SUMMARY OF DESIGN LOADS

DESIGN MOMENT (Mu) AND DESIGN SHEAR (Vu) ROOF DE


ULTIMATE MOMENT AT SUPPORT ULTI
FACTORED LOA
Mu = 0.9MDL + 1.0ME (Table 405.3.1g) Live Load, MLL
Dead Load, MDL
Mu = 1.2MDL + 1.0MLL + 1.0ME (Table 405.3.1e) Seismic Load, M
Mu = 0.9MDL + 1.0
→(ME is from Beam Moment of Seismic Analysis ) Mu = 1.2MDL + 1.0MLL
→(MDL and MLL is from Moment Distribution Method ) Mu-max
ULTI
"In designing of support beam use the FACTORED LOA
maximum value of Mu" Live Load, MLL
ULTIMATE MOMENT AT MIDSPAN Dead Load, MDL
Seismic Load, M
Mu = 1.2MDL + 1.6MLL (Table 405.3.1b) Mu = 0.9MDL + 1.0
Mu = 1.2MDL + 1.0MLL
Mu = 1.2MDL + 1.0MLL + 1.0ME (Table 405.3.1e) Mu = 1.2MDL + 1.6
Mu-max
→(MDL and MLL is from Moment Distribution Method )
FACTORED LOA
"In designing of midspan beam use the Live Load, VLL
maximum value of Mu" Dead Load, VDL
DESIGN SHEAR Seismic Load, V
Vu = 1.2VDL + 1.6V
Vu = 1.2VDL + 1.6VLL (Table 405.3.1b) Vu = 1.2VDL + 1.0VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE (Table 405.3.1e) Vu-max

→(VDL and VLL is from Moment Distribution Method ) Live Load, WLL
UNIFORM LOAD Dead Load, WDL
Wu = 1.2VDL + 1.6
Wu = 1.2VDL + 1.6VLL (Table 405.3.1b) Wu

ROOF DECK LONGITUDINAL (FRAME B & C) ROOF DE

ULTIMATE MOMENT AT SUPPORT ULTI


FACTORED LOADS Mu at Support FACTORED LOA
Live Load, MLL 0.00 kN-m Live Load, MLL
Dead Load, MDL 110.784 kN-m Dead Load, MDL
Seismic Load, ME 116.080 kN-m Seismic Load, M
Mu = 0.9MDL + 1.0ME 215.786 kN-m Mu = 0.9MDL + 1.0
Mu = 1.2MDL + 1.0MLL + 1.0ME 249.021 kN-m Mu = 1.2MDL + 1.0MLL
Mu-max 249.021 kN-m Mu-max
ULTIMATE MOMENT AT MIDSPAN ULTI
FACTORED LOADS Mu at Midspan FACTORED LOA
Live Load, MLL 0.00 kN-m Live Load, MLL
Dead Load, MDL 69.528 kN-m Dead Load, MDL
Seismic Load, ME 0.00 kN-m Seismic Load, M
Mu = 0.9MDL + 1.0ME 62.575 kN-m Mu = 0.9MDL + 1.0
Mu = 1.2MDL + 1.0MLL + 1.0ME 83.434 kN-m Mu = 1.2MDL + 1.0MLL
Mu = 1.2MDL + 1.6MLL 83.434 kN-m Mu = 1.2MDL + 1.6
Mu-max 83.434 kN-m Mu-max
DESIGN SHEAR
FACTORED LOADS SHEAR FACTORED LOA
Live Load, VLL 0.00 kN Live Load, VLL
Dead Load, VDL 91.105 kN Dead Load, VDL
Seismic Load, VE 14.510 kN Seismic Load, V
Vu = 1.2VDL + 1.6VLL 109.326 kN Vu = 1.2VDL + 1.6V
Vu = 1.2VDL + 1.0VLL + 1.0VE 123.836 kN Vu = 1.2VDL + 1.0VLL
Vu-max 123.836 kN Vu-max
UNIFORM LOAD
Live Load, WLL 0.000 kN Live Load, WLL
Dead Load, WDL 23.016 kN Dead Load, WDL
Wu = 1.2VDL + 1.6VLL 27.619 kN Wu = 1.2VDL + 1.6
Wu 27.619 kN Wu

ROOF DECK LONGITUDINAL (FRAME E)

ULTIMATE MOMENT AT SUPPORT


FACTORED LOADS Mu at Support
Live Load, MLL 0.00 kN-m
Dead Load, MDL 0.00 kN-m
Seismic Load, ME 116.080 kN-m
Mu = 0.9MDL + 1.0ME 116.080 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 116.080 kN-m
Mu-max 116.080 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 0.00 kN-m
Dead Load, MDL 94.755 kN-m
Seismic Load, ME 0.00 kN-m
Mu = 0.9MDL + 1.0ME 85.280 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 113.706 kN-m
Mu = 1.2MDL + 1.6MLL 113.706 kN-m
Mu-max 113.706 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 0.00 kN
Dead Load, VDL 49.871 kN
Seismic Load, VE 14.510 kN
Vu = 1.2VDL + 1.6VLL 79.794 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 74.355 kN
Vu-max 79.794 kN
UNIFORM LOAD
Live Load, WLL 0.000 kN
Dead Load, WDL 13.124 kN
Wu = 1.2VDL + 1.6VLL 15.749 kN
Wu 15.749 kN
GN LOADS

