DESIGN OF AN EXTENDED AERATION TREATMENT PLANT 2300 P.E.

CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS TANAH KERAJAAN


SELUAS 30.0EKAR, MUKIM PEDAH, DAERAH JERANTUT, PAHANG DARUL MAKMUR
UNTUK TETUAN DOYENVEST (M) SDN BHD

BASIC DATA:
This is an outline design to produce 10:20 BOD5:SS effluent.

Population, PE = 2300 P.E


Dry Weather Flow, DWF = 0.225 m3/c/d

Suspended Solid, SS = 300 mg/l


BOD5, BOD = 250 mg/l
Influent Ammonia NH3-N = 30 mg/l

Effluent BOD5, EBOD = 10 mg/l


Effluent SS ESS = 20 mg/l
Effluent Ammonia ENH3-N = 10 mg/l

LOADING

a. Hydraulic flow, Qavg = PE * DWF


= 517.50 m3/d

b. Peak Flow, Qpeak = Peak Factor * Qavg

-0.11
Peak Flow Factor Pff = 4.7(P)
= 4.29

Therefore, Qpeak = Pff x Qavg


= 2219.31 m3/d
= 1.54 m3/min

c. Suspended Solids Loading Rate = Qavg * SS


= 155.25 kg/d

d. BOD5 Loading Rate = Qavg * BOD


= 129.38 kg/d

e. NH3-N Loading Rate = Qavg * NH3-N


15.53 kg/d
PRIMARY BAR SCREEN DESIGN

Design Population, PE 2300


Design Flow, Qavg 517.50 m3/day 0.0060 l/s
Peaking Factor, PF 4.29
Peak Flow, Qpeak 2219.31 m3/day 25.81 l/s

Guidelines : Quantity of screenings = 30 m3 screening / 10^6 m3 wastewater

Number of Channels = 1
Number of Back-up Channel = 1

Qavg = 517.50 m3/day

Quantity of Screenings = Qavg x 30 / 1000000


= 0.0155 m3/day

Provide storage for 7 days

Quantity of Screenings = 7 x Quantity of Screenings per day


= 0.109 m3

Number of Storage Units = 1


Quantity per Unit = 0.109 m3

Dimension of screenings trough


L = 0.50 m
W = 0.30 m
D = 0.30 m
Volume = 0.045 m3 > 0.109 m3 error

Screen Design

Guidelines: Max flow through velocity at Qpeak Vmax = 1.0 m/ses


Guidelines: Min approach velocity at Qpeak Vmin = 0.3 m/sec

Bar Size Bs = 10 mm
Clear Opening Co = 25 mm

Efficiency Coefficient Eff = Clear Opening


Clear Opening + Bar size

= 0.71

Clear area through each screen at Qpe AQpeak = Qpeak


Vmax x 24 x 60 x 60

= 0.026 m2

Total cross sectional area of channel AC = AQpeak


Eff

= 0.036 m2

Assume, Depth of Flow at Qpeak D = 0.050 m


.

Required Width of Clear Opening @ Q Wclr = AC / D

= 0.72 m

Number of Openings No = Wclr x 1000


Co

= 29
Number of Bars Nbars = No - 1
= 28

Gross Width of Screen Wch = Wclr + (Nbars x Bs / 1000)

= 1.00 m

Set Wch = 0.50 m

Check velocities

Qpeak = 2219.31 m3/day 0.02569 m3/sec

Velocity of approach Vapp = Qpeak / (Wch x D)


= 1.03 m/sec >= 0.30 m/sec ok

Velocity through screen Vscr = Qpeak / (Wclr x D)


= 0.71 m/sec <= 1.00 m/sec ok

Hydraulic Profile Through Screen

Headloss Through Clean Screen

Formula: HLc = .0729 (V^2 - v^2)

where HLc = ? Clean screen max headloss (m)


V = 0.71 Velocity through screen (m/s)
v = 1.03 Approach velocity (m/s)

Therefore HLc = -0.04 m

Elevation of Channel Invert = 76.75 m

Upstream Water Elevation = 76.76 m

Downstream Water Elevation = 76.80 m

Headloss Through Half Clogged Screen

Assume velocity through screen is doubled

Formula: HLc = .0729 (V^2 - v^2)

where HLc = ? Clogged screen max headloss (m)


V = 1.429 Velocity through screen (m/s)
v = 1.03 Approach velocity (m/s)

Therefore HLc = 0.07 m

Elevation of Channel Invert = 76.75 m

Upstream Water Elevation = 76.87 m

Downstream Water Elevation = 76.80 m


PUMP SUMP DESIGN

Influent at Qpeak Influent = 2219.31 m3/day or 25.69 l/s

Influent at Qavg Influent = 517.50 m3/day or 5.99 l/s

Dimension of pump station L = 1.80 m


W = 1.50 m
Depth between start and stop D = 0.65 m
Chamfer volume v = 1/2 x ( 2.05 x 0.2 x 0.4 )
= 0.072 m3
Therefore effective volume to fill /drain
V = LxWxD-v
= 1.68 m3

Pumping rate @ Qpeak P = 26.00 l/s >= 25.69 l/s ok

Pump cycle time at Qavg


Guideline: 6 min, 15 max @ Qavg

Volume required for pump sump, V = T x q


4

Assume number of start / stop = 15 times per hr (required 6 - 15 start/hour)

where V = ? Required Volume (m3)


T = 4.0 Cycle Time (minute)
q = 26.00 Pumping Rate (L/sec)
= 1.56 Pumping Rate (m3/min)

Therefore, V = 1.56 m3 < 1.68 m3 ok

Pump Headloss Calculations

VALVES & FITTINGS K QUANTITY DISCHARGE


VALUE TOTAL

EXIT 1.00 1 1.00


CHECK VALVE 2.50 1 2.50
GATE VALVE 0.20 1 0.20
TEE THRU SIDE 1.80 1 1.80
ELBOW - 90 DEG 0.30 6 1.80

SUM OF K's FOR FITTINGS 7.30

PIPE DIAMETER 0.20 m

PUMPING RATE 26.00 L/sec

V = VELOCITY 0.83 m/sec

F = TOTAL FITTING HEAD LOSS 0.25 m


= (K x V2 / 2g)

L = LINEAR METER OF STRAIGHT PIPE 8.00 m

C = HAZEN-WILLIAMS ROUGHNESS COEFFICIENT 100.00

P = HEAD LOSS USING HAZEN-WILLIAMS EQATION 0.05 m

TOTAL LOSS = F + P 0.30 m

S = STATIC HEAD LOSS (Worst Case Scenerio) 79.60 - 76.00 m


3.45

TOTAL DYNAMIC HEAD 3.75 m


Size pump for 26.00 L/sec @ 3.75 m TDH

The submersible pump selected is as follows:-


Make = TSURUMI
Model = 100B42.2
Capacity = 18.20 L/sec
Total Head = 6.20 m
Power = 2.20 kW
Discharge Size = 100 mm
No. of Units = 2 (1 duty; 1 standby)

