Sunteți pe pagina 1din 1

KEYPLAN:

1000

1000
1000 1000 1000

1000 1000 1000

1000 1000 1000


474

474
Handrail clamp S 438 440 442

500

500

500
294 294
2100

2100
438 436 434

353

474
1000

1000
System overview
b a
Handrail clamp S

230
292
1524 732 1524 878 1524 878 1524 728 1524

384
438
Doka beam H20 eco P
d3 screw jack U-head Doka beam H20 eco P C
A
-1.20-

-1.20-
Scaffold Tubes By Site

-1.20-
F NOTES:

-1.20-

-1.20-
Diagonal cross 12.100

-1.20-
Back Stay By Site Back Stay By Site B

Back Stay By Site


Lifting chain attached to the d3 frame
E Safety Advice
-1.20-

-1.20-
-1.20-

-1.20-

-1.20-
Tower form

-1.20-
HT. = 6.00m
Back Stay By Site

5560
5682
d3 safety hook
-1.20-

-1.20-
-1.20-

-1.20-

-1.20-
-1.20-
HT. = 9.00m

8560
C

8682
-1.20-

-1.20-
-1.20-

-1.20-

-1.20-
-1.20-
Secures the d3 screw jack U-head or screw jack foot to

384
the d3 frame

452

98116-201-01
-1.20-

-1.20-
▪ when the towerframes are assembled in the horizon-
-1.20-

tal
▪ when the towerframes are lifted by crane
Multi-purpose waling WU12

Spindle strut 40/80cm


Tie rod 15.0+wing nut 15.0
d3 frame 1.20m & Rock anchor spread unit D
-1.20-

-1.20-
-1.20-

General remarks:
Spindle strut T7 150/200cm
▪ The gravity latches of the frame must always point
Multipurpose waling WS10
upwards.
a ... Inter-frame spacing = 60* / 100 / 150 / 175 / 200 / 250 / 300 cm
b ... Frame width = 152 cm

Section A-A * only for 1.20 and 0.90m frames


-0.90-

-0.90-
d3 screw jack foot
-0.90-

A Head unit D Base unit


B d3 frame E Scaffold planking
Scale 1:60 While the tableform is being lifted, there must
238

C Diagonal cross F d3 safety hook


298

NOT be any loose parts, tools or


other items on the tableform!

Wind Load Assumptions for Load Bearing Towers


Wind loads which are assumed:
a: load case 2 (EN12812) (falsework during loading, e.g. pouring): 64km/h (q=0,2kN/m²)
b: load case 3 (EN12812) (loaded falsework): xx km/h (q= Y,Y kN/m² )
The load bearing towers have to be prevented of tilting and gliding
(e.g. with guying; see User Information).

11220 General notes for load-bearing towers


Section A-A - The load-bearing towers have to be placed vertically.
- The load-bearing towers have to be placed on a statically stable base (concrete blocks, sleeper, etc.).
Scale 1:60

3000

2200
Foundation according to statical requirements by contractor.
- Necessary camber according to the planning information have to be considered when levelling the
formwork.

A A Calculation criteria
1500-2100

Our design is based on load assumptions as stated below (characteristic loads):


- Dead load of formwork/scaffold is taken into account.
- Live load = 2.50 kN/m²
- Concrete weight = 25 kN/m³
- Maximum concrete pressure Pmax = _ kN/m²
- Horizontal dummy load for working
procedure (pumping, vibrating, a.s.o) 2.5% of the vertical load
300

300

- Working wind speed = 64 km/h


Doka beam H20 eco P
d3 screw jack U-head - Maximum wind speed = _ km/h
-0.90-

-0.90-

-0.90-

The design of formwork and scaffold is according to Eurocodes

All measurements of the structure have to be checked! All measurements in mm!


Diagonal cross 12.100
Back Stay By Site
PLAN: PIER CAP FORMWORK - FRAMI X-LIFE
-1.20-

-1.20-

-1.20-

The stated reaction forces are actual unfactored characteristic loads (ɣ=1)!
SCALE FIRST CASTING 1:40
The transfer of the forces into the structure and the stability of the overall construction, must all
Back Stay By Site ! be verified by the structural designer.
-1.20-

-1.20-

-1.20-
-1.20-

-1.20-

-1.20-

Jubail Railway Network Expansion CTW130


MAX HT. = 11.30m

10860
10982
-1.20-

-1.20-

-1.20-

KRT-RUB1 Bridge - Pier Cap Side Shutter


620 9980 620 Side shutter for pier head for 2.10m height pier cap- Frami Xlife

850
-1.20-

-1.20-

-1.20-

Client:
APPROVAL DRAWING
Yapi Merkezy

500
not valid for execution
-1.20-

-1.20-

-1.20-

Approved by site
for execution: Date, Name, Signature

850
A A Drawn: ILYAS POOLAKKAL 01.07.2020 Drawing-No.: Rev.:
-1.20-

-1.20-

-1.20-

d3 frame 1.20m Checked: MUHSIN PANTHAKKAN 356-001102-1004


Revised: Scale: " AS SHOWN "
Advanced Formwork Co. Ltd.
-0.90-

-0.90-

-0.90-

24.31kN 87.30kN 88.16kN 51.61kN


Dammam Branch
P.O. Box 60120 Dammam 31481 Kingdom of Saudi Arabia
d3 screw jack foot
368

Tel.: +966 13 832 0606 Fax.: +966 13 832 3193


490

www.doka.com
This drawing is based upon the technical data and original DOKA products, or such products which are explicitely designated herein.
We can only warrant for DOKA products on the condition that they are used according product specification.
The unauthorized use, reproduction or processing of this drawing is forbidden, subject to penalty and subject to payment of damages.
This drawing must not be communicated neither to third parties nor to competitor companies. Subject to technical alterations.

To avoid risks regarding Health & Safety of users or third persons, "User Information", "Operating Instructions" and

Section A-A PLAN: PIER CAP FORMWORK - FRAMI X-LIFE "Fitting Instructions" have to be noted in addition to the information given on the drawings.

Scale 1:60 SCALE 1:40 If required ask your Doka partner for these documents. http://www.doka.com/downloadcenter/
SECOND CASTING
Scaffold boards for platforms and railings must be fixed according to Health & Safety regulations and local law!

S-ar putea să vă placă și