Bill of Quantities
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures

Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words

1 General Works
1.1
Insurance for the loss or damage to works, materials
and contractor's equipments including personal injury
or death as per Contract Data all Complete.
LS 1.00
1.2
Maintain traffic flow either by diversion or traffic
control and provide safety measures during working
hours as instructed by the engineer (Flagman,traffic
sign and diversion etc.) all Complete.
Job 1.00
1.3
Supplying and Erecting informatory board and name
plate (contract details) in place including 50mm dia.
steeel tube, 2mm thick steel plate sign board in place
1.2m.x 0.75m. Size bigger with back support and
two or more post as instructed by the engineer all
Complete as per Specification. [SS/SP-1501]
Nos. 2.00
2.0 Drain Construction, Gabion Retaining wall and
Culvert Construction Works -
Earthwork excavation in soft soil for drain and
trenches including shoring, struting, bracing, sheeting
2.1 and disposal upto 10 m and lift upto 3 m etc. all
complete as per specification. [Manual(20%),
Machine(80%)](SS-905)
m3 18.20
Providing and laying of hand pack Stone soling with
150 to 200 mm thick stones and packing with
2.2 smaller stone on prepared surface as per Drawing
and Technical Specifications.(SS-2602,2603) m3 3.31

1/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures

Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words

Providing and laying of Plain/Reinforced Cement


2.3 Concrete in Foundation complete as per Drawing and
Technical Specifications. PCC Grade M 15(SS-2000)
m3 2.91
Providing and laying Random Rubble Stone Masonry
work in cement mortar1:4 in structure complete as
2.4 per Drawing and Technical Specifications(SS-2607)
m3 11.90
Providing , Preparing and Installing form work
including necessary supports and removing after
2.5 completion for foundation and footings. Using timber
(soft wood) (Class F1 Finish)(SS-1804,1805) m2 0.80
Providing suitable material and Back filling behind
abutment, wing wall and return wall complete as per
2.6 Drawing and Technical Specifications.( Locally
available material) (Without watering& Compction
by Tamping rod)(SS-908)
m3 0.70
#REF!
2.7
#REF! #REF!
Providing and laying Gabion structure for retaining
earth with diaphragm including rolling, cutting
weaving , placing, laying sides and diaphragms with
binding wire and filling boulders all complete as per
Drawing and Technical Specification Mesh wire- 10
2.10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg (0.1057
kg/m), binding wire 12 Swg (0.0409 kg/m)
Hexagonal mesh Type 100 mm X 120 mm, Box size
2 X 1 X 1 m ( 11 sqm)(SS-2401)
m3 18.00
3 Pavement Construction Works -
3.1 Providing, laying, spreading and compacting
embankment with borrow material as per Drawing
and Technical Specification(SS-909,910) m3 660.00

2/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures

Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words

3.2

Scarifying the existing road surface to a depth of 50


mm and disposal of scarified Material with in all lifts
and lead as per Drawing and Technical
Specifications. (Mechanical means)(SS-1003) m2 2,100.00
3.3
Providing and laying granular sub-base on prepared
surface, mixing at OMC, and compacting to achieve
the desired density, complete as per Drawing and
Technical Specifications.(Mechanical means)(SS-
1201) m3 465.00
3.4 Providing and laying Crusher Run Macadam on a
prepared surface, spreading and mixing , watering
and compacting to form a layer of Base course as per
Drawing and Technical Specifications.(For 45 mm
maximum size)(SS-1204) m3 247.50
3.5
Providing and applying prime coat with Hot Bitumen
( including cutter) on prepared surface of granular
base including cleaning of road surface and spraying
by mechanical means as per Technical Specification .
(SSSS-1302) Lit 1,650.00
3.6
Providing and applying tack coat with hot Bitumen
at specified rate on the prepared non-bituminous
surfaces including cleaning as per Technical
Speciation .(Mechanical means)(SS-1302)
Lit 1,204.50
3.7
Providing and laying Bituminous concrete/ Asphalt
concrete using crushed aggregates of specified
grading, premixed with bituminous binder and filler
as per Drawing and Technical Specifications. (13 mm
nominal size) Grade II(SS-1309) m3 49.50
4 #REF!