ROOF DECK LONGITUDINAL (FRAME A) 3RD FLOOR LONGITUDINAL (F


ULTIMATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUP
FACTORED LOADS Mu at Support FACTORED LOADS
Live Load, MLL 0.00 kN-m Live Load, MLL
Dead Load, MDL 63.343 kN-m Dead Load, MDL
Seismic Load, ME 116.080 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 173.089 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 192.092 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu-max 192.092 kN-m Mu-max
ULTIMATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MID
FACTORED LOADS Mu at Midspan FACTORED LOADS
Live Load, MLL 0.00 kN-m Live Load, MLL
Dead Load, MDL 39.755 kN-m Dead Load, MDL
Seismic Load, ME 0.000 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 35.780 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 47.706 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu = 1.2MDL + 1.6MLL 47.706 kN-m Mu = 1.2MDL + 1.6MLL
Mu-max 47.706 kN-m Mu-max
DESIGN SHEAR DESIGN SHEAR
FACTORED LOADS SHEAR FACTORED LOADS
Live Load, VLL 0.00 kN Live Load, VLL
Dead Load, VDL 52.092 kN Dead Load, VDL
Seismic Load, VE 14.510 kN Seismic Load, VE
Vu = 1.2VDL + 1.6VLL 83.347 kN Vu = 1.2VDL + 1.6VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE 77.020 kN Vu = 1.2VDL + 1.0VLL + 1.0VE
Vu-max 83.347 kN Vu-max
UNIFORM LOAD UNIFORM LOAD
Live Load, WLL 0.000 kN Live Load, WLL
Dead Load, WDL 13.160 kN Dead Load, WDL
Wu = 1.2VDL + 1.6VLL 15.792 kN Wu = 1.2VDL + 1.6VLL
Wu 15.792 kN Wu

ROOF DECK LONGITUDINAL (FRAME D) 3RD FLOOR LONGITUDINAL (F

ULTIMATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUP


FACTORED LOADS Mu at Support FACTORED LOADS
Live Load, MLL 0.00 kN-m Live Load, MLL
Dead Load, MDL 95.535 kN-m Dead Load, MDL
Seismic Load, ME 116.080 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 202.062 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 230.722 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu-max 230.722 kN-m Mu-max
ULTIMATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MID
FACTORED LOADS Mu at Midspan FACTORED LOADS
Live Load, MLL 0.00 kN-m Live Load, MLL
Dead Load, MDL 71.914 kN-m Dead Load, MDL
Seismic Load, ME 0.00 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 64.723 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 86.297 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu = 1.2MDL + 1.6MLL 86.297 kN-m Mu = 1.2MDL + 1.6MLL
Mu-max 86.297 kN-m Mu-max
DESIGN SHEAR DESIGN SHEAR
FACTORED LOADS SHEAR FACTORED LOADS
Live Load, VLL 0.00 kN Live Load, VLL
Dead Load, VDL 87.795 kN Dead Load, VDL
Seismic Load, VE 14.510 kN Seismic Load, VE
Vu = 1.2VDL + 1.6VLL 105.354 kN Vu = 1.2VDL + 1.6VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE 119.864 kN Vu = 1.2VDL + 1.0VLL + 1.0VE
Vu-max 119.864 kN Vu-max
UNIFORM LOAD UNIFORM LOAD
Live Load, WLL 0.000 kN Live Load, WLL
Dead Load, WDL 23.016 kN Dead Load, WDL
Wu = 1.2VDL + 1.6VLL 27.619 kN Wu = 1.2VDL + 1.6VLL
Wu 27.619 kN Wu

3RD FLOOR LONGITUDINAL (F

ULTIMATE MOMENT AT SUP


FACTORED LOADS
Live Load, MLL
Dead Load, MDL
Seismic Load, ME
Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu-max
ULTIMATE MOMENT AT MID
FACTORED LOADS
Live Load, MLL
Dead Load, MDL
Seismic Load, ME
Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu = 1.2MDL + 1.6MLL
Mu-max
DESIGN SHEAR
FACTORED LOADS
Live Load, VLL
Dead Load, VDL
Seismic Load, VE
Vu = 1.2VDL + 1.6VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE
Vu-max
UNIFORM LOAD
Live Load, WLL
Dead Load, WDL
Wu = 1.2VDL + 1.6VLL
Wu
OR LONGITUDINAL (FRAME A) 3RD FLOOR LONGITUDINAL (FRAME
MATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT
Mu at Support FACTORED LOADS Mu at Sup
54.511 kN-m Live Load, MLL 102.849 k
104.186 kN-m Dead Load, MDL 166.496 k
324.560 kN-m Seismic Load, ME 324.560 k
418.327 kN-m Mu = 0.9MDL + 1.0ME 474.406 k
504.094 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 627.204 k
504.094 kN-m Mu-max 627.204 k
MATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Mid
43.222 kN-m Live Load, MLL 86.491 kN
105.143 kN-m Dead Load, MDL 123.282 k
0.000 kN-m Seismic Load, ME 0.000 kN
94.629 kN-m Mu = 0.9MDL + 1.0ME 110.954 k
169.394 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 234.429 k
195.327 kN-m Mu = 1.2MDL + 1.6MLL 286.324 k
195.327 kN-m Mu-max 286.324 k
DESIGN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEA
39.039 kN Live Load, VLL 78.121 k
110.257 kN Dead Load, VDL 154.092
40.570 kN Seismic Load, VE 40.570 k
223.258 kN Vu = 1.2VDL + 1.6VLL 340.292
211.917 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 303.601
223.258 kN Vu-max 340.292
UNIFORM LOAD UNIFORM LOAD
9.060 kN Live Load, WLL 18.130 k
29.037 kN Dead Load, WDL 40.970 k
49.340 kN Wu = 1.2VDL + 1.6VLL 78.172 k
49.340 kN Wu 78.172 k

