Documente Academic
Documente Profesional
Documente Cultură
GT IC
50'-6"
GT
21'-81
2" 12'-6" 1"
16'-32 1
50'-6"
3'
50'-6"
3' 3' 3' 3' 3' 21'-82" 12'-6" 16'-31
2"
1
1" W3 W3 V1 W36'-01" V1 10'-42" 9'-51" V1 W3 6'-0 1" 21'-81" 16'-31
9'-52 13'-3" 2 2 2 2"
3'
V1 2
3'
7'-9"
7'-9"
7'-9"
1"
1"
2'-6"
8'-6"
B TOILET DRESS TOILET DRESS B
8'-6"
8'-6"
B
1"
7'-42"
B
8'-6"
B B
7'-42
7'-42
TOILET DRESS STUDY TOILET DRESS
1
2'-6"
7'-42
7'
7'
D4
7'
7'
7'
D4
1"
10'-42 1" 12'-6" 1
W5 8'-42 2' 3' 8'-42" 14'-1" 12'-6"
D2
19'-6"
2' W5 13' 1"
6'-42 1"
14'-1" 13' 1" 14'-92
14'-92 STORE
STORE
W2
BEDROOM BEDROOM
1"
11'-9"
BEDROOM BEDROOM
11'-42
11'
11'
11'
11'
11'
11'
11'
11'
11'
6'
6'
6'
W2 W2
6'
W2
1"
1"
3'-41
1"
37'-52
37'-52
1
37'-52
1"
3'-42 6'-42" 2"
22'-5"
22'-5"
D3 D3 D3 D3 D3 D3
5' 5' 5'-62 " 1
3'-6" 3'-6" 3'-6" 3'-6" 3'-6" 3'-6" TOILET
TOILET V1 V1 22'-9"
3'
D2
3'
3'
AREA STATEMENT:
1"
6'-21"
6'-21"
DETAIL OF JOINERY:
6'-21"
2"
5'-52
2
2
6'-21
2'-6"
D4
GROUND FLOOR COVERED AREA =
11'-5"
11'-5"
11'-5"
DRESS 13'-9"
10'-8"
STAIRS 1"
10'-8"
GT 2915.7 SQ.FT
13'-11
3'
W3 D3
3'
2"
A
1"
A A A A W2 (WINDOW) = 6'0" X 6'0"
17'-11 1
A LOBBY
17'-112
LOBBY 7'-2" MUMTY AND
1" 1 2293.21 SQ.FT
18'
9'-81
2"
GT 9'-62 9'-62 " CHILDREN PLAY
60'
22'-5"
22'-5"
GT W1 AREA
22'-5"
BEDROOM BEDROOM
64'-82"
15'-61"
64'-8"
64'-8"
64'-8"
64'-8"
13'-21
11'
64'-8"
11'
8'
2" 457.95 SQ.FT
8'
1 W3 W1 W3 5'-3" 1"
9'-82 2
5'-02" 11'-1" 10'-6"
5'-
W4 (WINDOW) = 4'6" X 5'0" TOTAL PLOT AREA = 72 X 100 =
7'-3"
5'
1"
91
ROOM
9'-12
2
2
2"
1
8'-
9"
11'-71
W5 10' W5
11'
3'-3" 2'-22"
11'
DINING
GT
5'-01" 1" D1 (DOOR) = 5'0" X 8'6"
2'
16'
W6 7'-1" 2' 2" 2'
6 D2 (DOOR) = 3'0" X 8'6"
13'-21
4'-32 "
"
1
2"
18'-3"
6'
19'
19'
8'-61
6'-52"
POWDER
3'-6"
IC
1
2"
6'-6"
WASH GT
6'-10"
" D3 (DOOR) = 3'6" X 7'0"
2'-6"
10 1" 5' 8'-9"
"
8'-9" ROOM 8'-9"
10
7'-
V1 5'-12 W4 W3 3'
1"
D2
"
14'-61
1
7'-
8'-62
2"
3'
W3
3'
2"
'-1
IC
4'-71
12'-81
FOYER 2"
D2 MEDITATION D4 (DOOR) = 2'6" X 7'0"
5'
12
3'-6"
3'-3"
29'-1"
1"
6'-6"
6'-6"
1
4'-
"
1"
1
2
11
'-1
D1 12' "
5'
"
22
10'-82"
3'
2'-11"
'-9
1
3'
ENTRANCE 28'
13
NOTES:
10'-2"
13'-9"
VERANDA
1"
27'-2 1"
2"
2"
1"
DRAWING W2
27'-22
2
3"
1
27'-21
27'-21
15'-10"
27'-22
6'
2'-112"
2'-
ROOM UTILITY
6'
17'-9"
1. PLINTH LEVEL OF THE BUILDING SHALL BE PROVIDED BY THE DEPARTMENT
13
GT
13'-1"
13'-1"
10
'-4 1
2"
6'-6"
21'-3"
2"
6'-52
1"
'-4 2
7'-61
3'
TERRACE W3 FROM AN OFFICER NOT BELOW THE RANK OF THE "XEN".