3/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures

Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words

4.1

#REF! #REF! #REF!

4/23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures

Rate (NRs)
S.No. Description of Work Unit Quantity Amount(NRs)
Rate in Figure Rate in words

4.2

#REF! #REF! #REF!


4.3 #REF! #REF! #REF!
Total
VAT @ 13%
Grand Total

1. The numbers enclosed in the bracket in the particulars


represent DOR Standard Specifications Section Number. Contractor's Signature
Notes: 2. Field and Laboratory test charges and other taxes are
included in item rate. Seal

3. Quoted Item Rate shall be exclusive of the VAT. Name


Address

5/23
Government of Nepal
of Physical Infrastructure & Transport
Department of Roads
ivision Road Office, Biratnagar
Bill of Quantities

Remarks

6/23
Remarks

7/23
Remarks

8/23
Remarks

9/23
Remarks

10/23
Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Roads
Eastern Regional Roads Directorate
Division Road Office, Biratnagar

Abstract of Cost
F/Y: 2076/77

Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage:

S.N. Description of Works Unit Quantity Rate(NRs) Amount(NRs) Remarks


1 General Works
1.1 Insurance for the loss or damage to works, materials and
contractor's equipments including personal injury or LS 1.00 50000.00 50000.00
death as per Contract Data all Complete.

1.2 Maintain traffic flow either by diversion or traffic


control and provide safety measures during working
hours as instructed by the engineer (Flagman,traffic sign Job 1.00 25000.00 25000.00
and diversion etc.) all Complete.

1.3 Supplying and Erecting informatory board and name


plate (contract details) in place including 50mm dia.
steeel tube, 2mm thick steel plate sign board in place
1.2m.x 0.75m. Size bigger with back support and two Nos. 2.00 7563.69 15127.38
or more post as instructed by the engineer all Complete
as per Specification. [SS/SP-1501]

Sub Total-1 90127.38


2.0 Drain Construction, Gabion Retaining wall and
Culvert Construction Works
Earthwork excavation in soft soil for drain and trenches
including shoring, struting, bracing, sheeting and
2.1 disposal upto 10 m and lift upto 3 m etc. all complete as m3 18.20 173.55 3158.61
per specification. [Manual(20%), Machine(80%)](SS-
905)
Providing and laying of hand pack Stone soling with
150 to 200 mm thick stones and packing with smaller
2.2 stone on prepared surface as per Drawing and Technical m3 3.31 5052.36 16723.31
Specifications.(SS-2602,2603)

Providing and laying of Plain/Reinforced Cement


2.3 Concrete in Foundation complete as per Drawing and m3 2.91 11049.11 32152.91
Technical Specifications. PCC Grade M 15(SS-2000)
Providing and laying Random Rubble Stone Masonry
2.4 work in cement mortar1:4 in structure complete as per m3 11.90 9917.93 118023.36
Drawing and Technical Specifications(SS-2607)

Providing and Pointing with cement mortar on masonry


2.5 work in structure as per Technical Specifications cement m2 19.60 210.60 4127.76
mortar (1:3 )(SS-2600)
Providing , Preparing and Installing form work
including necessary supports and removing after
2.6 completion for foundation and footings. Using timber m2 0.80 1368.93 1095.14
(soft wood) (Class F1 Finish)(SS-1804,1805)
Providing suitable material and Back filling behind
abutment, wing wall and return wall complete as per
2.7 Drawing and Technical Specifications.( Locally m3 0.70 419.44 293.60
available material) (Without watering& Compction by
Tamping rod)(SS-908)
Providing and Laying Reinforced cement concrete NP3
Flush jointed pipe for culverts including fixing with
2.8 cement mortar 1:2 as per Drawing and Technical RM 10.00 6700.11 67001.10
Specifications.( 600 mm internal dia.)(SS-701)

11 of 23
Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage:

