Sunteți pe pagina 1din 225

CURRICULUM VITAE

Personal Details
Name : Nkanang, Uwemedimo Sunday
Nationality : Nigerian
Position : Project Engineer

Qualifications
University of Port Harcourt, Choba, Port B-ENG Mechanical
Education
Harcourt, Rivers, Nigeria Engineering 2013
Akanu Ibiam Federal Polytechnic, HND Mech. Engineering 2004
Unwana,Afikpo, Ebonyi State.
Government Technical College, Abak, Akwa WAEC/NABTEB 1997
Ibon State, Nigeria
 Nigerian Society of Engineers (membership in view)
Professional
 Nigerian Piping Engineer (Member)
Membership

 Project Engineer, IndexPro Int’l Services Limited , Km 21, PH/Aba 2014 -, 2017
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Piping Engineer, OCIP II - Subsurface & Surface Developmet 2013 - 2014
Company (SSDC) #12B Abua, Rumoibekwe Estate, Port Harcourt

 Piping Designer, CresTech Engineering Limited (Technip Gruop) # 2009 – 2013


4/6, Ajose Adeogun Street, Victoria Island, Lagos, Nigeria.

 Design/Field Engineer, GTA Engineering Nig. Limited ( Skipper 2007 – 2009


Energy Group) Apapa, Lagos.

 Ministry of Work (NYSC), Ikole LGA, Ekiti State, Nigeria. 2005 – 2006

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcoourt, Nigeria

Project Engineer
 Reviewed COMPANY IFC Drawings
 Conduct site inspection and verification with IFC Drawings
 Develop detailed site inspection report
 Compile detail technical report
 Raise Technical query
 Responsible for development of Project Execution Plan, Transportation and Installation Plan (TIP) and
other relevant procedures for Revamp project
 Responsible for developing lifting sequence and resources for all Onshore and Offshore installations.
 Responsible for field verifications on IFC, Generating materials Take Off (MTO) and Fabrication
drawings for WOP and AWO’s.
 Maintains constant communication with Onshore /Offshore work locations for resource support.
 Evaluate the scope of work on WOP and that of subcontracts.
 Monitor work progress offshore/onshore in line with the schedule and advise on any slippage
suggesting recovery measures.
 Track and monitor design changes on the project.
 Coordination of the Shop/fabrication drawings
 Provide timely support and advise to site installation crew to ensure compliance with installation plans,
procedures and methodology.

Experience 2014 - 2017 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Project Engineer – Onshore and Offshore Fabrication and Installation Support on:
 Agbami Stage 1 & 11 – Chevron/MPL
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL
 Aje Field Development project – FASL/Ariosh
 West Jupiter ROV Project – Total/MPL

Responsibility:
 Site Visit/Scoping
 Prepared site visit report, cost analysis and estimate.

 Responsible for fabrication and construction activities and development of budget estimates.
 Development of Project Procedures with attention to details

2
 Project Management and Scheduling.
 Client interface.
 Review Clients drawings and interpretation for fabrication.
 Conduct site inspection and verification + Compile detail technical report, Responsible for
developing lifting sequence and resources for all Onshore fabrication and Offshore
installations.
 Responsible for field verifications on IFC, Generating materials Take Off (MTO) and
Fabrication drawings for WOP and AWO’s.
 Maintains constant communication with Onshore /Offshore work locations for resource
support.
 Responsible for development of Work Order Proposal, Project Execution Plan, Transportation
and Installation Plan (TIP) and other relevant procedures to support WOP execution.
 Evaluate the scope of work on WOP and that of subcontracts. Monitor work progress
offshore/onshore in line with the schedule and advise on any slippage suggesting recovery
measures. Track and monitor design changes on the project.
 Provide timely support and advise to site installation crew to ensure compliance with
installation plans, procedures and methodology
 Coordinate the entire fabrication activities.

Experience 2013 – 2014 Subsurface & Surface Port Harcourt, Rivers State
Development Company (SSDC)

Piping Engineer – OCIP II Project, ExxonMobil

3
Project:
 Iyak SB Deck Extension Fabrication
 Asabo MP Piping Spool Fabrication
 Ubit GP Piping Spool Fabrication.

Responsibilities:
 Review IFC Drawings from MPN.
 Raise Technical Query to MPN if applicable
 Prepared Shop Drawings on Asabo MP, Ubit GP and Iyak SB for fabrication.
 Site Visit for IFC drawing verification.
 Prepared MTOs and Bill of Materials for Materials Request and Resolution.
 Prepared Hydro-test Pack Specimen Drawings for Spool Hydro-test exercise.
 Issued Work instruction Sheet for Cut and Prep, Assemble and Weld Sequence.
 Prepared Weld Map drawing for Asabo MP, Ubit GP and Iyak SB.
 Prepared As-Built Drawing
 Attend Project Review Meeting with MPN and Response to Spec. Queries.
 Developed Lifting/Rigging arrangement drawing.
 Coordinate piping fabrication activities
 Supervised the orientation and dimensional check with QA/QC engineer on site.

Experience 2009 – 2013 CresTech Engineering Limited Victoria Island, Lagos


(Technip Group)

Piping Designer - OFON PHASE 2 PROJECT, Total E&P Nigeria Limited

PDS 3D Modelling
Responsibilities:
 Equipment Modelling/Layout.
 Piping Modelling
 2D Drawings Extraction
 Isometric Drawings Extraction
 Interference Detection/Clash Check
 Internal Review/Check

4
 Complete Annotation

Project: Egina FPSO - Total Upstream Nigeria - Basic Engineering:

PDMS Piping Designer

 Offshore deep water field development including a 2MMbbl storage FPSO,


 UFR (Umbilicals, Risers and Flowlines),
 SPS (Subsea Production System),
 OOS (Oil Offloading System) for 208,000 Bopd. .

Responsibilities
 PDMS Piping Catalogue Preparation:
 Creation of Notepads for Piping Material Specs.
 Loading Notepads into Paragon.
 Loading Notepads into Propcon
 Loading Spec into Specon
 Generating Spec Reports
 Isometrics Extraction

Project: Iyak SB Slot Addiction Project (Detailed Engineering) ExxonMobil.


 Addiction of external well conductor slots (Which includes: Piping flowlines, production manifold, test
header, production header) tied to existing lines and gas lift facilities.
 The objective of this project is to provide increased oil production from the Iyak field through drilling of
additional wells and gas lifting the same wells.
 Iyak SA & SB platform are an unmanned 4-legged fixed steel jacket structure and presently has four
(4) internal slots occupied by three conductors as well as four (4) external slots occupied by two (2)
conductors.
 This project consists of platform modifications on Iyak SA to accommodate seven wells to be drilled
from three 42’’ conductors on Iyak SB well-head platform

Responsibilities:
 Generated Piping General Arrangement Drawings(plan)
 Prepared Piping Details Sections Drawings.
 Prepared Piping Isometrics and Checked (Flowlines, production manifold, test header, production

5
header, gas lift lines)
 Prepared MTOs and Bill Of Materials
 Developed Valve Data Sheet and Valve List.
 Prepared Piping Specialty Item List

Project: Etim Life Extension Repairs Project, Mobil Producing Unlimited


Detailed Engineering: To improve the operational conditions of the existing
Facilities (Etim LP and LB) by addressing the base existing integrity issues through provision
of mitigation to ensure safe and continued operations.

Responsibilities:
 Offshore Site visits on Etim Well Head and Production Platforms (Etim LB/LP Platforms.)
 Responsible for Site Visit/Marking up of Existing drawing towards ‘As-building’ them.
 Prepared Site Visit Report to As-build the existing Equipment and Layouts.
 Prepared Piping Isometric and Checking.
 Prepared Bill of Materials.
 Prepared Material -Take-Off (MTOs)
 Prepared Valve Master List and data sheets.
 Prepared SP Item-List and Tie-in point list.
 Modified general arrangement drawings for firewater diesel engine lines.
 Prepared Pipe Support Details drawing.
 Attend project review meetings and response to spec queries.

Project: Asabo Additional Gas Generator Project – Follow up Engineering


Project. (Detailed Engineering): Mobil Producing Unlimited

Responsibilities
 Generate Piping General Arrangement Drawings(plan)
 Prepared Piping Details Sections Drawings
 Prepared Piping Isometric and Checking.
 Prepared Bill of Materials.
 Prepared Material -Take-Off (MTOs)

6
 Prepared Valve Master List and data sheets.

Project: EGP3B Project, Chevron Nigeria Limited.


The EGP3B project objective is end routine gas flaring upon completion in COMPANY’s ESCRAVOS

Offshore Area. The project is comprised of three separate aspects; laying 73.6 Km of gas pipelines,

Engineering Procurement & Construction (EPC) of a new 120 mmscfd Gas Gathering and Compression

Platform (GGCP) and Brownfield Production Platform Modifications.

Responsibilities:
 Generated Piping General Arrangement Drawings(plan)
 Prepared Piping Details Sections Drawings.
 Prepared Piping Isometrics and Checked (Flowlines, production manifold, test header,
 production header, gas lift lines)
 Prepared MTOs and Bill Of Materials
 Generated Valve Data Sheet and Valve List.
 Prepared Piping Specialty Item List.

Experience 2007 – 2007 GTA Engineering Nig. Limited Apapa, Lagos


(Skipper Energy Group)

Design Engineer, National Integrated power Project (NIPP) 33/11KV INJECTION SUBSTATION -EPC

 Substation Layout Design showing the position of Electro-Mechanical Equipments such as Isolator,
Circuit Breakers, Voltage Transformer, Current Transformer, Gantry, Transformer, Lighting Arrestor
etc for Nine Injection Substations: Ipakodo, Igbogbo, Ijede, Imota, Agbowa, Epe, Ajegunle, Owutu and
Odungunyan Substations.

7
 Drawing of the Single line diagram for all the above NIPP Substation.

 Electrical Equipment’s Structure Design for the above Electro-Mechanical Equipment’s.

 Designed of 33kv, 11kv transformer Panels for PHCN project and prepared material take-off
for construction.

 Part of the team that Designed 132KV Substation for GHANA Electricity Company Ltd., under GHANA
Electricity Expansion Project.

 Carryout HVAC designed for the NIPP Substations and other Clients on Mechanical Piping Network
for Sewage System, Drainage, Fire Protection and Air-Conditioning.

 Capacitor banking installation for 10(Ten) Transmission station nationwide.

Experience 2005 – 2006 Ministry of Work, Ikole LGA Ikole, Ekiti State

Trainee Engineer. National Youth Service Corps (NYSC)

 Supervision of Local Government Construction Projects and other Technical maintenance


 Participated in the design, planning and implementation of project.

Experience 1999– 2000 Nigerian Gas Company NNPC Moscow Rd, Port Harcourt

Plant Operator, INDUSTRIAL TRAINING

 Gas Plant Operation

 Process Monitoring ,Control and Data logging

 Operation of Gas Heaters, Scrubbers, Pressure Control valves

 Natural Gas metering and Calculations.

 Installation and maintenance of gas facilities like pressure control valves, orifices and general pipe fittings.

 Use of Safety equipment, Drills, Troubleshooting etc.

8
 Effective use of the Computer Software Packages; Microsoft Word, Excel and Power Point.

 Gas facilities training.

Courses
Attended Helicopter Underwater Escape Training (TOLMANN) 2017
HSE Training on OCIP II Contractors(Mobil) 2013
Construction Risks Assessment Training(MPL) 2016
Basic Fire Fighting Course (IndexPro) 2015
Hazard Identification and Correction Program (U See, U Act) - 2013
ExxonMobil

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Strong knowledge in AutoCAD, PDMS 11.5, Micro Station V8 and PDS
Ability to function in an integrated project team environment
Ability to study and interprete piping, isometric drawings, general arrangement and
Equipment layout drawings, structural drawings etc.
Good communication skill
Good understanding of multi-discipline engineering activities.
Project Monitoring/ Co-ordination

D Good knowledge in preparing engineering inputs to technical tender packages

9
evelopment of Project Procedures with attention to details.

Knowledge in Specifications, Standards, Codes of Practices and Procedure etc

10
CURRICULUM VITAE

Personal Details
Name : Amos Friday Udoh
Nationality : Nigerian
Position : CAD Engineer

Qualifications
University of Port Harcourt, Choba, Port B. Eng. (Lower Division),
Education
Harcourt, Rivers, Nigeria Mechanical Engineering 2006

Secondary Comm. Sch. Ini, Akwa Ibom State. WASSC 1999


Nigeria
 Nigerian Society of Engineers (membership in view)
Professional
Membership

 Professionally qualified Mechanical Engineer with (Second class


Career honors, lower division) from University of Port-Harcourt Nigeria with
Summary more than Eight (8) years’ work experience.
Held other positions including Three year as a Project Engineer,
and also Three (3) years as a Quality Control Engr.

 Project Engineer, IndexPro Int’l Services Ltd. 2014 – 2018

 QAQC Coordinator/ Site Supervisor, NOMO & SONS Integrated


Services Ltd. 2009 – 2014

 Mathematics Teacher for SS2 and JS3, GOVT. DAY SEC. SCH.
MISAU, BAUCHI STATE (NYSC) 2008 – 2009

 Trainee Supervisor (Tools Room Department), NIGERIA


ENGINEERING WORKS LIMITED, PORT HARCOURT 2005

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

CAD/Field Engineer
PDS 3D Modelling
Responsibilities:
 Equipment Modelling/Layout.
 Piping Modelling
 2D Drawings Extraction
 Isometric Drawings Extraction
 Interference Detection/Clash Check
 Internal Review/Check
 Complete Annotation
 Assist Project Manager to ensure timely and safe execution of projects.
 Liaise with Project Manager to oversee the preparation, review and compliance of procedures,
operations and subcontractors with HSES&EMS, policies and procedures.
 Work with Project Manager and monitor projects to ensure compliance and review contract
documents, specifications and drawings.
 Draw and track schedules, monitor the overall progress of work against schedule.
 Participate in adhoc meetings, progress meeting, HSE meetings and kick-off
 meetings.
 Assist tradesmen to interpret job designs and drawings.
 Ensure that time of delivery is achieved.
 Report to Project Manager.

Experience 2014 - 2017 IndexPro Int’l Services Limited Port Harcourt, Nigeria

CAD/Field Engineer – Onshore and Offshore Fabrication and Installation Support on:
 Agbami Stage I & II – Chevron/MPL
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL
 Aje Field Development project – FASL/Ariosh
 West Jupiter ROV Project – Total/MPL
 Fabrication of Production Manifold and Suction Pile Grillages, Agbami Stage 3 ( Marine
Platforms LTD.)
 Fabrication of four numbers of CHUTE (ARIOSH)
 Extension of Moonpool Grillage & Construction of Hose Reel (Marine Platforms Ltd.)
 Construction of African Inspiration Main Deck Guardrail (Marine Platforms Ltd.)

2
 Construction of FIFI System Sea fastening Grillage (Marine Platforms Ltd.)
 Construction of Normand Pacific PILE & PLEM Bumper Frame. (CEONA)
 Construction of Gooseneck and Methanol Tank bonded Grillages. (CEONA)
 Construction of A Frame Grillage and IUTA Lifting Frame. (Marine Platforms Ltd.)
 Construction of Crane Base foundation, Cross Over Platform and Boom Rest (Rostrum Oil
and Gas)
 Construction of Access ladder and walkway (Marine Platforms Ltd.)
 Refurbishment of grillage (Marine Platforms Ltd.)
 Fabrication of fixed and Extendable ladder with cage. (Marine Platforms ltd.)
• Fabrication of VLS (CEONA)
• Refurbishment of bladder tank and fabrication of bladder Tank frame. (Marine
Platforms Ltd.)

Responsibility:
 Site Visit/Scoping
 Prepare site visit report, cost analysis and estimate.
 Prepare Equipment Modelling/Layout.
 Prepare Piping Modelling
 2D Drawings Extraction
 Isometric Drawings Extraction
 Interference Detection/Clash Check
 Internal Review/Check
 Complete Annotation
 Review Clients drawings and interpretation for fabrication.
 Conduct site inspection and verification + Compile detail technical report, Responsible for
developing lifting sequence and resources for all Onshore fabrication and Offshore
installations.
 Responsible for field verifications on IFC, Generating materials Take Off (MTO) and
Fabrication drawings for WOP and AWO’s.
 Maintains constant communication with Onshore /Offshore work locations for resource
support.
 Responsible for development of Work Order Proposal, Project Execution Plan,
Transportation and Installation Plan (TIP) and other relevant procedures to support WOP
execution.
 Evaluate the scope of work on WOP and that of subcontracts. Monitor work progress

3
CURRICULUM VITAE

Personal Details
Name : Nwokearu Chika Augustus
Nationality : Nigerian
Position : QA/QC Coordinator

Qualifications
Institute of Management and Technology, Higher National Diploma
Education
Enugu State (HND) Chemical 2008
Engineering
Secondary Technical School, Umuariam WAEC 1995

Obowo, Imo State, Nigeria


 American Welding Society- In view
Professional
 Nigeria Institute of Management
Membership

1
 QAQC Inspector, IndexPro Int’l Services Limited , Km 21, PH/Aba 2015-2018
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Mechanical Inspector/Quality Inspector, ONSHORE CONSTRUCTION 2017 - 2017
COMPANY LLC

 Mechanical Inspector/Quality Inspector, NIGERDOCK NIGERIA 2014-2016


PLC.

 Mechanical Inspector/Quality Inspector, DELATTRE BEONS NIGERIA 2013-2014


LIMITED (DBN)
 Mechanical Inspector/Quality Inspector, HYUNDAI HEAVY
2012 – 2013
ENGINEERING NIGERIA LIMITED
 Mechanical Inspector/Quality Inspector, SINOPEC OIL AND GAS SERVICES
NIGERIA LTD. 2011-2012
 QA/QC Engineer, CHUCKSBEH ENGINEERING NIG. LTD
 Welding Inspector Trainee, SAN TUZE ENGINEERING P/H 2009-2011
2005-2009

Work Experience

Experience 2015-2018 IndexPro Int’l Services Limited Port Harcourt,


Nigeria
Mechanical Inspector/Quality Inspector – Onshore and Offshore Fabrications and
Installations Support on
Projects:

- Bonga LWI/SIL project ( Snepco/Marine platforms)


- Agbami phase 3 ( Marine Platforms/Chevron).
- Aje Project ( Ariosh/FASL)
- ROV Tooling Basket (Snepco / Marine Platforms)
- Moonpool Grillage Extension Project ( Chevron /Marine Platforms)
- Golden Eagle Hose Reel Fabrication Project ( Marine Platforms)
- Siem-marlin Re-instatement Project ( Marine Platforms)

Responsibilities:
 Checking of equipment and structural alignment
 Preparation and Maintenance of all Quality Manual & Procedures
 Checking bolt torque and tightening

2
 Verifying structural placement
 Monitoring of general work quality at site
 Carrying out of Hydro test and leak test
 Preparation of inspection test plan (ITP) for all projects
 Monitoring of joint fit-up before the inception of welding
 Maintenance of daily weld record
 Raising of NDT request for completed welds
 Carrying out Daily Weld Audit
 General Structural and weld Quality Control

Experience 2014 - 2015 ADEX OIL AND GAS LIMITED Warri, Delta State
,Nigeria
Mechanical Inspector/Quality Inspector – Onshore and Offshore Fabrication and Installation
Support on:
Projects:
 PROVISION OF PIPING MODIFICATION OF SC-8 WELL-HEAD AT STUBB CREEK

Responsibilities:
 Monitoring, inspecting welding fabrication and reporting of progress.
 Requesting for Non-Destructive Examination of welds when the welding
work is completed.
 Coordinating the activities of third party inspectors and their reports before
approval.
 Carrying out of internal audit of the QMS and monitoring of the corrective
actions required.
 Review work breakdown schedule as well as construction drawing to make
contribution as the need arises
 Monitor work progress and issued daily progress report to client.
 Preparing and reviewing of as-built documents, ensure that all requirements
are correct and complete before handing over to the client

Experience 2012 – 2013 SINOPEC OIL AND GAS Port Harcourt, Rivers

3
SERVICES. State, Nigeria

DOCUMENT CONTROL SUPERVISOR

Responsibilities:
 Responsible for operating and maintaining the Department Project Document Control
System and ensuring the availability of up to date information/data throughout the
project.
 Ensure that all documentation, drawings and specifications are up to date and at the
correct revision.
 Ensure that client numbering and revision status is being used on all documentation,
drawings and correspondence. Participate in the discussion of the "Subcontractor
Document Register" during project and Supplier "kick off" meetings.
 Ensure that the "Document Control Procedure" is applied through to project
execution.
 Check correct procedure format, number and revision are being used.
 Dispatch documents and comments internally and externally as per distribution
matrix.
 Using reports, advise Client, Subcontractor, Project Manager and Team Members on
a weekly basis, the status of documents and comments internally and externally.
Prepare weekly and monthly Quality Report.
 Ensure Internal Departments produce documentation within MDR planned dates.
 Assist in supplying documentation for mobilization (hardcopy and electronic to disk).
 Manage archival activities for controlled documents and validation files.
 Interfacing with External Clients and Subcontractors.
 Coordinate the activities of Document Control / QA/QC, including processing /
scheduling distribution auditing controlled documents, maintenance of electronic files,
tracking and reporting on document review progress
 Manage all aspects of the controlled documents system, both electronically and
paper copies.
 Maintain proper documentation, of all internal audits, non-conformance reports,
surveillance reports and corrective actions.
 Provide support for the Quality System during audits, actively participate in
department activities and support to construction and engineering matters.
 Work with subject matter experts on technical subjects in a positive, collaborative
manner to prepare controlled documents which conform to company defined format
 Review and proofread documents for consistency of document format and system
concerns
 Adhere to and enforce company policies and procedures related to document control.
 Process all documentation received in DM in accordance with prescribed matrices
within agreed time scales.
 Process both design and vendor documents in accordance with the corporate or
project procedures.

4
 Accurately update information in the electronic document management system.
 Perform audits of company areas and processes to confirm compliance with
controlled procedure

Experience 2012 – 2012 HYUNDAI HEAVY Lagos, Nigeria


ENGINEERING NIGERIA
LIMITED

Mechanical Inspector/Quality Inspector -


Project:
DSO PROJECT
Responsibilities:
 Preparation of test pack
 Preparation and Maintenance of all Quality Manual & Procedures
 Performance of daily audit to check level of conformance to quality manual
 Preparation of weld procedures
 Preparation of test procedures and other procedures
 Monitoring of general work quality at site
 Carrying out of Hydro test and leak test
 Preparation of inspection test plan (ITP) for all projects
 Monitoring of joint fit-up before the inception of welding
 Maintenance of daily weld record
 Raising of NDT request for completed welds
 Carrying out Daily Weld Audit
 General Fabrication and weld Quality Control including Welding Inspection
 Monitoring and recording of welding procedure qualification test (WPQT)
 Performing of visual inspection of completed weld

 AWS CERTIFIED WELDING INSPECTOR In-veiw


Courses
Attended

5
Posses working knowledge in MS Word, MS Excel, MS Powerpoint,
Skills
MS Project.
Strong knowledge in AutoCAD, PDMS 11.5, Micro Station V8 and
PDS
General proficiency in quality management system, welding inspection
and NDT control.
Team working skills, Good team player, sharing team goals, aspirations
and support team members to achieving those goals.
Interpersonal and analytical skills: Result-Oriented and delivering on
promise.
Ability to work under pressure and to tight deadlines with limited
supervision.
Good communication skill
Good understanding of multi-discipline engineering activities.
Knowledge in Specifications, Standards, Codes of Practices and
Procedure etc

6
CURRICULUM VITAE

Personal Details
Name : Samuel Utip
Nationality : Nigerian
Position : Accountant

Qualifications
University of Port Harcourt, Port Harcourt B. Sc. Accounting,
Education Second Class (Honours)
2008-2012
Community Comprehensive secondary school.
Ikot Esop , Etim Ekpo L.G.A. Akwa Ibom State.
1994

Professional  Nigerian Institute of Management (Chartered) 2014


Membership
 Accountant- IndexPro Int’l Services Limited , Km 21, PH/Aba 2018- Date
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Accountant-Whiteside Energy Ltd 2014 -2016

 Financial Accounting Teacher -National Youth Service Corps, Ogun


State. 2013
Born To Reign International Secondary School, Ogun State

 Accounts Clerk -Esago Foundation Services Ltd 2006-2008


Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Accountant
Responsibities
 .Ensures that the statutory accounting books are accurately kept and up to date.
 .Maintains effective and efficient payment procedures in all business transactions
 Maintains proper and up to date records of the company’s fixed assets
 Liaises with banks and other financial institutions to facilitate transactions.
 Prepares end of year management accounts and reports for the management.
 .Prepares staff pay roll and ensures that PAYE: and other deductions are made and paid to the
appropriate authority
 .Ensures that withholding tax, VAT and company income tax are paid to the appropriate authority.

1
 Reconciles Bank statements of accounts and prepares Bank reconciliation statements

Experience 2014 -2016 Whiteside Energy Ltd Port Harcourt, Nigeria

Accountant

Responsibility:
 Cash disbursement and maintenance of all forms of cash book
 Invoicing
 maintaining account receivable and account payable
 Fixed asset register maintenance
 Preparation of management account
 Filing of VAT returns and other statutory payments
 Making of bank transactions
 Rendering of financial advice to management for effective decision making

Experience 2013 National Youth Service Corps. Ogun State

Financial Accounting Teacher

Born To Reign International Secondary School

Responsibility:
 Teaching of the students and preparing them for internal and all external examinations on
Financial Accounting

Experience 2006-2008 Esago Foundation Services Ltd Port Harcourt, Rivers State.

Accounts Clerk

Responsibilities:
 Keeping of Financial Records and other accounts support functions

Skills Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Ability to function in an integrated project team environment
Good communication skill..
Good Interpersonal skill
Ability to work under minimum or no supervision
High level of creativity and initiative
Passion for learning and adapting to a challenging task environment

2
3
CURRICULUM VITAE

Personal Details
Name : Amaefule Innocent Onyeche
Nationality : Nigerian
Position : Admin. / HR Officer

Qualifications
Rivers State University, Port Harcourt, Nigeria. M.sc,CorporateFinance
Education
Rivers State University of Science and B Sc.Banking and Finance 2002--2006
Technology, Nkpolu, Port Harcourt, Nigeria. (2nd Class Upper
Division)
1999
General Certificate of Education. GCE.

Professional
Membership

 Admin/HR Officer - IndexPro Int’l Services Limited , Km 21, PH/Aba 2018 – till date
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Operations Manager - Petromax Integrated Services Limited, 180 2015 - 2018
Aba Road, Port Harcourt .

 Admin/Commercial Officer –Selop Infinite Company Limited, 64 2008 – 2015


Makelele Okocha Road, Rumuigbo New Layout, Off Mgbuoba, Port
Harcourt, Rivers State, Nigeria.

 Chainman – MCC Nigeria Ltd., Mile 7, Ikwerre Road, Rumuigbo, Port 1996 – 2001
Harcourt, Rivers State. Nigeria
Work Experience

Experience 2018 till date IndexPro Int’l Services Limited Port Harcourt, Nigeria

Admin/HR Officer
 Responsible for all Human Resources and Administrative processes and functions. Setting up of
Human Resources and administrative structure for the company, viz; Staff Recruitment, selection and
placement. Company restructuring and setting up Human Resources policies and processes for
employee engagement with over 60 employees.

1
 Plan and coordinate internal Admin/HR functions.
 Assist the Admin/HR Manager in the development of Admin/HR strategies, policies, procedures and
framework; resource scheduling and allocation of resources and teams in field engagements.
Providing general administrative functions such as ensuring that the company complies with basic
external environment requirements, viz payment of taxes; utility bills; liaising with Pension Funds
Administrators to getting staff registered with the Fund and also ensuring that funds are properly
remitted as and when due.
 Staff benefit administration and welfare,
 Facility and fleet management,

Experience 2015 – 2018 Petromax Integrated Limited Port Harcourt, Nigeria

Operations Manager
Responsibility:
 Coordination of general site operations
 Handling of Material requisition and proper inventory of materials at site.
 Conduct daily Tool Box meetings in conjunction with the HSE officer
 Ensure regular attendance of staff at site
 Monitor overtime activities and ensure accurate records of overtime performance.

Experience 2008 – 2014 Solep Infinite Company Limited Port Harcourt, Rivers State

Admin/Commercial Officer

 Overseeing site operations, procurement and logistics in conjunction with site engineer.
 Plan, design and coordinate daily site activities in conjunction with site engineer.
 Staff benefit administration and welfare,

 Facility and fleet management,


 Spearheading company’s Corporate Social Responsibility.
 Daily report on site activities to the Managing Director.

Experience 1996 – 2001 MCC Nigeria Limited Port Harcourt, Rivers State.

Survey Chain Man


Responsibilities:
 Assist the surveyor in measurements and establishment of Road alignment, road width and
offsets.
 Assist in determining the actual length of the road and writing of chainages
 Establishment of drain lines and invert levels.
 Undertake other responsibilities as instructed by the surveyor.

2
Posses working knowledge in MS Word, MS Excel, MS Powerpoint
Skills
Ability to function in an integrated project team environment
Good communication skill
Project Monitoring/ Co-ordination

3
CURRICULUM VITAE
Personal Details
Name : Ekere, Edo-Abasi Michael
Nationality : Nigerian
Position : HSE Lead

Qualifications
Regional Maritime University, Nungua – Accra, MSc. Environmental 2009-2010
Education
Ghana. Engineering

University of Calabar, Calabar, Cross River, B Sc. Marine Biology (2nd 2003-2008
Nigeria Class Upper Devision)

Hope Waddel Training Institution, Calabar, WAEC 2000


Cross River, Nigeria

 Institute of Safety Professionals of Nigeria (MNISP)


Professional
Membership
 HSE Lead- IndexPro Int’l Services Limited , Km 21, PH/Aba 2014 - 2018
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 HSE Manager - Solenin Nigeria Limited, 321 PH/Aba Expressway, 2013 - 2014
Port Harcourt

 HSE Coordinator- Thompson & Grace Investments Limited, KM 16 2009 – 2013


PH/Aba Expressway, Port Harcourt, Rivers State, Nigeria.

 HSE Supervisor/AB Seaman- Akpos Marine Services Ltd., Aboloma 2008 – 2009
Jetty, Akpos Close, Aboloma, Port Harcourt, Rivers State. Nigeria

 Seaman Trainee- Regional Maritime University, Nungua/Thema 2007 – 2008


Expressway, Accra. Ghana.

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

HSE Lead
 Coordinate HSE Management System,
 Advise Project and top management on HSE issues,
 Conduct periodic safety and health walk-through inspections of all workplace facilities,
 Ensure that quarterly safety training and all other specifically required training is provided for
all employees,
 Ensure that OSHA’s Statistics Records are maintained,
 Conduct accident/injury investigations and illness exposure monitoring,
 Establish and monitor a program for reporting and investigating “near-miss” situations,
 Conduct investigations into employee inquiries, suggestions and complaints,
 Maintain required safety and health documents/files,
 Ensure periodic inspections of all motorized vehicles, Heavy equipment & all lifting gears,
 Provide timely support and advise to site installation crew to ensure compliance with installation safety
plans, procedures and methodology.
 Oversee all HSE matters.

Experience 2014 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

HSE Lead– ONSHORE AND OFFSHORE FABRICATION AND INSTALLATION Support on:
Projects:
 Kwale Flare Down Project-AGIP/AMAZON
 Agbami Stage 1 & 11 – Chevron/MPL
 West Jupiter ROV Project – Total/MPL
 Aje Field Development project – FASL/Ariosh
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL

Responsibility:
 Site safety coordination
 Prepare site/project specific Job Safety Analysis (JSA)
 Conduct daily Tool Box meetings
 Review and/or issue relevant Work Permits
 Supervise/coordinate emergency response plans and emergency response drill
 Inspect and audit work sites
 Ensure staff compliant to safety policies, processes and programs
 Development of Project HSMS Plan & Procedures with attention to details
 Project Management and Scheduling.

2
 Client HSEMS interface.
 Conduct site inspection and verification + Compile detail technical report, Responsible for developing
lifting sequence and resources for all Onshore fabrication and Offshore installations.
 Maintains constant communication with Onshore /Offshore work locations for resource support.
 Responsible for development of Transportation and Installation Plan (TIP) and other relevant
procedures to support WOP execution.
 Evaluate the scope of work on WOP and that of subcontracts. Monitor work progress offshore/onshore
in line with the schedule and advise on any slippage suggesting recovery measures
 Provide timely support and advise to site installation crew to ensure compliance with installation safety
plans, procedures and methodology

Experience 2013 – 2014 Solenin Nigeria Limited Port Harcourt, Rivers State

HSE Manager – OCIP II Project, SSDC/ExxonMobil

Project:
 Ubit GP Piping Spool Fabrication.

Responsibilities:
 Site safety coordination
 Prepare site/project specific Job Safety Analysis (JSA)
 Conduct daily Tool Box meetings
 Review and/or issue relevant Work Permits
 Supervise/coordinate emergency response plans and emergency response drill
 Inspect and audit work sites
 Ensure staff compliant to safety policies, processes and programs
 Development of Project HSMS Plan & Procedures with attention to details
 Project Management and Scheduling.
 Client HSEMS interface.
 Conduct site inspection and verification + Compile detail technical report, Responsible for
developing lifting sequence and resources for all Onshore fabrication and Offshore
installations.
 Maintains constant communication with Onshore /Offshore work locations for resource
support.
 Responsible for development of Transportation and Installation Plan (TIP) and other relevant
procedures to support WOP execution.

3
 Evaluate the scope of work on WOP and that of subcontracts. Monitor work progress
offshore/onshore in line with the schedule and advise on any slippage suggesting recovery
measures
Provide timely support and advise to site installation crew to ensure compliance with installation
safety plans, procedures and methodology

Experience 2009 – 2013 Thompson & Grace Investments Port Harcourt, Rivers State.
Ltd.