1"
V1 BALCONY
10'-1"
10'-1"
11
11'-3"
3' 4'- 3' "
2. GATE AND BOUNDARY SHALL BE CONSTRUCTED AS PER THE STANDARD DESIGN.
W5 11 DOUBLE HT.
1
2'
2"
3'-91
" 0
3"
16'
2
'-1 3. ALL CI, GI, SWP PIPES SHALL BE LAID EMBEDDED IN CEMENT CONCRETE 1:2:4:.
2'-
3'
PORTICO 6
3'
6'
6'
4'-6"
W1
VERANDA
2 11'-3"
12'-81
2"
11'-3" 11'-5 1"
2 NOTES:
6'-9"
2"
5'-82"
1"
5'-81
5'-82
W4 IC
4'-8"
4'-8"
2"
4'-8"
4'-8"
4'-8"
2'-111
1. OWNER WILL BE RESONSIBLE FOR THE SAFETY FACTOR OF THE STRUCTURE.
3'-6"
3'-6"
3'-6"
1
17'-6" 20'-31 17'-6" 20'-91" 17'-6" 20'-92"
2. THE W.M. CHAMBER SHALL BE KEPT 3" TO 5" FROM THE FINISHED COURT LEVEL.
2" 2
11'-3" 17'-6" 1"
11'-112 1"
19'-62 11'-3" 17'-6" 1"
10'-82 1"
20'-92 3. MAIN IC WILL BE CONNECTED TO THE MAIN SEWER IN ACCORDANCE WITH THE
IC
12' 16'-9" 6'-10" 3'-101
2" 5' 1"
3'-02 10'-9" 60'-3" 60'-3"
1'-3" 9" FLOW OF THE MAIN SEWER.
60'-3"
4. THE SEWER OF THE RESIDENCE SHOULD BE LAIN IN SUCH A WAY THAT ITS
TO THE MAIN
SEWER LINE
GROUND FLOOR PLAN TO THE MAIN
SEWER LINE
FIRST FLOOR PLAN SECOND FLOOR PLAN
OR THE SEPTIC OR THE SEPTIC LEVEL WITH THE SEWER OF THE CORPORATION SHOULD BE AT LEVEL OR HIGHER
TANK TANK
THAN THE INVERT LEVEL OF THE CORPORATION SEWER.
5. STRCURAL DESIGN SHOULD BE AS PER THE DESIGN GIVEN BY THE STRUCTURAL
50'-6" ENGINEER.
