PRESENTATION
ON
TERTIARY SEWAGE TREATMENT PLANT
SURAT
MUNICIPAL
CORPORATION
Sewerage System
19-Jan-18
Sewerage Scenario
Coverage : 167.50 sq.km. (i.e. 82 % of present
habitable area of @ 204 sq.km.)
Population catered : 97 % of present population
Length of sewer network : > 1776 km
Nos of sewer manholes : > 65,000
Sewage Pumping Stations : 60 Nos (1986.70 MLD)
Sewage Treatment Plants : 11 Nos (1032.5 MLD)
19-Jan-18
Tertiary Sewage Treatment Plant
Bamroli Sewage Treatment Plant
19-Jan-18
Bamroli Sewage Treatment Plant
Phase : I – Single Stage Biological Treatment
Capacity : 100 MLD
Technology : Anaerobic Biological Treatment through UASB system.
Year of Commissioning : 2003
Phase : II – Two Stage Biological / Secondary Treatment
Capacity : 100 MLD
Technology : Plant upgraded through Extended Aeration to meet the revised stringent
effluent discharge standards.
Year of Commissioning : 2008
Phase : III - Tertiary Treatment
Capacity : 40 MLD Product Water
Technology : Ultra Filtration (UF) & Reverse Osmosis (RO) System.
Year of Commissioning : 2014
Phase : IV – Addition in Tertiary Treatment Capacity
Capacity : 35 MLD Product Water
Technology : Ultra Filtration (UF) & Reverse Osmosis (RO) System.
Year for Commissioning : 2019
19-Jan-18
Need of Waste Water Recycling Project
19-Jan-18
Recycle, Reuse of Sewage Water Through Tertiary
Treatment : Bamroli STP
19-Jan-18
Tertiary Sewage Treatment Plant -
Waste water Recycle - Reuse Project
PROJECT CONCEPT
Tertiary treatment of secondary treated sewage and to generate
Industrial Grade Water for supply of Industrial Grade water to Pandesara
Industrial Estate.
OBJECTIVE
Recycle / Reuse of waste water
Contribution towards reducing the dependency on conventional
resources of water.
TECHNOLOGY
Sand Filtration
Ultra-filtration (UF)
Reverse Osmosis (RO)
Activated Carbon Filter (ACF)
19-Jan-18
Tertiary Sewage Treatment Plant
Capacity of the plant : 40 MLD
Contractor : M/s Enviro Control Associates (I) Pvt. Ltd
Technology partner : M/s Hyflux, Singapore
Capital Project Cost : Rs. 85.10 crores
Present Fresh water cost to Industries : Rs. 23/KL
Recycle water cost to Industries : Rs. 19.84/KL
(Yearly Increment on Indexation base)
Project commissioned on : May – 2014
Total Recycle water Supply to Industries till 15th November-17 : 38532 ML
Total Income through Industrial Grade Water till 15th November-17 : Rs. 74.77 Crore
19-Jan-18
Tertiary Treatment Process
Secondary Pre- Chlorination
Effluent
61 MLD Post-Chlorination
& pH adjustment
Chemical Dosing
Sand Filter
57 MLD
Reverse Osmosis
Degasser System
Ultra filtration
To
Pandesara
Industrial
8 MLD 8 MLD
Estate
Reject Water
21 MLD
Flocculation Disposal
Activated Carbon Filter
Partners & Roles
SMC USER OPERATOR
19-Jan-18
Tertiary Treatment Plant : Scenario
Existing Plants :
40 MLD capacity at Bamroli . (Phase – I) to cater need of Pandesara Industrial
Estate.
Work In Progress :
35 MLD capacity at Bamroli. (Phase – II) to cater need of Sachin Industrial Estate.
40 MLD capacity at Dindoli to cater additional need of Pandesara Industrial Estate.
To explore further use of Tertiary Treated Sewage Water for Gardening, Lake
Development, One TTP of 1 MLD capacity is taken up as pilot project at Kavi Kalapi
Garden, West Zone of Surat.
