.21 0.00 0.00 0.00
2+180.000 10.00 13.84 0.00 13.84 139.70 0.00 13.97 41.91 83.82 0.00 0.00 0.00
2+200.000 20.00 11.28 0.00 11.28 251.20 0.00 25.12 75.36 150.72 0.00 0.00 0.00
2+220.000 20.00 11.55 0.00 11.55 228.30 0.00 22.83 68.49 136.98 0.00 0.00 0.00
2+240.000 20.00 8.98 0.96 8.98 205.30 4.80 20.53 61.59 123.18 0.00 4.80 0.00
2+260.000 20.00 14.65 0.55 14.65 236.30 15.10 23.63 70.89 141.78 0.00 15.10 0.00
2+270.000 10.00 11.74 4.09 11.74 131.95 23.20 13.20 39.59 79.17 0.00 23.20 0.00
2+280.000 10.00 1.51 25.19 1.51 66.25 146.40 6.63 19.88 39.75 129.84 16.56 129.84
2+290.000 10.00 0.00 45.49 0.00 3.78 353.40 0.38 1.13 2.27 352.46 0.95 352.46
2+300.000 10.00 0.00 40.44 0.00 0.00 429.65 0.00 0.00 0.00 429.65 0.00 429.65
2+320.000 20.00 15.70 1.06 15.70 78.50 415.00 7.85 23.55 47.10 395.38 19.63 395.38
2+330.000 10.00 20.39 1.52 20.39 180.45 12.90 18.05 54.14 108.27 0.00 12.90 0.00
2+340.000 10.00 10.62 8.04 10.62 155.05 47.80 15.51 46.52 93.03 9.04 38.76 9.04
2+350.000 10.00 4.42 12.75 4.42 75.20 103.95 7.52 22.56 45.12 85.15 18.80 85.15
2+360.000 10.00 2.20 12.52 2.20 33.10 126.35 3.31 9.93 19.86 118.08 8.28 118.08
2+370.000 10.00 1.78 14.83 1.78 19.90 136.75 1.99 5.97 11.94 131.78 4.98 131.78
2+380.000 10.00 2.88 10.22 2.88 23.30 125.25 2.33 6.99 13.98 119.43 5.83 119.43
2+390.000 10.00 5.39 5.91 5.39 41.35 80.65 4.14 12.41 24.81 70.31 10.34 70.31
2+400.000 10.00 15.12 0.02 15.12 102.55 29.65 10.26 30.77 61.53 4.01 25.64 4.01
2+410.000 10.00 21.90 0.00 21.90 185.10 0.05 18.51 55.53 111.06 0.00 0.05 0.00
2+420.000 10.00 20.04 0.00 20.04 209.70 0.00 20.97 62.91 125.82 0.00 0.00 0.00
2+440.000 20.00 18.66 0.00 18.66 387.00 0.00 38.70 116.10 232.20 0.00 0.00 0.00
2+460.000 20.00 13.26 0.00 13.26 319.20 0.00 31.92 95.76 191.52 0.00 0.00 0.00
2+480.000 20.00 14.37 0.00 14.37 276.30 0.00 55.26 221.04 0.00 0.00 0.00 0.00
2+500.000 20.00 13.74 0.00 13.74 281.10 0.00 56.22 224.88 0.00 0.00 0.00 0.00
2+520.000 20.00 6.85 0.50 6.85 205.90 2.50 41.18 164.72 0.00 0.00 2.50 0.00
2+530.000 10.00 5.31 1.95 5.31 60.80 12.25 12.16 48.64 0.00 0.00 12.25 0.00
2+540.000 10.00 2.10 4.87 2.10 37.05 34.10 7.41 29.64 0.00 22.23 11.87
2+560.000 20.00 0.00 15.65 0.00 10.50 205.20 2.10 8.40 0.00 6.30 198.90
2+580.000 20.00 2.06 8.77 2.06 10.30 244.20 2.06 8.24 0.00 6.18 238.02
2+600.000 20.00 4.85 5.55 4.85 69.10 143.20 13.82 55.28 0.00 41.46 101.74
2+620.000 20.00 3.45 6.56 3.45 83.00 121.10 16.60 66.40 0.00 49.80 71.30
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

2+630.000 10.00 4.43 5.54 4.43 39.40 60.50 7.88 31.52 0.00 23.64 36.86
2+640.000 10.00 4.46 4.11 4.46 44.45 48.25 8.89 35.56 0.00 26.67 21.58
2+650.000 10.00 4.58 3.86 4.58 45.20 39.85 9.04 36.16 0.00 27.12 12.73
2+660.000 10.00 3.89 2.76 3.89 42.35 33.10 8.47 33.88 0.00 25.41 7.69
2+670.000 10.00 4.00 3.26 4.00 39.45 30.10 7.89 31.56 0.00 23.67 6.43
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

2+680.000 10.00 5.18 2.16 5.18 45.90 27.10 9.18 36.72 0.00 27.10 0.00
2+700.000 20.00 11.70 1.09 11.70 168.80 32.50 33.76 135.04 0.00 32.50 0.00
2+720.000 20.00 17.18 0.23 17.18 288.80 13.20 57.76 231.04 0.00 13.20 0.00
2+740.000 20.00 18.65 0.00 18.65 358.30 1.15 71.66 286.64 0.00 1.15 0.00
2+760.000 20.00 23.97 0.00 23.97 426.20 0.00 85.24 340.96 0.00 0.00 0.00
2+770.000 10.00 28.09 0.00 28.09 260.30 0.00 52.06 208.24 0.00 0.00 0.00
2+780.000 10.00 31.69 0.00 31.69 298.90 0.00 59.78 239.12 0.00 0.00 0.00
2+790.000 10.00 34.11 0.00 34.11 329.00 0.00 65.80 263.20 0.00 0.00 0.00
2+800.000 10.00 37.40 0.00 37.40 357.55 0.00 71.51 286.04 0.00 0.00 0.00
2+810.000 10.00 41.09 0.00 41.09 392.45 0.00 78.49 313.96 0.00 0.00 0.00
2+820.000 10.00 44.78 0.00 44.78 429.35 0.00 85.87 343.48 0.00 0.00 0.00
2+830.000 10.00 41.80 0.00 41.80 432.90 0.00 86.58 346.32 0.00 0.00 0.00
2+840.000 10.00 40.48 0.00 40.48 411.40 0.00 82.28 329.12 0.00 0.00 0.00
2+850.000 10.00 35.76 0.00 35.76 381.20 0.00 76.24 304.96 0.00 0.00 0.00
2+860.000 10.00 36.56 0.00 36.56 361.60 0.00 72.32 289.28 0.00 0.00 0.00
2+880.000 20.00 28.88 0.00 28.88 654.40 0.00 130.88 523.52 0.00 0.00 0.00
2+900.000 20.00 7.38 4.21 7.38 362.60 21.05 72.52 290.08 0.00 21.05 0.00
2+910.000 10.00 2.32 12.55 2.32 48.50 83.80 9.70 38.80 0.00 29.10 54.70
2+920.000 10.00 0.34 21.68 0.34 13.30 171.15 2.66 10.64 0.00 7.98 163.17
2+930.000 10.00 0.00 23.62 0.00 0.85 226.50 0.17 0.68 0.00 0.51 225.99
2+940.000 10.00 4.38 13.20 4.38 10.95 184.10 2.19 8.76 0.00 6.57 177.53
2+960.000 20.00 11.28 0.97 11.28 156.60 141.70 31.32 125.28 0.00 93.96 47.74
2+980.000 20.00 14.92 0.16 14.92 262.00 11.30 52.40 209.60 0.00 11.30 0.00
3+000.000 20.00 22.06 0.00 22.06 369.80 0.80 73.96 295.84 0.00 0.80 0.00
SUBTOTAL DEL Km. 2+000 AL 3+000 12,447.43 4,150.10 2,164.07 7,871.74 2,411.62 2,035.41 738.45 3,411.66 0.00
3+010.000 10.00 28.27 0.00 28.27 251.65 0.00 75.50 176.16 0.00 0.00 0.00 0.00
3+020.000 10.00 26.53 0.00 26.53 274.00 0.00 82.20 191.80 0.00 0.00 0.00 0.00
3+030.000 10.00 16.73 0.00 16.73 216.30 0.00 64.89 151.41 0.00 0.00 0.00 0.00
3+040.000 10.00 0.06 4.61 0.06 83.95 11.53 25.19 58.77 0.00 0.00 11.53 0.00
3+060.000 20.00 0.00 37.13 0.00 0.30 417.40 0.09 0.21 0.00 417.21 0.20 417.21
3+070.000 10.00 0.00 26.95 0.00 0.00 320.40 0.00 0.00 0.00 320.40 0.00 320.40
3+080.000 10.00 0.00 24.47 0.00 0.00 257.10 0.00 0.00 0.00 257.10 0.00 257.10
3+100.000 20.00 0.78 10.56 0.78 3.90 350.30 1.17 2.73 0.00 347.77 2.54 347.77
3+110.000 10.00 2.48 9.63 2.48 16.30 100.95 4.89 11.41 0.00 90.36 10.60 90.36
3+120.000 10.00 8.44 4.78 8.44 54.60 72.05 16.38 38.22 0.00 36.56 35.49 36.56
3+130.000 10.00 13.27 0.29 13.27 108.55 25.35 32.57 75.99 0.00 0.00 25.35 0.00
3+140.000 10.00 19.70 0.00 19.70 164.85 0.73 49.46 115.40 0.00 0.00 0.73 0.00
3+160.000 20.00 36.49 0.00 36.49 561.90 0.00 168.57 393.33 0.00 0.00 0.00 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

3+180.000 20.00 41.34 0.00 41.34 778.30 0.00 233.49 544.81 0.00 0.00 0.00 0.00
3+200.000 20.00 32.80 0.00 32.80 741.40 0.00 222.42 518.98 0.00 0.00 0.00 0.00
3+220.000 20.00 25.45 0.00 25.45 582.50 0.00 174.75 407.75 0.00 0.00 0.00 0.00
3+230.000 10.00 20.13 0.04 20.13 227.90 0.10 68.37 159.53 0.00 0.00 0.10 0.00
01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

3+240.000 10.00 15.94 0.14 15.94 180.35 0.90 54.11 126.25 0.00 0.00 0.90 0.00
3+250.000 10.00 11.16 1.59 11.16 135.50 8.65 40.65 94.85 0.00 0.00 8.65 0.00
3+260.000 10.00 7.23 2.69 7.23 91.95 21.40 27.59 64.37 0.00 0.00 21.40 0.00
3+280.000 20.00 4.67 1.28 4.67 119.00 39.70 35.70 83.30 0.00 0.00 39.70 0.00
3+300.000 20.00 4.40 1.98 4.40 90.70 32.60 27.21 63.49 0.00 0.00 32.60 0.00
3+320.000 20.00 3.50 2.12 3.50 79.00 41.00 23.70 55.30 0.00 0.00 41.00 0.00
3+330.000 10.00 1.99 5.22 1.99 27.45 36.70 8.24 19.22 0.00 18.86 17.84 18.86
3+340.000 10.00 2.45 6.40 2.45 22.20 58.10 6.66 15.54 0.00 43.67 14.43 43.67
3+350.000 10.00 3.42 4.44 3.42 29.35 54.20 8.81 20.55 0.00 35.12 19.08 35.12
3+360.000 10.00 5.70 0.00 5.70 45.60 11.10 13.68 31.92 0.00 0.00 11.10 0.00
3+380.000 20.00 4.35 0.32 4.35 100.50 1.60 30.15 70.35 0.00 0.00 1.60 0.00
3+387.220 7.22 2.94 0.04 2.94 26.32 1.30 7.90 18.42 0.00 0.00 1.30 0.00
SUBTOTAL DEL Km. 3+000 AL 3+347.95 5,014.32 1,863.16 1,504.30 3,510.02 0.00 1,567.04 296.13 1,567.04 0.00

TOTAL : 36,323.50 10,827.83 12,592.07 19,062.23 4,669.20 5,985.44 3,466.15 7,361.69 0.00

RESUMEN GENERAL
MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

CORTE RELLENO

MATERIAL PROPIO PRESTAMO


DE EXCEDENTE DE
PROGRESIVA LATERAL CON
MATER. CORTE CON
ROCA SUELTA ROCA FIJA LIBRE DE EN LA TRANSPORTE Km. ELIMINACION
SUELTO TOTAL TRANSPORTE DM
TRANSP. PROGRES. 2+020 DM =
= 0.450 Km.
1.129 Km.

0.00 5,994.22 4,517.41 1,207.73 548.29 1,073.43 1,621.71 548.29 0.00 9,549.36
1+000.00 2,929.49 3,163.06 1,049.86 1,834.71 1,358.15 3,192.86 1,834.71 0.00 2,114.83
2+000.00 2,164.07 7,871.74 2,411.62 2,035.41 738.45 2,773.85 3,411.66 0.00 6,261.93
3+000.00 1,504.30 3,510.02 0.00 1,567.04 296.13 1,863.16 1,567.04 0.00 1,584.13
12,592.07 19,062.23 4,669.20 5,985.44 3,466.15 9,451.58 7,361.69 0.00 19,510.24
TOTAL :
36,323.50 16,813.27 19,510.24

ACTIVIDAD UND. TOTAL


01.04 EXPLANACIONES
02.01.04.06 RELLENO CON MATERIAL PROPIO DE CORTE
02.01.04.07 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

AREA VOLUMEN

CORTE RELLENOS

DISTANCIA ROCA MATERIAL PROPIO PRESTAMO


PROGRESIVA
(m) CORTE 'RELLENO CORTE CON RELLENO TOTAL
CORTE TOTAL (m3) MAT.
(m2) TOTAL (m2) CUNETAS (m2) (m3)
SUELTO DE EXCEDENTE DE DE PRESTAMO
LIBRE DE TRANSPORTE EN LA PROGRESIVA
(m3) SUELTA (m3) FIJA (m3) CORTE CON LATERAL CON
(m3) (m3)
TRANSPORTE (m3) TRANSPORTE (m3)

ACTIVIDAD UND. TOTAL

CORTE DE MATERIAL SUELTO CON EQUIPO m3 12,592.07


CORTE DE PLATAFORMA EN ROCA SUELTA CON EXPLOSIVOS m3 19,062.23
CORTE DE PLATAFORMA EN ROCA FIJA CON EXPLOSIVOS m3 4,669.20
RELLENO CON MATERIAL PROPIO DE CORTE m3 16,813.27
ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 19,510.24
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

ANCHO BANCA ANCHO AREA TOTAL


ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
00+000 6.150 6.150
0+010 10.00 6.350 6.350 62.50
0+020 10.00 6.650 6.650 65.00
0+030 10.00 6.300 6.300 64.75
0+040 10.00 6.150 6.150 62.25
0+050 10.00 6.150 6.150 61.50 623.50
0+060 10.00 6.150 6.150 61.50
0+070 10.00 6.150 6.150 61.50
0+080 10.00 6.150 6.150 61.50
0+090 10.00 6.150 6.150 61.50
0+100 10.00 6.150 6.150 61.50
0+110 10.00 6.550 6.550 63.50
0+120 10.00 6.950 6.950 67.50
0+130 10.00 7.050 7.050 70.00
0+140 20.00 7.050 7.050 141.00
0+150 20.00 6.800 6.800 138.50
831.50
0+160 10.00 6.700 6.700 67.50
0+170 10.00 6.900 6.900 68.00
0+180 10.00 7.400 7.400 71.50
0+190 10.00 7.300 7.300 73.50
0+200 10.00 6.800 6.800 70.50
0+210 10.00 6.350 6.350 65.75
0+220 10.00 6.150 6.150 62.50
0+230 10.00 6.150 6.150 61.50
0+240 10.00 6.300 6.300 62.25
0+250 10.00 6.650 6.650 64.75
658.75
0+260 10.00 6.750 6.750 67.00
0+270 10.00 6.750 6.750 67.50
0+280 10.00 6.900 6.900 68.25
0+290 10.00 6.950 6.950 69.25
0+300 10.00 7.050 7.050 70.00
0+310 10.00 7.050 7.050 70.50
0+320 10.00 6.750 6.750 69.00
0+330 10.00 6.350 6.350 65.50
0+340 10.00 6.150 6.150 62.50
0+350 10.00 6.550 6.550 63.50
715.50
0+360 10.00 7.100 7.100 68.25
0+370 10.00 7.700 7.700 74.00
0+380 10.00 8.150 8.150 79.25
0+390 10.00 8.150 8.150 81.50
0+400 10.00 8.150 8.150 81.50
0+410 10.00 8.100 8.100 81.25
0+420 10.00 7.950 7.950 80.25
0+430 10.00 7.760 7.760 78.55
0+440 10.00 7.650 7.650 77.05
0+450 10.00 7.650 7.650 76.50
747.10
0+460 10.00 7.650 7.650 76.50
0+470 10.00 7.200 7.200 74.25
0+480 10.00 6.850 6.850 70.25
0+490 10.00 6.550 6.550 67.00
0+500 10.00 6.550 6.550 65.50
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

ANCHO BANCA ANCHO AREA TOTAL


ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
0+510 10.00 6.550 6.550 65.50
0+520 10.00 6.550 6.550 65.50
0+530 10.00 6.550 6.550 65.50
0+540 10.00 6.550 6.550 65.50
0+550 10.00 6.550 6.550 65.50
653.00
0+560 10.00 6.550 6.550 65.50
0+570 10.00 6.550 6.550 65.50
0+580 10.00 6.550 6.550 65.50
0+590 10.00 6.400 6.400 64.75
0+600 10.00 6.450 6.450 64.25
0+610 10.00 6.900 6.900 66.75
0+620 10.00 7.200 7.200 70.50
0+630 10.00 7.050 7.050 71.25
0+640 10.00 7.050 7.050 70.50
0+650 10.00 6.950 6.700 68.75
701.50
0+660 10.00 6.550 6.300 65.00
0+670 10.00 6.850 6.600 64.50
0+680 10.00 7.450 7.200 69.00
0+690 10.00 8.050 7.800 75.00
0+700 10.00 8.500 8.250 80.25
0+710 10.00 8.500 8.250 82.50
0+720 10.00 8.500 8.250 82.50
0+730 10.00 8.150 7.900 80.75
0+740 10.00 8.050 7.800 78.50
0+750 10.00 8.050 7.800 78.00
773.00
0+760 10.00 8.050 7.800 78.00
0+770 10.00 8.000 7.750 77.75
0+780 10.00 7.600 7.350 75.50
0+790 10.00 7.200 6.950 71.50
0+800 10.00 6.900 6.650 68.00
0+810 10.00 6.850 6.600 66.25
0+820 10.00 6.500 6.250 64.25
0+830 10.00 6.400 6.150 62.00
0+840 10.00 6.400 6.150 61.50
0+850 10.00 6.500 6.250 62.00
690.00
0+860 10.00 7.050 6.800 65.25
0+870 10.00 7.600 7.350 70.75
0+880 10.00 8.150 7.900 76.25
0+890 10.00 8.400 8.150 80.25
0+900 10.00 8.400 8.150 81.50
0+910 10.00 8.400 8.150 81.50
0+920 10.00 8.400 8.150 81.50
0+930 10.00 8.400 8.150 81.50
0+940 10.00 8.400 8.150 81.50
0+950 10.00 8.400 8.150 81.50
762.25
0+960 10.00 8.250 8.000 80.75
0+970 10.00 7.650 7.400 77.00
0+980 10.00 7.100 6.850 71.25
0+990 10.00 6.550 6.300 65.75
1+000 10.00 6.150 5.700 60.00
SUBTOTAL DEL Km. 0+00 AL 1+000 7,156.10
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

ANCHO BANCA ANCHO AREA TOTAL


ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
1+010 10.00 6.150 6.150 59.25
1+020 10.00 6.150 6.150 61.50
1+030 10.00 6.150 6.150 61.50
1+040 10.00 6.150 6.150 61.50
1+050 10.00 6.150 6.150 61.50
620.50
1+060 10.00 6.150 6.150 61.50
1+070 10.00 6.150 6.150 61.50
1+080 10.00 6.150 6.150 61.50
1+090 10.00 6.500 6.500 63.25
1+100 10.00 7.000 7.000 67.50
1+110 10.00 7.450 7.450 72.25
1+120 10.00 7.450 7.450 74.50
1+130 10.00 7.450 7.450 74.50
1+140 10.00 7.450 7.450 74.50
1+150 10.00 7.450 7.450 74.50
671.10
1+160 10.00 7.250 7.250 73.50
1+170 10.00 6.850 6.850 70.50
1+180 10.00 5.000 5.000 59.25
1+190 10.00 4.560 4.560 47.80
1+200 10.00 5.400 5.400 49.80
1+210 10.00 5.400 5.400 54.00
1+220 10.00 6.750 6.750 60.75
1+230 10.00 6.250 6.250 65.00
1+240 10.00 7.650 7.650 69.50
1+250 10.00 7.400 7.400 75.25
636.75
1+260 10.00 6.100 6.100 67.50
1+270 10.00 5.950 5.950 60.25
1+280 10.00 6.250 6.250 61.00
1+290 10.00 6.150 6.150 62.00
1+300 10.00 6.150 6.150 61.50
1+310 10.00 6.150 6.150 61.50
1+320 10.00 6.150 6.150 61.50
1+330 10.00 6.150 6.150 61.50
1+340 10.00 6.150 6.150 61.50
1+350 10.00 6.150 6.150 61.50
615.00
1+360 10.00 6.150 6.150 61.50
1+370 10.00 6.150 6.150 61.50
1+380 10.00 6.150 6.150 61.50
1+390 10.00 6.150 6.150 61.50
1+400 10.00 6.150 6.150 61.50
1+410 10.00 6.150 6.150 61.50
1+420 10.00 6.150 6.150 61.50
1+430 10.00 6.150 6.150 61.50
1+440 10.00 6.250 6.250 62.00
1+450 10.00 6.600 6.600 64.25
644.25
1+460 10.00 6.750 6.750 66.75
1+470 10.00 6.750 6.750 67.50
1+480 10.00 6.750 6.750 67.50
1+490 10.00 6.650 6.650 67.00
1+500 10.00 6.300 6.300 64.75
1+510 10.00 6.150 6.150 62.25

615.75
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

ANCHO BANCA ANCHO AREA TOTAL


ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
1+520 10.00 6.150 6.150 61.50
1+530 10.00 6.150 6.150 61.50
1+540 10.00 6.150 6.150 61.50
1+550 10.00 6.150 6.150 61.50
615.75
1+560 10.00 6.150 6.150 61.50
1+570 10.00 6.150 6.150 61.50
1+580 10.00 6.150 6.150 61.50
1+590 10.00 6.150 6.150 61.50
1+600 10.00 6.150 6.150 61.50
1+610 10.00 6.150 6.150 61.50
1+620 10.00 6.150 6.150 61.50
1+630 10.00 6.150 6.150 61.50
1+640 10.00 6.150 6.150 61.50
1+650 10.00 6.150 6.150 61.50
634.50
1+660 10.00 6.150 6.150 61.50
1+670 10.00 6.350 6.350 62.50
1+680 10.00 6.750 6.750 65.50
1+690 10.00 6.950 6.950 68.50
1+700 10.00 6.850 6.850 69.00
1+710 10.00 6.450 6.450 66.50
1+720 10.00 6.450 6.450 64.50
1+730 10.00 6.900 6.900 66.75
1+740 10.00 7.400 7.400 71.50
1+750 10.00 7.450 7.450 74.25
688.00
1+760 10.00 7.200 7.200 73.25
1+770 10.00 6.750 6.750 69.75
1+780 10.00 6.400 6.400 65.75
1+790 10.00 6.750 6.750 65.75
1+800 10.00 7.250 7.250 70.00
1+810 10.00 7.450 7.450 73.50
1+820 10.00 7.450 7.450 74.50
1+830 10.00 7.450 7.450 74.50
1+840 10.00 7.450 7.450 74.50
1+850 10.00 7.450 7.450 74.50
716.75
1+860 10.00 7.450 7.450 74.50
1+870 10.00 7.250 7.250 73.50
1+880 10.00 6.750 6.750 70.00
1+890 10.00 6.250 6.250 65.00
1+900 10.00 6.200 6.200 62.25
1+910 10.00 6.700 6.700 64.50
1+920 10.00 7.150 7.150 69.25
1+930 10.00 7.450 7.450 73.00
1+940 10.00 7.300 7.300 73.75
1+950 10.00 7.000 7.000 71.50
736.50
1+960 10.00 7.150 7.150 70.75
1+970 10.00 7.800 7.550 73.50
1+980 10.00 8.400 8.150 78.50
1+990 10.00 8.500 8.250 82.00
2+000 10.00 7.700 7.700 79.75
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

ANCHO BANCA ANCHO AREA TOTAL


ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
SUBTOTAL DEL Km. 1+00 AL 2+000 6,579.10
2+010 10.00 7.100 7.100 74.00
2+020 10.00 6.500 6.500 68.00
2+030 10.00 6.000 6.000 62.50
2+040 10.00 6.000 6.000 60.00
2+050 10.00 6.350 6.350 61.75
683.25
2+060 10.00 6.750 6.750 65.50
2+070 10.00 7.200 7.200 69.75
2+080 10.00 7.700 7.450 73.25
2+090 10.00 7.700 7.450 74.50
2+100 10.00 7.600 7.350 74.00
2+110 10.00 7.600 7.350 73.50
2+120 10.00 7.600 7.350 73.50
2+130 10.00 7.600 7.350 73.50
2+140 10.00 7.600 7.350 73.50
2+150 10.00 7.650 7.400 73.75
730.50
2+160 10.00 7.650 7.400 74.00
2+170 10.00 7.700 7.450 74.25
2+180 10.00 7.700 7.450 74.50
2+190 10.00 7.250 7.000 72.25
2+200 10.00 6.800 6.550 67.75
2+210 10.00 6.400 6.150 63.50
2+220 10.00 6.150 6.150 61.50
2+230 10.00 6.150 6.150 61.50
2+240 10.00 6.150 6.150 61.50
2+250 10.00 6.550 6.550 63.50
664.00
2+260 10.00 6.950 6.950 67.50
2+270 10.00 7.150 7.150 70.50
2+280 10.00 7.150 7.150 71.50
2+290 10.00 7.150 7.150 71.50
2+300 10.00 7.150 7.150 71.50
2+310 10.00 6.800 6.800 69.75
2+320 10.00 6.700 6.700 67.50
2+330 10.00 6.900 6.900 68.00
2+340 10.00 7.150 7.150 70.25
2+350 10.00 7.150 7.150 71.50
704.50
2+360 10.00 7.150 7.150 71.50
2+370 10.00 7.150 7.150 71.50
2+380 10.00 7.150 7.150 71.50
2+390 10.00 7.150 7.150 71.50
2+400 10.00 7.150 7.150 71.50
2+410 10.00 7.050 7.050 71.00
2+420 10.00 6.650 6.650 68.50
2+430 10.00 6.250 6.250 64.50
2+440 10.00 6.150 6.150 62.00
2+450 10.00 6.150 6.150 61.50
635.00
2+460 10.00 6.150 6.150 61.50
2+470 10.00 6.150 6.150 61.50
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

635.00
ANCHO BANCA ANCHO AREA TOTAL
ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
2+480 10.00 6.150 6.150 61.50
2+490 10.00 6.150 6.150 61.50
2+500 10.00 6.150 6.150 61.50
2+510 10.00 6.150 6.150 61.50
2+520 10.00 6.150 6.150 61.50
2+530 10.00 6.150 6.150 61.50
2+540 10.00 6.150 6.150 61.50
2+550 10.00 6.150 6.150 61.50
615.00
2+560 10.00 6.150 6.150 61.50
2+570 10.00 6.150 6.150 61.50
2+580 10.00 6.150 6.150 61.50
2+590 10.00 6.150 6.150 61.50
2+600 10.00 6.150 6.150 61.50
2+610 10.00 6.200 6.200 61.75
2+620 10.00 6.450 6.450 63.25
2+630 10.00 6.700 6.700 65.75
2+640 10.00 6.750 6.750 67.25
2+650 10.00 6.750 6.750 67.50
653.00
2+660 10.00 6.750 6.750 67.50
2+670 10.00 6.750 6.750 67.50
2+680 10.00 6.550 6.550 66.50
2+690 10.00 6.250 6.250 64.00
2+700 10.00 6.150 6.150 62.00
2+710 10.00 6.150 6.150 61.50
2+720 10.00 6.150 6.150 61.50
2+730 10.00 6.150 6.150 61.50
2+740 10.00 6.150 6.150 61.50
2+750 10.00 6.450 6.450 63.00
649.00
2+760 10.00 6.800 6.800 66.25
2+770 10.00 6.850 6.850 68.25
2+780 10.00 6.850 6.850 68.50
2+790 10.00 6.850 6.850 68.50
2+800 10.00 6.850 6.850 68.50
2+810 10.00 6.850 6.850 68.50
2+820 10.00 6.850 6.850 68.50
2+830 10.00 6.850 6.850 68.50
2+840 10.00 6.850 6.850 68.50
2+850 10.00 6.850 6.850 68.50 671.25
2+860 10.00 6.850 6.850 68.50
2+870 10.00 6.500 6.500 66.75
2+880 10.00 6.150 6.150 63.25
2+890 10.00 6.500 6.500 63.25
2+900 10.00 6.900 6.900 67.00
2+910 10.00 7.400 7.400 71.50
2+920 10.00 7.550 7.550 74.75
2+930 10.00 7.550 7.550 75.50
2+940 10.00 7.400 7.400 74.75
2+950 10.00 7.000 7.000 72.00
714.50
2+960 10.00 6.550 6.550 67.75
02.01 PAVIMENTOS ADOQUIN DE CONCRETO
02.01.03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO
DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

ANCHO BANCA ANCHO AREA TOTAL


714.50
ESTACA DISTANCIA (m) 'AREA (m2)
(m) SUBRASANTE (m) (m2)
2+970 10.00 6.150 6.150 63.50
2+980 10.00 6.600 6.600 63.75
2+990 10.00 7.500 7.500 70.50
3+000 10.00 8.600 8.600 80.50
SUBTOTAL DEL Km. 2+00 AL 3+000 6,720.00
3+010 10.00 9.400 9.400 90.00
3+020 10.00 10.150 10.150 97.75
3+030 10.00 10.150 10.150 101.50
3+040 10.00 10.150 10.150 101.50
3+050 10.00 10.000 10.000 100.75
920.25
3+060 10.00 9.300 9.300 96.50
3+070 10.00 8.600 8.600 89.50
3+080 10.00 8.000 8.000 83.00
3+090 10.00 7.850 7.850 79.25
3+100 10.00 8.250 8.250 80.50
3+110 10.00 8.550 8.550 84.00
3+120 10.00 8.550 8.550 85.50
3+130 10.00 7.800 7.800 81.75
3+140 10.00 6.650 6.650 72.25
3+150 10.00 6.150 6.150 64.00
695.00
3+160 10.00 6.150 6.150 61.50
3+170 10.00 6.150 6.150 61.50
3+180 10.00 6.150 6.150 61.50
3+190 10.00 6.150 6.150 61.50
3+200 10.00 6.150 6.150 61.50
3+210 10.00 6.150 6.150 61.50
3+220 10.00 6.350 6.350 62.50
3+230 10.00 6.700 6.700 65.25
3+240 10.00 6.850 6.850 67.75
3+250 10.00 6.850 6.850 68.50
640.50
3+260 10.00 6.550 6.550 67.00
3+270 10.00 6.150 6.150 63.50
3+280 10.00 6.150 6.150 61.50
3+290 10.00 6.150 6.150 61.50
3+300 10.00 6.150 6.150 61.50
3+310 10.00 6.200 6.200 61.75
3+320 10.00 6.600 6.600 64.00
3+330 10.00 7.000 7.000 68.00
3+340 10.00 7.350 7.350 71.75
3+350 10.00 7.250 7.250 73.00 588.85
3+360 10.00 6.900 6.900 70.75
3+370 10.00 6.550 6.550 67.25
3+380 10.00 6.200 6.200 63.75
3+387 7.20 6.150 6.150 48.60
SUBTOTAL DEL Km. 3+00 AL 3+353 2,844.60

