Sunteți pe pagina 1din 3

Note 835219 - FAQ: ATP composite note

Note Language: English Version: 8 Validity: Valid from 18.10.2005

Summary

Symptom
This note contains a list of all available FAQ notes for the ATP area and
its related application areas.

FAQ notes for the ATP check, for requirements in SD, for schedule lines in the sales
order

547118 FAQ: Result of ATP calculation

547512 FAQ: Customizing the ATP in R/3

607036 FAQ: Product allocation in R/3

548779 FAQ: Delivery units during the availability check

766475 FAQ: ATP check and confirmed quantities of stock transport orders

547277 FAQ: Requirements in SD and in the delivery


606282 FAQ: Returns processing, requirements and ATP

547508 FAQ: Schedule line overview and ATP

549064 FAQ: Rescheduling/backorder updating in R/3

546965 FAQ: Correlation and delivery groups in SD

547961 FAQ: Shipment and transport scheduling in R/3


146829 Process flow of route schedule

682613 FAQ: Local ATP from CRM

99999 ATP server: Installation and sizing

25444 SDRQCR21: Recovery of sales and delivery requirements

FAQ notes for related subject areas:

799948 FAQ: Dynamic assembly


764611 FAQ: Static assembly
321803 Explanatory notes on ATP Customizing (for production orders)

622299 Consulting: Availability check against planning

498149 FAQ: Availability check in purchasing

548510 FAQ: Confirmation function in R/3, confirmation schedule lines

619911 FAQ: Batch determination

842829 Replenishment dely from stock trans order: Special features

06.12.2007 Page 1 of 3
Note 835219 - FAQ: ATP composite note

Notes on further ATP relevant topics with consulting content:

873606 Rounding problem results in different confirmations

More Terms

Cause and Prerequisites


-

Solution
-

Header Data
Release Status: Released for Customer
Released on: 19.10.2005 08:49:52
Priority: Recommendations/additional info
Category: FAQ

Main Component SD-BF-AC Availability Check


Additional Components:
PP-ATO Assembly Processing

The note is not release-dependent.

Related Notes
Number Short Text
885177 Stock transfer in purchasing: New schedule line processing
842829 Replenishment deliv from stck trans order: Special features
799948 FAQ: Dynamic assembly
766475 FAQ: ATP check and confirmation of stock transport orders
764611 FAQ: Static assembly
682613 FAQ: Local ATP from CRM
622299 Consulting: Availability check against planning
619911 FAQ: Batch determination
607036 FAQ: Product allocation in R/3
606282 FAQ: Returns processing, requirements and ATP
549064 FAQ: Rescheduling/backorder updating in R/3

06.12.2007 Page 2 of 3
Note 835219 - FAQ: ATP composite note

Number Short Text


548779 FAQ: Delivery units during the availability check
548510 FAQ: Confirmation function in R/3, confirmatn schedule lines
547961 FAQ: Shipment and transportation scheduling in R/3 system
547512 FAQ: Customizing of the ATP in R/3
547508 FAQ: Schedule line overview and ATP
547277 FAQ: Requirements in SD and in the delivery
547118 FAQ: Result of ATP calculation
546965 FAQ: Correlation and delivery groups in SD
498149 FAQ: Availability check in purchasing
321803 Explanatory notes on the ATP Customizing
146829 Process flow of route schedule
99999 ATP server: Installation and sizing

Attributes
Attribute Value
weitere Komponenten PP-ATO

06.12.2007 Page 3 of 3

S-ar putea să vă placă și