Future Planning :
Conversation with Utran power house for use of Tertiary Treated Sewage Water is
under process. Upon finalization of the actual demand, Techno - Commercial
feasibility work will be expedited for TTP at Kosad.
To cater the demand of Tertiary Treated sewage water for industrial cluster of
Hazira based industrial area, SMC had series of meetings with end users &
accordingly planning has been undertaken to establish TTP at Bhesan.
19-Jan-18
Tertiary Treatment Plant : Future Planning
Existing functional STP Use of Treated Water Nearest Power Plant Detail
# Location & Waste WW Quantity of Details regarding Power Water Distance Current
Capacity water treated treated use of treated Station required by from source
(MLD) received per day Waste Waste water (Installed plant per STP of water
per day (MLD) water used capacity, day (MLD) (KM)
(MLD) (MLD) MW)
1 Bamroli 95 95 40 MLD Supply of Tertiary
STP - 100 Treated Water as
Industrial Grade
Water to Pandesara
GIDC
35 MLD under construction
for Supply of
Tertiary Treated
Water as Industrial
Grade Water to
Sachin GIDC
2 Dindoli 55 55 40 MLD under construction
STP - 66 for Supply of
Tertiary Treated
Water as Industrial
Grade Water to
19-Jan-18 Pandesara GIDC
Tertiary Treatment Plant : Future Planning
Existing functional STP Nearest Power Plant Detail
# Location & Waste water WW Power Station (Installed Water required Distance Current
Capacity (MLD) received per treated per capacity, MW) by plant per from STP source of
day (MLD) day (MLD) day (MLD) (KM) water
3 Singanpore 150 150 - - - -
STP - 155
4 Karanj 115 115 Sugen Power Plant 9 26 Tapi river
STP - 140 (Torrent), Gaypagla,
Surat (1147.5 MW)
5 Bhatar STP – 160 160
162
6 Anjana STP - 80 80
82.5
7 Bhesan STP – 100 100 NTPC Power Plant, 30 10 Tapi river
100 Kawas, Hazira, Surat
Guj State Electricity 17 11 Ichhapore
Generation Ltd (GSEG), GIDC
Power Plant, Kawas,
Hazira, Surat
ONGC Power Plant, 21 13 Tapi river
Bhatpore, Hazira, Surat
19-Jan-18
Tertiary Treatment Plant : Future Planning
Existing functional STP Nearest Power Plant Detail
# Location & Waste water WW Power Station (Installed Water required Distance Current
Capacity (MLD) received per treated per capacity, MW) by plant per from STP source of
day (MLD) day (MLD) day (MLD) (KM) water
8 Asarama STP - 14 14
15
10 Variav-Kosad 134 134 Guj State Electricity 30 5 Tapi river
STP - 134 Corporation Ltd
(GSECL), Utran Gas
based Power Plant, Utran,
Surat
11 Gavier - 53 3 3
Total - 1032.5 921 921
19-Jan-18
Sewage Treatment Plant : Future Planning
Under construction / Under planning STP details
# Status (Under Location Capacity Taken Under Likely Estimated Remarks
Construction / (MLD) which scheme date of Cost (Cr.)
Under Planning or by ULB itself comple
tion
1 Under Anjana 122 Amrut / Smart Dec-18 102.90 Upgradation of existing STP &
Construction City Augmentation of STP from 82.5
to 122 MLD
2 Under Dindoli 167 Smart City / Aug-19 131.31 Upgradation of existing STP &
Construction Surat Municipal Augmentation of STP from 66 to
Corportion 167 MLD
3 Under Bamroli 100 AMRUT Mission Feb-19 73.149 Upgradation of existing STP
Construction
4 Under Bhesan 100 AMRUT Mission Apr-20 193.00 Upgradation of existing STP &
Planning* Augmentation of STP from 100
to 200 MLD
5 Under Singanpore 60 AMRUT Mission Apr-20 231.00 Upgradation of existing STP &
Planning* Augmentation of STP from 155
to 215 MLD