TOTAL : 23,299.80
02.01.04 PAVIMENTOS
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

ESPESOR VOLUMEN VOLUMEN TOTAL


ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m) (m3) (m3)
00+000 6.000
0+010 10.00 6.200 61.00 0.200 12.200
0+020 10.00 6.500 63.50 0.200 12.700
0+030 10.00 6.150 63.25 0.200 12.650
0+040 10.00 6.000 60.75 0.200 12.150
0+050 10.00 6.000 60.00 0.200 12.000 121.70
0+060 10.00 6.000 60.00 0.200 12.000
0+070 10.00 6.000 60.00 0.200 12.000
0+080 10.00 6.000 60.00 0.200 12.000
0+090 10.00 6.000 60.00 0.200 12.000
0+100 10.00 6.000 60.00 0.200 12.000
0+110 10.00 6.400 62.00 0.200 12.400
0+120 10.00 6.800 66.00 0.200 13.200
0+130 10.00 6.900 68.50 0.200 13.700
0+140 20.00 6.900 138.00 0.200 27.600
0+150 20.00 6.650 135.50 0.200 27.100
162.70
0+160 10.00 6.550 66.00 0.200 13.200
0+170 10.00 6.750 66.50 0.200 13.300
0+180 10.00 7.250 70.00 0.200 14.000
0+190 10.00 7.150 72.00 0.200 14.400
0+200 10.00 6.650 69.00 0.200 13.800
0+210 10.00 6.200 64.25 0.200 12.850
0+220 10.00 6.000 61.00 0.200 12.200
0+230 10.00 6.000 60.00 0.200 12.000
0+240 10.00 6.150 60.75 0.200 12.150
0+250 10.00 6.500 63.25 0.200 12.650
128.75
0+260 10.00 6.600 65.50 0.200 13.100
0+270 10.00 6.600 66.00 0.200 13.200
0+280 10.00 6.750 66.75 0.200 13.350
0+290 10.00 6.800 67.75 0.200 13.550
0+300 10.00 6.900 68.50 0.200 13.700
0+310 10.00 6.900 69.00 0.200 13.800
0+320 10.00 6.600 67.50 0.200 13.500
0+330 10.00 6.200 64.00 0.200 12.800
0+340 10.00 6.000 61.00 0.200 12.200
0+350 10.00 6.400 62.00 0.200 12.400
140.10
0+360 10.00 6.950 66.75 0.200 13.350
0+370 10.00 7.550 72.50 0.200 14.500
0+380 10.00 8.000 77.75 0.200 15.550
0+390 10.00 8.000 80.00 0.200 16.000
0+400 10.00 8.000 80.00 0.200 16.000
0+410 10.00 7.950 79.75 0.200 15.950
0+420 10.00 7.800 78.75 0.200 15.750
0+430 10.00 7.610 77.05 0.200 15.410
0+440 10.00 7.500 75.55 0.200 15.110
0+450 10.00 7.500 75.00 0.200 15.000
146.42
0+460 10.00 7.500 75.00 0.200 15.000
0+470 10.00 7.050 72.75 0.200 14.550
0+480 10.00 6.700 68.75 0.200 13.750
0+490 10.00 6.400 65.50 0.200 13.100
0+500 10.00 6.400 64.00 0.200 12.800
0+510 10.00 6.400 64.00 0.200 12.800
0+520 10.00 6.400 64.00 0.200 12.800
0+530 10.00 6.400 64.00 0.200 12.800
0+540 10.00 6.400 64.00 0.200 12.800
0+550 10.00 6.400 64.00 0.200 12.800
127.60
0+560 10.00 6.400 64.00 0.200 12.800
0+570 10.00 6.400 64.00 0.200 12.800
0+580 10.00 6.400 64.00 0.200 12.800
0+590 10.00 6.250 63.25 0.200 12.650
0+600 10.00 6.300 62.75 0.200 12.550
0+610 10.00 6.750 65.25 0.200 13.050
0+620 10.00 7.050 69.00 0.200 13.800
0+630 10.00 6.900 69.75 0.200 13.950

137.30
02.01.04 PAVIMENTOS
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

ESPESOR VOLUMEN VOLUMEN TOTAL


ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m) (m3) (m3)
0+640 10.00 6.900 69.00 0.200 13.800
0+650 10.00 6.550 67.25 0.200 13.450
137.30
0+660 10.00 6.150 63.50 0.200 12.700
0+670 10.00 6.450 63.00 0.200 12.600
0+680 10.00 7.050 67.50 0.200 13.500
0+690 10.00 7.650 73.50 0.200 14.700
0+700 10.00 8.100 78.75 0.200 15.750
0+710 10.00 8.100 81.00 0.200 16.200
0+720 10.00 8.100 81.00 0.200 16.200
0+730 10.00 7.750 79.25 0.200 15.850
0+740 10.00 7.650 77.00 0.200 15.400
0+750 10.00 7.650 76.50 0.200 15.300
151.60
0+760 10.00 7.650 76.50 0.200 15.300
0+770 10.00 7.600 76.25 0.200 15.250
0+780 10.00 7.200 74.00 0.200 14.800
0+790 10.00 6.800 70.00 0.200 14.000
0+800 10.00 6.500 66.50 0.200 13.300
0+810 10.00 6.450 64.75 0.200 12.950
0+820 10.00 6.100 62.75 0.200 12.550
0+830 10.00 6.000 60.50 0.200 12.100
0+840 10.00 6.000 60.00 0.200 12.000
0+850 10.00 6.100 60.50 0.200 12.100
135.00
0+860 10.00 6.650 63.75 0.200 12.750
0+870 10.00 7.200 69.25 0.200 13.850
0+880 10.00 7.750 74.75 0.200 14.950
0+890 10.00 8.000 78.75 0.200 15.750
0+900 10.00 8.000 80.00 0.200 16.000
0+910 10.00 8.000 80.00 0.200 16.000
0+920 10.00 8.000 80.00 0.200 16.000
0+930 10.00 8.000 80.00 0.200 16.000
0+940 10.00 8.000 80.00 0.200 16.000
0+950 10.00 8.000 80.00 0.200 16.000
149.45
0+960 10.00 7.850 79.25 0.200 15.850
0+970 10.00 7.250 75.50 0.200 15.100
0+980 10.00 6.700 69.75 0.200 13.950
0+990 10.00 6.150 64.25 0.200 12.850
1+000 10.00 5.550 58.50 0.200 11.700
SUBTOTAL DEL Km. 0+00 AL 1+000 7,003.10 1,400.62
1+010 10.00 6.000 57.75 0.200 11.550
1+020 10.00 6.000 60.00 0.200 12.000
1+030 10.00 6.000 60.00 0.200 12.000
1+040 10.00 6.000 60.00 0.200 12.000
1+050 10.00 6.000 60.00 0.200 12.000
121.10
1+060 10.00 6.000 60.00 0.200 12.000
1+070 10.00 6.000 60.00 0.200 12.000
1+080 10.00 6.000 60.00 0.200 12.000
1+090 10.00 6.350 61.75 0.200 12.350
1+100 10.00 6.850 66.00 0.200 13.200
1+110 10.00 7.300 70.75 0.200 14.150
1+120 10.00 7.300 73.00 0.200 14.600
1+130 10.00 7.300 73.00 0.200 14.600
1+140 10.00 7.300 73.00 0.200 14.600
1+150 10.00 7.300 73.00 0.200 14.600
131.22
1+160 10.00 7.100 72.00 0.200 14.400
1+170 10.00 6.700 69.00 0.200 13.800
1+180 10.00 4.850 57.75 0.200 11.550
1+190 10.00 4.410 46.30 0.200 9.260
1+200 10.00 5.250 48.30 0.200 9.660
1+210 10.00 5.250 52.50 0.200 10.500
1+220 10.00 6.600 59.25 0.200 11.850
1+230 10.00 6.100 63.50 0.200 12.700
1+240 10.00 7.500 68.00 0.200 13.600
1+250 10.00 7.250 73.75 0.200 14.750
124.35
1+260 10.00 5.950 66.00 0.200 13.200
02.01.04 PAVIMENTOS
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387

ESPESOR VOLUMEN VOLUMEN TOTAL


ESTACA DISTANCIA (m) ANCHO (m) AREA (m2) 124.35
(m) (m3) (m3)
1+270 10.00 5.800 58.75 0.200 11.750
1+280 10.00 6.100 59.50 0.200 11.900
1+290 10.00 6.000 60.50 0.200 12.100
1+300 10.00 6.000 60.00 0.200 12.000
1+310 10.00 6.000 60.00 0.200 12.000
1+320 10.00 6.000 60.00 0.200 12.000
1+330 10.00 6.000 60.00 0.200 12.000
1+340 10.00 6.000 60.00 0.200 12.000
1+350 10.00 6.000 60.00 0.200 12.000
120.00
1+360 10.00 6.000 60.00 0.200 12.000
1+370 10.00 6.000 60.00 0.200 12.000
1+380 10.00 6.000 60.00 0.200 12.000
1+390 10.00 6.000 60.00 0.200 12.000
1+400 10.00 6.000 60.00 0.200 12.000
1+410 10.00 6.000 60.00 0.200 12.000
1+420 10.00 6.000 60.00 0.200 12.000
1+430 10.00 6.000 60.00 0.200 12.000
1+440 10.00 6.100 60.50 0.200 12.100
1+450 10.00 6.450 62.75 0.200 12.550
125.85
1+460 10.00 6.600 65.25 0.200 13.050
1+470 10.00 6.600 66.00 0.200 13.200
1+480 10.00 6.600 66.00 0.200 13.200
1+490 10.00 6.500 65.50 0.200 13.100
1+500 10.00 6.150 63.25 0.200 12.650
1+510 10.00 6.000 60.75 0.200 12.150
1+520 10.00 6.000 60.00 0.200 12.000
1+530 10.00 6.000 60.00 0.200 12.000
1+540 10.00 6.000 60.00 0.200 12.000
1+550 10.00 6.000 60.00 0.200 12.000
120.15
1+560 10.00 6.000 60.00 0.200 12.000
1+570 10.00 6.000 60.00 0.200 12.000
1+580 10.00 6.000 60.00 0.200 12.000
1+590 10.00 6.000 60.00 0.200 12.000
1+600 10.00 6.000 60.00 0.200 12.000
1+610 10.00 6.000 60.00 0.200 12.000
1+620 10.00 6.000 60.00 0.200 12.000
1+630 10.00 6.000 60.00 0.200 12.000
1+640 10.00 6.000 60.00 0.200 12.000
1+650 10.00 6.000 60.00 0.200 12.000
123.90
1+660 10.00 6.000 60.00 0.200 12.000
1+670 10.00 6.200 61.00 0.200 12.200
1+680 10.00 6.600 64.00 0.200 12.800
1+690 10.00 6.800 67.00 0.200 13.400
1+700 10.00 6.700 67.50 0.200 13.500
1+710 10.00 6.300 65.00 0.200 13.000
1+720 10.00 6.300 63.00 0.200 12.600
1+730 10.00 6.750 65.25 0.200 13.050
1+740 10.00 7.250 70.00 0.200 14.000
1+750 10.00 7.300 72.75 0.200 14.550
134.60
1+760 10.00 7.050 71.75 0.200 14.350
1+770 10.00 6.600 68.25 0.200 13.650
1+780 10.00 6.250 64.25 0.200 12.850
1+790 10.00 6.600 64.25 0.200 12.850
1+800 10.00 7.100 68.50 0.200 13.700
1+810 10.00 7.300 72.00 0.200 14.400
1+820 10.00 7.300 73.00 0.200 14.600
1+830 10.00 7.300 73.00 0.200 14.600
1+840 10.00 7.300 73.00 0.200 14.600
1+850 10.00 7.300 73.00 0.200 14.600
140.35
1+860 10.00 7.300 73.00 0.200 14.600
1+870 10.00 7.100 72.00 0.200 14.400
1+880 10.00 6.600 68.50 0.200 13.700
1+890 10.00 6.100 63.50 0.200 12.700
02.01.04 PAVIMENTOS
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387
140.35

ESPESOR VOLUMEN VOLUMEN TOTAL


ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m) (m3) (m3)
1+900 10.00 6.050 60.75 0.200 12.150
1+910 10.00 6.550 63.00 0.200 12.600
1+920 10.00 7.000 67.75 0.200 13.550
1+930 10.00 7.300 71.50 0.200 14.300
1+940 10.00 7.150 72.25 0.200 14.450
1+950 10.00 6.850 70.00 0.200 14.000
144.30
1+960 10.00 7.000 69.25 0.200 13.850
1+970 10.00 7.400 72.00 0.200 14.400
1+980 10.00 8.000 77.00 0.200 15.400
1+990 10.00 8.100 80.50 0.200 16.100
2+000 10.00 7.550 78.25 0.200 15.650
SUBTOTAL DEL Km. 1+00 AL 2+000 6,429.10 1,285.82
2+010 10.00 6.950 72.50 0.200 14.500
2+020 10.00 6.350 66.50 0.200 13.300
2+030 10.00 5.850 61.00 0.200 12.200
2+040 10.00 5.850 58.50 0.200 11.700
2+050 10.00 6.200 60.25 0.200 12.050
133.65
2+060 10.00 6.600 64.00 0.200 12.800
2+070 10.00 7.050 68.25 0.200 13.650
2+080 10.00 7.300 71.75 0.200 14.350
2+090 10.00 7.300 73.00 0.200 14.600
2+100 10.00 7.200 72.50 0.200 14.500
2+110 10.00 7.200 72.00 0.200 14.400
2+120 10.00 7.200 72.00 0.200 14.400
2+130 10.00 7.200 72.00 0.200 14.400
2+140 10.00 7.200 72.00 0.200 14.400
2+150 10.00 7.250 72.25 0.200 14.450
143.10
2+160 10.00 7.250 72.50 0.200 14.500
2+170 10.00 7.300 72.75 0.200 14.550
2+180 10.00 7.300 73.00 0.200 14.600
2+190 10.00 6.850 70.75 0.200 14.150
2+200 10.00 6.400 66.25 0.200 13.250
2+210 10.00 6.000 62.00 0.200 12.400
2+220 10.00 6.000 60.00 0.200 12.000
2+230 10.00 6.000 60.00 0.200 12.000
2+240 10.00 6.000 60.00 0.200 12.000
2+250 10.00 6.400 62.00 0.200 12.400
129.80
2+260 10.00 6.800 66.00 0.200 13.200
2+270 10.00 7.000 69.00 0.200 13.800
2+280 10.00 7.000 70.00 0.200 14.000
2+290 10.00 7.000 70.00 0.200 14.000
2+300 10.00 7.000 70.00 0.200 14.000
2+310 10.00 6.650 68.25 0.200 13.650
2+320 10.00 6.550 66.00 0.200 13.200
2+330 10.00 6.750 66.50 0.200 13.300
2+340 10.00 7.000 68.75 0.200 13.750
2+350 10.00 7.000 70.00 0.200 14.000
137.90
2+360 10.00 7.000 70.00 0.200 14.000
2+370 10.00 7.000 70.00 0.200 14.000
2+380 10.00 7.000 70.00 0.200 14.000
2+390 10.00 7.000 70.00 0.200 14.000
2+400 10.00 7.000 70.00 0.200 14.000
2+410 10.00 6.900 69.50 0.200 13.900
2+420 10.00 6.500 67.00 0.200 13.400
2+430 10.00 6.100 63.00 0.200 12.600
2+440 10.00 6.000 60.50 0.200 12.100
2+450 10.00 6.000 60.00 0.200 12.000
124.00
2+460 10.00 6.000 60.00 0.200 12.000
2+470 10.00 6.000 60.00 0.200 12.000
2+480 10.00 6.000 60.00 0.200 12.000
02.01.04 PAVIMENTOS
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387
124.00

ESPESOR VOLUMEN VOLUMEN TOTAL


ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m) (m3) (m3)
2+490 10.00 6.000 60.00 0.200 12.000
2+500 10.00 6.000 60.00 0.200 12.000
2+510 10.00 6.000 60.00 0.200 12.000
2+520 10.00 6.000 60.00 0.200 12.000
2+530 10.00 6.000 60.00 0.200 12.000
2+540 10.00 6.000 60.00 0.200 12.000
2+550 10.00 6.000 60.00 0.200 12.000
120.00
2+560 10.00 6.000 60.00 0.200 12.000
2+570 10.00 6.000 60.00 0.200 12.000
2+580 10.00 6.000 60.00 0.200 12.000
2+590 10.00 6.000 60.00 0.200 12.000
2+600 10.00 6.000 60.00 0.200 12.000
2+610 10.00 6.050 60.25 0.200 12.050
2+620 10.00 6.300 61.75 0.200 12.350
2+630 10.00 6.550 64.25 0.200 12.850
2+640 10.00 6.600 65.75 0.200 13.150
2+650 10.00 6.600 66.00 0.200 13.200
127.60
2+660 10.00 6.600 66.00 0.200 13.200
2+670 10.00 6.600 66.00 0.200 13.200
2+680 10.00 6.400 65.00 0.200 13.000
2+690 10.00 6.100 62.50 0.200 12.500
2+700 10.00 6.000 60.50 0.200 12.100
2+710 10.00 6.000 60.00 0.200 12.000
2+720 10.00 6.000 60.00 0.200 12.000
2+730 10.00 6.000 60.00 0.200 12.000
2+740 10.00 6.000 60.00 0.200 12.000
2+750 10.00 6.300 61.50 0.200 12.300
126.80
2+760 10.00 6.650 64.75 0.200 12.950
2+770 10.00 6.700 66.75 0.200 13.350
2+780 10.00 6.700 67.00 0.200 13.400
2+790 10.00 6.700 67.00 0.200 13.400
2+800 10.00 6.700 67.00 0.200 13.400
2+810 10.00 6.700 67.00 0.200 13.400
2+820 10.00 6.700 67.00 0.200 13.400
2+830 10.00 6.700 67.00 0.200 13.400
2+840 10.00 6.700 67.00 0.200 13.400
2+850 10.00 6.700 67.00 0.200 13.400 131.25
2+860 10.00 6.700 67.00 0.200 13.400
2+870 10.00 6.350 65.25 0.200 13.050
2+880 10.00 6.000 61.75 0.200 12.350
2+890 10.00 6.350 61.75 0.200 12.350
2+900 10.00 6.750 65.50 0.200 13.100
2+910 10.00 7.250 70.00 0.200 14.000
2+920 10.00 7.400 73.25 0.200 14.650
2+930 10.00 7.400 74.00 0.200 14.800
2+940 10.00 7.250 73.25 0.200 14.650
2+950 10.00 6.850 70.50 0.200 14.100
139.90
2+960 10.00 6.400 66.25 0.200 13.250
2+970 10.00 6.000 62.00 0.200 12.400
2+980 10.00 6.450 62.25 0.200 12.450
2+990 10.00 7.350 69.00 0.200 13.800
3+000 10.00 8.450 79.00 0.200 15.800
SUBTOTAL DEL Km. 2+00 AL 3+000 6,570.00 1,314.00
3+010 10.00 9.250 88.50 0.200 17.700
3+020 10.00 10.000 96.25 0.200 19.250
3+030 10.00 10.000 100.00 0.200 20.000
3+040 10.00 10.000 100.00 0.200 20.000
3+050 10.00 9.850 99.25 0.200 19.850
181.05
3+060 10.00 9.150 95.00 0.200 19.000
3+070 10.00 8.450 88.00 0.200 17.600
3+080 10.00 7.850 81.50 0.200 16.300
02.01.04 PAVIMENTOS
02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO DE SOCABAYA - AREQUIPA -
META FISICA: AREQUIPA
0+000 @ 3+387
181.05

ESPESOR VOLUMEN VOLUMEN TOTAL


ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m) (m3) (m3)
3+090 10.00 7.700 77.75 0.200 15.550
3+100 10.00 8.100 79.00 0.200 15.800
3+110 10.00 8.400 82.50 0.200 16.500
3+120 10.00 8.400 84.00 0.200 16.800
3+130 10.00 7.650 80.25 0.200 16.050
3+140 10.00 6.500 70.75 0.200 14.150
3+150 10.00 6.000 62.50 0.200 12.500
136.00
3+160 10.00 6.000 60.00 0.200 12.000
3+170 10.00 6.000 60.00 0.200 12.000
3+180 10.00 6.000 60.00 0.200 12.000
3+190 10.00 6.000 60.00 0.200 12.000
3+200 10.00 6.000 60.00 0.200 12.000
3+210 10.00 6.000 60.00 0.200 12.000
3+220 10.00 6.200 61.00 0.200 12.200
3+230 10.00 6.550 63.75 0.200 12.750
3+240 10.00 6.700 66.25 0.200 13.250
3+250 10.00 6.700 67.00 0.200 13.400
125.10
3+260 10.00 6.400 65.50 0.200 13.100
3+270 10.00 6.000 62.00 0.200 12.400
3+280 10.00 6.000 60.00 0.200 12.000
3+290 10.00 6.000 60.00 0.200 12.000
3+300 10.00 6.000 60.00 0.200 12.000
3+310 10.00 6.050 60.25 0.200 12.050
3+320 10.00 6.450 62.50 0.200 12.500
3+330 10.00 6.850 66.50 0.200 13.300
3+340 10.00 7.200 70.25 0.200 14.050
3+350 10.00 7.100 71.50 0.200 14.300 114.33
3+360 10.00 6.750 69.25 0.200 13.850
3+370 10.00 6.400 65.75 0.200 13.150
3+380 10.00 6.050 62.25 0.200 12.450
3+387 7.20 6.000 43.38 0.200 8.676
SUBTOTAL DEL Km. 3+00 AL 3+348 2,782.38 556.48

TOTAL : 22,784.58 4,556.92

CUADRO RESUMEN
MATERIAL GRANULAR PARA BASE PUESTO EN OBRA

ITEM ACTIVIDAD SUBPARTIDAS UNIDAD VOLUMEN PORCENTAJE TOTAL

02.01.04.01 MATERIAL GRANULAR PARA BASE PUESTO EN OBRA M3 4,556.92 80% 3,645.53
02.01.04.02 MATERIAL CHANCADO PARA BASE PUESTO EN OBRA M3 4,556.92 20% 911.38
02.01.04.03 BASE GRANULAR E=0.20 m M2 22,647.83 - 22,647.83
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
00+000 6.000
0+010 10.00 6.200 61.00
0+020 10.00 6.500 63.50
0+030 10.00 6.150 63.25
0+040 10.00 6.000 60.75
0+050 10.00 6.000 60.00 608.50
0+060 10.00 6.000 60.00
0+070 10.00 6.000 60.00
0+080 10.00 6.000 60.00
0+090 10.00 6.000 60.00
0+100 10.00 6.000 60.00
0+110 10.00 6.400 62.00
0+120 10.00 6.800 66.00
0+130 10.00 6.900 68.50
0+140 10.00 6.900 69.00
0+150 10.00 6.650 67.75
676.75
0+160 10.00 6.550 66.00
0+170 10.00 6.750 66.50
0+180 10.00 7.250 70.00
0+190 10.00 7.150 72.00
0+200 10.00 6.650 69.00
0+210 10.00 6.200 64.25
0+220 10.00 6.000 61.00
0+230 10.00 6.000 60.00
0+240 10.00 6.150 60.75
0+250 10.00 6.500 63.25
643.75
0+260 10.00 6.600 65.50
0+270 10.00 6.600 66.00
0+280 10.00 6.750 66.75
0+290 10.00 6.800 67.75
0+300 10.00 6.900 68.50
0+310 10.00 6.900 69.00
0+320 10.00 6.600 67.50
0+330 10.00 6.200 64.00
0+340 10.00 6.000 61.00
0+350 10.00 6.400 62.00
700.50
0+360 10.00 6.950 66.75
0+370 10.00 7.550 72.50
0+380 10.00 8.000 77.75
0+390 10.00 8.000 80.00
0+400 10.00 8.000 80.00
0+410 10.00 7.950 79.75
0+420 10.00 7.800 78.75
0+430 10.00 7.610 77.05
0+440 10.00 7.500 75.55
0+450 10.00 7.500 75.00
732.10
0+460 10.00 7.500 75.00
0+470 10.00 7.050 72.75
0+480 10.00 6.700 68.75
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
732.10

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
0+490 10.00 6.400 65.50
0+500 10.00 6.400 64.00
0+510 10.00 6.400 64.00
0+520 10.00 6.400 64.00
0+530 10.00 6.400 64.00
0+540 10.00 6.400 64.00
0+550 10.00 6.400 64.00
638.00
0+560 10.00 6.400 64.00
0+570 10.00 6.400 64.00
0+580 10.00 6.400 64.00
0+590 10.00 6.250 63.25
0+600 10.00 6.300 62.75
0+610 10.00 6.750 65.25
0+620 10.00 7.050 69.00
0+630 10.00 6.900 69.75
0+640 10.00 6.900 69.00
0+650 10.00 6.550 67.25
686.50
0+660 10.00 6.150 63.50
0+670 10.00 6.450 63.00
0+680 10.00 7.050 67.50
0+690 10.00 7.650 73.50
0+700 10.00 8.100 78.75
0+710 10.00 8.100 81.00
0+720 10.00 8.100 81.00
0+730 10.00 7.750 79.25
0+740 10.00 7.650 77.00
0+750 10.00 7.650 76.50
758.00
0+760 10.00 7.650 76.50
0+770 10.00 7.600 76.25
0+780 10.00 7.200 74.00
0+790 10.00 6.800 70.00
0+800 10.00 6.500 66.50
0+810 10.00 6.450 64.75
0+820 10.00 6.100 62.75
0+830 10.00 6.000 60.50
0+840 10.00 6.000 60.00
0+850 10.00 6.100 60.50
675.00
0+860 10.00 6.650 63.75
0+870 10.00 7.200 69.25
0+880 10.00 7.750 74.75
0+890 10.00 8.000 78.75
0+900 10.00 8.000 80.00
0+910 10.00 8.000 80.00
0+920 10.00 8.000 80.00
0+930 10.00 8.000 80.00
0+940 10.00 8.000 80.00
0+950 10.00 8.000 80.00
747.25
0+960 10.00 7.850 79.25
0+970 10.00 7.250 75.50
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

747.25
AREA AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
0+980 10.00 6.700 69.75
0+990 10.00 6.150 64.25
1+000 10.00 5.550 58.50
SUBTOTAL DEL Km. 0+00 AL 1+000 6,866.35 6,866.35
1+010 10.00 6.000 57.75
1+020 10.00 6.000 60.00
1+030 10.00 6.000 60.00
1+040 10.00 6.000 60.00
1+050 10.00 6.000 60.00
605.50
1+060 10.00 6.000 60.00
1+070 10.00 6.000 60.00
1+080 10.00 6.000 60.00
1+090 10.00 6.350 61.75
1+100 10.00 6.850 66.00
1+110 10.00 7.300 70.75
1+120 10.00 7.300 73.00
1+130 10.00 7.300 73.00
1+140 10.00 7.300 73.00
1+150 10.00 7.300 73.00
656.10
1+160 10.00 7.100 72.00
1+170 10.00 6.700 69.00
1+180 10.00 4.850 57.75
1+190 10.00 4.410 46.30
1+200 10.00 5.250 48.30
1+210 10.00 5.250 52.50
1+220 10.00 6.600 59.25
1+230 10.00 6.100 63.50
1+240 10.00 7.500 68.00
1+250 10.00 7.250 73.75
621.75
1+260 10.00 5.950 66.00
1+270 10.00 5.800 58.75
1+280 10.00 6.100 59.50
1+290 10.00 6.000 60.50
1+300 10.00 6.000 60.00
1+310 10.00 6.000 60.00
1+320 10.00 6.000 60.00
1+330 10.00 6.000 60.00
1+340 10.00 6.000 60.00
1+350 10.00 6.000 60.00
600.00
1+360 10.00 6.000 60.00
1+370 10.00 6.000 60.00
1+380 10.00 6.000 60.00
1+390 10.00 6.000 60.00
1+400 10.00 6.000 60.00
1+410 10.00 6.000 60.00
1+420 10.00 6.000 60.00
1+430 10.00 6.000 60.00
1+440 10.00 6.100 60.50
1+450 10.00 6.450 62.75
629.25
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
629.25
1+460 10.00 6.600 65.25
1+470 10.00 6.600 66.00
1+480 10.00 6.600 66.00
1+490 10.00 6.500 65.50
1+500 10.00 6.150 63.25
1+510 10.00 6.000 60.75
1+520 10.00 6.000 60.00
1+530 10.00 6.000 60.00
1+540 10.00 6.000 60.00
1+550 10.00 6.000 60.00
600.75
1+560 10.00 6.000 60.00
1+570 10.00 6.000 60.00
1+580 10.00 6.000 60.00
1+590 10.00 6.000 60.00
1+600 10.00 6.000 60.00
1+610 10.00 6.000 60.00
1+620 10.00 6.000 60.00
1+630 10.00 6.000 60.00
1+640 10.00 6.000 60.00
1+650 10.00 6.000 60.00
619.50
1+660 10.00 6.000 60.00
1+670 10.00 6.200 61.00
1+680 10.00 6.600 64.00
1+690 10.00 6.800 67.00
1+700 10.00 6.700 67.50
1+710 10.00 6.300 65.00
1+720 10.00 6.300 63.00
1+730 10.00 6.750 65.25
1+740 10.00 7.250 70.00
1+750 10.00 7.300 72.75
673.00
1+760 10.00 7.050 71.75
1+770 10.00 6.600 68.25
1+780 10.00 6.250 64.25
1+790 10.00 6.600 64.25
1+800 10.00 7.100 68.50
1+810 10.00 7.300 72.00
1+820 10.00 7.300 73.00
1+830 10.00 7.300 73.00
1+840 10.00 7.300 73.00
1+850 10.00 7.300 73.00
701.75
1+860 10.00 7.300 73.00
1+870 10.00 7.100 72.00
1+880 10.00 6.600 68.50
1+890 10.00 6.100 63.50
1+900 10.00 6.050 60.75
1+910 10.00 6.550 63.00
1+920 10.00 7.000 67.75
1+930 10.00 7.300 71.50