HSE Coordinator - Onshore (Base) & Offshore Support, Total E&P Nigeria Limited, SPDC, & Exxon Mobil

Project:
 Edop Crane Installation, Repairs, Maintenance, and Inspection services
 SPDC Flow Line Construction, Replacement And Repairs
I. Sectional Replacement of flow line 70L Agbada 1 SPDC
II. Excavation, Holiday Detection, Repairs and Sectional Replacement of Flow line 44L
Agbada 1 SPDC

Responsibilities:
 Site safety coordination
 Prepare site/project specific Job Safety Analysis (JSA)
 Conduct daily Tool Box meetings
 Review and/or issue relevant Work Permits
 Supervise/coordinate emergency response plans and emergency response drill
 Inspect and audit work sites
 Ensure staff compliant to safety policies, processes and programs
 Development of Project HSMS Plan & Procedures with attention to details
 Project Management and Scheduling.
 Client HSEMS interface.
 Conduct site inspection and verification + Compile detail technical report, Responsible for
developing lifting sequence and resources for all Onshore fabrication and Offshore
installations.
 Maintains constant communication with Onshore /Offshore work locations for resource
support.
 Responsible for development of Transportation and Installation Plan (TIP) and other relevant

4
procedures to support WOP execution.
 Evaluate the scope of work on WOP and that of subcontracts. Monitor work progress
offshore/onshore in line with the schedule and advise on any slippage suggesting recovery
measures
Provide timely support and advise to site installation crew to ensure compliance with installation
safety plans, procedures and methodology

Professional International General Certificate in Occupational Health & Safety


Certifications NEBOSH 2013

International Technical Certificate in Oil & Gas Operational Safety 2013


NEBOSH

Managing Safely IOSH 2013

OH&S Management Systems Auditor/Lead Auditor Training


2013
Course (Based on BS OHSAS 18001:2007 Standard)
Lifting Equipment Inspection- LEEA
2013
HSE Supervision Level III Nigerian Institute of Safety
2012
Professionals

HSE Appreciation Level II Nigerian Institute of Safety


2012
Professionals

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Good communication skill
Good understanding of multi-discipline engineering activities.
Project Monitoring/ Co-ordination

Good knowledge in preparing HSE inputs to technical tender packages development of


Project Procedures with attention to details.

Knowledge in Specifications, Standards, Codes of Practices and Procedure etc

5
CURRICULUM VITAE

Personal Details
Name : Emmanuel N. Omunakwe
Nationality : Nigerian
Position : Admin/Business Develompment Manager

Qualifications
University of Port Harcourt, Choba, Rivers PGDip Management 2007-2010
Education
State, Nigeria
Rivers State University of Science and B.Tech Computer 1998-2003
Technology Engineering

Government Comprehensive Secondary 1988-1993


SSCE
School , PHC
 NIIT Certified
Professional
Membership
 Microsoft Certified Professional

 Admin/Business Development Manager, Indexpro Int’l Service Ltd – 2014-2018


Career
Port Harcourt
Summary
 Information Technologist, Alcon Nigerian Ltd. – Bonny
 Business Development Executive/Southern Operations Manager, Premium Health 2013-2014
Ltd. – Port Harcourt 2010 – October 2013 2010-2013
 Zonal Coordinator, Premium Health Ltd.
2008-2010
 IT/Client Service Executive, Premium Health Ltd.
2006 - 2008 2006-2008
 System Support Engineer/ Trainer, Poly Computers – NYSC Bauchi
2004-2005
 Desktop/System Support Engineer, Microworks Nig Ltd - SPDC Lagos
 Rigger/Scaffolder/Welder’s mate, West Africa Oilfield Services(WAOS) 2003-2004
Port Harcourt
1995-1996

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Admin/Business Development Manager


Responsibilities:
 Responsible for providing an efficient and professional administrative and clerical service to colleagues,
managers and supervisors to facilitate the efficient operation of the office.
 Providing secretarial services such as minute taking, WP and diary management.
 Ensuring office procedures and systems operate efficiently
 Handling requests for information and data.
 Circulating documents via post and email.
 Raising purchase orders and chasing outstanding accounts.
 Recording, compiling, transcribing and distributing the minutes of meetings

Experience 2014 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Business & Planning Manager – Onshore and Offshore Fabrication and Installation Support on:
 Agbami Stage I & II – Chevron/MPL
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL
 Aje Field Development project – FASL/Ariosh
 West Jupiter ROV Project – Total/MPL
Responsibility:
 Responsible for providing an efficient and professional administrative and clerical service to
colleagues, managers and supervisors to facilitate the efficient operation of the office.
 Providing secretarial services such as minute taking, WP and diary management.
 Ensuring office procedures and systems operate efficiently
 Handling requests for information and data.
 Circulating documents via post and email.
 Raising purchase orders and chasing outstanding accounts.
 Recording, compiling, transcribing and distributing the minutes of meetings.

Experience 2013 - 2014 Alcon Nigerian Ltd. Bonny, Nigeria

2
Information Technologist
Responsibility:
 Network Administration

 Management of all IT infrastructure in the operation

Experience 2006 - 2013 Premium Health Limited Port Harcourt, Nigeria

Business Development Executive/Southern Operations Manager, Zonal Coordinator, IT/Client Services Executive
Business Development Executive/Southern Operations Manager Responsibilities:
 Responsible for developing and maintaining a productive business relationship with old and new
clients. Had a record of consistently meeting set targets.
 Recruited, trained and supervised a team of staff that grew to be very efficient and goal oriented.

Zonal Coordinator Responsibilities:

 Responsible for 10 direct reports and successfully employed, coached and trained a successful team
to expand the work in the zone.
 Impacting on company gross profit by managing utilization rates and controlling fraud and abuse of
the system

IT/ Client Service Executive Responsibilities:


 Management of the IT infrastructure in the Zone, took charge of registration of new clients,
managed the enrollee and provider activities in the zone.

NIIT Certified Microsoft Certified Professional


Courses
Attended

Business development attributes


Skills
 Possessing commercial flair needed to understand diverse market and identify
potential opportunities and new clients.
 Ensure that projects are financially viable before proceeding.
 Ability to respond promptly to emergency situations or new customer requirements.
 Writing up sales reports, activity reports and revenue for-cast, completing administrative records
accurately.

3
CURRICULUM VITAE

Personal Details
Name : Ekanem, Ekomobong Ezekiel
Nationality : Nigerian
Position : Field QA/QC Inspector

Qualifications
 Federal University of Technology, Owerri,  B. Eng. Metallurgical & 1989-1995
Education
Materials Eng.- 2nd
Class Honours, Lower
 Holy Family College/Sec Sch., Midim, Abak, AKS Division 1981-1986
 WAEC GCE O/L

Professional  Corporate member, The Nigerian Society of Engineers (MNSE)


Membership

1. Field QA/QC Inspector-INDEXPRO INT’L SERVICES LTD. 1. 2018– Till Date


Career
Summary 2. Aug. 2017 –
2. Project Quality Manager/Branch Manager - GABSON Engineering Feb 2018
Services Ltd., Lagos State, Nigeria 3. Aug. 2015 –
3. Site Construction Coordinator- GABSON Engineering Services Ltd., July 2017
Lagos State, Nigeria 4. Feb 2013 –
4. Site QA/QC Coordinator-Capital Energy Ltd., Lagos (Assigned to
Dec 2016
Midwestern Oil & Gas Co. Projects)
5. April 2008 –
5. Lead QA/QC Supervisor/Pipeline Integrity Engineer-East Horizon
Dec 2012
Gas Company (a Subsidiary of Oando PLC)
6. April 2008 –
6. QA/QC Supervisor/Pipeline Integrity Engineer- East Horizon Gas
Company (a Subsidiary of Oando PLC) Sept 2011)
7. Welding Inspector/Coating Inspector-LANSEM Nig. Ltd., Port 7. Feb 2003 –
Harcourt Dec 2007
8. Assistant Maintenance Engineer-Nigerian Cement Co. Plc, Nkalagu, 8. Nov 1995 –
Ebonyi State May 1998

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Site QA/QC Inspector-KWALE FLARE DOWN PROJECT-KWALE GAS PLANT


 Supervision of pipeline and facilities construction/installation activities: welding, NDT, painting/coating,
and cathodic protection system
 Supervision of pipeline/facilities commissioning activities: pigging, hydro-testing, drying/nitrogen
purging
 Managing the company’s site project resources – allocating equipment, human and material
resources optimally
 Rendering quality coverage on pipeline and facilities projects to ensure compliance with
specifications, procedures and plans
 Witnessing welder’s, WPS and PQR qualification
 Ensuring the evaluation of the qualifications of inspection personnel, welders, and NDT technicians
 Preparing and documenting quality and construction reports and participating in quality audits
 Reviewing NCR and concession request associated with welding and NDT activities and providing
recommendations according to codes and standards
 Ensuring the maintenance of a tracking welding log register, extracting KPIs and necessary
information to ensure and improve welding performance
 Ensuring compliance with HSE guidelines in the construction, use, repairs and maintenance of all gas
pipeline facilities and installations, which includes checking permits and PPE compliance at site,
equipment survey/calibration certificates, employees’ medical fitness reports, etc.
 Liaising with contractor for field level changes in scope, etc.
 Supervising pipeline operation, maintenance, and repair activities
 Developing and implementing inspection and maintenance plans for equipment
 Conducting in-house condition monitoring/integrity checks on installed pipeline system (pipeline, AGIs
- PRMS, pig launcher/receiver)

Experience Aug. 2017 – Feb 2018 GABSON Engineering Services Ltd. Lagos, Nigeria

Project Quality Manager/Branch Manager


Responsibility:
 Managing project quality activities to ensure compliance with contract specifications, industry codes &
standards, HSE regulations and requirements
 Managing inspection of production processes (welding, NDT, painting/coating), NDE and testing plans
for new construction, repair work and alterations
 Identifying and developing solutions to correct inspection function deficiencies and providing
feedback on quality related issues and metrics, and providing early warning on potential quality
problems
 Providing advice to project managers on quality issues, and resolving quality problems
 Managing the implementation of the company’s QMS for project planning, fabrication, assembly,

2
erection, inspection, documentation and operational activities, including internal quality audits
 Managing the review of QA/QC documents, procedures and programmes such material verification,
WPQR, WQT, PQP, ITP, WPS, QCP, and job procedures
 Ensuring control of non-conforming products by use of NCRs, cars and preventive actions
 Identifying and developing QA/QC personnel certification requirements
 Monitoring suppliers and contractor’s quality assurance and quality control activities
 Reviewing, evaluating and endorsing contractors’ and suppliers’ quality records
 Providing input for engineering quality and construction issues, and managing construction processes
 Managing the company’s branch resources to achieve its objectives, and ensuring efficient
operations on a day-to-day basis and addressing customer and employee satisfaction issues
 Managing and reviewing service contracts and checking completed work by contractors and vendors
 Carrying out facility and engineering job inspections
Achievements:
 Developed and organized quality control records and reports for increased efficiency
 Saved project cost by working closely with suppliers to ensure materials met project quality standards
Experience Aug. 2015 – Jul. 2017 GABSON Engineering Services Ltd. Lagos, Nigeria

Site Construction Coordinator


Responsibilities:
 Overseeing and coordinating project construction activities in accordance with project objectives, contract
specifications and HSE regulations
 Coordinating activities of site safety, technical and quality inspection personnel
 Coordinating the field planning and overseeing execution of mechanical construction (welding & fabrication,
NDT, coating), hook-up, pull-out and commissioning activities, including mechanical repairs of onshore assets
such as spool replacement
 Establishing, implementing, and maintaining verification process for mechanical completion
 Carrying out facility and engineering job inspections and providing input for engineering and construction issues
and managing construction processes
 Managing the company’s site resources to achieve project objectives, and ensuring efficient operations on a
day-to-day basis
 Managing site logistics, ensuring timely dispatch of staff and equipment to all project sites
 Managing site interfaces between contractors and sub-contractors
 Participating in monthly HSE and weekly project review meetings carried out in field locations
 Managing and controlling materials inventory on all project sites to avoid possible shortage
 Ensuring accurate documentation and daily reporting of all site activities, including status reports, field safety,
issues and challenges
 Ensuring change requests are in accordance with management of change plan and coordinating resolution of
construction related issues
 Monitoring and appraising contractor’s performance and recommending corrective action to be taken where
deficiencies are detected and verifying that actions are taken
Achievements:
 Supervised project construction efforts to ensure that projects were completed to required standards, on time
and within budget constraints

3
Experience Feb 2013 – Dec 2016 CAPITAL ENERGY LTD Lagos, Nigeria

Site QA/QC Coordinator (Pipeline/Storage Facilities Projects)


Responsibilities:
 Supervising and coordinating all site pipeline & appurtenances mechanical completion activities (welding, NDT,
painting/coating)
 Overseeing all site pipeline & appurtenances pre-commissioning/commissioning activities: pigging, hydro-
testing, drying/purging, installation of cathodic protection and pipeline surveillance (leak and intrusion detection)
systems, and introduction of hydrocarbon
 Planning, coordinating and supervising site QA/QC functions, HSE and construction activities and ensuring
compliance with specifications, procedures and plans
 Reviewing QC documents: PQP, ITP, job procedures, WPS, QCP, etc.
 Witnessing welder’s qualification tests and qualification of WPQR.
 Ensuring control of non-conforming products by use of NCRs, CARs and preventive actions
 Ensuring proper control, traceability and identification of materials/Conducting materials reconciliation
 Ensuring the provision and documentation of accurate and timely quality/HSE/construction and test reports,
highlighting critical issues and providing early warning on potential quality, HSE and construction challenges
 Managing the company’s project resources on site to achieve project- and overall business objectives
 Managing community, government, security and worksite interfaces
 Participating in risk assessment (HAZID/HAZOP) exercises for projects
 Attending project review meetings and monthly HSE meetings
Achievements:
 Assessed and re-designed piping system configuration, resulting in significant cost savings
 Optimized the use of project resources by implementing flexible work schedules and site activities
EAST HORIZON GAS COMPANY
Experience April 2008 – Dec 2012 (a Subsidiary of Oando PLC) Lagos, Nigeria

Lead QA/QC Supervisor/Pipeline Integrity Engineer

Supervision of pipeline and facilities construction/installation activities: welding, NDT, painting/coating, and
cathodic protection system

Supervision of pipeline/facilities commissioning activities: pigging, hydro-testing, drying/nitrogen purging

Managing the company’s site project resources – allocating equipment, human and material resources
optimally

Rendering quality coverage on pipeline and facilities projects to ensure compliance with specifications,
procedures and plans

Witnessing welder’s, WPS and PQR qualification

Ensuring the evaluation of the qualifications of inspection personnel, welders, and NDT technicians

Preparing and documenting quality and construction reports and participating in quality audits

Reviewing NCR and concession request associated with welding and NDT activities and providing
recommendations according to codes and standards

Ensuring the maintenance of a tracking welding log register, extracting KPIs and necessary information to
ensure and improve welding performance

4
Ensuring compliance with HSE guidelines in the construction, use, repairs and maintenance of all gas pipeline
facilities and installations, which includes checking permits and PPE compliance at site, equipment
survey/calibration certificates, employees’ medical fitness reports, etc.

Liaising with contractor for field level changes in scope, etc.

Supervising pipeline operation, maintenance, and repair activities

Developing and implementing inspection and maintenance plans for equipment

Conducting in-house condition monitoring/integrity checks on installed pipeline system (pipeline, AGIs -
PRMS, pig launcher/receiver)
Achievements:

Saved project cost by proactively engaging with host communities to reduce downtime

Saved facility life from fire by proactively engaging public fire service department.
(April 2008 – Sept 2011) QA/QC Supervisor/Pipeline Integrity Engineer

Principal Accountabilities:

Supervising pipeline system (pipeline, AGIs – PRMS, pig launcher/receiver) mechanical completion phase
activities: welding, NDT, painting/coating, etc.

Supervising pipeline pre-commissioning and commissioning activities: cleaning, hydro-testing, drying, purging
and introduction of gaseous hydrocarbon

Supervising cathodic protection system installation - both impressed current and sacrificial anodes

Verifying that all contractor’s and subcontractor’s welders are qualified according task requirements

Maintaining a traceability system for activities performed and tracking materials used for construction

Monitoring and controlling the contractor’s welding and other qc inspectors

Reviewing and approving weld map and validating test package as per project requirements

Approving welding inspection/coating reports and ensuring that inspections comply with ITPs

Ensuring HSE guidelines are followed in the construction, use, repair & maintenance of pipeline system

Carrying out routine in-house corrosion monitoring and CP assurance checks and preparing pipeline condition
monitoring reports, highlighting issues and providing suggestions for addressing problems

Professional CSWIP 3.1 (Level 2) – Welding Inspection


Certifications
BGAS-CSWIP (Grade 2) - Painting Inspection

PCN Level 2 (RFI) – Nondestructive Testing

ASNT Level 2 (MT, PT, UT) – Nondestructive Testing

ISO 9001 Certified Lead Auditor (PECB) – Quality Management System (QMS)

BOSIET (International – OPITO approved) - HSE

5
Jun 1998 – May 1999 Shell Intensive Training Program for
Other
Graduates (SITP), as a Trainee Engineer in Surface & Sub -
Trainings
surface Engineering - Run by Robert Gordon University,
Aberdeen, UK.
API 570: Piping Inspection
API 580: Risk-Based Inspection
Project Management Professional (PMP)

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Good communication skill
Competent in hazard Identification, accident investigation and documenting relevant
HSE records
Familiarity with both Offshore and Onshore Construction activities
Good knowledge of developing and implementing HSE Plans
Ability to interpret, implement and review HSE Policies and Procedures
Possess strong analytical ability of evaluating KPIs to determine and improve HSE
performance
Able to manage and successfully improve safety culture among fieldworkers
Good interest in conducting trainings, toolbox meetings and emergency drills
Possess expertise in Peace and Conflict resolution and implementation Programs and
Campaigns
Possess effective communication, report writing and presentation skills
Proficient in the use of MS Office and other software packages

6
CURRICULUM VITAE

Personal Details
Name : David Ntor- ue
Nationality : Nigerian
Position : Cad Engineer/ Piping Designer

Qualifications
M.Eng. in Petroleum and Gas 2014
Education University Of Port Harcourt. Engineering.(2nd Class Upper
Division)

University Of Science And Technology, Nkpolu,


B.Tech. Chemical/ 2007
Rivers State. petrochemical E

1999
Birabil Memorial Grammar School, Bori, Rivers WASSCE
State.
 Health Safety and Environment (HSE Level 2&3).
Professional
Membership

1
 Cad Engineer/ Piping Designer- IndexPro Int’l Services Limited , Km 2018-Date
Career 21, PH/Aba Expressway, Port Harcourt, Rivers State, Nigeria.
Summary
 Solenin Nig Project Manager/ Administrative Officer -Allisonj Nigeria 2015
Limited.

 Operations Manager- ET&F Global ServicesNigeria Limited.61b Aba 2014


road Port Harcourt

 Process Designer/ Process Engineer-Southern Swamp Associated 2012– 2015


Gas Solution + (SSAGS) Project
Saipem Contracting Nigeria Limited JV. With Kohasa Engineering
Rumoulumeni Base, Port Harcourt
 Process Designer-Northern Option Pipeline (NOPL) Project2012Northern 2011 – 2012
Option Pipeline (NOPL) Project.Saipem Contracting Nigeria Limited JV. With
Kohasa Engineering

2010-2011
 Contractor- Raidah Engineering Works JV Kurus Nigeria Limited N0. 1 Pal
Avenue off Peter Odili Road.Port Harcourt.

 Head of Chemistry Department / Corp Liaison Officer (CLO)- NATIONAL 2009-2010


YOUTH SERVICE CORPS Federal Science and technical college. Askira Uba
LGA, Borno State. Nigeria

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Cad Engineer/ Piping Designer

 Preparation of shop drawing


 Interpretation Iso and shop drawings
 Calculation of pipe length
 Preparation of cutting sheet
 Supervision of fitters
 Taking dimensional controls

2
Experience 2015 Allisonj Nigeria Limited. Port Harcourt, Nigeria

Responsibilities
Developing Schedule
 Time Estimating
 Cost Estimating
 Documentation
 Creating Charts and Schedules
 Risk Analysis
 Managing Risks and Issue
 Monitoring and Reporting Progress
 Team Leadership
 Strategic Influencing
 Business Partnering
Working with Vendors
Scalability, Interoperability and Portability Analysis
Controlling Quality
Benefits Realization.

Experience 2011-2012 /2012 – 2015 Saipem Contracting Nigeria Limited Port Harcourt, Rivers State
JV. With Kohasa Engineering

Process Designer/ Process Engineer

Project:
 Southern Swamp Associated Gas Solution + (SSAGS) Project

Responsibilities:
 Modification of Process and Instrumentation Diagram
 Hysis softwear, line sizing and valve sizing
 Back Check and Implementation of Red Mark Up’s on Process Engineering Flow
Scheme (PEFS), Process Flow Diagram (PFD), Process Safety Flow Scheme (PSFS),
Block Flow Diagram (BFD),

3
 Process Designer and Back Checking of Parameters.

Project: Northern Option Pipeline (NOPL) Project

Responsibilities:
• Early Gas Production OB/OB
• Drafting of Process Engineering FlowScheme, (PEFS).
• Process Designer
• DRAFTING OF ASBUILT DRAWING

Experience 2009-2010 NATIONAL YOUTH SERVICE . Askira Uba LGA .Borno State.
CORPS Nigeria

Head of Chemistry Department / Corp Liaison Officer (CLO

Responsibilities

 Chemistry Teacher
 laboratory instructor
 CDS Coordinator.

4
Professional
Certifications
Project Management

Simulation Using HYSYS Software

AutoCAD Software

Plant Design Management System(PDMS)

Process Design (Sizing and Specification) of Onshore & Offshore


Equipment Facilities such as Pumps, Compressors, Lines,
Separators, Process Safety Valve, and Control Valves, Tanks.

Microsoft office Suite

Development and interpretationof Block Flow Diagram,Process


Flow Diagram, Processand Instrumentation Diagram Scheme.

Health Safety and Environment (HSE Level 2&3

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Good communication skill
Good understanding of multi-discipline engineering activities.

5
CURRICULUM VITAE

Personal Details
Name : Eneyo, Elsie Emmanuel
Nationality : Nigerian
Position : Document Control Coordinator

Qualifications
Rivers State University of Science & Tech. Port BSc. - Secretarial
Education
Harcourt. Administration 2002 - 2007
Rivers State University of Science & Tech. Port
Harcourt. University Diploma 1982 - 1984
Secondary Commercial School, Ibekwe, Ikot
Abasi. Akwa Ibom State. WAEC
State School Elelenwa, Port Harcourt.

Professional
Membership

1
Career  Document Control Coordinator- IndexPro Int’l Services Limited ,
Summary 2018
Km 21, PH/Aba Expressway, Port Harcourt, Rivers State, Nigeria

 Document Control Coordinator - Subsurface & Surface Development 2014


Company Limited. 12b Abua Close Rumuibekwe Housing Estate, Port
Harcourt.

 Document Control Coordinator- SIRPI-Alusteel Construction Limited. 2006 - 2012


20 East West Road, Port Harcourt.

 Document Control Coordinator- Suffork Petroleum Services


Limited Trans Amadi Industrial Layout, Port Harcourt . 2004 – 2006

 Document Controller- DSNL Offshore Limited.23 East West Road,


Port Harcourt. 2002 – 2004

 Executive Secretary-ABB SOIMI Nigeria Limited, Aba Road, Port


Harcourt. 1992 - 2001

 Management Secretary, MD- SERIC IMPIANTI (Nig) Limited. Aba


Road, Port Harcourt.
1989 - 1991

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Document Control Coordinator -Onshore and Offshore Fabrication and Installation Support on
 Project: Kwale Flare Down Project-AGIP/AMAZON
Responsibilities:
 Effectively receives, scans, and share pertinent documents throughout all phases of the project, including
engineering, procurement, & construction, ensuring they are systems as required by procedure with the Global
Practice Numbering System.
 Control of revisions and distribution of critical information such that all parties have the proper, current and
relevant information for decision making. In-charge of identifying, providing all relevant management team
document during project reviews, meetings, and audits.

2
 Identifying deliverable, and the appropriate attributes, classification, categorizations & electronic formats
required and the accurate delivery of the document control functions are adhered. Enter Data into Manual or
Electronic Document Management System (EDMS).

 Providing efficient and effective access to Project Information. Means of Communication between the Team &
external parties e.g. Project Contractors. Keep logs & knowledge of requirements on Master Documents
Register, Distribution Matrix, Transmittal, for immediate implementation.

 Ensuring timely review & comment on Client Work Orders packs, Change Orders and Approved Procedures by
the Client/Company policies and procedures must be adhered to despite personnel being located in diverse
geographical locations

 Certification of basic quality control (quality checks) of the documentation in the system, including information
from Subcontractors and their DFO deliverables based on checklists.

 Archives Management. – Maintains records and ensures their current revisions status for DFO. Follow-up and
file all typical documents relevant to the project (templates, presentation, pictures, CDs. Ensures confidentiality.

 Responsible for development of DFO Plan in conjunction with company DFO Coordinator. Final & Early Delivery
of Documentation.

 Preparation and Turnover of DFO Documentation for Operations in their categories to the Client.

Experience 2013 Subsurface & Surface Development Port Harcourt, Nigeria


Company Limited.

Document Control Coordinator – OCIP II Project Mobil Producing Nigeria Unlimited


Projects:
Offshore Construction & Installation Program – OCIP II

Responsibility:
 Effectively receives, scans, and share pertinent documents throughout all phases of the project, including
engineering, procurement, & construction, ensuring they are systems as required by procedure with the Global
Practice Numbering System.

 Control of revisions and distribution of critical information such that all parties have the proper, current and
relevant information for decision making. In-charge of identifying, providing all relevant management team
document during project reviews, meetings, and audits.

 Identifying deliverable, and the appropriate attributes, classification, categorizations & electronic formats

3
 required and the accurate delivery of the document control functions are adhered. Enter Data into Manual or
Electronic Document Management System (EDMS).

 Providing efficient and effective access to Project Information. Means of Communication between the Team &
external parties e.g. Project Contractors. Keep logs & knowledge of requirements on Master Documents
Register, Distribution Matrix, Transmittal, for immediate implementation.

 Ensuring timely review & comment on Client Work Orders packs, Change Orders and Approved Procedures by
the Client/Company policies and procedures must be adhered to despite personnel being located in diverse
geographical locations.

 Certification of basic quality control (quality checks) of the documentation in the system, including information
from Subcontractors and their DFO deliverables based on checklists.

 Archives Management. – Maintains records and ensures their current revisions status for DFO. Follow-up and
file all typical documents relevant to the project (templates, presentation, pictures, CDs. Ensures
confidentiality.

 Responsible for development of DFO Plan in conjunction with company DFO Coordinator. Final & Early Delivery
of Documentation.
 Preparation and Turnover of DFO Documentation for Operations in their categories to the Client

Experience 2006-2012 SIRPI-Alusteel Construction Port Harcourt, Rivers State


Limited

Document Control Coordinator – OCIP I Project, Mobil Producing Nigeria Unlimited

Project:
 Offshore Construction & Installation Program – OCIP I

Responsibilities:
 Effectively receives, scans, and share pertinent documents throughout all phases of the project,
including engineering, procurement, & construction, ensuring they are systems as required by
procedure with the Global Practice Numbering System.

 Control of revisions and distribution of critical information such that all parties have the proper,
current and relevant information for decision making. In-charge of identifying, providing all relevant
management team document during project reviews, meetings, and audits.

 Identifying deliverable, and the appropriate attributes, classification, categorizations & electronic
formats required and the accurate delivery of the document control functions are adhered. Enter
Data into Manual or Electronic Document Management System (EDMS).

 Providing efficient and effective access to Project Information. Means of Communication between the
Team & external parties e.g. Project Contractors. Keep logs & knowledge of requirements on Master

4
Documents Register, Distribution Matrix, Transmittal, for immediate implementation.

 Ensuring timely review & comment on Client Work Orders packs, Change Orders and Approved
Procedures by the Client/Company policies and procedures must be adhered to despite personnel
being located in diverse geographical locations
 Certification of basic quality control (quality checks) of the documentation in the system, including
information from Subcontractors and their DFO deliverables based on checklists.

 Archives Management. – Maintains records and ensures their current revisions status for DFO.
Follow-up and file all typical documents relevant to the project (templates, presentation, pictures, CDs.
Ensures confidentiality.
 Responsible for development of DFO Plan in conjunction with company DFO Coordinator. Final &
Early Delivery of Documentation.
 Preparation and Turnover of DFO Documentation for Operations in their categories to the Client.

Experience 2009 – 2013 ABB SOIMI Nigeria Limited Port Harcourt, Rivers State.

Executive Secretary

Responsibilities:
 Screens all incoming communications, established priorities and advises,filters outgoing
correspondences for GM’s signature, clearance and further action by other staff, where ever
possible, takes initiatives to handle routine matters in close consultation with the General Manager.

 Manages the office, ensures an environment of professionalism and team work at all times & set
exemplary standards of conduct.

 Maintains the Filing System. Updates and maintains electronic filing system and contributes to the
maintenance of a proper filing system for the executive office.

 Manages General Manager schedules efficiently and discretely with due regards. Makes necessary
arrangements and contacts for travels including preparation of agenda and confirmation of
appointments, briefing materials etc.

 Ensures punctuality.

 Organizes regular and ad-hoc meetings taking minutes and summarizing actions for follow-up by the
General Manager.

 Coordinates information flow in the office and disseminates corporate and interoffice communication
to staff as required. Drafts routing correspondence, interoffice circulars, general briefing notes,
documents, reports and minutes of meetings when requested.

 Ensures safekeeping of confidential materials.

 Maintains up to date Information and data on Projects & Project Management Team. Facilitates

5
information sharing between departments & sites. Ensures management team are kept informed of
important corporate initiatives and policies, programs and operational matters.

 Ensures that appropriate protocol and correspondence guidelines are adhered to when
communicating with govt. & other external partners
.
QMS Document and Data Control Course by Trac
Professional
Trainings Consultancy Training Services

Document Control Workshops and Seminars organized by


Exxon Mobil / Shell Nigeria

EMFOS – Fundamentals of Safety for Leaders - Exxon


Mobil. Nigeria

ISO Awareness Training / Quality Assurance Induction: -


Organized By QA/QC Corporate

Safety Induction Course: - Organized by the Safety, Health


& Environment Dept

Advanced Secretarial Management Course - Sulan


Consultancy Services

Industrial First Aid - Sulan Consultancy Services

Management Development Course on Advanced Skills for


Executive Secretaries,& Personal Assistant. - Business
Education Examination Council

Skills Contribute to the Project team for the smooth realization of objectives.
Provide guidelines to effectively manage documents generated
Ensure Flow of Project information from clients.
Posses working knowledge in MS Word, MS Excel,
Ability to function in an integrated project team environment
Good communication skill
Good knowledge in preparing inputs to Project Procedures with attention to details.
Knowledge in Global Documentation Practices etc

6
CURRICULUM VITAE

Personal Details
Name : Ubi, Michael Ibor
Nationality : Nigerian
Position : Field HSE Coordinator

Qualifications
 University of Calabar, Calabar, Cross River  B.Sc. Business 2008
Education
State Management ( 2nd
Class Lower Division)

 Member Nigerian Institute Of Safety Professionals (MNISP)


Professional
 Fire Protection Association of Nigeria-Member
Membership
 Institute of Loan and Risk Management of Nigeria-Associate member
 Portfolio and Debt Management Institute-Associate Member
 OSHA and Leadership Safety Certification.
1. HSE Coordinator-INDEXPRO INT’L SERVICES LTD. 1. 2018– Till Date
Career
2. HSE Manager- DAMAS OIL AND MARINE SERVICES (DB DOLPHIN 2. Jan 2017-June. 2018
Summary
BARGE) 3. Jun 2015 to 2016
3. HSE Coordinator- ASCOT FABRICATION & CONSTRUCTORS NIG LTD.
4. Feb 2011 - Sept 2015
4. HSE Manager- HAZCON NIGERIA LIMITED 5. Oct.2009 – Mar, 2010
5. HSE Officer-GEOREX PETROLEUM

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Field HSE Coordinator-KWALE FLARE DOWN PROJECT (KWALE GAS PLANT)


 Report to Project HSE Lead.
 Coordinate HSE Management System,
 Advise Project and top management on HSE issues,
 Conduct periodic safety and health walk-through inspections of all workplace facilities,
 Ensure that quarterly safety training and all other specifically required training is provided for
 all employees,
 Ensure that OSHA’s Statistics Records are maintained,
 Conduct accident/injury investigations and illness exposure monitoring,
 Establish and monitor a program for reporting and investigating “near-miss” situations,
 Conduct investigations into employee inquiries, suggestions and complaints,

1
 Maintain required safety and health documents/files,
 Ensure periodic inspections of all motorized vehicles, Heavy equipment & all lifting gears,
 Provide timely support and advise to site installation crew to ensure compliance with installation safety
plans, procedures and methodology.
 Oversee all field HSE matters.

Experience 2017 to 2018 DAMAS OIL AND MARINE SERVICES (DB Port Harcourt, Rivers
DOLPHIN BARGE) State, Nigeria

HSE Manager-
Projects:
 Drydock Operation
 Lifting Operation of Two Manifold Skid from DB Dolphin Vessel to FSO Ugo-Ocha (CHEVRON FIELD)

Responsibility:
 Develop HSE policies, Manuals and procedures
 Conduct routine inspection to ensure compliance on standards and regulations.
 Analyze site trends and root causes to present plan and suggestion to improve control.
 Participate in project planning and change in management activities to identify HSE issues and
opportunities with a goal to eliminate and control risk
 Ensure safety compliance during the lifting operation.
 Enforce procedure and ensure operations are done as planned.
 To ensure pre-installation meeting held between DB Dolphin vessel and FSO Ugo-Ocha for review of
risk assessment.
 Conduct Toolbox meetings with the personnels involved in the operations
Experience Jun 2015 to 2016 ASCOT FABRICATION & Port Harcourt, Rivers State,
CONSTRUCTORS NIG LTD. Nigeria

HSE CORDINATOR/TEAM LEAD


Projects:
Off-shore Fabrication and General Maintenance of Addax Platforms

Responsibilities:
 Supervision on general maintenance of all defective handrails, gratings, and escape ladder of
off-shore platform.
 Taking of measurement and development of ISO drawing on EBNE WELL 7H LINE.
 Supervision on repair of ruptured 4" flow line spools of well 1-ht on ORON NORTH platform.
 Supervision of welding operation on well header injector head and tacking of equipment to the main
deck of BLUE SHARK JACK-UP BARGE on ADANGA NORTH SOUTH platform.
 Supervision on fabrication of a meiotic sector sonar tripod for seabed survey at ADNA platform.
 Supervise all tasks and sequences, direct welders to build up low spots or short pieces with weld,
 Supervision on general maintenance of all defective handrails, gratings, and escape ladder.