8'-6"
ROAD TO PANCHKULA
PL PL
36'-5"
SANITARY SYMBOLS
11'
9"
W3 D2 FT = FLOOR TRAP
7'-9"
7'-9"
7'-9"
ABC
D2 1"
7'-9"
7'-9"
1'-12 JUNCTION
39'-9 1"
2 GT = GULLY TRAP
11'-5"
1'-6" 9" CHILDREN PROPOSED
IC = INSPECTION CHAMBER
ROAD TO CHANDIGARH
HOSPITAL SITE
1'-101 1'-11
2"
2"
3'-9"
3'-9"
3'-9"
CIP = CAST IRON PIPE
3'-9"
3'-9"
2'-3"
1"
1'-6"
6'-62
49'-6"
GIP = GALVANIZED IIRON PIPE
9"
9"
V1 W3 W3 3'
1
2'-72 "
KEY PLAN
SWP = STONE WARE PIPE
8'
8'
W3 V1 D2 W4 9" BRICK WALL 4.5" BRICK WALL RWP = RAIN WATER PIPE
8'
35'-9"
D2 D2 W5
1"
21'-6"
22'-62
35'-9"
35'-9"
SIZE OF PIPES
3'-9"
3'-9"
26'-6"
3'-9"
6'-3"
24'-3"
12' 48'-3"
24'-3"
W1
IC TO IC = 4" DIA STONE WARE PIPE
11'
11'
W5
COVERED AREA = 2915.702
6'
D1
12'-6"
8'-6"
20'
20'
50'-6" 1
61'-32" square ft WC TO IC = 4" DIA CAST IRON PIPE
3'-6"
2'-6"
1'-6"
1 1
10'-82" 21'-9" 12'-6" 16'-32" 10'-9"
IC/IT TO MAIN SEWER LINE = 6" DIA
2'-6"
1'-6"
IC IC
GT IC
GT
50'-6"
STONE WARE PIPE
8'-6"
8'-6"
FRONT ELEVATION
BACK ELEVATION
36'-5"
SPECIFIACTIONS:
11'
11'
2"
37'-51
1. FOUNDATION = PCC 1: 5: 10
39'-9 1"
2 2. DPC = 1:2: 4 CEMENT CONCRETE
11'-5"
11'-5"
1"
OTHERS
1'-102
IC
3. SUPER STRUCTURE = BURNT BRICKS IN CEMENT MORTAR
1'-6"
GT
PROPERTY HOSPITAL
GT 10'-9" 4. ROOF = 4.5" RCC SLAB.
1"
GT
100'
9"
42
TILE TERRACING
28' 8'-91" 5. FLOOR = PCC 1:2:4.
2
7'-9"
7'-9"
16'
19'-3"
D2
19'
D2
1"
IC
28'-02
MUMTY AND
CHILDREN PLAY OWNER'S SIGNATURE ARCHITECT'S SIGNATURE
15'-11"
3'
3'
8'-01
3'-9"
3'-9"
WITH MUD PHUSKA AND BITUMEN WITH MUD PHUSKA AND BITUMEN
WATER PROOFING WATER PROOFING WATER PROOFING
GT
1"
8'-92
6"
10'-1"
2'
6"
2'
12'-81"
LOBBY AREA 2
BEDROOM
8'
DRESS
4'
34'-3"
4'-8"
DRESS TOILET
FIRST FLOOR PLAN
6'
1"
35'-9"
35'-9"
TOILET W1
35'-9"
35'-9"
STUDY D2 D3 D3 D3 IC
60'-3"
COVERED AREA = 2293.207
2"
19'-111
4'-6"
18'-10"
26'-6"
15'-4"
15'-4"
1'-6"
square ft.
FLOOR FINISH OVER 1:3 CEMENT FLOOR FINISH OVER 1:3 CEMENT TANK TANK
MORTAR OVER BRICKBATS
6" 1'-3"
2"
6"
2'
12'-2"
DRESS
4'
DRESS TOILET
41"
2
6'
11'
TOILET W1
STUDY D3 D3 D3 D3
PROPERTY OF THE 2'
1"
14'-82
PASSAGE FROM THE
OWNER
2"
2'
3'-111
OWNER PROPERTY
4'-6"
1'-6"
1'-6"
FLOOR FINISH OVER 1:3 CEMENT FLOOR FINISH OVER 1:3 CEMENT 50% KEPT FOR THE RESIDENCE FUTURE EXPANSION
MORTAR OVER PCC 1:4:8 MORTAR OVER PCC 1:4:8 4'-11"
REMAINING LEFT FOR THE FUTURE
4'-10"
EXPANSION
9'-91
2"
18'
4'-11"
SECTION B-B SECTION A-A 54'