721.50
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
1+940 10.00 7.150 72.25
1+950 10.00 6.850 70.00
721.50
1+960 10.00 7.000 69.25
1+970 10.00 7.400 72.00
1+980 10.00 8.000 77.00
1+990 10.00 8.100 80.50
2+000 10.00 7.550 78.25
SUBTOTAL DEL Km. 1+00 AL 2+000 6,429.10 6,429.10
2+010 10.00 6.950 72.50
2+020 10.00 6.350 66.50
2+030 10.00 5.850 61.00
2+040 10.00 5.850 58.50
2+050 10.00 6.200 60.25
668.25
2+060 10.00 6.600 64.00
2+070 10.00 7.050 68.25
2+080 10.00 7.300 71.75
2+090 10.00 7.300 73.00
2+100 10.00 7.200 72.50
2+110 10.00 7.200 72.00
2+120 10.00 7.200 72.00
2+130 10.00 7.200 72.00
2+140 10.00 7.200 72.00
2+150 10.00 7.250 72.25
715.50
2+160 10.00 7.250 72.50
2+170 10.00 7.300 72.75
2+180 10.00 7.300 73.00
2+190 10.00 6.850 70.75
2+200 10.00 6.400 66.25
2+210 10.00 6.000 62.00
2+220 10.00 6.000 60.00
2+230 10.00 6.000 60.00
2+240 10.00 6.000 60.00
2+250 10.00 6.400 62.00
649.00
2+260 10.00 6.800 66.00
2+270 10.00 7.000 69.00
2+280 10.00 7.000 70.00
2+290 10.00 7.000 70.00
2+300 10.00 7.000 70.00
2+310 10.00 6.650 68.25
2+320 10.00 6.550 66.00
2+330 10.00 6.750 66.50
2+340 10.00 7.000 68.75
2+350 10.00 7.000 70.00
689.50
2+360 10.00 7.000 70.00
2+370 10.00 7.000 70.00
2+380 10.00 7.000 70.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
689.50

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+390 10.00 7.000 70.00
2+400 10.00 7.000 70.00
2+410 10.00 6.900 69.50
2+420 10.00 6.500 67.00
2+430 10.00 6.100 63.00
2+440 10.00 6.000 60.50
2+450 10.00 6.000 60.00
620.00
2+460 10.00 6.000 60.00
2+470 10.00 6.000 60.00
2+480 10.00 6.000 60.00
2+490 10.00 6.000 60.00
2+500 10.00 6.000 60.00
2+510 10.00 6.000 60.00
2+520 10.00 6.000 60.00
2+530 10.00 6.000 60.00
2+540 10.00 6.000 60.00
2+550 10.00 6.000 60.00
600.00
2+560 10.00 6.000 60.00
2+570 10.00 6.000 60.00
2+580 10.00 6.000 60.00
2+590 10.00 6.000 60.00
2+600 10.00 6.000 60.00
2+610 10.00 6.050 60.25
2+620 10.00 6.300 61.75
2+630 10.00 6.550 64.25
2+640 10.00 6.600 65.75
2+650 10.00 6.600 66.00
638.00
2+660 10.00 6.600 66.00
2+670 10.00 6.600 66.00
2+680 10.00 6.400 65.00
2+690 10.00 6.100 62.50
2+700 10.00 6.000 60.50
2+710 10.00 6.000 60.00
2+720 10.00 6.000 60.00
2+730 10.00 6.000 60.00
2+740 10.00 6.000 60.00
2+750 10.00 6.300 61.50
634.00
2+760 10.00 6.650 64.75
2+770 10.00 6.700 66.75
2+780 10.00 6.700 67.00
2+790 10.00 6.700 67.00
2+800 10.00 6.700 67.00
2+810 10.00 6.700 67.00
2+820 10.00 6.700 67.00
2+830 10.00 6.700 67.00
2+840 10.00 6.700 67.00
656.25
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+850 10.00 6.700 67.00 656.25
2+860 10.00 6.700 67.00
2+870 10.00 6.350 65.25
2+880 10.00 6.000 61.75
2+890 10.00 6.350 61.75
2+900 10.00 6.750 65.50
2+910 10.00 7.250 70.00
2+920 10.00 7.400 73.25
2+930 10.00 7.400 74.00
2+940 10.00 7.250 73.25
2+950 10.00 6.850 70.50
699.50
2+960 10.00 6.400 66.25
2+970 10.00 6.000 62.00
2+980 10.00 6.450 62.25
2+990 10.00 7.350 69.00
3+000 10.00 8.450 79.00
SUBTOTAL DEL Km. 2+00 AL 3+000 6,570.00 6,570.00
3+010 10.00 9.250 88.50
3+020 10.00 10.000 96.25
3+030 10.00 10.000 100.00
3+040 10.00 10.000 100.00
3+050 10.00 9.850 99.25
905.25
3+060 10.00 9.150 95.00
3+070 10.00 8.450 88.00
3+080 10.00 7.850 81.50
3+090 10.00 7.700 77.75
3+100 10.00 8.100 79.00
3+110 10.00 8.400 82.50
3+120 10.00 8.400 84.00
3+130 10.00 7.650 80.25
3+140 10.00 6.500 70.75
3+150 10.00 6.000 62.50
680.00
3+160 10.00 6.000 60.00
3+170 10.00 6.000 60.00
3+180 10.00 6.000 60.00
3+190 10.00 6.000 60.00
3+200 10.00 6.000 60.00
3+210 10.00 6.000 60.00
3+220 10.00 6.200 61.00
3+230 10.00 6.550 63.75
3+240 10.00 6.700 66.25
3+250 10.00 6.700 67.00
625.50
3+260 10.00 6.400 65.50
3+270 10.00 6.000 62.00
3+280 10.00 6.000 60.00
3+290 10.00 6.000 60.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
625.50

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
3+300 10.00 6.000 60.00
3+310 10.00 6.050 60.25
3+320 10.00 6.450 62.50
3+330 10.00 6.850 66.50
3+340 10.00 7.200 70.25
3+350 10.00 7.100 71.50 571.63
3+360 10.00 6.750 69.25
3+370 10.00 6.400 65.75
3+380 10.00 6.050 62.25
3+387 7.20 6.000 43.38
SUBTOTAL DEL Km. 3+00 AL 3+348 2,782.38 2,782.38

TOTAL : 22,647.83 22,647.83

02.01.04.05 ACARREO INTERNO DE ADOQUINES


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: 0+000 @ PAMPA,
3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
00+000 6.000
0+010 10.00 6.200 61.00
0+020 10.00 6.500 63.50
0+030 10.00 6.150 63.25
0+040 10.00 6.000 60.75
0+050 10.00 6.000 60.00 608.50
0+060 10.00 6.000 60.00
0+070 10.00 6.000 60.00
0+080 10.00 6.000 60.00
0+090 10.00 6.000 60.00
0+100 10.00 6.000 60.00
0+110 10.00 6.400 62.00
0+120 10.00 6.800 66.00
0+130 10.00 6.900 68.50
0+140 10.00 6.900 69.00
0+150 10.00 6.650 67.75
676.75
0+160 10.00 6.550 66.00
0+170 10.00 6.750 66.50
0+180 10.00 7.250 70.00
0+190 10.00 7.150 72.00
0+200 10.00 6.650 69.00
0+210 10.00 6.200 64.25
0+220 10.00 6.000 61.00
0+230 10.00 6.000 60.00
0+240 10.00 6.150 60.75
0+250 10.00 6.500 63.25
643.75
0+260 10.00 6.600 65.50
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m) 643.75
(m2) (m2)
0+270 10.00 6.600 66.00
0+280 10.00 6.750 66.75
0+290 10.00 6.800 67.75
0+300 10.00 6.900 68.50
0+310 10.00 6.900 69.00
0+320 10.00 6.600 67.50
0+330 10.00 6.200 64.00
0+340 10.00 6.000 61.00
0+350 10.00 6.400 62.00
700.50
0+360 10.00 6.950 66.75
0+370 10.00 7.550 72.50
0+380 10.00 8.000 77.75
0+390 10.00 8.000 80.00
0+400 10.00 8.000 80.00
0+410 10.00 7.950 79.75
0+420 10.00 7.800 78.75
0+430 10.00 7.610 77.05
0+440 10.00 7.500 75.55
0+450 10.00 7.500 75.00
732.10
0+460 10.00 7.500 75.00
0+470 10.00 7.050 72.75
0+480 10.00 6.700 68.75
0+490 10.00 6.400 65.50
0+500 10.00 6.400 64.00
0+510 10.00 6.400 64.00
0+520 10.00 6.400 64.00
0+530 10.00 6.400 64.00
0+540 10.00 6.400 64.00
0+550 10.00 6.400 64.00
638.00
0+560 10.00 6.400 64.00
0+570 10.00 6.400 64.00
0+580 10.00 6.400 64.00
0+590 10.00 6.250 63.25
0+600 10.00 6.300 62.75
0+610 10.00 6.750 65.25
0+620 10.00 7.050 69.00
0+630 10.00 6.900 69.75
0+640 10.00 6.900 69.00
0+650 10.00 6.550 67.25
686.50
0+660 10.00 6.150 63.50
0+670 10.00 6.450 63.00
0+680 10.00 7.050 67.50
0+690 10.00 7.650 73.50
0+700 10.00 8.100 78.75
0+710 10.00 8.100 81.00
0+720 10.00 8.100 81.00
0+730 10.00 7.750 79.25
0+740 10.00 7.650 77.00
0+750 10.00 7.650 76.50
758.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
758.00
0+760 10.00 7.650 76.50
0+770 10.00 7.600 76.25
0+780 10.00 7.200 74.00
0+790 10.00 6.800 70.00
0+800 10.00 6.500 66.50
0+810 10.00 6.450 64.75
0+820 10.00 6.100 62.75
0+830 10.00 6.000 60.50
0+840 10.00 6.000 60.00
0+850 10.00 6.100 60.50
675.00
0+860 10.00 6.650 63.75
0+870 10.00 7.200 69.25
0+880 10.00 7.750 74.75
0+890 10.00 8.000 78.75
0+900 10.00 8.000 80.00
0+910 10.00 8.000 80.00
0+920 10.00 8.000 80.00
0+930 10.00 8.000 80.00
0+940 10.00 8.000 80.00
0+950 10.00 8.000 80.00
747.25
0+960 10.00 7.850 79.25
0+970 10.00 7.250 75.50
0+980 10.00 6.700 69.75
0+990 10.00 6.150 64.25
1+000 10.00 5.550 58.50
SUBTOTAL DEL Km. 0+00 AL 1+000 6,866.35 6,866.35
1+010 10.00 6.000 57.75
1+020 10.00 6.000 60.00
1+030 10.00 6.000 60.00
1+040 10.00 6.000 60.00
1+050 10.00 6.000 60.00
605.50
1+060 10.00 6.000 60.00
1+070 10.00 6.000 60.00
1+080 10.00 6.000 60.00
1+090 10.00 6.350 61.75
1+100 10.00 6.850 66.00
1+110 10.00 7.300 70.75
1+120 10.00 7.300 73.00
1+130 10.00 7.300 73.00
1+140 10.00 7.300 73.00
1+150 10.00 7.300 73.00
656.10
1+160 10.00 7.100 72.00
1+170 10.00 6.700 69.00
1+180 10.00 4.850 57.75
1+190 10.00 4.410 46.30
1+200 10.00 5.250 48.30
1+210 10.00 5.250 52.50
1+220 10.00 6.600 59.25
1+230 10.00 6.100 63.50

621.75
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
1+240 10.00 7.500 68.00
1+250 10.00 7.250 73.75
621.75
1+260 10.00 5.950 66.00
1+270 10.00 5.800 58.75
1+280 10.00 6.100 59.50
1+290 10.00 6.000 60.50
1+300 10.00 6.000 60.00
1+310 10.00 6.000 60.00
1+320 10.00 6.000 60.00
1+330 10.00 6.000 60.00
1+340 10.00 6.000 60.00
1+350 10.00 6.000 60.00
600.00
1+360 10.00 6.000 60.00
1+370 10.00 6.000 60.00
1+380 10.00 6.000 60.00
1+390 10.00 6.000 60.00
1+400 10.00 6.000 60.00
1+410 10.00 6.000 60.00
1+420 10.00 6.000 60.00
1+430 10.00 6.000 60.00
1+440 10.00 6.100 60.50
1+450 10.00 6.450 62.75
629.25
1+460 10.00 6.600 65.25
1+470 10.00 6.600 66.00
1+480 10.00 6.600 66.00
1+490 10.00 6.500 65.50
1+500 10.00 6.150 63.25
1+510 10.00 6.000 60.75
1+520 10.00 6.000 60.00
1+530 10.00 6.000 60.00
1+540 10.00 6.000 60.00
1+550 10.00 6.000 60.00
600.75
1+560 10.00 6.000 60.00
1+570 10.00 6.000 60.00
1+580 10.00 6.000 60.00
1+590 10.00 6.000 60.00
1+600 10.00 6.000 60.00
1+610 10.00 6.000 60.00
1+620 10.00 6.000 60.00
1+630 10.00 6.000 60.00
1+640 10.00 6.000 60.00
1+650 10.00 6.000 60.00
619.50
1+660 10.00 6.000 60.00
1+670 10.00 6.200 61.00
1+680 10.00 6.600 64.00
1+690 10.00 6.800 67.00
1+700 10.00 6.700 67.50
1+710 10.00 6.300 65.00
1+720 10.00 6.300 63.00

673.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
1+730 10.00 6.750 65.25
1+740 10.00 7.250 70.00
1+750 10.00 7.300 72.75
673.00
1+760 10.00 7.050 71.75
1+770 10.00 6.600 68.25
1+780 10.00 6.250 64.25
1+790 10.00 6.600 64.25
1+800 10.00 7.100 68.50
1+810 10.00 7.300 72.00
1+820 10.00 7.300 73.00
1+830 10.00 7.300 73.00
1+840 10.00 7.300 73.00
1+850 10.00 7.300 73.00
701.75
1+860 10.00 7.300 73.00
1+870 10.00 7.100 72.00
1+880 10.00 6.600 68.50
1+890 10.00 6.100 63.50
1+900 10.00 6.050 60.75
1+910 10.00 6.550 63.00
1+920 10.00 7.000 67.75
1+930 10.00 7.300 71.50
1+940 10.00 7.150 72.25
1+950 10.00 6.850 70.00
721.50
1+960 10.00 7.000 69.25
1+970 10.00 7.400 72.00
1+980 10.00 8.000 77.00
1+990 10.00 8.100 80.50
2+000 10.00 7.550 78.25
SUBTOTAL DEL Km. 1+00 AL 2+000 6,429.10 6,429.10
2+010 10.00 6.950 72.50
2+020 10.00 6.350 66.50
2+030 10.00 5.850 61.00
2+040 10.00 5.850 58.50
2+050 10.00 6.200 60.25
668.25
2+060 10.00 6.600 64.00
2+070 10.00 7.050 68.25
2+080 10.00 7.300 71.75
2+090 10.00 7.300 73.00
2+100 10.00 7.200 72.50
2+110 10.00 7.200 72.00
2+120 10.00 7.200 72.00
2+130 10.00 7.200 72.00
2+140 10.00 7.200 72.00
2+150 10.00 7.250 72.25
715.50
2+160 10.00 7.250 72.50
2+170 10.00 7.300 72.75
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

715.50
AREA AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+180 10.00 7.300 73.00
2+190 10.00 6.850 70.75
2+200 10.00 6.400 66.25
2+210 10.00 6.000 62.00
2+220 10.00 6.000 60.00
2+230 10.00 6.000 60.00
2+240 10.00 6.000 60.00
2+250 10.00 6.400 62.00
649.00
2+260 10.00 6.800 66.00
2+270 10.00 7.000 69.00
2+280 10.00 7.000 70.00
2+290 10.00 7.000 70.00
2+300 10.00 7.000 70.00
2+310 10.00 6.650 68.25
2+320 10.00 6.550 66.00
2+330 10.00 6.750 66.50
2+340 10.00 7.000 68.75
2+350 10.00 7.000 70.00
689.50
2+360 10.00 7.000 70.00
2+370 10.00 7.000 70.00
2+380 10.00 7.000 70.00
2+390 10.00 7.000 70.00
2+400 10.00 7.000 70.00
2+410 10.00 6.900 69.50
2+420 10.00 6.500 67.00
2+430 10.00 6.100 63.00
2+440 10.00 6.000 60.50
2+450 10.00 6.000 60.00
620.00
2+460 10.00 6.000 60.00
2+470 10.00 6.000 60.00
2+480 10.00 6.000 60.00
2+490 10.00 6.000 60.00
2+500 10.00 6.000 60.00
2+510 10.00 6.000 60.00
2+520 10.00 6.000 60.00
2+530 10.00 6.000 60.00
2+540 10.00 6.000 60.00
2+550 10.00 6.000 60.00
600.00
2+560 10.00 6.000 60.00
2+570 10.00 6.000 60.00
2+580 10.00 6.000 60.00
2+590 10.00 6.000 60.00
2+600 10.00 6.000 60.00
2+610 10.00 6.050 60.25
2+620 10.00 6.300 61.75
2+630 10.00 6.550 64.25

638.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+640 10.00 6.600 65.75
2+650 10.00 6.600 66.00
638.00
2+660 10.00 6.600 66.00
2+670 10.00 6.600 66.00
2+680 10.00 6.400 65.00
2+690 10.00 6.100 62.50
2+700 10.00 6.000 60.50
2+710 10.00 6.000 60.00
2+720 10.00 6.000 60.00
2+730 10.00 6.000 60.00
2+740 10.00 6.000 60.00
2+750 10.00 6.300 61.50
634.00
2+760 10.00 6.650 64.75
2+770 10.00 6.700 66.75
2+780 10.00 6.700 67.00
2+790 10.00 6.700 67.00
2+800 10.00 6.700 67.00
2+810 10.00 6.700 67.00
2+820 10.00 6.700 67.00
2+830 10.00 6.700 67.00
2+840 10.00 6.700 67.00
2+850 10.00 6.700 67.00 656.25
2+860 10.00 6.700 67.00
2+870 10.00 6.350 65.25
2+880 10.00 6.000 61.75
2+890 10.00 6.350 61.75
2+900 10.00 6.750 65.50
2+910 10.00 7.250 70.00
2+920 10.00 7.400 73.25
2+930 10.00 7.400 74.00
2+940 10.00 7.250 73.25
2+950 10.00 6.850 70.50
699.50
2+960 10.00 6.400 66.25
2+970 10.00 6.000 62.00
2+980 10.00 6.450 62.25
2+990 10.00 7.350 69.00
3+000 10.00 8.450 79.00
SUBTOTAL DEL Km. 2+00 AL 3+000 6,570.00 6,570.00
3+010 10.00 9.250 88.50
3+020 10.00 10.000 96.25
3+030 10.00 10.000 100.00
3+040 10.00 10.000 100.00
3+050 10.00 9.850 99.25
905.25
3+060 10.00 9.150 95.00
3+070 10.00 8.450 88.00
3+080 10.00 7.850 81.50
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
905.25

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
3+090 10.00 7.700 77.75
3+100 10.00 8.100 79.00
3+110 10.00 8.400 82.50
3+120 10.00 8.400 84.00
3+130 10.00 7.650 80.25
3+140 10.00 6.500 70.75
3+150 10.00 6.000 62.50
680.00
3+160 10.00 6.000 60.00
3+170 10.00 6.000 60.00
3+180 10.00 6.000 60.00
3+190 10.00 6.000 60.00
3+200 10.00 6.000 60.00
3+210 10.00 6.000 60.00
3+220 10.00 6.200 61.00
3+230 10.00 6.550 63.75
3+240 10.00 6.700 66.25
3+250 10.00 6.700 67.00
625.50
3+260 10.00 6.400 65.50
3+270 10.00 6.000 62.00
3+280 10.00 6.000 60.00
3+290 10.00 6.000 60.00
3+300 10.00 6.000 60.00
3+310 10.00 6.050 60.25
3+320 10.00 6.450 62.50
3+330 10.00 6.850 66.50
3+340 10.00 7.200 70.25
3+350 10.00 7.100 71.50 571.63
3+360 10.00 6.750 69.25
3+370 10.00 6.400 65.75
3+380 10.00 6.050 62.25
3+387 7.20 6.000 43.38
SUBTOTAL DEL Km. 3+00 AL 3+348 2,782.38 2,782.38

factor (UND) 50.00


TOTAL : 22,647.83 1,132,391.50

02.01.04.06 ADOQUINES DE CONCRETO H=0.06 m, f'c=420 kg/cm2


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: 0+000 @ PAMPA,
3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
00+000 6.000
0+010 10.00 6.200 61.00
0+020 10.00 6.500 63.50

608.50
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
0+030 10.00 6.150 63.25
0+040 10.00 6.000 60.75
0+050 10.00 6.000 60.00 608.50
0+060 10.00 6.000 60.00
0+070 10.00 6.000 60.00
0+080 10.00 6.000 60.00
0+090 10.00 6.000 60.00
0+100 10.00 6.000 60.00
0+110 10.00 6.400 62.00
0+120 10.00 6.800 66.00
0+130 10.00 6.900 68.50
0+140 10.00 6.900 69.00
0+150 10.00 6.650 67.75
676.75
0+160 10.00 6.550 66.00
0+170 10.00 6.750 66.50
0+180 10.00 7.250 70.00
0+190 10.00 7.150 72.00
0+200 10.00 6.650 69.00
0+210 10.00 6.200 64.25
0+220 10.00 6.000 61.00
0+230 10.00 6.000 60.00
0+240 10.00 6.150 60.75
0+250 10.00 6.500 63.25
643.75
0+260 10.00 6.600 65.50
0+270 10.00 6.600 66.00
0+280 10.00 6.750 66.75
0+290 10.00 6.800 67.75
0+300 10.00 6.900 68.50
0+310 10.00 6.900 69.00
0+320 10.00 6.600 67.50
0+330 10.00 6.200 64.00
0+340 10.00 6.000 61.00
0+350 10.00 6.400 62.00
700.50
0+360 10.00 6.950 66.75
0+370 10.00 7.550 72.50
0+380 10.00 8.000 77.75
0+390 10.00 8.000 80.00
0+400 10.00 8.000 80.00
0+410 10.00 7.950 79.75
0+420 10.00 7.800 78.75
0+430 10.00 7.610 77.05
0+440 10.00 7.500 75.55
0+450 10.00 7.500 75.00
732.10
0+460 10.00 7.500 75.00
0+470 10.00 7.050 72.75
0+480 10.00 6.700 68.75
0+490 10.00 6.400 65.50
0+500 10.00 6.400 64.00
0+510 10.00 6.400 64.00

638.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
0+520 10.00 6.400 64.00
0+530 10.00 6.400 64.00
0+540 10.00 6.400 64.00
0+550 10.00 6.400 64.00
638.00
0+560 10.00 6.400 64.00
0+570 10.00 6.400 64.00
0+580 10.00 6.400 64.00
0+590 10.00 6.250 63.25
0+600 10.00 6.300 62.75
0+610 10.00 6.750 65.25
0+620 10.00 7.050 69.00
0+630 10.00 6.900 69.75
0+640 10.00 6.900 69.00
0+650 10.00 6.550 67.25
686.50
0+660 10.00 6.150 63.50
0+670 10.00 6.450 63.00
0+680 10.00 7.050 67.50
0+690 10.00 7.650 73.50
0+700 10.00 8.100 78.75
0+710 10.00 8.100 81.00
0+720 10.00 8.100 81.00
0+730 10.00 7.750 79.25
0+740 10.00 7.650 77.00
0+750 10.00 7.650 76.50
758.00
0+760 10.00 7.650 76.50
0+770 10.00 7.600 76.25
0+780 10.00 7.200 74.00
0+790 10.00 6.800 70.00
0+800 10.00 6.500 66.50
0+810 10.00 6.450 64.75
0+820 10.00 6.100 62.75
0+830 10.00 6.000 60.50
0+840 10.00 6.000 60.00
0+850 10.00 6.100 60.50
675.00
0+860 10.00 6.650 63.75
0+870 10.00 7.200 69.25
0+880 10.00 7.750 74.75
0+890 10.00 8.000 78.75
0+900 10.00 8.000 80.00
0+910 10.00 8.000 80.00
0+920 10.00 8.000 80.00
0+930 10.00 8.000 80.00
0+940 10.00 8.000 80.00
0+950 10.00 8.000 80.00
747.25
0+960 10.00 7.850 79.25
0+970 10.00 7.250 75.50
0+980 10.00 6.700 69.75
0+990 10.00 6.150 64.25
1+000 10.00 5.550 58.50
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
SUBTOTAL DEL Km. 0+00 AL 1+000 6,866.35 6,866.35
1+010 10.00 6.000 57.75
1+020 10.00 6.000 60.00
1+030 10.00 6.000 60.00
1+040 10.00 6.000 60.00
1+050 10.00 6.000 60.00
605.50
1+060 10.00 6.000 60.00
1+070 10.00 6.000 60.00
1+080 10.00 6.000 60.00
1+090 10.00 6.350 61.75
1+100 10.00 6.850 66.00
1+110 10.00 7.300 70.75
1+120 10.00 7.300 73.00
1+130 10.00 7.300 73.00
1+140 10.00 7.300 73.00
1+150 10.00 7.300 73.00
656.10
1+160 10.00 7.100 72.00
1+170 10.00 6.700 69.00
1+180 10.00 4.850 57.75
1+190 10.00 4.410 46.30
1+200 10.00 5.250 48.30
1+210 10.00 5.250 52.50
1+220 10.00 6.600 59.25
1+230 10.00 6.100 63.50
1+240 10.00 7.500 68.00
1+250 10.00 7.250 73.75
621.75
1+260 10.00 5.950 66.00
1+270 10.00 5.800 58.75
1+280 10.00 6.100 59.50
1+290 10.00 6.000 60.50
1+300 10.00 6.000 60.00
1+310 10.00 6.000 60.00
1+320 10.00 6.000 60.00
1+330 10.00 6.000 60.00
1+340 10.00 6.000 60.00
1+350 10.00 6.000 60.00
600.00
1+360 10.00 6.000 60.00
1+370 10.00 6.000 60.00
1+380 10.00 6.000 60.00
1+390 10.00 6.000 60.00
1+400 10.00 6.000 60.00
1+410 10.00 6.000 60.00
1+420 10.00 6.000 60.00
1+430 10.00 6.000 60.00
1+440 10.00 6.100 60.50
1+450 10.00 6.450 62.75
629.25
1+460 10.00 6.600 65.25
1+470 10.00 6.600 66.00
1+480 10.00 6.600 66.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
629.25

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
1+490 10.00 6.500 65.50
1+500 10.00 6.150 63.25
1+510 10.00 6.000 60.75
1+520 10.00 6.000 60.00
1+530 10.00 6.000 60.00
1+540 10.00 6.000 60.00
1+550 10.00 6.000 60.00
600.75
1+560 10.00 6.000 60.00
1+570 10.00 6.000 60.00
1+580 10.00 6.000 60.00
1+590 10.00 6.000 60.00
1+600 10.00 6.000 60.00
1+610 10.00 6.000 60.00
1+620 10.00 6.000 60.00
1+630 10.00 6.000 60.00
1+640 10.00 6.000 60.00
1+650 10.00 6.000 60.00
619.50
1+660 10.00 6.000 60.00
1+670 10.00 6.200 61.00
1+680 10.00 6.600 64.00
1+690 10.00 6.800 67.00
1+700 10.00 6.700 67.50
1+710 10.00 6.300 65.00
1+720 10.00 6.300 63.00
1+730 10.00 6.750 65.25
1+740 10.00 7.250 70.00
1+750 10.00 7.300 72.75
673.00
1+760 10.00 7.050 71.75
1+770 10.00 6.600 68.25
1+780 10.00 6.250 64.25
1+790 10.00 6.600 64.25
1+800 10.00 7.100 68.50
1+810 10.00 7.300 72.00
1+820 10.00 7.300 73.00
1+830 10.00 7.300 73.00
1+840 10.00 7.300 73.00
1+850 10.00 7.300 73.00
701.75
1+860 10.00 7.300 73.00
1+870 10.00 7.100 72.00
1+880 10.00 6.600 68.50
1+890 10.00 6.100 63.50
1+900 10.00 6.050 60.75
1+910 10.00 6.550 63.00
1+920 10.00 7.000 67.75
1+930 10.00 7.300 71.50
1+940 10.00 7.150 72.25
1+950 10.00 6.850 70.00
721.50
1+960 10.00 7.000 69.25
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m) 721.50
(m2) (m2)
1+970 10.00 7.400 72.00
1+980 10.00 8.000 77.00
1+990 10.00 8.100 80.50
2+000 10.00 7.550 78.25
SUBTOTAL DEL Km. 1+00 AL 2+000 6,429.10 6,429.10
2+010 10.00 6.950 72.50
2+020 10.00 6.350 66.50
2+030 10.00 5.850 61.00
2+040 10.00 5.850 58.50
2+050 10.00 6.200 60.25
668.25
2+060 10.00 6.600 64.00
2+070 10.00 7.050 68.25
2+080 10.00 7.300 71.75
2+090 10.00 7.300 73.00
2+100 10.00 7.200 72.50
2+110 10.00 7.200 72.00
2+120 10.00 7.200 72.00
2+130 10.00 7.200 72.00
2+140 10.00 7.200 72.00
2+150 10.00 7.250 72.25
715.50
2+160 10.00 7.250 72.50
2+170 10.00 7.300 72.75
2+180 10.00 7.300 73.00
2+190 10.00 6.850 70.75
2+200 10.00 6.400 66.25
2+210 10.00 6.000 62.00
2+220 10.00 6.000 60.00
2+230 10.00 6.000 60.00
2+240 10.00 6.000 60.00
2+250 10.00 6.400 62.00
649.00
2+260 10.00 6.800 66.00
2+270 10.00 7.000 69.00
2+280 10.00 7.000 70.00
2+290 10.00 7.000 70.00
2+300 10.00 7.000 70.00
2+310 10.00 6.650 68.25
2+320 10.00 6.550 66.00
2+330 10.00 6.750 66.50
2+340 10.00 7.000 68.75
2+350 10.00 7.000 70.00
689.50
2+360 10.00 7.000 70.00
2+370 10.00 7.000 70.00
2+380 10.00 7.000 70.00
2+390 10.00 7.000 70.00
2+400 10.00 7.000 70.00
2+410 10.00 6.900 69.50