CHANNEL INVERT EL 76.75


0.0 m
HIGH LEVEL ALARM EL 76.75
0.15 m
STANDBY PUMP CUT IN EL 76.60
0.15 m
DUTY PUMP CUT IN EL 76.45
0.65 m
ALL PUMPS CUT OFF EL 75.80
0.4 m
INVERT ELEVATION EL 75.40

Pump cycle time at Qpeak


Guideline: 6 min, 15 max @ Qavg

Time to fill sump = V


Qpeak
= 1.09 min

Time to empty sump = V


Qpump - Qpeak
= -3.75 min

Cycle time base on actual operating point = 60 min per hour


Time fill + Time empty min per cycle
= -22.6 cycle per hour 6 - 15 cycle / hr error

Determine Size of Force Main


Guideline: 1 - 2.5m/s velocity in pipe

Required size of raw sewage pipe = [ 4 x Qraw / (2.5 m/s x 3.14] 1/2

= [ 4 x 0.0182 / (2.5 m/s x 3.14] 1/2

= 0.115 m

= 100 mm > 115 mm error

Actual velocity in selected pipe = Qpump / cross section area of pipe


2.32 m/s < 2.5 m/s ok
Determine Total Dynamic Head ( TDH )

TDH = hst + hf + hm

Where ; hst = Static head (m) …………A


hf = Losses through the pipe ( Hazen - William Formula ) …………B
hm = Losses through fittings …………C

A Thus, static head of pump, hst = 79.60 - 76.00 m


= 3.45 m

B Hazen - William Formula


hf = 6.82 V 1.85 x L
C D1.167

Where ; V = Velocity m/sec

V = Q/A = 11.50 L/sec


1000 x 3.142 x 0.10 2 / 4

= 0.83 m/sec

C = Coefficient of roughnes = 100.00

L = Length of pipe, m = 8.00 m

D = Diameter of pipe, m = 0.20 m

Thus, losses through the pipe, hf = 0.050 m

C Losses through fittings

hm = KV²
2g

Where ; K = Head loss coefficeint 7.30

V = Velocity m/sec 0.83

G = Gravity, m/s² 9.81

hm = 0.25 m

Therefore ,

Total Dynamic Head ( TDH ) = hst + hf + hm


= 3.76 m

To plot chart for the System Curve & Pump Curve from the above equitition:-

Pump head
Q (L/s) V (m/s) hst (m) hf (m) hm (m) TDH (m)
(m)

0 0.00 3.45 0.000 0.000 3.45 16.0


3.33 0.11 3.45 0.001 0.004 3.46 14.0
6.67 0.21 3.45 0.004 0.017 3.47 12.6
10.00 0.32 3.45 0.009 0.038 3.50 10.8
13.33 0.42 3.45 0.015 0.067 3.53 9.0
16.67 0.53 3.45 0.022 0.105 3.58 7.0
20.00 0.64 3.45 0.031 0.151 3.63 5.2
23.00 0.73 3.45 0.040 0.199 3.69 3

* refer to Chart attached


INFLUENT RAW SEWAGE PUMP
(TSURUMI MODEL 100 B42.2)
20.00

System Curve

15.00
Head (m)

Pump Operating Point


10.00 18.2L/sec @ 5.5 m TDH

5.00

Pump Curve

0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30

Flowrate, Q (L/sec)
FINE SCREEN DESIGN
Parameters
Population PE = 2,300

Peak Flow Qpeak = 2219.31 m3/day


= 0.03 m3/sec

Design Flow Qavg = 517.50 m3/day


= 0.01 m3/sec

Guidelines: Max flow through velocity at Qpeak Vmax = 1.00 m/sec

Guidelines: Min approach velocity at Qpeak Vmin = 1.00 m/sec

Set Elevation of Datum Hd = 0.00 m

Design

Bar Size Bs = 10.00 mm


Clear Opening Co = 12.00 mm

Efficiency Coefficient Eff = Clear Opening


Clear Opening + Bar size

= 0.55

Clear area through each screen at Qpeak, AQpeak = Qpeak


Vmax

= 0.0257 m2

Total cross sectional area of channel required = AQpeak


Eff

= 0.05 m2

Assume Depth of Flow D = 0.055 m ----- 1

Width of Clear Openings Wclr = AQpeak / D

= 0.47 m

Number of Openings No = Wclr x 1000


Co

= 39

Number of Bars Nbars = No - 1


= 38

Width of Frame Wfr = 0.10 m

Gross Width of Screen W = Wclr + Wfr + (Nbars x Bs / 1000)


= 0.95 m

Set width of screen W = 0.50 m

Determine Width of Downstream Throat

Total Peak Flow, Qpeak = 1.71 B (H^1.5)

Qpeak = 0.026 m3/s

Set depth of flow H = 0.055 m from - - 1

Determine width of throat B = ? m

Therefore B = Qpeak / 1.71 / (H^1.5)


= 1.16 m

= Throat width of grit chamber


OK
Energy equation between upstream and downstream of clean screen

Velocity at Qpeak through clear openings of screen, Vs

Vs = Qpeak
Wclr x d1

= 0.65 m/sec

Headloss through clean screen hLs = (Vs^2 - v1^2) / 2g x 1/0.7


= 0.0039 m

X2 E2
= + d2 + (v2^2 /2g)
X3 = E3 + d3 + (v3^2 /2g) + hLs

X2 = X3

Where,
E2 = 0.000 m Height above datum
Trial and Error d1 = 0.09 m Upstream Depth
v1 = 0.60 m/sec Upstream Velocity
E3 = 0.000 m Height above datum
d2 = 0.055 m Downstream Depth @ Qpeak
v2 = 0.93 m/sec Channel Velocity

Therefore, X2 = 0.10
X3 = 0.10 ok

0.000

Elevation of Channel Invert = 79.00 m

Upstream Water Elevation = 79.09 m

Downstream Water Elevation = 79.06 m

Energy equation between upstream and downstream of 50% clogged screen

Headloss through clogged screen hLcs = (Vcs^2 - v2^2) / 2g x 1/0.7

Velocity through clogged screen Vcs = Qpeak


(Assume 50% clogging) Wclr x 0.5 x Upstream Depth d"

= 0.92 m/sec

hLcs = 0.05
Therefore,
X2 = 2 + d" + (v"^2 /2g)
E
X3 = E3 + d3 + (v3^2 /2g) + hLcs

X2 = X3

Where,
E2 = 0.00 m Height above datum
Trial and Error d" = 0.120 m Upstream Depth
v" = 0.43 m/sec Upstream Velocity
E3 = 0.00 m Height above datum
d3 = 0.055 m Downstream Depth @ Qpeak
v3 = 0.93 m/sec Channel Velocity

Check:
X2 = 0.13
X3 = 0.15 ok

-0.018

Elevation of Channel Invert = 79.00 m

Upstream Water Elevation = 79.12 m

Downstream Water Elevation = 79.06 m


DESIGN OF A CONSTANT VELOCITY GRIT CHANNEL

Guidelines = 0.2 m/s flow through velocity

Number of Channels Provided = 1


Number of Back-up Channels Provided = 1

Constant Velocity Channel Formula

Q = 1.71 B (H1.5)