2
Experience Nov 2014 to Aug 2017 OHENMERGE COMPANY LIMITED Lagos, Nigeria

QHSE Officer
Responsibilities:
 Ensure the safety of personnel, equipment and environment
 Coordinate employees and assist in the implementation of OHSAS 18001:2007
 Conduct regular toolbox talk for employees, contractors and sub-contractors
 Carry out hazard identification and risk assessments.
 Organize safety induction for new hires and sub-contractors
 Assign appropriate Personal protective equipment to employees and ensure they are properly used
 Represent company in external workshops and HSE meetings
 Manage and audit subcontractors/vendors
 Communicate and discuss all Hse issues with employees to promote and enhance HSE performance.
Report to management all safety issues that needs immediate actions
 Organize in-house safety trainings and Hse presentations
 Develop HSE plan and Job Hazard analysis for every project
 Facilitate and use the regular Hse meetings to reinforce employees’ commitments
 Organize, conduct and participate in workplace inspections and emergency drills
 Update and compile weekly and monthly safety statistics/Key performance indicators
 Respond to employee’s safety concerns (Middle man between employees and management)
 Monitor compliance with procedures for safe work practices
 Update Hse policies and manuals
 Record and investigate all reported incidents.
 Participate in environmental field operations (Environmental Compliance Monitoring, Environmental
Evaluation Studies and Environmental Impact Assessment).
 Assist employees to ensure knowledge of all quality standards (ISO 9001:2015) and compliance to all
project specifications
 Implementation of the quality management and control programme for all projects
 Monitor all processes to ensure process owners follow the established processes.
 Monitor and ensure compliance of employees to company's policies and procedure

3
 Ensuring that all test results/reports are verified to meet contract requirements/specifications
 Manage Subcontractors/vendors to ensure compliance to statutory regulations and company's
policies/guidelines.
 Ensure all materials delivered to site are inspected and conform to specified requirements
 Raise Non-conformance reports once a deviation is identified and initiate corrective actions.
 Responsible for overseeing/audits of subcontractor quality management systems
 Conduct internal quality audits

Experience August 2013 – October 2014 AURORA SHIELD LIMITED Lagos, Nigeria

HSE Officer /Administrative Head


 Ensure the safety of personnel, equipment and environment
 Conduct regular toolbox talks and workplace inspections
 Organize HSE meetings and In-house trainings
 Organize safety induction for new hires
 Build strong relationships with customers/clients and company shareholders
 Collaborate with team members to improve overall customer satisfaction
 Analyze, monitor and increase customer base to identify improvement opportunities
 Stay up-to-date with company’s best practices, policies, objectives and targets
 Oversee/ensure compliance of the organization’s procedures with regulatory bodies
 Supervise and effectively manage team members and subordinates
 Responsible for staff welfare and respond to employees’ safety concerns
 General office administrative duties

Experience Jul. 2011–Jun. 2013 PROSAFETY INTEGRATED SERVICES LIMITED Lagos, Nigeria

HSE Trainee (National Youth Service Corp)


 Develop health safety and environment documentations for clients in different sectors of the economy
 Update HSE policies and manuals
 Conduct regular toolbox talk and inspections
 Represent company in externals workshops and meetings
 Organize safety trainings and meetings
 Communicate and discuss all Hse issues with employees to promote and enhance Hse performance
 Manage and maintain business relationship between the company and her clients.
 Served as a customer care representative and administrative officer for company

4
Professional NEBOSH International General Certificate in Management of
Certifications International health and safety 2014

NEBOSH International General Certificate in controlling workplace


hazards 2014

NEBOSH International General Certificate in International health


and safety practical application

Institute of Safety Professionals of Nigeria (ISPON) – Hse Level 3


Supervision

Institute of Safety Professionals of Nigeria (ISPON) – General HSE,


Competence and Development Course

Implementation of Quality Management System (ISO 9001:2015)


Course

Internal audit for Quality Management System Course

Implementation of Environmental Management System (ISO


14001:2015) Course

Designated First Aider’s Course 2017


Other
Trainings
Vast experience in Occupational Health, Safety and Environment (HSE) Management
Skills
System.
Proven expertise in OH&S Management System establishment, implementation &
auditing.
Ability to write HSE plans, procedures, manual and interpret OH&S 1800:2007
requirements.
Ability to conduct work-based Hazard Identification, Risk assessment, Workplace
accident
Investigation & Root cause analysis.
Knowledgeable in the legal and contractual HSE requirements as well as the
international local legislature,
Demonstrated communication, interpersonal, and organizational skills
Proven research and report writing skills, including good presentation and analytical
skills

5
CURRICULUM VITAE

Personal Details
Name : Grace Ukaegbu
Nationality : Nigerian
Position : Field HSE Supervisor

Qualifications

Education
 Rivers State University of Science and  BSC Mathematics 1999-2004
Technology Port Harcourt  Senior Secondary 1990-1995
 Community Secondary School Ndoki School Certificate
Obohia. Examination (SSCE)
May/June

 Member, Nigerian Institute of Safety Professionals (MNISP)-IN VIEW


Professional
Membership

 HSE Field Supervisor-INDEXPRO INT’L SERVICES LTD.  2018– Till


Career
Summary Date
 HSE Supervisor- ZAKHEM AND BAYWOOD JOINT VENTURES LTD,  2010 – 2016
Port Harcourt, Rivers State.

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Field HSE Officer


 Ensure compliance to Occupational Health & Safety Act and other applicable safety regulations.
 Conducts Equipment and facility inspections according to regulatory standards.
 Participates in Health Risk assessments, job hazard analysis and root cause analysis
 Conducts Task Specific Toolbox Talks and safety in-house training as well as inductions.
 Coordinates company’s medical, security and fire emergency drills.
 Participates actively in waste and environmental management related activities.
 Maintain documentation such as HSE manual, policies and procedures as well as controlled
documents
 Follow up on lifting equipment & accessories inspection and certification.
 Participates in PPE issuance and ensures proper use and maintenance of PPE.

1
Experience March 2012 – May 2016 ZAKHEM AND BAYWOOD JOINT Port Harcourt, Rivers State
VENTURES LTD

HSE Supervisor:
Projects:
Total E & P OUR Gas Pipeline Project
Responsibility:
 Enforcing safety management into business activities through the implementation of the HSE MS
 Conduct JHA of all work activities
 Deploy the HEMP and RISK ASSESSMENT MATRIX tools in wor k activities
 Driving safe HSE practices through HSE monthly meetings
 Advise the contractor on applicable regulation and safety requirement
 Prepare contractor safety statistics
 Develop Checklist for contractor projects
 Cascading HSE strategy and concepts to the workforce
 Ensure compliance to projects safety management program
 Managing HSE assurance and compliance verification audits
 Participate in incident/accident investigation
 Conducts HSE officers certification test
 Certification Vehicle Journey Manager
Experience March 2010 – May 2012 ZAKHEM AND BAYWOOD JOINT Port Harcourt, Rivers State
VENTURES LTD

HSE Supervisor:

Project:
 Construction of 480m Quay Wall.

Responsibilities:
 Preparation of HSE documents and plans to conform with HSE laws and regulations for the
organization
 Carrying out of induction and training sessions for new personnel visitors of ZBJ.
 Carrying out inspection on safety equipment and devices before deployment of the company
 Reviewing of HSE documents to meet corporate client HSE demands
 Provision of professional advice to maintenance team and management on HSE issues.
 Planning and carrying out Drills to assess Emergency Response readiness of all work force to
meet corporate Client
 HSE targets and requirement.
 Supervision and monitoring of contractors to ensure conformity of ZBJ HSE plan and
benchmark.
 Review and analysis of Inter Vehicle Monitoring System (IVMS) REPORT to ensure ZBJ

2
Drivers Compliancy to set out Corporate Client Journey Management Plan with respect to
Federal road safety rule standard regulations.
 Implementation of HSE system as per client HSE requirement.
 Preparation of on-spot Job Risk Assessment.
 Documentation and Supervision of ZBJ HSE activities.
 Participating in Accident/Incident investigation.
 Giving information to construction team, regarding Safety related matters like Sign board
requirement.
 Supervision of field Joint Coating and Blasting activities to ensure client HSE standard
 Supervision of surface and in-trench welding activities.
 Supervision of lifting and lowering activities.
 Supervision of Horizontal Directional Drilling activities (HDD).
HSE Supervisor Level 1 – 3 Certificate by Institute of Safety
Professional
Professionals of Nigeria (ISPON)
Certifications
Onshore/Offshore Health, Safety and Environment

Other
General Certificate on Safety
Trainings HSE Competency certificate level 3
Accident /Incident Reporting
Total Gas Testing Training
Total Permit to Work Training

Ability to organize work, manage pressure and handle emergencies


Skills
Ability to work alone as well as a team
Excellent interpersonal skills and able to communicate
Customer –oriented and target –focused individual
Trust worthy and loyal to constituted authority, but able to maintain a balance for the
shared goal
Exhibit maturity in my dealings with superiors and subordinates in the work
environment
Effective in cross-functional communication and positive thinking in approach to work
Innate negotiate skills and highly accountable

3
CURRICULUM VITAE

Personal Details
Name : Obi Glory Ada
Nationality : Nigerian
Position : Field HSE Supervisor

Qualifications
 University of Port Harcourt, Choba, Rivers  B.Sc. Plant Science 2005-2010
Education
State and Biotechnology
 Capital High School, Oyigbo, Rivers State  West African Senior
1999-2005
School Certificate

 Member, Institute of Safety professionals of Nigeria (MISPON)


Professional
Membership

1. HSE Supervisor-INDEXPRO INT’L SERVICES LTD. 1. 2018– Till


Career
Summary Date
2. HSE Consultant-Powertech Intermediary Services International
2. Jan 2018
Limited
3. HSE Consultant-Geospectra Engineering Services and Consultants 3. Nov. 2017 –
Limited Mar. 2018
4. QHSE Officer-Ohenmerge Company Limited 4. Nov. 2014 to
5. HSE Officer /Administrative Head -Aurora Shield Limited Aug. 2017
5. Aug. 2013 –
6. HSE Trainee (National Youth Service Corp)-Prosafety Integrated Services
Limited, Lagos Sate Oct. 2014
6. July 2011 –
June 2013

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

HSE Officer
 Ensure compliance to Occupational Health & Safety Act and other applicable safety regulations.
 Conducts Equipment and facility inspections according to regulatory standards.
 Participates in Health Risk assessments, job hazard analysis and root cause analysis
 Conducts Task Specific Toolbox Talks and safety in-house training as well as inductions.
 Coordinates company’s medical, security and fire emergency drills.
 Participates actively in waste and environmental management related activities.

1
 Maintain documentation such as HSE manual, policies and procedures as well as controlled
documents
 Follow up on lifting equipment & accessories inspection and certification.
 Participates in PPE issuance and ensures proper use and maintenance of PPE.

Experience Jan. 2018 POWERTECH INTERMEDIARY SERVICES Port Harcourt, Rivers


INTERNATIONAL LIMITED State, Nigeria

HSE Consultant
Responsibility:
 Develop HSE policies, Manuals and procedures
 Visit the organization regularly to monitor HSE MS implementation
 Promote a good safety culture throughout the organization
 Participate in External audits conducted by regulatory bodies or clients
 Facilitate in-house HSE trainings for all staff
 Conduct workplace inspection
 Conduct Hazard identification and Risk assessment
 Monitor equipment maintenance and calibration using the equipment maintenance log and calibration
tracker respectively
 Conduct quality checks on Items supplied to ascertain conformity with standard requirement
 Induction of new employees and short service workers
 Respond to employees’ safety needs and concerns
 Organize and participate in monthly HSE meetings and Emergency drills
 Purchase of PPE and safety equipment
Experience November 2017 – March GEOSPECTRA ENGINEERING Port Harcourt, Rivers State,
2018 SERVICES AND CONSULTANTS Nigeria
LIMITED

HSE Consultant

Responsibilities:
 Evaluate workplace safety and promote a positive health and safety culture in the workplace
 Develop and monitor the implementation of HSE policies, Manuals and procedures
 Develop and implement the Organization’s training program
 Conduct Hazard identification and Risk assessment
 Ensure the organization complies with mandatory regulations
 Participate in External audits conducted by regulatory bodies or clients

2
Experience Nov 2014 to Aug 2017 OHENMERGE COMPANY LIMITED Lagos, Nigeria

QHSE Officer
Responsibilities:
 Ensure the safety of personnel, equipment and environment
 Coordinate employees and assist in the implementation of OHSAS 18001:2007
 Conduct regular toolbox talk for employees, contractors and sub-contractors
 Carry out hazard identification and risk assessments.
 Organize safety induction for new hires and sub-contractors
 Assign appropriate Personal protective equipment to employees and ensure they are properly used
 Represent company in external workshops and HSE meetings
 Manage and audit subcontractors/vendors
 Communicate and discuss all Hse issues with employees to promote and enhance HSE performance.
Report to management all safety issues that needs immediate actions
 Organize in-house safety trainings and Hse presentations
 Develop HSE plan and Job Hazard analysis for every project
 Facilitate and use the regular Hse meetings to reinforce employees’ commitments
 Organize, conduct and participate in workplace inspections and emergency drills
 Update and compile weekly and monthly safety statistics/Key performance indicators
 Respond to employee’s safety concerns (Middle man between employees and management)
 Monitor compliance with procedures for safe work practices
 Update Hse policies and manuals
 Record and investigate all reported incidents.
 Participate in environmental field operations (Environmental Compliance Monitoring, Environmental
Evaluation Studies and Environmental Impact Assessment).
 Assist employees to ensure knowledge of all quality standards (ISO 9001:2015) and compliance to all
project specifications
 Implementation of the quality management and control programme for all projects
 Monitor all processes to ensure process owners follow the established processes.
 Monitor and ensure compliance of employees to company's policies and procedure
 Ensuring that all test results/reports are verified to meet contract requirements/specifications
 Manage Subcontractors/vendors to ensure compliance to statutory regulations and company's
policies/guidelines.
 Ensure all materials delivered to site are inspected and conform to specified requirements
 Raise Non-conformance reports once a deviation is identified and initiate corrective actions.
 Responsible for overseeing/audits of subcontractor quality management systems

3
 Conduct internal quality audits

Experience August 2013 – October 2014 AURORA SHIELD LIMITED Lagos, Nigeria

HSE Officer /Administrative Head


 Ensure the safety of personnel, equipment and environment
 Conduct regular toolbox talks and workplace inspections
 Organize HSE meetings and In-house trainings
 Organize safety induction for new hires
 Build strong relationships with customers/clients and company shareholders
 Collaborate with team members to improve overall customer satisfaction
 Analyze, monitor and increase customer base to identify improvement opportunities
 Stay up-to-date with company’s best practices, policies, objectives and targets
 Oversee/ensure compliance of the organization’s procedures with regulatory bodies
 Supervise and effectively manage team members and subordinates
 Responsible for staff welfare and respond to employees’ safety concerns
 General office administrative duties

Experience Jul. 2011–Jun. 2013 PROSAFETY INTEGRATED SERVICES LIMITED Lagos, Nigeria

HSE Trainee (National Youth Service Corp)


 Develop health safety and environment documentations for clients in different sectors of the economy
 Update HSE policies and manuals
 Conduct regular toolbox talk and inspections
 Represent company in externals workshops and meetings
 Organize safety trainings and meetings
 Communicate and discuss all Hse issues with employees to promote and enhance Hse performance
 Manage and maintain business relationship between the company and her clients.
 Served as a customer care representative and administrative officer for company

Professional NEBOSH International General Certificate in Management of


Certifications International health and safety 2014

NEBOSH International General Certificate in controlling workplace


hazards 2014

NEBOSH International General Certificate in International health


and safety practical application

4
Institute of Safety Professionals of Nigeria (ISPON) – Hse Level 3
Supervision

Institute of Safety Professionals of Nigeria (ISPON) – General HSE,


Competence and Development Course

Implementation of Quality Management System (ISO 9001:2015)


Course

Internal audit for Quality Management System Course

Implementation of Environmental Management System (ISO


14001:2015) Course

Designated First Aider’s Course 2017


Other
Trainings
Vast experience in Occupational Health, Safety and Environment (HSE) Management
Skills
System.
Proven expertise in OH&S Management System establishment, implementation &
auditing.
Ability to write HSE plans, procedures, manual and interpret OH&S 1800:2007
requirements.
Ability to conduct work-based Hazard Identification, Risk assessment, Workplace
accident
Investigation & Root cause analysis.
Knowledgeable in the legal and contractual HSE requirements as well as the
international local legislature,
Demonstrated communication, interpersonal, and organizational skills
Proven research and report writing skills, including good presentation and analytical
skills

5
CURRICULUM VITAE

Personal Details
Name : Onu Dickson Edoka
Nationality : Nigerian
Position : Field HSE Supervisor

Qualifications
 University of Nigeria, Nsukka  MSc. Maritime 2018
Education
 University of Agriculture, Makurdi Telecommunication
 B Eng.– Electrical/
Electronic
2000
Engineering-

 Associate member, National Registry of Environmental Professionals (NREP)


Professional
Membership

 HSE Supervisor-INDEXPRO INT’L SERVICES LTD.  2018– Till


Career
Summary Date
 HSE Field Officer- DEUX PROJECT LIMITED, Lekki Fze, Lagos  2015 - 2018
State, Nigeria

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

HSE Officer
 Ensure compliance to Occupational Health & Safety Act and other applicable safety regulations.
 Conducts Equipment and facility inspections according to regulatory standards.
 Participates in Health Risk assessments, job hazard analysis and root cause analysis
 Conducts Task Specific Toolbox Talks and safety in-house training as well as inductions.
 Coordinates company’s medical, security and fire emergency drills.
 Participates actively in waste and environmental management related activities.
 Maintain documentation such as HSE manual, policies and procedures as well as controlled
documents
 Follow up on lifting equipment & accessories inspection and certification.
 Participates in PPE issuance and ensures proper use and maintenance of PPE.

1
Experience 2016 - 2018 DEUX PROJECT LIMITED Lagos, Nigeria

HSE Field Officer–on:


Projects:
 Dangote Fertilizer Plant Project, Lekki Fze, Lagos. Nigeria

Responsibility:
 Participate in developing, reviewing and implementing HSE plan
 Assist in the development of the Job Hazard Analysis, risk assessment and timely validation of the
Permit-to-Work document
 Promote safe work practices on site and close-out raised UA/UCs in target time
 Ensured that materials and equipment are properly colour coded or pre-mobilized before taking to site
 Enforced PPE compliance among workers
 Attend and enforce lessons learnt from trainings conducted by the lead Contractor (Saipem Nigeria)
 Participate in carrying out internal safety audit of the company’s safety management system
 Conduct regular safety inspection on equipment, work practices to ensure compliance with
required work place safety standards, policy and subsequent close-out of identified breach.
 Conduct fitness exercise and tool box meeting
 General supervision of work at height; scaffold erection, modification and dismantling;
excavation; concrete casting and painting activities
Experience Sep. 2015 –Dec. 2016 DEUX PROJECT LIMITED Lagos, Nigeria

HSE Field Officer – SAMSUNG EGINA FPSO FABRICATON YARD, LADOL FZE, LAGOS Jan. 2015 – Dec. 2016

Project:
 Construction of 480m Quay Wall.

Responsibilities:
 Conducted Tool Box Meeting before the start-up of any task
 Prepared the JHA, Risk Assessment and Emergency response plan for the task
 Ensured the timely issuance of PTW before any task
 Ensured that workers are safety compliant and well informed through trainings
 Conduct regular checks on equipment before use.
 Incident prevention and investigation and sharing lessons learnt.

Experience Sep. 2015 –Dec. 2016 DEUX PROJECT LIMITED Lagos, Nigeria

HSE Field Officer – SAMSUNG EGINA FPSO FABRICATON YARD, LADOL FZE, LAGOS Jan. 2015 – Dec. 2016
Project:
 Installation of 4 tonne marine fenders
 Installation of Corrosion control Devices (Anode and Cathodic protection)

2
Responsibilities:
 Supervised the installation of marine cone fenders for vessel docking
 Conducted Tool Box Meeting before the start-up of any task
 Prepared the JHA, Risk Assessment and Emergency response plan for the task
 Ensured the timely issuance of PTW before any task
 Ensured that workers are safety compliant and well informed through trainings
 Conduct regular checks on equipment before use.
 Incident prevention and investigation and sharing lessons learnt
 Supervised the installation of 4.67 tonne sacrificial anodes on marine piles 7.7meters below
sea level
 Conducted pre-dive meetings with the dive team prior to any dive
 Conducted alcohol test and assessed the health status of the team before a dive
 Prepared the JHA, Risk assessment, Dive log and Emergency response plan for the task
 Conducted regular checks on deployed equipment before use.
 Inspection of the required PPE
 Ensured the dive intervals and break are strictly adhered to
 Ensured PTW is made available before beginning the task

Professional International General Certificate in Occupational Health & Safety


Certifications NEBOSH 2018

Onshore/Offshore Health, Safety and Environment


2012

Saipem Contracting Nigeria Limited 2017


Other
Trainings Waste Management
Permit-to-Work System(PTW)
Work at Height and Fall Protection
Risk Assessment Awareness and Job Safety Analysis(JSA)
Confine Space Entry

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Good communication skill
Competent in hazard Identification, accident investigation and documenting relevant
HSE records
Familiarity with both Offshore and Onshore Construction activities
Good knowledge of developing and implementing HSE Plans
Ability to interpret, implement and review HSE Policies and Procedures
Possess strong analytical ability of evaluating KPIs to determine and improve HSE
performance

3
Able to manage and successfully improve safety culture among fieldworkers
Good interest in conducting trainings, toolbox meetings and emergency drills
Possess expertise in Peace and Conflict resolution and implementation Programs and
Campaigns
Possess effective communication, report writing and presentation skills
Proficient in the use of MS Office and other software packages

4
CURRICULUM VITAE

Personal Details
Name : Ekanem, Ekomobong Ezekiel
Nationality : Nigerian
Position : Field QA/QC Inspector

Qualifications
 Federal University of Technology, Owerri,  B. Eng. Metallurgical & 1989-1995
Education
Materials Eng.- 2nd
Class Honours, Lower
 Holy Family College/Sec Sch., Midim, Abak, AKS Division 1981-1986
 WAEC GCE O/L

Professional  Corporate member, The Nigerian Society of Engineers (MNSE)


Membership

1. Field QA/QC Inspector-INDEXPRO INT’L SERVICES LTD. 1. 2018– Till Date


Career
Summary 2. Aug. 2017 –
2. Project Quality Manager/Branch Manager - GABSON Engineering Feb 2018
Services Ltd., Lagos State, Nigeria 3. Aug. 2015 –
3. Site Construction Coordinator- GABSON Engineering Services Ltd., July 2017
Lagos State, Nigeria 4. Feb 2013 –
4. Site QA/QC Coordinator-Capital Energy Ltd., Lagos (Assigned to
Dec 2016
Midwestern Oil & Gas Co. Projects)
5. April 2008 –
5. Lead QA/QC Supervisor/Pipeline Integrity Engineer-East Horizon
Dec 2012
Gas Company (a Subsidiary of Oando PLC)
6. April 2008 –
6. QA/QC Supervisor/Pipeline Integrity Engineer- East Horizon Gas
Company (a Subsidiary of Oando PLC) Sept 2011)
7. Welding Inspector/Coating Inspector-LANSEM Nig. Ltd., Port 7. Feb 2003 –
Harcourt Dec 2007
8. Assistant Maintenance Engineer-Nigerian Cement Co. Plc, Nkalagu, 8. Nov 1995 –
Ebonyi State May 1998

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Site QA/QC Inspector-KWALE FLARE DOWN PROJECT-KWALE GAS PLANT


 Supervision of pipeline and facilities construction/installation activities: welding, NDT, painting/coating,
and cathodic protection system
 Supervision of pipeline/facilities commissioning activities: pigging, hydro-testing, drying/nitrogen
purging
 Managing the company’s site project resources – allocating equipment, human and material
resources optimally
 Rendering quality coverage on pipeline and facilities projects to ensure compliance with
specifications, procedures and plans
 Witnessing welder’s, WPS and PQR qualification
 Ensuring the evaluation of the qualifications of inspection personnel, welders, and NDT technicians
 Preparing and documenting quality and construction reports and participating in quality audits
 Reviewing NCR and concession request associated with welding and NDT activities and providing
recommendations according to codes and standards
 Ensuring the maintenance of a tracking welding log register, extracting KPIs and necessary
information to ensure and improve welding performance
 Ensuring compliance with HSE guidelines in the construction, use, repairs and maintenance of all gas
pipeline facilities and installations, which includes checking permits and PPE compliance at site,
equipment survey/calibration certificates, employees’ medical fitness reports, etc.
 Liaising with contractor for field level changes in scope, etc.
 Supervising pipeline operation, maintenance, and repair activities
 Developing and implementing inspection and maintenance plans for equipment
 Conducting in-house condition monitoring/integrity checks on installed pipeline system (pipeline, AGIs
- PRMS, pig launcher/receiver)

Experience Aug. 2017 – Feb 2018 GABSON Engineering Services Ltd. Lagos, Nigeria

Project Quality Manager/Branch Manager


Responsibility:
 Managing project quality activities to ensure compliance with contract specifications, industry codes &
standards, HSE regulations and requirements
 Managing inspection of production processes (welding, NDT, painting/coating), NDE and testing plans
for new construction, repair work and alterations
 Identifying and developing solutions to correct inspection function deficiencies and providing
feedback on quality related issues and metrics, and providing early warning on potential quality
problems
 Providing advice to project managers on quality issues, and resolving quality problems
 Managing the implementation of the company’s QMS for project planning, fabrication, assembly,

2
erection, inspection, documentation and operational activities, including internal quality audits
 Managing the review of QA/QC documents, procedures and programmes such material verification,
WPQR, WQT, PQP, ITP, WPS, QCP, and job procedures
 Ensuring control of non-conforming products by use of NCRs, cars and preventive actions
 Identifying and developing QA/QC personnel certification requirements
 Monitoring suppliers and contractor’s quality assurance and quality control activities
 Reviewing, evaluating and endorsing contractors’ and suppliers’ quality records
 Providing input for engineering quality and construction issues, and managing construction processes
 Managing the company’s branch resources to achieve its objectives, and ensuring efficient
operations on a day-to-day basis and addressing customer and employee satisfaction issues
 Managing and reviewing service contracts and checking completed work by contractors and vendors
 Carrying out facility and engineering job inspections
Achievements:
 Developed and organized quality control records and reports for increased efficiency
 Saved project cost by working closely with suppliers to ensure materials met project quality standards
Experience Aug. 2015 – Jul. 2017 GABSON Engineering Services Ltd. Lagos, Nigeria

Site Construction Coordinator


Responsibilities:
 Overseeing and coordinating project construction activities in accordance with project objectives, contract
specifications and HSE regulations
 Coordinating activities of site safety, technical and quality inspection personnel
 Coordinating the field planning and overseeing execution of mechanical construction (welding & fabrication,
NDT, coating), hook-up, pull-out and commissioning activities, including mechanical repairs of onshore assets
such as spool replacement
 Establishing, implementing, and maintaining verification process for mechanical completion
 Carrying out facility and engineering job inspections and providing input for engineering and construction issues
and managing construction processes
 Managing the company’s site resources to achieve project objectives, and ensuring efficient operations on a
day-to-day basis
 Managing site logistics, ensuring timely dispatch of staff and equipment to all project sites
 Managing site interfaces between contractors and sub-contractors
 Participating in monthly HSE and weekly project review meetings carried out in field locations
 Managing and controlling materials inventory on all project sites to avoid possible shortage
 Ensuring accurate documentation and daily reporting of all site activities, including status reports, field safety,
issues and challenges
 Ensuring change requests are in accordance with management of change plan and coordinating resolution of
construction related issues
 Monitoring and appraising contractor’s performance and recommending corrective action to be taken where
deficiencies are detected and verifying that actions are taken
Achievements:
 Supervised project construction efforts to ensure that projects were completed to required standards, on time
and within budget constraints

3
Experience Feb 2013 – Dec 2016 CAPITAL ENERGY LTD Lagos, Nigeria

Site QA/QC Coordinator (Pipeline/Storage Facilities Projects)


Responsibilities:
 Supervising and coordinating all site pipeline & appurtenances mechanical completion activities (welding, NDT,
painting/coating)
 Overseeing all site pipeline & appurtenances pre-commissioning/commissioning activities: pigging, hydro-
testing, drying/purging, installation of cathodic protection and pipeline surveillance (leak and intrusion detection)
systems, and introduction of hydrocarbon
 Planning, coordinating and supervising site QA/QC functions, HSE and construction activities and ensuring
compliance with specifications, procedures and plans
 Reviewing QC documents: PQP, ITP, job procedures, WPS, QCP, etc.
 Witnessing welder’s qualification tests and qualification of WPQR.
 Ensuring control of non-conforming products by use of NCRs, CARs and preventive actions
 Ensuring proper control, traceability and identification of materials/Conducting materials reconciliation
 Ensuring the provision and documentation of accurate and timely quality/HSE/construction and test reports,
highlighting critical issues and providing early warning on potential quality, HSE and construction challenges
 Managing the company’s project resources on site to achieve project- and overall business objectives
 Managing community, government, security and worksite interfaces
 Participating in risk assessment (HAZID/HAZOP) exercises for projects
 Attending project review meetings and monthly HSE meetings
Achievements:
 Assessed and re-designed piping system configuration, resulting in significant cost savings
 Optimized the use of project resources by implementing flexible work schedules and site activities
EAST HORIZON GAS COMPANY
Experience April 2008 – Dec 2012 (a Subsidiary of Oando PLC) Lagos, Nigeria

Lead QA/QC Supervisor/Pipeline Integrity Engineer

Supervision of pipeline and facilities construction/installation activities: welding, NDT, painting/coating, and
cathodic protection system

Supervision of pipeline/facilities commissioning activities: pigging, hydro-testing, drying/nitrogen purging

Managing the company’s site project resources – allocating equipment, human and material resources
optimally

Rendering quality coverage on pipeline and facilities projects to ensure compliance with specifications,
procedures and plans

Witnessing welder’s, WPS and PQR qualification

Ensuring the evaluation of the qualifications of inspection personnel, welders, and NDT technicians

Preparing and documenting quality and construction reports and participating in quality audits

Reviewing NCR and concession request associated with welding and NDT activities and providing
recommendations according to codes and standards

Ensuring the maintenance of a tracking welding log register, extracting KPIs and necessary information to
ensure and improve welding performance

4
Ensuring compliance with HSE guidelines in the construction, use, repairs and maintenance of all gas pipeline
facilities and installations, which includes checking permits and PPE compliance at site, equipment
survey/calibration certificates, employees’ medical fitness reports, etc.

Liaising with contractor for field level changes in scope, etc.

Supervising pipeline operation, maintenance, and repair activities

Developing and implementing inspection and maintenance plans for equipment

Conducting in-house condition monitoring/integrity checks on installed pipeline system (pipeline, AGIs -
PRMS, pig launcher/receiver)
Achievements:

Saved project cost by proactively engaging with host communities to reduce downtime

Saved facility life from fire by proactively engaging public fire service department.
(April 2008 – Sept 2011) QA/QC Supervisor/Pipeline Integrity Engineer

Principal Accountabilities:

Supervising pipeline system (pipeline, AGIs – PRMS, pig launcher/receiver) mechanical completion phase
activities: welding, NDT, painting/coating, etc.

Supervising pipeline pre-commissioning and commissioning activities: cleaning, hydro-testing, drying, purging
and introduction of gaseous hydrocarbon

Supervising cathodic protection system installation - both impressed current and sacrificial anodes

Verifying that all contractor’s and subcontractor’s welders are qualified according task requirements

Maintaining a traceability system for activities performed and tracking materials used for construction

Monitoring and controlling the contractor’s welding and other qc inspectors

Reviewing and approving weld map and validating test package as per project requirements

Approving welding inspection/coating reports and ensuring that inspections comply with ITPs

Ensuring HSE guidelines are followed in the construction, use, repair & maintenance of pipeline system

Carrying out routine in-house corrosion monitoring and CP assurance checks and preparing pipeline condition
monitoring reports, highlighting issues and providing suggestions for addressing problems

Professional CSWIP 3.1 (Level 2) – Welding Inspection


Certifications
BGAS-CSWIP (Grade 2) - Painting Inspection

PCN Level 2 (RFI) – Nondestructive Testing

ASNT Level 2 (MT, PT, UT) – Nondestructive Testing

ISO 9001 Certified Lead Auditor (PECB) – Quality Management System (QMS)

BOSIET (International – OPITO approved) - HSE

5
Jun 1998 – May 1999 Shell Intensive Training Program for
Other
Graduates (SITP), as a Trainee Engineer in Surface & Sub -
Trainings
surface Engineering - Run by Robert Gordon University,
Aberdeen, UK.
API 570: Piping Inspection
API 580: Risk-Based Inspection
Project Management Professional (PMP)

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Good communication skill
Competent in hazard Identification, accident investigation and documenting relevant
HSE records
Familiarity with both Offshore and Onshore Construction activities
Good knowledge of developing and implementing HSE Plans
Ability to interpret, implement and review HSE Policies and Procedures
Possess strong analytical ability of evaluating KPIs to determine and improve HSE
performance
Able to manage and successfully improve safety culture among fieldworkers
Good interest in conducting trainings, toolbox meetings and emergency drills
Possess expertise in Peace and Conflict resolution and implementation Programs and
Campaigns
Possess effective communication, report writing and presentation skills
Proficient in the use of MS Office and other software packages

6
CURRICULUM VITAE

Personal Details
Name : Ekong, Mfreke Peter
Nationality : Nigerian
Position : HSE Officer

Qualifications
 Fidei Polytechnic, Gboko, Benuei State. Nigeria  HND Mass  2015-2017
Education
Communication
 Dorben Polytechnic, Abuja. Nigeria  OND Mass  2010-2012
 Madona Comprehensive Secondary School, Oruk Communication
Anam, Akwa Ibom State. Nigeria  SSCE  2014

 None
Professional
Membership

 HSE Officer- IndexPro Int’l Services Limited , Km 21, PH/Aba 2018-Date


Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Logistics Officer- Dukkon Environmentalist, Uyo, Akwa Ibom State, Nigeria. 2017- 2018

 Room Service – Royalty Hotels Ltd., Eket/Oron Road, Eket, Akwa Ibom
State, Nigeria 2014 – 2016

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

HSE Officer
Ensures that safety policies and procedures are complied with within the company and working
environment to enhance productivity and profit maximization.