620.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+420 10.00 6.500 67.00
2+430 10.00 6.100 63.00
2+440 10.00 6.000 60.50
2+450 10.00 6.000 60.00
620.00
2+460 10.00 6.000 60.00
2+470 10.00 6.000 60.00
2+480 10.00 6.000 60.00
2+490 10.00 6.000 60.00
2+500 10.00 6.000 60.00
2+510 10.00 6.000 60.00
2+520 10.00 6.000 60.00
2+530 10.00 6.000 60.00
2+540 10.00 6.000 60.00
2+550 10.00 6.000 60.00
600.00
2+560 10.00 6.000 60.00
2+570 10.00 6.000 60.00
2+580 10.00 6.000 60.00
2+590 10.00 6.000 60.00
2+600 10.00 6.000 60.00
2+610 10.00 6.050 60.25
2+620 10.00 6.300 61.75
2+630 10.00 6.550 64.25
2+640 10.00 6.600 65.75
2+650 10.00 6.600 66.00
638.00
2+660 10.00 6.600 66.00
2+670 10.00 6.600 66.00
2+680 10.00 6.400 65.00
2+690 10.00 6.100 62.50
2+700 10.00 6.000 60.50
2+710 10.00 6.000 60.00
2+720 10.00 6.000 60.00
2+730 10.00 6.000 60.00
2+740 10.00 6.000 60.00
2+750 10.00 6.300 61.50
634.00
2+760 10.00 6.650 64.75
2+770 10.00 6.700 66.75
2+780 10.00 6.700 67.00
2+790 10.00 6.700 67.00
2+800 10.00 6.700 67.00
2+810 10.00 6.700 67.00
2+820 10.00 6.700 67.00
2+830 10.00 6.700 67.00
2+840 10.00 6.700 67.00
2+850 10.00 6.700 67.00 656.25
2+860 10.00 6.700 67.00
2+870 10.00 6.350 65.25
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

656.25
AREA AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+880 10.00 6.000 61.75
2+890 10.00 6.350 61.75
2+900 10.00 6.750 65.50
2+910 10.00 7.250 70.00
2+920 10.00 7.400 73.25
2+930 10.00 7.400 74.00
2+940 10.00 7.250 73.25
2+950 10.00 6.850 70.50
699.50
2+960 10.00 6.400 66.25
2+970 10.00 6.000 62.00
2+980 10.00 6.450 62.25
2+990 10.00 7.350 69.00
3+000 10.00 8.450 79.00
SUBTOTAL DEL Km. 2+00 AL 3+000 6,570.00 6,570.00
3+010 10.00 9.250 88.50
3+020 10.00 10.000 96.25
3+030 10.00 10.000 100.00
3+040 10.00 10.000 100.00
3+050 10.00 9.850 99.25
905.25
3+060 10.00 9.150 95.00
3+070 10.00 8.450 88.00
3+080 10.00 7.850 81.50
3+090 10.00 7.700 77.75
3+100 10.00 8.100 79.00
3+110 10.00 8.400 82.50
3+120 10.00 8.400 84.00
3+130 10.00 7.650 80.25
3+140 10.00 6.500 70.75
3+150 10.00 6.000 62.50
680.00
3+160 10.00 6.000 60.00
3+170 10.00 6.000 60.00
3+180 10.00 6.000 60.00
3+190 10.00 6.000 60.00
3+200 10.00 6.000 60.00
3+210 10.00 6.000 60.00
3+220 10.00 6.200 61.00
3+230 10.00 6.550 63.75
3+240 10.00 6.700 66.25
3+250 10.00 6.700 67.00
625.50
3+260 10.00 6.400 65.50
3+270 10.00 6.000 62.00
3+280 10.00 6.000 60.00
3+290 10.00 6.000 60.00
3+300 10.00 6.000 60.00
3+310 10.00 6.050 60.25
3+320 10.00 6.450 62.50

571.63
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
3+330 10.00 6.850 66.50
3+340 10.00 7.200 70.25
3+350 10.00 7.100 71.50 571.63
3+360 10.00 6.750 69.25
3+370 10.00 6.400 65.75
3+380 10.00 6.050 62.25
3+387 7.20 6.000 43.38
SUBTOTAL DEL Km. 3+00 AL 3+348 2,782.38 2,782.38

TOTAL : 22,647.83 22,647.83

02.01.04.07 SELLADO Y COMPACTACION ADOQUIN DE CONCRETO


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: 0+000 @ PAMPA,
3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
00+000 6.000
0+010 10.00 6.200 61.00
0+020 10.00 6.500 63.50
0+030 10.00 6.150 63.25
0+040 10.00 6.000 60.75
0+050 10.00 6.000 60.00 608.50
0+060 10.00 6.000 60.00
0+070 10.00 6.000 60.00
0+080 10.00 6.000 60.00
0+090 10.00 6.000 60.00
0+100 10.00 6.000 60.00
0+110 10.00 6.400 62.00
0+120 10.00 6.800 66.00
0+130 10.00 6.900 68.50
0+140 10.00 6.900 69.00
0+150 10.00 6.650 67.75
676.75
0+160 10.00 6.550 66.00
0+170 10.00 6.750 66.50
0+180 10.00 7.250 70.00
0+190 10.00 7.150 72.00
0+200 10.00 6.650 69.00
0+210 10.00 6.200 64.25
0+220 10.00 6.000 61.00
0+230 10.00 6.000 60.00
0+240 10.00 6.150 60.75
0+250 10.00 6.500 63.25
643.75
0+260 10.00 6.600 65.50
0+270 10.00 6.600 66.00
0+280 10.00 6.750 66.75
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
643.75

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
0+290 10.00 6.800 67.75
0+300 10.00 6.900 68.50
0+310 10.00 6.900 69.00
0+320 10.00 6.600 67.50
0+330 10.00 6.200 64.00
0+340 10.00 6.000 61.00
0+350 10.00 6.400 62.00
700.50
0+360 10.00 6.950 66.75
0+370 10.00 7.550 72.50
0+380 10.00 8.000 77.75
0+390 10.00 8.000 80.00
0+400 10.00 8.000 80.00
0+410 10.00 7.950 79.75
0+420 10.00 7.800 78.75
0+430 10.00 7.610 77.05
0+440 10.00 7.500 75.55
0+450 10.00 7.500 75.00
732.10
0+460 10.00 7.500 75.00
0+470 10.00 7.050 72.75
0+480 10.00 6.700 68.75
0+490 10.00 6.400 65.50
0+500 10.00 6.400 64.00
0+510 10.00 6.400 64.00
0+520 10.00 6.400 64.00
0+530 10.00 6.400 64.00
0+540 10.00 6.400 64.00
0+550 10.00 6.400 64.00
638.00
0+560 10.00 6.400 64.00
0+570 10.00 6.400 64.00
0+580 10.00 6.400 64.00
0+590 10.00 6.250 63.25
0+600 10.00 6.300 62.75
0+610 10.00 6.750 65.25
0+620 10.00 7.050 69.00
0+630 10.00 6.900 69.75
0+640 10.00 6.900 69.00
0+650 10.00 6.550 67.25
686.50
0+660 10.00 6.150 63.50
0+670 10.00 6.450 63.00
0+680 10.00 7.050 67.50
0+690 10.00 7.650 73.50
0+700 10.00 8.100 78.75
0+710 10.00 8.100 81.00
0+720 10.00 8.100 81.00
0+730 10.00 7.750 79.25
0+740 10.00 7.650 77.00
0+750 10.00 7.650 76.50
758.00
0+760 10.00 7.650 76.50
0+770 10.00 7.600 76.25
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

758.00
AREA AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
0+780 10.00 7.200 74.00
0+790 10.00 6.800 70.00
0+800 10.00 6.500 66.50
0+810 10.00 6.450 64.75
0+820 10.00 6.100 62.75
0+830 10.00 6.000 60.50
0+840 10.00 6.000 60.00
0+850 10.00 6.100 60.50
675.00
0+860 10.00 6.650 63.75
0+870 10.00 7.200 69.25
0+880 10.00 7.750 74.75
0+890 10.00 8.000 78.75
0+900 10.00 8.000 80.00
0+910 10.00 8.000 80.00
0+920 10.00 8.000 80.00
0+930 10.00 8.000 80.00
0+940 10.00 8.000 80.00
0+950 10.00 8.000 80.00
747.25
0+960 10.00 7.850 79.25
0+970 10.00 7.250 75.50
0+980 10.00 6.700 69.75
0+990 10.00 6.150 64.25
1+000 10.00 5.550 58.50
SUBTOTAL DEL Km. 0+00 AL 1+000 0.000 6,866.35 6,866.35
1+010 10.00 6.000 57.75
1+020 10.00 6.000 60.00
1+030 10.00 6.000 60.00
1+040 10.00 6.000 60.00
1+050 10.00 6.000 60.00
605.50
1+060 10.00 6.000 60.00
1+070 10.00 6.000 60.00
1+080 10.00 6.000 60.00
1+090 10.00 6.350 61.75
1+100 10.00 6.850 66.00
1+110 10.00 7.300 70.75
1+120 10.00 7.300 73.00
1+130 10.00 7.300 73.00
1+140 10.00 7.300 73.00
1+150 10.00 7.300 73.00
656.10
1+160 10.00 7.100 72.00
1+170 10.00 6.700 69.00
1+180 10.00 4.850 57.75
1+190 10.00 4.410 46.30
1+200 10.00 5.250 48.30
1+210 10.00 5.250 52.50
1+220 10.00 6.600 59.25
1+230 10.00 6.100 63.50
1+240 10.00 7.500 68.00
1+250 10.00 7.250 73.75
621.75
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
621.75
1+260 10.00 5.950 66.00
1+270 10.00 5.800 58.75
1+280 10.00 6.100 59.50
1+290 10.00 6.000 60.50
1+300 10.00 6.000 60.00
1+310 10.00 6.000 60.00
1+320 10.00 6.000 60.00
1+330 10.00 6.000 60.00
1+340 10.00 6.000 60.00
1+350 10.00 6.000 60.00
600.00
1+360 10.00 6.000 60.00
1+370 10.00 6.000 60.00
1+380 10.00 6.000 60.00
1+390 10.00 6.000 60.00
1+400 10.00 6.000 60.00
1+410 10.00 6.000 60.00
1+420 10.00 6.000 60.00
1+430 10.00 6.000 60.00
1+440 10.00 6.100 60.50
1+450 10.00 6.450 62.75
629.25
1+460 10.00 6.600 65.25
1+470 10.00 6.600 66.00
1+480 10.00 6.600 66.00
1+490 10.00 6.500 65.50
1+500 10.00 6.150 63.25
1+510 10.00 6.000 60.75
1+520 10.00 6.000 60.00
1+530 10.00 6.000 60.00
1+540 10.00 6.000 60.00
1+550 10.00 6.000 60.00
600.75
1+560 10.00 6.000 60.00
1+570 10.00 6.000 60.00
1+580 10.00 6.000 60.00
1+590 10.00 6.000 60.00
1+600 10.00 6.000 60.00
1+610 10.00 6.000 60.00
1+620 10.00 6.000 60.00
1+630 10.00 6.000 60.00
1+640 10.00 6.000 60.00
1+650 10.00 6.000 60.00
619.50
1+660 10.00 6.000 60.00
1+670 10.00 6.200 61.00
1+680 10.00 6.600 64.00
1+690 10.00 6.800 67.00
1+700 10.00 6.700 67.50
1+710 10.00 6.300 65.00
1+720 10.00 6.300 63.00
1+730 10.00 6.750 65.25
1+740 10.00 7.250 70.00

673.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
1+750 10.00 7.300 72.75
673.00
1+760 10.00 7.050 71.75
1+770 10.00 6.600 68.25
1+780 10.00 6.250 64.25
1+790 10.00 6.600 64.25
1+800 10.00 7.100 68.50
1+810 10.00 7.300 72.00
1+820 10.00 7.300 73.00
1+830 10.00 7.300 73.00
1+840 10.00 7.300 73.00
1+850 10.00 7.300 73.00
701.75
1+860 10.00 7.300 73.00
1+870 10.00 7.100 72.00
1+880 10.00 6.600 68.50
1+890 10.00 6.100 63.50
1+900 10.00 6.050 60.75
1+910 10.00 6.550 63.00
1+920 10.00 7.000 67.75
1+930 10.00 7.300 71.50
1+940 10.00 7.150 72.25
1+950 10.00 6.850 70.00
721.50
1+960 10.00 7.000 69.25
1+970 10.00 7.400 72.00
1+980 10.00 8.000 77.00
1+990 10.00 8.100 80.50
2+000 10.00 7.550 78.25
SUBTOTAL DEL Km. 1+00 AL 2+000 0.000 6,429.10 6,429.10
2+010 10.00 6.950 72.50
2+020 10.00 6.350 66.50
2+030 10.00 5.850 61.00
2+040 10.00 5.850 58.50
2+050 10.00 6.200 60.25
668.25
2+060 10.00 6.600 64.00
2+070 10.00 7.050 68.25
2+080 10.00 7.300 71.75
2+090 10.00 7.300 73.00
2+100 10.00 7.200 72.50
2+110 10.00 7.200 72.00
2+120 10.00 7.200 72.00
2+130 10.00 7.200 72.00
2+140 10.00 7.200 72.00
2+150 10.00 7.250 72.25
715.50
2+160 10.00 7.250 72.50
2+170 10.00 7.300 72.75
2+180 10.00 7.300 73.00
2+190 10.00 6.850 70.75
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA
715.50

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
2+200 10.00 6.400 66.25
2+210 10.00 6.000 62.00
2+220 10.00 6.000 60.00
2+230 10.00 6.000 60.00
2+240 10.00 6.000 60.00
2+250 10.00 6.400 62.00
649.00
2+260 10.00 6.800 66.00
2+270 10.00 7.000 69.00
2+280 10.00 7.000 70.00
2+290 10.00 7.000 70.00
2+300 10.00 7.000 70.00
2+310 10.00 6.650 68.25
2+320 10.00 6.550 66.00
2+330 10.00 6.750 66.50
2+340 10.00 7.000 68.75
2+350 10.00 7.000 70.00
689.50
2+360 10.00 7.000 70.00
2+370 10.00 7.000 70.00
2+380 10.00 7.000 70.00
2+390 10.00 7.000 70.00
2+400 10.00 7.000 70.00
2+410 10.00 6.900 69.50
2+420 10.00 6.500 67.00
2+430 10.00 6.100 63.00
2+440 10.00 6.000 60.50
2+450 10.00 6.000 60.00
620.00
2+460 10.00 6.000 60.00
2+470 10.00 6.000 60.00
2+480 10.00 6.000 60.00
2+490 10.00 6.000 60.00
2+500 10.00 6.000 60.00
2+510 10.00 6.000 60.00
2+520 10.00 6.000 60.00
2+530 10.00 6.000 60.00
2+540 10.00 6.000 60.00
2+550 10.00 6.000 60.00
600.00
2+560 10.00 6.000 60.00
2+570 10.00 6.000 60.00
2+580 10.00 6.000 60.00
2+590 10.00 6.000 60.00
2+600 10.00 6.000 60.00
2+610 10.00 6.050 60.25
2+620 10.00 6.300 61.75
2+630 10.00 6.550 64.25
2+640 10.00 6.600 65.75
2+650 10.00 6.600 66.00
638.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
638.00
2+660 10.00 6.600 66.00
2+670 10.00 6.600 66.00
2+680 10.00 6.400 65.00
2+690 10.00 6.100 62.50
2+700 10.00 6.000 60.50
2+710 10.00 6.000 60.00
2+720 10.00 6.000 60.00
2+730 10.00 6.000 60.00
2+740 10.00 6.000 60.00
2+750 10.00 6.300 61.50
634.00
2+760 10.00 6.650 64.75
2+770 10.00 6.700 66.75
2+780 10.00 6.700 67.00
2+790 10.00 6.700 67.00
2+800 10.00 6.700 67.00
2+810 10.00 6.700 67.00
2+820 10.00 6.700 67.00
2+830 10.00 6.700 67.00
2+840 10.00 6.700 67.00
2+850 10.00 6.700 67.00 656.25
2+860 10.00 6.700 67.00
2+870 10.00 6.350 65.25
2+880 10.00 6.000 61.75
2+890 10.00 6.350 61.75
2+900 10.00 6.750 65.50
2+910 10.00 7.250 70.00
2+920 10.00 7.400 73.25
2+930 10.00 7.400 74.00
2+940 10.00 7.250 73.25
2+950 10.00 6.850 70.50
699.50
2+960 10.00 6.400 66.25
2+970 10.00 6.000 62.00
2+980 10.00 6.450 62.25
2+990 10.00 7.350 69.00
3+000 10.00 8.450 79.00
SUBTOTAL DEL Km. 2+00 AL 3+000 0.000 6,570.00 6,570.00
3+010 10.00 9.250 88.50
3+020 10.00 10.000 96.25
3+030 10.00 10.000 100.00
3+040 10.00 10.000 100.00
3+050 10.00 9.850 99.25
905.25
3+060 10.00 9.150 95.00
3+070 10.00 8.450 88.00
3+080 10.00 7.850 81.50
3+090 10.00 7.700 77.75
3+100 10.00 8.100 79.00
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
3+110 10.00 8.400 82.50
3+120 10.00 8.400 84.00
3+130 10.00 7.650 80.25
3+140 10.00 6.500 70.75
3+150 10.00 6.000 62.50
680.00
3+160 10.00 6.000 60.00
3+170 10.00 6.000 60.00
3+180 10.00 6.000 60.00
3+190 10.00 6.000 60.00
3+200 10.00 6.000 60.00
3+210 10.00 6.000 60.00
3+220 10.00 6.200 61.00
3+230 10.00 6.550 63.75
3+240 10.00 6.700 66.25
3+250 10.00 6.700 67.00
625.50
3+260 10.00 6.400 65.50
3+270 10.00 6.000 62.00
3+280 10.00 6.000 60.00
3+290 10.00 6.000 60.00
3+300 10.00 6.000 60.00
3+310 10.00 6.050 60.25
3+320 10.00 6.450 62.50
3+330 10.00 6.850 66.50
3+340 10.00 7.200 70.25
3+350 10.00 7.100 71.50 571.63
3+360 10.00 6.750 69.25
3+370 10.00 6.400 65.75
3+380 10.00 6.050 62.25
3+387 7.20 6.000 43.38
SUBTOTAL DEL Km. 3+00 AL 3+348 2,782.38 2,782.38

TOTAL : 22,647.83 22,647.83

02.01.04.08 SARDINEL SUMERGIDO 0.15 x 0.35m. f´c=175 kg/cm2


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: 0+000 @ PAMPA,
3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO SUB TOTAL


ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
0+000
1+000.00 1.00 1000.00 - - 1000.00
1+163.25 1.00 163.25 - - 163.25
1+240.00 2.00 76.75 - - 153.50
1+990.90 1.00 750.90 - - 750.90
2+072.80
ADOQUINES DE CONCRETO
02.01.04.04 CAMA DE ARENA H=4.00 cm,
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA
META FISICA: PAMPA,
0+000 @DISTRITO
3+387 DE SOCABAYA - AREQUIPA - AREQUIPA

AREA AREA TOTAL


ESTACA DISTANCIA (m) ANCHO (m)
(m2) (m2)
3+000.00 1.00 927.20 - - 927.20
3+387.20 1.00 387.20 - - 387.20

TOTAL DEL Km. 0+000 AL 3+387.2 3382.05

CUADRO RESUMEN
PAVIMENTO

ACTIVIDAD SUBPARTIDAS UNIDAD PARCIAL TOTAL

CAMA DE ARENA H=4.00 cm, M2 22,647.83 22,647.83


ACARREO INTERNO DE ADOQUINES UND 1,132,391.50 1,132,391.50
ADOQUINES DE CONCRETO H=0.06 m, f'c=420 kg/cm2 M2 22,647.83 22,647.83
SELLADO Y COMPACTACION ADOQUIN DE CONCRETO M2 22,647.83 22,647.83
SARDINEL SUMERGIDO 0.15 x 0.35m. f´c=175 kg/cm2 M 3,382.05 3,382.05
02.01.05 SEÑALIZACIÓN Y SEGURIDAD VIAL

OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA, DISTRITO


DE SOCABAYA - AREQUIPA - AREQUIPA
META FISICA: 0+000 @ 3+387

02.01.05.01 PINTADO DE MARCAS PAVIMEMTO (LÍNEA DISCONTINUA e=0.125 m.)


DIMENSIONAMIENTO SUB TOTAL
DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (m)
0+000.00 / 0+020.80 1.00 20.80 - - 20.80
0+039.40 / 0+307.50 1.00 268.10 - - 268.10
0+340.00 / 0+893.50 1.00 563.30 - - 563.30
0+906.00 / 1+066.00 1.00 151.05 - - 151.05
1+076.00 / 1+684.00 1.00 608.50 - - 608.50
1+703.00 / 1+747.00 1.00 44.95 - - 44.95
1+772.00 / 1+781.00 1.00 9.30 - - 9.30
1+813.00 / 3+093.00 1.00 1280.10 - - 1280.10

3+110.00 / 3+387.20 1.00 278.10 - - 278.10


TOTAL SEÑALES : 3224.20

02.01.05.02 PINTADO DE MARCAS PAVIMEMTO (LÍNEA CONTINUA e=0.125 m.)


DIMENSIONAMIENTO SUB TOTAL
DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (m)
0+000.00 / 3+387.20 2.00 3387.20 - - 6774.40
TOTAL SEÑALES : 6774.40

02.01.05.03 PINTADO DE SIMBOLO LETRAS Y ZONAL


DIMENSIONAMIENTO SUB TOTAL
DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (m)
0+020 / 0+040
Flecha (defrente-derecha) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 2.00 3.50 0.50 - 3.50
Ciclovia 2.00 area 0.30 - 0.60
0+300 / 0+340
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 3.90 0.50 - 1.95
1.00 3.10 0.50 - 1.55
Ciclovia 1.00 area 0.30 - 0.30
0+880 / 0+920
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 5.10 0.50 - 2.55
1.00 3.10 0.50 - 1.55
Ciclovia 1.00 area 0.30 - 0.30
1+050 / 1+090
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 3.10 0.50 - 1.55
1.00 3.10 0.50 - 1.55
Ciclovia 1.00 area 0.30 - 0.30
1+680 / 1+700
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 3.10 0.50 - 1.55
1.00 3.70 0.50 - 1.85
Ciclovia 1.00 area 0.30 - 0.30
1+740 / 1+780
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 4.40 0.50 - 2.20
1.00 3.10 0.50 - 1.55
Ciclovia 1.00 area 0.30 - 0.30
1+780 / 1+820
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 3.10 0.50 - 1.55
1.00 4.40 0.50 - 2.20
Ciclovia 2.00 area 0.30 - 0.60
3+080 / 3+120
Flecha (defrente-derecha-izquierda) 1.00 area 2.06 - 2.06
Flecha (derecha-izquierda) 1.00 area 2.06 - 2.06
lineas a=0.50 1.00 3.10 0.50 - 1.55
1.00 5.45 0.50 - 2.73
Ciclovia 3.00 area 0.30 - 0.90
TOTAL SEÑALES : 65.94

02.01.05.04 SEÑALES REGLAMENTARIA 60 X 90 cm.


UBICACIÓN / DESIGNACION
OCTOGONAL RECTANGULAR
PROGRESIVA KM.
DERECHA IZQUIERDA
600 X 600 mm 600 X 900 mm
0+100 R-30 1
3+200 R-30 1
TOTAL SEÑALES : 2

02.01.05.05 SEÑALES PREVENTIVAS Y REGLAMENTARIAS 60 X 60 cm.


PROGRESIVA UBICACIÓN / DESIGNACION CUADRADA DE : CUADRADA DE :
600X 600 mm. 750X750 mm.
KM DERECHA IZQUIERDA Nº Nº
0+330 P-2B 1
0+365 P-48 1
0+440 P-2A 1
0+500 P-48 1
0+650 P-2A 1
0+775 P-2B 1
0+795 P-48 1
0+860 P-2B 1
0+975 P-48 1
0+985 P-2A 1
1+055 P-48 1
1+085 P-2A 1
1+190 P-2B 1
1+190 P-1A 1
1+250 P-1B 1
1+295 P-48 1
1+330 P-53 1
1+375 P-48 1
1+430 P-48 1
1+835 P-53 1
1+935 P-2A 1
1+955 P-48 1
2+027 P-2B 1
2+090 P-48 1
2+100 P-53 1
2+555 P-53 1
2+600 P-53 1
2+850 P-53 1
2+875 P-2B 1
2+960 P-2A 1
2+990 P-4B 1
3+105 P-4A 1
3+265 P-53 1
3+325 P-53 1
3+365 P-48 1
TOTAL SEÑALES : 35

02.01.05.06 POSTES KILOMETRICOS


PROGRESIVA UBICACIÓN / DESIGNACION
TOTAL
KM DERECHA IZQUIERDA
1+000 Poste Km. 1 1
2+000 Poste Km. 2 1
3+000 Poste Km. 3 1
TOTAL POSTES: 3

RESUMEN
02.01.05SEÑALIZACION Y SEGURIDAD VIAL
ITEM ACTIVIDAD UNIDAD TOTAL
02.01.05.01 PINTADO DE MARCAS PAVIMEMTO (LÍNEA DISCONTINUA e=0.125 m.) m 3,224.20
02.01.05.02 PINTADO DE MARCAS PAVIMEMTO (LÍNEA CONTINUA e=0.125 m.) m 6,774.40
02.01.05.03 PINTADO DE SIMBOLO LETRAS Y ZONAL m2 65.94
02.01.05.04 SEÑALES REGLAMENTARIA 60 X 90 cm. und 2.00
02.01.05.05 SEÑALES PREVENTIVAS Y REGLAMENTARIAS 60 X 60 cm. und 35.00
02.01.05.06 POSTES KILOMETRICOS und 3.00
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.650
165.00
0+100 100.00 1.650 165.00
0+110 10.00 1.650 16.50
165.00
0+200 90.00 1.650 148.50
0+210 10.00 1.650 16.50
165.00
0+300 90.00 1.650 148.50
0+310 10.00 1.650 16.50
165.00
0+400 90.00 1.650 148.50
0+410 10.00 1.650 16.50
165.00
0+500 90.00 1.650 148.50
0+510 10.00 1.650 16.50
0+590 80.00 1.650 132.00 170.50
0+600 10.00 2.750 22.00
0+610 10.00 3.650 32.00
0+620 10.00 3.650 36.50
210.50
0+630 10.00 1.650 26.50
0+700 70.00 1.650 115.50
0+710 10.00 1.650 16.50
165.00
0+800 90.00 1.650 148.50
0+810 10.00 1.650 16.50
165.00
0+900 90.00 1.650 148.50
0+910 10.00 1.650 16.50
165.00
1+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 0+00 AL 1+000 1,701.00 1,701.00
1+010 10.00 1.650 16.50
165.00
1+100 90.00 1.650 148.50
1+110 10.00 1.650 16.50
110.25
1+160 50.00 2.100 93.75
1+240 10.00 1.650 18.75
117.75
1+300 60.00 1.650 99.00
1+310 10.00 1.650 16.50
165.00
1+400 90.00 1.650 148.50
1+410 10.00 1.650 16.50
165.00
1+500 90.00 1.650 148.50
1+510 10.00 1.650 16.50
165.00
1+600 90.00 1.650 148.50
1+610 10.00 1.650 16.50
165.00
1+700 90.00 1.650 148.50
1+710 10.00 1.650 16.50
165.00
1+800 90.00 1.650 148.50
1+810 10.00 1.650 16.50
165.00
1+900 90.00 1.650 148.50
1+910 10.00 1.650 16.50
165.00
2+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 1+00 AL 2+000 1,548.00 1,548.00
2+010 10.00 1.650 16.50
165.00
2+100 90.00 1.650 148.50
2+110 10.00 1.650 16.50
165.00
2+200 90.00 1.650 148.50
2+210 10.00 1.650 16.50
165.00
2+300 90.00 1.650 148.50
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
2+310 10.00 1.650 16.50
165.00
2+400 90.00 1.650 148.50
2+410 10.00 1.650 16.50
165.00
2+500 90.00 1.650 148.50
2+510 10.00 1.650 16.50
165.00
2+600 90.00 1.650 148.50
2+610 10.00 1.650 16.50
165.00
2+700 90.00 1.650 148.50
2+710 10.00 1.650 16.50
165.00
2+800 90.00 1.650 148.50
2+810 10.00 1.650 16.50
165.00
2+900 90.00 1.650 148.50
2+910 10.00 1.650 16.50
170.78
3+004 93.50 1.650 154.28
SUBTOTAL DEL Km. 2+00 AL 3+000 1,655.78 1,655.78
3+047 1.650
88.28
3+100 53.50 1.650 88.28
3+110 10.00 1.650 16.50
165.00
3+200 90.00 1.650 148.50
3+210 10.00 1.650 16.50
165.00
3+300 90.00 1.650 148.50
3+310 10.00 1.650 16.50
143.88
3+387 77.20 1.650 127.38
SUBTOTAL DEL Km. 3+00 AL 3+348 562.16 562.16

TOTAL : 5,466.94 5,466.94

02.02.01.02 LIMPIEZA DEL TERRENO MANUAL


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.650
165.00
0+100 100.00 1.650 165.00
0+110 10.00 1.650 16.50
165.00
0+200 90.00 1.650 148.50
0+210 10.00 1.650 16.50
165.00
0+300 90.00 1.650 148.50
0+310 10.00 1.650 16.50
165.00
0+400 90.00 1.650 148.50
0+410 10.00 1.650 16.50
165.00
0+500 90.00 1.650 148.50
0+510 10.00 1.650 16.50
0+590 80.00 1.650 132.00 170.50
0+600 10.00 2.750 22.00
0+610 10.00 3.650 32.00
0+620 10.00 3.650 36.50
210.50
0+630 10.00 1.650 26.50
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2) 210.50
(m2)
0+700 70.00 1.650 115.50
0+710 10.00 1.650 16.50
165.00
0+800 90.00 1.650 148.50
0+810 10.00 1.650 16.50
165.00
0+900 90.00 1.650 148.50
0+910 10.00 1.650 16.50
165.00
1+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 0+00 AL 1+000 1,701.00 1,701.00
1+010 10.00 1.650 16.50
165.00
1+100 90.00 1.650 148.50
1+110 10.00 1.650 16.50
110.25
1+160 50.00 2.100 93.75
1+240 10.00 1.650 18.75
117.75
1+300 60.00 1.650 99.00
1+310 10.00 1.650 16.50
165.00
1+400 90.00 1.650 148.50
1+410 10.00 1.650 16.50
165.00
1+500 90.00 1.650 148.50
1+510 10.00 1.650 16.50
165.00
1+600 90.00 1.650 148.50
1+610 10.00 1.650 16.50
165.00
1+700 90.00 1.650 148.50
1+710 10.00 1.650 16.50
165.00
1+800 90.00 1.650 148.50
1+810 10.00 1.650 16.50
165.00
1+900 90.00 1.650 148.50
1+910 10.00 1.650 16.50
165.00
2+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 1+00 AL 2+000 1,548.00 1,548.00
2+010 10.00 1.650 16.50
165.00
2+100 90.00 1.650 148.50
2+110 10.00 1.650 16.50
165.00
2+200 90.00 1.650 148.50
2+210 10.00 1.650 16.50
165.00
2+300 90.00 1.650 148.50
2+310 10.00 1.650 16.50
165.00
2+400 90.00 1.650 148.50
2+410 10.00 1.650 16.50
165.00
2+500 90.00 1.650 148.50
2+510 10.00 1.650 16.50
165.00
2+600 90.00 1.650 148.50
2+610 10.00 1.650 16.50
165.00
2+700 90.00 1.650 148.50
2+710 10.00 1.650 16.50
165.00
2+800 90.00 1.650 148.50
2+810 10.00 1.650 16.50
165.00
2+900 90.00 1.650 148.50
2+910 10.00 1.650 16.50
170.78
3+004 93.50 1.650 154.28
SUBTOTAL DEL Km. 2+00 AL 3+000 1,655.78 1,655.78
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
3+047 1.650
88.28
3+100 53.50 1.650 88.28
3+110 10.00 1.650 16.50
165.00
3+200 90.00 1.650 148.50
3+210 10.00 1.650 16.50
165.00
3+300 90.00 1.650 148.50
3+310 10.00 1.650 16.50
143.88
3+387 77.20 1.650 127.38
SUBTOTAL DEL Km. 3+00 AL 3+348 562.16 562.16