Q = Flow m3/s
B = Width of Throat m
H = Depth of Flow m

Therefore, = ( Q / 1.71 / B )^0.67

Area of Parabola, A = 2/3 W H


W = Width of Parabola m
H = Depth of Flow m
Assume:
V = 0.2 m/s (Per guidelines)

Q = A x V
= 2/3 W H x V

Therefore W = 1.5 Q
H x V

Assume: B = 0.33 m
Qavg per Channel = 517.50 m3/day 0.0060 m3/s

Q AT DIFFERENT
FLOW FACTOR FACTOR Depth Width
( x QAVG) m3/sec H(m) W(m)

0.10 0.001 0.01 0.43


0.25 0.001 0.02 0.58
0.50 0.003 0.03 0.73
1.00 0.006 0.05 0.92 @ Qavg
2.00 0.012 0.08 1.16
3.00 0.018 0.10 1.33
4.00 0.024 0.12 1.46
4.29 0.026 0.13 1.50 @ Qpeak
5.00 0.030 0.14 1.57
6.00 0.036 0.16 1.67
7.00 0.042 0.18 1.76

Determine Length of Channel

Say settlement vel of particle Vs = 0.02 m/s

Say velocity of flow V = 0.2 m/s

Depth of channel at peak flow, H = 0.13 m


Width of channel, W = 1.50 m

Length of Channel L = V x H
Vs

L = 1.29 m

Provided Length L = 3.00 m

Surface Area of Channel SA = 4.49 m2

Surface Overflow Rate SR = Qpeak / SA


= 494.50 m3/m2/day < 1500 m3/m2/day
Quantity of grit

Guidelines = 0.03 m3 / 1000 m3 of wastewater

Grit Quantity per Channel = Qavg x 0.03/1000


= 0.016 m3/day

Provide area for 30 days storage


Grit quantity = 0.47 m3

Dimension of hopper at bottom of grit channel


L : W ration 2:1 as per guidelines
L = 3.00 m
W = 0.50 m
D = 0.15 m
Volume = 0.225 >= 0.466 ok

1500 mm

700 mm

50 mm

450 mm

1000 mm

Check ratio of grit tank dimension

Ratio W: D = 1 : 2 W D
2.00 1

Ratio W: L = 1 : 2 W L
1 2

Hydraulic Retension Time, Tr

Guidelines = 3 min @ Qpeak < 5,000 pe

Area of retangular = 1.05 m2


Area of trapezium = 0.06 m2
Area of grit storage = 0.45 m2

Total Area = 1.56 m2


L = 3.00 m

Volume, V = 4.69 m3

Qpeak = 2219.31 m3/day


= 1.54 m3/min

Tr = V / Qpeak
= 3.04 min >= 3 min ok
X-Axis Y-Axis
-0.837 0.161
-0.787 0.143
-0.748 0.129
-0.731 0.123
-0.664 0.101
-0.580 0.077
-0.460 0.049
-0.365 0.031
-0.290 0.019
-0.214 0.011
0 0
0.214 0.011
0.290 0.019
0.365 0.031
0.460 0.049
0.580 0.077
0.664 0.101
0.731 0.123
0.748 0.129
0.787 0.143
0.837 0.161

CONSTANT VELOCITY FLOW


X - SECTION
0.7

0.6
)
0.7

0.6

Depth (m)
0.5

0.4

0.3

0.2

0.1

0 GRIT STORAG

-0.1
-0.5 -0.4 -0.3 -0.2 -0.1 0 0.1
Width (m)
Width Depth
X - Axis Y - Axis
0.427 0.011
0.580 0.019
0.731 0.031
0.921 0.049
1.160 0.077
1.328 0.101
1.462 0.123
1.496 0.129
1.575 0.143
1.673 0.161

CITY FLOW CHANNEL


GRIT STORAGE

0 0.1 0.2 0.3 0.4 0.5


Width (m)
CONSTANT VELOCITY FLOW CHANNEL
X - SECTION
1.250

1.150

1.050

0.950
Depth (m)

0.850

0.750

0.650

0.550

0.450

0.350

0.250

0.150

0.050

-0.050
GRIT
STORAGE
-0.150
-0.650 -0.450 -0.250 -0.050Width (m)
Channel 0.150 0.350 0.550
DESIGN OF A GRIT / GREASE CHAMBER
Guidelines : Detension time T = 360 sec @ Qpeak

Number of Channels Provided = 1


Number of Back-up Channels Provided = 1

Peak Flow Qpeak = 2219.31 m3/day


= 0.026 m3/sec

Detension Time T = 6 min


= 360 sec

Volume Required V = Qpeak x T


= 9.25 m3

Provide:
Length L = 2.90 m
Width W = 1.60 m
Depth D = 0.85 m

Volume Provided V = 3.94 m3 > 9.25 m3 error

Ratio L:W = 1.81 : 1.0


W:D = 1.88 : 1.0 ok

Determine Length of Channel

Provided Length L = 2.90 m


Width of channel, W = 1.60 m
Surface Area of Channel SA = 4.64 m2

Surface Overflow Rate SR = Qpeak / SA


= 478.30 m3/m2/day
< 1500 m3/m2/day ok

Quantity of grit

Guidelines = 0.03 m3 / 1000 m3 of wastewater

Grit Quantity = Qavg x 0.03/1000


= 0.016 m3/day

Allow for storage of 30 days = 0.47 m3

Quantity of grease

Average quantity of grease S = 8 kg / 1000 m3


Specific gravity of grease sg = 0.95

Therefore quantity of grease Qs = Qavg x S


= 4.14 kg/day

Flowrate of Grease Fs = Qs / 1000 / sg


= 0.0044 m3/day

Allow for storage of 30 days Vs = 30 x Fs


= 0.131 m3

Grit/Grease Drying Bed Sizing

Accumulated grease for 30 days Vs = 0.131 m3


Accumulated grit for 30 days = 0.466 m3

Depth of Feed D = 0.25 m

Therefore, Area required A1 = 2.39 m2 Grease

Dimension of Grit/Grease Drying Bed

Length = 1.50 m
Width = 0.75 m
Area = 1.13 m2 > 2.39 m2 error
DESIGN OF A GREASE CHAMBER

