Lighting installed

no. From HL village


HPSV LED
1 27.2.2020 LORONG 4 JALAN SENTOSA SALIM PHASE 1 3 0
2 27.2.2020 LORONG 4 SENTOSA SALIM PHASE 1 2 0
3 27.2.2020 RH DANGOL TG. BEKAKAP 5 0
4 27.2.2020 RH CLEMENT SEKUAU 8 0
5 27.2.2020 RH TUNGKU & RH FRANCIS SKIM SEKUAU 3 0
6 27.2.2020 RH NGALAI SEKUAU 4 0
7 27.2.2020 RH THOMAS, RH ANTHONY & RH BASEH BAWANG ASSAN 4 0
8 27.2.2020 RH UJIEH JALAN TEKU/PASAI 5 0
9 27.2.2020 RH LIPU PELUGAU 9 0
10 27.2.2020 RH DIAN JALAN SK PELUGAU 6 0
11 27.2.2020 RH ENTALANG PELUGAU 2 0
12 27.2.2020 RH MALING AK BANSU NG. TAMIN 2 0
13 27.2.2020 RH NYAWIN TAMIN 2 0
14 27.2.2020 RH NYABONG NG. TAMIN 1 0
15 27.2.2020 RH TATOM NG. TAMIN 7 0
16 27.2.2020 KPG BARU SELANGAU, JALAN SELANGAU-MUKAH 15 0
17 27.2.2020 RH ARISON,RH MAMBANG,RH APING & UNGGANG 7 0
18 27.2.2020 RH DAS JALAN SK KEMENA 5 0
19 27.2.2020 RH PASANG JALAN SK SG KEMENA 5 0
20 27.2.2020 RH JAGONG JALAN SK KEMENA 5 0
21 27.2.2020 RH KUCHING JALAN SIBU / BINTULU 6 0
22 27.2.2020 RH JABING JALAN SIBU / BINTULU 6 0
23 27.2.2020 RH HAMATABIKIRIE JALAN SIBU / BINTULU 4 0
24 27.2.2020 RH KUNSUN JALAN SIBU / BINTULU 9 0
25 27.2.2020 RH SELAT & RH RANGKONG JALAN JARDAH SG. DUAT SELANGAU 4 0
26 27.2.2020 RH KASSIN SELANGAU 2 0
27 27.2.2020 RH MERAWING SELANGAU 1 0
28 27.2.2020 RH ENSELA SELANGAU 7 0
29 27.2.2020 RH SUNA JALAN SIBU / BINTULU 15 0
30 27.2.2020 RH JANGGU,RH KIAW,RH BUNAK,RH SINGALANG 14 0
31 27.2.2020 RH BUNAK & RH SYLVESTER BANA (JLN SIBU/BINTULU) 17 0
32 27.2.2020 RH KUDING (RH UNGGAI) TEKALONG,DIJIH 2 0
33 27.2.2020 RH WILLIAM BANSA DIJIH 8 0
34 27.2.2020 RH MUJAH DIJIH 4 0
35 27.2.2020 RH ANGOM 9 0
36 27.2.2020 RH LAWRENCE NANGA BON KEMUYANG 8 0
37 27.2.2020 RH CHABU PENASU 6 0
38 27.2.2020 RH AKONG PENASU 2 0
39 27.2.2020 JALAN LADANG BT.11 JALAN OYA 9 0
40 27.2.2020 JALAN LADANG BT.11 (RUMAH MELINA,RH AMI & RH TURAI) 5 0
41 27.2.2020 RH MAWAR KEMENA (SIBU/BINTULU) 3 0
42 27.2.2020 RH SLYVESTER BAYU (SIBU/BINTULU) 2 0
43 27.2.2020 JALAN JERAWIT TIMUR 30 0
44 27.2.2020 JALAN SK PELUGAU 6 0
45 28.2.2020 Rh Bunda Ak Dalun 10
46 28.2.2020 Kpg Keranji Madu 3
47 28.2.2020 Rh Landas 5
48 27.2.2020 RUMAH ENCHARANG SK PELUGAU 3 0
49 27.2.2020 RUMAH GAMANG SK PELUGAU 12 0
50 27.2.2020 RH WATSON, RH UBONG & RH BANYOI JLN SK PELUGAU 20 0
51 12.3.2020 Rh Lambai, Nanga Tada 14
52 12.3.2020 Rh Puji 2
53 20.5.2020 Lorong 4 Jalan Sentosa Salim 5
54 20.5.2020 Rh Juki Salim Belalang 3
55 20.5.2020 Rh Kelak Salim Belalang 3
56 20.5.2020 Rh Lawrence, Nanga Bon Kemuyang 8
57 20.5.2020 Rh Melina, Ami & Turai, Batu 11 14