TOTAL : 5,466.94 5,466.94

02.02.03 PAVIMENTO DE CICLOVIA


02.02.02.01 PERFILADO Y COMPACTADO DE SUB-RASANTE AQP
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.650
165.00
0+100 100.00 1.650 165.00
0+110 10.00 1.650 16.50
165.00
0+200 90.00 1.650 148.50
0+210 10.00 1.650 16.50
165.00
0+300 90.00 1.650 148.50
0+310 10.00 1.650 16.50
165.00
0+400 90.00 1.650 148.50
0+410 10.00 1.650 16.50
165.00
0+500 90.00 1.650 148.50
0+510 10.00 1.650 16.50
0+590 80.00 1.650 132.00 170.50
0+600 10.00 2.750 22.00
0+610 10.00 3.650 32.00
0+620 10.00 3.650 36.50
210.50
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
210.50
0+630 10.00 1.650 26.50
0+700 70.00 1.650 115.50
0+710 10.00 1.650 16.50
165.00
0+800 90.00 1.650 148.50
0+810 10.00 1.650 16.50
165.00
0+900 90.00 1.650 148.50
0+910 10.00 1.650 16.50
165.00
1+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 0+00 AL 1+000 1,701.00 1,701.00
1+010 10.00 1.650 16.50
165.00
1+100 90.00 1.650 148.50
1+110 10.00 1.650 16.50
110.25
1+160 50.00 2.100 93.75
1+240 10.00 1.650 18.75
117.75
1+300 60.00 1.650 99.00
1+310 10.00 1.650 16.50
165.00
1+400 90.00 1.650 148.50
1+410 10.00 1.650 16.50
165.00
1+500 90.00 1.650 148.50
1+510 10.00 1.650 16.50
165.00
1+600 90.00 1.650 148.50
1+610 10.00 1.650 16.50
165.00
1+700 90.00 1.650 148.50
1+710 10.00 1.650 16.50
165.00
1+800 90.00 1.650 148.50
1+810 10.00 1.650 16.50
165.00
1+900 90.00 1.650 148.50
1+910 10.00 1.650 16.50
165.00
2+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 1+00 AL 2+000 1,548.00 1,548.00
2+010 10.00 1.650 16.50
165.00
2+100 90.00 1.650 148.50
2+110 10.00 1.650 16.50
165.00
2+200 90.00 1.650 148.50
2+210 10.00 1.650 16.50
165.00
2+300 90.00 1.650 148.50
2+310 10.00 1.650 16.50
165.00
2+400 90.00 1.650 148.50
2+410 10.00 1.650 16.50
165.00
2+500 90.00 1.650 148.50
2+510 10.00 1.650 16.50
165.00
2+600 90.00 1.650 148.50
2+610 10.00 1.650 16.50
165.00
2+700 90.00 1.650 148.50
2+710 10.00 1.650 16.50
165.00
2+800 90.00 1.650 148.50
2+810 10.00 1.650 16.50
165.00
2+900 90.00 1.650 148.50
2+910 10.00 1.650 16.50
170.78
3+004 93.50 1.650 154.28
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
SUBTOTAL DEL Km. 2+00 AL 3+000 1,655.78 1,655.78
3+047 1.650
88.28
3+100 53.50 1.650 88.28
3+110 10.00 1.650 16.50
165.00
3+200 90.00 1.650 148.50
3+210 10.00 1.650 16.50
165.00
3+300 90.00 1.650 148.50
3+310 10.00 1.650 16.50
143.88
3+387 77.20 1.650 127.38
SUBTOTAL DEL Km. 3+00 AL 3+348 562.16 562.16

TOTAL : 5,466.94 5,466.94

02.02.02.02 BASE GRANULAR E=0.15 m C/EQUIPO EN CICLOVIA


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.650
165.00
0+100 100.00 1.650 165.00
0+110 10.00 1.650 16.50
165.00
0+200 90.00 1.650 148.50
0+210 10.00 1.650 16.50
165.00
0+300 90.00 1.650 148.50
0+310 10.00 1.650 16.50
165.00
0+400 90.00 1.650 148.50
0+410 10.00 1.650 16.50
165.00
0+500 90.00 1.650 148.50
0+510 10.00 1.650 16.50
0+590 80.00 1.650 132.00 170.50
0+600 10.00 2.750 22.00
0+610 10.00 3.650 32.00
0+620 10.00 3.650 36.50
210.50
0+630 10.00 1.650 26.50
0+700 70.00 1.650 115.50
0+710 10.00 1.650 16.50
165.00
0+800 90.00 1.650 148.50
0+810 10.00 1.650 16.50
165.00
0+900 90.00 1.650 148.50
0+910 10.00 1.650 16.50
165.00
1+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 0+00 AL 1+000 1,701.00 1,701.00
1+010 10.00 1.650 16.50
165.00
1+100 90.00 1.650 148.50
1+110 10.00 1.650 16.50
110.25
1+160 50.00 2.100 93.75
1+240 10.00 1.650 18.75
117.75
1+300 60.00 1.650 99.00
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
1+310 10.00 1.650 16.50
165.00
1+400 90.00 1.650 148.50
1+410 10.00 1.650 16.50
165.00
1+500 90.00 1.650 148.50
1+510 10.00 1.650 16.50
165.00
1+600 90.00 1.650 148.50
1+610 10.00 1.650 16.50
165.00
1+700 90.00 1.650 148.50
1+710 10.00 1.650 16.50
165.00
1+800 90.00 1.650 148.50
1+810 10.00 1.650 16.50
165.00
1+900 90.00 1.650 148.50
1+910 10.00 1.650 16.50
165.00
2+000 90.00 1.650 148.50
SUBTOTAL DEL Km. 1+00 AL 2+000 1,548.00 1,548.00
2+010 10.00 1.650 16.50
165.00
2+100 90.00 1.650 148.50
2+110 10.00 1.650 16.50
165.00
2+200 90.00 1.650 148.50
2+210 10.00 1.650 16.50
165.00
2+300 90.00 1.650 148.50
2+310 10.00 1.650 16.50
165.00
2+400 90.00 1.650 148.50
2+410 10.00 1.650 16.50
165.00
2+500 90.00 1.650 148.50
2+510 10.00 1.650 16.50
165.00
2+600 90.00 1.650 148.50
2+610 10.00 1.650 16.50
165.00
2+700 90.00 1.650 148.50
2+710 10.00 1.650 16.50
165.00
2+800 90.00 1.650 148.50
2+810 10.00 1.650 16.50
165.00
2+900 90.00 1.650 148.50
2+910 10.00 1.650 16.50
170.78
3+004 93.50 1.650 154.28
SUBTOTAL DEL Km. 2+00 AL 3+000 1,655.78 1,655.78
3+047 1.650
88.28
3+100 53.50 1.650 88.28
3+110 10.00 1.650 16.50
165.00
3+200 90.00 1.650 148.50
3+210 10.00 1.650 16.50
165.00
3+300 90.00 1.650 148.50
3+310 10.00 1.650 16.50
143.88
3+387 77.20 1.650 127.38
SUBTOTAL DEL Km. 3+00 AL 3+348 562.16 562.16

TOTAL : 5,466.94 5,466.94


02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
02.02.02.03 IMPRIMACION ASFALTICA MC-30
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
00+000 1.500
150.00
0+100 100.00 1.500 150.00
0+110 10.00 1.500 15.00
150.00
0+200 90.00 1.500 135.00
0+210 10.00 1.500 15.00
150.00
0+300 90.00 1.500 135.00
0+310 10.00 1.500 15.00
150.00
0+400 90.00 1.500 135.00
0+410 10.00 1.500 15.00
150.00
0+500 90.00 1.500 135.00
0+510 10.00 1.500 15.00
150.00
0+600 90.00 1.500 135.00
0+610 10.00 1.500 15.00
150.00
0+700 90.00 1.500 135.00
0+710 10.00 1.500 15.00
150.00
0+800 90.00 1.500 135.00
0+810 10.00 1.500 15.00
150.00
0+900 90.00 1.500 135.00
0+910 10.00 1.500 15.00
150.00
1+000 90.00 1.500 135.00
SUBTOTAL DEL Km. 0+00 AL 1+000 1,500.00 1,500.00
1+010 10.00 1.500 15.00
150.00
1+100 90.00 1.500 135.00
1+110 10.00 1.500 15.00
90.00
1+160 50.00 1.500 75.00
1+240 10.00 1.500 15.00
105.00
1+300 60.00 1.500 90.00
1+310 10.00 1.500 15.00
150.00
1+400 90.00 1.500 135.00
1+410 10.00 1.500 15.00
150.00
1+500 90.00 1.500 135.00
1+510 10.00 1.500 15.00
150.00
1+600 90.00 1.500 135.00
1+610 10.00 1.500 15.00
150.00
1+700 90.00 1.500 135.00
1+710 10.00 1.500 15.00
150.00
1+800 90.00 1.500 135.00
1+810 10.00 1.500 15.00
150.00
1+900 90.00 1.500 135.00
1+910 10.00 1.500 15.00
150.00
2+000 90.00 1.500 135.00
SUBTOTAL DEL Km. 1+00 AL 2+000 1,395.00 1,395.00
2+010 10.00 1.500 15.00
150.00
2+100 90.00 1.500 135.00
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
2+110 10.00 1.500 15.00
150.00
2+200 90.00 1.500 135.00
2+210 10.00 1.500 15.00
150.00
2+300 90.00 1.500 135.00
2+310 10.00 1.500 15.00
150.00
2+400 90.00 1.500 135.00
2+410 10.00 1.500 15.00
150.00
2+500 90.00 1.500 135.00
2+510 10.00 1.500 15.00
150.00
2+600 90.00 1.500 135.00
2+610 10.00 1.500 15.00
150.00
2+700 90.00 1.500 135.00
2+710 10.00 1.500 15.00
150.00
2+800 90.00 1.500 135.00
2+810 10.00 1.500 15.00
150.00
2+900 90.00 1.500 135.00
2+910 10.00 1.500 15.00
155.25
3+004 93.50 1.500 140.25
SUBTOTAL DEL Km. 2+00 AL 3+000 1,505.25 1,505.25
3+047 1.500 0.00
80.25
3+100 53.50 1.500 80.25
3+110 10.00 1.500 15.00
150.00
3+200 90.00 1.500 135.00
3+210 10.00 1.500 15.00
150.00
3+300 90.00 1.500 135.00
3+310 10.00 1.500 15.00
130.80
3+387 77.20 1.500 115.80
SUBTOTAL DEL Km. 3+00 AL 3+387.2 511.05 511.05

TOTAL : 4,911.30 4,911.30

02.02.02.04 CARPETA ASFALTICA EN FRIO (e=0.05 m)


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
00+000 1.500
150.00
0+100 100.00 1.500 150.00
0+110 10.00 1.500 15.00
150.00
0+200 90.00 1.500 135.00
0+210 10.00 1.500 15.00
150.00
0+300 90.00 1.500 135.00
0+310 10.00 1.500 15.00
150.00
0+400 90.00 1.500 135.00
0+410 10.00 1.500 15.00
150.00
0+500 90.00 1.500 135.00
0+510 10.00 1.500 15.00
150.00
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
150.00
0+600 90.00 1.500 135.00
0+610 10.00 1.500 15.00
150.00
0+700 90.00 1.500 135.00
0+710 10.00 1.500 15.00
150.00
0+800 90.00 1.500 135.00
0+810 10.00 1.500 15.00
150.00
0+900 90.00 1.500 135.00
0+910 10.00 1.500 15.00
150.00
1+000 90.00 1.500 135.00
SUBTOTAL DEL Km. 0+00 AL 1+000 1,500.00 1,500.00
1+010 10.00 1.500 15.00
150.00
1+100 90.00 1.500 135.00
1+110 10.00 1.500 15.00
90.00
1+160 50.00 1.500 75.00
1+240 10.00 1.500 15.00
105.00
1+300 60.00 1.500 90.00
1+310 10.00 1.500 15.00
150.00
1+400 90.00 1.500 135.00
1+410 10.00 1.500 15.00
150.00
1+500 90.00 1.500 135.00
1+510 10.00 1.500 15.00
150.00
1+600 90.00 1.500 135.00
1+610 10.00 1.500 15.00
150.00
1+700 90.00 1.500 135.00
1+710 10.00 1.500 15.00
150.00
1+800 90.00 1.500 135.00
1+810 10.00 1.500 15.00
150.00
1+900 90.00 1.500 135.00
1+910 10.00 1.500 15.00
150.00
2+000 90.00 1.500 135.00
SUBTOTAL DEL Km. 1+00 AL 2+000 1,395.00 1,395.00
2+010 10.00 1.500 15.00
150.00
2+100 90.00 1.500 135.00
2+110 10.00 1.500 15.00
150.00
2+200 90.00 1.500 135.00
2+210 10.00 1.500 15.00
150.00
2+300 90.00 1.500 135.00
2+310 10.00 1.500 15.00
150.00
2+400 90.00 1.500 135.00
2+410 10.00 1.500 15.00
150.00
2+500 90.00 1.500 135.00
2+510 10.00 1.500 15.00
150.00
2+600 90.00 1.500 135.00
2+610 10.00 1.500 15.00
150.00
2+700 90.00 1.500 135.00
2+710 10.00 1.500 15.00
150.00
2+800 90.00 1.500 135.00
2+810 10.00 1.500 15.00
150.00
2+900 90.00 1.500 135.00
2+910 10.00 1.500 15.00
155.25
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
155.25
3+004 93.50 1.500 140.25
SUBTOTAL DEL Km. 2+00 AL 3+000 1,505.25 1,505.25
3+047 1.500 0.00
80.25
3+100 53.50 1.500 80.25
3+110 10.00 1.500 15.00
150.00
3+200 90.00 1.500 135.00
3+210 10.00 1.500 15.00
150.00
3+300 90.00 1.500 135.00
3+310 10.00 1.500 15.00
130.80
3+387 77.20 1.500 115.80
SUBTOTAL DEL Km. 3+00 AL 3+387.2 511.05 511.05

TOTAL : 4,911.30 4,911.30

02.02.03 CONCRETO SIMPLE


02.02.03.01 SARDINEL BURBUJA f'c= 175 kg/cm2
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO SUB TOTAL


ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
0+000
0+020.20 1.00 20.20 - - 20.20
0+034.05
0+304.75 1.00 270.70 - - 270.70
0+327.10
0+451.00 1.00 127.60 - - 127.60
0+462.90
0+469.20 1.00 6.30 - - 6.30
0+485.60
0+573.80 1.00 85.75 - - 85.75
0+585.60
0+894.80 1.00 337.80 - - 337.80
0+904.60
1+060.00 1.00 157.60 - - 157.60
SUBTOTAL DEL Km. 0+000 AL 1+060 1005.95

DIMENSIONAMIENTO SUB TOTAL


ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
1+075.30
1+163.25 1.00 83.75 - - 83.75
1+240.00
1+684.45 1.00 442.95 - - 442.95
1+699.35
1+780.10 1.00 78.90 - - 78.90
1+810.00
3+003.00 1.00 1191.00 - - 1191.00
SUBTOTAL DEL Km. 1+075.30 AL 3+003 1796.60
02.02 CICLOVIA
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
DIMENSIONAMIENTO SUB TOTAL
ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
3+046.50
3+095.85 1.00 51.50 - - 51.50
3+108.60
3+387.20 1.00 281.70 - - 281.70
SUBTOTAL DEL Km. 3+003 AL 3+387.2 333.20

TOTAL : 3135.75

01.05.01 SARDINEL SUMERGIDO 0.15 x 0.30 m, f'c= 175 kg/cm2


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO SUB TOTAL


ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
0+020.20
0+034.05 1.00 13.60 - - 13.60
0+304.75
0+327.10 1.00 22.00 - - 22.00
0+451.00
0+462.90 1.00 12.80 - - 12.80
0+469.20
0+485.60 1.00 16.50 - - 16.50
0+573.80
0+585.60 1.00 11.55 - - 11.55
0+894.80
0+904.60 1.00 10.95 - - 10.95

SUBTOTAL DEL Km. 0+000 AL 1+060 87.40

DIMENSIONAMIENTO SUB TOTAL


ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
1+060.00
1+075.30 1.00 15.00 - - 15.00
1+684.45
1+699.35 1.00 15.30 - - 15.30
1+750.00
1+773.50 1.00 22.50 - - 22.50
1+780.00
1+810.00 1.00 30.15 - - 30.15
SUBTOTAL DEL Km. 1+075.30 AL 3+003 82.95

DIMENSIONAMIENTO SUB TOTAL


ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
3+095.85
3+108.60 1.00 12.95 - - 12.95
SUBTOTAL DEL Km. 3+003 AL 3+387.2 12.95

TOTAL : 183.30
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.450
145.00
0+100 100.00 1.450 145.00
0+110 10.00 1.450 14.50
145.00
0+200 90.00 1.450 130.50
0+210 10.00 1.450 14.50
145.00
0+300 90.00 1.450 130.50
0+310 10.00 1.450 14.50
145.00
0+400 90.00 1.450 130.50
0+410 10.00 1.450 14.50
145.00
0+500 90.00 1.450 130.50
0+510 10.00 1.450 14.50
145.00
0+600 90.00 1.450 130.50
0+610 10.00 1.450 14.50
145.00
0+700 90.00 1.450 130.50
0+710 10.00 1.450 14.50
145.00
0+800 90.00 1.450 130.50
0+810 10.00 1.450 14.50
145.00
0+900 90.00 1.450 130.50
0+910 10.00 1.450 14.50
145.00
1+000 90.00 1.450 130.50
SUBTOTAL DEL Km. 0+00 AL 1+000 1,450.00 1,450.00
1+010 10.00 1.450 14.50
145.00
1+100 90.00 1.450 130.50
1+110 10.00 1.450 14.50
79.75
1+155 45.00 1.450 65.25
1+240 10.00 1.450 14.50
101.50
1+300 60.00 1.450 87.00
1+310 10.00 1.450 14.50
145.00
1+400 90.00 1.450 130.50
1+410 10.00 1.450 14.50
145.00
1+500 90.00 1.450 130.50
1+510 10.00 1.450 14.50
145.00
1+600 90.00 1.450 130.50
1+610 10.00 1.450 14.50
145.00
1+700 90.00 1.450 130.50
1+710 10.00 1.450 14.50
145.00
1+800 90.00 1.450 130.50
1+810 10.00 1.450 14.50
145.00
1+900 90.00 1.450 130.50
1+910 10.00 1.450 14.50
1+991 80.80 1.450 117.16 151.67
2+000 9.20 2.900 20.01
SUBTOTAL DEL Km. 1+00 AL 2+000 1,347.92 1,347.92
2+010 10.00 2.900 29.00
2+073 62.80 2.900 91.06 179.22
2+100 27.20 1.450 59.16
2+110 10.00 1.450 14.50
145.00
2+200 90.00 1.450 130.50
2+210 10.00 1.450 14.50
145.00
2+300 90.00 1.450 130.50
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
2+310 10.00 1.450 14.50
145.00
2+400 90.00 1.450 130.50
2+410 10.00 1.450 14.50
145.00
2+500 90.00 1.450 130.50
2+510 10.00 1.450 14.50
145.00
2+600 90.00 1.450 130.50
2+610 10.00 1.450 14.50
145.00
2+700 90.00 1.450 130.50
2+710 10.00 1.450 14.50
145.00
2+800 90.00 1.450 130.50
2+810 10.00 1.450 14.50
145.00
2+900 90.00 1.450 130.50
2+910 10.00 1.450 14.50
150.08
3+004 93.50 1.450 135.58
SUBTOTAL DEL Km. 2+00 AL 3+000 1,489.30 1,489.30
3+047 1.450
77.58
3+100 53.50 1.450 77.58
3+110 10.00 1.450 14.50
145.00
3+200 90.00 1.450 130.50
3+210 10.00 1.450 14.50
145.00
3+300 90.00 1.450 130.50
3+310 10.00 1.450 14.50
126.44
3+387 77.20 1.450 111.94
SUBTOTAL DEL Km. 3+047 AL 3+387.2 494.02 494.02

TOTAL : 4,781.24 4,781.24

02.03.01.02 LIMPIEZA DEL TERRENO MANUAL


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.450
145.00
0+100 100.00 1.450 145.00
0+110 10.00 1.450 14.50
145.00
0+200 90.00 1.450 130.50
0+210 10.00 1.450 14.50
145.00
0+300 90.00 1.450 130.50
0+310 10.00 1.450 14.50
145.00
0+400 90.00 1.450 130.50
0+410 10.00 1.450 14.50
145.00
0+500 90.00 1.450 130.50
0+510 10.00 1.450 14.50
145.00
0+600 90.00 1.450 130.50
0+610 10.00 1.450 14.50
145.00
0+700 90.00 1.450 130.50
0+710 10.00 1.450 14.50
145.00
0+800 90.00 1.450 130.50
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+810 10.00 1.450 14.50
145.00
0+900 90.00 1.450 130.50
0+910 10.00 1.450 14.50
145.00
1+000 90.00 1.450 130.50
SUBTOTAL DEL Km. 0+00 AL 1+000 1,450.00 1,450.00
1+010 10.00 1.450 14.50
145.00
1+100 90.00 1.450 130.50
1+110 10.00 1.450 14.50
79.75
1+155 45.00 1.450 65.25
1+240 10.00 1.450 14.50
101.50
1+300 60.00 1.450 87.00
1+310 10.00 1.450 14.50
145.00
1+400 90.00 1.450 130.50
1+410 10.00 1.450 14.50
145.00
1+500 90.00 1.450 130.50
1+510 10.00 1.450 14.50
145.00
1+600 90.00 1.450 130.50
1+610 10.00 1.450 14.50
145.00
1+700 90.00 1.450 130.50
1+710 10.00 1.450 14.50
145.00
1+800 90.00 1.450 130.50
1+810 10.00 1.450 14.50
145.00
1+900 90.00 1.450 130.50
1+910 10.00 1.450 14.50
1+991 80.80 1.450 117.16 151.67
2+000 9.20 2.900 20.01
SUBTOTAL DEL Km. 1+00 AL 2+000 1,347.92 1,347.92
2+010 10.00 2.900 29.00
2+073 62.80 2.900 91.06 179.22
2+100 27.20 1.450 59.16
2+110 10.00 1.450 14.50
145.00
2+200 90.00 1.450 130.50
2+210 10.00 1.450 14.50
145.00
2+300 90.00 1.450 130.50
2+310 10.00 1.450 14.50
145.00
2+400 90.00 1.450 130.50
2+410 10.00 1.450 14.50
145.00
2+500 90.00 1.450 130.50
2+510 10.00 1.450 14.50
145.00
2+600 90.00 1.450 130.50
2+610 10.00 1.450 14.50
145.00
2+700 90.00 1.450 130.50
2+710 10.00 1.450 14.50
145.00
2+800 90.00 1.450 130.50
2+810 10.00 1.450 14.50
145.00
2+900 90.00 1.450 130.50
2+910 10.00 1.450 14.50
150.08
3+004 93.50 1.450 135.58
SUBTOTAL DEL Km. 2+00 AL 3+004 1,489.30 1,489.30
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
3+047 1.450
77.58
3+100 53.50 1.450 77.58
3+110 10.00 1.450 14.50
145.00
3+200 90.00 1.450 130.50
3+210 10.00 1.450 14.50
145.00
3+300 90.00 1.450 130.50
3+310 10.00 1.450 14.50
126.44
3+387 77.20 1.450 111.94
SUBTOTAL DEL Km. 3+047 AL 3+387.2 494.02 494.02

TOTAL : 4,781.24 4,781.24

02.03.02 CONCRETO SIMPLE


02.03.02.01 CONCRETO EN VEREDAS, RAMPAS PEATONALES f'c=175 kg/cm2, x 9cm, Pulido 1:2 x 1cm, INC/BRUÑADO 1/2"
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
0+000 1.200
120.00
0+100 100.00 1.200 120.00
0+110 10.00 1.200 12.00
120.00
0+200 90.00 1.200 108.00
0+210 10.00 1.200 12.00
120.00
0+300 90.00 1.200 108.00
0+310 10.00 1.200 12.00
120.00
0+400 90.00 1.200 108.00
0+410 10.00 1.200 12.00
120.00
0+500 90.00 1.200 108.00
0+510 10.00 1.200 12.00
120.00
0+600 90.00 1.200 108.00
0+610 10.00 1.200 12.00
120.00
0+700 90.00 1.200 108.00
0+710 10.00 1.200 12.00
120.00
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
120.00
0+800 90.00 1.200 108.00
0+810 10.00 1.200 12.00
120.00
0+900 90.00 1.200 108.00
0+910 10.00 1.200 12.00
120.00
1+000 90.00 1.200 108.00
SUBTOTAL DEL Km. 0+00 AL 1+000 1,200.00 1,200.00
1+010 10.00 1.200 12.00
120.00
1+100 90.00 1.200 108.00
1+110 10.00 1.200 12.00
66.00
1+155 45.00 1.200 54.00
1+240 10.00 1.200 12.00
84.00
1+300 60.00 1.200 72.00
1+310 10.00 1.200 12.00
120.00
1+400 90.00 1.200 108.00
1+410 10.00 1.200 12.00
120.00
1+500 90.00 1.200 108.00
1+510 10.00 1.200 12.00
120.00
1+600 90.00 1.200 108.00
1+610 10.00 1.200 12.00
120.00
1+700 90.00 1.200 108.00
1+710 10.00 1.200 12.00
120.00
1+800 90.00 1.200 108.00
1+810 10.00 1.200 12.00
120.00
1+900 90.00 1.200 108.00
1+910 10.00 1.200 12.00
1+991 80.80 1.200 96.96 125.52
2+000 9.20 2.400 16.56
SUBTOTAL DEL Km. 1+00 AL 2+000 1,115.52 1,115.52
2+010 10.00 2.400 24.00
2+073 62.80 2.400 75.36 148.32
2+100 27.20 1.200 48.96
2+110 10.00 1.200 12.00
120.00
2+200 90.00 1.200 108.00
2+210 10.00 1.200 12.00
120.00
2+300 90.00 1.200 108.00
2+310 10.00 1.200 12.00
120.00
2+400 90.00 1.200 108.00
2+410 10.00 1.200 12.00
120.00
2+500 90.00 1.200 108.00
2+510 10.00 1.200 12.00
120.00
2+600 90.00 1.200 108.00
2+610 10.00 1.200 12.00
120.00
2+700 90.00 1.200 108.00
2+710 10.00 1.200 12.00
120.00
2+800 90.00 1.200 108.00
2+810 10.00 1.200 12.00
120.00
2+900 90.00 1.200 108.00
2+910 10.00 1.200 12.00
124.20
3+004 93.50 1.200 112.20
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
SUBTOTAL DEL Km. 2+00 AL 3+000 1,232.52 1,232.52
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
3+047 1.200
64.20
3+100 53.50 1.200 64.20
3+110 10.00 1.200 12.00
120.00
3+200 90.00 1.200 108.00
3+210 10.00 1.200 12.00
120.00
3+300 90.00 1.200 108.00
3+310 10.00 1.200 12.00
104.64
3+387 77.20 1.200 92.64
SUBTOTAL DEL Km. 3+047 AL 3+387.2 408.84 408.84

TOTAL : 3,956.88 3,956.88

05.04.05 GRADAS
02.03.02.02 CONCRETO SIMPLE f'c= 175 kg/cm2 EN GRADAS SOBRE TERRENO NATURAL
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO TOTAL
ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m3)
1+404.00 AREA 10.90 1.60 - 17.44

TOTAL : 17.44

02.03.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS SOBRE TERRENO


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO TOTAL
ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m2)
14.00 1.60 0.30 - 6.72
1+404.00
2.00 3.90 - 0.40 3.12

TOTAL : 9.84

02.03.03 VARIOS
02.03.03.01 JUNTAS ASFALTICAS
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO TOTAL
ESTACA
Nº VECES LONGITUD ANCHO ALTURA (m)
0+000 0.00
1+000 334.00 1.20 - - 400.80
1+155 52.00 1.20 - - 62.40
1+240
1+991 250.00 1.20 - - 300.00
02.03 VEREDAS, RAMPAS Y GRADAS
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: DISTRITO
0+000 @DE3+387
SOCABAYA - AREQUIPA - AREQUIPA

AREA TOTAL
ESTACA DISTANCIA (m) ANCHO (m) AREA (m2)
(m2)
2+073 54.00 1.20 - - 64.80
3+004 310.00 1.20 - - 372.00
3+047
3+387 114.00 1.20 - - 136.80

TOTAL : 1336.80

02.03.03.02 BRUÑAS DE 1 x 1 cm.


OBRA : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR TRAMO LAS PEÑAS – LA PAMPA,
META FISICA: 0+000 @ 3+387 DISTRITO DE SOCABAYA - AREQUIPA - AREQUIPA

DIMENSIONAMIENTO TOTAL
ESTACA
DISTANCIA Nº VECES LONGITUD ALTURA (m)