Guidelines : Detension time T = 180 sec @ Qpeak

Number of Chamber Provided = 1


Number of Back-up Chamber Provided = 1

Peak Flow Qpeak = 2219.31 m3/day


= 0.026 m3/sec

Detension Time T = 180 sec

Volume Required V = Qpeak x T


= 4.62 m3

Provide:
Length L = 3.80 m
Width W = 1.20 m
Depth D = 1.10 m

Volume Provided V = 5.02 m3 > 4.62 m3 ok

Grease Quantities

Average quantity of grease S = 8 kg / 1000 m3


Specific gravity of grease sg = 0.95

Therefore quantity of grease Qs = Qavg x S


= 4.14 kg/day

Flowrate of Grease Fs = Qs / 1000 / sg


= 0.0044 m3/day

Allow for storage of 30 days Vs = 30 x Fs


= 0.13 m3

Depth of grease baffle required to contain scum for 30 days


Length L = 3.80 m
Width W = 1.20 m
Depth of water below baffle D = 0.02 m

Volume of grease storage provide V = 0.09 m3 > 0.13 m3 ok


WEIR BEFORE AERATION BASINS not use

Design Population, PE 2300


Design Flow, Qavg 517.50 m3/day 0.01 m3/sec
Peaking Factor, PF 4.29
Peak Flow, Qpeak 2219.31 m3/day 0.03 m3/sec

Number of Aeration Basins, N = 1

Peak Flow to Each Aeration Basin = Qpeak / N


= 0.026 m3/sec

Formula Q(m3/sec) = Cw x Le x H^1.5

where Cw = 1.84 Weir Coefficient


Le = 0.3704 m Length
H = 0.148 m Height

With end contraction


Le = L - (0.1)nH

where L = 0.40 m Length


n = 2 Number of side contractions
H = 0.148 m Height of Flow

Therefore Le = 0.3704 m

Therefore Q = 0.039 m3/sec >= 0.026 m3/sec ok

Height of water above weir = 102 mm Qpeak if both tanks open

Height of weir = 170 mm Qpeak if one tank open

Therefore, size opening for 400mm x 250 mm H = 272 mm

RECTANGULAR WEIR AT OUTLET BOX


Design Population, PE 2300
Design Flow, Qavg 517.50 m3/day 0.01 m3/sec
Peaking Factor, PF 4.29
Peak Flow, Qpeak 2219.31 m3/day 0.03 m3/sec

Formula Q(m3/sec) = Cw x Le x H^1.5

where Cw = 1.84 Weir Coefficient


Le = 0.578 m Length
H = 0.11 m Height

With end contraction


Le = L - (0.1)nH

where L = 0.60 m Length


n = 2 Number of side contractions
H = 0.110 m Height of Flow

Therefore Le = 0.578 m

Therefore Q = 0.039 m3/sec >= 0.026 m3/sec ok

Height of water above weir = 110 mm @ Qpeak


90 DEG V-NOTCH WEIR AT OUTLET BOX

Design Population, PE 2000


Design Flow, Qavg 450.00 m3/day
Peaking Factor, PF 4.35
Peak Flow, Qpeak 1959.73 m3/day 0.023 m3/sec

90 deg V-Notch Weir Formula


5/2
q (m3/sec) = 1.417 H

H (m) = 192 mm or 0.192 m at Qpeak

Therefore, q = 0.023 m3/sec >= 0.023 m3/sec ok

Set depth of weir @ 250mm ok


DESIGN OF ANOXIC CHAMBER
Population PE = 2300

Peak Flow Qpeak = 2,219.31 m3/day


= 92.47 m3/hr
= 1.54 m3/min
= 0.026 m3/s
= 25.69 l/s

Design Flow Qavg = 517.50 m3/day


= 21.56 m3/hr
= 0.36 m3/min
= 0.01 m3/s
= 5.99 l/s

Peaking Factor PF = 4.29

Using the Lodification Ludzack-Ettinger Process

Assume

Influent Ammonia-N Ni = 30 mg/l


Effluent Ammonia-N Ne = 10 mg/l
Mixed liquor Suspended Solids MLSS = 3600 mg/l
Mixed Liquor Volatile Suspended Solids MLVSS = 2880 mg/l (MVLSS = 0.8 x MLSS
Temperature Temp = 28 deg C
Dissolved Oxigen Do = 0.1 mg/l
Specific Denitrification Rate U = 0.11 per day
Overall Denitrification rate Ua = ? per day
Residence Time Temp = ? hrs

Calculation Overall Denitrification Rate

Formula : Ua = U x 1.09(Temp-20)X(1-DO)
0.20 per day

Calculation Residence Time

Formula : T = Ni - Ne
Ua x MLVSS x 24 hrs/day

= 0.81 hrs required

Size anoxic zone for a residence time of Anox = 2 hrs

Determine size of anoxic tank

Anoxic zone volume required, Vol = Anox x Qavg


24

= 43.13 m3

Number of Anoxic Tank, N = 2 nos

Volume required per Tank, Vreq = 21.56 m3

Tank Dimension
Length = 2.30 m
Width = 1.50 m
Depth = 4.50 m
=
Anoxic tank volume = 31.05 m3 > 21.56 m3 ok

Actual hydraulic retention time provided = Anoxic tank volume


Qavg
= 2.88 hrs
EXTENDED AERATION TANK DESIGN
Sizing

Number of Aeration Tank, No. = 2

Minimum Hydraulic Retention Time, HRT = 19.4 hours

Volume Required, V = 418.31 m3

Volume Required Per Tank, Vol = 209.16 m3

Dimension of each tank: Ratio


Area A = 46.48 m2 L : W
Length L = 10.60 m 10.60 : 4.40
Width W = 4.40 m 2.41 : 1
Depth D = 4.50 m
Freeboard FB = 0.65 m
Volume Vol = 209.88 m3

Total Volume Provided Vp = 419.76 m3 > 418.31 m3

Therefore, HRT Provided = 19.47 hrs > 19.4 hrs ok

Sludge Age (MCRT)

Guidelines > 20 days


Assume, MLSS = 3600 mg/l

SA = Total solids in aeration tank


Excess sludge wasting / day + Solids in effluent

Total solids in aeration tank = MLSS x Vp / 1000


= 1511.14 kg

Solids in effluent = 10 mg/l


= 5.18 kg/day

Sludge Yield, = 0.40 @ 24 hours HRT


= 0.60 @ 18 hours HRT

Determine Sy @ Actual HRT


Via Interpolation Therefore actua = (24 -21.9) x (0.6 - 0.4) + 0.4
(24 - 18)

Sy = 0.55 kg / kg BOD removed based on HRT interpolation

Excess sludge wasting / day Sd = QAVG x Sy (BOD5-EBOD5)


(Sludge accumulation per day) = 68.45 kg/day

SA = 20.53 days ok

Waste Activated Sludge (WAS)

Excess Sludge Wasting / day WAS = 68.45 kg/day

Assume underflow concentration = 1% or 10,000 mg/l or 10 kg/m3

Volume of WAS = 6.84 m3/day


= 6844.61 l/day
Return Activated Sludge Flow (RAS)

