DRAINAGE DEPARTMENT

PRESENTATION
ON
TERTIARY SEWAGE TREATMENT PLANT

SURAT
MUNICIPAL
CORPORATION
Sewerage System

19-Jan-18
Sewerage Scenario
 Coverage : 167.50 sq.km. (i.e. 82 % of present
habitable area of @ 204 sq.km.)
 Population catered : 97 % of present population
 Length of sewer network : > 1776 km
 Nos of sewer manholes : > 65,000
 Sewage Pumping Stations : 60 Nos (1986.70 MLD)
 Sewage Treatment Plants : 11 Nos (1032.5 MLD)

19-Jan-18
Tertiary Sewage Treatment Plant
Bamroli Sewage Treatment Plant

Single Stage Biological Treatment (2003)


Two Stage Biological / Secondary Treatment (2008)
Tertiary Treatment (2014) : Phase – I (Operational)
Tertiary Treatment (2017) : Phase – II (Under Construction)

19-Jan-18
Bamroli Sewage Treatment Plant
Phase : I – Single Stage Biological Treatment
 Capacity : 100 MLD
 Technology : Anaerobic Biological Treatment through UASB system.
 Year of Commissioning : 2003
Phase : II – Two Stage Biological / Secondary Treatment
 Capacity : 100 MLD
 Technology : Plant upgraded through Extended Aeration to meet the revised stringent
effluent discharge standards.
 Year of Commissioning : 2008
Phase : III - Tertiary Treatment
 Capacity : 40 MLD Product Water
 Technology : Ultra Filtration (UF) & Reverse Osmosis (RO) System.
 Year of Commissioning : 2014
Phase : IV – Addition in Tertiary Treatment Capacity
 Capacity : 35 MLD Product Water
 Technology : Ultra Filtration (UF) & Reverse Osmosis (RO) System.
 Year for Commissioning : 2019
19-Jan-18
Need of Waste Water Recycling Project

 To meet huge water requirement due to industrial development,


recycle and reuse of water is essential.
 Assured water requirement and assured revenue generation; enable
guaranteed recovery of O&M cost by implementing such project on
EPC basis.
 Revenue generation from recycled Waste water.
 Assured Water supply for Pandesara Industrial units.

19-Jan-18
Recycle, Reuse of Sewage Water Through Tertiary
Treatment : Bamroli STP

19-Jan-18
Tertiary Sewage Treatment Plant -
Waste water Recycle - Reuse Project
PROJECT CONCEPT
 Tertiary treatment of secondary treated sewage and to generate
Industrial Grade Water for supply of Industrial Grade water to Pandesara
Industrial Estate.
OBJECTIVE
 Recycle / Reuse of waste water
 Contribution towards reducing the dependency on conventional
resources of water.

TECHNOLOGY
 Sand Filtration
 Ultra-filtration (UF)
 Reverse Osmosis (RO)
 Activated Carbon Filter (ACF)
19-Jan-18
Tertiary Sewage Treatment Plant
 Capacity of the plant : 40 MLD
 Contractor : M/s Enviro Control Associates (I) Pvt. Ltd
 Technology partner : M/s Hyflux, Singapore
 Capital Project Cost : Rs. 85.10 crores
 Present Fresh water cost to Industries : Rs. 23/KL
 Recycle water cost to Industries : Rs. 19.84/KL
(Yearly Increment on Indexation base)
 Project commissioned on : May – 2014
 Total Recycle water Supply to Industries till 15th November-17 : 38532 ML
 Total Income through Industrial Grade Water till 15th November-17 : Rs. 74.77 Crore

19-Jan-18
Tertiary Treatment Process
Secondary Pre- Chlorination
Effluent
61 MLD Post-Chlorination
& pH adjustment
Chemical Dosing
Sand Filter

57 MLD
Reverse Osmosis
Degasser System

43 MLD 32 MLD Product


32 MLD
water
Tank

Ultra filtration
To
Pandesara
Industrial
8 MLD 8 MLD
Estate

Reject Water
21 MLD
Flocculation Disposal
Activated Carbon Filter
Partners & Roles
SMC USER OPERATOR

 End consumer  Monitoring of inlet and


outlet parameters
 Conceptualization of  Assurance to purchase
project committed quantity for  Construction of plant to
well defined time meet the desired
 Preparation of detailed parameters
design, invitation of duration
tender and selection of  Acceptance of the rate  Complete O&M of the
operating agency structure as mutually plant including all
agreed major/minor repairs,
 Project funding replacements including
 Land allocation  Agreed to price variation spares
corresponding to RBI
 Project execution index  Comprehensive
treatment responsibility
 Payment of electricity  Regular payment to from collection point to
bill support the system disposal point
TTP Inlet

Treated Water Quality Achieved


Desirable limits as per
Parameters Inlet of TTP Outlet of TTP Drinking water
standard IS-10500
Color (Hazen units) 55 <5 5
TTP Outlet
pH 6.5-7.5 6-7.5 6-8.5
Total Hardness as CaCO3 750 <300 300
(mg/L
Iron as Fe(mg/L) 0.63 <0.25 0.30
Manganese as Mn (mg/L) 0.12 <0.10 0.10
Total Dissolved Solids 2100 <500 500
(mg/L)
Raw-TTP Inlet-TTP Outlet BOD (mg/L) 20 <5 No Standard
COD (mg/L) 100 <50 No Standard
Suspended Solids (mg/L) 30 <2 5.0 (Turbidity)
Total Nitrogen as N (mg/L) 14 <10 10.20
Total Phosphorous as P 8 6-10 -
(mg/L)
Residual Chlorine (mg/L) 0.5 0.5 <0.25
Tertiary Sewage Treatment Plant -
Waste water Recycle - Reuse Project
BENIFITS
 Reduced diversion of drinking water for non-potable purposes.
 Conserve valuable ground water resources for future generation.
 Facilitates recycling of wastewater - an environmentally sound and
progressive advance practice.
 Assured resource for Pandesara Industrial Estate.
 Enabled SMC to reduce pressure on conventional water resources in the
city.
 Guaranteed revenue generation for Surat Municipal Corporation.