0+000 1+000 1000 333 9.60 - 3200.00

1+000 1+155 155 52 9.60 - 496.00

1+240 1+991 751 250 9.60 - 2403.20

1+991 2+073 82 55 9.60 - 524.80

2+073 3+004 931 310 9.60 - 2979.20

3+047 3+387 340 113 9.60 - 1088.00

TOTAL : 10691.20
MUROS DE CONTENCION

03.01 MOVIMIENTO DE TIERRAS


03.01.01 CORTE DE MATERIAL SUELTO CON EQUIPO

DIMENSIONAMIENTO MAT. ROCA


PARCIAL
N° PROGRESIVA DESCRIPCION SUELTO SUELTA FIJA
Nº VECES (M3)
LONGITUD ANCHO ALTURA (m3) (m3) (m3)
01 0+000 A 0+039 MURO DE MAMPOSTERIA 1.00 3.00 1.01 AREA 3.03 2.42 6.06
0+240.00 MURO DE MAMPOSTERIA 1.00 3.90 0.83 AREA 3.24 0.97 1.30 0.97
0+246.00 MURO DE MAMPOSTERIA 1.00 6.00 1.16 AREA 6.96 2.09 2.78 2.09
0+252.00 MURO DE MAMPOSTERIA 1.00 5.97 1.88 AREA 11.22 3.37 4.49 3.37
0+258.00 MURO DE MAMPOSTERIA 1.00 5.97 2.24 AREA 13.37 4.01 5.35 4.01
0+264.00 MURO DE MAMPOSTERIA 1.00 6.00 2.12 AREA 12.72 3.82 5.09 3.82
0+270.00 MURO DE MAMPOSTERIA 1.00 5.98 1.70 AREA 10.17 3.05 4.07 3.05
02
0+276.00 MURO DE MAMPOSTERIA 1.00 5.98 1.55 AREA 9.27 2.78 3.71 2.78
0+282.00 MURO DE MAMPOSTERIA 1.00 5.98 1.60 AREA 9.57 2.87 3.83 2.87
0+288.00 MURO DE MAMPOSTERIA 1.00 5.97 1.29 AREA 7.70 2.31 3.08 2.31
0+294.00 MURO DE MAMPOSTERIA 1.00 5.97 1.13 AREA 6.75 2.03 2.70 2.03
0+300.00 MURO DE MAMPOSTERIA 1.00 5.97 0.88 AREA 5.25 1.58 2.10 1.58
0+306.00 MURO DE MAMPOSTERIA 1.00 15.07 0.53 AREA 7.99 2.40 3.20 2.40
0+318.00 MURO DE MAMPOSTERIA 1.00 6.00 0.74 AREA 4.44 1.33 1.78 1.33
0+324.00 MURO DE MAMPOSTERIA 1.00 5.97 0.93 AREA 5.55 1.67 2.22 1.67
0+330.00 MURO DE MAMPOSTERIA 1.00 5.97 1.40 AREA 8.36 2.51 3.34 2.51
0+336.00 MURO DE MAMPOSTERIA 1.00 1.97 1.32 AREA 2.60 0.78 1.04 0.78
03
0+360.00 MURO DE MAMPOSTERIA 1.00 5.97 1.04 AREA 6.21 1.86 2.48 1.86
0+366.00 MURO DE MAMPOSTERIA 1.00 5.97 1.20 AREA 7.16 2.15 2.86 2.15
0+372.00 MURO DE MAMPOSTERIA 1.00 5.97 1.28 AREA 7.64 2.29 3.06 2.29
0+378.00 MURO DE MAMPOSTERIA 1.00 5.47 1.58 AREA 8.64 2.59 3.46 2.59
0+459.00 MURO DE MAMPOSTERIA 1.00 5.97 1.54 AREA 9.19 5.51 3.68
0+465.00 MURO DE MAMPOSTERIA 1.00 5.97 1.93 AREA 11.52 6.91 4.61
0+471.00 MURO DE MAMPOSTERIA 1.00 5.97 1.32 AREA 7.88 4.73 3.15
0+489.00 MURO DE MAMPOSTERIA 1.00 5.98 1.01 AREA 6.04 3.62 2.42
0+495.00 MURO DE MAMPOSTERIA 1.00 5.97 1.24 AREA 7.40 4.44 2.96
0+501.00 MURO DE MAMPOSTERIA 1.00 5.97 2.77 AREA 16.54 9.92 6.62
0+507.00 MURO DE MAMPOSTERIA 1.00 5.97 1.88 AREA 11.22 6.73 4.49

04
0+513.00 MURO DE MAMPOSTERIA 1.00 5.97 1.48 AREA 8.84 5.30 3.54
0+519.00 MURO DE MAMPOSTERIA 1.00 5.97 1.10 AREA 6.57 3.94 2.63
04
0+525.00 MURO DE MAMPOSTERIA 1.00 5.97 1.56 AREA 9.31 5.59 3.72
0+531.00 MURO DE MAMPOSTERIA 1.00 5.97 1.15 AREA 6.87 4.12 2.75
0+537.00 MURO DE MAMPOSTERIA 1.00 5.97 1.20 AREA 7.16 4.30 2.86
0+543.00 MURO DE MAMPOSTERIA 1.00 5.97 1.14 AREA 6.81 4.09 2.72
0+549.00 MURO DE MAMPOSTERIA 1.00 5.97 0.78 AREA 4.66 2.80 1.86
0+555.00 MURO DE MAMPOSTERIA 1.00 5.97 0.61 AREA 3.64 2.18 1.46
0+561.00 MURO DE MAMPOSTERIA 1.00 5.97 0.72 AREA 4.30 2.58 1.72
0+567.00 MURO DE MAMPOSTERIA 1.00 5.97 1.14 AREA 6.81 4.09 2.72
0+573.00 MURO DE MAMPOSTERIA 1.00 5.97 1.08 AREA 6.45 3.87 2.58
0+774.00 MURO DE MAMPOSTERIA 1.00 6.00 1.46 AREA 8.76 5.26 3.50
0+780.00 MURO DE MAMPOSTERIA 1.00 6.00 1.49 AREA 8.94 5.36 3.58
0+786.00 MURO DE MAMPOSTERIA 1.00 6.00 1.45 AREA 8.70 5.22 3.48
0+792.00 MURO DE MAMPOSTERIA 1.00 6.00 1.45 AREA 8.70 5.22 3.48
0+798.00 MURO DE MAMPOSTERIA 1.00 6.00 1.39 AREA 8.34 5.00 3.34
0+804.00 MURO DE MAMPOSTERIA 1.00 6.00 1.98 AREA 11.88 7.13 4.75
05
0+810.00 MURO DE MAMPOSTERIA 1.00 6.00 1.78 AREA 10.68 6.41 4.27
0+816.00 MURO DE MAMPOSTERIA 1.00 6.00 1.50 AREA 9.00 5.40 3.60
0+822.00 MURO DE MAMPOSTERIA 1.00 6.00 1.46 AREA 8.76 6.13 2.63
0+828.00 MURO DE MAMPOSTERIA 1.00 6.00 7.16 AREA 42.96 30.07 12.89
0+834.00 MURO DE MAMPOSTERIA 1.00 6.00 5.14 AREA 30.84 21.59 9.25
0+840.00 MURO DE MAMPOSTERIA 1.00 5.15 2.53 AREA 13.03 9.12 3.91
1+368.00 MURO DE MAMPOSTERIA 1.00 6.00 4.19 AREA 25.14 12.57 12.57
1+374.00 MURO DE MAMPOSTERIA 1.00 6.00 2.91 AREA 17.46 8.73 8.73
1+380.00 MURO DE MAMPOSTERIA 1.00 6.00 2.82 AREA 16.92 8.46 8.46
06
1+386.00 MURO DE MAMPOSTERIA 1.00 6.00 2.77 AREA 16.62 8.31 8.31
1+392.00 MURO DE MAMPOSTERIA 1.00 3.50 2.46 AREA 8.61 4.31 4.31
1+404.00 MURO DE MAMPOSTERIA 1.00 3.00 2.18 AREA 6.54 3.27 3.27
1+578.00 MURO DE MAMPOSTERIA 1.00 6.00 1.60 AREA 9.60 4.80 4.80
1+584.00 MURO DE MAMPOSTERIA 1.00 6.00 1.55 AREA 9.30 0.93 2.79 5.58
1+590.00 MURO DE MAMPOSTERIA 1.00 6.00 1.51 AREA 9.06 0.91 2.72 5.44
1+596.00 MURO DE MAMPOSTERIA 1.00 6.00 1.64 AREA 9.84 0.98 2.95 5.90
1+602.00 MURO DE MAMPOSTERIA 1.00 6.00 1.58 AREA 9.48 0.95 2.84 5.69
1+608.00 MURO DE MAMPOSTERIA 1.00 6.00 1.56 AREA 9.36 0.94 2.81 5.62
1+614.00 MURO DE MAMPOSTERIA 1.00 6.00 1.74 AREA 10.44 1.04 3.13 6.26
1+620.00 MURO DE MAMPOSTERIA 1.00 6.00 1.42 AREA 8.52 0.85 2.56 5.11
1+626.00 MURO DE MAMPOSTERIA 1.00 6.00 1.10 AREA 6.60 0.66 1.98 3.96
1+632.00 MURO DE MAMPOSTERIA 1.00 6.00 1.04 AREA 6.24 0.62 1.87 3.74
1+638.00 MURO DE MAMPOSTERIA 1.00 6.00 1.41 AREA 8.46 0.85 2.54 5.08
1+644.00 MURO DE MAMPOSTERIA 1.00 6.00 1.22 AREA 7.32 0.73 2.20 4.39
1+650.00 MURO DE MAMPOSTERIA 1.00 6.00 1.38 AREA 8.28 0.83 2.48 4.97
1+656.00 MURO DE MAMPOSTERIA 1.00 6.00 2.21 AREA 13.26 1.33 3.98 7.96
07 1+662.00 MURO DE MAMPOSTERIA 1.00 6.00 2.22 AREA 13.32 1.33 4.00 7.99
1+668.00 MURO DE MAMPOSTERIA 1.00 6.00 2.51 AREA 15.06 1.51 4.52 9.04
1+674.00 MURO DE MAMPOSTERIA 1.00 6.00 2.51 AREA 15.06 1.51 4.52 9.04
1+680.00 MURO DE MAMPOSTERIA 1.00 6.00 2.72 AREA 16.32 1.63 4.90 9.79
1+686.00 MURO DE MAMPOSTERIA 1.00 6.00 2.51 AREA 15.06 1.51 4.52 9.04
1+704.00 MURO DE MAMPOSTERIA 1.00 6.00 1.73 AREA 10.38 1.04 3.11 6.23
1+710.00 MURO DE MAMPOSTERIA 1.00 6.00 0.78 AREA 4.68 0.47 1.40 2.81
1+716.00 MURO DE MAMPOSTERIA 1.00 6.00 0.82 AREA 4.92 0.49 1.48 2.95
1+722.00 MURO DE MAMPOSTERIA 1.00 6.00 0.84 AREA 5.04 0.50 1.51 3.02
1+728.00 MURO DE MAMPOSTERIA 1.00 6.00 0.82 AREA 4.92 0.49 1.48 2.95
1+734.00 MURO DE MAMPOSTERIA 1.00 10.70 1.27 AREA 13.59 1.36 4.08 8.15
1+740.00 MURO DE MAMPOSTERIA 1.00 10.70 2.62 AREA 28.03 2.80 8.41 16.82
1+746.00 MURO DE MAMPOSTERIA 1.00 10.70 2.31 AREA 24.72 2.47 7.42 14.83
1+770.00 MURO DE MAMPOSTERIA 1.00 10.70 1.78 AREA 19.05 1.91 5.72 11.43
1+776.00 MURO DE MAMPOSTERIA 1.00 10.70 1.70 AREA 18.19 1.82 5.46 10.91
1+815.00 MURO DE MAMPOSTERIA 1.00 6.00 1.83 AREA 10.98 5.49 5.49
1+821.00 MURO DE MAMPOSTERIA 1.00 6.00 2.37 AREA 14.22 7.11 7.11
1+827.00 MURO DE MAMPOSTERIA 1.00 6.00 1.98 AREA 11.88 5.94 5.94
08
1+833.00 MURO DE MAMPOSTERIA 1.00 6.00 3.04 AREA 18.24 9.12 9.12
1+839.00 MURO DE MAMPOSTERIA 1.00 6.00 1.64 AREA 9.84 4.92 4.92
1+842.00 MURO DE MAMPOSTERIA 1.00 6.00 1.60 AREA 9.60 4.80 4.80
2+652.00 MURO DE MAMPOSTERIA 1.00 6.00 0.96 AREA 5.76 1.15 4.61
2+658.00 MURO DE MAMPOSTERIA 1.00 6.00 0.82 AREA 4.92 0.98 3.94
2+664.00 MURO DE MAMPOSTERIA 1.00 6.00 0.93 AREA 5.58 1.12 4.46
09 2+670.00 MURO DE MAMPOSTERIA 1.00 6.00 1.08 AREA 6.48 1.30 5.18
2+676.00 MURO DE MAMPOSTERIA 1.00 6.00 0.67 AREA 4.02 0.80 3.22
2+682.00 MURO DE MAMPOSTERIA 1.00 6.00 0.54 AREA 3.24 0.65 2.59
2+688.00 MURO DE MAMPOSTERIA 1.00 3.00 0.58 AREA 1.74 0.35 1.39
2+898.00 MURO DE MAMPOSTERIA 1.00 6.00 1.63 AREA 9.78 1.96 7.82

10
2+904.00 MURO DE MAMPOSTERIA 1.00 6.00 1.97 AREA 11.82 2.36 9.46
2+910.00 MURO DE MAMPOSTERIA 1.00 6.00 2.59 AREA 15.54 3.11 12.43
2+916.00 MURO DE MAMPOSTERIA 1.00 6.00 4.59 AREA 27.54 5.51 22.03
2+922.00 MURO DE MAMPOSTERIA 1.00 6.00 6.17 AREA 37.02 7.40 29.62
10 2+928.00 MURO DE MAMPOSTERIA 1.00 6.00 6.28 AREA 37.68 7.54 30.14
2+934.00 MURO DE MAMPOSTERIA 1.00 6.00 2.51 AREA 15.06 3.01 12.05
2+940.00 MURO DE MAMPOSTERIA 1.00 6.00 2.63 AREA 15.78 3.16 12.62
2+946.00 MURO DE MAMPOSTERIA 1.00 6.00 1.90 AREA 11.40 2.28 9.12
2+952.00 MURO DE MAMPOSTERIA 1.00 6.00 1.83 AREA 10.98 2.20 8.78
2+958.00 MURO DE MAMPOSTERIA 1.00 39.38 1.54 AREA 60.65 12.13 48.52
3+000.00 MURO DE MAMPOSTERIA 1.00 6.00 0.24 AREA 1.44 0.29 1.15
3+006.00 MURO DE MAMPOSTERIA 1.00 6.00 0.24 AREA 1.44 0.43 1.01
3+012.00 MURO DE MAMPOSTERIA 1.00 6.00 0.24 AREA 1.44 0.43 1.01
3+018.00 MURO DE MAMPOSTERIA 1.00 6.00 0.24 AREA 1.44 0.43 1.01
11
3+024.00 MURO DE MAMPOSTERIA 1.00 6.00 0.24 AREA 1.44 0.43 1.01
3+030.00 MURO DE MAMPOSTERIA 1.00 6.00 0.22 AREA 1.32 0.40 0.92
3+036.00 MURO DE MAMPOSTERIA 1.00 3.60 0.72 AREA 2.59 0.78 1.81
3+042.00 MURO DE MAMPOSTERIA 1.00 3.60 0.93 AREA 3.35 1.01 2.35
3+051.00 MURO DE MAMPOSTERIA 1.00 6.00 2.66 AREA 15.96 4.79 11.17
3+057.00 MURO DE MAMPOSTERIA 1.00 6.00 5.40 AREA 32.40 9.72 22.68
3+063.00 MURO DE MAMPOSTERIA 1.00 5.97 5.44 AREA 32.48 9.74 22.74
3+069.00 MURO DE MAMPOSTERIA 1.00 5.97 4.91 AREA 29.31 8.79 20.52
3+075.00 MURO DE MAMPOSTERIA 1.00 6.00 1.82 AREA 10.92 3.28 7.64
12 3+081.00 MURO DE MAMPOSTERIA 1.00 6.00 2.14 AREA 12.84 3.85 8.99
3+087.00 MURO DE MAMPOSTERIA 1.00 6.00 1.12 AREA 6.72 2.02 4.70
3+093.00 MURO DE MAMPOSTERIA 1.00 6.00 1.76 AREA 10.56 3.17 7.39
3+111.00 MURO DE MAMPOSTERIA 1.00 6.00 0.79 AREA 4.74 1.42 3.32
3+117.00 MURO DE MAMPOSTERIA 1.00 6.00 1.14 AREA 6.84 2.05 4.79
3+123.00 MURO DE MAMPOSTERIA 1.00 6.00 0.94 AREA 5.64 1.69 3.95
3+246.00 MURO DE MAMPOSTERIA 1.00 6.00 0.75 AREA 4.50 1.35 3.15
3+249.00 MURO DE MAMPOSTERIA 1.00 6.00 0.93 AREA 5.58 1.67 3.91
3+255.00 MURO DE MAMPOSTERIA 1.00 6.00 0.99 AREA 5.94 1.78 4.16
3+261.00 MURO DE MAMPOSTERIA 1.00 6.00 0.99 AREA 5.94 1.78 4.16
3+267.00 MURO DE MAMPOSTERIA 1.00 6.00 1.02 AREA 6.12 1.84 4.28
3+273.00 MURO DE MAMPOSTERIA 1.00 6.00 1.12 AREA 6.72 2.02 4.70
3+279.00 MURO DE MAMPOSTERIA 1.00 6.00 0.83 AREA 4.98 1.49 3.49

13
3+285.00 MURO DE MAMPOSTERIA 1.00 6.00 0.64 AREA 3.84 1.15 2.69
3+291.00 MURO DE MAMPOSTERIA 1.00 6.00 0.63 AREA 3.78 1.13 2.65
3+297.00 MURO DE MAMPOSTERIA 1.00 6.00 0.88 AREA 5.28 1.58 3.70
13
3+303.00 MURO DE MAMPOSTERIA 1.00 6.00 1.11 AREA 6.66 2.00 4.66
3+309.00 MURO DE MAMPOSTERIA 1.00 6.00 1.29 AREA 7.74 2.32 5.42
3+315.00 MURO DE MAMPOSTERIA 1.00 6.00 1.36 AREA 8.16 2.45 5.71
3+321.00 MURO DE MAMPOSTERIA 1.00 6.00 1.83 AREA 10.98 3.29 7.69
3+327.00 MURO DE MAMPOSTERIA 1.00 6.00 3.04 AREA 18.24 5.47 12.77
3+333.00 MURO DE MAMPOSTERIA 1.00 6.00 2.19 AREA 13.14 3.94 9.20
3+339.00 MURO DE MAMPOSTERIA 1.00 6.00 2.79 AREA 16.74 5.02 11.72
3+345.00 MURO DE MAMPOSTERIA 1.00 6.00 2.78 AREA 16.68 5.00 11.68
3+351.00 MURO DE MAMPOSTERIA 1.00 6.00 2.32 AREA 13.92 4.18 9.74
3+357.00 MURO DE MAMPOSTERIA 1.00 3.00 1.05 AREA 3.15 0.95 2.21
TOTAL : 1605.74 470.64 670.27 470.29

CORTE DE MATERIAL SUELTO CON EQUIPO


PARCIAL ROCA
MAT. SUELTO (m3)
(M3) SUELTA (m3) FIJA (m3)
1611.19 470.64 670.27 470.29

100.00% 29.21% 41.60% 29.19%


02.01.03.04 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO MANUAL

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
01 0+000 A 0+039 MURO DE MAMPOSTERIA 1.00 3.00 0.06 AREA 0.18
0+240.00 MURO DE MAMPOSTERIA 1.00 3.90 0.21 AREA 0.82
0+246.00 MURO DE MAMPOSTERIA 1.00 6.00 0.26 AREA 1.56
0+252.00 MURO DE MAMPOSTERIA 1.00 5.97 0.38 AREA 2.27
0+258.00 MURO DE MAMPOSTERIA 1.00 5.97 0.45 AREA 2.69
0+264.00 MURO DE MAMPOSTERIA 1.00 6.00 0.40 AREA 2.40
0+270.00 MURO DE MAMPOSTERIA 1.00 5.98 0.28 AREA 1.67
02
0+276.00 MURO DE MAMPOSTERIA 1.00 5.98 0.24 AREA 1.44
0+282.00 MURO DE MAMPOSTERIA 1.00 5.98 0.26 AREA 1.55
0+288.00 MURO DE MAMPOSTERIA 1.00 5.97 0.16 AREA 0.96
0+294.00 MURO DE MAMPOSTERIA 1.00 5.97 0.11 AREA 0.66
0+300.00 MURO DE MAMPOSTERIA 1.00 5.97 0.07 AREA 0.42
0+306.00 MURO DE MAMPOSTERIA 1.00 15.07 0.05 AREA 0.75
0+318.00 MURO DE MAMPOSTERIA 1.00 6.00 0.14 AREA 0.84
0+324.00 MURO DE MAMPOSTERIA 1.00 5.97 0.09 AREA 0.54
0+330.00 MURO DE MAMPOSTERIA 1.00 5.97 0.23 AREA 1.37
0+336.00 MURO DE MAMPOSTERIA 1.00 1.97 0.32 AREA 0.63
03
0+360.00 MURO DE MAMPOSTERIA 1.00 5.97 0.15 AREA 0.90
0+366.00 MURO DE MAMPOSTERIA 1.00 5.97 0.19 AREA 1.13
0+372.00 MURO DE MAMPOSTERIA 1.00 5.97 0.22 AREA 1.31
0+378.00 MURO DE MAMPOSTERIA 1.00 5.47 0.35 AREA 1.91
0+459.00 MURO DE MAMPOSTERIA 1.00 5.97 0.14 AREA 0.84
0+465.00 MURO DE MAMPOSTERIA 1.00 5.97 0.46 AREA 2.75
0+471.00 MURO DE MAMPOSTERIA 1.00 5.97 0.21 AREA 1.25
0+489.00 MURO DE MAMPOSTERIA 1.00 5.98 0.04 AREA 0.24
0+495.00 MURO DE MAMPOSTERIA 1.00 5.97 0.14 AREA 0.84
0+501.00 MURO DE MAMPOSTERIA 1.00 5.97 0.66 AREA 3.94
0+507.00 MURO DE MAMPOSTERIA 1.00 5.97 0.41 AREA 2.45
0+513.00 MURO DE MAMPOSTERIA 1.00 5.97 0.27 AREA 1.61
0+519.00 MURO DE MAMPOSTERIA 1.00 5.97 0.14 AREA 0.84
04
04
0+525.00 MURO DE MAMPOSTERIA 1.00 5.97 0.30 AREA 1.79
0+531.00 MURO DE MAMPOSTERIA 1.00 5.97 0.17 AREA 1.01
0+537.00 MURO DE MAMPOSTERIA 1.00 5.97 0.15 AREA 0.90
0+543.00 MURO DE MAMPOSTERIA 1.00 5.97 0.11 AREA 0.66
0+549.00 MURO DE MAMPOSTERIA 1.00 5.97 0.04 AREA 0.24
0+555.00 MURO DE MAMPOSTERIA 1.00 5.97 0.00 AREA 0.00
0+561.00 MURO DE MAMPOSTERIA 1.00 5.97 0.01 AREA 0.06
0+567.00 MURO DE MAMPOSTERIA 1.00 5.97 0.10 AREA 0.60
0+573.00 MURO DE MAMPOSTERIA 1.00 5.97 0.06 AREA 0.36
0+774.00 MURO DE MAMPOSTERIA 1.00 6.00 0.15 AREA 0.90
0+780.00 MURO DE MAMPOSTERIA 1.00 6.00 0.17 AREA 1.02
0+786.00 MURO DE MAMPOSTERIA 1.00 6.00 0.16 AREA 0.96
0+792.00 MURO DE MAMPOSTERIA 1.00 6.00 0.15 AREA 0.90
0+798.00 MURO DE MAMPOSTERIA 1.00 6.00 0.15 AREA 0.90
0+804.00 MURO DE MAMPOSTERIA 1.00 6.00 0.26 AREA 1.56
05
0+810.00 MURO DE MAMPOSTERIA 1.00 6.00 0.19 AREA 1.14
0+816.00 MURO DE MAMPOSTERIA 1.00 6.00 0.12 AREA 0.72
0+822.00 MURO DE MAMPOSTERIA 1.00 6.00 0.15 AREA 0.90
0+828.00 MURO DE MAMPOSTERIA 1.00 6.00 5.38 AREA 32.28
0+834.00 MURO DE MAMPOSTERIA 1.00 6.00 3.42 AREA 20.52
0+840.00 MURO DE MAMPOSTERIA 1.00 5.15 0.65 AREA 3.35
1+368.00 MURO DE MAMPOSTERIA 1.00 6.00 1.50 AREA 9.00
1+374.00 MURO DE MAMPOSTERIA 1.00 6.00 0.59 AREA 3.54
1+380.00 MURO DE MAMPOSTERIA 1.00 6.00 0.60 AREA 3.60
06
1+386.00 MURO DE MAMPOSTERIA 1.00 6.00 0.55 AREA 3.30
1+392.00 MURO DE MAMPOSTERIA 1.00 3.50 0.43 AREA 1.51
1+404.00 MURO DE MAMPOSTERIA 1.00 3.00 0.53 AREA 1.59
1+578.00 MURO DE MAMPOSTERIA 1.00 6.00 0.29 AREA 1.74
1+584.00 MURO DE MAMPOSTERIA 1.00 6.00 0.27 AREA 1.62
1+590.00 MURO DE MAMPOSTERIA 1.00 6.00 0.26 AREA 1.56
1+596.00 MURO DE MAMPOSTERIA 1.00 6.00 0.28 AREA 1.68
1+602.00 MURO DE MAMPOSTERIA 1.00 6.00 0.26 AREA 1.56
1+608.00 MURO DE MAMPOSTERIA 1.00 6.00 0.25 AREA 1.50
1+614.00 MURO DE MAMPOSTERIA 1.00 6.00 0.32 AREA 1.92
1+620.00 MURO DE MAMPOSTERIA 1.00 6.00 0.24 AREA 1.44
1+626.00 MURO DE MAMPOSTERIA 1.00 6.00 0.17 AREA 1.02
1+632.00 MURO DE MAMPOSTERIA 1.00 6.00 0.19 AREA 1.14
1+638.00 MURO DE MAMPOSTERIA 1.00 6.00 0.25 AREA 1.50
1+644.00 MURO DE MAMPOSTERIA 1.00 6.00 0.12 AREA 0.72
1+650.00 MURO DE MAMPOSTERIA 1.00 6.00 0.22 AREA 1.32
1+656.00 MURO DE MAMPOSTERIA 1.00 6.00 0.39 AREA 2.34
07 1+662.00 MURO DE MAMPOSTERIA 1.00 6.00 0.36 AREA 2.16
1+668.00 MURO DE MAMPOSTERIA 1.00 6.00 0.37 AREA 2.22
1+674.00 MURO DE MAMPOSTERIA 1.00 6.00 0.40 AREA 2.40
1+680.00 MURO DE MAMPOSTERIA 1.00 6.00 0.46 AREA 2.76
1+686.00 MURO DE MAMPOSTERIA 1.00 6.00 0.45 AREA 2.70
1+704.00 MURO DE MAMPOSTERIA 1.00 6.00 0.26 AREA 1.56
1+710.00 MURO DE MAMPOSTERIA 1.00 6.00 0.01 AREA 0.06
1+716.00 MURO DE MAMPOSTERIA 1.00 6.00 0.02 AREA 0.12
1+722.00 MURO DE MAMPOSTERIA 1.00 6.00 0.03 AREA 0.18
1+728.00 MURO DE MAMPOSTERIA 1.00 6.00 0.03 AREA 0.18
1+734.00 MURO DE MAMPOSTERIA 1.00 10.70 0.12 AREA 1.28
1+740.00 MURO DE MAMPOSTERIA 1.00 10.70 0.55 AREA 5.89
1+746.00 MURO DE MAMPOSTERIA 1.00 10.70 0.45 AREA 4.82
1+770.00 MURO DE MAMPOSTERIA 1.00 10.70 0.21 AREA 2.25
1+776.00 MURO DE MAMPOSTERIA 1.00 10.70 0.20 AREA 2.14
1+815.00 MURO DE MAMPOSTERIA 1.00 6.00 0.20 AREA 1.20
1+821.00 MURO DE MAMPOSTERIA 1.00 6.00 0.32 AREA 1.92
1+827.00 MURO DE MAMPOSTERIA 1.00 6.00 0.26 AREA 1.56
08
1+833.00 MURO DE MAMPOSTERIA 1.00 6.00 0.54 AREA 3.24
1+839.00 MURO DE MAMPOSTERIA 1.00 6.00 0.31 AREA 1.86
1+842.00 MURO DE MAMPOSTERIA 1.00 6.00 0.23 AREA 1.38
2+652.00 MURO DE MAMPOSTERIA 1.00 6.00 0.06 AREA 0.36
2+658.00 MURO DE MAMPOSTERIA 1.00 6.00 0.06 AREA 0.36
2+664.00 MURO DE MAMPOSTERIA 1.00 6.00 0.10 AREA 0.60
09 2+670.00 MURO DE MAMPOSTERIA 1.00 6.00 0.16 AREA 0.96
2+676.00 MURO DE MAMPOSTERIA 1.00 6.00 0.10 AREA 0.60
2+682.00 MURO DE MAMPOSTERIA 1.00 6.00 0.06 AREA 0.36
2+688.00 MURO DE MAMPOSTERIA 1.00 3.00 0.08 AREA 0.24
2+898.00 MURO DE MAMPOSTERIA 1.00 6.00 0.21 AREA 1.26
2+904.00 MURO DE MAMPOSTERIA 1.00 6.00 0.15 AREA 0.90
2+910.00 MURO DE MAMPOSTERIA 1.00 6.00 0.19 AREA 1.14

10
2+916.00 MURO DE MAMPOSTERIA 1.00 6.00 2.82 AREA 16.92
2+922.00 MURO DE MAMPOSTERIA 1.00 6.00 4.03 AREA 24.18
10 2+928.00 MURO DE MAMPOSTERIA 1.00 6.00 4.09 AREA 24.54
2+934.00 MURO DE MAMPOSTERIA 1.00 6.00 0.03 AREA 0.18
2+940.00 MURO DE MAMPOSTERIA 1.00 6.00 0.18 AREA 1.08
2+946.00 MURO DE MAMPOSTERIA 1.00 6.00 0.13 AREA 0.78
2+952.00 MURO DE MAMPOSTERIA 1.00 6.00 0.20 AREA 1.20
2+958.00 MURO DE MAMPOSTERIA 1.00 39.38 0.21 AREA 8.27
3+000.00 MURO DE MAMPOSTERIA 1.00 6.00 0.00 AREA 0.00
3+006.00 MURO DE MAMPOSTERIA 1.00 6.00 0.00 AREA 0.00
3+012.00 MURO DE MAMPOSTERIA 1.00 6.00 0.00 AREA 0.00
3+018.00 MURO DE MAMPOSTERIA 1.00 6.00 0.00 AREA 0.00
11
3+024.00 MURO DE MAMPOSTERIA 1.00 6.00 0.00 AREA 0.00
3+030.00 MURO DE MAMPOSTERIA 1.00 6.00 0.00 AREA 0.00
3+036.00 MURO DE MAMPOSTERIA 1.00 3.60 0.19 AREA 0.68
3+042.00 MURO DE MAMPOSTERIA 1.00 3.60 0.08 AREA 0.29
3+051.00 MURO DE MAMPOSTERIA 1.00 6.00 0.07 AREA 0.42
3+057.00 MURO DE MAMPOSTERIA 1.00 6.00 3.24 AREA 19.44
3+063.00 MURO DE MAMPOSTERIA 1.00 5.97 3.34 AREA 19.94
3+069.00 MURO DE MAMPOSTERIA 1.00 5.97 3.13 AREA 18.69
3+075.00 MURO DE MAMPOSTERIA 1.00 6.00 0.10 AREA 0.60
12 3+081.00 MURO DE MAMPOSTERIA 1.00 6.00 0.20 AREA 1.20
3+087.00 MURO DE MAMPOSTERIA 1.00 6.00 0.06 AREA 0.36
3+093.00 MURO DE MAMPOSTERIA 1.00 6.00 0.17 AREA 1.02
3+111.00 MURO DE MAMPOSTERIA 1.00 6.00 0.02 AREA 0.12
3+117.00 MURO DE MAMPOSTERIA 1.00 6.00 0.14 AREA 0.84
3+123.00 MURO DE MAMPOSTERIA 1.00 6.00 0.12 AREA 0.72
3+246.00 MURO DE MAMPOSTERIA 1.00 6.00 0.15 AREA 0.90
3+249.00 MURO DE MAMPOSTERIA 1.00 6.00 0.14 AREA 0.84
3+255.00 MURO DE MAMPOSTERIA 1.00 6.00 0.16 AREA 0.96
3+261.00 MURO DE MAMPOSTERIA 1.00 6.00 0.10 AREA 0.60
3+267.00 MURO DE MAMPOSTERIA 1.00 6.00 0.17 AREA 1.02
3+273.00 MURO DE MAMPOSTERIA 1.00 6.00 0.20 AREA 1.20
3+279.00 MURO DE MAMPOSTERIA 1.00 6.00 0.10 AREA 0.60
3+285.00 MURO DE MAMPOSTERIA 1.00 6.00 0.11 AREA 0.66
3+291.00 MURO DE MAMPOSTERIA 1.00 6.00 0.10 AREA 0.60