QRAS = MLSS x QAVG


Cu - MLSS

Cu = Underflow concentration assume at 0.8 % solid or 8,000 mg/l

QRAS = 423.41 m3/day 4.92 l/s

Set QRAS = 465.75 m3/day 5.42 l/s

Qavg = 517.50 m3/day

Ratio of QRAS : QAVG = 0.90 ok

Oxygen Requirements

Oxygen required per kg of BOD5 re OR = 2.00 kg O2 / kg BOD5

Actual Oxygen Required AOR = OR x BOD5 removed


= 248.40 kg/day

Maintain DO of 2 mg/l in aeration tank


QAVG = 517.50 m3/day
Total = 517.50 m3/day

Oxygen required in tank = Total x 2 / 1000


= 1.04 kg/day

Total AOR = 249.44 kg/day

Oxygen correction factor AOR/SOR

AOR/SOR = (((BETA * ACF * Csf @ 28 deg) - C ) / Css ) * ALPHA * 1.024^T-20

Where BETA = 0.98


ACF = 0.989
Csf = 7.83
C = 1.5
Css = 9.08
Alpha = 0.75
T = 30

Therefore AOR/SOR = 0.64

Standard Oxygen Required SOR = 391.23 kg/day

O2 transfer efficiency O2eff = 20 % @ 6 m3/hr (See catalog)

Actual O2 transfer efficiency O2act = SOR kg/day


O2eff/100 x 1.201 kg/m3 x 0.232 kg O2/kg air x 1440 min/day
Total amount of air required
= 4.88 m3/min

Number of diffusers required

Flowrate per diffuser = 0.10 m3/min or 6 m3/hr


= 100.00 L/min

Quantity = Total air required / Flowrate

= 48.75 Use 52 ok

Number of diffusers per tank = 26 Nos in each Aeration tank


Check F/M Ratio

Guidelines for F/M ratio is between 0.05 to 0.10 kg BOD / kg MLSS

Influent BOD5, = 250 mg/l


= 129.38 kg/day

MLSS = 3600 mg/l

Volume provided, Vp = 419.76 m3

F/M Ratio = INBOD / (MLSS x Vp)


= 0.086 ok

Check Aeration Loading

Guidelines : 0.1 - 0.4 kg/m3/day

AL = INBOD / Vp
= 0.31 kg/m3/day ok

Check Mixing Rate

Per EPA guidelines, 0.010 to 0.025 m3/min. m3

Volume of air from Blower Va = 4.88 m3/min (See Blower calculations)

Volume of tank provided Vp = 419.76 m3

Therefore, Mixing Rate = Va / Vp


= 0.012 m3/min. m3 ok
CLARIFIER DESIGN
Guidelines : Hydraulic retension time (HRT) = 2 hours @ Qpeak
Guidelines : Surface overflow rate = 30 m3/m2/day
Guidelines : Side water depth (SWD) = 3 m

Surface Area = Qpeak / 30 m3/m2/day


= 73.98 m2

Number of clarifiers = 2

Surface area required per clarifier = 36.99 m2

Dimension of each clarifier

L = 6.20 m
W = 6.20 m

Therefore, actual area provided = 38.44 m2 > 36.99 m2 ok

Provided Length, L = 6.20 m


Provided Width, W = 6.20 m

Effective Volume = Volume of cone with slope of 60 deg.


SWD in cone = 3.46 m (See attach volume cals)
Cone volume = 65.73 m3 ok
Vertical SWD = 1.04 m
Vertical SWD volume = 39.98 m3

Total Volume = 105.70 m3


Total SWD = 4.50 m

HRT
Per guidelines: < 2 hours
= Total Volume m3 / Qpeak m3/day x 24 hours
= 2.29 >= 2 hours ok

Overflow Weir
Per guidelines: 150 - 180 m3/day/m

Max weir loading rate, Wr = 180 m3/day/m


Peak Flow, Qpeak = 2219.31 m3/day

Min Weir Length Required per Clarifier = Qpeak / Wr / No. of Clarifiers


= 6.16 m

Total length of weir provided per Clarifier, Tw = 3.00 m

Actual weir loading rate = 369.89 m3/day/m error

Solids Loading Rate (SLR)


Guideliness : < 150 kg/m2/day at Qpeak
< 50 kg/m2/day at Qavg

MLSS = 3600 mg/l or 3.6 kg/m3

Total Q = Qpeak + QRAS


(For QRAS look under Extended Aeration Tank Sizing)
= 2685.06 m3/day

SLR (Qpeak) = (Total Q / Actual Surface Area) x MLSS kg/day

= 125.73 kg/m2/day ok

SLR (Qavg) = (Qavg + Qras) / Actual Surface Area x MLSS kg/day

= 46.04 kg/m2/day ok
Launder Calculation

Overflow from weir to lauder = Qpeak / number of tank


= 1109.66 m3 / launder

Launder size
Length = 3.00 m
Width = 0.25 m
Flow velocity = 0.80 m /s < 1.0 m/s ok
Depth of flow in launder = 21.41 mm < 0.3m as provided
Determine Volume of Cone
L

L W

h h
60 y
BW 1 A BW2 B

L = 6.20 m
W = 6.20 m
BW 1 = 2.20 m
BW 2 = 2.20 m

A = (L - BW1) / 2
= 2.00

B = (W - BW2) / 2
= 2.00

h = height of cone
= A x Tan 60
3.46 m

Tan y = h /B
y = Tan -1 (h/B)
= 60.00 degrees

Therefore, Volume of Cone V = [ (1/3 x 2A x 2B x h) +(1/2 x 2A x BW2 x h)


+ ( 1/2 x (W + BW2) x h) ]

V = 65.73 m3

L (m)
W (m)

h (m)

A (m) BW1 (m)


Scum Withdrawal Airlift Pipe Design
Percent submergence = Hs / (Hs + Hl) x 100

Hs = Depth (m) of air pipe below water surface


Hl = Height (m) of lift

Scum Airlift
Hs = 3.8 m
Hl = 0.7 m
Percent Submergence = 84.44 %

With reference to the attached chart, Discharge = 45 gpm 2.84 l/s


Velocity = 2 ft/sec 0.61 m/s
Air Requirement = 7 cfm 0.20 m3/min
AEROBIC SLUDGE HOLDING TANK DESIGN
Guidelines: Sludge yield = 0.6 kg/kg BOD5 (Standard "A")

Design Population, PE = 2300


Design Flow, QAVG = 517.5 m3/day

Sludge Yield Ys = 0.55 kg/kgBOD5/day (Calculated earlier)

Sludge accumulation per day Sd = QAVG x Ys (BOD5-EBOD5)


= 68.31 kg

Temperature of Wastewater T = 28 Deg C

Percent Volatile Suspended Solid (VSS) VSS = 75 %

Percent VSS Destruction VSSd = 55 %

Influent to Digester WAS = 68.31 kg/day

Influent Solid Content Conc = 1%

Total Volatile Solid TVS = VSS/100 x WAS


= 51.23 kg/day

Total Volatile Solid Destruction TVSd = VSSd/100 x TVS


= 28.18 kg/day

Therefore, Total Solids Remaining After Digestion TSd = Nonvolatile Solid + VS Remaining

= (WAS - TVS) + { (1 - VSSd/100) x TVS }

= (26.73 - 20.05) + { (1 - 55/100) x 20.05)