S.N. Description of Works Unit Quantity Rate(NRs) Amount(NRs) Remarks


Providing and laying Gabion structure for retaining
earth with diaphragm including rolling, cutting
weaving , placing, laying sides and diaphragms with
binding wire and filling boulders all complete as per
2.90 Drawing and Technical Specification Mesh wire- 10 m3 18.00 5125.88 92265.84
Swg(0.0615 kg/m), Selvedge Wire 8 Swg (0.1057
kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal
mesh Type 100 mm X 120 mm, Box size 2 X 1 X 1 m
( 11 sqm)(SS-2401)
Sub Total-2 334841.63
3 Pavement Construction Works
3.1
Providing, laying, spreading and compacting
embankment with borrow material as per Drawing and m3 660.00 506.02 333973.20
Technical Specification(SS-909,910)
3.2 Scarifying the existing road surface to a depth of 50 mm
and disposal of scarified Material with in all lifts and
m2 2100.00 20.64 43344.00
lead as per Drawing and Technical Specifications.
(Mechanical means)(SS-1003)
3.3 Providing and laying granular sub-base on prepared
surface, mixing at OMC, and compacting to achieve the
desired density, complete as per Drawing and Technical m3 465.00 2451.12 1139770.80
Specifications.(Mechanical means)(SS-1201)

3.4 Providing and laying Crusher Run Macadam on a


prepared surface, spreading and mixing , watering and
compacting to form a layer of Base course as per m3 247.50 3100.43 767356.42
Drawing and Technical Specifications.(For 45 mm
maximum size)(SS-1204)

3.5 Providing and applying prime coat with Hot Bitumen


( including cutter) on prepared surface of granular base
including cleaning of road surface and spraying by Lit 1650.00 126.14 208131.00
mechanical means as per Technical Specification .
3.6 (SSSS-1302)
Providing and applying tack coat with hot Bitumen at
specified rate on the prepared non-bituminous surfaces
including cleaning as per Technical Speciation . Lit 1204.50 119.62 144082.29
(Mechanical means)(SS-1302)
3.7 Providing and laying Bituminous concrete/ Asphalt
concrete using crushed aggregates of specified grading,
premixed with bituminous binder and filler as per m3 49.50 22607.96 1119094.02
Drawing and Technical Specifications. (13 mm nominal
size) Grade II(SS-1309)

Sub Total-3 3755751.73


Total of (1+2+3+4) 4180720.74
Contingency @5 % 209036.04
VAT @13% 543493.70
Grand Total 4933250.48
Prepared by : Checked by: Recommended by: Approved by:

12 of 23
13 of 23
Department of Roads
Division Road Office, Biratnagar
Calculation of Quantities

Name of Project: Jhada Ward No -3- Office -Dekhi-Hatibanda jane Batoma -Jhigiyakhola-Pakkipul -Sadak Morang.
Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage:
Length(m Breadth( Height
S.No. Description of Work No. Quantity Unit Remarks
) m) (m)
1 General Works
1.01 Insurance for the loss or damage to works,
materials and contractor's equipments including
personal injury or death as per Contract Data all 1.00 1.00 LS
Complete.
1.02 Maintain traffic flow either by diversion or traffic
control and provide safety measures during
working hours as instructed by the engineer 1.00 1.00 Job
(Flagman,traffic sign and diversion etc.) all
Complete.
1.03 Supplying and Erecting informatory board and
name plate (contract details) in place including
50mm dia. steeel tube, 2mm thick steel plate sign
board in place 1.2m.x 0.75m. Size bigger with 2.00 2.00 Nos.
back support and two or more post as instructed by
the engineer all Complete as per Specification.
[SS/SP-1501]

2.0 Drain Construction, Gabion Retaining wall and


Culvert Construction Works
2.01 Earthwork excavation in soft soil for drain and
trenches including shoring, struting, bracing,
sheeting and disposal upto 10 m and lift upto 3 m
etc. all complete as per specification.
[Manual(20%), Machine(80%)](SS-905)
For Pipe Culvert
Head Wall and Tail Wall 2.00 3.50 1.30 2.00 18.20
Total 18.20 m3
2.02 Providing and laying of hand pack Stone soling
with 150 to 200 mm thick stones and packing with
smaller stone on prepared surface as per Drawing
and Technical Specifications.(SS-2602,2603)