OR LONGITUDINAL (FRAME C) 3RD FLOOR LONGITUDINAL (FRAME

MATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT


Mu at Support FACTORED LOADS Mu at Sup
102.849 kN-m Live Load, MLL 81.797 kN
141.033 kN-m Dead Load, MDL 112.319 k
324.560 kN-m Seismic Load, ME 324.560 k
451.490 kN-m Mu = 0.9MDL + 1.0ME 425.647 k
596.649 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 541.140 k
596.649 kN-m Mu-max 541.140 k
MATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Mid
86.491 kN-m Live Load, MLL 76.032 kN
101.233 kN-m Dead Load, MDL 85.389 kN
0.000 kN-m Seismic Load, ME 0.000 kN
91.110 kN-m Mu = 0.9MDL + 1.0ME 76.850 kN
207.971 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 178.499 k
259.865 kN-m Mu = 1.2MDL + 1.6MLL 224.118 k
259.865 kN-m Mu-max 224.118 k
DESIGN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEA
78.121 kN Live Load, VLL 73.813 k
109.318 kN Dead Load, VDL 103.651
40.570 kN Seismic Load, VE 40.570 k
268.654 kN Vu = 1.2VDL + 1.6VLL 254.417
249.873 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 238.764
268.654 kN Vu-max 254.417
UNIFORM LOAD UNIFORM LOAD
18.130 kN Live Load, WLL 18.130 k
27.170 kN Dead Load, WDL 27.170 k
61.612 kN Wu = 1.2VDL + 1.6VLL 61.612 k
61.612 kN Wu 61.612 k

OR LONGITUDINAL (FRAME E)

MATE MOMENT AT SUPPORT


Mu at Support
0.000 kN-m
0.000 kN-m
324.560 kN-m
324.560 kN-m
324.560 kN-m
324.560 kN-m
MATE MOMENT AT MIDSPAN
Mu at Midspan
65.413 kN-m
110.026 kN-m
0.000 kN-m
99.023 kN-m
197.444 kN-m
236.692 kN-m
236.692 kN-m
DESIGN SHEAR
SHEAR
34.428 kN
57.908 kN
40.570 kN
133.966 kN
144.488 kN
144.488 kN
UNIFORM LOAD
9.060 kN
15.239 kN
32.783 kN
32.783 kN
ITUDINAL (FRAME B) 2ND FLOOR LONGITUDINAL (FRAME A)
MENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT
Mu at Support FACTORED LOADS Mu at Support
102.849 kN-m Live Load, MLL 54.511 kN-m
166.496 kN-m Dead Load, MDL 75.045 kN-m
324.560 kN-m Seismic Load, ME 466.510 kN-m
474.406 kN-m Mu = 0.9MDL + 1.0ME 534.051 kN-m
627.204 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 611.075 kN-m
627.204 kN-m Mu-max 611.075 kN-m
MENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Midspan
86.491 kN-m Live Load, MLL 43.222 kN-m
123.282 kN-m Dead Load, MDL 47.098 kN-m
0.000 kN-m Seismic Load, ME 0.000 kN-m
110.954 kN-m Mu = 0.9MDL + 1.0ME 42.388 kN-m
234.429 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 99.740 kN-m
286.324 kN-m Mu = 1.2MDL + 1.6MLL 125.673 kN-m
286.324 kN-m Mu-max 125.673 kN-m
GN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEAR
78.121 kN Live Load, VLL 39.039 kN
154.092 kN Dead Load, VDL 61.714 kN
40.570 kN Seismic Load, VE 58.310 kN
340.292 kN Vu = 1.2VDL + 1.6VLL 145.589 kN
303.601 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 171.406 kN
340.292 kN Vu-max 171.406 kN
ORM LOAD UNIFORM LOAD
18.130 kN Live Load, WLL 9.060 kN
40.970 kN Dead Load, WDL 15.591 kN
78.172 kN Wu = 1.2VDL + 1.6VLL 33.205 kN
78.172 kN Wu 33.205 kN

ITUDINAL (FRAME D) 2ND FLOOR LONGITUDINAL (FRAME C)

MENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT


Mu at Support FACTORED LOADS Mu at Support
81.797 kN-m Live Load, MLL 102.849 kN-m
112.319 kN-m Dead Load, MDL 146.423 kN-m
324.560 kN-m Seismic Load, ME 466.510 kN-m
425.647 kN-m Mu = 0.9MDL + 1.0ME 598.291 kN-m
541.140 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 745.067 kN-m
541.140 kN-m Mu-max 745.067 kN-m
MENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Midspan
76.032 kN-m Live Load, MLL 86.491 kN-m
85.389 kN-m Dead Load, MDL 101.024 kN-m
0.000 kN-m Seismic Load, ME 0.000 kN-m
76.850 kN-m Mu = 0.9MDL + 1.0ME 90.922 kN-m
178.499 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 207.720 kN-m
224.118 kN-m Mu = 1.2MDL + 1.6MLL 259.614 kN-m
224.118 kN-m Mu-max 259.614 kN-m
GN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEAR
73.813 kN Live Load, VLL 78.121 kN
103.651 kN Dead Load, VDL 110.218 kN
40.570 kN Seismic Load, VE 58.310 kN
254.417 kN Vu = 1.2VDL + 1.6VLL 270.094 kN
238.764 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 268.693 kN
254.417 kN Vu-max 268.693 kN
ORM LOAD UNIFORM LOAD
18.130 kN Live Load, WLL 18.130 kN
27.170 kN Dead Load, WDL 29.582 kN
61.612 kN Wu = 1.2VDL + 1.6VLL 64.506 kN
61.612 kN Wu 64.506 kN

2ND FLOOR LONGITUDINAL (FRAME E)

ULTIMATE MOMENT AT SUPPORT


FACTORED LOADS Mu at Support
Live Load, MLL 0.000 kN-m
Dead Load, MDL 0.000 kN-m
Seismic Load, ME 466.510 kN-m
Mu = 0.9MDL + 1.0ME 466.510 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 466.510 kN-m
Mu-max 466.510 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 65.413 kN-m
Dead Load, MDL 110.076 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 99.068 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 197.504 kN-m
Mu = 1.2MDL + 1.6MLL 236.752 kN-m
Mu-max 236.752 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 34.428 kN
Dead Load, VDL 57.935 kN
Seismic Load, VE 58.310 kN
Vu = 1.2VDL + 1.6VLL 134.010 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 162.260 kN
Vu-max 162.260 kN
UNIFORM LOAD
Live Load, WLL 9.060 kN
Dead Load, WDL 15.246 kN
Wu = 1.2VDL + 1.6VLL 32.791 kN
Wu 32.791 kN
2ND FLOOR LONGITUDINAL (FRAME B)
ULTIMATE MOMENT AT SUPPORT
FACTORED LOADS Mu at Support
Live Load, MLL 102.849 kN-m
Dead Load, MDL 146.423 kN-m
Seismic Load, ME 466.510 kN-m
Mu = 0.9MDL + 1.0ME 598.291 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 745.067 kN-m
Mu-max 745.067 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 86.491 kN-m
Dead Load, MDL 101.024 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 90.922 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 207.720 kN-m
Mu = 1.2MDL + 1.6MLL 259.614 kN-m
Mu-max 259.614 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 78.121 kN
Dead Load, VDL 110.218 kN
Seismic Load, VE 58.310 kN
Vu = 1.2VDL + 1.6VLL 270.094 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 268.693 kN
Vu-max 268.693 kN
UNIFORM LOAD
Live Load, WLL 18.130 kN
Dead Load, WDL 29.582 kN
Wu = 1.2VDL + 1.6VLL 64.506 kN
Wu 64.506 kN

2ND FLOOR LONGITUDINAL (FRAME D)

ULTIMATE MOMENT AT SUPPORT


FACTORED LOADS Mu at Support
Live Load, MLL 81.797 kN-m
Dead Load, MDL 123.242 kN-m
Seismic Load, ME 466.510 kN-m
Mu = 0.9MDL + 1.0ME 577.428 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 696.197 kN-m
Mu-max 696.197 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 76.032 kN-m
Dead Load, MDL 90.726 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 81.653 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 184.903 kN-m
Mu = 1.2MDL + 1.6MLL 230.522 kN-m
Mu-max 230.522 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 73.813 kN
Dead Load, VDL 107.829 kN
Seismic Load, VE 58.310 kN
Vu = 1.2VDL + 1.6VLL 261.102 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 261.518 kN
Vu-max 261.518 kN
UNIFORM LOAD
Live Load, WLL 18.130 kN
Dead Load, WDL 27.170 kN
Wu = 1.2VDL + 1.6VLL 61.612 kN
Wu 61.612 kN
SUMMARY OF DESIGN LOADS