TSd = 40.13 kg/day

Density of water ρ = 1000.00 kg/m3

Specific gravity of sludge sg = 1.015

Therefore, TSd in term of volume = 3.95 m3/day

Storage days provided T = 30 days

Volume of Tank Required Vtank = 118.62 m3

Number of Tank Provided No. = 1

Volume of Tank Required V = 118.62 m3

SIZE OF EACH TANK

Depth = 4.5 m
Width = 3.3 m
Length = 8.0 m
Volume = 118.80 m3 > 118.62 m3 ok
OXYGEN REQUIREMENT FOR DIGESTION
Guidelines: 1.5kgO2/kgBOD

Wt of sludge digested Ws = Sd - TSd


= 28.18 kg

Amount of oxygen required, (AOR) Ws x 1.5 = 42.27 kg

Oxygen correction factor AOR/SOR

AOR/SOR = (((BETA * ACF * Csf @ 28 deg) - C ) / Css ) * ALPHA * 1.024^T-20

Where BETA = 0.98


ACF = 0.989
Csf = 7.83
C = 1.5
Css = 9.08
Alpha = 0.75
T = 30

Therefore AOR/SOR = 0.64

Standard Oxygen Required SOR = 66.29 kg/day

Assume O2 transfer efficiency O2eff = 10 %

Total amount of air required = SOR kg/day


O2eff/100 x 1.201 kg/m3 x 0.232 kg O2/kg air x 1440 min/day

= 1.65 m3/min

Number of diffusers required

Flowrate per diffuser = 200.00 L/min


0.200 m3/min
Quantity =
Total air required / Flowrate
=
8.26 Use 10 ok
DRYING BED DESIGN

Digested Sludge From Aerobic Digester DS = 40.13 kg/day (See Aerobic Digester cals)

Concentration of Sludge C = 1%
= 10 kg/m3

Specific gravity of sludge sg = 1.015

Volume of Digested Sludge Vds = 3.95 m3/day

Per guidelines: Provide 4 week cycle for 450mm thick feed depth

Volume of Vds required V = Vds(m3/day) x 28days


(Based on 21 days drying; 7 days feeding)
= 110.71 m3

Depth of Feed D = 0.45 m

Therefore, Area required A = 246.02 m2

Provide fully covered drying beds

Therefore actual area required A = 164.01 m2 ( 1/3 reduction in area)

Number of Drying Beds provided = 4

Dimension of Drying Beds

Dimension of Bed
Length = 16.50 m
Width = 2.50 m
Area = 41.25 m2

Total area of drying bed provided = nos of bed x bed area


= 165.0 m2 > 164.0 m2 ok

Determine Volume of Dewatered Sludge (DS)

Assume final sludge concentration is 25%

DS = Vs x Si x SGi x n
SGo x So

DS = ? Volume of Dewatered Sludge, (m3/day)


Vs = 3.95 Volume of Influent Sludge (m3/day)
Si = 0.01 Fractional Percent Solid Content of Influent Sludge
So = 0.25 Fractional Percent Solid Content of Dewatered Sludge
SGi = 1.015 Specific Gravity of Sludge Before Thickening
SGo = 1.03 Specific Gravity of Sludge After Thickening
n = 0.95 Fractional Percent Capture

Therefore
DS = 0.15 m3/day @ 25% solid

Provide covered storage for 30 days

Volume required V = DS x 30 days

= 4.44 m3

Dimension provided Depth = 0.50 m


Width = 1.00 m
Length = 4.60 m
Volume = 2.30 m3 > 4.44 m3 ok
Drying Bed Feed Pump Design
Pump Sizing

Pumping rate per pump P = 9.10 L/sec


= 546.00 L/min

Pump Headloss Calculations

VALVES & FITTINGS K QUANTITY SUCTION QUANTITY DISCHARGE


VALUE TOTAL TOTAL

ENTRY 0.50 1 0.50 0 0.00


EXIT 1.00 0 - 1 1.00
CHECK VALVE 2.50 0 - 0 0.00
SLUICE VALVE 0.20 0 - 1 0.20
REDUCER 0.30 0 - 1 0.30
TEE THRU SIDE 1.80 0 - 0 0.00
TEE THRU RUN 0.60 0 - 1 0.60
ELBOW - 45 DEG 0.23 0 - 0 0.00
ELBOW - 90 DEG 0.30 0 - 5 1.50

SUM OF K's FOR FITTINGS 0.50 3.60

PIPE DIAMETER 0.10 m 0.10

PUMPING RATE 9.10 L/sec 9.10

V = VELOCITY 1.16 m/sec 1.16

F = TOTAL FITTING HEAD LOSS 0.03 m 0.25


= (K x V2 / 2g)

L = LINEAR METER OF STRAIGHT PIPE 0.00 m 15.00

M = MULTIPLYING FACTOR 1.10 1.10

C = HAZEN-WILLIAMS ROUGHNESS COEFFICIENT 100.00 100.00

P = HEAD LOSS USING HAZEN-WILLIAMS EQATION 0.00 m 0.39

TOTAL LOSS = F + P 0.03 m 0.64

TOTAL SUCTION + DISCHARGE LOSS 0.73 m

S = STATIC HEAD LOSS (Worst Case Scenerio) 4.00 m

TOTAL DYNAMIC HEAD 4.73 m

Size pump for 9.10 L/sec @ 4.73 m TDH

The submersible pump selected is as follows:-


Make = Ebara
Model = 65DVS51.5
Capacity = 9.10 L/sec
Total Head = 4.73 m
Power = 1.50 kW
Discharge Size = 65 mm connect to 100 mm
No. of Units = 1 (1 duty)

Determine Size of Force Main


Guideline: 1 - 2.5m/s velocity in pipe

Required size of sludge pump = [ 4 x Qsludge / (2.5 m/s x 3.14] 1/2

= [ 4 x 0.0091 / (2.5 m/s x 3.14] 1/2

= 0.068 m

= 80 mm > 68 mm ok

Actual velocity in selected pipe = 1.81 m/s > 2.5 m/s ok


Determine Total Dynamic Head ( TDH )

TDH = hst + hf + hm

Where ; hst = Static head (m) …………A


hf = Losses through the pipe ( Hazen - William Formula ) …………B
hm = Losses through fittings …………C

A Thus, static head of pump, hst = 4.00 m

B Hazen - William Formula


hf = 6.82 V 1.85 X L
C D1.167

Where ; V = Velocity m/sec 1.16 m/s

V = Q/A = 8 L/sec
1000 x 3.142 x 0.10 2 / 4

= 1.16 m/sec

C = Coefficient of roughness 0.00

L = Length of pipe, m 15.00

D = Diameter of pipe, m 0.10

Thus, losses through the pipe, hf = #DIV/0! m

C Losses through fittings

hm = KV²
2g

Where ; K = Head loss coefficeint 4.10

V = Velocity m/sec 1.16

G = Gravity, m/s² 9.81

hm = 0.29 m

Therefore ,

Total Dynamic Head ( TDH ) = hst + hf + hm


= ### m

To plot chart for the System Curve & Pump Curve from the above equitition:-

Q (L/s) V (m/s) TDH (m) Pump head (m)