Experience 2018 - Date IndexPro Int’l Services Limited Port Harcourt, Nigeria

Site Nurse– Workshop/Base Fabrication and Installation Support on:


Projects:
 Kwale Flare Down Project-AGIP/AMAZON

1
Responsibility:
 The Safety Officer is responsible for monitoring and assessing hazardous and unsafe situations.
 Developing measures to assure personnel safety.
 Correct unsafe acts or conditions through the regular line of authority.
 May exercise emergency authority to prevent or stop unsafe acts when immediate action is required.
 The Safety Officer maintains awareness of active and developing situations.
 Ensures there are safety messages in each Incident Action Plan.
 Participate in planning meetings to identify any health and safety concerns inherent in the operations
daily work-plan.
 Review the Incident Action Plan for safety implications.
 Investigate accidents that have occurred within incident areas.
 Ensure preparation and implementation of Site Safety, Security, Health & Environment Plan
(SSSHEP).
 Inspects the site to ensure it is a hazard-free environment.
 Conducts toolbox meetings.
 An HSE Officer is part of the project management team and leads all efforts to enhance safety.
 Reviews and approves all sub-contractors safety plans.
 Verifies that injury logs and reports are completed and submitted to related government agencies and
clients.
 Verifies that all tools and equipment are adequate and safe for use.
 Promotes safe practices at the job site.
 Enforces safety guidelines.
 Trains and carries out drills and exercises on how to manage emergency situations.
 Conducts investigations of all accidents and near-misses.
 Reports to concerned authorities as requested or mandated by regulations.
 Conducts job hazard analysis.
 Establishes safety standards and policies as needed.
 Watches out for the safety of all workers and works to protect them from entering hazardous
situations.
 Responds to employees’ safety concerns.
 Coordinates registration and removal of hazardous waste.
 Serves as the link between state and local agencies and contractors.
 Receives reports from and responds to orders issued by Ministry of Labor & Productivity, and Ministry
of Environment.
 Arranges for OSHA mandated testing and/or evaluations of the workplace by external
agencies/consultants.
 Support the development of HSE policies and programs.
 Review existing policies and measures and update according to legislation.
 Advise and instruct on various safety-related topics (noise levels, use of machinery etc.).
 Conduct risk assessment and enforce preventative measures.

2
 Initiate and organize HSSE training of employees and executives.
 Inspect premises and the work of personnel to identify issues or non-conformity (e.g. not using
protective equipment)
 Oversee installations, maintenance, disposal of substances etc.
 Stop any unsafe acts or processes that seem dangerous or unhealthy
 Record and investigate incidents to determine causes and handle worker’s compensation claims
 Prepare reports on occurrences and provide statistical information to upper management.
 Carry out PTW Monitoring

Experience 2017- 2018 Dukkon Environmental Services Uyo, Akwa Ibom State
Ltd.

• Logistics Officer

Project:
 General

Responsibilities:
 Transport of persons, goods and / or documents(Function type: Logistic Support)
 Provide transportation for Head of Office, other employees
 Follow up the driver planning and scheduling using Outlook Calendar and register
transportation requests in 'DRIVERS'
 Deliver payment transfers to the bank and/or the suppliers, conduct cash purchases for office
expenditure
 Distribute mail as needed, both incoming and outgoing
 Pick up flight tickets
 Deliver correspondence to government authorities and assist in processing various permits
 Facilitate airport pick ups for VIP visitors and transportation during official visits
 Service vehicle maintenance management
 Schedule annual vehicle examination for service vehicles with the Transportation Department
and apply for the renewal for the vehicle license
 Determine when and what kind of maintenance the vehicle needs, keep track of general
maintenance schedules, especially car tyre condition
 Ensure sound running of the vehicles assigned and arrange minor repairs where necessary
 Check oil and tyres properly and keep the service vehicles in clean condition, both inside and
outside
 Keep track of timely car insurance renewals
 Update monthly mileage records
 Maintain log book of each service vehicle on daily basis
 Support Administration Section as a messenger by assisting with the mail deliveries, both
incoming and outgoing

3
2009
Professional Mandatory Basic Safety (STCW'95) – Maritime Academy, Oron
Certifications
HSE Competency Level3-ISPON In-view

General HSE Certificate-ISPON In-view

Posses working knowledge in MS Word, MS Excel, MS Powerpoint


Skills
Ability to function in an integrated project team environment
Good communication skill
Knowledge in Standards, Codes of Practices and Procedure etc

4
CURRICULUM VITAE

Personal Details
Name : Udokot, Israel Brown
Nationality : Nigerian
Position : HSE Officer

Qualifications
 Akanu Ibiam Federal Polytechnic, Unwana,  HND Mechanical Engr.  2003-2005
Education
Afikpo, Ebonyi State. Nigeria Technology
 Akanu Ibiam Federal Polytechnic, Unwana,  ND Mechanical Engr.  1999-2001
Afikpo, Ebonyi State. Nigeria Technology
 Christian Community Secondary School, Okoyo  SSCE  1990-1996
Ukanafun, Akwa Ibom State. Nigeria

 Member Institute of Safety Professionals (MNISP)- In View


Professional
Membership

 HSE Officer- IndexPro Int’l Services Limited , Km 21, PH/Aba 2018-Date


Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Store Keeper – EKM Global Services Ltd., 254 Abak/Ikot Ekpene Road, 2008 - 2014
Abak, Akwa Ibom State, Nigeria

 NYSC (Physics Teacher)- Udoma Community Secondary School, 2006 – 2007


Inoma Akator, Anambra West. Anambra State.

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

HSE Officer
Ensures that safety policies and procedures are complied with within the company and working
environment to enhance productivity and profit maximization.

1
Experience 2018 - Date IndexPro Int’l Services Limited Port Harcourt, Nigeria

Site Nurse– Workshop/Base Fabrication and Installation Support on:


Projects:
 Kwale Flare Down Project-AGIP/AMAZON

Responsibility:
 The Safety Officer is responsible for monitoring and assessing hazardous and unsafe situations.
 Developing measures to assure personnel safety.
 Correct unsafe acts or conditions through the regular line of authority.
 May exercise emergency authority to prevent or stop unsafe acts when immediate action is required.
 The Safety Officer maintains awareness of active and developing situations.
 Ensures there are safety messages in each Incident Action Plan.
 Participate in planning meetings to identify any health and safety concerns inherent in the operations
daily work-plan.
 Review the Incident Action Plan for safety implications.
 Investigate accidents that have occurred within incident areas.
 Ensure preparation and implementation of Site Safety, Security, Health & Environment Plan
(SSSHEP).
 Inspects the site to ensure it is a hazard-free environment.
 Conducts toolbox meetings.
 An HSE Officer is part of the project management team and leads all efforts to enhance safety.
 Reviews and approves all sub-contractors safety plans.
 Verifies that injury logs and reports are completed and submitted to related government agencies and
clients.
 Verifies that all tools and equipment are adequate and safe for use.
 Promotes safe practices at the job site.
 Enforces safety guidelines.
 Trains and carries out drills and exercises on how to manage emergency situations.
 Conducts investigations of all accidents and near-misses.
 Reports to concerned authorities as requested or mandated by regulations.
 Conducts job hazard analysis.
 Establishes safety standards and policies as needed.
 Watches out for the safety of all workers and works to protect them from entering hazardous
situations.
 Responds to employees’ safety concerns.
 Coordinates registration and removal of hazardous waste.
 Serves as the link between state and local agencies and contractors.
 Receives reports from and responds to orders issued by Ministry of Labor & Productivity, and Ministry
of Environment.
 Arranges for OSHA mandated testing and/or evaluations of the workplace by external

2
agencies/consultants.
 Support the development of HSE policies and programs.
 Review existing policies and measures and update according to legislation.
 Advise and instruct on various safety-related topics (noise levels, use of machinery etc.).
 Conduct risk assessment and enforce preventative measures.
 Initiate and organize HSSE training of employees and executives.
 Inspect premises and the work of personnel to identify issues or non-conformity (e.g. not using
protective equipment)
 Oversee installations, maintenance, disposal of substances etc.
 Stop any unsafe acts or processes that seem dangerous or unhealthy
 Record and investigate incidents to determine causes and handle worker’s compensation claims
 Prepare reports on occurrences and provide statistical information to upper management.
 Carry out PTW Monitoring

Experience 2008 - 2014 EKM Global Services Ltd. Abak, Akwa Ibom State

• Store Keeper

Project:
 General

Responsibilities:
 Maintain receipts, records, and withdrawals of the stockroom
 Receive, unload, and shelve supplies
 Perform other stock-related duties, including returning, packing, pricing, and labeling supplies
 Inspect deliveries for damage or discrepancies and report those to accounting for
reimbursements and record keeping
 Rotate stock and coordinate the disposal of surpluses
 Ensure adequate record keeping and manage all documentation to confirm proper stock
levels and maintain inventory control
 Coordinate the handling of freight, the movement of equipment, and necessary minor repairs

Experience 2006 – 2007 Udoma Community Secondary School Anambra West, Anambra
State.

National Youth Corp Member

Responsibilities:
 Physics Teacher

3
2018
Professional Level 3 HSE Competency- ISPON
Certifications 2018
General HSE Certificate-ISPON

Posses working knowledge in MS Word, MS Excel, MS Powerpoint


Skills
Ability to function in an integrated project team environment
Good communication skill
Knowledge in Standards, Codes of Practices and Procedure etc

4
CURRICULUM VITAE

Personal Details
Name : Enang, Imekan Thompson
Nationality : Nigerian
Position : IT Personnel

Qualifications
University of Uyo, Calabar, Akwa Ibom state, B Sc. Computer Science 2007-20014
Education
Nigeria
2006
Saint Mary’s Senior Science College Ediene SSCE
Abak, Abak LGA, Akwa Ibom State, Nigeria
Government School Udianga Enem, Etim Ekpo 1998
L.G.A, A kwa Ibom State, Nigeria FSLC

 Nigeria Computer Society (NCS)


Professional
Membership
 Association of Online IT Support Persons

1
 IT Personnel- IndexPro Int’l Services Limited , Km 21, PH/Aba 2018 –TILL DATE
Career
Expressway, Port Harcourt, Rivers State, Nigeria
Summary
2017- 2018
 IT Personnel/Market Developer – Airtel Nigeria , 82 Ikot
Ekpene Road Uyo, Akwa Ibom State
2013 – 2015
 IT Personnel Dueltex Network ltd , Kilometre 8 Port Harcourt
Aba Express way
2011 – 2012
 IT Personnel/ Industrial Trainee IBBIL Computer, 180 Aka road
Uyo, Akwa Ibom State
2008 – 20011
 IT Support Person VAL Computer Resources (Night Shift) ,
University of Uyo Anex Campus, Ikpa road, Uyo Akwa Ibom
State

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt,


Nigeria
IT PERSONNEL
 IT Stock/Asset Management within/outside Index pro facility
 Monitor and maintain computer systems and networks.
 Diagnose hardware/software faults and solve technical and applications problems
 Install and configure computer hardware operating systems and applications
 Providing staff with effective support within stipulated timelines, one on one or remotely
 Troubleshoot systems and network problems, diagnos and solve Hardware/software and wired/wireless
communication faults.
 Effective management and coordination of ICT vendors, suppliers and partners.
 Access control system management
 Conduct training for staff on basic computer operations
 Troubleshooting system and network problems and diagnosing and solving hardware/software faults
 Access control system Configuration, and backup/cloud storage

2
Experience 2014- 2018 IndexPro Int’l Services Limited Port Harcourt,Nigeria

IT Personnel
Projects:
 Kwale Flare Down Project-AGIP/AMAZON
Responsibility:

 Design and implementation of wired/wireless internet service

 Troubleshoot, maintain and administer the use of LANs, workstations, connection to the internet

and peripheral equipments

 Provide day to day and over the phone technical support

 Enforce the deployment of operating policies and procedures to ensure the protection of the company’s IT

assets

 Design, implement, and evaluate systems that support end users in the productive use of computer

hardware and software which covers the following:

o Development and maintenance of user documentation files/manuals, including complete

user manuals, FAQs and help files.

o Development and maintenance of comprehensive training programmes (basic and or

advanced) for new and existing users

o Providing and regularly updating documentation and on-line help facilities.

o Support Infrastructure System accessible through the Internet, mail and or voice.

 Develop, review, certify and maintain back-up/disaster recovery and business continuity plans and

procedure in the event of power failure, damage to system, etc and facilitate the prompt correction of such

failures if and when they occur.

Experience 2017– 2018 Airtel Nigeria ltd Uyo, Akwa Ibom State

IT Personnel/Market Developer

3
Responsibilities:
 Territory Infrastructure Management

 Keep a database containing territory KPIs, Outlets, BTS, KYC kits, REC base and Population

 7 pointer NCC compliance check

 Outlet Management

 Ensure Kit Availability and usability

 Product Availability

 Retailer Management

 Retailer Education on new scheme

 Trade Intelligence through prompt feedback on competitive activities.

 Troubleshoot software/hardware fault upon trade visit and escalate when necessary to the

appropriate department

Experience 2003 – 2015 Prime Sources Ltd/DNL Port Harcourt, Rivers


State.

IT PERSONNEL/BARGE ADMIN

Project: Escravos Gas Project phase 3b : Production Platform Modification


Client: Chevron Nigeria Ltd
Responsibilities:
 Design and implementation of wireless internet service onboard (over 100 users)
 Troubleshoot, maintain and administer the use of LANs, workstations, connection to the internet and
peripheral equipment.
 Configuration of IP phones, routers and switches
 Provide day to day and over the phone technical support
 Front/Back end system integration over the network
 System recommendation/purchase
 Web site optimization in collaboration with the developer
 Evaluate and install computer hardware, software, operating system and software applications
 Daily/weekly/monthly cloud backup of company’s data
 Evaluate and implement remote access control system
 Coordinate and control personnel movement to and from the ship

4
 Conduct toolbox meeting on weekly basis (IT related)

Professional CompTIA A+
Certifications 2013
CCNA 2013

Software/Hardware Good user of Microsoft Office Suite


Skills: WAN/LAN setup and management to Structural office cabling,
Routers/Switches configurations/installation
Confident user of Team Viewer
Software installations on PC’s/ Phone and Tablets configurations
Good knowledge of windows OS/LINUX/MAC
Good radio communication skills
High troubleshooting skills
E-mail communication facilities (Microsoft Outlook)
Internet communication facilities (browsing and information search
Computer (desktop/Laptop dismantling and coupling)
System cloning

5
CURRICULUM VITAE

Personal Details
Name : Akpaneyen, Etini Etukufot
Nationality : Nigerian
Position : Lifting Engineer

Qualifications
 Delta State University, Abraka, Delta State Masters in Energy and  2015-2017
Education
Petroleum Economics
[MEPE]
 Madonna University, Okija, Anambra State  Electrical/Electronics  2007-2013
Engineering (B.Eng)
 Mid-Town Secondary Commercial School, Ikot  Secondary School  2001-2007
Ekpene, Akwa Ibom State Leaving Certificate
(WAEC)
 Council For The Regulation Of Engineering in Nigeria [COREN]
Professional
 Lifting Equipment Engineers Association[LEEA]- In View
Membership
1. Lifting Engineer-INDEXPRO INT’L SERVICES LTD. 1. 2018– Till Date
Career
2. Rigger-THOMPSON & GRACE INVESTMENTS LTD. 2. Jan 2016-June. 2018
Summary
3. Industrial Trainee-FNL ENGINEERING NIGERIA LIMITED, UYO 3. 2010 – 2011

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Lifting Engineer-KWALE FLARE DOWN PROJECT (KWALE GAS PLANT)


Responsibilities:
 The management of lift planning and execution
 Ensuring that contractual arrangements for major lifts meet the needs of the project and that suitable terms
and conditions are in place.
 Ensuring that lifting plans, risk assessments and method statements for the work are reviewed and approved
to ensure compliance with the relevant International, NAOC and AP specifications and requirements.
 Ensuring that such reviews are performed by suitably qualified personnel.
 Acting as the Authorised person in controlling the lift.
 Ensuring that all minor lifting, rigging and slings operations have suitable risk assessments and method
statements.
 Ensuring that all lifts are reviewed, approved and controlled by appropriately qualified personnel and that

1
these personnel are identified in an appropriate way as responsible.
 Responsibility for the safe execution of the work being done.
 The day to day supervision of the lifting operations
 Maintain a strong and effective professional working relationship with the Client Project and Installation
Management and the other contractors.
 Support and promote the implementation of the Project Safety, Security and Quality plans
 Provide leadership to ensure prompt prioritisation and coordination of all unforeseen issues at the site,
escalating to the Insatllation Supervisor as necessary
 Write regular progress reports as required by the Installation Supervisor/Manager
 Carry out training in lifting, rigging and slinging for INDEXPRO and any other party necessary to ensure the
highest standard of safety leadership and execution of work on the site

Jan 2016-June.
Experience THOMPSON & GRACE INVESTMENTS LTD. Port Harcourt, Rivers
2018 State, Nigeria

Rigger-
Responsibility:
 Align, level, and anchor machinery.
 Attach loads to rigging to provide support or prepare them for moving, using hand and power tools.
 Attach pulleys and blocks to fixed overhead structures such as beams, ceilings, and gin pole booms,
using bolts and clamps.
 Control movement of heavy equipment through narrow openings or confined spaces, using chainfalls,
gin poles, gallows frames, and other equipment.
 Dismantle and store rigging equipment after use.
 Fabricate, set up, and repair rigging, supporting structures, hoists, and pulling gear, using hand and
power tools.
 Manipulate rigging lines, hoists, and pulling gear to move or support materials such as heavy
equipment, ships, or theatrical sets.
 Select gear such as cables, pulleys, and winches, according to load weights and sizes, facilities, and
work schedules.
 Signal or verbally direct workers engaged in hoisting and moving loads, in order to ensure safety of
workers and materials.
 Test rigging to ensure safety and reliability.
 Tilt, dip, and turn suspended loads to maneuver over, under, and/or around obstacles, using multi-
point suspension techniques.
Lifting Equipment Inspection- LEEA In view
Professional
Certifications 2018
SURVIVAL AT SEA & HELICOPTER UNDERWATER ESCAPE

INTRODUCTION TO SAFETY MANAGEMENT (OSHA) 2015

2
Excellent communication, interpersonal, analytical and numerical skills.
Skills
Ability to Impact knowledge.
Quick to grasp new ideas.
Ability to work as a team and interact with people at all levels.
Exhibit the need to achieve and possess a good sense of judgment.
Possess a good problem solving ability and have a high sense of insight and foresight.
Ability to maintain integrity and organizational skills.
Creative skills, high level of management and planning skills.

3
CURRICULUM VITAE

Personal Details
Name : AKPAN, EDIDIONG CLETUS
Nationality : Nigerian
Position : Materials/ Warehouse Coordinator

Qualifications
Cross River University of Technology B. Eng. Mechanical
Education
(CRUTECH),Calabr, Cross River State, Nigeria Engineering 2013

Universal Secondary Academy, Manta – Abak WASSC 2007


 Nigerian Society of Engineers (membership in view)
Professional
Membership

 To be part of a professional and stable organization that has


Career
strong values, workforce and prospects for personal
Summary
development as well as the growth of the establishment, I make
creativity an aspect of my innovative skill and it has helped in
understanding how to cope and manage with the uncertainties
that beclouds the Engineering sector and its challenges.

 Materials/Warehouse Coordinator, IndexPro Int’l Services Ltd.


2014 – 2018

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Materials/Warehouse Coordinator
Responsibilities:
 Inventory management
 Material receipt and issuance
 Control consumables and non-consumables

1
 Supervise and control materials and machines used for regular operations and project
delivery
 Report to Project Manager.

Experience 2014 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Materials/Warehouse Coordinator – Onshore and Offshore Fabrication and Installation Support on:
 Agbami Stage I & II – Chevron/MPL
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL
 Aje Field Development project – FASL/Ariosh
 West Jupiter ROV Project – Total/MPL
 Fabrication of Production Manifold and Suction Pile Grillages, Agbami Stage 3 ( Marine
Platforms LTD.)
 Fabrication of four numbers of CHUTE (ARIOSH)
 Extension of Moonpool Grillage & Construction of Hose Reel (Marine Platforms Ltd.)
 Construction of African Inspiration Main Deck Guardrail (Marine Platforms Ltd.)
 Construction of FIFI System Sea fastening Grillage (Marine Platforms Ltd.)
 Construction of Normand Pacific PILE & PLEM Bumper Frame. (CEONA)
 Construction of Gooseneck and Methanol Tank bonded Grillages. (CEONA)
 Construction of A Frame Grillage and IUTA Lifting Frame. (Marine Platforms Ltd.)
 Construction of Crane Base foundation, Cross Over Platform and Boom Rest (Rostrum Oil
and Gas)
 Construction of Access ladder and walkway (Marine Platforms Ltd.)
 Refurbishment of grillage (Marine Platforms Ltd.)
 Fabrication of fixed and Extendable ladder with cage. (Marine Platforms ltd.)
• Fabrication of VLS (CEONA)
• Refurbishment of bladder tank and fabrication of bladder Tank frame. (Marine
Platforms Ltd.)

Responsibility:
 Inventory management
 Material receipt and issuance
 Control consumables and non-consumables
 Supervise and control materials and machines used for regular operations and project
delivery

 Report to Project Manager.

2
 Internal Review/Check

 Inventory Management & Warehouse Maintenance 2016


Courses
Attended

Pipe drafting experience


Skills
Mechanical fitter
Interpret fabrication drawing
Material control
Experienced in handling 9” and 4” Grinding and cutting machines
Material stock taking

Knowledge in Specifications, Standards, Codes of Practices and Procedure etc

Sending as – built fabrication progress reports to the project manager

Ability to work under tight reporting schedule

A good team/group leader

3
CURRICULUM VITAE

Personal Details
Name : Stephen, Uduak Okon
Nationality : Nigerian
Position : Material Clerk

Qualifications
University of Calabar, Calabar, Cross River, B.A (English) - Inview 2014-2018
Education
Nigeria.
University of Calabar, Calabar, Cross River, National Diploma-Health 2007-2009
Nigeria. Records & Information
Management.
Mafon Secondary Commercial School,Oron, WAEC 2001-2006
Akwa Ibom, Nigeria

 An Associate member - Chartered Institute of Supply Chain Management, USA & Chartered
Professional Institute of Warehousing And Materials Management, Nigeria
Membership

1
 Material Clerk - IndexPro Int’l Services Limited , Km 21, PH/Aba 2016-2018
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Trainee (Workshop & Warehouse) – Bil Integrated Services Ltd, 2014-2015
Eket/Ibeno Road, Akwa Ibom State, Nigeria.

 Health Counsellor/Facilitator – Global HIV/AIDS Initiative


Nigeria(GHAIN). A subsidiary of Family Health International(FHI). 2010-2014

 Class Teacher/ Public Relations Officer - Dominion International


Secondary School, Eket, Akwa Ibom State, Nigeria. 2008-2010

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Material Clerk.
Responsibilities
 Records all materials and tools movements.
 Ensures smooth and unrestricted machine operations to avoid fabrication stoppages and delays.
 Maintains traceability of materials/ tools.
 Assists in receiving, registering, storing and issuing of materials.
 Receives, organizes, monitors and maintains the company’s materials/tools stocked in the warehouse.
 Ensures safety compliance and proper usage of tools/equipments.
 Compiles inventory balance of materials/consumables.
 Sorts materials according to size, type or specifications.
 Ensures that only authorized personnel have access to materials and equipments stored.
 Generates a log down sheet to control and monitor materials and equipments.
 Keeps inventory record of materials and equipments.
 Identifies material types, forms and quantity to be removed or issued for work.
 Defines custodial responsibility for any worker once he has issued a machine or equipment.
 Ensures all items, machines and equipments are stored safely and in good condition .
 Prepares a toolbox in compliance with an approved packing list.

2
Experience 2014 - 2015 Bil Integrated Services Limited Eket, AKS, Nigeria

Trainee
Project: Ubit GP Piping Spool Fabrication- Exxon Mobil
 Assisted warehouse personnel in issuing and recording materials.
 Occasionally went to the workshop to serve as fitters mate.
 Examined measures taken before the fabrication of a piping spool.
 Attended Job Safety Analysis(JSA) / Tool Box meetings.
 Was a good observer of safety rules

Experience 2010 – 2014 Global HIV/AIDS Initiative Nigeria Uyo, AKS, Nigeria
(GHAIN)

Projects:
 HIV/AIDS free Nigeria (A community project).
Know Your Status Today! (A free Counseling /Testing program for all Nigerians

Responsibilities
 Examined and tested potential clients of the facility.
 Held regular talks with clients.
 Facilitated during workshops and seminars within and outside the hospital facility.
 Was occasionally on tours and visits to clients. In order to know how they were coping with the HIV
epidemic.
 Was also in charge of collection and collation of data pertaining to those diagnosed of HIV.

3
Professional Professional Certificate in Warehousing & Materials Management,
Certifications from Chartered Institute of Supply Chain, Warehousing and 2018
Materials Management, Nigeria.(on course).

Posses working knowledge in MS Word and MS Excel.


Skills
Ability to function in an integrated project team environment
Good communication skills.
Good understanding of multi-discipline engineering activities
Knowledge in Specifications and Standards, etc.

4
CURRICULUM VITAE

Personal Details
Name : Osajie, Gilbert
Nationality : Nigerian
Position : QA-QC Inspector (COATING INSPECTOR)

Qualifications
Petroleum Training Institute, Effurun Delta (HND) Electrical/Electronic 2000-2002
Education
State. Engr
Petroleum Training Institute, Effurun Delta State (OND) Electrical/Electronic 1996-1998
Engr

Emaudo Secondary School, Ekpoma. Edo WASSE 1993


State.

NACE membership number; 292138


Professional
Membership

1
 Coating/Painting Inspector -IndexPro Int’l Services Limited , Km 21, 2014 - 2018
Career PH/Aba Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Coating/Painting/Insulation Inspector -SINOPEC Oil and Gas Service 2012 to 2014
Company Nigeria Limited

2009 – 2013
 Coating/painting Inspector-ASCOT Flow Lines Nigeria Limited (Old
Willbros) East West Road, Choba, Port Harcourt
2008 to 2011
 Engineering design and CAD Operator-Azimarine and General Services
Ltd, Contractor to Exxonmobil Producing Nigeria Ltd

2005 to 2008
 Engineering design,CAD Operator - Julius Berger Nigeria Plc
2003 to 2004
 National Youth Service corps, Gombe State .

2015 to 2016
 EVOMEC Global Services Limited

 SAIPEM CONTRACTING NIGERIA LIMITED 2016

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Coating/Painting Inspector
 Review of procedures, Qualification of painters and Blasters
 Review of Purchase orders for all coating materials prior to supply
 Ensure that all contractors coating documents, quality document are maintained according to the
project Quality plan
 Ensure proper storage and preservation of coating materials on site and making sure that inventory is
at minimum level to reduce storage coats
 Interpreting client’s specifications and liaising with paint manufactures to know the suitable products
as per the specifications review/management of the approved purchase orders and related invoices
regarding coating materials

2
 Comply and implement quality system requirements. Ensure fulfillment of inspection and test
requirements at all stage as per Quality control plan and contract requirement and maintain pertinent
records. Ensure that copies of applicable QC plans are available at the location of work.
 Issue NCR when non conformance is observed during inspection. Liaise with the project Manager for
the corrective action against non conformances.
 Ensure that weather conditions are suitable for blasting and paints application focal points on any
quality related issues in the field. Monitor subcontractor’s performance for compliance with quality
requirements, where ever applicable.

 Ensure job procedures and method statements are, strictly adhered to during installation and field
erections. Ensure all drawings released for construction are current revision. Ensure the
implementations of the applicable QA/QC procedures, QC plans and work instructions, which include
activities related to blasting and coating applications.
 Witness applicator qualification or trade test and paint system and all other coating activities-
inspection, wrapping etc. Holiday testing inspection operations of all pipe spools /flare lines
 Inspect location and suitability of access for areas of work, type of blasting equipment and tools to be
used, coating materials storage conditions, type of and size of blasting media, metal surface defects,
pre-cleaning or solvent cleaning of surface, degree of cleanliness required, surface profile of blast
cleared surface, type of coating application equipment and tools
 Experience in protective coating, offshore operations, new construction and maintenance of oil and
gas platforms, jack up drilling rid, refineries, ship marine/FPSO and miming plant.
 Inspection and supervision of thermal insulation application.
 Inspection and supervision of Field Joint Coating (pipeline coating) with various types of coatings
including heat shrink sleeve, heat shrink sleeve for HDD river crossing method, FBE, 3LPE , 3LPP,
5LPP etc.
 Inspection and supervision of field joint coating using Injected Mould polyurethane (IMPU) for 3LPP
and 5LPP.
 Inspection and Supervision of PULL BACK activities in 2.3km and 2.9km HDD river crossing
 Perform stop audits to ensure a safe workplace,

Experience 2014 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Coating/Painting Inspector – Onshore and Offshore Fabrication and Installation Support on:
Projects:
 Kwale Flare Down Project-AGIP/AMAZON
 Agbami Stage 1 & 11 – Chevron/MPL
 West Jupiter ROV Project – Total/MPL
 Aje Field Development project – FASL/Ariosh
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL

3
Responsibility:
 Review of procedures, Qualification of painters and Blasters
 Review of Purchase orders for all coating materials prior to supply
 Ensure that all contractors coating documents, quality document are maintained according to the
project Quality plan
 Ensure proper storage and preservation of coating materials on site and making sure that inventory is
at minimum level to reduce storage coats.

 Interpreting client’s specifications and liaising with paint manufactures to know the suitable products
as per the specifications review/management of the approved purchase orders and related invoices
regarding coating materials
 Issue NCR when nonconformance is observed during inspection. Liaise with the project Manager for
the corrective action against non-conformances
 Ensure that weather conditions are suitable for blasting and paints application focal points on any
quality related issues in the field. Monitor subcontractor’s performance for compliance with quality
requirements, where ever applicable

 Ensure job procedures and method statements are, strictly adhered to during installation and field
erections. Ensure all drawings released for construction are current revision. Ensure the
implementations of the applicable QA/QC procedures, QC plans and work instructions, which include
activities related to blasting and coating applications
 Inspect location and suitability of access for areas of work, type of blasting equipment and tools to be used,
coating materials storage conditions, type of and size of blasting media, metal surface defects, pre-cleaning or
solvent cleaning of surface, degree of cleanliness required, surface profile of blast Experience in protective
coating, offshore operations, new construction and maintenance of oil and gas platforms, jack up
drilling rid, refineries, ship marine/FPSO and miming plant.
 Inspection and supervision of thermal insulation application
 Inspection and supervision of Field Joint Coating (pipeline coating) with various types of coatings
including heat shrink sleeve, heat shrink sleeve for HDD river crossing method, FBE, 3LPE , 3LPP,
5LPP etc.
 Inspection and supervision of field joint coating using Injected Mould polyurethane (IMPU) for 3LPP
and 5LPP.
 Inspection and Supervision of PULL BACK activities in 2.3km and 2.9km HDD river crossing
 Perform stop audits to ensure a safe workplace.

Experience 2005 to 2008 Azimarine and General Services Port Harcourt, Rivers State
Ltd.Exxonmobil

Engineering design and CAD Operator – ExxonMobil Producing Nigeria Ltd.

4
Project:

 Etim Targeted Risk base coating - Exxonmobil


 Grit Blasting /Painting of OSO RD Platform- Exxonmbil
 OSO offshore crane coating by manual surface preparation SP1 & SP2 standard, using 2 coating
system - Exxonmobil
 Idoho offshore crane coating - Exxonmobil
 Edop Offshore carne coating by manual surface preparation SP1& SP2 standard using 2 coat system
Exxonmobil.
 Fabrication /installation and coating of 2006 flowlines - Exxonmobil
 Fabrication /Coating of Awawa Flow lines – Exxonmobil
 Recoating of 23 crane booms -Exxonmobil
 Recoating of 2MPN security boat - Exxonmobil
 Fabrication /coating of Six Security watch Towers - Exxonmobil
 Fabrication / coating of 11 marine Buoys - Exxonmobil
 Fabrication /coating 2007 flow elements - Exxonmobil
 Grit Blasting of 11 helidecks - ExxonMobil
 Fabrication/Coating of Ubit Drain/Air line - ExxonMobil

Responsibilities:

 Site survey, bill of material and installation of piping


 Responsible for Hydrotesting of pipe spools
 Site verifications of drawings prior to fabrications
 Dimensional control

 Production of piping isometric drawings


 Issuing drawings to AZIMARINE Construction Supt. for fabrication.
 Supervision and training of junior draftsmen / CAD users in the basics of isometric drawing and the
use of AutoCAD
 Supervision on Platform shut down activities. Issuing drawings to MPN Construction Engineers for
materials’ procurement.