DESIGN MOMENT (Mu) AND DESIGN SHEAR (Vu) ROOF D


ULTIMATE MOMENT AT SUPPORT ULT
FACTORED LOA
Mu = 0.9MDL + 1.0ME (Table 405.3.1g) Live Load, ML
Dead Load, MD
Mu = 1.2MDL + 1.0MLL + 1.0ME (Table 405.3.1e) Seismic Load, M
Mu = 0.9MDL + 1.
→(ME is from Beam Moment of Seismic Analysis ) Mu = 1.2MDL + 1.0MLL
→(MDL and MLL is from Moment Distribution Method ) Mu-max
ULT
"In designing of support beam use the FACTORED LOA
maximum value of Mu" Live Load, ML
ULTIMATE MOMENT AT MIDSPAN Dead Load, MD
Seismic Load, M
Mu = 1.2MDL + 1.6MLL (Table 405.3.1b) Mu = 0.9MDL + 1.
Mu = 1.2MDL + 1.0MLL
Mu = 1.2MDL + 1.0MLL + 1.0ME (Table 405.3.1e) Mu = 1.2MDL + 1.6
Mu-max
→(MDL and MLL is from Moment Distribution Method )
FACTORED LOA
"In designing of midspan beam use the Live Load, VL
maximum value of Mu" Dead Load, VD
DESIGN SHEAR Seismic Load, V
Vu = 1.2VDL + 1.6
Vu = 1.2VDL + 1.6VLL (Table 405.3.1b) Vu = 1.2VDL + 1.0VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE (Table 405.3.1e) Vu-max

→(VDL and VLL is from Moment Distribution Method ) Live Load, WL


UNIFORM LOAD Dead Load, WD
Wu = 1.2VDL + 1.6
Wu = 1.2VDL + 1.6VLL (Table 405.3.1b) Wu

ROOF DECK TRANSVERSE (FRAME 2 & 3) ROOF D

ULTIMATE MOMENT AT SUPPORT ULT


FACTORED LOADS Mu at Support FACTORED LOA
Live Load, MLL 0.000 kN-m Live Load, ML
Dead Load, MDL 82.459 kN-m Dead Load, MD
Seismic Load, ME 122.510 kN-m Seismic Load, M
Mu = 0.9MDL + 1.0ME 196.723 kN-m Mu = 0.9MDL + 1.
Mu = 1.2MDL + 1.0MLL + 1.0ME 221.461 kN-m Mu = 1.2MDL + 1.0MLL
Mu-max 221.461 kN-m Mu-max
ULTIMATE MOMENT AT MIDSPAN ULT
FACTORED LOADS Mu at Midspan FACTORED LOA
Live Load, MLL 0.000 kN-m Live Load, ML
Dead Load, MDL 49.126 kN-m Dead Load, MD
Seismic Load, ME 0.000 kN-m Seismic Load, M
Mu = 0.9MDL + 1.0ME 44.213 kN-m Mu = 0.9MDL + 1.
Mu = 1.2MDL + 1.0MLL + 1.0ME 58.951 kN-m Mu = 1.2MDL + 1.0MLL
Mu = 1.2MDL + 1.6MLL 58.951 kN-m Mu = 1.2MDL + 1.6
Mu-max 58.951 kN-m Mu-max
DESIGN SHEAR
FACTORED LOADS SHEAR FACTORED LOA
Live Load, VLL 0.000 kN Live Load, VL
Dead Load, VDL 74.155 kN Dead Load, VD
Seismic Load, VE 17.500 kN Seismic Load, V
Vu = 1.2VDL + 1.6VLL 118.648 kN Vu = 1.2VDL + 1.6
Vu = 1.2VDL + 1.0VLL + 1.0VE 106.486 kN Vu = 1.2VDL + 1.0VLL
Vu-max 118.648 kN Vu-max
UNIFORM LOAD
Live Load, WLL 0.000 kN Live Load, WL
Dead Load, WDL 21.574 kN Dead Load, WD
Wu = 1.2VDL + 1.6VLL 25.889 kN Wu = 1.2VDL + 1.6
Wu 25.889 kN Wu

ROOF DECK TRANSVERSE(FRAME 5)

ULTIMATE MOMENT AT SUPPORT


FACTORED LOADS Mu at Support
Live Load, MLL 0.000 kN-m
Dead Load, MDL 45.154 kN-m
Seismic Load, ME 116.080 kN-m
Mu = 0.9MDL + 1.0ME 156.719 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 170.265 kN-m
Mu-max 170.265 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 0.000 kN-m
Dead Load, MDL 28.339 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 25.505 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 34.007 kN-m
Mu = 1.2MDL + 1.6MLL 34.007 kN-m
Mu-max 34.007 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 0.000 kN
Dead Load, VDL 42.759 kN
Seismic Load, VE 17.500 kN
Vu = 1.2VDL + 1.6VLL 68.414 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 68.811 kN
Vu-max 68.414 kN
UNIFORM LOAD
Live Load, WLL 0.000 kN
Dead Load, WDL 12.439 kN
Wu = 1.2VDL + 1.6VLL 14.927 kN
Wu 14.927 kN
N LOADS