13
3+297.00 MURO DE MAMPOSTERIA 1.00 6.00 0.12 AREA 0.72
13
3+303.00 MURO DE MAMPOSTERIA 1.00 6.00 0.22 AREA 1.32
3+309.00 MURO DE MAMPOSTERIA 1.00 6.00 0.23 AREA 1.38
3+315.00 MURO DE MAMPOSTERIA 1.00 6.00 0.21 AREA 1.26
3+321.00 MURO DE MAMPOSTERIA 1.00 6.00 0.31 AREA 1.86
3+327.00 MURO DE MAMPOSTERIA 1.00 6.00 0.54 AREA 3.24
3+333.00 MURO DE MAMPOSTERIA 1.00 6.00 0.27 AREA 1.62
3+339.00 MURO DE MAMPOSTERIA 1.00 6.00 0.38 AREA 2.28
3+345.00 MURO DE MAMPOSTERIA 1.00 6.00 0.42 AREA 2.52
3+351.00 MURO DE MAMPOSTERIA 1.00 6.00 0.37 AREA 2.22
3+357.00 MURO DE MAMPOSTERIA 1.00 3.00 0.17 AREA 0.51
TOTAL : 371.57
03MUROS DE CONTENCION

03.01 OBRAS PRELIMINARES


03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 00+035.4 A 00+038.4 MURO DE MAMPOSTERIA 1 3.00 1.50 - 4.50
02 00+017.3 A 00+031.1 MURO DE MAMPOSTERIA 1 15.20 1.70 - 25.84
03 00+243.9 A 00+303.9 MURO DE MAMPOSTERIA 1 60.00 1.25 - 75.00
04 00+327.15 A 00+340 MURO DE MAMPOSTERIA 1 12.00 1.40 - 16.80
05 00+345.5 A 00+387 MURO DE MAMPOSTERIA 1 41.50 1.20 - 49.80
06 00+438 A 00+444.5 MURO DE MAMPOSTERIA 1 6.50 1.30 - 8.45
07 00+456 A 00+476 MURO DE MAMPOSTERIA 1 20.00 1.50 - 30.00
08 00+438 A 00+444.5 MURO DE MAMPOSTERIA 1 11.20 1.30 - 14.56
09 00+486 A 00+576 MURO DE MAMPOSTERIA 1 54.00 1.60 - 86.40
10 00+770 A 00+806 MURO DE MAMPOSTERIA 1 71.15 2.35 167.20
11 01+368.8 A 01+407.52 MURO DE MAMPOSTERIA 1 28.05 1.80 50.49
12 01+580 A 01+777.52 MURO DE MAMPOSTERIA 1 166.00 1.70 282.20
13 01+809.75 A 01+846.50 MURO DE MAMPOSTERIA 1 36.75 2.00 73.50
14 02+650 A 02+690 MURO DE MAMPOSTERIA 1 39.00 1.10 42.90
15 02+900 A 02+960 MURO DE MAMPOSTERIA 1 60.00 2.65 159.00
16 03+003 A 03+042.6 MURO DE MAMPOSTERIA 1 39.60 1.25 49.50
17 03+048.70 A 03+129.70 MURO DE MAMPOSTERIA 1 72.70 2.20 159.94
18 02+510 A 02+590 MURO DE MAMPOSTERIA 1 45.00 1.60 72.00
TOTAL : 1368.08

03.01.02 LIMPIEZA DEL TERRENO MANUAL

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 00+035.4 A 00+038.4 MURO DE MAMPOSTERIA 1 3.00 1.50 - 4.50
02 00+017.3 A 00+031.1 MURO DE MAMPOSTERIA 1 15.20 1.70 - 25.84
03 00+243.9 A 00+303.9 MURO DE MAMPOSTERIA 1 60.00 1.25 - 75.00
04 00+327.15 A 00+340 MURO DE MAMPOSTERIA 1 12.00 1.40 - 16.80
05 00+345.5 A 00+387 MURO DE MAMPOSTERIA 1 41.50 1.20 - 49.80
06 00+438 A 00+444.5 MURO DE MAMPOSTERIA 1 6.50 1.30 - 8.45
07 00+456 A 00+476 MURO DE MAMPOSTERIA 1 20.00 1.50 - 30.00
08 00+476 A 00+485.70 MURO DE MAMPOSTERIA 1 11.20 1.30 - 14.56
09 00+486 A 00+576 MURO DE MAMPOSTERIA 1 54.00 1.60 - 86.40
10 00+770 A 00+806 MURO DE MAMPOSTERIA 1 71.15 2.35 167.20
11 01+368.8 A 01+407.52 MURO DE MAMPOSTERIA 1 28.05 1.80 50.49
12 01+580 A 01+777.52 MURO DE MAMPOSTERIA 1 166.00 1.70 282.20
13 01+809.75 A 01+846.50 MURO DE MAMPOSTERIA 1 36.75 2.00 73.50
14 02+650 A 02+690 MURO DE MAMPOSTERIA 1 39.00 1.10 42.90
15 02+900 A 02+960 MURO DE MAMPOSTERIA 1 60.00 2.65 159.00
16 03+003 A 03+042.6 MURO DE MAMPOSTERIA 1 39.60 1.25 49.50
17 03+048.70 A 03+129.70 MURO DE MAMPOSTERIA 1 72.70 2.20 159.94
18 02+510 A 02+590 MURO DE MAMPOSTERIA 1 45.00 1.60 72.00
TOTAL : 1368.08

03.02 CONCRETO SIMPLE

03.02.01 CONCRETO SOLADO h = 4" ; 1:12 ; C:H

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
MURO DE C° ARMADO 01 1 6.00 2.70 - 16.20
10 00+770 A 00+806
MURO DE C° ARMADO 02 1 11.15 3.10 - 34.57
MURO DE C° ARMADO 01 2 6.00 2.70 - 32.40
15 02+900 A 02+960 MURO DE C° ARMADO 02 1 6.00 3.10 - 18.60
MURO DE C° ARMADO 03 2 6.00 3.75 - 45.00
MURO DE C° ARMADO 02 2 6.00 3.10 - 37.20
17 03+048.70 A 03+129.70
MURO DE C° ARMADO 03 1 6.00 3.75 - 22.50
TOTAL : 206.47

´03.03 MUROS DE MAMPOSTERIA DE PIEDRA


03.03.01 MUROS EN MAMPOSTERIA DE PIEDRA

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
01 00+035.4 A 00+038.4 MURO DE MAMPOSTERIA 1 3.00 2.47 AREA 7.40
MURO DE MAMPOSTERIA 1 1 2.00 0.99 AREA 1.98
02 00+017.3 A 00+031.1 MURO DE MAMPOSTERIA 8 1 4.00 3.97 AREA 15.86
MURO DE MAMPOSTERIA 11 1 9.20 5.83 AREA 53.62
MURO DE MAMPOSTERIA 1 1 6.00 0.99 AREA 5.93
MURO DE MAMPOSTERIA 2 2 6.00 1.40 AREA 16.78
03 00+243.9 A 00+303.9 MURO DE MAMPOSTERIA 3 1 6.00 1.68 AREA 10.05
MURO DE MAMPOSTERIA 4 3 6.00 2.05 AREA 36.95
MURO DE MAMPOSTERIA 5 3 6.00 2.47 AREA 44.42
MURO DE MAMPOSTERIA 2 1 6.43 1.40 AREA 8.99
04 00+327.15 A 00+340
MURO DE MAMPOSTERIA 5 1 6.43 2.47 AREA 15.87
MURO DE MAMPOSTERIA 1 2 6.00 0.99 AREA 11.88
MURO DE MAMPOSTERIA 2 2 6.00 1.40 AREA 16.78
05 00+345.5 A 00+387 MURO DE MAMPOSTERIA 3 1 6.00 1.68 AREA 10.05
MURO DE MAMPOSTERIA 4 1 6.00 2.05 AREA 12.32
1 5.50 2.05 AREA 11.29
MURO DE MAMPOSTERIA 1 1 1.00 0.99 AREA 0.99
MURO DE MAMPOSTERIA 4 1 1.00 2.05 AREA 2.05
06 00+438 A 00+444.5 MURO DE MAMPOSTERIA 5 1 1.00 2.47 AREA 2.47
MURO DE MAMPOSTERIA 6 1 1.50 2.84 AREA 4.26
MURO DE MAMPOSTERIA 8 1 2.00 3.97 AREA 7.93
MURO DE MAMPOSTERIA 4 1 2.00 2.05 AREA 4.11
MURO DE MAMPOSTERIA 5 1 6.00 2.47 AREA 14.81
07 00+456 A 00+476
MURO DE MAMPOSTERIA 6 1 6.00 2.84 AREA 17.04
MURO DE MAMPOSTERIA 7 1 6.00 3.45 AREA 20.70
MURO DE MAMPOSTERIA 1 1 1.00 0.99 AREA 0.99
MURO DE MAMPOSTERIA 4 1 1.20 2.05 AREA 2.46
08 00+476 A 00+485.70 MURO DE MAMPOSTERIA 5 1 2.00 2.47 AREA 4.94
MURO DE MAMPOSTERIA 6 1 3.00 2.84 AREA 8.52
MURO DE MAMPOSTERIA 8 1 4.00 3.97 AREA 15.86
MURO DE MAMPOSTERIA 2 2 6.00 1.40 AREA 16.78
MURO DE MAMPOSTERIA 3 3 6.00 1.68 AREA 30.15
MURO DE MAMPOSTERIA 4 3 6.00 2.05 AREA 36.95
09 00+486 A 00+576
MURO DE MAMPOSTERIA 5 1 6.00 2.47 AREA 14.81
MURO DE MAMPOSTERIA 7 2 6.00 3.45 AREA 41.40
MURO DE MAMPOSTERIA 9 1 6.00 4.48 AREA 26.87
MURO DE MAMPOSTERIA 6 7 6.00 2.84 AREA 119.28
10 00+770 A 00+806
MURO DE MAMPOSTERIA 7 2 6.00 3.45 AREA 41.40
MURO DE MAMPOSTERIA 6 1 3.05 2.84 AREA 8.66
11 01+368.8 A 01+407.52
MURO DE MAMPOSTERIA 8 5 5.00 3.97 AREA 99.13
MURO DE MAMPOSTERIA 3 3 6.00 1.68 AREA 30.15
MURO DE MAMPOSTERIA 4 5 6.00 2.05 AREA 61.50
MURO DE MAMPOSTERIA 5 8 6.00 2.47 AREA 118.46
MURO DE MAMPOSTERIA 6 2 6.00 2.84 AREA 34.08
12 01+580 A 01+777.52 MURO DE MAMPOSTERIA 7 4 6.00 3.45 AREA 82.80
1 2.00 3.45 AREA 6.90
MURO DE MAMPOSTERIA 8 2 6.00 3.97 AREA 47.58
MURO DE MAMPOSTERIA 9 4 6.00 4.48 AREA 107.47
MURO DE MAMPOSTERIA 10 1 2.30 5.13 AREA 11.80
MURO DE MAMPOSTERIA 7 1 6.00 3.45 AREA 20.70
13 01+809.75 A 01+846.50 MURO DE MAMPOSTERIA 8 4 6.00 3.97 AREA 95.16
MURO DE MAMPOSTERIA 9 1 6.00 4.48 AREA 26.87
MURO DE MAMPOSTERIA 1 1 9.00 0.99 AREA 8.89
14 02+650 A 02+690 MURO DE MAMPOSTERIA 2 3 6.00 1.40 AREA 25.16
MURO DE MAMPOSTERIA 3 2 6.00 1.68 AREA 20.10
MURO DE MAMPOSTERIA 5 1 6.00 2.47 AREA 14.81
MURO DE MAMPOSTERIA 7 1 6.00 3.45 AREA 20.70
15 02+900 A 02+960 MURO DE MAMPOSTERIA 9 1 6.00 4.48 AREA 26.87
MURO DE MAMPOSTERIA 10 1 6.00 5.13 AREA 30.78
MURO DE MAMPOSTERIA 11 1 6.00 5.83 AREA 34.97
MURO DE MAMPOSTERIA 1' 3 6.00 0.48 AREA 8.64
16 03+003 A 03+042.6 MURO DE MAMPOSTERIA 1 3 6.00 0.99 AREA 17.78
MURO DE MAMPOSTERIA 5 1 3.60 2.47 AREA 8.88
MURO DE MAMPOSTERIA 2 1 6.00 1.40 AREA 8.39
MURO DE MAMPOSTERIA 3 1 6.70 1.68 AREA 11.22
MURO DE MAMPOSTERIA 4 1 6.00 2.05 AREA 12.32
MURO DE MAMPOSTERIA 5 1 6.00 2.47 AREA 14.81
17 03+048.70 A 03+129.70
MURO DE MAMPOSTERIA 6 1 6.00 2.84 AREA 17.04
MURO DE MAMPOSTERIA 8 1 6.00 3.97 AREA 23.79
MURO DE MAMPOSTERIA 9 1 6.00 4.48 AREA 26.87
MURO DE MAMPOSTERIA 13 2 6.00 7.29 AREA 87.43
MURO DE MAMPOSTERIA 1 7 6.00 0.99 AREA 41.50
MURO DE MAMPOSTERIA 2 4 6.00 1.40 AREA 33.55
MURO DE MAMPOSTERIA 3 1 6.00 1.68 AREA 10.05
MURO DE MAMPOSTERIA 4 1 6.00 2.05 AREA 12.32
18 02+510 A 02+590
MURO DE MAMPOSTERIA 6 1 6.00 2.84 AREA 17.04
MURO DE MAMPOSTERIA 8 1 6.00 3.97 AREA 23.79
MURO DE MAMPOSTERIA 9 2 6.00 4.48 AREA 53.74
MURO DE MAMPOSTERIA 10 1 6.00 5.13 AREA 30.78
TOTAL : 2108.42

03.04 CONCRETO ARMADO


03.04.01 MUROS DE CONTENCION
03.04.01.01 CONCRETO f'c=210 kg/cm2 EN MUROS DE CONTENCION

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
MURO DE C° ARMADO 01 1 6.00 2.47 AREA 14.79
10 00+770 A 00+806
MURO DE C° ARMADO 02 1 11.15 2.79 AREA 31.11
MURO DE C° ARMADO 01 2 6.00 2.47 AREA 29.58
15 02+900 A 02+960 MURO DE C° ARMADO 02 1 6.00 2.79 AREA 16.74
MURO DE C° ARMADO 03 2 6.00 3.40 AREA 40.74
MURO DE C° ARMADO 02 2 6.00 2.79 AREA 33.48
17 03+048.70 A 03+129.70
MURO DE C° ARMADO 03 1 6.00 3.40 AREA 20.37
TOTAL : 186.81

03.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
MURO DE C° ARMADO 01 2 6.00 - 4.20 50.40
10 00+770 A 00+806
MURO DE C° ARMADO 02 2 11.15 - 4.70 104.81
MURO DE C° ARMADO 01 4 6.00 - 4.20 100.80
15 02+900 A 02+960 MURO DE C° ARMADO 02 2 6.00 - 4.70 56.40
MURO DE C° ARMADO 03 4 6.00 - 5.20 124.80
MURO DE C° ARMADO 02 4 6.00 - 4.70 112.80
17 03+048.70 A 03+129.70
MURO DE C° ARMADO 03 2 6.00 - 5.20 62.40
TOTAL : 612.41

03.04.01.03 ACERO DE REFUERZO f'y=4200 kg/cm2 EN MUROS DE CONTENCION

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (KG)
MURO DE C° ARMADO 01 1 6.00 - - 1080.28
10 00+770 A 00+806
MURO DE C° ARMADO 02 1 11.15 - - 2765.56
MURO DE C° ARMADO 01 2 12.00 - - 2190.63
15 02+900 A 02+960 MURO DE C° ARMADO 02 1 6.00 - - 1513.00
MURO DE C° ARMADO 03 2 12.00 - - 3502.97
MURO DE C° ARMADO 02 2 12.00 - - 3026.00
17 03+048.70 A 03+129.70
MURO DE C° ARMADO 03 1 6.00 - - 1751.49
TOTAL : 15829.93

´03.05 VARIOS
03.05.01 JUNTAS DE DILATACION E=1"

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
10 00+770 A 00+806 MURO DE C° ARMADO 1 14.10 0.35 - 4.94
15 02+900 A 02+960 MURO DE C° ARMADO 1 24.80 0.35 - 8.68
17 03+048.70 A 03+129.70 MURO DE C° ARMADO 1 20.20 0.35 - 7.07

TOTAL : 20.69
PLANILLA DE METRADOS ACERO DE REFUERZO

Elemento Fierro Elemento Longitud total (m) Factor Parcial


Ítem Total Unidad
Denominación Cant. Ø Cant. Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1" (kg/m) kg

03.04.01.03 ACERO DE REFUERZO f'y=4200 kg/cm2 EN MUROS DE CONTENCION 15,829.93 KG

MURO C°A° 01 - ACERO FY= 4200KG/CM2 1,080.28


Muro
Acero longitudinal 1 2 5/8 23 4.95 227.70 1.552 353.39
Acero longitudinal 2 2 5/8 45 1.90 171.00 1.552 265.39
Acero transversal 1 1 3/8 14 6.40 89.60 0.560 50.18
Acero transversal 2 1 1/2 16 6.40 102.40 0.994 101.79
Zapata
Acero longitudinal 1 1 1/2 48 2.40 115.20 0.994 114.51
Acero longitudinal 2 1 1/2 48 1.10 52.80 0.994 52.48
Acero transversal 1 1 1/2 10 7.00 70.00 0.994 69.58
Acero transversal 2 1 1/2 5 7.00 35.00 0.994 34.79
Uña
Acero transversal 1 1 1/2 6 6.40 38.40 0.994 38.17

MURO C°A° 02 - ACERO FY= 4200KG/CM2 2,765.56


Muro
Acero longitudinal 1 2 5/8 62 5.50 682.00 1.552 1,058.46
Acero longitudinal 2 2 5/8 124 2.00 496.00 1.552 769.79
Acero transversal 1 1 3/8 16 11.80 188.80 0.560 105.73
Acero transversal 2 1 1/2 17 11.80 200.60 0.994 199.40
Zapata
Acero longitudinal 1 1 1/2 88 2.85 250.80 0.994 249.30
Acero longitudinal 2 1 1/2 88 1.10 96.80 0.994 96.22
Acero transversal 1 1 1/2 12 12.80 153.60 0.994 152.68
Acero transversal 2 1 1/2 5 12.80 64.00 0.994 63.62
Uña
Acero transversal 1 1 1/2 6 11.80 70.80 0.994 70.38

MURO C°A° 01 - ACERO FY= 4200KG/CM2 2,190.63


Muro
Acero longitudinal 1 2 5/8 47 4.95 465.30 1.552 722.15
Acero longitudinal 2 2 5/8 93 1.90 353.40 1.552 548.48
Acero transversal 1 1 3/8 14 12.80 179.20 0.560 100.35
Acero transversal 2 1 1/2 16 12.80 204.80 0.994 203.57
Zapata
Acero longitudinal 1 1 1/2 96 2.40 230.40 0.994 229.02
Acero longitudinal 2 1 1/2 96 1.10 105.60 0.994 104.97
Acero transversal 1 1 1/2 10 13.80 138.00 0.994 137.17
Acero transversal 2 1 1/2 5 13.80 69.00 0.994 68.59
Uña
Acero transversal 1 1 1/2 6 12.80 76.80 0.994 76.34

MURO C°A° 02 - ACERO FY= 4200KG/CM2 1,513.00


Muro
Acero longitudinal 1 2 5/8 34 5.50 374.00 1.552 580.45
Acero longitudinal 2 2 5/8 68 2.00 272.00 1.552 422.14
Acero transversal 1 1 3/8 16 6.40 102.40 0.560 57.34
Acero transversal 2 1 1/2 17 6.40 108.80 0.994 108.15
Zapata
Acero longitudinal 1 1 1/2 48 2.85 136.80 0.994 135.98
Acero longitudinal 2 1 1/2 48 1.10 52.80 0.994 52.48
Acero transversal 1 1 1/2 12 7.00 84.00 0.994 83.50
Acero transversal 2 1 1/2 5 7.00 35.00 0.994 34.79
Uña
Acero transversal 1 1 1/2 6 6.40 38.40 0.994 38.17

MURO C°A° 03 - ACERO FY= 4200KG/CM2 3,502.97


Muro
Acero longitudinal 1 2 3/4 50 6.05 605.00 2.235 1,352.18
Acero longitudinal 2 2 3/4 100 2.10 420.00 2.235 938.70
Acero transversal 1 1 3/8 19 12.80 243.20 0.560 136.19
Acero transversal 2 1 1/2 20 12.80 256.00 0.994 254.46
Zapata
Acero longitudinal 1 1 1/2 96 3.40 326.40 0.994 324.44
Acero longitudinal 2 1 1/2 96 1.20 115.20 0.994 114.51
Acero transversal 1 1 1/2 16 14.00 224.00 0.994 222.66
Acero transversal 2 1 1/2 6 14.00 84.00 0.994 83.50
Uña
Acero transversal 1 1 1/2 6 12.80 76.80 0.994 76.34
MURO C°A° 02 - ACERO FY= 4200KG/CM2 3,026.00
Muro
Acero longitudinal 1 2 5/8 68 5.50 748.00 1.552 1,160.90
Acero longitudinal 2 2 5/8 136 2.00 544.00 1.552 844.29
Acero transversal 1 1 3/8 16 12.80 204.80 0.560 114.69
Acero transversal 2 1 1/2 17 12.80 217.60 0.994 216.29
Zapata
Acero longitudinal 1 1 1/2 96 2.85 273.60 0.994 271.96
Acero longitudinal 2 1 1/2 96 1.10 105.60 0.994 104.97
Acero transversal 1 1 1/2 12 14.00 168.00 0.994 166.99
Acero transversal 2 1 1/2 5 14.00 70.00 0.994 69.58
Uña
Acero transversal 1 1 1/2 6 12.80 76.80 0.994 76.34

MURO C°A° 03 - ACERO FY= 4200KG/CM2 1,751.49


Muro
Acero longitudinal 1 2 3/4 25 6.05 302.50 2.235 676.09
Acero longitudinal 2 2 3/4 50 2.10 210.00 2.235 469.35
Acero transversal 1 1 3/8 19 6.40 121.60 0.560 68.10
Acero transversal 2 1 1/2 20 6.40 128.00 0.994 127.23
Zapata
Acero longitudinal 1 1 1/2 48 3.40 163.20 0.994 162.22
Acero longitudinal 2 1 1/2 48 1.20 57.60 0.994 57.25
Acero transversal 1 1 1/2 16 7.00 112.00 0.994 111.33
Acero transversal 2 1 1/2 6 7.00 42.00 0.994 41.75
Uña
Acero transversal 1 1 1/2 6 6.40 38.40 0.994 38.17
04.00.OBRAS DE DRENAJE E HIDRAULICA

4.01 OBRAS PRELIMINARES


04.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA
ALCANTARILLAS DE ALIVIO TIPO MARCO
DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 0+079.32 ALCANTARILLA 1 1 9.40 - 1.00 9.40
02 1+017.17 PAREDES 1 9.40 - 1.00 9.40
03 1+320.87 PAREDES 1 9.40 - 1.00 9.40
04 2+301.64 PAREDES 1 10.40 - 1.00 10.40
05 3+045.25 PAREDES 1 15.23 - 1.00 15.23
TOTAL : 53.83

PASES DE AGUA TIPO MARCO


DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 1+088.47 PAREDES 1 12.80 - 1.00 12.80
02 1+851.47 PAREDES 1 18.98 - 1.00 18.98
03 2+632.01 PAREDES 1 14.77 - 1.00 14.77
04 2+746.48 PAREDES 1 12.77 - 1.00 12.77
05 2+764.52 PAREDES 1 15.97 - 1.00 15.97
06 2+848.44 PAREDES 1 18.55 - 1.00 18.55
07 2+884.81 PAREDES 1 12.37 - 1.00 12.37
08 3+001.80 PAREDES 1 10.32 - 0.60 6.19
TOTAL : 112.40

CANAL TIPO MARCO


DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
CANAL CERRADO 1.00 58.58 1.00 - 58.58
01 1+218.80
CANAL CERRADO 1.00 26.74 1.00 - 26.74
TOTAL : 85.32

TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA 251.55


04.01.02 LIMPIEZA DEL TERRENO MANUAL
ALCANTARILLAS DE ALIVIO TIPO MARCO
DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 0+079.32 ALCANTARILLA 1 1 9.40 - 1.00 9.40
02 1+017.17 PAREDES 1 9.40 - 1.00 9.40
03 1+320.87 PAREDES 1 9.40 - 1.00 9.40
04 2+301.64 PAREDES 1 10.40 - 1.00 10.40
05 3+045.25 PAREDES 1 15.23 - 1.00 15.23

TOTAL : 53.83

PASES DE AGUA TIPO MARCO


DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 1+088.47 PAREDES 1 12.80 - 1.00 12.80
02 1+851.47 PAREDES 1 18.98 - 1.00 18.98
03 2+632.01 PAREDES 1 14.77 - 1.00 14.77
04 2+746.48 PAREDES 1 12.77 - 1.00 12.77
05 2+764.52 PAREDES 1 15.97 - 1.00 15.97
06 2+848.44 PAREDES 1 18.55 - 1.00 18.55
07 2+884.81 PAREDES 1 12.37 - 1.00 12.37
08 3+001.80 PAREDES 1 10.32 - 0.60 6.19

TOTAL : 112.40

CANAL TIPO MARCO


DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
CANAL CERRADO 1.00 58.58 1.00 - 58.58
01 1+218.80
CANAL CERRADO 1.00 26.74 1.00 - 26.74
TOTAL : 85.32

LIMPIEZA DEL TERRENO MANUAL 251.55

4.03 ALCANTARILLA TIPO MARCO


04.03.01 CONCRETO f'c=210 kg/cm2 EN ALCANTARILLA
ALCANTARILLAS DE ALIVIO TIPO MARCO
DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
PAREDES 2 9.40 0.20 0.60 2.26
FONDO 1 9.40 1.00 0.20 1.88
01 0+079.32 LOSA 1 9.40 1.00 0.20 1.88
ALERO 1 1 1.00 0.20 0.50 0.10
ALERO 2 1 1.45 0.20 0.70 0.20
PAREDES 2 9.40 0.20 0.60 2.26
FONDO 1 9.40 1.00 0.20 1.88
02 1+017.17 LOSA 1 9.40 1.00 0.20 1.88
ALERO 1 1 1.00 0.20 0.50 0.10
ALERO 2 1 1.45 0.20 0.70 0.20
PAREDES 2 9.40 0.20 0.60 2.26
FONDO 1 9.40 1.00 0.20 1.88
03 1+320.87 LOSA 1 9.40 1.00 0.20 1.88
ALERO 1 1 1.00 0.20 0.50 0.10
ALERO 2 1 1.45 0.20 0.70 0.20
PAREDES 2 10.34 0.20 0.60 2.48
FONDO 1 10.40 1.00 0.20 2.08
04 2+301.64 LOSA 1 10.34 1.00 0.20 2.07
ALERO 1 1 1.00 0.20 0.50 0.10
ALERO 2 1 1.45 0.20 0.70 0.20
PAREDES 2 15.23 0.20 0.60 3.66
FONDO 1 15.23 1.00 0.20 3.05
05 3+045.25 LOSA 1 15.23 1.00 0.20 3.05
ALERO 1 1 1.00 0.20 0.50 0.10
ALERO 2 1 1.45 0.20 0.70 0.20

TOTAL : 35.95

04.03.02 ENCOFRADO Y DESENCOFRADO EN ALCANTARILLA

ALCANTARILLAS DE ALIVIO TIPO MARCO


DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
PAREDES 2 9.40 0.60 - 11.28
PAREDES EXTERNAS 2 9.40 1.00 - 18.80
LOSA 2 9.40 0.60 - 11.28
01 0+079.32 ALERO 1 2 1.00 0.50 - 1.00
ALERO 2 2 1.45 0.70 - 2.03
LADOS 2 0.20 0.70 - 0.28
LADOS 2 0.20 0.50 - 0.20
PAREDES 2 9.40 0.60 - 11.28
PAREDES EXTERNAS 2 9.40 1.00 - 18.80
LOSA 2 9.40 0.60 - 11.28
02 1+017.17 ALERO 1 2 1.00 0.50 - 1.00
ALERO 2 2 1.45 0.70 - 2.03
LADOS 2 0.20 0.70 - 0.28
LADOS 2 0.20 0.50 - 0.20
PAREDES 2 9.40 0.60 - 11.28
PAREDES EXTERNAS 2 9.40 1.00 - 18.80
LOSA 2 9.40 0.60 - 11.28
03 1+320.87 ALERO 1 2 1.00 0.50 - 1.00
ALERO 2 2 1.45 0.70 - 2.03
LADOS 2 0.20 0.70 - 0.28
LADOS 2 0.20 0.50 - 0.20
PAREDES 2 10.35 0.60 - 12.42
PAREDES EXTERNAS 2 10.35 1.00 - 20.70
LOSA 2 10.35 0.60 - 12.42
04 2+301.64 ALERO 1 2 1.00 0.50 - 1.00
ALERO 2 2 1.45 0.70 - 2.03
LADOS 2 0.20 0.70 - 0.28
LADOS 2 0.20 0.50 - 0.20
PAREDES 2 15.23 0.60 - 18.28
PAREDES EXTERNAS 2 15.23 1.00 - 30.46
LOSA 2 15.23 0.60 - 18.28
05 3+045.25 ALERO 1 2 1.00 0.50 - 1.00
ALERO 2 2 1.45 0.70 - 2.03
LADOS 2 0.20 0.70 - 0.28
LADOS 2 0.20 0.50 - 0.20
TOTAL : 254.19

04.03.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN ALCANTARILLA 2023.65