Experience 2009 – 2013 Julius Berger Nigeria Plc. Bayelsa State

Engineering design,CAD Operator

Project:

Gbaran/Ubie Intergrated Oil and Gas Project

Responsibilities:
 Site survey, bill of material and installation of piping.
 Responsible for Hydro testing of pipe spools.

5
 Site verifications of drawings prior to fabrications.
 Dimensional control
 Production of piping isometric drawings.
 Issuing drawings to AZIMARINE Construction Supt. for fabrication.
 Supervision and training of junior draftsmen / CAD users in the basics of isometric drawing and the
use of AutoCAD
 Supervision on Platform shut down activities. Issuing drawings to MPN Construction Engineers for
materials’ procurement.
2010
Professional NACE Certified Coating Inspection Level 1 (CIP LEVEL 1)
Certifications
NACE Certified Coating Inspection Level 2 (CIP LEVEL 2) 2010
2014-2015
Certificate in AUTOCAD

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project..


Skills
AutoCAD 2000,2004 and 2007
Quick and ready to learn, and Fast learner
Good Analytical and Conceptional Ability, Team Player

6
CURRICULUM VITAE

Personal Details
Name : Nnabude, Michael
Nationality : Nigerian
Position : Piping Engineer (CADD)

Qualifications
University of Port Harcourt, Rivers State. B.Eng. {Mech. Engr. } 2nd 2006- 2009
Education
Class Honours
Institute of Management and Technology, HND Upper Credit (Chem. 2000-2002
Enugu. Engr.)
St. Charles Special Science School Onitsha, SSCE 1994-1996
Anambra State.
● Pipeline Professionals Association of Nigeria (PLAN) – Membership Id: PLN-1-40514
Professional ● Corporate Member - Nigeria Society of Engineers
Membership

 Piping Engineer-IndexPro Int’l Services Limited , Km 21, PH/Aba 2018


Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Project Engineer - Nigerian Bottling Company (Coca Cola Hbc) 2016-2018
2015
 Piping Supervisor – DBN

 Piping and Pipeline Engineer- DAEWOO NIGERIA LIMITED 2014

 Piping Engineer -Shell Engineering Design Office (Sedo), P.H


2009 – 2014

 Piping Designer- DOVER ENGINEERING LTD, P.H


2009
 Piping Engineer -National Engineering Technical Company Of Nigeria Ltd. 2018
(Netco)

 Piping Engineer-Halden Nigeria Limited [Oil and Gas Service Company] 2006-2008

 Industrial Trainee -Fibow Petroleum Engineering and Environmental


1999

1
Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Piping Engineer
 Site visit of oil and gas facilities for modification and plant layout purposes.
 Prepare piping design deliverables such as construction drawings, PGA’s and plot plans.
 Supervise the installation works properly.
 Plan and schedule the work within the given deadlines.
 Allocate responsibilities to the workers.
 Assist pipe fitters with regards to construction related issues identified on drawing
 Review and Correction of punch list items.
 Prepare the documents at the various stages of development of the project.
 Collaborate with team of designers to complete all mechanical capital projects and provide all
engineering support.
 Provide support to all projects and maintain accuracy in all piping project and ensure compliance to all
piping material specifications and maintain knowledge on all orders.
 Analyze all mechanical designs and prepare various concepts for piping designs and develop required
mechanical drawings.
 Provide support to all purchase activities and evaluate all vendor submittals.

Experience 2016 - 2018 Nigerian Bottling Company (Coca Cola Port Harcourt, Nigeria
Hbc)

Project Engineer
● Prepare and monitor job progress.
● Interact daily with the contractors to identify their constraints and the best way to resolve it.
● Report progress of work daily to the project manager.
● Monitor compliance to applicable codes, HSE and other issues that may arise.
● Any other job that may be assigned by the project manager.

Experience 2015 DBN Port Harcourt, Rivers State

Piping Supervisor

2
Project:
 . Oben Gas Plant Expansion Project ( Seplat )

Responsibilities:
 Provide technical interpretation of design documents in support of construction managers,
superintendents, and contractors and provides specific expertise for problem solving.
 Assist craftsmen, foremen and project supervision with regard to construction related issues identified on
drawings.
 Review and witness correction of punch list items
 Where design is deemed unacceptable, raise a technical query for engineering review.
 Maintains effective communication between company and client to ensure timely flow of design documents
 Any other duty assigned by the superintendent

Experience 2014 Daewoo Nigeria Limited Port Harcourt, Rivers State.

Piping and Pipeline Engineer

Responsibilities:

 Design of Pig Trap Systems and associated piping


 Assist in the development of Class Location studies, pipe stress calculations, mainline valve spacing
and hydraulic calculations.
 Generation of Wall Thickness calculation for onshore pipe systems
 Development of Pipeline Approach drawings and Alignment sheets
 Pipe On-Bottom Stability Analysis
 Experienced in applicable industry codes and regulations such as ASME B31.3, ASME B31.4 and
ASME B31.8 alongside company specifications design manuals for SPDC.
 Preparation of Tie-In Schedule and MTO’s.
 Pipe loading calculations for civil and structural usage.
 Any other duty assigned by the Piping/Pipeline Discipline Lead.

Experience 2009 Dover Engineering Ltd, P.H Port Harcourt, Rivers State.

Piping Engineer

Responsibility

● Site visit of oil and gas facilities for tie-in purposes.


● Carry out piping layout studies in accordance with the specification.
● Blocking and cutting of layout drawing to acceptable and presentable scale.

3
● Produces piping isometrics and GA’S
● Development of CTR’s
● Preparation of Tie-In Schedule and MTO

Experience 2008 National Engineering Technical Port Harcourt


Company Of Nigeria Ltd. (Netco

Piping Engineer

Responsibility
● Checking of AS-BUILT drawings submitted by contractors to make sure that is done to the set
standard.
● Generation and review of drawings for documentation and modification purposes.
● Making sure that the contractor mark-up reflects exactly what we have on site to avoid
inconsistency in drawings.
● Any other duty assigned by the Mechanical Lead

Piping and Ability to use PDMS, Pipe Data-Pro and AutoCAD software’s.
Pipeline Ability to generate mark-up of oil and gas facilities.
Engineer
Ability to produce and interpret design drawings.

4
CURRICULUM VITAE

Personal Details
Name : Akubueze,Anthony
Nationality : Nigerian
Position : QAQC Inspector
Qualifications
Rivers State University Science and Technology Mechanical Engineering 2006-2010.
Education
{RSUSTMile 3 Diobe Portharcourt, Rivers State. (Bachelor of Science)

Don Bosco Technical Institution {DBTI},Onitsha Mechanical Technology 2003-2005.


Anambra State. Higher National Diploma

Secondary Technical School Obodoukwu WAEC 1997-2003


Ideate North L.G.A Imo State,
 Member American Welding Society
Professional
 Member Nigerian National Pipe Fitters/ Pipe Welders Association
Membership

1
 QAQC Inspector- IndexPro Int’l Services Limited , Km 21, PH/Aba 2018
Career Expressway, Port Harcourt, Rivers State, Nigeria.
Summary

 QA/QC Engineer (Welding Inspector.) - Saipem Cont. Nig Ltd.


2015-2018
(SCNL)

 QA/QC Engineer ( Welding Inspector.)- Addax Petroleum.


2011-2013
 QA/QC Welding Inspector - SPDC. Port Harcourt, Rivers State. 2010-2011
2006-2009
 Pipe Fitter - Saipem Contracting Nig Limited.

2005
 Industrial Technician -Saipem Contracting Nigeria Ltd. -Port Harcourt,
Rivers State. Nigeria

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

QAQC Inspector
 General preparation of work site.

• Check all applicable documents.


• Actively participate in all project technical meetings.
• Inspection of materials on grand reneging from pipes, flanges, valves, electrodes, ovens,
welding machines and its calibration certificates.
• Making sure that all the welding process are monitored.
• Preheat and inter-pass temperatures are monitored.
• Monitoring of Inter-pass cleaning – chipping, grinding, gouging,
• Essential variables such as current, voltage, travel speed are monitored.* Filler metals, fluxes
and shielding gases are correctly and safely kept.
• Visual inspections are carried out to ascertain acceptability of appearance of welds and
Dimensional accuracy ascertained.

2
• Conformity with drawings and standards requirements.
• Ensure weld procedure sheet and application standard.
• Review and update all applicable WPS and also document NDT reports.
• Review inspection and test plan, prepare welders performance log book.
• Monitoring when defects are partially removed and fully removed (visual and NDT).
• Re-welding is strictly monitored with an approved WPS and Re-inspect all completed repair.
• Prepare and document all necessary reports for reference purposes at the end of day activities.
• Collation of all documents and reports for final inspection, approval and storage.

Experience 2015-2018 Saipem Cont. Nig Ltd. (SCNL) Port Harcourt, Nigeria

QA/QC Engineer (Welding Inspector) Southern Swamp Associated Gas Solution(SSAGS)Production Facility.
Projects:
Southern Swamp Associated Gas Solution(SSAGS)Production Facility
AFAM Power Plants
Federal Government Alleviation Project (Amnesty Training) Niger Delter Amnesty Programs.
Aminan Project EPC 2A Project,Akpo Project, USAN Project
General Maintenance Works

Responsibility:
 Ensuring Compliance to company's general specification codes and standards as par the project requirements

• Qualification of welding procedures and welders (WPS and WQT).


 Monitoring and control of welding of Duplex, Austenitic SS and Carbon steel pipes
 Ensuring that preheating and interpass temperatures are strictly followed as par WPS
requirements.
 Performing Visual Inspection and requesting for NDT test.
 Generating daily welding reports (fit up, visual and parameter check report, weld summary reports.
 Requesting for and witnessing the carrying out of PMI and Ferrite test on SS & DSS and preparation of its
reports.
 Issuing of RFI to the client and NCR to construction team when necessary.
 Inspection of welding activities and the installation of spools on module 1, 2, 3, 4, 5,6and 7.

3
 Mechanical completion activities which involves preparation of test packs, line inspection
 Fully involved in hydroteste activities , lick test
 Inspection on concrete mixing and casting/poring as well as grating.
 Raising and closing of all the MCC punch list
 Part of Commissioning team / handing over of all QAQC related Documents.

Experience 2011 – 2013 Addax Petroleum. Port Harcourt, Rivers State

QA/QC Engineer – Oron South-West Offshore

Project:
 Modification of Platform ,Installation of oml 123 Subsea Pipeline and Risers, Maintenance of ADNL
platform

Responsibilities:

 Reconciliation and verification of material certificate as well as review of drawings for fabrication andfit-up.
 Read and interpreted blueprints, technical drawings, and computer-generated reports.
 Preparation of quality reports and documentation.
 Conduct welders qualification tests {WQT}
 Monitoring to ensure compliance with client specifications and standard.
 Identification of welding consumables such as electrodes, filler wire, fluxes, shielding and backing.
 Making sure that dimensions, tolerances, preparation, fit-up and alignment are in accordance with the
Approved drawings and standards. Tack welds, bridging pieces, clamping and type of backing are
correct.
 Cleanliness of work area is maintained.
 Preheating is done in accordance with procedure.
 Monitoring Pr-heating and inter-pass cleaning during welding.
 Carrying out visual inspection on the welded joints.
 Coordinate NDT request for completed joints.
 Review of NDT reports and interpretation of radio-graphic film result.
 Monitoring of repair joints and ensuring proper repair procedures are strictly followed.
 Insuring of {NCR} and corrective action request {CAR} when necessary.
 Inspection of tie-in activities.
 Carrying out inspection on risers, topside and deck.
 Part of the inspection team for installation of risers, topside and deck.
 Part of the inspection and supervision team for cleaning, flushing, pigging, and pressure testing of
completed 24",16",12"and 6" pipelines respectively.
 Ensures proper daily welding reports and documentation as well as signing NDT reports.
 Collation of all documents and reports. and foreword to the client Reps for final inspection, approval and
storage.

4
Experience 2009 – 2013 SPDC Port Harcourt, Rivers State.

QA/QC Welding Inspector - Nestoil and Gas Group


.
Project:
 Nctl Belema Pipeline Project 24"& 8".Eggs Phase 1&2 Pipeline Proj 18" 10". Soku oil Flow lines/
Ofuyam Gas line.

Responsibilities:
 General preparation of work site.
 Check all applicable documents.
 Actively participate in all project technical meetings.
 Inspection of materials on grand reneging from pipes, flanges, valves, electrodes, ovens, welding
machines and its calibration certificates.
 Making sure that all the welding process are monitored.
 Preheat and inter-pass temperatures are monitored.
 Monitoring of Inter-pass cleaning – chipping, grinding, gouging,
 Essential variables such as current, voltage, travel speed are monitored.* Filler metals, fluxes and shielding
gases are correctly and safely kept.
 Visual inspections are carried out to ascertain acceptability of appearance of welds and Dimensional accuracy
ascertained.
 Conformity with drawings and standards requirements.
 Ensure weld procedure sheet and application standard.
 Review and update all applicable WPS and also document NDT reports.
 Review inspection and test plan, prepare welders performance log book.
 Monitoring when defects are partially removed and fully removed (visual and NDT).
 Re-welding is strictly monitored with an approved WPS and Re-inspect all completed repair.
 Prepare and document all necessary reports for reference purposes at the end of day’s activities.
 Collation of all documents and reports for final inspection, approval and storage.

5
Professional General Maintenance Works
Certifications 2013
Certified NDT (ASNT) Level II in MPl, RT, UT and RFI (F.I).

Certificate of competence Level II & III,(cert NO:/22/12894)Issued


By Nigerian Federal Ministry ofLabour and Productivity( Trade 2013
Test).

Certified Pipe Fitter, Issued By Saipem Pipe Fitting Training


2013
School, Port Harcourt Base

Ability to meet targets


Skills
Fast learner and good communication skill.
Multidisciplinary exposure.
Lean principles knowledge
Excellent attention to detail
Strong leadership skill.
Ability to work independently and as a team .

6
CURRICULUM VITAE

Personal Details
Name : Nwokearu Chika Augustus
Nationality : Nigerian
Position : QA/QC Inspector

Qualifications
Institute of Management and Technology, Higher National Diploma
Education
Enugu State (HND) Chemical 2008
Engineering
Secondary Technical School, Umuariam WAEC 1995

Obowo, Imo State, Nigeria


 American Welding Society- In view
Professional
 Nigeria Institute of Management
Membership

1
 QAQC Inspector, IndexPro Int’l Services Limited , Km 21, PH/Aba 2015-2018
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Mechanical Inspector/Quality Inspector, ONSHORE CONSTRUCTION 2017 - 2017
COMPANY LLC

 Mechanical Inspector/Quality Inspector, NIGERDOCK NIGERIA 2014-2016


PLC.

 Mechanical Inspector/Quality Inspector, DELATTRE BEONS NIGERIA 2013-2014


LIMITED (DBN)
 Mechanical Inspector/Quality Inspector, HYUNDAI HEAVY
2012 – 2013
ENGINEERING NIGERIA LIMITED
 Mechanical Inspector/Quality Inspector, SINOPEC OIL AND GAS SERVICES
NIGERIA LTD. 2011-2012
 QA/QC Engineer, CHUCKSBEH ENGINEERING NIG. LTD
 Welding Inspector Trainee, SAN TUZE ENGINEERING P/H 2009-2011
2005-2009

Work Experience

Experience 2015-2018 IndexPro Int’l Services Limited Port Harcourt,


Nigeria
Mechanical Inspector/Quality Inspector – Onshore and Offshore Fabrications and
Installations Support on
Projects:

- Bonga LWI/SIL project ( Snepco/Marine platforms)


- Agbami phase 3 ( Marine Platforms/Chevron).
- Aje Project ( Ariosh/FASL)
- ROV Tooling Basket (Snepco / Marine Platforms)
- Moonpool Grillage Extension Project ( Chevron /Marine Platforms)
- Golden Eagle Hose Reel Fabrication Project ( Marine Platforms)
- Siem-marlin Re-instatement Project ( Marine Platforms)

Responsibilities:
 Checking of equipment and structural alignment
 Preparation and Maintenance of all Quality Manual & Procedures
 Checking bolt torque and tightening

2
 Verifying structural placement
 Monitoring of general work quality at site
 Carrying out of Hydro test and leak test
 Preparation of inspection test plan (ITP) for all projects
 Monitoring of joint fit-up before the inception of welding
 Maintenance of daily weld record
 Raising of NDT request for completed welds
 Carrying out Daily Weld Audit
 General Structural and weld Quality Control

Experience 2014 - 2015 ADEX OIL AND GAS LIMITED Warri, Delta State
,Nigeria
Mechanical Inspector/Quality Inspector – Onshore and Offshore Fabrication and Installation
Support on:
Projects:
 PROVISION OF PIPING MODIFICATION OF SC-8 WELL-HEAD AT STUBB CREEK

Responsibilities:
 Monitoring, inspecting welding fabrication and reporting of progress.
 Requesting for Non-Destructive Examination of welds when the welding
work is completed.
 Coordinating the activities of third party inspectors and their reports before
approval.
 Carrying out of internal audit of the QMS and monitoring of the corrective
actions required.
 Review work breakdown schedule as well as construction drawing to make
contribution as the need arises
 Monitor work progress and issued daily progress report to client.
 Preparing and reviewing of as-built documents, ensure that all requirements
are correct and complete before handing over to the client

Experience 2012 – 2013 SINOPEC OIL AND GAS Port Harcourt, Rivers

3
SERVICES. State, Nigeria

DOCUMENT CONTROL SUPERVISOR

Responsibilities:
 Responsible for operating and maintaining the Department Project Document Control
System and ensuring the availability of up to date information/data throughout the
project.
 Ensure that all documentation, drawings and specifications are up to date and at the
correct revision.
 Ensure that client numbering and revision status is being used on all documentation,
drawings and correspondence. Participate in the discussion of the "Subcontractor
Document Register" during project and Supplier "kick off" meetings.
 Ensure that the "Document Control Procedure" is applied through to project
execution.
 Check correct procedure format, number and revision are being used.
 Dispatch documents and comments internally and externally as per distribution
matrix.
 Using reports, advise Client, Subcontractor, Project Manager and Team Members on
a weekly basis, the status of documents and comments internally and externally.
Prepare weekly and monthly Quality Report.
 Ensure Internal Departments produce documentation within MDR planned dates.
 Assist in supplying documentation for mobilization (hardcopy and electronic to disk).
 Manage archival activities for controlled documents and validation files.
 Interfacing with External Clients and Subcontractors.
 Coordinate the activities of Document Control / QA/QC, including processing /
scheduling distribution auditing controlled documents, maintenance of electronic files,
tracking and reporting on document review progress
 Manage all aspects of the controlled documents system, both electronically and
paper copies.
 Maintain proper documentation, of all internal audits, non-conformance reports,
surveillance reports and corrective actions.
 Provide support for the Quality System during audits, actively participate in
department activities and support to construction and engineering matters.
 Work with subject matter experts on technical subjects in a positive, collaborative
manner to prepare controlled documents which conform to company defined format
 Review and proofread documents for consistency of document format and system
concerns
 Adhere to and enforce company policies and procedures related to document control.
 Process all documentation received in DM in accordance with prescribed matrices
within agreed time scales.
 Process both design and vendor documents in accordance with the corporate or
project procedures.

4
 Accurately update information in the electronic document management system.
 Perform audits of company areas and processes to confirm compliance with
controlled procedure

Experience 2012 – 2012 HYUNDAI HEAVY Lagos, Nigeria


ENGINEERING NIGERIA
LIMITED

Mechanical Inspector/Quality Inspector -


Project:
DSO PROJECT
Responsibilities:
 Preparation of test pack
 Preparation and Maintenance of all Quality Manual & Procedures
 Performance of daily audit to check level of conformance to quality manual
 Preparation of weld procedures
 Preparation of test procedures and other procedures
 Monitoring of general work quality at site
 Carrying out of Hydro test and leak test
 Preparation of inspection test plan (ITP) for all projects
 Monitoring of joint fit-up before the inception of welding
 Maintenance of daily weld record
 Raising of NDT request for completed welds
 Carrying out Daily Weld Audit
 General Fabrication and weld Quality Control including Welding Inspection
 Monitoring and recording of welding procedure qualification test (WPQT)
 Performing of visual inspection of completed weld

 AWS CERTIFIED WELDING INSPECTOR In-veiw


Courses
Attended

5
Posses working knowledge in MS Word, MS Excel, MS Powerpoint,
Skills
MS Project.
Strong knowledge in AutoCAD, PDMS 11.5, Micro Station V8 and
PDS
General proficiency in quality management system, welding inspection
and NDT control.
Team working skills, Good team player, sharing team goals, aspirations
and support team members to achieving those goals.
Interpersonal and analytical skills: Result-Oriented and delivering on
promise.
Ability to work under pressure and to tight deadlines with limited
supervision.
Good communication skill
Good understanding of multi-discipline engineering activities.
Knowledge in Specifications, Standards, Codes of Practices and
Procedure etc

6
CURRICULUM VITAE

Personal Details
Name : Asian, Umoh
Nationality : Nigerian
Position : Assistant Welding Inspector

Qualifications
University of Uyo, Nigeria B.Sc Chemistry 2015
Education

Saint Mary’s Senior Science College WAEC 2004


Ediene Abak, Akwa Ibom State

 Global Technology Development


Professional
Membership

 Assistant Welding Inspector - IndexPro Int’l Services Limited , Km 21, 2017-till Date
Career PH/Aba Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Chemistry Teacher- National youth service corps. Noble Secondary 2016
School

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Assistant Welding Inspector


 Inspection of weld joints to ascertain the quality in line with client’s prescription
 Giving analysis on the magnetic properties of proposed materials to be used in fabrication jobs

1
 Giving of detailed report on every weld joint, for easy identification in the event of any fault.
 Giving reports on job progress
 Giving instructions on the quality of materials for use in each project.

Experience 2016 NOBLE SECONDARY SCHOOL Port Harcourt, Nigeria

CHEMISTRY TEACHER
:
Responsibility:
 Teaching Chemistry in senior secondary classes.
 Setting of examinations and marking of scripts.
 Compilation of examination results and record keeping.

Professional Certificate of Competence in Industrial Safety


Certifications 2013

Excellent knowledge in MS Word, MS Excel.


Skills
Good communication skill

2
CURRICULUM VITAE

Personal Details
Name : Umoh, Victor Monday
Nationality : Nigerian
Position : QAQC Officer

Qualifications

Education
Institute of Petroleum Studies (IPS), University PGD.Petroleum 2015-2016
of Port Harcoourt Tech(Distinction)
2006-2011
University of Port Harcourt, Choba, B.Eng Gas Engineering
Rivers State (Second Class Lower
Division)

JUNE 2005
Wify Comprehensive Secondary School, Eliozu WASSCE

1998
Trinity Educational Centre, Woji, Rivers State First School Leaving
Certificate

Professional  National Registry of Environmental Professionals (NREP, USA)


Membership  Society of Petroleum Engineers (SPE) – Member ID NO:4550676

1
Career
June 2018
Summary  HSE Officer/ Permit Holder-Ibibama Nigeria Limited,Bonny Island
Rivers State, Nigeria. To
Sept. 2018

June 2018
 HSE Officer/Permit Holder-Asikamba Nigeria Limited, Bonny Island,
Rivers State, Nigeria. To
15th June

Jan 2015
 Forward Nigeria, Cross River State To
Feb 2015

 TUB Global Resources, Port Harcourt Rivers State, Nigeria Nov 2011
To
June 2012

2
Work Experience

Experience June 2018- Sept 2018 Ibibama Nigeria Limited, Bonny Island Rivers State, Nigeria

Permit Holder & HSE Lead

Projects:
 Excavation of failed road section at access gate two
 Excavation and repair of road failed section at perimeter fence
 Excavation and repair of failed road section at Shell Jetty
 Lifting Operation jobs from contractor’s quarters to jetty and tank farm

Responsibility:
 Coordinate and carryout daily toolbox talk
 Daily raising, suspension and close of permits upon completion of job.
 Conduct periodic safety awareness briefings to contractors
 Ensure periodic safety requirements are met and updated by contract(s) e.g. periodic changing of
personnel’s PPEs
 Ensure daily HSEStatistics Records are maintained
 Conduct accident/injury investigations
 Establish and monitor a program for reporting and investigating unsafe acts & unsafe conditions within
BOGT terminal situations,
 Conduct investigations into employee inquiries, suggestions and complaints when situation arises
 Maintain required safety and health documents/files with SPDC HSE team
 Ensure periodic inspections of all motorized vehicles, Heavy equipment& all lifting equipment during
lifting operations
 Oversee all HSE matters.
 Daily report of all unsafe acts and condition

Experience June 2018 Asikamba Nigeria Limited, Bonny Island Port Harcourt, Nigeria

Permit Holder &HSE Lead

Projects:
 Shoreline Protection

Responsibility:
 Coordinate and carryout daily toolbox talk
 Daily raising, suspension and close of permits upon completion of job.
 Conduct periodic safety awareness briefings to contractors

3
 Ensure periodic safety requirements are met and updated by contract(s) e.g. periodic changing of
personnel’s PPEs
 Ensure daily HSEStatistics Records are maintained
 Conduct accident/injury investigations
 Establish and monitor a program for reporting and investigating unsafe acts & unsafe conditions within
BOGT terminal situations,
 Conduct investigations into employee inquiries, suggestions and complaints when situation arises
 Maintain required safety and health documents/files with SPDC HSE team
 Ensure periodic inspections of all motorized vehicles, Heavy equipment& all lifting equipment during
lifting operations

Experience Jan 2015 – Febuary2014 Forward Nigeria Cross River State

Call Center Agent / Data Analyst

Project:
 2015 Election

Responsibilities:
 Editing of data from call centre agents using online excel sheets
 Computation of data received from other call center agents
 Keeping records of out-going and incoming calls

Experience Nov 2011 – June 2012 TUB Global Resources Rivers State, Nigeria

Office Assistant

Responsibilities:
 Troubleshooting wireless network
 Documentation of inventories
 Processing of documents & delivering of goods to clients
 Keeping & providing monthly progress report

4
Professional
Certifications
Shell PTW Certification June 2017

National Registry of Environmental Professionals (NREP,USA) 2016

Certification on Eclipse Software For Reservoir Simulation 2012

Skills
Posses working knowledge in MS Word, MS Excel, MS Powerpoint
Ability to function in an integrated project team environment
Excellentwritten & oral communication skill
Good understanding of multi-discipline engineering activities.
High adaptability skills

Ready to face new personal & professional challenges with energy

Ability to work in complex environment in line with corporate values & principles

Ability to prioritize multiple tasks

Knowledge in Specifications, Standards, Codes of Practices and Procedure etc

5
CURRICULUM VITAE

Personal Details
Name : Grace Dan
Nationality : Nigerian
Position : Project Secretary
Phone number : 08064241676
Email adressed : grace.dan@indexproltd.com

Qualifications
Heritage Polytechnic,Eket, Akwa Ibom State, HND. Mass Com.
Education
Nigeria (Lower Credit) 2011-2015

Danson Secondary Commercial School, Ikot WASSCE 2003-2008


Uyo Nsit, Akwa Ibom State, Nigeria

Mayflower Primary School, Akwa Ibom State First School Leaving 1997-2002
Certificate
 Poject Secretary - IndexPro Int’l Services Limited , Km 21, PH/Aba 2018
Career
Expressway, Port Harcourt, Rivers State, Nigeria
Summary

 Secretary - Hippocampus Consulting Nigeria. No 218 2017


Nwaniba Road Uyo.
 Teacher - Community Secondary School Enugu (NYSC) Port
 Harcourt, Rivers State, Nigeria. 2016

1
Work Experience

Experience 2018 Indexpro int’l Service Limited Port Harcourt, Nigeria

Project Secretary
 Filling organizing and servicing meeting, Including producing agendas and taking minutes.
 Typing and word processing
 Photocopying ,filling and documenting processes
 Office administration
 Coordinating mail-shots similar publicity tasks
 Implementing new procedures

Experience 2018-Date Indexpro int’l Service Limited Port Harcourt, Nigeria

Project Secretary –Workshop/Base Fabrication and installation on Support :


Projects
 Kwale Flare Down Project – AGIP/AMAZON

Responsiblity:
 Ensures meetings are effectively organized
 attend meetings and take minutes
 Checking that agreed actions are carried out
 Compilation of staff CVs
 Documentation and Record keeping
 Maintain stationery
 Printing and photocopying important documents, sometimes on behalf of other colleagues
 Typing and word processing packaged
 Assist in Document control department
 Create and maintain Filing and other office system
 Serve coffee to management and clients
 Organize and store paperwork,documents and computer based information

Experience 2016 Community Secondary School, Enugu

Physical & Health Education Teacher


Responsibility
 Teaching JSS2 Physical Health Education
 Carrying
 out test and exam assessment on students

2
 Compilation of student’s mid-term and termly result

Hippocampus Consulting Nigeria.


Experience 2018 No 218 Nwaniba

SECRETARY

Responsibity:
 Book meeting room and conference facilities
 Organized travel and accommodation for student and tutors
 Keep diaries and arrange appointments
 Deal with telephone and enquiries
 Schedule and attend meetings and take minutes

Posses working knowledge in MS Word, MS Excel.


Skills
Ability to function in an integrated project team environment
Good communication skill
Ability to express technical information in a creative & simple manner
Analytical and skilled in listening, explaining and consulting.

An individual with good communication skilled and excellent in human


relation.

Confidential

3
CURRICULUM VITAE

Personal Details
Name : Andem, Patrick Patience
Nationality : Nigerian
Position : Nurse

Qualifications
School of Midwifery, Iquita, Oron L.G.A., Akwa Registered Midwife
Education
Ibom, Nigeria 2013-2015

School Of Nursing, Immanuel General Hospital, Registered Nurse 2009-2012


Eket, Akwa Ibom, Nigeria

Community Secondary School, Eka Uruk Eshiet, WAEC (O-Level) 2008


Etim Ekpo, Akwa Ibom, Nigeria
 National Association of Nigeria Nurses and Midwives (NANNM)
Professional
Membership

 Company Nurse- IndexPro Int’l Services Limited , Km 21, PH/Aba 2018-Date


Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Staff Nurse/Midwifwe – St. Martins Hospital, 21 Stadium Road, Port 2015 - 2018
Harcourt, Rivers State, Nigeria

 Staff Nurse- Alma Clinic, 5 Afia St. Off Baracks Rd., Uyo, Akwa Ibom 2012 – 2013
State. NIgeria.

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Company Nurse
 Responsible for the general medical-related administrative tasks, medical duties and staff patient care
at work.
 Provision of primary healthcare to staff patients and preparing them for consultations or medical
interventions.
 Establish interpersonal relationships with the staff and maintain absolute staff patient confidentiality.

1
Experience 2018 - Date IndexPro Int’l Services Limited Port Harcourt, Nigeria

Site Nurse– Workshop/Base Fabrication and Installation Support on:


Projects:
 Kwale Flare Down Project-AGIP/AMAZON

Responsibility:
 Perform first aid treatment and follow up care
 Keeps record of all first aid treatment cases.
 Perform office work, excellent internal and external costumer services and inventory of supplies
needed for the company's medical facility
 Maintain a quality, clean and safe company's medical clinic
 Administer prescribed medications and treatments
 Facilitate random Drug checking to employees in line with INDEXPRO’s Alcohol and Drug Check
Policy.
 Give a monthly Employee Wellness Program (EWP) to employees to provide awareness and
encouragement to aim a healthy lifestyle.
 Scheduled employees' Annual Physical Examination with our HMO (Health Maintenance
Organization) provider.
 Perform physical exams and health histories
 Assess job hazards and incorporate health promotion strategies to minimize accidents
 Provided health teaching to workers to ensure safety standards are met
 Conducts medical evacuation drills.
 Ensure that first aid boxes are always available at work sites and filled with all the necessary medical
items.
 Monitors the physical health condition of individuals to ensure total fitness before daily activities are
embarked upon.
 Ensures that all the set procedures and standards are followed in carrying out day to day activities.
 Advices the management on possible change in any element of the company’s health system.
 Interfaces with the Companies Reatainership Clinics

Experience 2015 - 2018 St. Martins Hospital Port Harcourt, Rivers State

• Staff Nurse/Midwife

Project:
 General

Responsibilities:
 Pediatric Nursing
 Emergency health care administrator
 Maternity health care

2
 Administration of prescribed drugs
 Patients observation and monitoring
 Documentation and Record keeping
 Pre and post-operative management of patients
 Patient’s counseling

Experience 2012 – 2013 Alma Clinic Uyo, Akwa Ibom State.

Staff Nurse

Project:
 General

Responsibilities:
 Emergency health care administrator
 Administration of prescribed drugs
 Patients observation and monitoring
 Documentation and Record keeping
 Pre and post-operative management of patients
 Patient’s counseling

Professional Registered Nurse/Midwife License


Certifications 2015
Registered Midwife Certificate 2015
Registered Nurse Certificate 2012

Posses working knowledge in MS Word, MS Excel, MS Powerpoint


Skills
Ability to function in an integrated project team environment
Good communication skill
Knowledge in Standards, Codes of Practices and Procedure etc

3
CURRICULUM VITAE

Personal Details
Name : Atang, Ann Samuel
Nationality : Nigerian
Position : Trainee Engineer
Qualifications
Akwa Ibom State University, Akwa Ibom State,, B-ENG(Hons) In Civil
Education
Nigeria Engineering. 2011-2016

Government Girls Science Secondary School WAEC 2011


Kuje Abuja,

 Nigerian Society of Engineers (NSE)


Professional
Membership

 Trainee Engineer-Index Pro Intl.Services Limited 2018


Career Portharcourt, Nigeria
Summary
 Asst. Site Engineer-Federal capital development Authority/Gilmore 2016 - 2018
Construction Company. ABUJA, NIGERIA

 Student Trainee-Kakatar construction Company.. 2015 – 2016


ABUJA, NIGERIA

1
Work Experience

Experience 2018 Index-Pro Intl company Port Harcourt, Nigeria

Trainee Engineer
Project:
Kwale flare down Gas project.
Under ground and Above Ground piping Fabrication and Erection and Structural Installation.
Responsibilties:
 Asst Material Officer,
 Documentation of stock card.