ROOF DECK TRANSVERSE (FRAME 1) 3RD FLOOR TRANSVERSE (FR


ULTIMATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUP
FACTORED LOADS Mu at Support FACTORED LOADS
Live Load, MLL 0.000 kN-m Live Load, MLL
Dead Load, MDL 45.154 kN-m Dead Load, MDL
Seismic Load, ME 122.510 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 163.149 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 176.695 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu-max 176.695 kN-m Mu-max
ULTIMATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MID
FACTORED LOADS Mu at Midspan FACTORED LOADS
Live Load, MLL 0.000 kN-m Live Load, MLL
Dead Load, MDL 28.339 kN-m Dead Load, MDL
Seismic Load, ME 0.000 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 25.505 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 34.007 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu = 1.2MDL + 1.6MLL 34.007 kN-m Mu = 1.2MDL + 1.6MLL
Mu-max 34.007 kN-m Mu-max
DESIGN SHEAR DESIGN SHEAR
FACTORED LOADS SHEAR FACTORED LOADS
Live Load, VLL 0.000 kN Live Load, VLL
Dead Load, VDL 42.759 kN Dead Load, VDL
Seismic Load, VE 17.500 kN Seismic Load, VE
Vu = 1.2VDL + 1.6VLL 68.414 kN Vu = 1.2VDL + 1.6VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE 68.811 kN Vu = 1.2VDL + 1.0VLL + 1.0VE
Vu-max 68.414 kN Vu-max
UNIFORM LOAD UNIFORM LOAD
Live Load, WLL 0.000 kN Live Load, WLL
Dead Load, WDL 12.439 kN Dead Load, WDL
Wu = 1.2VDL + 1.6VLL 14.927 kN Wu = 1.2VDL + 1.6VLL
Wu 14.927 kN Wu

ROOF DECK TRANSVERSE (FRAME 4) 3RD FLOOR LTRANSVERSE (FR

ULTIMATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUP


FACTORED LOADS Mu at Support FACTORED LOADS
Live Load, MLL 0.000 kN-m Live Load, MLL
Dead Load, MDL 78.314 kN-m Dead Load, MDL
Seismic Load, ME 122.510 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 192.993 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 216.487 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu-max 216.487 kN-m Mu-max
ULTIMATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MID
FACTORED LOADS Mu at Midspan FACTORED LOADS
Live Load, MLL 0.000 kN-m Live Load, MLL
Dead Load, MDL 49.150 kN-m Dead Load, MDL
Seismic Load, ME 0.000 kN-m Seismic Load, ME
Mu = 0.9MDL + 1.0ME 44.235 kN-m Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME 58.980 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu = 1.2MDL + 1.6MLL 58.980 kN-m Mu = 1.2MDL + 1.6MLL
Mu-max 58.980 kN-m Mu-max
DESIGN SHEAR DESIGN SHEAR
FACTORED LOADS SHEAR FACTORED LOADS
Live Load, VLL 0.000 kN Live Load, VLL
Dead Load, VDL 74.161 kN Dead Load, VDL
Seismic Load, VE 17.500 kN Seismic Load, VE
Vu = 1.2VDL + 1.6VLL 118.658 kN Vu = 1.2VDL + 1.6VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE 106.493 kN Vu = 1.2VDL + 1.0VLL + 1.0VE
Vu-max 118.658 kN Vu-max
UNIFORM LOAD UNIFORM LOAD
Live Load, WLL 0.000 kN Live Load, WLL
Dead Load, WDL 21.574 kN Dead Load, WDL
Wu = 1.2VDL + 1.6VLL 25.889 kN Wu = 1.2VDL + 1.6VLL
Wu 25.889 kN Wu

3RD FLOOR LTRANSVERSE (FR

ULTIMATE MOMENT AT SUP


FACTORED LOADS
Live Load, MLL
Dead Load, MDL
Seismic Load, ME
Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu-max
ULTIMATE MOMENT AT MID
FACTORED LOADS
Live Load, MLL
Dead Load, MDL
Seismic Load, ME
Mu = 0.9MDL + 1.0ME
Mu = 1.2MDL + 1.0MLL + 1.0ME
Mu = 1.2MDL + 1.6MLL
Mu-max
DESIGN SHEAR
FACTORED LOADS
Live Load, VLL
Dead Load, VDL
Seismic Load, VE
Vu = 1.2VDL + 1.6VLL
Vu = 1.2VDL + 1.0VLL + 1.0VE
Vu-max
UNIFORM LOAD
Live Load, WLL
Dead Load, WDL
Wu = 1.2VDL + 1.6VLL
Wu
OOR TRANSVERSE (FRAME 1) 3RD FLOOR TRANSVERSE (FRAME
MATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT
Mu at Support FACTORED LOADS Mu at Sup
34.558 kN-m Live Load, MLL 76.230 kN
52.173 kN-m Dead Load, MDL 97.304 kN
332.570 kN-m Seismic Load, ME 332.570 k
379.526 kN-m Mu = 0.9MDL + 1.0ME 420.144 k
429.736 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 525.565 k
429.736 kN-m Mu-max 525.565 k
MATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Mid
29.442 kN-m Live Load, MLL 54.567 kN
32.741 kN-m Dead Load, MDL 57.892 kN
0.000 kN-m Seismic Load, ME 0.000 kN
29.467 kN-m Mu = 0.9MDL + 1.0ME 52.103 kN
68.731 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 124.037 k
86.396 kN-m Mu = 1.2MDL + 1.6MLL 156.778 k
86.396 kN-m Mu-max 156.778 k
DESIGN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEAR
30.492 kN Live Load, VLL 62.370 k
49.404 kN Dead Load, VDL 87.481 k
47.510 kN Seismic Load, VE 47.510 k
115.637 kN Vu = 1.2VDL + 1.6VLL 214.814
137.287 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 214.857
137.287 kN Vu-max 214.814
UNIFORM LOAD UNIFORM LOAD
8.400 kN Live Load, WLL 16.800 k
14.372 kN Dead Load, WDL 25.424 k
30.686 kN Wu = 1.2VDL + 1.6VLL 57.389 k
30.686 kN Wu 57.389 k