19-Jan-18
Tertiary Treatment Plant : Scenario
 Existing Plants :
 40 MLD capacity at Bamroli . (Phase – I) to cater need of Pandesara Industrial
Estate.

 Work In Progress :
 35 MLD capacity at Bamroli. (Phase – II) to cater need of Sachin Industrial Estate.
 40 MLD capacity at Dindoli to cater additional need of Pandesara Industrial Estate.
 To explore further use of Tertiary Treated Sewage Water for Gardening, Lake
Development, One TTP of 1 MLD capacity is taken up as pilot project at Kavi Kalapi
Garden, West Zone of Surat.

 Future Planning :
 Conversation with Utran power house for use of Tertiary Treated Sewage Water is
under process. Upon finalization of the actual demand, Techno - Commercial
feasibility work will be expedited for TTP at Kosad.
 To cater the demand of Tertiary Treated sewage water for industrial cluster of
Hazira based industrial area, SMC had series of meetings with end users &
accordingly planning has been undertaken to establish TTP at Bhesan.
19-Jan-18
Tertiary Treatment Plant : Future Planning
Existing functional STP Use of Treated Water Nearest Power Plant Detail
# Location & Waste WW Quantity of Details regarding Power Water Distance Current
Capacity water treated treated use of treated Station required by from source
(MLD) received per day Waste Waste water (Installed plant per STP of water
per day (MLD) water used capacity, day (MLD) (KM)
(MLD) (MLD) MW)
1 Bamroli 95 95 40 MLD Supply of Tertiary
STP - 100 Treated Water as
Industrial Grade
Water to Pandesara
GIDC
35 MLD under construction
for Supply of
Tertiary Treated
Water as Industrial
Grade Water to
Sachin GIDC
2 Dindoli 55 55 40 MLD under construction
STP - 66 for Supply of
Tertiary Treated
Water as Industrial
Grade Water to
19-Jan-18 Pandesara GIDC
Tertiary Treatment Plant : Future Planning
Existing functional STP Nearest Power Plant Detail
# Location & Waste water WW Power Station (Installed Water required Distance Current
Capacity (MLD) received per treated per capacity, MW) by plant per from STP source of
day (MLD) day (MLD) day (MLD) (KM) water
3 Singanpore 150 150 - - - -
STP - 155
4 Karanj 115 115 Sugen Power Plant 9 26 Tapi river
STP - 140 (Torrent), Gaypagla,
Surat (1147.5 MW)
5 Bhatar STP – 160 160
162
6 Anjana STP - 80 80
82.5
7 Bhesan STP – 100 100 NTPC Power Plant, 30 10 Tapi river
100 Kawas, Hazira, Surat
Guj State Electricity 17 11 Ichhapore
Generation Ltd (GSEG), GIDC
Power Plant, Kawas,
Hazira, Surat
ONGC Power Plant, 21 13 Tapi river
Bhatpore, Hazira, Surat
19-Jan-18
Tertiary Treatment Plant : Future Planning
Existing functional STP Nearest Power Plant Detail
# Location & Waste water WW Power Station (Installed Water required Distance Current
Capacity (MLD) received per treated per capacity, MW) by plant per from STP source of
day (MLD) day (MLD) day (MLD) (KM) water
8 Asarama STP - 14 14
15
10 Variav-Kosad 134 134 Guj State Electricity 30 5 Tapi river
STP - 134 Corporation Ltd
(GSECL), Utran Gas
based Power Plant, Utran,
Surat

11 Gavier - 53 3 3
Total - 1032.5 921 921

19-Jan-18
Sewage Treatment Plant : Future Planning
Under construction / Under planning STP details
# Status (Under Location Capacity Taken Under Likely Estimated Remarks
Construction / (MLD) which scheme date of Cost (Cr.)
Under Planning or by ULB itself comple
tion
1 Under Anjana 122 Amrut / Smart Dec-18 102.90 Upgradation of existing STP &
Construction City Augmentation of STP from 82.5
to 122 MLD
2 Under Dindoli 167 Smart City / Aug-19 131.31 Upgradation of existing STP &
Construction Surat Municipal Augmentation of STP from 66 to
Corportion 167 MLD
3 Under Bamroli 100 AMRUT Mission Feb-19 73.149 Upgradation of existing STP
Construction
4 Under Bhesan 100 AMRUT Mission Apr-20 193.00 Upgradation of existing STP &
Planning* Augmentation of STP from 100
to 200 MLD
5 Under Singanpore 60 AMRUT Mission Apr-20 231.00 Upgradation of existing STP &
Planning* Augmentation of STP from 155
to 215 MLD

* Next phase (tentative) (Subject to demand,


feasibility & Land availability)
19-Jan-18
Thank you