Experience 2016-2018 Federal Capital Development Abuja, Nigeria


Authority(FCDA)/Gilmore Construction
Assistant Site Engineer-Development of Jahi District Abuja..
Responsibilities:

 Set out, level and survey the site, check plans, analyzed structural drawings for accuracy of
calculations,
 Geotechnical/Earth Works-collection of Soil Samples,
 Soil tests ranging from density compaction test,CBR test, Aggregate test, test of soil strength of solid
blocks, sieving, and plasticity test.
 Structural designs and culvert designs.

 Day to day management of the site, including supervising and monitoring the site labor force
and the work of sub-contractors.

2
Professional WEB/Mobile(APPS)Development And Entrepreneurship Training
Certifications Under the UNESCO-FCTA YOUTHMOBILE PROJECT 2018
2017
Nigerian Society Of Engineers [NSE] (Graduate Member)

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Effective communication skill
Good understanding of multi-discipline engineering activities.
Project Monitoring/ Co-ordination

Highly Resourceful

Knowledge in Specifications, Standards, Codes of Practices and Procedure etc

3
CURRICULUM VITAE

Personal Details
Name : Ekwueme Chigozie
Nationality : Nigerian
Position : Mechanical Fitter

Qualifications
Akanu Ohafia Secondary School, Akanu Ohafia WAEC 2003
Education
 NILL
Professional
Membership
 Mechanical Fitter- IndexPro Int’l Services Limited , Km 21, PH/Aba 2015 - DATE
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
 Structural/Pipe Fitter- Sudelettra Nigeria Limited 2015

 Structural Fitter- Topman & Dana Services.


2014
 Fitter- U.F.T Engineering Limited

 Fitter- Ponticelli Nig. Ltd. 2013

 Fitter- Fairtex Intergrated Service Ltd. 2014

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Mechanical Fitter
 Fits and assembles structural frameworks and housings from materials, such as angle iron, I-beams,
and plate steel, using handtools and welding equipment and following blueprint specifications
 Lays out parts dimensions on worktable, using square, chalk line, and soapstone.
 Tack-welds scrap metal to outline to provide jig for assembly.
 Positions parts in jig and files, chisels, and grinds parts, as indicated, to fit them together.
 May heat parts with acetylene torch and bend them in vise, on anvil, or around stakes mounted in
table.
 Tack-welds fitted parts together or directs FITTER HELPER to tack-weld parts.
 May heat parts with acetylene torch and dip parts in cyanide bath to harden.
 Periodically compares dimensions of assembly to blueprint specifications, using square, rule, and

1
calipers.
 Works to tolerances of 0625 inch.
 May anneal parts with acetylene torch to remove stresses of welding.
 May fasten parts together with acetylene torch and brazing rod.

Experience 2015 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

FITTER– ONSHORE AND OFFSHORE FABRICATION AND INSTALLATION Support on:


Projects:
 Kwale Flare Down Project-AGIP/AMAZON
 Agbami Stage 1 & 11 – Chevron/MPL
 West Jupiter ROV Project – Total/MPL
 Aje Field Development project – FASL/Ariosh
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL

Responsibility:
 Examine detailed drawings or specifications to find out job, material and equipment requirements
 Set up and adjust metal working machines and equipment
 Operate machines to produce parts or tools by turning, boring, milling, planing, shaping, slotting,
grinding or drilling metal stock or components
 Fit and assemble metal parts, tools or sub-assemblies, including welding or brazing parts
 Cut, thread, bend and install hydraulic and pneumatic pipes and lines
 Dismantle faulty tools and assemblies and repair or replace defective parts
 Set up and/or operate hand and machine tools, welding equipment
 Check accuracy and quality of finished parts, tools or sub-assemblies.

Experience 2013 Sudelettra Nigeria Limited Port Harcourt, Rivers State

Structural/Pipe Fitter- Fabrication of Mega Warehouse-EA Project Exxon Mobile

Project:
 Ubit GP Piping Spool Fabrication.

Responsibilities:
 Pipe Fabrication

2
Experience 2014 Topman & Dana Services. Port Harcourt, Rivers State.

Structural Fitter

Project:
 Oil Field Installations, Offshore Operation
 Rig Maintenance
 Mega Ware House

Responsibilities:
 Examine detailed drawings or specifications to find out job, material and equipment
requirements
 Set up and adjust metal working machines and equipment
 Operate machines to produce parts or tools by turning, boring, milling, planing, shaping,
slotting, grinding or drilling metal stock or components
 Fit and assemble metal parts, tools or sub-assemblies, including welding or brazing parts
 Set up and/or operate hand and machine tools, welding equipment
 Check accuracy and quality of finished parts, tools or sub-assemblies

Professional Trade Test Level 2 Certificate in Piping/Structural Fitting


Certifications 2009

Ability to function in an integrated project team environment


Skills
Good communication skill
Good understanding of multi-discipline engineering activities.
Ability to work under minimum or no supervision

Willingness to learn

Good interpersonal skills

Hard working and physical fit

3
CURRICULUM VITAE

Personal Details
Name : Essien Robert Essien
Nationality : Nigerian
Position : Mechanical Fitter

Qualifications
Community Technical College Ikot Aka Senior Secondary 1979-1984
Education
Certificate
 NILL
Professional
Membership
1. Mechanical Fitter- IndexPro Int’l Services Limited , Km 21, 1. 2016 - DATE
Career PH/Aba Expressway, Port Harcourt, Rivers State, Nigeria
Summary
2. 2014
2. Rig Welder- Shelf Drilling Nig Ltd
3. Rig Welder-Transocean Support Service Nig Ltd 3. 2008-2013
4. Semi-Automatic Welder-Saipem Contracting Nig Ltd 4. 2007-2008
5. Pipe Welder/Argon/Semi-Automatic- Willbros Offshore (Nig) Ltd 5. 2004-2006
6. Argon/Semi-Automatic /Pipe Welder-E.E.Ltd
7. Pipefitter/ Mechanical Fitter-Amber Resources 6. 2001-2004
8. Argon/Pipe Welder- WECO 7. 1999-2001
9. Pipe Welder-Dee woo 8. 1997-1999
10. Pipe Welder/Mechanical Fitter-Metal Construction West Africa 9. 1995-1996
Ltd
11. Pipe Welder-Enosco (Nig) Ltd 310 Aba Express Way Port 10. 1990-1994
Harcourt 11. 1988-1990

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Mechanical Fitter
 Fits and assembles structural frameworks and housings from materials, such as angle iron, I-beams,
and plate steel, using hand tools and welding equipment and following blueprint specifications
 Lays out parts dimensions on worktable, using square, chalk line, and soapstone.
 Tack-welds scrap metal to outline to provide jig for assembly.
 Positions parts in jig and files, chisels, and grinds parts, as indicated, to fit them together.
 May heat parts with acetylene torch and bend them in vise, on anvil, or around stakes mounted in
table.
 Tack-welds fitted parts together or direct FITTER HELPER to tack-weld parts.

1
 May heat parts with acetylene torch and dip parts in cyanide bath to harden.
 Periodically compares dimensions of assembly to blueprint specifications, using square, rule, and
calipers.
 Works to tolerances of 0625 inch.
 May anneal parts with acetylene torch to remove stresses of welding.
 May fasten parts together with acetylene torch and brazing rod.

Experience 2016 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Supervisor/ Mechanical Fitter – ONSHORE AND OFFSHORE FABRICATION AND INSTALLATION Support
on:
Projects:
 Kwale Flare Down Project-AGIP/AMAZON
 Agbami Stage 1 & 11 – Chevron/MPL
 Aje Field Development project – FASL/Ariosh
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL

Responsibility:
 Examine detailed drawings or specifications to find out job, material and equipment requirements
 Set up and adjust metal working machines and equipment
 Operate machines to produce parts or tools by turning, boring, milling, planing, shaping, slotting,
grinding or drilling metal stock or components
 Fit and assemble metal parts, tools or sub-assemblies, including welding or brazing parts
 Set up and/or operate hand and machine tools, welding equipment
 Check accuracy and quality of finished parts, tools or sub-assemblies.

Experience 2014 Shelf Drilling Nig Ltd Port Harcourt, Rivers State

Rig Welder

Responsibilities:
 Welding

Experience 2008-2013 Transocean Support Service Nig Various Locations


Ltd

Rig Welder.

Project:
 Oil Field Installations, Offshore Operation

2
 Rig Maintenance
 Mega Ware House

Responsibilities:
 Welding

Professional City and Guide 1984


Certifications
Federal Government Trade Test Grade 2 1984

Federal Government Test Grade 3 1985

Federal Government Trade Test Grade 1 1988-1990

Diligence in carrying out assigned task


Skills
Ability to work with minimum supervision
Good interpersonal and communication skills
Dynamic and result oriented
Innovative with strong analytical mind
Effective goal-getter

3
CURRICULUM VITAE

Personal Details
Name : Nwokocha Chukwuemeka Jacob
Nationality : Nigerian
Position : Mechanical Fitter
Qualifications
 PTI WARRI  DIPLOMA WELDIN &  1995-1996
Education FABRICATIONS
 BOYS’ TECHNICAL COLLEGE ABA  WAEC TECHNICAL ORCITY AND  1984-1987
GUILDS OF LONDON (C&G)
 COMMUNITY SECONDARY SCHOOL NENU  TRADE TEST 2&3 FEDERAL  1981-1984
OBIOMA NGWA CRAFT CERTIFICATE

 NILL
Professional
Membership
1. Mechanical Fitter- IndexPro Int’l Services Limited , Km 21, PH/Aba 1. 2014 – DATE
Career Expressway, Port Harcourt, Rivers State, Nigeria
Summary
2. 2013-2014
2. Pipe Fitter-Link Techinical & Scientific Ltd.
3. Mechanical FITER-NOMO & Sons Intergrated Services Ltd. 3. 2012-2013
4. Fabricator/ Fitter-Thompson & Grace Investment Co 4. 2011-2012
5. Structural/Pipe Fitter-LAMBIC GENERAL SERVICES 5. 2010-2012
6. Fabrication/Welder-EMSCOPE ENERGY SERVICE LTD. 6. 2009-2010
7. Welder-Prodeco Nigeria Limited
7. 2008-2009

Work Experience

Experience 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Mechanical Fitter
 Fits and assembles structural frameworks and housings from materials, such as angle iron, I-beams,
and plate steel, using hand tools and welding equipment and following blueprint specifications
 Lays out parts dimensions on worktable, using square, chalk line, and soapstone.
 Tack-welds scrap metal to outline to provide jig for assembly.
 Positions parts in jig and files, chisels, and grinds parts, as indicated, to fit them together.
 May heat parts with acetylene torch and bend them in vise, on anvil, or around stakes mounted in
table.
 Tack-welds fitted parts together or direct FITTER HELPER to tack-weld parts.
 May heat parts with acetylene torch and dip parts in cyanide bath to harden.

1
 Periodically compares dimensions of assembly to blueprint specifications, using square, rule, and
calipers.
 Works to tolerances of 0625 inch.
 May anneal parts with acetylene torch to remove stresses of welding.
 May fasten parts together with acetylene torch and brazing rod.

Experience 2014 - 2018 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Supervisor/ Mechanical Fitter – ONSHORE AND OFFSHORE FABRICATION AND INSTALLATION Support
on:
Projects:
 Kwale Flare Down Project-AGIP/AMAZON
 Agbami Stage 1 & 11 – Chevron/MPL
 Aje Field Development project – FASL/Ariosh
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL

Responsibility:
 Examine detailed drawings or specifications to find out job, material and equipment requirements
 Set up and adjust metal working machines and equipment
 Operate machines to produce parts or tools by turning, boring, milling, planing, shaping, slotting,
grinding or drilling metal stock or components
 Fit and assemble metal parts, tools or sub-assemblies, including welding or brazing parts
 Set up and/or operate hand and machine tools, welding equipment
 Check accuracy and quality of finished parts, tools or sub-assemblies.

Experience 2013-2014 Link Techinical & Scientific Ltd Port Harcourt, Rivers State

Pipe Fitter

Responsibilities:
 Vessel Structural Maintenance

Experience 2012-2013 NOMO & Sons Integrated Port Harcourt, Rivers State
Services Ltd

Mechanical FITTER

Responsibilities:
 Construction of Diesel Tank

2
 Construction of long basket
 Construction of pipe rack and oxygen rack
 Maintenance/Construction of Container and Fabrication of Skid and Skips
 Construction/Burial of 1x2x1.4m Gas lift flow line from SMTQ 4to IMOR 2 flow station.

Professional City and Guide 1984


Certifications
Federal Government Trade Test Grade 2 1984

Federal Government Test Grade 3 1985

Federal Government Trade Test Grade 1 1988-1990

Diligence in carrying out assigned task


Skills
Ability to work with minimum supervision
Good interpersonal and communication skills
Dynamic and result oriented
Innovative with strong analytical mind
Effective goal-getter

3
CURRICULUM VITAE

Personal Details
Name : EKONG, DANIEL PETER
Nationality : Nigerian
Position : Procurement/Logistics Manager

Qualifications
University of Calabar, Calabar, Cross River, B. Sc. (Lower Division), 2008
Education
Nigeria Geology & Minning

Secondary Comm. Sch. Ini, Akwa Ibom State. WASSC 1999


Nigeria
 Chattered Institute Of Procurement And Supply-CIPS (membership in view)
Professional
Membership

 Professionally qualified Procurements executive with (Second class


Career honors, lower division) from University of Calabar Nigeria with more
Summary than Eleven (11) years’ work experience.
Held other positions including Three year as a Logistics Coordinator,
and also Three (3) years as a Materials and Stores Clerk.

 Procurement/Logistics Manager, IndexPro Int’l Services Ltd. 2014-Date

 Logistics Coordinator, Sub Surface & Surface Dev Conpany Ltd.


2011-2013
 Materials and Stores Clerk, Solenin Nigeria Limited 2009-2011

 Mathematics Teacher for SS2 and JS3, GOVT. DAY SEC. SCH.
MISAU, BAUCHI STATE (NYSC) 2008 – 2009

1
Work Experience

Experience 2019 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Procurement/Logistics Manager
Responsibilities:
 Reporting to the Managing Director and Project Manager.
 MTO/Requisition Review
 Pre-Qualification of vendors and Bidders List
 Raise and send Request For Quotation (RFQ)
 Oversea Sealed Bid Procedure
 Lead Bid Evaluations Commette
 Price Evaluation
 Acceptance Of Terms & Conditions
 Delivery
 Purchase Order/Facsimile Instruction
 Authority for Amendment (AFA)/Change Orders
 Invoice Processing
 Filing
 Purchasing Reporting
 Expediting
 Assist Project Manager to ensure timely and safe execution of projects.
 Liaise with Project Manager to oversee the preparation, review and compliance of procedures,
operations and subcontractors with HSES&EMS, policies and procedures.
 Work with Project Manager and monitor projects to ensure compliance and review contract
documents, specifications and drawings.
 Participate in adhoc meetings, progress meeting, HSE meetings and kick-off
meetings.

Experience 2014 - 2017 IndexPro Int’l Services Limited Port Harcourt, Nigeria

Procurement/Logistics Manager – Onshore and Offshore Fabrication and Installation Support on:
 Agbami Stage I & II – Chevron/MPL
 Bonga Project – SNEPCO/MPL
 BOOR 3 Riser Recovery Project – SNEPCO/MPL
 Aje Field Development project – FASL/Ariosh
 West Jupiter ROV Project – Total/MPL
 Fabrication of Production Manifold and Suction Pile Grillages, Agbami Stage 3 ( Marine
Platforms LTD.)
 Fabrication of four numbers of CHUTE (ARIOSH)

2
 Extension of Moonpool Grillage & Construction of Hose Reel (Marine Platforms Ltd.)
 Construction of African Inspiration Main Deck Guardrail (Marine Platforms Ltd.)
 Construction of FIFI System Sea fastening Grillage (Marine Platforms Ltd.)
 Construction of Normand Pacific PILE & PLEM Bumper Frame. (CEONA)
 Construction of Gooseneck and Methanol Tank bonded Grillages. (CEONA)
 Construction of A Frame Grillage and IUTA Lifting Frame. (Marine Platforms Ltd.)
 Construction of Crane Base foundation, Cross Over Platform and Boom Rest (Rostrum Oil
and Gas)
 Construction of Access ladder and walkway (Marine Platforms Ltd.)
 Refurbishment of grillage (Marine Platforms Ltd.)
 Fabrication of fixed and Extendable ladder with cage. (Marine Platforms ltd.)
• Fabrication of VLS (CEONA)
• Refurbishment of bladder tank and fabrication of bladder Tank frame. (Marine
Platforms Ltd.)

Responsibility:
 Assist Project Manager to ensure timely and safe execution of projects.
 Liaise with Project Manager to oversee the preparation, review and compliance of
procedures, operations and subcontractors with HSES&EMS, policies and procedures.
 Work with Project Manager and monitor projects to ensure compliance and review contract
documents, specifications and drawings.
 Participate in adhoc meetings, progress meeting, HSE meetings and kick-off
 meetings.
 Maintains constant communication with Onshore /Offshore work locations for resource
support.
 Responsible for development of Work Order Proposal, Transportation and Installation Plan
(TIP) and other relevant procedures to support WOP execution.
 Evaluate the scope of work on WOP and that of subcontracts.
 Provide timely support and advise to Project Management Team to ensure compliance with
Procurement plans, procedures and methodology
 Coordinate the entire fabrication activities.

3
A Curriculum Vita
SUMMARY/OVERVIEW
Over 8 years of relevant experience in Project Controls/Engineering Management; Onshore, Offshore and
Deep-water and FPSO Projects, in Engineering Procurement, Installation, Construction and Commissioning.
Concept, Brownfield, Greenfield, and Experience includes onshore and offshore supervision.
A competent professional with cross functional experience in: Contracts /Subcontracts Formation, Contracts
Administration, Subcontract Administration, Tendering / Proposals, Variations/Claims and a Self starter,
results-driven and focused on timely, accurate and high quality delivery of projects.
Good communication and team building skills – well able to lead and gain respect both with internally and
externally parties. Ability to improvise/priorities with little notice without losing attention to detail.
Ability to Mentor and Train young graduate in my area of specialty.
Vast Knowledge and Experience in; Drafting, Engineering Blueprint reading, Project Planning &
Scheduling, Pressure Vessel Fabrication/Manufacturing.

PERSONAL INFORMATION

Surname Enabulele
Other Name Osakpamwan
Contact Details Work +234 8028398017
Home +234 8051851387
Cell +234 8062549484
E-mail osas.hazcon@yahoo.com

LANGUAGES
Home Language English (Fluent) written and spoken
OTHER
Professional Membership/Associations
• AAPM Certified International Project Manager (CIPM)
• AAPM Certified Planning Engineer (CPE)
• CIPS Certificate in Procurement and Supply Operations (MCIPS)
• Certified Internal QMS Auditor

Achievements/Milestones
• Successful  completion  of    ADNA WHP Topside Fabrication, Structural and Piping Integration Project (6
LEG JACKET) 260 TONS
• ADNH 6WI Water Injection Platform
• ADNH 7WI Water Injection Platform
• TMMP Deck Extensions Fabrication & Integration  
• Fabrication of Onskid 66” x 4.5m Glycol Sump Tank  
• McIver Jetty main warehouse & Offices structural repairs (Renovation and Construction)  

QUALIFICATIONS

Tertiary Education
Qualification
Institution University of Nicosia
Year 2017 (In-progress)
Subject MBA
Institution University of Nigeria Nsukka, Nigeria
Year 2009
Subject Mechanical Engineering
COURSES/SKILLS
Skills

Computer Skills Computer Skills Skill Level


Microsoft Office Suite, AutoCAD, Oracle Primavera Experienced
MS Project

PROFESSIONAL SYNOPSIS / AREAS OF EXPERTISE

• EPC Planning & Scheduling/Project Reporting/Project Management


• Cost Progress & Performance Monitoring & Cost Controlling
• Quantity Tracking & Resource Leveling
• Technical and Commercial Bid/ Tender Preparation
• Generation and Management of Integrated Schedule – Conceptual, Procurement,
Fabrication/Construction, Installation, Pre-commissioning and Commissioning and Shutdown Schedule
• Development of Work Breakdown Structure, definition of activities/tasks, establishment of relationship
and estimation of durations, identifying necessary constraints and resource loadings.
• Analyze Floats/Slacks and critical paths of the schedule and recommend solutions to mitigate impact.
• Planning - Definition of General Project targets and detailed project baseline.
• Monitoring of actual earned values, analysis of variances between actual and planned values of project
baselines.
• Trend analysis of project control parameters. Manage Change Orders and Claims in accordance with
contract/subcontract conditions.
• Sound background in Fabrication tools and equipment
• Experienced/Conversant with Engineering Design methods, Codes and Standards – (ASME, API,
AWS, NACE).
• Generation of MTO/BOM
• Knowledge of Cathodic Protection, NDT techniques, failure analysis, including CA
• Engineering Drawing/Blue Print Reading

EMPLOYMENT HISTORY
Company Hazcon Nigeria Limited, Port Harcourt/Calabar, Nigeria
Position Project Manager
Period of Employment 13 January 2012 - Till Date
Duties Ensure that the appropriate standards and specifications are employed for design,
materials’ selection and construction, Support the Project Team with ongoing
project schedule analysis, reporting, and Change Management and Maintain
regular contact with project teams and with the Functional Organization. Ensuring
project delivering as per schedule, and not undermining good quality in finished
product. Liaising with the client reps on site to ensure accurate information flow
from the clients to the contractor. Ensuring all the sectional heads are up and doing
in their various dedicated tasks and Ensuring the proper close out of projects,
including the production of as built dossiers (construction records, etc.) and as built
drawings
Company Hazcon Nigeria Limited, Calabar, Nigeria
Position Project Engineer/Planner
Period Of Employment 19 September 2012 – 12 January 2012

Duties Provide overall project schedule, progress measurement, and change management
leadership and expertise
Supporting the Project Team with ongoing project schedule analysis, reporting, and
Change Management and Maintain regular contact with project teams and with the
Functional Organization.
Company Ziengof Nigerian Limited, Calabar, Nigeria
Position Project Manager/Engineer
Period of Employment 05 May 2010– 19 September 2012
Project Schedule Preparation & Reviews Contractor Schedules for usefulness,
Duties
logic, level of detail, input sources, timing, lines of communication, and
interfaces with other project elements and consistency with Current
Control Estimate, WBS, and the Project Plan.
Establishes the schedule requirements and frequencies of issue for all of the
contractor schedule deliverables and strives for timely detection of trends and
specifically deviations from the plan.
Company Roman Home Construction, Calabar. Nigeria
Position Project Engineer/ Scheduling Engineer
Period of Employment 18 January 2010 – 05 May 2010
Duties Provide overall project schedule, progress measurement, and change management
leadership and expertise
Maintain close liaison with members of the Project Services organization
Develop Level 1 and Level 2 schedules for assigned Project
Advise the Project organizations with respect to: Project controls tools and reports
and Operators efforts in schedule

Company Bridge Way Engineering, Calabar. Nigeria


Position Project Planner/ Scheduling Engineer
Period of Employment 02 October 2008 – 15 January 2010
Provide overall project schedule, progress measurement, and change management
Duties
leadership and expertise
Maintain close liaison with members of the Project Services organization
Develop Level 1 and Level 2 schedules for assigned Project
Advise the Project organizations with respect to: Project controls tools and reports
and Operators efforts in schedule

PROJECT INVOLVED/WORKED
• Fabrication and Installation of 6 Well Hook-Up Spools for ORW Addax- 2014
• Fabrication Of VFD Skid Module For West Fault Block Platform Deck Extension- 2014
• Manufacturing/Fabrication of 66” Glycol Sump Tank/Skid Domgas project (EPC- ASME Pressure
Vessel)- 2014
• KTMB Manifold Extension. (EPC) - 2013
• ADNA WHP Topside Fabrication, Structural and Piping Integration Project (JACKET)- 2011-2012
• ADNH 6WI Water Injection Platform- 2011-2012
• ADNH 7WI Water Injection Platform- 2011-2012
• TMMP Deck Extensions Fabrication & Integration- 2011
• TB-2090-Fabrication of Boat Landing for Adanga North B Platform.- 2012
• TB-2246-Fabrication of Access Walkways & Crown Shims for Adanga North A & B and Oron West-
South Platform.- 2012
• TB-2429-Fabrications of Boat Landing for Adanga Main Water Injection (ADI 1) Platform. 2011-2012
• TB-2152- Piping prefabrication for Adanga North A Platform – 2011- 2012
• MTB-1031- Fabrication of Deck Extension & Associated Piping for Adanga Redevelopment Platform. -
2012
• MTB-1022- Adanga Redevelopment Project Manifold Assembly and leak testing for ADPP. - 2011
• DMSC-0221-Fabrication of 12” Sub Sea Tie-in spool.- 2011
• DMSC-0213-Fabrication of Piping Spools for Adanga Redevelopment Projects.-2011
• MTB 1038 Onshore/Offshore fabrication of Adanga North B Platform well hook ups spools 9H, 10H &
11H- 2011
• MTB 1038 Oron West South Gas lift Separator Modification & Integrity test.-20111
• MTB 1038 Boom Fabrication and repair.- 2010
• MTB 1038 Valve Access Deck Extension Ebughu Platform.-2010
• (SLTB–0059) Fabrication of access gates into the McIver Jetty.- 2010
• (TB-2855) fabrication of Ebughu wellhead tripod platform valve Access deck and cellar deck extension.-
2010
• McIver Jetty main warehouse structural repairs (SLTB – 0053) - 2010
• Structural Repair Of (small) Twin Warehouse at McIver Jetty Calabar.- 2010
• (SLTB 0074) - Construction of Generator House for McIver Jetty- 2010
• Removal of Fence/Handrails along Millerio Foreshore at Addax Shoreline Calabar – 2009
• Design Constructability, Fabrication, and Construction, installation & Commissioning of Adanga
Redevelopment mini-Shutdown & Post Shutdown work December 2008 –Dec. 2009.
• Power Brushing and Painting of Gear switch Electrical Panel- 2008
• (MTB-1479) Blasting and Coating of KTM Caissons for KTM-B- 2008

REFERENCES (PLEASE NOTE: THEY ALL CALL ME OSAS (OSAKPAMWAN)

Engr.  Gerald  Agu  


Structural  Engineer  (National  Consultant)  
Addax  Petroleum  Nigeria  Limited      
+2348035285541  
 
Evangel  Akpan  
Managing  Director  
Hazcon  Nigeria  Limited      
+2348037361966  
 
 
 
Experience 2008 – 2019 GOVT. DAY SEC. SCH. MISAU, BAUCHI STATE

Youth Corp Member

Responsibilities:
 Mathematics Teacher for SS2 and JS3

Experience 2005 NIGERIA ENGINEERING WORKS Port Harcourt


LIMITED (Industrial Training)

Trainee Supervisor (Tools Room Department)


Trainee Supervisor (Tools Room Department)

 CIPS Level 3 Advanced Cert In Procurement And Supplies 2018


Courses
Attended
Operations
 CIPS Level 2 Cert In Procurement And Supplies Operations 2017
 Nigeria Institute of Safety Professionals [NISP]: HSE Level 2-
2011
Appreciation
 Nigeria Institute of Safety Professionals [NISP]: HSE Level 3-
Supervision 2011

Posses working knowledge in MS Word, MS Excel, MS Powerpoint, MS Project.


Skills
Ability to function in an integrated project team environment
Good communication skill
Good understanding of multi-discipline engineering activities.
Knowledge in Specifications, Standards, Codes of Practices and Procedure etc

4
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

SUMMARY
Personal Details
Full name: JIMOH, Yinusa Alaro
Current Post: Professor of Civil Engineering
Date of Birth: 1951 January 10
LGA and State: Ifelodun / Kwara
Sex: Male
Nationality: Nigerian
Plot 11, Veterinary Road, Agric. Area GRA,
Permanent Home Address: P. O. Box 5413 Ilorin, Kwara State, Nigeria.

ENGINEERING SKILL

C O M P U T E R SKILLS

SACS R5.5 | STAAD.Pro v8i | Abaqus v6.14 | MSTower | Tekla | Navisworks |


AutoCAD 2013 | PDMS 12.0 | Matlab | MathCAD 14 | Primavera P6 | Fabrication
Management System | Advanced Microsoft Office tools, Plan Design Management
System (PDMS) / Primavera P6.

KEY SKILLS

o Able to drive through project/business goal, ensure implementation plus


performance measurement against target in subsea construction in pipelines, risers,
platforms, and flowlines

o Able to challenge poor performance, provide formative feedback, develop


improvement plans and implement. Knowledgeable in the use Primavera 06 and
Microsoft project planner.

o Have in-depth knowledge of standards and codes - ISO, AWS, ABS, DNV,
ASTM, ASME, BS, API, NACE, ANSI, etc, applicable in onshore and offshore design
and installation of facilities in the oil and gas, energy and power sectors.

WORKING EXPERIENCE

Solenin Nigeria Limited (Nov. 2016 till date)


JOB DESCRIPTION:

o Development of Foundation and Details Drawings


o Generation of Slab Layout Drawings and Slab re-enforcement details
o MTO/BOM
o Stress Analysis
o Beam Layout Drawings and Beam re-enforcement details
o Project management processes and procedures development.
o Project performance measurements and audits.
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

o Project mentoring and leadership.


o Project planning and scope development, schedule development, cost baselining,
quality and risks management. o Project management office growth mentoring.
o Hydraulic Design
o Structural Modelling and Calculations (Storage Structure)

Institutions Attended: Date starting with latest


Institution From To
1. University of Ilorin, Ilorin Nigeria 1988 1991
2. University of Ilorin, Ilorin Nigeria 1984 1987
3. Ahmadu Bello University, Samaru Zaria, Nigeria 1988 1991
4. Offa Grammar School, Offa Kwara State 1970 1971
5. Government College Keffi, Nasarawa State 1965 1969

Pure Academic Qualifications: Date starting with latest


Qualification Title Year Obtained
1. Doctor of Philosophy (Ph.D.) Civil Engineering 1991
2. Master of Engineering (M.Eng.) Civil Engineering 1987

3. Bachelor of Engineering (B.Eng.) Civil Engineering 1975


4. Higher School Certificate (HSC) 1971
5. West African School Certificate (WASC) Grade I 1969
Professional Qualifications: Dates starting with latest
Award Institution Certification Year Obtained
1. Nigerian Institution of Civil Engineers Fellow (00072) 2003

2. Association of Consulting Engineers, Nigeria (ACEN) Member (214) 2000


3. The Nigerian Society of Engineers Fellow (02653) 1998
4.Council for the Regulation of Engineering in Nigeria Registered Engr. 1988
Civil (R3194)
Scholarships and Prizes: Date starting with latest
Scholarship / Prize
Scholarship From To
1. University of Ilorin Scholar for Ph.D Civil Engineering 1988 1991
2. Federal Government of Nigeria Post Graduate ScholarshipM. Eng 1984 1987
3. Kwara State Undergraduate Scholarship B. Eng. (Civil) 1972 1975
Prize
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

1. Form II D end of year prize 1966


xv. Training Programmes Attended: Date starting with latest
Training Course Location From To
Workshop on ODL Program Unilorin 04/03/2010 04/04/2010
Open and Distant Auditorium
Learning

Workshop on Item Writing structure, Unilorin 04/05/2009 04/05/2009


Multiple choice Item Writing Auditorium
Test taxonomy etc.

Design of TransportationDesign, Sheraton 13/05/2008 15/05/2008


Infrastructure financing & Hotels
Management & Towers,
of Infrastructure Ikeja Lagos
including PubliPrivate
Partnership and Concession.

The use of FIDIC Contract bidding Golden Gate 26/11/2007 28/11/2007


Documents Documents, Restaurant
Procedures, Ikoyi Lagos
Evaluation, etc.

Basic Issues in Research Proposal, data Unilorin 03/07/2005 03/07/2005


Research Methodology collection, analysis and Auditorium
Interpretation

A Three-Week Moulding of block and Nigerian 01/12/1986 20/12/1986


Intensive Programmebricks from soil, roof Building and
For Trainers of sheeting from coconut Road Research
Technical Extension fibres, use of soil block Institute
Workers in Rural moulding machines, etc.
Housing

xviii. Honours, Distinctions and Membership of Learned and Professional Bodies:

Distinction
1. Honorary Fellow, The Nigerian Society of Technician Engineers (Hon.
FNSET) 2007 – Date

2. Branch Meritorious Service Award as Chairman, Ilorin Branch of the Nigerian Society of Engineers; 2002
3. Certificate of Honour as the most outstanding Lecturer of the Technological Year, Association of Civil Engineering
Students, Kwara State Polytechnic; 1998.
4. Annual Branch Awards, Ilorin Branch of the Nigerian Society of Engineers; 1996, 2002, 2006 and 2009.
Membership
1. Member, Materials Society of Nigeria (MSN); 2006 - Date (No. P0589).
2. Member, American Society of Civil Engineers (ASCE); 2009 - Date (No. 934133).
3. Member, the Nigerian Society of Engineers (NSE) 1984 – Date (No. 02653).
4. Registered Civil Engineer, Council for the Regulation of Engineering in Nigeria
(COREN); 1988 – Date (No. R3194).
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

5. Member, Association of Consulting Engineers, Nigeria (ACEN); 2000 – Date (No. 214).

xvi. Working Experience: Date starting with latest


Organisation Rank Location From To
1. University of Ilorin Professor Ilorin 2012 Date
2. University of Ilorin Senior Lecturer Ilorin 1998 2012
3.Kwara State Polytechnic Chief Lecturer Ilorin 1979 1998
4. Yolas/Sheladia Associates Material Specialist/Pavement Ibadan 1994 1997
5. Alfonso & Co. Limited Senior Engineer/Site Agent Ibadan 1977 1978
6. Bilfinger& Berger Nig. Ltd. Junior Civil Engineer Lagos 1976 1977
7. Niger State Ministry of Works NYSC Engineer Bida 1975 1976

Details of Responsibilities
1.Professor in Civil Engineering, University of Ilorin, 2012 – Date:
In addition to responsibilities details for the senior lecturership post, the responsibilities added
are administrative posts, headship

2.Senior Lecturer in Civil Engineering, University of Ilorin, 1998 – 2012:

Teaching and Researching in the following areas;Study of Recycling of agricultural wastes for flexible and rigid

pavements to ensure environmental friendliness in road works and economy with palm kernel shells, locust bean

pods and corn cobs, Cold mix asphalt patches in flexible pavement with dissolved pure water sachet, Environmental

Pollution Aspects of Traffic Operation and Management in Urban Areas, traffic noise, greenhouse gas emissions,

etc., Management of urban traffic congestion for Socio-economic working of Ilorin city, Assessment of

Liquefaction potential of Soils as preventive measure against infrastructure damage and Geotechnical Aspects of

Transportation and Pavement Engineering.

