Sunteți pe pagina 1din 1

SURVEY

ENGINEERS
COSTOS Y PRESUPUESTOS GRUPO A OCTAVO
CICLO
HOJA DE METRADOS - ZAPATAS

PROYECTO : CONSTRUCCION DE LA GUARDIANIA MULTIPLICAR POR PARA KG/ML


FECHA : DICIEMBRE DEL 2020 TIPO 1 2 3 4 5 6
A CARGO : ING. ED ROYER f 1/4" 3/8" 1/2" 5/8" 3/4" 1" HOJA
UBICACIÓN : AREQUIPA - PIEDRA SANTA w /m 0.25 0.56 0.994 1.552 2.235 3.973 05
HOJA : ACERO 01 % DESP. 2% 3% 5% 7% 8% 10%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
ACERO PARA ZAPATAS Z-1
1.45

3 1/2" 6 11 1.45 95.126 95.1


3 1/2" 6 8 2.05 97.81 97.8
2.05

ACERO PARA ZAPATAS Z-2


1.45

3 1/2" 6 11 1.45 95.126 95.1


3 1/2" 6 8 1.85 88.267 88.3
1.85

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 0 0 376.33 0 0 0 376.3284
TOTAL (KG/ACERO) + DESPERDICIO 0 0 395.14 0 0 0
395.14482
ACERO EN VARILLAS (VAR) 0 0 44 0 0 0

VISIT TO OUR CHNNEL: EDSON ROYER TAIPE BY: EDSON ROYER TAIPE

S-ar putea să vă placă și