For Pipe Culvert


Head Wall and Tail Wall 2.00 3.50 1.30 0.15 1.36
Bed of Pipe 1.00 10.00 1.30 0.15 1.95
Total 3.31 m3
2.03 Providing and laying of Plain/Reinforced Cement
Concrete in Foundation complete as per Drawing
and Technical Specifications. PCC Grade M
15(SS-2000)
For Pipe Culvert
Head Wall and Tail Wall 2.00 3.50 1.30 0.10 0.91
Bed of Pipe 1.00 10.00 1.30 0.10 1.30
For Top of Head and Tail Wall of Culvert 2.00 3.50 1.00 0.10 0.70
Total 2.91 m3
2.04 Providing and laying Random Rubble Stone
Masonry work in cement mortar1:4 in structure
complete as per Drawing and Technical
Specifications(SS-2607)
For Pipe Culvert
Head Wall and Tail Wall 2.00 3.50 0.85 2.00 11.90

Prepared by: Checked by: Approved by:


14 of 23

Length(m Breadth( Height


S.No. Description of Work No. Quantity Unit Remarks
) m) (m)
Total 11.90 m3
2.05 Providing and Pointing with cement mortar on
masonry work in structure as per Technical
Specifications cement mortar (1:3 )(SS-2600)
For Pipe Culvert
Head Wall and Tail Wall 4.00 3.50 1.40 19.60
19.60 m2
2.06 Providing , Preparing and Installing form work
including necessary supports and removing after
completion for foundation and footings. Using
timber (soft wood) (Class F1 Finish)(SS-
1804,1805)
For Top of Head and Tail Wall of Culvert 2.00 8.00 0.05 0.80
Total 0.80 m2
2.07
Providing suitable material and Back filling
behind abutment, wing wall and return wall
complete as per Drawing and Technical
Specifications.( Locally available material)
(Without watering& Compction by Tamping rod)
(SS-908)
Culvert Head and Tail Wall 2.00 3.50 0.10 1.00 0.70
Total 0.70 m3
2.09 Providing and Laying Reinforced cement concrete
NP3 Flush jointed pipe for culverts including
fixing with cement mortar 1:2 as per Drawing and
Technical Specifications.( 600 mm internal dia.)
(SS-701)
Hume Pipe 1.00 10.00 10.00 RM
Providing and laying Gabion structure for
retaining earth with diaphragm including rolling,
cutting weaving , placing, laying sides and
diaphragms with binding wire and filling boulders
2.10 all complete as per Drawing and Technical
Specification Mesh wire- 10 Swg(0.0615 kg/m),
Selvedge Wire 8 Swg (0.1057 kg/m), binding wire
12 Swg (0.0409 kg/m) Hexagonal mesh Type 100
mm X 120 mm, Box size 2 X 1 X 1 m ( 11 sqm)
(SS-2401) 1.00 6.00 2.00 1.00 12.00
1.00 6.00 1.00 1.00 6.00
3.0 Pavement Construction Works Total 18.00 m3
3.0
Providing, laying, spreading and compacting
embankment with borrow material as per Drawing
and Technical Specification(SS-909,910)
Sides 2.00 150.00 1.50 1.00 450.00 m3
Road Way 1.00 150.00 7.00 0.20 210.00 m3
660.00
3.02 Scarifying the existing road surface to a depth of
50 mm and disposal of scarified Material with in
all lifts and lead as per Drawing and Technical
Specifications. (Mechanical means)(SS-1003)
1.00 300.00 7.00 2100.00
Total 2100.00 m2
3.03 Providing and laying granular sub-base on
prepared surface, mixing at OMC, and compacting
to achieve the desired density, complete as per
Drawing and Technical Specifications.
(Mechanical means)(SS-1201)
Carriageway 1.00 300.00 5.50 0.20 330.00
Shoulder 2.00 300.00 0.75 0.30 135.00

Prepared by: Checked by: Approved by:


15 of 23

Length(m Breadth( Height


S.No. Description of Work No. Quantity Unit Remarks
) m) (m)
Total 465.00 m3
3.4 Providing and laying Crusher Run Macadam on a
prepared surface, spreading and mixing , watering
and compacting to form a layer of Base course as
per Drawing and Technical Specifications.(For 45
mm maximum size)(SS-1204)