18.6 4
0 0.00 4 18.6 16.4 4.04
2 0.25 4.04 16.4 14.2 4.15
4 0.51 4.15 14.2 13 4.23
8 1.02 4.57 8.3 8.33 4.57
9.5 1.21 4.80 4.2 4.2 4.8

* refer to Chart attached


DRYING BED FEED PUMP
Submersible Pump
EBARA Model 65DVS51.5
20

Pump Curve
18

16
Pump Operating Point
9.2 L/sec @ 4.7 m
14
Head (m)

12

10
System Curve
8

0
0 2 4 6 8 10
Flowrate, Q (L/sec)
X-Axis Pump System Pump System
0 16.2 4 0
3.3 14.2 4.25 198
6.67 12.4 4.92 400.2
10 11 5.97 600
13.33 9 7.39 799.8
16.67 7.4 9.17 1000.2
19.98 5.6 11.27 1198.8

65DVS X-Axis Pump System


0 18.6 4
2 16.4 4.04
4 14.2 4.15
8 8.33 4.57
9.5 4.2 4.8

3.580986
Blower- 1 Sizing
Air Requirement for Aeration = 4.88 m3/min
Air Requirement for Aerobic Sludge Digestion = 1.65 m3/min

TOTAL AIR REQUIREMENT Qd = 6.53 m3/min

Determine air flow under standard condition, Q s

Qs = Qd x (1.0332 + Pd) x 273 + St


1.0332 273 + Sd

Qs = ? Air flow under standard condition (m3/min)


Qd = 6.53 Air flow under discharge condition (m3/min)
Pd = 0.41 Discharge static pressure (kgf/cm2)
PS = -0.05 Suction static pressure (kgf/cm2)
St = 30 Suction temperature o
C
Sd = 38 Discharge temperature o
C

Therefore,

Qs = 8.88 m3/min

Determine discharge pressure under standard condition, P s

Ps = 1.0332 + Pd - 1 x 1.0332
1.0332 + PS

= 0.48 kgf/cm2

Size blower for 9.09 m3/min @ 0.48 kgf/cm2


Provide 2 blowers : 1 duty, 1 standby

Model: Fu Tsu Model TSC 125, 920rpm, 15.0kW


Blower-3 Sizing
Air Requirement for Scum Airlift = 0.20 m3/min
Air Requirement for RAS = 0.6091 m3/min
Air Requirement for WAS = 0.0090 m3/min
Air Requirement for MLSS = 2.10 m3/min

TOTAL AIR REQUIREMENT Qd = 2.91 m3/min

Determine air flow under standard condition, Qs

Qs = Qd x (1.0332 + Pd) x 273 + St


1.0332 273 + Sd

Qs = ? Air flow under standard condition (m3/min)


Qd = 2.91 Air flow under discharge condition (m3/min)
Pd = 0.45 Discharge static pressure (kgf/cm2)
PS = -0.05 Suction static pressure (kgf/cm2)
St = 30 Suction temperature o
C
Sd = 38 Discharge temperature o
C

Therefore,

Qs = 4.08 m3/min

Determine discharge pressure under standard condition, Ps

Ps = 1.0332 + Pd - 1 x 1.0332
1.0332 + PS

= 0.53 kgf/cm2

Size blower for 1.76 m3/min @ 0.53 kgf/cm2


Provide 1 blowers : 1 duty

Model: Fu-Tsu Model TSC 80, 760 rpm @ 5.5 Kw


Sludge Withdrawal Airlift Pipe Design
Calculate the submerged distance of the air inlet (S) by the following formula:

S = Basin SWD - ( 1 + (3 x Pump Dia) / 12 )

where

SWD (ft) = 14.76 ft 4.50 m


Pump Dia (in) for RAS = 3.00 in 0.075 m
Pump Dia (in) for MLSS & scum = 2.00 in 0.050 m

S = 13.01 ft 3.97 m

Calculate the Air Supply Volume (Vair) required:

Vair = h / { C x LOG [ (H + 10.4) / 10.4 ] }

where

h = 0.75 total lift required (m)


H = 4.50 submergence (m)
C = 10.20 constant for less than 15m lift

Vair = 0.47 m3/min of air per m3 of water


A eff = 25.00 air-lift efficiency (%)

Determine Volume of Air Requirement for SCUM, V SCUM


SCUM = 75.0 m3/day
= 0.0521 m3/min

Vair-SCUM = Vair x RAS x Aeff


= 0.0981 m3/min

Determine Volume of Air Requirement for RAS, V RAS


RAS = 465.8 m3/day See Aeration Tank cals
= 0.3234 m3/min

Vair-RAS = Vair x RAS x Aeff


= 0.6091 m3/min

Determine Volume of Air Requirement for WAS, V WAS


WAS = 6.84 m3/day See Aeration Tank cals
= 0.0048 m3/min

Vair-WAS = Vair x WAS x Aeff


= 0.0090 m3/min

Determine Volume of Air Requirement for MLSS Return, V MR


MLSS = 4 Qave - QRAS
= 2070.00 - 182.3 m3/day
= 1604.25 m3/day

MLSS Return = 1604.3 m3/day


= 1.1141 m3/min

Vair-MLSS = Vair x MLSS x Aeff


= 2.0984 m3/min
Aeration Piping Headloss To Aeration Tanks
Criteria
Ambient air temperature To = 30 deg C 303.2 deg K

Ambient barometric pressure Po = 1.00 atm

Air supply pressure P = 1.450 atm

Blower capacity Qb = 6.53 m3/min

Blower efficiency e = 75 %

Equations

Friction factor f = 0.029 x D^0.027


Q^0.148

Temperature in pipe (deg K) T = To x (P/Po)^0.283

Velocity head Hv = 9.82E-8 x TQ^2


PD^4

Headloss (mm) hL = f x (L/D) x Hv or K x Hv

A. Pipe Fittings Losses

No. Valves & Fittings Size (mm) Quantity K Value Q (m3/min) T (deg K) hL, headloss (mm)
1 Check valve 80 1 2.50 6.53 336.77 59.32
2 Gate valve 80 1 0.80 6.53 336.77 18.98
9 Reducer 80 0.20 6.53 336.77 0.00
3 Tee thru side 80 1 1.80 6.53 336.77 42.71
4 Tee thru run 80 1 0.60 6.53 336.77 14.24
5 Elbow 90 deg 80 2 0.30 6.53 336.77 14.24
6 Elbow 90 deg 80 0.30 6.53 336.77 0.00
4 Tee thru run 50 2 0.60 4.35 336.77 82.93
9 Reducer 25 2 0.20 1.09 336.77 27.64
7 Tee thru run 25 0.60 1.09 336.77 0.00
4 Tee thru run 25 0.60 1.09 336.77 0.00
5 Elbow 90 deg 25 1 0.30 1.09 336.77 20.73
8 Elbow 90 deg 25 0.30 1.09 336.77 0.00
9 Reducer 25 0.20 1.09 336.77 0.00
10 Gate valve 25 1 0.80 1.09 336.77 55.29

