Sunteți pe pagina 1din 2

1 2 3 4 5 6 7 8

+DC1
A A
BATTERY CHARGER - NO.1 BATTERY CHARGER - NO.2
INPUT: 3 PH, 400VAC, 50HZ INPUT: 3 PH, 400VAC, 50HZ
OUTPUT: 110VDC, 50A OUTPUT: 110VDC, 50A

ATS
F1, 2P, 6A 3P, 160A F2, 2P, 6A
27 36kA 27

F3, 2P, 6A
B V B

to DC-2

MCB-01
2P, 63A
20kA

F4, 2P, 6A F5, 2P, 6A R


27-1

A
C C

MCB-01 MCB-02 MCB-03 MCB-04 MCB-05 MCB-06 MCB-07 MCB-08 MCB-09 MCB-10 MCB-11 MCB-12
2P, 20A 2P, 30A 2P, 20A 2P, 30A 2P, 20A 2P, 30A 2P, 20A 2P, 30A 2P, 20A 2P, 30A 2P, 20A 2P, 30A
20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA

CB =1YB-01 CB =1YB-01 CB =2YB-01 CB =2YB-01 CB =3YB-01 CB =3YB-01 CB =4YB-01 CB =4YB-01 CB =5YB-01 CB =5YB-01 CB =6YB-01 CB =6YB-01
Trip 1 & Close Motor Trip 1 & Close Motor Trip 1 & Close Motor Trip 1 & Close Motor Trip 1 & Close Motor Trip 1 & Close Motor
(Future) (Future) (Future) (Future)
D D

MCB-13 MCB-14 MCB-15 MCB-16 MCB-17 MCB-18 MCB-19 MCB-20 MCB-21 MCB-22
2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A
20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA

TCP1 TCP2 LCP BCP CSCS server Transformer AC No.1 22kV 22kV 22kV
control panel control panel control panel Cont. Prot. panel panel TP.1 (RCC1) Control Control Signals Metering

E E

MCB-23 MCB-24 MCB-25 MCB-26 MCB-27 MCB-28 MCB-29 MCB-30 MCB-31 MCB-32
2P, 30A 2P, 30A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A
20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA

22kV Spare Spare Spare Spare Spare Spare Spare Spare Spare
Motor

F F

REV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+DC2
A A

F3, 2P, 6A
B V B

to DC-1

MCB-01
2P, 63A
20kA
We reserve all rights in this document and in the information contained herein.Reproduction,use or disclosure

F4, 2P, 6A F5, 2P, 6A R


27-1

A
C C

2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 30A 2P, 30A 2P, 30A 2P, 30A 2P, 30A 2P, 30A
20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA

CB =1YB-01 CB =2YB-01 CB =3YB-01 CB =4YB-01 CB =5YB-01 CB =6YB-01 DS control DS control DS control DS control DS control DS control
Trip coil 2 Trip coil 2 Trip coil 2 Trip coil 2 Trip coil 2 Trip coil 2 for bay 1 for bay 2 for bay 3 for bay 4 for bay 5 for bay 6
(Future) (Future) (Future) (Future) (Future)
D D

MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01
2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A
20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA

TRP1 TRP2 Transformer Spare Spare Transformer AC No.2 22kV 22kV 22kV
prot. panel prot. panel TP.2 (RCC2) Control Control Signals Metering

E E

MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01 MCB-01
2P, 30A 2P, 30A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A 2P, 20A
20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA 20kA

22kV Spare Spare Spare Spare Spare Spare Spare Spare Spare
Motor

F D PROJECT: TITLE: F
DESIGN: --- DATE: 27.04.2020 ---
C
CONNECTION DIAGRAMS
DRAWN: --- DATE: 27.04.2020 KROKOR SUBSTATION SINGLE LINE DIAGRAM DC2
B DC
CHECK: --- DATE: 01.05.2020
A ISSUED FOR APPROVAL 04.05.20 REV SHEET: 4
DWG NO: ---
REV DESCRIPTION DATE APPR: --- DATE: 04.05.2020 SIZE A4 TOTAL: 8
1 2 3 4 5 6 7 8

S-ar putea să vă placă și