Carriageway 1.00 300.00 5.50 0.15 247.50


Total 247.50 m3
3.05 Providing and applying prime coat with Hot
Bitumen ( including cutter) on prepared surface of
granular base including cleaning of road surface
and spraying by mechanical means as per
Technical Specification .(SSSS-1302)

Carriageway 1.00 300.00 5.50 1650.00


Total 1650.00 m2
1650.00 @1.00 lit/m2 1650.00 Lit
3.6 Providing and applying tack coat with hot
Bitumen at specified rate on the prepared non-
bituminous surfaces including cleaning as per
Technical Speciation .(Mechanical means)(SS-
1302)
Carriageway 1.00 300.00 5.50 1650.00
Total 1650.00 m2
1650.00 @0.73lit/m2 1204.50 Lit
3.7
Providing and laying Bituminous concrete/
Asphalt concrete using crushed aggregates of
specified grading, premixed with bituminous
binder and filler as per Drawing and Technical
Specifications. (13 mm nominal size) Grade II(SS-
1309)
Ch (2+000 to 15+000)-Carriageway 1.00 300.00 5.50 0.03 49.50
Total 49.50 m3

Prepared by: Checked by: Approved by:


Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Roads
Eastern Regional Roads Directorate
Division Road Office, Biratnagar

Abstract of Cost

Name of Project:-Biratnagar - Devangunj Road, Morang/Sunsari.


Name of Work:-Blacktopped Road Construction Works including Drainage Structures
Chainage: 2+000 to 15+000

S.N. Description of Works Unit Quantity Rate(NRs)


1.00 General Works
1.01 Insurance for the loss or damage to works, materials and
contractor's equipments including personal injury or LS 1.00 1200000.00
death as per Contract Data all Complete.

1.02 Maintain traffic flow either by diversion or traffic


control and provide safety measures during working
hours as instructed by the engineer (Flagman,traffic sign Job 1.00 300000.00
and diversion etc.) all Complete.

1.03 Supplying and Erecting informatory board and name


plate (contract details) in place including 50mm dia.
steeel tube, 2mm thick steel plate sign board in place
1.2m.x 0.75m. Size bigger with back support and two Nos. 2.00 6603.30
or more post as instructed by the engineer all Complete
as per Specification. [SS/SP-1501]

Sub Total-1
2 Drain, Gabion wall and Culvert Construction Works

Earth work excavation for drain and trenches in all type


of soil including shoring, struting, bracing, sheeting and
2.01 safe disposal all complete as per specification.[SS/SP- m3 1300.00 120.11
905]

Providing and laying dry stone solling including


2.02 dressing etc. with relavent lead and lift all complete as m3 320.25 3585.47
per specification .[SS/SP-2602,2603]

Providing and placing cement concrete for the non-


structural elements including compaction, curing,
2.03 testing and relevant lead etc. as per drawing all m3 266.00 10638.45
complete as per specification [1:2:4 (cement : sand :
aggregate)][SS/SP-2000]
Providing and laying Random rubble masonry in cement
sand (1:4) mortar including scaffolding, curing etc. all
2.04 complete as per Specification.[SS/SP-2602,2603, 2607] m3 625.00 9024.52

Providing , Preparing and Installing form work


including necessary supports and removing after
2.05 completion for walls all complete as per specification. m2 842.90 649.02
[SS/SP-1800]

Backfilling to structures, foundations pits, side drains,


etc. from excavated materials including compaction, all
2.06 m3 163.00 405.10
complete as per specification.[SS/SP-908]

Proving and laying RCC pipes of diameter 600 mm


(internal) with or without collars jointed with stiff
2.07 mixture of cement mortar in the proportion of 1 : 2 ( 1 #REF! 50.00 7372.57
cement : 2 fine sand ) all Complete as per Specification.
[SS/SP-908]
Providing and placing machine mixed M20/20 cement
concrete for the slab etc. including compaction, curing,
2.08 testing etc. all complete as per specification .[SS/SP- m3 160.00 10902.84
2000]
Providing and laying Reinforcement ( diameter above 8
mm and upto 16 mm) including cutting, bending,
binding, fixing in position and lead 30m. etc. all
2.09 complete as per specification and drawing.[SS/SP- MT 22.92 119654.60
2000]