3. Material Specialist and Pavement Engineer, Sheladia Associates NY / Yolas Consultants,

Ilorin Nigeria, April 1994 – September 1997 on Multi- States Road project II, OYO State

component, Nigerian Road Network Maintenance Management Study FMW and 7thHighway

Sector Loan FMW, aWorld Bank Supported Projects: Development and Application of Quality

Control Manuals and Hand Book for Road Construction, Rehabilitation, Pavement Maintenance

Management and Materials Property Characterization. Total Quality Management (TQM) of

Engineering ConsultancyService, Residency Supervision of Projects and Procurement Processes

according to World Bank, African Development Bank (AfDB) and Nigeria.


PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

4. LecturerinKwara State Polytechnic, Ilorin 1979 – 1998: Teaching & Researching, Curriculum
Development and Administration. Successfully Presented Departmental Programmes for
Accreditation and Re-accreditation of the National and Higher National Diploma (ND and
HND) by National Board for Technical Education (NBTE); 1979-1998. Offered Administrative
and Academic Leadership as Head of Department 1981 – 1987 (Ag.), 1988 – 1991 and 1996 -
1998.

5. Senior Civil Engineer /Site Agent, Alfonso & Co Ltd, Ojoo. Ibadan 1977 – 1988:
Construction Project Supervision, Planning & Management in respect of Buildings, Urban &
Rural Roads and Industrial Plants and Factories at Ibadan, Ondo /Okitipupa, Omi Adio,
including planning & progress and sub contract jobs evaluation, costing and supervision;
March 1977- December 1978
6. Junior Civil Engineer, Bilfinger& Berger Nig. Ltd. IjoraLagosJuly 1976 - March 1977:
3rdApapa Wharf Extension (Harbour& Auxiliary Works, Construction Planning, Plants and
Civil Works Scheduling & Management) including sub contract works evaluation and
monitoring).

7. NYSC Engineer, Niger State Ministry of Works, Transport & Housing, Bida Division July
1975 – June 1976: Supervision of Construction, Maintenance and Rehabilitation of Buildings,
Roads and Bridges;

xvii. Research Interests or Commissioned Projects: Date starting with latest


Title Year

1. Technical & Procurement Assistance for Concessioned and Public Private


Partnership in Infrastructural Development (Marine – Inland Container Depot

(ICD) and Freeways/Expressways. 2010

2. Recycling of Agricultural (Biomass) Wastes for Roads and Airport Pavement:


Characteristics, Processing, Performance, Climate and Economic

Impacts 2009

3. Geotechnics of Pavement: Development of ISO-CBR for Road Soils,


Assessment of Liquefaction Potential of Soils, Laboratory Modeling of Soils

for Pavement Studies 2008

4. Transportation Systems: Characteristics, Environmental and Socio-economic


Impacts 2007

5. Site Evaluation for Geotechnical and Foundation and Quality Control of Civil
Works, e.g. Installation of Dangote Flour Mills Ilorin, Proposed Airports

Headquarters, CBD Abuja, Foundation System to Structures, Towers and Masts 2003

6. Use of Paving Blocks / Bricks as Alternative to Timber and Flexible


Pavement In Drilling Locations (Shell Petroleum Development Company

(SPDC), Western Division, Project W1182) 1992


PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

xxi. List of Publications.


Home-Based Journal Articles In-Print:
1) Y. A. Jimoh and O. O. Adeleke (2005), Potential Benefits of Intelligent Transportation System
(ITS) in Nigeria,USEP 1-94, Journal of Research Information in Civil Engineering (RICE),
Vol. 2, No. 1., pp.46 – 53,Publicationat Ilorin,Department of Civil Engineering, University of
Ilorin, Ilorin Nigeria www.rice-usep.com

2) Jimoh Y. A. and Yusuf I.T. (2006); Introducing Virtual Peak Hour Factor As a Cost
Reduction Strategy in Traffic Data Collection, USEP 1-183, Journal of Research Information
in Civil Engineering (RICE), Vol. 3, No. 1. 155 – 173, Publication at Ilorin, Department of
Civil Engineering, University of Ilorin, Ilorin Nigeria www.rice-usep.com
3) Y.A. Jimoh (2007); Residual Strength Model for Concrete Exposed to High Temperatures,
Nigerian Journal of Technological Development,Vol. 5, No. 1&2, pp1-12., at Ilorin,
Publication of the Faculty of Engineering&Technology, University of Ilorin, Ilorin Nigeria.

4) Jimoh, Y. A and Yusuf, I. T.(2009), Design and Analysis of Heavy Load Pavement for Cost
Effective Port Operation of the Nigerian West – East Coastal Shelf, Journal of Research
Information in Civil Engineering (RICE), Vol. 6, No. 1., 56 – 78, Publication at Ilorin,
Department of Civil Engineering, University of Ilorin, Ilorin Nigeria www.rice-usep.com.

5) Jimoh, Y. A. and Adama, A. Y. (2010), A Markov Deterioration Model for predicting


Recurrent Maintenance of a Network of Roads: Case Study of Niger State, Nigeria; Nigerian
Journal of Technological Development, Vol. 7, No.2, pp 58-67, Publication of the Faculty
Engineering & Technology, University of Ilorin, Ilorin Nigeria.

Home-Based Technical Report


6) O. A. Adetifa, E. O.
Akinyemi, Y. A. Jimoh, & D. J. Galega (1992): Final Report on the “Provision of
Engineering Services for the Use of Paving Blocks as Alternative to Timber Pavement in
Drilling Location”; Project No. W1182 for the Western Division of Shell Petroleum
Development Company (SPDC) Warri, by the Department of Civil Engineering, University of
Ilorin, 1991-1992.

National Journal Articles In-Print:


7) Y. A. Jimoh and E. O. Akinyemi (1989); Flexible Pavement – Life Implications of Current
Specifications for Road Base Materials in Tropical Countries, Ife Journal of
Technology,Vol.1, No. 1, pp 9 – 21 Faculty of Technology, ObafemiAwolowo University
(OAU), formerly University of Ife, Ile-Ife Nigeria.

8) Y. A. Jimoh and Akinyemi E. O. (1995), Analysis of Rutting Behaviour of Brick Patched Road
Section, NSE Technical Transactions,Vol. 30, No. 1, pp. 57-63, Quarterly Journal publication
of the Nigerian Society of Engineers (NSE).

9) Ogundipe M.O. and Y. A. Jimoh (2008), Strength based Appropriateness of Sawdust Concrete
for Rigid Pavement; Journal of Research in Engineering, Vol. 5, No. 3, pp.1- 6, Publication
of University of Uyo International Research and Development Institute in association with Kan
Educational Books,www.irdionline.com.
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

10) Jimoh, Yinusa A. and Kolo, Solomon S. (2010), Partial Substitution of Asphalt Binder with
Reprocessed Polyethylene Water Sachets; NSE Technical Transactions,Vol. 45 No. 4, pp. 1 –
14, Quarterly Journal Publication of the Nigerian Society of Engineers (NSE).
11) Y. A. Jimoh, E. O. Akinyemi and N. O. Okunlola (2011), A Study of the Traffic Operational Parameters on Major

Arterials to Assess the Socio-economic Working of a City – The Case Study of Ilorin, Nigeria; Journal of

Logistics and Transport [JLT],Vol. 4, No. 1, pp. 13 – 29, Publication of the Nigerian Institute of Transport

Technology (NITT),Zaria.

12) Y. A. Jimoh (2011), An Estimation of Effects of Factors on the Speed of Commuting Vehicles at Low Flows on

Urban Arterials- an Empirical Data from Nigeria; Journal of Logistics and Transport [JLT], Vol. 3, No. 1, pp.

22-37, a Publication of the Nigerian Institute of Transport Technology (NITT),Zaria.

13) Y. A. Jimoh, J. A. Aweda and J. A. Bakare (2011); A Traffic Noise Pollution Model for an
Urban Arterial: Case Study of Tanke - University Road, Ilorin (Nigeria), NSE Technical
Transactions,Vol. 46, No. 4, pp.20 – 27, Quarterly Journal Publication of the Nigerian Society
of Engineers (NSE).

14) O. O. Adeleke and Y. A. Jimoh (2011) Bus Stop Location for Improved Movement on an
Urban Arterial in Ilorin Metropolis, Nigeria; Journal of Engineering Research,Vol. 16, No.4
(JER-16, No. 4), pp. 50-55, Publication of the Faculty of Engineering, University of Lagos,
Nigeria.

National Journal Article Accepted for Publication:


15) Yusuf, I. T and Jimoh, Y. A ‘The Evaluation of Palm Kernel Shells as Coarse Aggregates for
Rigid Pavement in A Coastal Region, Nigeria; NSE Technical Transactions, Quarterly Journal
Publication of the Nigerian Society of Engineers (NSE), letter of Acceptance dated 14/ 04/
2012.

National Edited Conference Proceedings:


16). Y. A. Jimoh and E. O. Akinyemi (1987), “Stress – Strain Properties of a Typical Road Base
Material and Implications for Pavement Design in Nigeria; Proc. 19thAnnual Conf. on
Materials Testing, Control and Research, pp. 145 – 164; held at Kaduna Polytechnic
February 1987; Organized by the Federal Ministry of Works and Housing, Kaduna Polytechnic
and Texas Research & Development Foundation, United States of America.

17). Jimoh Y. A. and E. O. Akinyemi (1990); “A Strategy for Optimizing the Use of Road Surface
Funds in Nigerian Cities in the 1990s;” Proc. National Conf. Nigerian Society of
Engineers, Jos Plateau State, Nigeria, pp. 129 – 136.

National Technical Report:


18) Y. A. Jimoh and M. M. Akinola (1995), Confirmatory Sub - Soil Investigation for Proposed
Nigerian Airports Headquarters, CBD, Abuja, produced and endorsed for Messrs. JIM AKIN
AND ASSOCIATES Ilorin; March 1995 for the Nigerian Airports Authority, Ikeja Lagos.
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

International Journal Articles In-Print:


19) O. M. Ogundipe and Y. A. Jimoh (2009); Durability – Based Appropriateness of Sawdust Concrete for

Pavement; Journal of Advanced Materials Research, Advances in Materials and Systems Technology II,

Switzerland, Vols. 62-64, pp11-16, (download on line) dol 10.4028/www.scientific.net/AMR.62-64.11

20) Y. A. Jimoh (2010), Assessment of Vehicle Trip Production Rates in Ilorin (Nigeria); Journal of Applied Science

and Technology (JAST), Vol. 15, No. 1&2, pp.57 – 62, Accra Ghana, Publication of JAST Foundation for

International Centre for Materials Science & Technology and Industry (ICMST) Ghana, Natural & Social Sciences

Sector (INSS) of the Council for Scientific and Industrial Research (CSIR) Ghana, ISSN 0855-

2215,http://www.inasp.org.uk/AJOL, info@ajol.info.

21) Y. A. Jimoh (2010), Estimating Total Manouvering Time of Drivers Using GAMMA Distribution Function of

Instantaneous Speeds; Journal of Applied Science and Technology (JAST),Vol. 15, No. 1&2, pp.63 – 69, Accra

Ghana, Publication of JAST Foundation for International Centre for Materials Science & Technology and Industry

(ICMST) Ghana, Natural & Social Sciences Sector (INSS) of the Council for Scientific and Industrial Research

(CSIR) Ghana, ISSN 0855-2215,http://www.inasp.org.uk/AJOL, info@ajol.info.

22) Kolo, S. S. and Jimoh, Y. A. (2010),Effect of Dissolved Pure Water Sachets on the Strength Properties of Asphalt

Pavement Mixes,Global Journal of Engineering & Technology,Vol.3, No. 3, (2010) 487-495, Global Research

Publication, Calcutta India.

23) O. O. Adeleke and Y. A. Jimoh (2011), Sampling of Intersections for Traffic Delay Study in an
African Sub Region Urban City; Epistemics in Science, Engineering and Technology,
Canada, Vol.1, No.3, 2011, 131-137. Canada, Epistemics in Science, Engineering and
Technology, http://www.espistemicsgaia.webs.com, epistemics3@evol.com

24) Yinusa A Jimoh and Stephen S Kolo (2011), Dissolved Pure Water Sachet as a Modifier of Optimum Binder

Content in Asphalt Mixes; Epistemics in Science, Engineering and Technology, Canada,Vol.1, No.4, 2011, 176-

184. Canada, Epistemics in Science, Engineering and Technology, http://www.espistemicsgaia.webs.com,

epistemics3@evol.com

25) Adama, Andrew Yisa and Y. A. Jimoh(2011), Production and Classification of Locust Bean
Pod Ash (LBPA) as A Pozzolan; Research CIVIL ENGINEERING
PORTAL,http://www.engineeringcivil.com, November, 7 pages.

26) S. S. Kolo and Y. A. Jimoh(2011), A Comparison of Marshall Properties of Various Types of


Cold Mixes Found in Nigeria; CIVIL ENGINEERING PORTAL,
http://www.engineeringcivil.com, October, 10 pages.

27) S. S. Kolo, Y. A. JimohandP N Ndoke(2011), A Study of Axle Overloadings on A Rural Road


in Nigeria; CIVIL ENGINEERING PORTAL, Highway Engineering, Project Reports,
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Papers, on Monday, 12th December, 2011, http://www.engineeringcivil.com, 12 pages.

28) Ogundipe M.O. and Y. A. Jimoh (2012), Strength-Based Appropriateness of Sawdust Concrete
for Rigid Pavement; Journal of Advanced Materials Research, Advances in Materials and
Systems III, Vol. 367, 13 pp.13-18, (Download
online)10.4028/www.scientific.net/AMR.367.13.

29) Y. A. Jimoh (2012), Model and Application for a Pothole in Flexible Pavement Maintenance Due to Axle Loads;

Epistemics in Science, Engineering and Technology, Canada, Vol.2, No.1, 2012, 1-7. Canada, Epistemics in

Science, Engineering and Technology, http://www.espistemicsgaia.webs.com, epistemics3@evol.com

30) Y. A. Jimoh, O. O. Adeleke and A. A. Afolabi (2012); An Evaluation of the Operation of a


Fixed-Time Signalization for a Four Leg Intersection in Ilorin Metropolis, Nigeria; Research
Journal for Applied Sciences, Engineering and Technology, 4(17); 2839-2845, 2012, ISSN:
2040-7467, published by Maxwell Scientific Organisation, UK.
31) J. A. Aweda and Y. A. Jimoh,

International Journal Article Accepted for Publication:


31) Oyediran A.T., Y. A. Jimoh and Aribisala, J. O. (2007), The Effect of Compactive Efforts on
Compactionon Soil for Road Works in Southwestern Nigeria, publications of Afro-Euro Centre
for Development Studies, ulOstrobramska 136, m. 30 04-026Warsaw, Poland; 5pp. Letter of
acceptance dated 27th May 2007 and certificate of authorship attached
International Edited Conference Proceedings:
32) Y. A. Jimoh&Akinyemi E. O. (1993), A Methodology for Estimation of Modulus of
Deformation for a Brick paved Soil System, Proceedings of 3rd International Conference on
Structural Engineering Analysis and Modeling (SEAM3)Vol. 1, pp. 735 – 755, held 27-29
July 1993, University of Science &Technology (UST), Kumasi Ghana.

33) Y.A. Jimoh (1997), Static and Dynamic Models for Structural Analysis of Small Element
Pavements; Proc. Fourth International Congress on Structural Engineering Analysis
&Modeling (SEAM 4), Vol. II Pp. 217–234, held 9-11 September 1997, University of Science
& Technology (UST),Kumasi Ghana.

34) Jimoh, Y A (2005) Shear strength/ moisture content models for a laterite soil in Ilorin, Kwara
State Nigeria, Proceedings of the 16th International Conference on Soil Mechanics and
Geotechnical Engineering(16th ICSSMGE), Paper NI-3, pp521- 525, held at Osaka Japan
July 2005.
35) Y. A. Jimoh (2009),A 2D Mathematical Model for CBR of a Road sub base in Ilorin, Nigeria,” Proceedings of the

17th International Conference on Soil Mechanics and Geotechnical Engineering (17th ICSSMGE), Vol. I, pp.

396-398, edited by MamdouhHamza, MrawanShahien and Yasser El-Mossallamy, held 5-9 October, 2009 at

Alexandria Egypt.

International Technical Report:


36) Y. A. Jimoh (2009), Report Insitu Determination of Bearing Capacity of Site for 50m Global
Telecom Mast Towerlocated at HSE No. NF471 Block C, Sector 4B Abubon Eastern Region of
Ghana (Site No. NKA 002),produced and endorsed for Messrs JAY Consultants Ilorin on behalf
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

of Messrs AL – BanufInvestment Company Ltd, the commissioned contractors by the Globacom


Nig. Ltd., March.

xxii. Major Conferences and Workshops Attended: Date starting with latest
Conferences Attended:
Geotechnical Engineering Workshop by the Nigerian Geotechnical Association (NGA) and the
International Society of Soil Mechanics & Geotechnical Engineering (ISSM&GE), Eko Hotels
& Suites, Victoria Island Lagos Nigeria, held from 30/04/201to01/05/2012.

1.2011NSE National Conference / Annual General Meeting, Calabar, Cross River


State05/12/2011 to 10/12/2011.

2.International Conference on Sustainable Urban Water Supply in Developing Countries at


Ilorin, University of Ilorin Auditorium, 26/07/2010 to 28/07/
3.17th International Conference of Soil Mechanics & Geotechnical Engineering
(17ICSSM&GE) Alexandria Egypt, Alexandria Egypt, 05/10/2009 to 09/10/2009.

Workshops Attended:
1 2012 Annual Branch Workshop & Training of the Nigerian Society of Engineers, Ilorin Branch
on Public Utilities Management for Sustainability, Branch Engineering Centre (BEC),
TundeIdiagbon Road, 23/05/2012 to 25/05/2012.
2 Association of Consulting Engineers, Nigeria (ACEN) International Workshop on
Infrastructure, Sheraton Hotels & Towers Abuja, 28/04/2009 to 30/04/2009.

xxiii. Information on Fellowship, Master’s project(s) and Ph. DThesis/Theses Supervised: Date starting with latest
Master’s Projects Completed

1) Laboratory Determination of Resilient Modulus (MR) of Hot Mix Asphalt (HMA); Afolabi, AbdulazeezAdemola,
03/30GB012, 2008 – 2011, Sole.
2) Assessment of Benkelman Beam Apparatus for Effective Design of Pavement Rehabilitation Works; Onundi,
Adams Anpitan, 89/020612, 2001 – 2010, Sole.
3) A Study of the Influence of a Pool of Water on the Permeability Properties of a Road Subgrade in Ilorin, Nigeria,
Akanbi, Mashood A.,03/68GC001, 2003 – 2009, Sole.
4) Relationship Between the Strength and Compaction Characteristics of Soils: A Case Study of Chikanda- Kosobosu
Road in Kwara State, Olufadi, MusbauYomi, 97/30Gb036, 2005 – 2009, Sole.
5) An Assessment of the Effectiveness of Bitumen Extracted from Agbabu Tar Sand for Production of Broom Road
Product (BRP) Mats, Adebayo, Funmilayo Farida, 93/03711, 2004 -2009, Sole.
6) A Computer Based Development of a Cost effective Maintenance Scheme for Improved Efficiency of Niger State
Road Network, Adama, Andrew Yisa05/68GE001,2005 – 2008, Sole.
7) Effects of Bitumen Modification with Dissolved Waste Pure Water Sachet in Asphalt Mixes for Road Works and
Pollution Control, Kolo, Solomon Sunday, 05/68GE002, 2005 – 2008, Sole.
8) An Investigation into the Use of Sawdust for Rigid Pavement Works, Ogundipe, Olumide Moses, 03/68GE003,
2003 – 2005, Sole.
9) Cost Based Design of Heavy Load Pavement for Nigerian Ports, Yusuf, Ibrahim Tunde,
89/019486, 2001 – 2005, Sole.

10) A Study of Traffic on Major Arterials in Ilorin, Okunlola, Nathaniel O. , 1998 – 2002, collaborative, Joint Prof E.
O. Akinyemi.
Master’s projects in progress

1) Determination of Lifespan of Asphalt Mixes in the Laboratory, Bolajoko, Zulkainanin, 00/68GE003, 2000 – 2011,
Sole.
2) Traffic performance characteristics of a typical sub urban corridor: Case study of Abuja – Keffi
road, Bello, Abosede A, 92/032466, 2007 – 2011, Joint with Dr. A. B Ibitoye.
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Ph. D. Completed:

1) Empirical Modeling of Traffic Delays at Urban Intersections in Ilorin Metropolis, Kwara State, Nigeria, Adeleke,
OluwafemiOyetunde, 93/038838, 2000 – 2010, Sole.
Ph. D. in Progress:

1) A Study of the Pozzolanic Action of Corn Cob Ash for Highways Development and MDG,
Apampa, Ahmed O., (11/GE), 2011–Date, Proposal stage, Sole.

2) Stabilization of Poor Soils with Extraction and Ash from Agricultural (Biomass) Waste
Vegetable Sources for Cost Effective Pavement Works, Adama, AndrewYisa,05/68GE001,
2009 –Date, Sole. Student has presented Progress Report Nos. 1&2, and two Faculty Seminars.

3) Production and Evaluation of Cold Patching with Dissolved Pure Water Sachet -modified
Asphalt, Kolo, Stephen Sunday, 05/68GE002, 2009 - Date. Student already presented progress
Report Nos. 1 and 2 with 2 Faculty Seminars.

4) Characteristics of Palm Kernel Shell as Coarse Aggregate in Rigid Pavement for very weak
Sub-grades (Coastal Region), Yusuf, I. T. (89/019486, 2007 – Date, Sole. Student presented two
Faculty Seminars already entitled ‘Criticality of Coarse Aggregates for Rigid Pavement in
Coastal and Weak Swamps’ and ‘A Proposal on the development of dynamic models for Palm
Kernel Shell Rigid Pavement’.

2. A Study of Liquefaction Potential of the Soils of South West, Nigeria, Ige, Joseph O.,
06/68GF001, 2006 – Date, Sole. Student has presented Progress Report No. 1and 2 and two
Faculty Seminars, - Soil liquefaction potential prone activities and Evaluation of soil
liquefaction with in situ tests, SPT and CPT.

xxiv. Details of Administrative Experience: Date starting with latest (Position Held, Details of
Service and duration; (Year, From To)

1. Head,Department of Civil Engineering, University of Ilorin. 2012 till Date.


2. Coordinator, Students Work Study, Technology & Entrepreneurship Centre (TEC),
University of Ilorin.
Details of service – Assist the Director in the execution of the workstudyprogramme in the
selection of students, invitation of request for participation from the various units of the
university, monitoring and service control, including wages. 2009 – 2011.
3. Acting Head, Department of Civil Engineering, University of Ilorin.
Details of Service –Academic and Administrative Leadership in the management of the
Degree Programmes being offered by the Department, including accreditation of the
programmes by the National Universities Commission (NUC) and the Council for the
regulation of engineering in Nigeria (COREN).
2005 – 2007.

4. Branch Chairman, the Nigerian Society of Engineers, Ilorin.


Details of Service – Coordination of the technical, administrative and welfare programmes
and activities of the branch (at individuals and as a group) including Quality Representation
of the Branch at the National Council of the Nigerian Society of Engineers, National
Headquarters Affairs and Occasions. 2000 -2001
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

5. Acting Head& Head, Department of Civil Engineering,Kwara State Polytechnic


(formerly Kwara College of Technology), Ilorin
Details of Service- Academic and administrative leadership for the National Diploma and
Higher National Diploma in CivilEngineering (ND & HND Civil), including successful
presentation of programmes for the National Board for Technical Education
(NBTE)Accreditation and Re-accreditation.
1981– 1984, 1988 – 1991, 1997 - 1998.
.Details of Teaching Experience: Date staring with the latest
S/N Institution Course(s)Taken Level Period:
From To
1 University of Ilorin Soil Mechanics (CVE 322), 300, 1998 2012
Applied Soil Mechanics &
Foundation (CVE422), 400, 1998 2012
Geotechnical Engineering
(CVE524) 500 1998 2012
2 University of Ilorin Civil Engineering Materials
(CVE341) 300 1998 2012
3 University of Ilorin Transportation Engineering
(CVE 474), Transportation 400 1998 2011
Engineering II CVE 575, 500 1998 2012
Transportation System
Design & Analysis I & II 500 1998 2012
(CVE 577 & 578)
4 University of Ilorin Final Year Project
Supervision in Civil
Engineering CVE 591 &
592 500 1998 2012
5 University of Ilorin Transportation Engineering
Practical & Highway
/Pavement Materials,
Engineering and Design
(CVE 681, 682, 683, 684, 600, 1999 2012
685, 728), Advanced 700
Foundation Engineering
(CVE662), Probabilistic 600
Analysis of Civil
Engineering Systems
(CVE 653) 600

6 Kwara State CEC Courses Soil


Polytechnics, Ilorin Mechanics (213) Advanced NDII
Soil Mechanics(318, 328) HND I 1978 1998
Foundation Engineering
(418) Advanced HND
Foundations (428). II 1980 1998
7 Kwara State Transportation Engineering HND I
Polytechnics, Ilorin Analysis, Planning and & II 1980 1998
construction.
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

xxvi. Service to the Community: Date starting with the latest


S/N Position Service Period Year
From To
1 Member as University of Ilorin Senate and Business 2007 Date
Faculty Representative Committee of Senate (BCOS)

2 Member University Committee on Mineral and 2004 Date


Natural Resources.

3 Chairman Faculty Adhoc Committee on the need for 2011 2012


development of consultancies in the faculty.

4 Member of Board, Coordinator Student Work Study 2009 2012


University Technology Programme.
&Entrepreneurship Centre
(TEC)

5 Member and Secretary, Investigation of the Collapsed Building on 2012 2012 NBRRI
Panel on building Cocoa Road Ilorin, April 2012 under the
collapse. auspices of the National Building & Road
Research Institute (NBRRI) Abuja.

6 External Examiner Quality Control and Assurance in Civil 2002 2011


Engineering Education at Post Graduate
level (Master’s and Ph. D., Ahmadu Bello
University Zaria.

7 Member of Committee Technical and Journal Publication and 2005 2011


Conference Planning and Communiqué
Drafting of the Nigerian Society of
Engineers.

8 External Examiner Quality Control & Assurance in Engineering 2005 2011


and Technology Education in Nigeria.
Nigerian Institute of Transport Technology
(NITT), Zaria.

9 Member & Sub Committee University Committee on Rail Transport and 2005 2010
Chairman Urban Public Movement (Prof. Ogunsanya
Committee).

10 Chief Examiner, NSE Professional certification for engineering 2000 2009


Ilorin Centre& COREN practice in Nigeria for the Nigerian Society
Examiner of Engineers and Council for the Regulation
of Engineering in Nigeria.
PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

11 Member Governing Council, Federal Polytechnic 2005 2008


Offa, nominee of the NSE and Professional
bodies

12 Panel Member COREN Accreditation and Pre-assessment of 2006 - 2006


Bachelor of Engineering programmes,
Igbinedion University, Okada Edo State

13 Member University of Ilorin Junior Staff 2001 2005


Appointment & Promotion Committee

14 Departmental Post Coordination of Post graduate courses being


Graduate Coordinator. run in the department.

15 Resource person and Certification / Training for Quality Control 2002 2002
programme coordinator. civil engineering officers in the employment
of Shell Petroleum Development Company
East and West Division (Port Harcourt and
Warri), organized by the Nigerian society of
engineers.

16 Chairman Board of Governors, Okanle / Fajeromi 1987 1990


Community High School

17 Resource Person The Nigerian Geotechnical Association 2006 2006


(NGA)on “A Short Course on Onshore
Geotechnical Investigation and Foundation
Design for Shell Petroleum and
Development Corporation (SPDC) Civil
Engineers under the auspices of NGA, a
Division of the Nigerian Society of
Engineers held at Federal Palace Hotel,
Lagos,1st edition.
18 Resource Person The Nigerian Geotechnical Association 2010 2010
(NGA) on “A Short Course on Onshore
Geotechnical Investigation and Foundation
Design for Shell Petroleum and
Development Corporation (SPDC) Civil
Engineers under theauspicesofNGA, a
Division of the Nigerian Society of
Engineers held at Castle de Pedro and SPDC
Learning Village, Warri, Delta State, 2nd
edition.

xxvii. Present Employment, Status, Salary and Employer


PROFESSOR JIMOH YINUSA ALAROIKIBO
[ENGINEERING CONSULTANT- CIVIL/STRUCTURAL ENGINEERING]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Present Employer Status From To


University of Ilorin, Ilorin Nigeria Senior Lecturer 1998 Date
CIVIL/STRUCTURAL
SOLENIN NIGERIA LIMITED CONSULTANT TILL DATE
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

SUMARY
Post‐graduate experience on a variety of oil & gas engineering, petroleum product storage and hazardous waste
storage facilities projects.
Sound knowledge of Civil & Structural Engineering principles, codes and standards, and the ability to reflect these
in Brownfield & Greenfield engineering projects.
Short courses/trainings in Finite Element Analysis, Offshore Platform Design, Project Management, Safety &
Security.
Progressively responsible for site visits to gas plants, onshore/offshore facilities locations, and broad‐ based
responsibilities in equipment support structures design.
Demonstrate ability to build long‐term relationships and determine cost‐effective solutions.
Exceptional computer skills including spreadsheet programming and modeling.

WORK EXPERIENCE
Jul. 2016 – Date: Project Engineer (TOTAL’s Egina UFR Project), Saipem Nigeria
Monitors & Controls all activities on TOTAL’s EGINA FPSO Installation & Fabrication Aids. Prepares
Scope of Works Requirements for prospective Vendors/Sub‐contractors.
Assists in managing Vendors/Sub‐contractors on the Shop Drawings & Fabrication deliverables. Interfaces
between Management, Operations, Installation, Fabrication & Procurement teams. Checks for the
feasibility & constructability of all Installation & Fabrication Aids on the project. Generates & reviews Shop
Drawings & Material Take‐offs.

Apr. 2015 – Jul. 2016: Project Engineer (SHELL’s SSAGS Project), Saipem Nigeria
Supported in the Preparation of Project Execution Plan.
Coordinated interfaces among Management, Engineering, QA/QC & Fabrication teams.
Supported in producing Lifting & Transportation analysis of all Twister & Module structures. Produced
Material Take‐off (MTO) of approximately 85 Ton Pipe Supports.
Reviewed Navisworks 3D model & Weld Mark Drawings to support Fabrication Team.
Rendered Technical Support to Fabrication Team on Piping Engineering
Participated in Constructability Review sessions & Pre‐fabrication Coordination Meetings
Interfaced with Structural & Piping Engineering teams to clarify project complications.
Identified change in Scope of Works, and ensure Change Orders are current & adequate.
Population of the Completions Management Database and Punch List in line with applicable project
procedures and latest design data.
Developed spreadsheet program for optimal project works.

Apr. 2014 – Apr. 2015: Structural Engineer (TOTAL’s Egina UFR Project), Saipem Nigeria
Designed, executed & checked the typical structural studies for the project.
Prepared Bill of Materials/Material Take‐off.
Extraction of Bill of Materials and other weight information from the 3D CAD model.
Reviewed Shop & Fabrication drawings for modules.
Prepared Upending & Lifting Analysis of 8m Diameter x 6m Long FPSO Can (SACS v5.5)
Carried‐out analysis & design of various fabrication/construction aids
Modelled & Analysed 6m Dia. x 26m Long Buoyancy Tank (Abaqus v6.13 & SACS v5.5)
Monitored Improvement System by reverting with lessons‐learned during the project.

Nov. 2012 – Apr. 2014: Project (Structural) Engineer, Dover Engineering Limited
Analysed & designed structural platform for NLNG’s 104 Ton Condensate Flash Vessel (STAAD.Pro), and
Connecting Walkways between New & Existing Structures.
Carried‐ out infrastructural design on roads, drainages & turnstile base for NLNG.
Designed suitable supports structures for various Process vessels
Prepared Structural Design Basis Memorandum & Specifications
Provided the Design of Deck Modification & Access Platforms for new valves & spools Assigned
jobs & coordinated the activities of Structural Engineers & Designers
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Interfaced with client’s Project Engineer to review & turn‐in weekly progress
Successfully delivered Approved for Construction (AFC) package to NLNG Project Team with recommendation
from Lead Structural Engineer & client representative.

Sep. 2013 – Apr. 2014: Nigerian Local Content Development Training Coordinator (Structural), Dover Engineering Limited

Directly responsible for training & mentoring of Trainee Engineers towards achieving the aims of the Nigerian
Local Content Policy.
Prepared training slides & manuals on Discipline Working Tools, Working Hours, Dress Code, Quality Control
Measures, Use of Computer in Engineering Design, STAAD.Pro & SACS, Introduction to Offshore & Onshore
Engineering, Use of Codes & Standards etc.
Prepared assessment/projects at the end of each training topic.
Turned‐in weekly reports to the Lead Structural Engineer on training outcome.