Subtotal 336.08

B. Straight Pipe Losses

No. Length (m) DIA (mm) Velocity (m/min) Q (m3/min) f, fric. factor T (deg K) hL, headloss (mm)
1 8.00 100 1130.94 8.88 0.02000 336.77 28.80
2 4.00 50 3015.84 5.92 0.02100 336.77 215.03
3 7.00 50 1507.92 2.96 0.02300 336.77 103.04
4 4.00 25 3015.84 1.48 0.02500 336.77 511.98

Subtotal 858.84
C. Supply Pressure At The Blower

1 Losses in piping = 858.84 mm


2 Losses in pipe fittings = 336.08 mm
3 Losses in air filter = 50.00 mm
3 Losses in silencer = 50.00 mm
4 Losses in blower = 150.00 mm
5 Losses in diffusers = 160.00 mm
6 Static head = 4100.00 mm

Total 5704.92 mm @ 5.70 m

Therefore, the absolute supply = 1.55 atm


pressure

D. Power Requirement of Blower, P (kw)

P = w RTo x [ (P/Po)^0.283 - 1 ]
8.41 e

where R = 8.314 kJ/k mole deg K

w = air mass flow, kg/s

Therefore, P = 7 Kw or 9 HP

Select next bigger size motor = 5.5 Kw 7 HP


ok

Size blower for 9.09 m3/min @ 0.48 kgf/cm2

Fu Tsu Model TSC 125, 920rpm, 15.0kW

Provide 2 blowers; 1 running, 1 standby


CHLORINATION TANK DESIGN
Qpeak = 2219.31 m3/day
= 1.54 m3/min

Detension Time at Qpeak t = 15.00 min

Volume of Tank V = Qpeak x t


= 23.12 m3

Number of Tanks N = 1

Number of Bays per Tank n = 4

Dimension of Tank Provided


Depth H = 1.80 m ok max 3m
Wetted depth h = 1.50
Width W = 0.75 m
Length L = 4.50 m
Number of pass n = 4

Volume Provided Vp = 24.30 m3 >= 23.12 m3

Check:

Ratio Ratio ok
Wetted depth : Width
1.50 : 0.75
2 : 1
Length : Width
4.50 : 0.75
6 : 1

Detension Time at Qpeak t = Vp / Qpeak


= 15.77 min > 15 min ok

PARSHALL FLUME FOR DISCHARGE

Design Flow, Qavg = 517.5 m3/day


Peaking Factor PF = 4.29
Peak Flow Qpeak = 2219.31 m3/day

Formula for flow calculation with diffrent throat width of Parshall Flume by Harlan Bengtson

Flow thru 1" PF, Q = 0.338 x H1.55


where
Flow tru PF Q = flow in PF in cfs
= 0.9071091 cfs = Qpeak

Head over flume H = in ft

For Q > Qpeak, water level in PF H = 1.8263509 ft


556.7 mm
90 DEGREE V-NOTCH WEIR AT OUTLET BOX

Design Population , PE = 2300


Design Flow, Qavg = 517.5 m3/day
Peaking Factor PF = 4.29
Peak Flow Qpeak = 2219.31 m3/day

90 Deg V-Notch Weir Formula

q(m3/sec) = 1.417H 5/2

H (m) = 150 mm or 0.15 m at Qpeak


Therefore, q = 0.012348 m3/sec > = 0.02569 m3/sec ok

Set depth of weir @ 200 mm ok


INFLUENT INFLUENT INFLUENT SECONDARY EFFLUENT
Flow (m3/d) 517.50 Flow (m3/d) 521.31 Flow (m3/d) 510.88 MLSS Flow (m3/d) 510.73
BOD (kg/day) 129.38 BOD (kg/day) 129.38 BOD (kg/day) 109.97 Flow (m3/d) 1604.25 BOD(kg/d) 5.11
TSS(kg/d) 155.25 TSS(kg/d) 157.26 TSS(kg/d) 133.67 TSS(kg/d) 10.21

INFLUENT SCREEN PUMP ANOXIC TANK AERATION SECONDARY FINAL


FLOW CHAMBER * STATION BASINS CLARIFIERS EFFLUENT
LAST 10 mg/L BOD
MANHOLE 20 mg/L TSS
RAS
RAS = 1%
Flow (m3/d) 423.41
TSS(kg/d) 4234.09

LIQUID FLOW

SOLID FLOW
WAS
* Assume 15% of BOD/TSS is removed from screenings and grit
* Assume 2% of flow is removed from screenings WAS = 1%
Flow (m3/d) 6.84
TSS(kg/d) 68.45
DIGESTED SLUDGE DEWATERED SLUDGE
Flow (m3/d) 3.95 Flow (m3/d) 0.15
TSS(kg/d) 40.13 TSS(kg/d) 38.13

AEROBIC SLUDGE
SLUDGE HOLDING DRYING BEDS
TANK
(75% VSS) (25-40% SOLIDS)
(55% VSS Destruction) (95% CAPTURE)

SUPERNATANT
Flow (m3/d) 3.81
TSS(kg/d) 2.01

SOLIDS BALANCE @ Qavg


INFLUENT INFLUENT INFLUENT SECONDARY EFFLUENT
Flow (m3/d) 689.63 Flow (m3/d) 697.82 Flow (m3/d) 683.87 Flow (m3/d) 683.82
BOD (kg/day) 172.41 BOD (kg/day) 172.41 BOD (kg/day) 146.55 BOD(kg/d) 6.84
TSS(kg/d) 206.89 TSS(kg/d) 236.97 TSS(kg/d) 201.43 TSS(kg/d) 13.68

INFLUENT SCREEN AERATION SECONDARY FINAL


FLOW CHAMBER * BASINS CLARIFIERS EFFLUENT
10 mg/L BOD
20 mg/L TSS
RAS

LIQUID FLOW

SOLID FLOW

* Assume 15% of BOD/TSS is removed from screenings and grit


* Assume 2% of flow is removed from screenings
WAS

WAS = 1%
Flow (m3/d) 9.10
TSS(kg/d) 91.03
THICKENED SLUDGE DIGESTED SLUDGE DEWATERED SLUDGE
Flow (m3/d) 2.09 Flow (m3/d) 1.23 Flow (m3/d) 0.05
TSS(kg/d) 62.79 TSS(kg/d) 36.89 TSS(kg/d) 35.05

GRAVITY AEROBIC SLUDGE SLUDGE


SLUDGE THICKENER SLUDGE HOLDING DRYING BEDS HOLDING
TANK TANK AREA
(3% Solid) (80% VSS) (25-40% SOLIDS) (30 DAYS)
(55% VSS Destruction) (95% CAPTURE)

SUPERNATANT SUPERNATANT
Flow (m3/d) 7.01 Flow (m3/d) 1.18
TSS(kg/d) 28.24 TSS(kg/d) 1.84

SOLIDS BALANCE @ Qavg