Fabrication of hexagonal mesh type 100mm x 120 mm


Gabion boxes / mattresses with diapharagms, with
binding wire 12 swg, mesh wire 10 swg and selvedged
wire 8 swg , including rolling, cutting and weaving ;
assembling Gabion boxes mattresses, palcing in position
including stretching, forming compartments; tying with
bracing wires and tie wires; tying down the lid
2.10 complete; and providing and filling stone / boulder in m3 500.00 5085.26
gabion boxes / mattresses etc. including dressing,
beding, bonding and all transporation as per
specification.[SS/SP- 2401]

Sub Total-2
3.00 Pavement Construction Works
3.10 Formation of embankment including compaction in
layers not exceeding 150 mm compacted depth, m3 16800.00 504.01
watering etc. all complete as per specification [SS/SP-
907 ]
3.20 Subgrade preparation / Regrading of gravel surface by
scarifying with grader machine including watering,
levelling , formation of camber and compaction all m2 91000.00 10.41
complete for sub grade preparation work all complete as
per Specification. [SS/SP- 1003]
3.30 Providing, Laying, Spreading, watering, Leveling and
compaction as per required camber of riverbed gravel
for sub base course with all transportation all Complete m3 20150.00 2433.33
as per Specification. [SS/SP-1201]

3.40 Providing, laying, spreading, watering, levelling and


compaction of crusher run materials for base course
with relevant lead and lift all complete as per m3 10725.00 2798.39
Specification. [SS/SP-1202]

3.50 Providing and spraying bituminious prime coat


including cleaning the road surface using wire, brushes,
broom etc. before applying prime coat all complete as Lit 71500.00 162.38
per Specification. [SS/SP-1301, 1302]

3.60 Providing and spraying bituminious tack coat including


cleaning the road surface using wire, brushes, broom
etc. before applying tack coat all Complete as per Lit 52195.00 162.38
Specification. [SS/SP-1301, 1302]

3.70 Providing mixing and laying asphalt concrete with


compaction all complete as per specification . [SS/SP- m3 2860.00 16328.03
1307, 1308]

Sub Total-3
4.00 Traffic Safety Related Works
4.10 Supplying and erecting traffic sign in place including
50mm dia. Steel tube, 2mm. thick steel plate, cement
concrete, painting, writing and supporting steel angle
nut and bolit etc. complete a) 60cm. Dia. Circular,
60cm. equilateral traingle and 60cm.x 45cm. rectangular Nos. 10.00 2255.79
shaped sign (single post). all Complete as per
Specification. [SS/SP- 1501]

4.20 Supplying and placing R.C.C. Kilometer post (Bigger


kilometer post placed at each 5 km.) including
excavation, back filling, painting and writing etc. all Nos. 3.00 4549.79
Complete as per Specification [SS/SP- 1503]

4.30 Supplying and placing R.C.C. Kilometer post


(Standarad kilometer post placed at each 1 km.)
including excavation, back filling, painting and writing Nos. 14.00 2114.60
etc. all Complete as per Specification [SS/SP- 1503]
4.40 Supplying and fixing in place R.C.C. delineator and
guard post including excavation, back filling, painting
and erection etc. all complete as per drawing and Nos. 350.00 1139.77
Specification.[SS/SP- 1504]

Sub Total-4
Total of (1+2+3+4)
Contingency @5 %
VAT @13%
Grand Total

Prepared by : Checked by: Recommended by:


t

ar

F/Y: 2075/76

ctures

Amount(NRs) Remarks

1312549.03
1200000.00

300000.00

13206.60

1513206.60

156143.00

156143.00

1148246.76

2829827.70
5640325.00

547058.95

66031.30

368628.50

1744454.40

14874570.54

2742483.43

2542630.00

17785829.04

9991494.24

8467368.00
49978909.50

947310.00

57857287.41

49031599.50

96796492.65

30012732.75

11610170.00

8475424.10

46698165.80

155242770.15

22557.90

13649.37

29604.40
398919.50

464731.17 548382.7806 35001307.39 35549690.17


175006536.96 13462041.30 :Per KM Road Construction Cost
8750326.85
22750849.80
206507713.61

Approved by:

1312549.027