Sunteți pe pagina 1din 2

209

Hazop Worksheet
Hazard Identification Study Work
HAZOP WORKSHEET NO. 62
SCHEME NO. P&ID NO. A095/02/41/70/1161
NODE NO. 62 Piping and Instrumentation Diagram GSU/GPU OSBL HOOK-UP Details (24” Dia RLNG Pipeline)
S.N. Guide Deviation Process Causes Consequences Safeguards Recommendations
Word
1. Flow No flow 1. Isolation valve in 24” 1. Loss of production. ------ 1. Flow meter with Alarm
RLNG line closed. 2. Delay in transfer of system should be
2. No availability of RLNG in RLNG. provided.
the pipeline 2. Continuous monitoring
3. Pipeline may be broken in of flow should be checked
between. regularly at central control
room.
Less Flow 1. Isolation valve partially Loss of production. ------ 1. Flow meter with Alarm
closed. system should be
2. Less quantity of Gas provided.
available. 2. Continuous monitoring
3. Leakage in the pipeline of flow should be checked
regularly at central control
room.
More flow Over flow of the Gas 1. Loss of Gas. ------ 1. Flow meter with Alarm
2. Pipeline pressure may system should be
increase. provided.
3. Chance of leakage. 2. Continuous monitoring
of flow should be checked
regularly at central control
room.
210
Hazop Worksheet
Hazard Identification Study Work
HAZOP WORKSHEET NO. 62 (Continue)

SCHEME NO. P&ID NO. A095/02/41/70/1161


NODE NO. 62 Piping and Instrumentation Diagram GSU/GPU OSBL HOOK-UP Details (24” Dia RLNG Pipeline)
S.N. Guide Word Deviation Process Causes Consequences Safeguards Recommendations
2. Pressure Less No significant impact. ------ ------ ------
Pressure
More More quantity of gas 1. Pressure in the 1. By pass isolation High pressure alarm
Pressure available. pipeline may increase. valve provided. system should be
2. Damage to pipeline 2. Pressure Transmitter provided and
provided. connected to central
control room.
3. Reverse Not likely to ----- ----- ----- -----
occur.

S-ar putea să vă placă și