TOTAL 356 0
GRAND TOTAL 356
Remarks
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures & T3K6471 coordinate not complete
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
no pictures
with pics
with pics
with pics
no pictures
no pictures
no pictures
with pics
with pics
with pics
with pics
with pics
with pics
with pics
Lighting installed
no. From HL village
HPSV LED
1 28.2.2020 Rh Anthony Undi (Ng Tuah) 2
2 28.2.2020 Rh Awan (Rantau Dilang) 2
3 28.2.2020 Rh Douglas (Rantau Dilang) 1
4 28.2.2020 Rh Henry Ak Ina (Ng Tuah) 2
5 28.2.2020 Rh Henry Ak John (Ng Tuah) 2
6 28.2.2020 Rh Jugah (Rantau Dilang) 2
7 28.2.2020 Rh Kendawang Ak Bareng (Ng Tuah) 3
8 28.2.2020 Rh Mak (Rantau Dilang) 2
9 28.2.2020 Rh Merikan (Rh Richard) 3
10 28.2.2020 Rh Pius (Ng Tuah) 4
11 28.2.2020 Rh Veronica (Bawan) 2
12 12.3.2020 Rh Jali 1
13 12.3.2020 Rh Kendawang Ak Sigai 4
14 12.3.2020 Rh Mambak 5
15 12.3.2020 Rh Nanggai, Ng Bukong 3
16 14.3.2020 Perkampungan Cina Pedai 21
17 14.3.2020 Rh Boniface 5
18 14.3.2020 Rh Empera 2
19 14.3.2020 Rh Engkalayau 2
20 14.3.2020 Rh Jampi 4
21 14.3.2020 Rh Joshua 3
22 14.3.2020 Rh Kalom 3
23 14.3.2020 Rh Letan-Tedong 2
24 14.3.2020 Rh Lily 11
25 14.3.2020 Rh Merikan 4
26 14.3.2020 Rh Moses 3
27 14.3.2020 Rh Perpetua Lika 7
28 14.3.2020 Rh Radin 2
29 14.3.2020 Rh Winniefred Minnoh 2
30 17.3.2020 Kpg Bedil 5
31 17.3.2020 Rh Alexander 7
32 17.3.2020 Rh Arun 3
33 17.3.2020 Rh Benang 5
34 17.3.2020 Rh Chendang 5
35 17.3.2020 Rh Gerut 6
36 17.3.2020 Rh Joseph 7
37 17.3.2020 Rh Jubit 3
38 17.3.2020 Rh Sumping 6
39 20.5.2020 Rh Ato 2
40 20.5.2020 Rh Engkulau 5
41 20.5.2020 Rh Kalong 4
42 20.5.2020 Rh Michael Jalak 5
43 20.5.2020 Rh Nanggai, Ng Bukong 3
TOTAL 175 0
GRAND TOTAL 175
GPS COORDINATES AND PICTURES CHECKLIST
Project : LJK 6 Phase 1
Client : Sarawak Energy Berhad (SEB)
Main Contractor : Ciri Kuasa Sdn Bhd
Subcontractor : Highline Engineering Sdn Bhd

CONTRACT TOTAL GPS


UNIT RATE
NO. DAERAH OR RETAKE
(RM)
GPS & PICS HPSV LED TOTAL HPSV

1 SARIKEI 210.00 184 2 186


2 JULAU CKSB 210.00 138 0 138 138
3 PAKAN CKSB 220.00 108 0 108 108
4 SIBU HIGHLINE 210.00 533 0 533 356
5 SELANGAU 210.00 114 0 114
6 KANOWIT HIGHLINE 210.00 196 0 196 175
7 MUKAH 230.00 611 1 612
8 MATU 250.00 56 0 56
9 DARO 250.00 106 0 106
10 DALAT 240.00 24 0 24
11 KAPIT 260.00 112 0 112
12 SONG 260.00 129 0 129
TOTAL 2311 3 2314 777
GPS AND PICS SUBMITTED BALANCE

TOTAL TOTAL
LED TOTAL GPS PICS REMARKS HPSV LED
GPS PICS
0 -184 -2 -186 -186
138 CLOSED 0 0 0 0
108 CLOSED 0 0 0 0
356 356 67 ONLY 67 PICS -177 0 -177 -466
0 -114 0 -114 -114
175 175 175 -21 0 -21 -21
0 -611 -1 -612 -612
0 -56 0 -56 -56
0 -106 0 -106 -106
0 -24 0 -24 -24
0 -112 0 -112 -112
0 -129 0 -129 -129
0 777 -1534 -3 -1537 -1826