4.04 PASES DE AGUA TIPO MARCO

04.03.01 CONCRETO f'c=210 kg/cm2 EN CANALES


PASES DE AGUA TIPO MARCO
DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
PAREDES 2 12.80 0.20 0.60 3.07
FONDO 1 12.80 0.20 1.00 2.56
01 1+088.47 LOSA 1 10.11 0.20 1.00 2.02
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 18.98 0.20 0.60 4.56
FONDO 1 18.98 0.20 1.00 3.80
02 1+851.47 LOSA 1 15.55 0.20 1.00 3.11
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 14.77 0.20 0.60 3.54
FONDO 1 14.77 0.20 1.00 2.95
03 2+632.01 LOSA 1 11.95 0.20 1.00 2.39
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 12.77 0.20 0.60 3.06
FONDO 1 12.77 0.20 1.00 2.55
04 2+746.48 LOSA 1 10.32 0.20 1.00 2.06
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 15.97 0.20 0.60 3.83
FONDO 1 15.97 0.20 1.00 3.19
05 2+764.52 LOSA 1 13.56 0.20 1.00 2.71
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 18.55 0.20 0.60 4.45
FONDO 1 18.55 0.20 1.00 3.71
06 2+848.44 LOSA 1 15.40 0.20 1.00 3.08
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 12.37 0.20 0.60 2.97
FONDO 1 12.37 0.20 1.00 2.47
07 2+884.81 LOSA 1 9.96 0.20 1.00 1.99
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
PAREDES 2 10.32 0.20 0.60 2.48
FONDO 1 10.32 0.20 1.00 2.06
08 3+001.80 LOSA 1 9.65 0.20 1.00 1.93
ALERO 1 1 1.00 0.20 0.55 0.11
ALERO 2 1 1.00 0.20 0.55 0.11
TOTAL : 72.30

04.03.02 ENCOFRADO Y DESENCOFRADO EN CANAL

PASES DE AGUA TIPO MARCO


DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
PAREDES 2 12.80 0.60 - 15.36
PAREDES EXTERNAS 2 12.80 1.00 - 25.60
01 1+088.47 LOSA 1 10.11 0.60 6.07
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 18.98 0.60 - 22.78
PAREDES EXTERNAS 2 18.98 1.00 - 37.96
02 1+851.47 LOSA 1 15.55 0.60 9.33
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 14.77 0.60 - 17.72
PAREDES EXTERNAS 2 14.77 1.00 - 29.54
03 2+632.01 LOSA 1 11.95 0.60 7.17
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 12.77 0.60 - 15.32
PAREDES EXTERNAS 2 12.77 1.00 - 25.54
04 2+746.48 LOSA 1 10.32 0.60 6.19
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 15.97 0.60 - 19.16
PAREDES EXTERNAS 2 15.97 1.00 - 31.94
05 2+764.52 LOSA 1 13.56 0.60 8.14
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 18.55 0.60 - 22.26
PAREDES EXTERNAS 2 18.55 1.00 - 37.10
06 2+848.44 LOSA 1 15.40 0.60 9.24
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 12.37 0.60 - 14.84
PAREDES EXTERNAS 2 12.37 1.00 - 24.74
07 2+884.81 LOSA 1 9.96 0.60 5.98
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
PAREDES 2 10.32 0.60 - 12.38
PAREDES EXTERNAS 2 10.32 1.00 - 20.64
08 3+001.80 LOSA 1 9.65 0.60 - 5.79
ALEROS 2 1.00 1.50 - 3.00
LADOS 4 0.55 0.20 - 0.44
TOTAL : 458.31

04.03.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN CANAL 3535.17

4.04 CANAL DE CONCRETO ARMADO TIPO MARCO


04.04.01 CONCRETO f'c=210 kg/cm2 EN CANALES

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
LOSA (60X60 CM) 98.00 0.60 0.60 0.20 7.06
FONDO 1.00 58.58 1.00 0.20 11.72
PAREDES 2.00 58.58 0.20 0.60 14.06
01 1+218.81
LOSA (60X60 CM) 45.00 0.60 0.60 0.20 3.24
FONDO 1.00 26.74 1.00 0.20 5.35
PAREDES 2.00 26.74 0.20 0.60 6.42
TOTAL : 47.85

04.04.02 ENCOFRADO Y DESENCOFRADO EN CANAL

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
LOSA 98.00 0.60 0.60 - 35.28
CONTORNO DE TAPA 98.00 0.60 0.20 - 11.76
PAREDES 2.00 58.58 0.80 - 93.73
PAREDES INTERIORES 2.00 58.58 0.60 - 70.30
01 1+148 - 1+217.63
LOSA 45.00 0.60 0.60 - 16.20
CONTORNO DE TAPA 45.00 0.60 0.20 - 5.40
PAREDES 2.00 26.74 0.80 - 42.78
PAREDES INTERIORES 2.00 26.74 0.60 - 32.09
TOTAL : 307.54

04.04.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN CANAL 2041.27

4.05 CANAL DE MAMPOSTERIA DE PIEDRA


04.05.01 MAMPOSTERIA DE PIEDRA CANALES

DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
01 0+740 - 0+780 CANAL EMBOQUILLADO DE P 1.00 40.00 1.80 0.25 18.00
02 0+890 - 0+900 CANAL EMBOQUILLADO DE P 1.00 10.00 1.80 0.25 4.50
03 0+970 - 0+975 CANAL EMBOQUILLADO DE P 1.00 5.00 1.80 0.25 2.25
04 1+645 - 1+665 CANAL EMBOQUILLADO DE P 1.00 20.00 1.80 0.25 9.00
05 1+820 - 1+830 CANAL EMBOQUILLADO DE P 1.00 10.00 1.80 0.25 4.50
06 1+985 - 1+995 CANAL EMBOQUILLADO DE P 1.00 10.00 1.80 0.25 4.50
07 2+075 - 2+090 CANAL EMBOQUILLADO DE P 1.00 15.00 1.80 0.25 6.75
TOTAL : 49.50

4.06 CUNETAS
04.06.01 CUNETA REVESTIDA DE PIEDRA
SECCION TRIANGULAR
DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 0+017.20 - 0+118.50 CUNETA TRIANGULAR 1.00 101.30 1.15 - 116.50
02 0+129.50 - 0+195.55 CUNETA TRIANGULAR 1.00 66.05 1.15 - 75.96
03 0+205.55 - 0+276.75 CUNETA TRIANGULAR 1.00 71.20 1.15 - 81.88
04 0+283.75 - 0+405.50 CUNETA TRIANGULAR 1.00 111.45 1.15 - 128.17
05 0+413.50 - 0+428.15 CUNETA TRIANGULAR 1.00 14.65 1.15 - 16.85
06 0+438.00 - 0+453.80 CUNETA TRIANGULAR 1.00 14.55 1.15 - 16.73
07 0+467.50 - 0+640.50 CUNETA TRIANGULAR 1.00 175.20 1.15 - 201.48
08 0+993.20 - 1+089.10 CUNETA TRIANGULAR 1.00 97.10 1.15 - 111.67
09 1+095.50 - 1+120.50 CUNETA TRIANGULAR 1.00 26.20 1.15 - 30.13
10 1+120.50 - 1+163.25 CUNETA TRIANGULAR 1.00 35.30 1.15 - 40.60
11 1+285.90 - 1+363.10 CUNETA TRIANGULAR 1.00 78.60 1.15 - 90.39
12 1+369.40 - 1+440.50 CUNETA TRIANGULAR 1.00 72.50 1.15 - 83.38
13 1+447.65 - 1+848.20 CUNETA TRIANGULAR 1.00 396.40 1.15 - 455.86
14 1+860.50 - 1+965.25 CUNETA TRIANGULAR 1.00 101.90 1.15 - 117.19
15 2+220.00 - 2+529.20 CUNETA TRIANGULAR 1.00 307.05 1.15 - 353.11
16 2+535.53 - 2+579.20 CUNETA TRIANGULAR 1.00 43.65 1.15 - 50.20
17 2+585.50 - 3+124.80 CUNETA TRIANGULAR 1.00 538.45 1.15 - 619.22
18 3+139.90 - 3+233.20 CUNETA TRIANGULAR 1.00 94.10 1.15 - 108.22
19 3+243.00 - 3+286.75 CUNETA TRIANGULAR 1.00 43.35 1.15 - 49.85
20 3+296.65 - 3+361.95 CUNETA TRIANGULAR 1.00 62.60 1.15 - 71.99
TOTAL : 2819.38

SECCION TRAPESOIDAL
DIMENSIONAMIENTO PARCIAL
N° PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
01 0+118.50 - 0+129.50 CUNETA TRAPESOIDAL 1.00 11.00 2.20 - 24.20
02 0+195.55 - 0+205.55 CUNETA TRAPESOIDAL 1.00 7.00 2.20 - 15.40
03 0+276.75 - 0+283.75 CUNETA TRAPESOIDAL 1.00 7.00 2.20 - 15.40
04 0+405.50 - 0+413.50 CUNETA TRAPESOIDAL 1.00 5.50 2.20 - 12.10
05 0+428.15 - 0+438.00 CUNETA TRAPESOIDAL 1.00 7.50 2.20 - 16.50
06 0+453.80 - 0+467.50 CUNETA TRAPESOIDAL 1.00 10.00 2.20 - 22.00
07 1+089.10 - 1+095.50 CUNETA TRAPESOIDAL 1.00 4.00 2.20 - 8.80
08 1+120.50 - 1+130.00 CUNETA TRAPESOIDAL 1.00 7.50 2.20 - 16.50
09 1+363.10 - 1+369.40 CUNETA TRAPESOIDAL 1.00 4.00 2.20 - 8.80
10 1+440.50 - 1+447.65 CUNETA TRAPESOIDAL 1.00 5.00 2.20 - 11.00
11 1+848.20 - 1+860.50 CUNETA TRAPESOIDAL 1.00 8.50 2.20 - 18.70
12 2+579.20 - 2+585.50 CUNETA TRAPESOIDAL 1.00 4.00 2.20 - 8.80
13 2+529.20 - 2+535.53 CUNETA TRAPESOIDAL 1.00 4.00 2.20 - 8.80
14 2+579.20 - 2+585.50 CUNETA TRAPESOIDAL 1.00 4.00 2.20 - 8.80
15 3+124.80 - 3+139.90 CUNETA TRAPESOIDAL 1.00 11.00 2.20 - 24.20
16 3+233.20 - 3+243.00 CUNETA TRAPESOIDAL 1.00 7.00 2.20 - 15.40
16 3+286.75 - 3+296.65 CUNETA TRAPESOIDAL 1.00 7.50 2.20 - 16.50
TOTAL : 251.90

RESUMEN
TOTAL :
SUB
ITEM ACTIVIDAD UNIDAD TOTAL
TOTAL
04.06.01 CUNETA REVESTIDA DE PIEDRA m2 3,071.28
SECCION TRIANGULAR 2,819.38
SECCION TRAPESOIDAL 251.90
4.02MOVIMIENTO DE TIERRAS

04.02.01 EXCAVACION A MANO EN TERRENO NORMAL

ALCANTARILLAS DE ALIVIO TIPO MARCO


DIMENSIONAMIENTO ROCA
MAT.
PARCIAL
PROGRESIVA DESCRIPCION SUELTO SUELTA FIJA
Nº VECES (M3)
(m3) (m3) (m3)
LONGITUD ANCHO ALTURA
CANAL 1.00 area 10.82 1.60 17.31 13.85 3.46
0+079.32 CABEZAL 1.00 area 1.53 1.65 2.52 2.02 0.50
CAJA DE INGRESO 1.00 area 1.58 1.00 1.58 1.26 0.32
CANAL 1.00 area 10.67 1.60 17.07 11.95 5.12
1+017.17 CABEZAL 1.00 area 1.53 1.65 2.52 1.77 0.76
CAJA DE SALIDA 1.00 area 1.58 1.00 1.58 1.11 0.47
CANAL 1.00 area 9.00 1.60 14.40 7.20 7.20
1+320.87 CABEZAL 1.00 area 1.53 1.65 2.52 1.26 1.26
CAJA DE SALIDA 1.00 area 1.58 1.00 1.58 0.79 0.79
CANAL 1.00 area 9.36 1.60 14.98 1.50 4.49 8.99
2+301.64 CABEZAL 1.00 area 1.53 1.65 2.52 0.25 0.76 1.51
CAJA DE SALIDA 1.00 area 1.58 1.00 1.58 0.16 0.47 0.95
CANAL 1.00 area 13.87 1.60 22.19 6.66 15.53
3+045.25 CABEZAL 1.00 area 1.53 1.65 2.52 0.76 1.77
CAJA DE SALIDA 1.00 area 1.58 1.00 1.58 0.47 1.11

TOTAL : 106.47 51.01 44.02 11.45


PASES DE AGUA TIPO MARCO
DIMENSIONAMIENTO MAT. ROCA
PARCIAL
PROGRESIVA DESCRIPCION SUELTO SUELTA FIJA
Nº VECES (M3)
LONGITUD ANCHO ALTURA (m3) (m3) (m3)
CANAL 1.00 area 9.68 1.60 15.49 15.49
1+088.47 SALIDA 1.00 1.00 1.00 1.20 1.20 1.20
INGRESO 1.00 1.00 1.00 1.20 1.20 1.20
CANAL 1.00 area 12.13 1.60 19.41 15.53 3.88
1+851.47 SALIDA 1.00 1.00 0.90 1.20 1.08 0.86 0.22
INGRESO 1.00 1.00 0.90 1.20 1.08 0.86 0.22
CANAL 1.00 area 10.52 1.60 16.83 11.78 5.05
2+632.01 SALIDA 1.00 1.00 0.90 1.20 1.08 0.76 0.32
INGRESO 1.00 1.00 0.90 1.20 1.08 0.76 0.32
CANAL 1.00 area 11.47 1.60 18.35 12.85 5.51
2+746.48 SALIDA 1.00 1.00 0.90 1.20 1.08 0.76 0.32
INGRESO 1.00 1.00 0.90 1.20 1.08 0.76 0.32
CANAL 1.00 area 10.80 1.60 17.28 12.10 5.18
2+764.52 SALIDA 1.00 1.00 0.90 1.20 1.08 0.76 0.32
INGRESO 1.00 1.00 0.90 1.20 1.08 0.76 0.32
CANAL 1.00 10.58 5.73 1.60 9.17 9.17
2+848.44 SALIDA 1.00 1.00 0.90 0.90 0.81 0.81
INGRESO 1.00 1.00 0.90 0.90 0.81 0.81
CANAL 1.00 11.14 5.53 1.60 8.85 8.85
2+884.81 SALIDA 1.00 1.00 0.90 0.90 0.81 0.81
INGRESO 1.00 1.00 0.90 0.90 0.81 0.81
CANAL 1.00 17.61 7.57 1.60 12.11 12.11
3+001.80 SALIDA 1.00 1.00 0.90 0.90 0.81 0.81
INGRESO 1.00 1.00 0.90 0.90 0.81 0.81
TOTAL : 133.39 76.40 22.00 34.99
CANAL DE REGADIO TIPO MARCO
DIMENSIONAMIENTO MAT. ROCA
PARCIAL
PROGRESIVA DESCRIPCION SUELTO SUELTA FIJA
Nº VECES (M3)
LONGITUD ANCHO ALTURA (m3) (m3) (m3)
CANAL 1.00 58.58 1.00 0.90 52.72 36.91 15.82
1+218.810
CANAL 1.00 26.74 1.00 0.90 24.07 16.85 7.22
TOTAL : 76.79 53.75 23.04

EXCAVACION CLASIFICADA PARA ESTRUCTURAS


PARCIAL ROCA
MAT. SUELTO (m3)
(M3) SUELTA (m3) FIJA (m3)
316.65 181.16 89.05 46.44

100.00% 57.21% 28.12% 14.66%


04.02.04 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO MANUAL

ALCANTARILLAS DE ALIVIO TIPO MARCO

DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
(M3)
Nº VECES
LONGITUD ANCHO ALTURA
PARTE SUPERIOR 1.00 area 2.22 1.00 2.22
0+079.32
CANAL 2.00 area 10.82 0.30 6.49
PARTE SUPERIOR 1.00 area 2.09 1.00 2.09
1+017.17
CANAL 2.00 area 10.68 0.30 6.41
PARTE SUPERIOR 1.00 area 0.59 1.00 0.59
1+320.87
CANAL 2.00 area 9.00 0.30 5.40
PARTE SUPERIOR 1.00 area 0.31 1.00 0.31
2+301.64
CANAL 2.00 area 9.36 0.30 5.62
PARTE SUPERIOR 1.00 area 0.72 1.00 0.72
3+045.25
CANAL 2.00 area 13.87 0.30 8.32
TOTAL : 38.17

PASES DE AGUA TIPO MARCO


DIMENSIONAMIENTO
PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES (M3)
LONGITUD ANCHO ALTURA
PARTE SUPERIOR 1.00 area 1.11 1.00 1.11
1+088.47
CANAL 2.00 area 9.68 0.30 5.81
PARTE SUPERIOR 1.00 area 2.43 1.00 2.43
1+851.47
CANAL 2.00 area 12.13 0.30 7.28
PARTE SUPERIOR 1.00 area 1.46 1.00 1.46
2+632.01
CANAL 2.00 area 10.52 0.30 6.31
PARTE SUPERIOR 1.00 area 2.84 1.00 2.84
2+746.48
CANAL 2.00 area 11.47 0.30 6.88
PARTE SUPERIOR 1.00 area 1.64 1.00 1.64
2+764.52
CANAL 2.00 area 10.80 0.30 6.48
PARTE SUPERIOR 1.00 area 1.40 1.00 1.40
2+848.44
CANAL 2.00 area 10.58 0.30 6.35
PARTE SUPERIOR 1.00 area 2.53 1.00 2.53
2+884.81
CANAL 2.00 area 11.14 0.30 6.68
PARTE SUPERIOR 1.00 area 6.74 1.00 6.74
3+001.80
CANAL 2.00 area 17.61 0.30 10.57
TOTAL : 76.51
CANAL DE REGADIO TIPO MARCO
DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
CANAL 2.00 58.58 1.00 0.30 35.15
1+218.81
CANAL 2.00 26.74 1.00 0.30 16.04
TOTAL : 35.15

CUADRO RESUMEN

RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO MANUAL 149.83


CONSULTORÍAS Y EJECUCIÓN DE OBRAS
Elemento Fierro Elemento Longitud total (m) Factor Parcial
N° Progresiva Total Unidad
Denominación Cant. Ø Cant. Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1" (kg/m) kg
04.03.03 ACERO DE REFUERZO f'y=4,200 ALCANTARILLA TIPO MARCO 2,023.65 KG
Acero longitudinal 1 3/8 28 9.80 274.40 0.560 153.66
Acero transversal 1 2 3/8 63 1.20 151.20 0.560 84.67
Acero transversal 2 2 3/8 63 1.40 176.40 0.560 98.78
01 0+079.32 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo sardinel 1 3/8 7 1.40 9.80 0.560 5.49
Acero logitudinal alero salida 1 3/8 6 1.45 8.70 0.560 4.87
Estribo sardinel 1 3/8 10 1.80 18.00 0.560 10.08
Acero longitudinal 1 3/8 28 9.80 274.40 0.560 153.66
Acero transversal 1 2 3/8 63 1.20 151.20 0.560 84.67
Acero transversal 2 2 3/8 63 1.40 176.40 0.560 98.78
02 1+017.17 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo sardinel 1 3/8 7 1.40 9.80 0.560 5.49
Acero logitudinal alero salida 1 3/8 6 1.45 8.70 0.560 4.87
Estribo sardinel 1 3/8 10 1.80 18.00 0.560 10.08
Acero longitudinal 1 3/8 28 9.80 274.40 0.560 153.66
Acero transversal 1 2 3/8 63 1.20 151.20 0.560 84.67
Acero transversal 2 2 3/8 63 1.40 176.40 0.560 98.78
03 1+320.87 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo sardinel 1 3/8 7 1.40 9.80 0.560 5.49
Acero logitudinal alero salida 1 3/8 6 1.45 8.70 0.560 4.87
Estribo sardinel 1 3/8 10 1.80 18.00 0.560 10.08
Acero longitudinal 1 3/8 28 10.34 289.52 0.560 162.13
Acero transversal 1 2 3/8 69 1.20 165.60 0.560 92.74
Acero transversal 2 2 3/8 69 1.40 193.20 0.560 108.19
04 2+301.64 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo sardinel 1 3/8 7 1.40 9.80 0.560 5.49
Acero logitudinal alero salida 1 3/8 6 1.45 8.70 0.560 4.87
Estribo sardinel 1 3/8 10 1.80 18.00 0.560 10.08
Acero longitudinal 1 3/8 28 15.23 426.44 0.560 238.81
Acero transversal 1 2 3/8 102 1.20 244.80 0.560 137.09
Acero transversal 2 2 3/8 102 1.40 285.60 0.560 159.94
05 3+045.25 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo sardinel 1 3/8 7 1.40 9.80 0.560 5.49
Acero logitudinal alero salida 1 3/8 6 1.45 8.70 0.560 4.87
Estribo sardinel 1 3/8 10 1.80 18.00 0.560 10.08
Elemento Fierro Elemento Longitud total (m) Factor Parcial
N° Progresiva
(kg/m) kg
Total Unidad
Denominación Cant. Ø Cant. Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
04.03.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN CANAL 3,535.17 KG
CONSULTORÍAS Y EJECUCIÓN DE OBRAS
Acero longitudinal 1 3/8 28 10.11 283.08 0.560 158.52
Acero transversal 1 2 3/8 68 1.20 163.20 0.560 91.39
Acero transversal 2 2 3/8 68 1.40 190.40 0.560 106.62
01 0+690.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 15.55 435.40 0.560 243.82
Acero transversal 1 2 3/8 104 1.20 249.60 0.560 139.78
Acero transversal 2 2 3/8 104 1.40 291.20 0.560 163.07
02 0+727.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 11.95 334.60 0.560 187.38
Acero transversal 1 2 3/8 80 1.20 192.00 0.560 107.52
Acero transversal 2 2 3/8 80 1.40 224.00 0.560 125.44
03 1+090.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 10.32 288.96 0.560 161.82
Acero transversal 1 2 3/8 69 1.20 165.60 0.560 92.74
Acero transversal 2 2 3/8 69 1.40 193.20 0.560 108.19
04 1+645.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 13.56 379.68 0.560 212.62
Acero transversal 1 2 3/8 91 1.20 218.40 0.560 122.30
Acero transversal 2 2 3/8 91 1.40 254.80 0.560 142.69
05 1+845.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 15.40 431.20 0.560 241.47
Acero transversal 1 2 3/8 103 1.20 247.20 0.560 138.43
Acero transversal 2 2 3/8 103 1.40 288.40 0.560 161.50
06 2+703.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Elemento Fierro Elemento Longitud total (m) Factor Parcial
N° Progresiva
(kg/m) kg
Total Unidad
06 2+703.00 Denominación Cant. Ø Cant. Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
CONSULTORÍAS Y EJECUCIÓN DE OBRAS
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 9.96 278.88 0.560 156.17
Acero transversal 1 2 3/8 67 1.20 160.80 0.560 90.05
Acero transversal 2 2 3/8 67 1.40 187.60 0.560 105.06
07 2+722.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero longitudinal 1 3/8 28 9.65 270.20 0.560 151.31
Acero transversal 1 2 3/8 65 1.20 156.00 0.560 87.36
Acero transversal 2 2 3/8 65 1.40 182.00 0.560 101.92
08 2+810.00 Acero logitudinal alero entrada 1 3/8 4 1.00 4.00 0.560 2.24
Estribo 1 3/8 7 1.50 10.50 0.560 5.88
Acero logitudinal alero salida 1 3/8 4 1.45 5.80 0.560 3.25
Estribo 1 3/8 7 1.50 10.50 0.560 5.88

04.04.03 ACERO DE REFUERZO f'y=4,200 kg/cm2 EN CANAL 2,041.27 KG

Acero longitudinal 1 3/8 16 58.58 937.28 0.560 524.88


Acero transversal 1 2 3/8 391 1.20 938.40 0.560 525.50
Acero transversal 2 1 3/8 391 1.60 625.60 0.560 350.34
Acero longitudinal 1 3/8 16 26.74 427.84 0.560 239.59
Acero transversal 1 2 3/8 179 1.20 429.60 0.560 240.58
Acero transversal 2 1 3/8 179 1.60 286.40 0.560 160.38
05AFECTACION DE TERRENOS DE TERCEROS

4.01 OBRAS PRELIMINARES


04.01.01 TRAZO NIVELES Y REPLANTEO DURANTE LA OBRA 1342.64

MURO DE MAMPOSTERIA
DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
0+520.00 MURO DE MAMPOSTERIA 1.00 28.88 0.40 - 11.55
0+670.00 MURO DE MAMPOSTERIA 1.00 24.88 0.40 - 9.95
0+780.00 MURO DE MAMPOSTERIA 1.00 88.60 0.40 - 35.44
0+930.00 MURO DE MAMPOSTERIA 1.00 11.99 0.40 - 4.80
0+970.00 MURO DE MAMPOSTERIA 1.00 100.37 0.40 - 40.15
101.89

RAMPA COMPACTADA
DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
0+030.00 ACCESO A VIVIENDA 1.00 20.00 3.50 - 70.00
0+120.00 ACCESO A VIVIENDA 1.00 23.00 3.50 - 80.50
0+210.00 ACCESO A VIVIENDA 1.00 16.50 3.50 - 57.75
0+280.00 ACCESO A VIVIENDA 1.00 15.50 3.50 - 54.25
0+410.00 ACCESO A VIVIENDA 1.00 10.00 3.50 - 35.00
ACCESO A VIVIENDA 1.00 25.50 3.50 - 89.25
0+460.00
ACCESO A VIVIENDA 1.00 21.00 3.50 - 73.50
1+680.00 ACCESO A VIVIENDA 1.00 55.00 3.50 - 192.50
1+800.00 ACCESO A VIVIENDA 1.00 23.00 3.50 - 80.50
1+860.00 ACCESO A VIVIENDA 1.00 44.00 3.50 - 154.00
3+100.00 ACCESO A VIVIENDA 1.00 30.00 3.50 - 105.00
3+140.00 ACCESO A VIVIENDA 1.00 71.00 3.50 - 248.50
1240.75

4.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION A MANO EN TERRENO NORMAL

MURO DE MAMPOSTERIA
DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
0+520.00 MURO DE MAMPOSTERIA 1.00 28.88 0.40 0.40 4.62
0+670.00 MURO DE MAMPOSTERIA 1.00 24.88 0.40 0.40 3.98
0+780.00 MURO DE MAMPOSTERIA 1.00 88.60 0.40 0.40 14.18
0+930.00 MURO DE MAMPOSTERIA 1.00 11.99 0.40 0.40 1.92
0+970.00 MURO DE MAMPOSTERIA 1.00 100.37 0.40 0.40 16.06
40.76

04.02.05 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km 50.95

MURO DE MAMPOSTERIA
DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
0+520.00 MURO DE MAMPOSTERIA 1.00 28.88 0.40 0.40 4.62
0+670.00 MURO DE MAMPOSTERIA 1.00 24.88 0.40 0.40 3.98
0+780.00 MURO DE MAMPOSTERIA 1.00 88.60 0.40 0.40 14.18
0+930.00 MURO DE MAMPOSTERIA 1.00 11.99 0.40 0.40 1.92
0+970.00 MURO DE MAMPOSTERIA 1.00 100.37 0.40 0.40 16.06
40.76

´03.03 MUROS DE MAMPOSTERIA DE PIEDRA


03.03.01 MUROS EN MAMPOSTERIA DE PIEDRA

DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M3)
0+520.00 MURO DE MAMPOSTERIA 1.00 28.88 0.40 1.50 17.33
0+670.00 MURO DE MAMPOSTERIA 1.00 24.88 0.40 1.50 14.93
0+780.00 MURO DE MAMPOSTERIA 1.00 88.60 0.40 1.50 53.16
0+930.00 MURO DE MAMPOSTERIA 1.00 11.99 0.40 1.50 7.19
0+970.00 MURO DE MAMPOSTERIA 1.00 100.37 0.40 1.50 60.22
152.83

4.02 VIAS DE ACCESO A VIVIENDAS


04.02.01 ACCESO A VIVIENDA (RAMPA COMPACTADA) A=3.50 M.

RAMPA COMPACTADA
DIMENSIONAMIENTO PARCIAL
PROGRESIVA DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (M2)
0+030.00 ACCESO A VIVIENDA 1.00 20.00 - - 20.00
0+120.00 ACCESO A VIVIENDA 1.00 23.00 - - 23.00
0+210.00 ACCESO A VIVIENDA 1.00 16.50 - - 16.50
0+280.00 ACCESO A VIVIENDA 1.00 15.50 - - 15.50
0+410.00 ACCESO A VIVIENDA 1.00 10.00 - - 10.00
ACCESO A VIVIENDA 1.00 25.50 - - 25.50
0+460.00
ACCESO A VIVIENDA 1.00 21.00 - - 21.00
1+680.00 ACCESO A VIVIENDA 1.00 55.00 - - 55.00
1+800.00 ACCESO A VIVIENDA 1.00 23.00 - - 23.00
1+860.00 ACCESO A VIVIENDA 1.00 44.00 - - 44.00
3+100.00 ACCESO A VIVIENDA 1.00 30.00 - - 30.00
3+140.00 ACCESO A VIVIENDA 1.00 71.00 - - 71.00
354.50
4.02 VARIOS
04.02.01 REUNIONES Y TRAMITES CON PROPIETARIOS DE VIVIENDAS AFECTADAS

DIMENSIONAMIENTO PARCIAL
N° DESCRIPCION
Nº VECES LONGITUD ANCHO ALTURA (GLB)
1 1.00 - - - 1.00
1.00
06CONSERVACION DEL MEDIO AMBIENTE

06.01 CAPACITACION A LA POBLACION

REQUERIDO DIMENSIONAMIENTO
N° DESCRIPCION
Nº VECES GBL PARCIAL

1 TALLERES CAP/SENSB. 1.00 4.00 1.00 1.00 4.00


TOTAL ( GBL ) 4.00

06.02 CONFORMACION DE BOTADERO


REQUERIDO DIMENSIONAMIENTO
N° BOTADERO DESCRIPCION VOLUMEN LONGITUD ANCHO
Nº VECES PARCIAL
(m3) (m.) (m.)
1 1+760 NIVELACION 1.00 750.00 23.00 23.00 500.00
TOTAL ( M2 ) 500.00

06.03 REMOCION DE SUELO CONTAMINADO PARQUE DE MAQUINAS

DIMENSIONAMIENTO
N° DESCRIPCION PARCIAL TOTAL
Nº VECES LONGITUD ANCHO ALTURA
1 PARQUE DE MAQUINARIA 1.00 47.43 47.44 0.10 225.00 225.00
TOTAL ( M2 ) 225.00

06.04 IMPLEMENTACION PLAN DE MANEJO AMBIENTAL

DIMENSIONAMIENTO
N° DESCRIPCION PARCIAL TOTAL
Nº VECES LONGITUD ANCHO ALTURA
1 PARQUE DE MAQUINARIA 1.00 - - - 1.00 1.00
TOTAL ( GLB ) 1.00

06.05 RIEGO Y CONTROL DE POLVOS


REQUERIDO DIMENSIONAMIENTO
N° DESCRIPCION
Nº VECES MES PARCIAL
1 RIEGO Y CONTROL DE POLVOS 1.00 4.00 1.00 1.00 4.00
TOTAL ( MES ) 4.00

S-ar putea să vă placă și