OR LTRANSVERSE (FRAME 3) 3RD FLOOR TRANSVERSE (FRAME

MATE MOMENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT


Mu at Support FACTORED LOADS Mu at Sup
57.173 kN-m Live Load, MLL 51.836 kN
83.552 kN-m Dead Load, MDL 120.146 k
332.570 kN-m Seismic Load, ME 332.570 k
407.767 kN-m Mu = 0.9MDL + 1.0ME 440.701 k
490.005 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 528.581 k
490.005 kN-m Mu-max 528.581 k
MATE MOMENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Mid
54.567 kN-m Live Load, MLL 58.884 kN
61.944 kN-m Dead Load, MDL 89.013 kN
0.000 kN-m Seismic Load, ME 0.000 kN
55.750 kN-m Mu = 0.9MDL + 1.0ME 80.112 kN
128.900 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 165.700 k
161.640 kN-m Mu = 1.2MDL + 1.6MLL 201.030 k
161.640 kN-m Mu-max 201.030 k
DESIGN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEAR
58.658 kN Live Load, VLL 55.902 k
84.747 kN Dead Load, VDL 128.094
47.510 kN Seismic Load, VE 47.510 k
205.985 kN Vu = 1.2VDL + 1.6VLL 272.033
207.864 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 257.125
207.864 kN Vu-max 272.033
UNIFORM LOAD UNIFORM LOAD
16.800 kN Live Load, WLL 16.800 k
25.424 kN Dead Load, WDL 39.224 k
57.389 kN Wu = 1.2VDL + 1.6VLL 73.949 k
57.389 kN Wu 73.949 k

OR LTRANSVERSE (FRAME 5)

MATE MOMENT AT SUPPORT


Mu at Support
34.558 kN-m
90.027 kN-m
332.570 kN-m
413.594 kN-m
475.160 kN-m
475.160 kN-m
MATE MOMENT AT MIDSPAN
Mu at Midspan
29.442 kN-m
63.898 kN-m
0.000 kN-m
57.508 kN-m
106.120 kN-m
123.785 kN-m
123.785 kN-m
DESIGN SHEAR
SHEAR
30.492 kN
93.114 kN
47.510 kN
185.573 kN
189.739 kN
189.739 kN
UNIFORM LOAD
8.400 kN
28.164 kN
47.237 kN
47.237 kN
NSVERSE (FRAME 2) 2ND FLOOR TRANSVERSE (FRAME 1)
MENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT
Mu at Support FACTORED LOADS Mu at Support
76.230 kN-m Live Load, MLL 34.558 kN-m
97.304 kN-m Dead Load, MDL 102.235 kN-m
332.570 kN-m Seismic Load, ME 472.410 kN-m
420.144 kN-m Mu = 0.9MDL + 1.0ME 564.422 kN-m
525.565 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 629.650 kN-m
525.565 kN-m Mu-max 629.650 kN-m
MENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Midspan
54.567 kN-m Live Load, MLL 29.442 kN-m
57.892 kN-m Dead Load, MDL 64.163 kN-m
0.000 kN-m Seismic Load, ME 0.000 kN-m
52.103 kN-m Mu = 0.9MDL + 1.0ME 57.747 kN-m
124.037 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 106.438 kN-m
156.778 kN-m Mu = 1.2MDL + 1.6MLL 124.103 kN-m
156.778 kN-m Mu-max 124.103 kN-m
GN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEAR
62.370 kN Live Load, VLL 30.492 kN
87.481 kN Dead Load, VDL 96.814 kN
47.510 kN Seismic Load, VE 67.490 kN
214.814 kN Vu = 1.2VDL + 1.6VLL 191.493 kN
214.857 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 214.159 kN
214.814 kN Vu-max 214.159 kN
ORM LOAD UNIFORM LOAD
16.800 kN Live Load, WLL 8.400 kN
25.424 kN Dead Load, WDL 28.164 kN
57.389 kN Wu = 1.2VDL + 1.6VLL 47.237 kN
57.389 kN Wu 47.237 kN

NSVERSE (FRAME 4) 2ND FLOOR TRANSVERSE (FRAME 3)

