S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words
1 General Works
1.1
Insurance for the loss or damage to works, materials
and contractor's equipments including personal injury
or death as per Contract Data all Complete.
LS 1.00
1.2
Maintain traffic flow either by diversion or traffic
control and provide safety measures during working
hours as instructed by the engineer (Flagman,traffic
sign and diversion etc.) all Complete.
Job 1.00
1.3
Supplying and Erecting informatory board and name
plate (contract details) in place including 50mm dia.
steeel tube, 2mm thick steel plate sign board in place
1.2m.x 0.75m. Size bigger with back support and
two or more post as instructed by the engineer all
Complete as per Specification. [SS/SP-1501]
Nos. 2.00
2.0 Drain Construction, Gabion Retaining wall and
Culvert Construction Works -
Earthwork excavation in soft soil for drain and
trenches including shoring, struting, bracing, sheeting
2.1 and disposal upto 10 m and lift upto 3 m etc. all
complete as per specification. [Manual(20%),
Machine(80%)](SS-905)
m3 18.20
Providing and laying of hand pack Stone soling with
150 to 200 mm thick stones and packing with
2.2 smaller stone on prepared surface as per Drawing
and Technical Specifications.(SS-2602,2603) m3 3.31
1/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words
2/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words
3.2
3/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words
4.1
4/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words
4.2
5/23
Government of Nepal
of Physical Infrastructure & Transport
Department of Roads
ivision Road Office, Biratnagar
Bill of Quantities
Remarks
6/23
Remarks
7/23
Remarks
8/23
Remarks
9/23
Remarks
10/23
Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Roads
Eastern Regional Roads Directorate
Division Road Office, Biratnagar
Abstract of Cost
F/Y: 2076/77
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage:
11 of 23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage:
12 of 23
13 of 23
Department of Roads
Division Road Office, Biratnagar
Calculation of Quantities
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage:
Length(m Breadth( Height
S.No. Description of Work No. Quantity Unit Remarks
) m) (m)
1 General Works
1.01 Insurance for the loss or damage to works,
materials and contractor's equipments including
personal injury or death as per Contract Data all 1.00 1.00 LS
Complete.
1.02 Maintain traffic flow either by diversion or traffic
control and provide safety measures during
working hours as instructed by the engineer 1.00 1.00 Job
(Flagman,traffic sign and diversion etc.) all
Complete.
1.03 Supplying and Erecting informatory board and
name plate (contract details) in place including
50mm dia. steeel tube, 2mm thick steel plate sign
board in place 1.2m.x 0.75m. Size bigger with 2.00 2.00 Nos.
back support and two or more post as instructed by
the engineer all Complete as per Specification.
[SS/SP-1501]
Abstract of Cost
Sub Total-1
2 Drain, Gabion wall and Culvert Construction Works
Sub Total-2
3.00 Pavement Construction Works
3.10 Formation of embankment including compaction in
layers not exceeding 150 mm compacted depth, m3 16800.00 504.01
watering etc. all complete as per specification [SS/SP-
907 ]
3.20 Subgrade preparation / Regrading of gravel surface by
scarifying with grader machine including watering,
levelling , formation of camber and compaction all m2 91000.00 10.41
complete for sub grade preparation work all complete as
per Specification. [SS/SP- 1003]
3.30 Providing, Laying, Spreading, watering, Leveling and
compaction as per required camber of riverbed gravel
for sub base course with all transportation all Complete m3 20150.00 2433.33
as per Specification. [SS/SP-1201]
Sub Total-3
4.00 Traffic Safety Related Works
4.10 Supplying and erecting traffic sign in place including
50mm dia. Steel tube, 2mm. thick steel plate, cement
concrete, painting, writing and supporting steel angle
nut and bolit etc. complete a) 60cm. Dia. Circular,
60cm. equilateral traingle and 60cm.x 45cm. rectangular Nos. 10.00 2255.79
shaped sign (single post). all Complete as per
Specification. [SS/SP- 1501]
Sub Total-4
Total of (1+2+3+4)
Contingency @5 %
VAT @13%
Grand Total
ar
F/Y: 2075/76
ctures
Amount(NRs) Remarks
1312549.03
1200000.00
300000.00
13206.60
1513206.60
156143.00
156143.00
1148246.76
2829827.70
5640325.00
547058.95
66031.30
368628.50
1744454.40
14874570.54
2742483.43
2542630.00
17785829.04
9991494.24
8467368.00
49978909.50
947310.00
57857287.41
49031599.50
96796492.65
30012732.75
11610170.00
8475424.10
46698165.80
155242770.15
22557.90
13649.37
29604.40
398919.50
Approved by:
1312549.027