MENT AT SUPPORT ULTIMATE MOMENT AT SUPPORT


Mu at Support FACTORED LOADS Mu at Support
51.836 kN-m Live Load, MLL 57.173 kN-m
120.146 kN-m Dead Load, MDL 97.304 kN-m
332.570 kN-m Seismic Load, ME 472.410 kN-m
440.701 kN-m Mu = 0.9MDL + 1.0ME 559.984 kN-m
528.581 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 646.348 kN-m
528.581 kN-m Mu-max 646.348 kN-m
MENT AT MIDSPAN ULTIMATE MOMENT AT MIDSPAN
Mu at Midspan FACTORED LOADS Mu at Midspan
58.884 kN-m Live Load, MLL 54.567 kN-m
89.013 kN-m Dead Load, MDL 57.892 kN-m
0.000 kN-m Seismic Load, ME 0.000 kN-m
80.112 kN-m Mu = 0.9MDL + 1.0ME 52.103 kN-m
165.700 kN-m Mu = 1.2MDL + 1.0MLL + 1.0ME 124.037 kN-m
201.030 kN-m Mu = 1.2MDL + 1.6MLL 156.778 kN-m
201.030 kN-m Mu-max 156.778 kN-m
GN SHEAR DESIGN SHEAR
SHEAR FACTORED LOADS SHEAR
55.902 kN Live Load, VLL 58.658 kN
128.094 kN Dead Load, VDL 87.481 kN
47.510 kN Seismic Load, VE 67.490 kN
272.033 kN Vu = 1.2VDL + 1.6VLL 210.359 kN
257.125 kN Vu = 1.2VDL + 1.0VLL + 1.0VE 231.125 kN
272.033 kN Vu-max 231.125 kN
ORM LOAD UNIFORM LOAD
16.800 kN Live Load, WLL 16.800 kN
39.224 kN Dead Load, WDL 25.424 kN
73.949 kN Wu = 1.2VDL + 1.6VLL 57.389 kN
73.949 kN Wu 57.389 kN

2ND FLOOR TRANSVERSE (FRAME 5)

ULTIMATE MOMENT AT SUPPORT


FACTORED LOADS Mu at Support
Live Load, MLL 34.558 kN-m
Dead Load, MDL 108.911 kN-m
Seismic Load, ME 472.410 kN-m
Mu = 0.9MDL + 1.0ME 570.430 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 637.661 kN-m
Mu-max 637.661 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 29.442 kN-m
Dead Load, MDL 64.321 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 57.889 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 106.627 kN-m
Mu = 1.2MDL + 1.6MLL 124.292 kN-m
Mu-max 124.292 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 30.492 kN
Dead Load, VDL 97.493 kN
Seismic Load, VE 67.49 kN
Vu = 1.2VDL + 1.6VLL 192.579 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 214.97 kN
Vu-max 214.974 kN
UNIFORM LOAD
Live Load, WLL 8.400 kN
Dead Load, WDL 28.164 kN
Wu = 1.2VDL + 1.6VLL 47.237 kN
Wu 47.237 kN
2ND FLOOR TRANSVERSE (FRAME 2)
ULTIMATE MOMENT AT SUPPORT
FACTORED LOADS Mu at Support
Live Load, MLL 76.230 kN-m
Dead Load, MDL 125.395 kN-m
Seismic Load, ME 472.410 kN-m
Mu = 0.9MDL + 1.0ME 585.266 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 699.114 kN-m
Mu-max 699.114 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 54.567 kN-m
Dead Load, MDL 97.729 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 87.956 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 171.842 kN-m
Mu = 1.2MDL + 1.6MLL 204.582 kN-m
Mu-max 204.582 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 62.370 kN
Dead Load, VDL 131.396 kN
Seismic Load, VE 67.490 kN
Vu = 1.2VDL + 1.6VLL 285.078 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 287.535 kN
Vu-max 287.535 kN
UNIFORM LOAD
Live Load, WLL 16.800 kN
Dead Load, WDL 39.224 kN
Wu = 1.2VDL + 1.6VLL 73.949 kN
Wu 73.949 kN

2ND FLOOR TRANSVERSE (FRAME 4)

ULTIMATE MOMENT AT SUPPORT


FACTORED LOADS Mu at Support
Live Load, MLL 51.836 kN-m
Dead Load, MDL 52.141 kN-m
Seismic Load, ME 472.410 kN-m
Mu = 0.9MDL + 1.0ME 519.337 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 586.815 kN-m
Mu-max 586.815 kN-m
ULTIMATE MOMENT AT MIDSPAN
FACTORED LOADS Mu at Midspan
Live Load, MLL 58.884 kN-m
Dead Load, MDL 32.724 kN-m
Seismic Load, ME 0.000 kN-m
Mu = 0.9MDL + 1.0ME 29.452 kN-m
Mu = 1.2MDL + 1.0MLL + 1.0ME 98.153 kN-m
Mu = 1.2MDL + 1.6MLL 133.483 kN-m
Mu-max 133.483 kN-m
DESIGN SHEAR
FACTORED LOADS SHEAR
Live Load, VLL 55.902 kN
Dead Load, VDL 49.376 kN
Seismic Load, VE 67.490 kN
Vu = 1.2VDL + 1.6VLL 146.084 kN
Vu = 1.2VDL + 1.0VLL + 1.0VE 182.643 kN
Vu-max 182.643 kN
UNIFORM LOAD
Live Load, WLL 16.800 kN
Dead Load, WDL 14.364 kN
Wu = 1.2VDL + 1.6VLL 44.117 kN
Wu 44.117 kN