Feb. 2013 – Apr. 2014: Civil & Structural Engineer, Gusfel Engineering Limited (Independent)
Analysed & designed Pile Foundation to support a 350 Ton capacity Mooring Bollard
Designed Pipe Racks & Pump Shelters for Swamp Area Gas Gathering/Supply Project for NAOC. Designed
Drains, Culverts & Bundwall for Crude Oil Storage Tank
Designed Oil Loading/Recovery Shelters and Foundation
Modeled & analysed Pipe/Valve Supports & Pig Launcher Skid
Prepared Bill of Material for the project

Jan. 2008 – Sep. 2011: Civil & Structural Engineer, Dover Engineering Limited
Designed various overhead and underground equipment support structures.
Developed spreadsheets for several structural calculations.
Prepared detailed calculations/reports on Weight Control and Material Take‐off.
Carried‐out preliminary design of mitigation works at an erosion site.
Produced joint/padeye calculations of onshore/offshore steel structures.
Facilitated inductions/training sessions for Trainee Engineers on Quality Procedures. Assisted
as a discipline Health, Safety & Environment focal point.
Responsible for the quality check of Structural discipline deliverables before issuance.
Developed a system of collating clients’ comments for structural deliverables.

Jan. 2007 – Dec. 2007: Trainee Structural Engineer, Dover Engineering Limited
Preparing engineering verification checklists.
Structural analysis & calculation of primary offshore platform members. QA/QC
training on ISO 9001; 2000 (Quality Management Systems).
Facilities set‐up/participation in monthly HSE meetings.
Apr. 2005 – Sep. 2005: Industrial Trainee, Contracts Department, Total E&P
Packaging, circulation, and tracking of contract documents.
Acquired sound knowledge on contract procedure/administration.
Received tenders/bids and set‐up conference room for HSE meetings.

Oct. 2005 – Dec. 2005: Trainee Engineer, Mercury Engineering & Construction Limited
Assisted in site supervision on Total Housing Extension Project.
Carried‐out concrete cube testing & quantity survey of weekly work done.
Jul. 2004 – Nov. 2004: Industrial Trainee, Abbibet Consults
Detailing of reinforced concrete structures using AutoCAD Road
& Culvert Design
Preparation of Bar Bending Schedule (BBS)
EDUCATION
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

EDUCATION
Sep. 2011 – Sep. 2012: University of Manchester | PGCert Structural Engineering
Steel Structures | Finite Elements Analysis | Elastic & Plastic Analysis of Structures | Fire Engineering | Conservation of
Structures | Structural Dynamics & Stability | Reinforced Concrete Structures
Jan. 2000 – Nov. 2006: University of Port Harcourt | BEng Civil Engineering (2 nd Class Upper)
Research project on the “Optimisation of Shoreline Protection methods using Gabion Revetment” Case Study: Bonny
Island, Nigeria.

TRAINING/COURSES
Project Management Training (35 PDU for PMP Certification) | DexNova Consulting Limited (Apr. 2016)
Project Management principles, and their application and context on business projects.

Abaqus/CAE & General Abaqus Modelling | Finite Element Analysis Services (Pty) Ltd (Aug. 2015)
User‐efficient training on the use of Abaqus CAE, Standard & Explicit.

Advanced Excel Training | Mactianah Information Technologies (Jun. 2015)


Using advanced formula, graphs and presentation techniques to maximise impact

Introduction to Project Management | ENI Corporate University (Apr. 2015)


Understanding the definition & implementation of projects.

Leadership in Health & Safety | Saipem Contracting Nig. Ltd., Port Harcourt (Feb. 2015)
Leadership development and cultural change programme which was developed to foster a strong
organizational safety culture.

Offshore Platform Design Using SACS | Gold Gate Engineering Institute Lagos (Sep. 2012)
Basic & Intermediate Offshore Engineering for Structural Engineers

Basic Safety & Security | G4S Secure Solutions (UK) Ltd. (Apr. 2012)
Basic Safety & Security Training towards the Olympic Games, London 2012

VOLUNTARY ACTIVITIES
Jun. 2012 – Sep. 2012: Support Visitors’ Services Assistant, Whitworth Art Gallery, University of Manchester, UK.

Provided warm welcome and support to visitors


Supported the use of front desk computer and telephone & preparation of Gallery spaces
Thoughtfully ensured Gallery codes & conducts were observed
Monitored stock level of marketing, education and other public information
Successfully worked with colleagues in the wider public engagement team.

Sep. 2011 – Sep. 2012: Environmental Representative, Whitworth Park Students’ Residence, University of Manchester,
UK.
Actively involved in Carbon Control Projects
Promoting a Greener Environment in & around the Hall of Residence.
Aug. 2005 – Aug. 2006: Editor‐in‐ Chief, Civil Engineering Students’ Magazine, University of Port Harcourt

Conceived, oversaw, planned and compiled the news section.


Edited technical articles and instructed co‐editors on effective writing
techniques.
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

C O M P U T E R SKILLS
SACS R5.5 | STAAD.Pro v8i | Abaqus v6.14 | MSTower | Tekla | Navisworks | AutoCAD 2013 | PDMS 12.0 | Matlab |
MathCAD 14 | Primavera P6 | Fabrication Management System | Advanced Microsoft Office tools

CODES & STANDARDS


EN, BS, ASTM, AISC, ASME, API, AASHTO, ACI, DNV, Shell DEP v36, Total GS etc .

PROJECT INVOLVEMENT
Petroleum Storage Facility Solenin Nigeria Limited 2015

Chemical Warehouse Jochris Engineering Limited 2015


Southern Swamp Associated Gas Solution Project Shell Pet. Dev. Co. 2015
Bollard Pull Station Coastland Logistic Nig.Ltd. 2015
Egina Field Development Project Total E&P 2014
Indorama Gas Pipeline Project NAOC/IEFCL 2013
Supply of Pig Launcher with Skid Accugas Ltd. 2013
Agbami Cold Vent Compression Project Chevron Nig. Ltd. 2013
Swamp Area Gas Supply for NLNG T4/5 EPC of Ogbainbiri FS Nigerian Agip Oil Co. Ltd. 2013
Kolo Creek Deep Field Development Project Shell Pet. Dev. Co. 2012
Additional Heat Exchangers for Minux Units Project Chevron Nig. Ltd. 2012
EPCC for Debottlenecking of CSU‐3/4/5 Project NLNG Ltd. 2012
Structural Design of Port Aspdin Hotel IStructE/Concrete Centre 2012
Nembe Independent Power Project Shell Pet. Dev. Co. 2011
OML100 Activation & Flare‐out ‐ Basic Engineering Total E&P 2011
OML100 Fire Water Upgrade ‐ Basic Engineering Total E&P 2010
Condensate Stabilisation Unit Debottlenecking Project NLNG Ltd. 2010
Escravos River Crossing Project Chevron Nig. Ltd. 2009
Northern Option Pipeline Project Total E&P 2009
Design of 56m Tower Foundation for 12 Locations Shell Pet. Dev. Co. 2009
Expansion of Escravos ‐ Lagos Gas Pipeline Nigerian Gas Co. 2008
Design of High Grade Radar Support for Bonga FPSO Shell Pet. Dev. Co. 2008
Adanga North Wellhead Platforms Addax Petroleum 2008
AMQ Helicopter Refueling Units Total E&P 2008
Satellite Field Development Project Mobil Producing Nig. 2007
Gas Supply to Geregu PHCN Power Station Nigerian Gas Co. 2007

AFFILIATIONS & CERTIFICATIONS


Nigerian Society of Engineers (NSE) – Corporate Member (32287) | Council for the Regulation of Engineering in Nigeria
(COREN) – Registered Engineer (R.31159) | Institution of Structural Engineers (IStructE) – Graduate Member (088379166)
| American Society of Civil Engineers (ASCE) ‐ Student Member (415810) | Institution of Civil Engineers (ICE) ‐ Student
Member (62503114) | National Society of Black Engineers (NSBE) | Primavera 6.0 Project Management Certification |
Shell Basic Swimming Certification | Helicopter Underwater Escape Training (HUET)/Survival at Sea (SAS) Certification.

AWARDS
Best Design Project, University of Manchester/Finalist, Structural Concrete Student Design Competition awarded by
IStructE/Concrete Centre, UK – 2012 | Rivers State Sustainable Development Agency Postgraduate Scholarship Award –
2011 | Federal Government of Nigeria Undergraduate Scholarship Award – 2002 | Joint Christian Campus Fellowship
Award of Stewardship – 2006 | Society of Civil & Environmental Engineering Students Award of Achievement ‐ 2006
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

ACTIVITIES & INTERESTS


Training, Research & Development | Design of publications using Adobe Photoshop, CorelDraw, Microsoft Publisher &
FrontPage | Professional logo creation, business card design & website development | Still life drawings, typing, editing &
proof‐ reading of written works | Public speaking & creating positive awareness
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
AARON DIKIBO
[CIVIL/STRUCTURAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
OTARO OGHENEKARO JACKSON
[MECHANICAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Career Summary

Experienced Engineer with a broad Mechanical infrastructural design background. Able to


produce innovative, yet realistic customer focused solutions. Adaptable and possesses superior
communication and interpersonal skills.

Date of Birth: 7th July 1972


Place of Birth: Ughelli, Delta State
Marital Status: Married
Local Govt. of Origin: Isoko North, Delta State

SCHOOLS ATTENDED WITH DATES

SCHOOLS DATES
University of Port Harcourt (Master of Engineering – M. Eng.) 1998 – 2001

Federal University of Technology, Owerri (Bachelor of Engineering – B. Eng.) 1989 – 1995

Metropolitan College Isolo, Lagos (West African School Certificate – WASC) 1986 – 1988

Government College Ughelli, Delta State 1982 – 1988

Oharisi Model Primary School, Ughelli, Delta State 1976 – 1982

CERTIFICATES OBTAINED
Industrial/Production Engineering, M.Eng. (Mechanical Engineering) University of Port Harcourt

Farm Power/Machinery Engineering, B. Eng. (Agric. Engineering) Fed. Unversity of Tech. Owerri

West African School Certificate Metropolitan College Isolo


Plant and Piping Engineering / Designer (Piping design and Stress Analysis) – Solenin Nigeria Limited
PROFESSIONAL QUALIFICATION
Certified Project Management Professional
A Council for the Regulation of Engineering in Nigeria (COREN) Registered Engineer
Certified Goldhofer Heavy Duty Trailer PST/THP Operator

Engineering Skill
Project Engr. /Subsea Engineer/ Cost Engineer / Construction Engr./ Schedule Engineer/ Maintenance Engr./ Rotation
Engr. / Piping Engr./Design Engr./ Planning Engineer/ Piping Engr./ MS Project / Plant Design Management System
(PDMS) / Primavera P6.
Key Skills
o Able to drive through project/business goal, ensure implementation plus performance measurement against target
in subsea construction in pipelines, risers, platforms, and flowlines
o Able to challenge poor performance, provide formative feedback, develop improvement plans and implement.
Knowledgeable in the use Primavera 06 and Microsoft project planner.
o Have in-depth knowledge of standards and codes - ISO, AWS, ABS, DNV, ASTM, ASME, BS, API, NACE,
ANSI, etc, applicable in onshore and offshore design and installation of facilities in the oil and gas, energy and
power sectors.

Working Experience
Solenin Nigeria Limited (Nov. 2015 till date)
o Mechanical Design
OTARO OGHENEKARO JACKSON
[MECHANICAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

o Pipeline Engineering Design


o MTO/BOM
o Stress Analysis
o Plant Model Design
o Project management processes and procedures development.
o Project performance measurements and audits.
o Project mentoring and leadership.
o Project planning and scope development, schedule development, cost baselining, quality and risks management.
o Project management office growth mentoring.
HirevOil Ltd – Site Rep./Engineer (Oct. 2013 – Oct. 2015)
Construction of a 50,000BPD Modular Petroleum Refinery
o Act as main technical adviser on site for subcontractor, crafts people and operatives. Advise on technical and
project engineering or create same in the absence to ensure project delivering meet acceptable industrial
standards.Assess designs, construction procedures/activities, protection and materials to ensure
compliance with prevailing industrial standards (API-620, API-650, API-651, etc.) in construction of thirty (30)
large low pressure storage tanks (2000CUM and 5000CUM) for crude oil and refined products.
o Verify/Validate piping designs, drawings (PFDs, P&IDs, isometrics, etc.) submittals for construction,
fabrication/weld procedures/activities in accordance with regulatory guidelines and prevailing industrial standards
(ASME B31.3) for crude and product transportation.
o Ensure work package costs do not exceed set thresholds, Milestones are met, risks are managed and technical
issues are quickly resolved in order to track and monitor project budget.
o Review designs, supervise and manage constructions according to set down project plans and standards in the
construction/installation of refinery modules, pumps, turbines, warehouses, Canopies, loading bay, treatment plant,
etc.

Morpol Engineering Services Nigeria Limited- Site coordinator/Lead Engr. (Apr. 2011-Nov 2011)
Erection and installation of a Single Super Phosphate (SSP) plant and equipment dis-assembled from
Offenbach Germany within a footprint of 14m X 14m and 45m high.
o Assess requirements, recruit/procure, develop, mentor & manage the performance of all project resources, whilst
assuring optimum utilization.
o Provide development of construction plan, plot plan, equipment layout, piping routing, piping isometric, pipe
support design, field mapping, and system schematics.
o Carry out preliminary project risk assessment to identify and assess risks and uncertainties associated with project
implementation and develop risk management plan and mitigation strategies for areas under consideration.
Construction of a 24” over 23KM gas pipeline
o Verify pipeline grades, sizes and wall-thickness for the various fluid/material transporting systems and verify
pipelines against design and code requirements for installation, commissioning and operation.
o Prepare material take off (MTO) and compile necessary requisition information for the procurement of materials
EmeryPro Consultancy Nig.-Principal Consultant (Nov. 2009 – Apr 2011)
o Project management processes and procedures development and Project performance measurements and audits.
o Project planning and scope development, schedule development, cost baselining, quality and risks management.
Rockson Engineering PH- Site Manager (Dec. 2007 –Nov. 2009)
o Interface with the various disciplines for project construction, installation, pre-commissioning and testing of
equipment/machines in the construction of 75MW Power Station.
o Evaluate reports and document submissions; liaise with clients, contractors, manufacturers and components
suppliers.
o Monitor verifiable activities/task against schedule and compile reports and appraisal.
o Formulate and develop conceptual project engineering design into functional scopes of work in power plant
installation.
o Provide functional guidance to the company’s engineering contractor(s) on engineering, design and construction
matters to ensure that work quality is implement to international standards, produced in a timely and cost effective
manner.
o Anticipate, identify future project’s requirement and constraints with a view to effectively manage and optimize
manpower, equipment and material use in order to meet project target.
OTARO OGHENEKARO JACKSON
[MECHANICAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Rockson Engineering PH – Mechanical Superintendent (Jun 2003-2007)


o Install 4 X 25 MW GE Turbines including ancillary and Balance of Plant involving Compressor, Gas skid, Fire-
Fighting system and others.
o Ensure quality management of work by focusing team on achievement of milestones, key project objectives, design
specifications and engineering standards.
o Effectively manage assigned budget by monitoring cost aspect of the project within direct control to forecast final
costs, identifies trend and take actions to avoid cost overruns.
o Coordination of heavy lift (80-200 tons) of equipment involving transportation and skidding unto foundation base.

o Create and develop project plans, tasks with designated time-frame, apportioning resources, track progress, monitor
and control all aspect of mechanical project schedule with a view to meeting set target.
o Installation of MS5001 Simple-cycle, single-shaft Nuevo Pignone gas Turbines with rated capacity of 26MW at
ISO conditions and auxiliary equipment comprising inlet filters units, exhaust units, ventilating air units, lube oil
cooling units, oil vapour separator units, gas scrubber units, compressor units, Gas skid unit, fire-fighting pump
unit and other.
o Ensure all weld work involving welding procedure specification (WPS), Welder Qualification test (WQT),
Procedure Qualification Record (PQR), NDT and NT tests, meet all relevant standards construction specification
(B31.3, AWS, D1.1,API104) and are in consonance with ISO 9001.
o Undertook pre-commissioning, commissioning and start-up MS 5001 NouvoPignone gas turbine.
o Utility piping involving Gas piping, drain piping, instrument/ service air piping, fuel piping, oil piping, fire fighting
water piping with fittings (ball valves, gate valves, check valves, butterfly valves, ESD, psv, flanges, etc) , as well
as NDT testing to confirm integrity of welds.
Rockson Eng. PH –Maintenance Engineer (Technical Assessment of Sapele Power Station-March 2004)
Technical assessment of Sapele Station with a view to highlight the requirement for a complete revamping of all
machines and equipment, consisting of:
 6*120 MW BBC (ABB) steam Turbines and 4*75 MW BBC (ABB) Gas Turbines.
 6 boilers (Babcock) with individual capacity of generating High Pressure (HP) 4.35m 3 steam at 120 0C,
181 bar and Low Pressure (LW) 4.05m3 steam at 120 0C, 28 bar.
 Ancillary equipment including boiler feed pump, water treatment plant, deaerator unit, booster pumps, FD
fan drives, condensate extraction units, lubricating oil coolers, etc.
Rockson Eng. PH –Operation & Maintenance Eng. (Feb. 2003 – Jun. 2003) Solar Mars 100 Gas turbines (3*12WM)
o Diagnostic routine maintenance checks through boroscoping of hot gas path, inspection of compressor rotor vanes,
exciter plug, nozzles, etc.
o Carried out scheduled engine compressor ingestive cleaning as at when due to recover recoverable degradation and
ensure optimum performance of system.
o Undertake planned maintenance tasks such as retro-fitting of damaged parts
o Undertook planned scheduled in-shop inspection and maintenance with intent to recover non-recoverable
degradation ( Nozzles, fuel injectors, ignition exciter, torch igniter, igniter plug, magnetic pick-up, bleed valve,
variable vane system, thermocouple intergrity.
o Operational duties involving control and routine diagnostic task on 11kv 50Hz switchgear panels (6 nos.), 33kv
switchgear panel (12 nos.) at 3000A rated bus bar, a 33kv feeder breaker (3 nos.) and incomer breaker (2 nos.), a
28MVA 11/33KV step up transformer (3 nos.), a PLC load management system, revenue meter, import and export
control facilities as well as synchronization of blackstart voltage with turbine voltage output prior to switch over
and to maintain all three turbine voltage.

Walvis Nig. Ltd. Fed. Ocean Terminal, Onne, PH. – Service Engineer (Dec. 2000 – Feb. 2003)
o Ensured maintenance objectives are achieved, i.e. preserve company assets, ensure facility’s integrity over life-
cycle, and ensure optimum performance under the combined aspect of maintainability and maintenance support.
o Supervised complete overhauling of a wide range of Diesel engines (Caterpillar, Daihatsu, Watsila, MWM, Detroit,
Cummins, Perkins, GM), Pumps (centrifugal/rotating/reciprocation), oil-water separator (purifiers), Hydraulic
winches, air compressors, Gears, Propeller shaft (controllable and fixed pitch), as well as pipes and fitting
installations.
o Carried out quarterly evaluation of asserts uptime, repair time, operating time with a view to establish asset
Reliability, Serviceability and Availability.
OTARO OGHENEKARO JACKSON
[MECHANICAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

o Utilized Reliability Centred Maintenance (RCM), failure mode and effect analysis (FMEA), in drawing
maintenance schedule for facilities on board ocean going vessels.
Shell Petroleum Development Company (SPDC) PH- Research Programme (M. Eng. Jan 99-Nov. 00)
o Investigation of probable failures in an Ingersoll-Rand Compressor.
o Reliability analysis and developing of maintenance programme for an Ingersoll-Rand Compressor units.
o Failure mode analysis and reliability based preventive maintenance for a station flow pump and cat generator using
RCM.
Benek Engineering Co. Ltd. – Workshop Supervisor (Nov. 97- May 99)
o Responsible for the general maintenance of all mechanical equipment both at workshop and at work sites.
o Supervision of major construction and fabrication works at working site and base involving tanks, supports and
others.
W. African Portland Cement Co. (WAPCO), Ewekoro – Workshop Engr. (NYSC) (Jul.96 – Jun.97)

o Repairs and change-out of damaged hydraulic rams and seals, hydraulic hoses, and conduit lines, O-rings, gaskets,
hydraulic pumps, fuel injector nozzles, air filters, radiators, and others.
o Maintenance of rotary equipment such as air compressors, pumps, and generating plant.
o General strip down and built up during complete overhauling of a Cat 950, Cat 769, Bobcat, Cat D8N, Cat D9N,
Cat 988, cranes and others.

Computer Skills
Software Application: Microsoft Office (Word, Excel, PowerPoint, Access, CorelDraw, Arts and Letter
AutoCAD, MS Project and Primavera P6 Project Planners.
Operating System: MS-DOS, Windows ‘98’ Novel Netware: UNIX
Programming Language: FORTRAN, BASIC, C++, AND Dbase.

Strength
A sound analytical mind, a team player, high energy input at work, confident, self-motivated, proactive , possesses a sharp
learning curve and sound communication skill.

Hobbies
Playing chess, Reading, Swimming, Playing football and watching films.
OTARO OGHENEKARO JACKSON
[MECHANICAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
OTARO OGHENEKARO JACKSON
[MECHANICAL ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
CHIBUZOH, AZUBUIKE ANIAGOH
[QUANTITY SURVEYOR]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

OBJECTIVES

¤ To work and contribute my quota in a reliable organization.

¤ To fully utilize my ability and also building my career.

¤ The opportunity for maximum growth and development in a construction industry.

¤ To attain optimal goal of the organization to which employment is offered.

BIO DATA

Date of Birth: 5th December, 1984.

Gender: Male.

Religion: Christian.

Marital Status: Single.

Nationality: Nigerian.

State Of Origin: Anambra.

Local Govt. Area: Njikoka.

Town: Abagana.

Village: Ezi-ube Umudunu.

SCHOOLS ATTENDED WITH DATES

¤ Federal Polytechnic Oko, Anambra State. 2008 – 2009.

¤ Federal Polytechnic Oko, Anambra State. 2005 – 2006.

¤ Federal Polytechnic Oko, Ufuma Campus, Anambra State. 2003 – 2004.


¤ Nnamdi Azikiwe Secondary School Abagana, Anambra State. 1997 – 2003.
¤ Udoeke Primary School Abagana, Anambra State. 1992 – 1997.

EDUCATIONAL QUALIFICATION

¤ NYSC Discharge Certificate. 2011.


¤ Higher National Diploma Certificate. 2009.
¤ National Diploma Certificate. 2006.
CHIBUZOH, AZUBUIKE ANIAGOH
[QUANTITY SURVEYOR]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

¤ Prelimum Certificate. 2004.


¤ Senior Secondary School Certificate. 2003.
¤ First School Leaving Certificate. 1997

WORK EXPERIENCE

1. Quantity Surveyor‐ Solenin Nigeria Limited Jan. 2017 – Date

¤ Carryout quantity surveyor jobs vis:

¤ BOQ Estimation

¤ BOM Estimation

¤ Bidding and Tendering

¤ QA/QC Checker

¤ Material Requisition

¤ Costing and Evaluation

2. Assistant Quantity Surveyor in Brospal Partnership,


No 9 Ogui Road, Enugu State. Feb., 2015 to Dec,2016.
3. Clerk of Work in S. Daniele W/A Ltd, 29/30 U.J. Esene Stadium Complex,
Calabar, Cross Rivers State. Sept., 2013 to Jan., 2015.
4. Assistant Project Quantity Surveyor in S. Daniele W/A Ltd, 29/30 U.J. Esene
Stadium Complex, Calabar, Cross Rivers State. July, 2013 to Jan., 2015.
5. Site Supervisor/ Q. S in Shelter and Space Ltd,
No 18 Enugu Rd Onitsha, Anambra State. Oct., 2012 to June, 2013.
6. Casual Staff in Federal Capital Development Authority [FCDA],
Area 11 near Nigerian Police Headquarter, Abuja FCT. 2011 to 2012.
7. Site Supervisor/ Q. S in Shelter and Space Ltd,
No 18 Enugu Rd Onitsha, Anambra State. Aug., 2011 to June, 2012.
8. Resident Quantity Surveyor in Works Department,
Federal Medical Centre Yenagoa, Bayelsa State. Aug., 2010 to June, 2011.
9. Site Supervisor/ Q. S in Eureka Consult,
No 18 Enugu Rd Onitsha, Anambra State. Aug., 2009 to June, 2010.
10. Site Supervisor [1 Year Industrial Attachment] in Eureka Consult,
No 18 Enugu Rd Onitsha, Anambra State. July, 2007 to June, 2008.
11. Foreman [4 Months Industrial Attachment] in Quantity Surveying Department,
Ministry of Works, Housing and Transport, Awka, Anambra State.
Nov./ Dec., 2005 to Jan./ Feb., 2006.
CHIBUZOH, AZUBUIKE ANIAGOH
[QUANTITY SURVEYOR]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

AWARDS AND INVOLVEMENTS WITH DATES:

¤ Certificate of membership, Economic and Financial Crime Commission,

Community Development Service Group [NYSC]. 2011.

¤ Certificate of membership, Drug Free Club,

Federal Polytechnic Oko Chapter. 2009.

¤ Certificate of merit, Fin. Sec./ Treasurer, Federation of Njikoka Student,

Federal Polytechnic Oko Chapter. 2008/ 2009

Achievement

Gained practical and detail experience about the working relationship between the
consultants and contractors in the construction industry.

Languages:

English, Hausa and Yoruba

Interests and activities:

Reading computer books about latest technology, listening to soft music, playing and
watching soccer.
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Career Summary

A member of some professional bodies within and outside Nigeria like the Society of Petroleum Engineers, with over

fifteen years experience in Local and International Oil and Gas engineering design (Onshore & Offshore Facilities),

project management, construction management vessel maintenance and business development - stemmed from

major EPC contract in the Oil & Gas industries.

• Transportation pipelines, downstream and upstream facility upgrade, including project support and services with

both operating and design services contractor. Experienced Mechanical Piping/Pipeline Engineer, PDMS and CAD

Co-ordinator with proven track record in design and delivering projects within schedule.

• Experience in ISO 9001:2008 PMS, Consulting, Coordination and Site Supervision of Mechanical Piping

Engineering Activity on wide variety of projects. (Greenfield and Brownfield Projects). Material Selection /

Specification - Data Sheet and Materials Requisition (MTO), Tie-in List, Bulk MTO, Vendor selection.

Preparation of Cost Estimate, Protection and Coating of Pipelines, Project Management / Control, Plant Survey.

Developed Conceptual Studies to FEED and Detailed Engineering Design with associated procurement services

• Experience in working with the following International Codes and Standard Practices: ASME Code, ASTM, API,

British Standard, DNV, DIN and ISO Standard. Shell Design and Engineering Practice (DEP), Exxonmobil Global

Practice (GEP) and Eni-Agip Division International Standards. Chevron Engineering Practice, Total GP and

Design Guideline etc.

• I am an excellent team player with good communication skills in written and verbal English Language, willingness

to travel for short or long assignments, ability to operate in a multi-national environment. Co-ordination of Design

Reviews, HAZOP, SAFOP, HAZID and SIF. Tender and bid preparation, Client representative in technical and

managerial issues within and outside the Company. Have a good understanding of contractual matters, CAPEX and

OPEX, Budget Estimates and Research.

State of Origin: Delta State


Sex: Male
Date of Birth: Feb.24th 1972
Sex: Male
Marital Status: Married
INSTITUTION ATTENDED WITH DATES:
Rivers State University of Science and Technology 2004 - 2017
Rivers State University of Science and Technology 2001-2002
The Federal Polytechnic Idah, Kogi State 1992-1996
DEGREE OBTAINED WITH DATES
MTech Mechanical Engineering (2004-2017)
PGD Mechanical Engineering (2001-2002)
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

HND Metallurgical Engineering (Lower credit) Dec. 1996


OND Foundry Engineering Technology (Lower Credit) March 1993

PROFESSIONAL TRAINING
PROJECT MANAGEMENT USING MS PROJECT PROFESSIONAL -INDIA NOV. 2008
HSE Competence course (level 3) Nov. 2000
Diploma in data processing April 2000
Quality Management System August 2004
HSE Competence course (level 2) Oct. 2005
Plant Design Management System (PDMS User) AVEVA June 2013
Effective Communication Skills for Technical Professionals (SPE) July 2013

PROFESSIONAL MEMBERSHIP
Nigerian Society of Engineers Membership Number 17319
Nigerian Institution Of Mechanical Engineers Membership Number D00009
COUNCIL FOR THE REGULATION OF ENGR (COREN) Membership Number R.14194
SOCIETY OF PETROLEUM ENGINEERS SPE Number 4081998
PAPER PUBLICATION
ENTREPRENEURSHIP & SMALL BUSINESS START-UP, SPEI -167527 at the 37th International
Conference of The Society of Petroleum Engineers, 2013
PROFESSIONAL EXPERIENCE:
Director- Mechanical Designs (PLATFORM ENGINEERING SERVICES LTD) April. 2016-Date
Piping / Pipeline Designs
Mechanical/Plumbing Design
Instrument Air Piping Design
Fire Water Design
Machine and Process Design
Preparation of Specifications
Preparation of Report
QA/QC on Deliverables
Project Engineering Interface
Client Representative
Field Engineering/Supervision
Commissioning and Start-up Engineer- Aker Solutions / Structured Resource Business Limited, Oct.
28th, 2014 to 18th of Nov. 2014
Maintenance of Coalescer vessel, trouble shooting of Coaleser transformers on SNEPCo Sea Eagle FPSO
Topside
Consultant Lecturer, (Offshore Technology Institute - University of Port Harcourt) May, 2014
• Lectured MSc students on Pipeline Design & Construction (Part Time)
Maintenance Consultant (PLATFORM ENGINEERING SERVICES LTD) JULY. 2009- Till Date (Part Time)
Process Vessel Maintenance of Vertical Separators
Isolation/spading off processes of the stations for safe work execution
Planning, implementation and management of technical task associated with decision
making in operation and maintenance
Facilitate the compliance and implementation of company’s environmental and safety
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

policies and standards in operation


Involved in the stripping of mechanical facilities in the compressor stations such as the
superior gas compressor engines, power plants, fuel gas units, Coalescer replacement,
Glycol \ regeneration units, liquid handling units.
Tagging and stripping of the station valves and pumps
Material inventory
Principal Piping Engineer, (IMPaC Oil & Gas Engineering Ltd. NIG.) Nov. 2005 - April 2016
• Developed pipeline design basis
• Carried out wall thickness calculation with combined stress calculation in accordance with ASME B31.8
• Road/Rig crossing calculation (case and uncase crossing) in accordance with API RP 1102
• Elastic bend radius and cold bend radius calculations in accordance with ASME B31.8
• Hydrostatic pressure calculation and diagram
• Verification of stability at low lying area using Anti-buoyancy calculation.
• Developed design philosophies Procedures, Project Specifications, Data Sheet and Typical pipeline
drawings.
• Mechanical data sheet for Launcher and Receiver
• Material Requisition for Barred Tee
• Material Requisition for Line Pipe
• Material Requisition for Launcher and Receiver
• Material Requisition for Insulating Joint
• Piping Layout Design and Studies
• Coordination of other Engineering Team Members
• Use of Laser Scanning Machine for Design & Fabrication Quality Assurance
• Prepare As-Built, Demolition & Modifications drawings of the piping layouts / piping general
arrangements.
• Production of Piping Material & Valve Specification
• Development of Critical line list, Tie-in Schedule, Piping GA Index Sheet
• Production of Piping Isometric from the General Arrangement Drawing
• Production of Valve Data sheet, Specialities item and Piping MTO
• Design / Production of Pipe Support and Pipe Support Details
• Development of Material Requisition for manual valve Piping and fittings.
• Bid Preparation & Tender evaluation
Projects:
 SNEPCO SEA EAGLE FURTHER OIL DEVELOPMENT ON (Sea Eagle FPSO Oily Water
Separators interconnecting piping, Laser Scanning on RP-A Platform, DP-A Platform, DP-B
Platform for QA/QC verification and also to Develop New Routing to New Wells 2013 to Date
 Research and Survey on Training Needs Analysis for the Nigeria National Oil Training Academy
for (Petrofac International (Nigeria) Limited / NCDMB) 2013
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

 Forcados Yokri Integrated Project, new Onshore Scope (FEED & DED) July 2012 to Date

 Nembe Electrical Interdependency Power Project (FEED & DED) 2012 to Date

 AFAM 5 Okoloma Gas Plant DED, 2011-2012

 Mobil Laser Scan Fabrication Assurance, 2012

 SNEPCO / Dormalong Laser Scan Fabrication Assurance 2013
Project Manager (IMPaC Oil & Gas Engineering Pvt. Ltd., Mumbai, INDIA.) May, 2008 –Dec. 2008
Principal Duties:
Preparation of Specifications.
Prepares and implements a Project Quality Plan (PQP) with reference to the corporate QM-system and
contractual QM-requirements.
Proposes, compiles and negotiates (possibly together with the Project Coordinator) contract variations.
Ensures the financial acceptance by Client.
Check and Review Deliverables prepared by discipline engineers
Study of Client approved standards and procedures.
Contacting and Correspondence with vendors.
Responsibilities –
Full responsibility for the project including the overall planning, organisation, delegation, coordination
and control of all works to meet the project objectives.
Adhering to the quality of PRODUCTS.
The adherence to the PQP. - The preparation of a Close Out Report with analysis of project results
and quality of PRODUCTS.
Feed back of improvement potential to the Client and IMPaC organisation
Authorities.
Allocate budgets for project execution by the disciplines.
Commit IMPaC resources in cooperation with the PC and the Resource Coordinator (RC).
Set priorities for the execution of project work.
Adherence to the plans and procedures.
Review the performance of the project staff.
Review the work of any functional group, assigned to the project.
Negotiate contract revisions with Client.
Principal Piping Engineer (IMPaC Oil & Gas Engineering Ltd.) Nov. 2005 – May 2008
Job Description:
Detailed Engineering design, Preparation of As-built, Design Modification of Process Engineering
Flow Scheme, Piping General Arrangement, Plot Plan & Piping Isometric Drawings.
Planning of activities
Producing piping layouts and layout reviews
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Checking general arrangements and isometrics


Support selection and detailing
Developing and using piping specifications
Data sheets and Use of spreadsheets and data bases
Producing standards and procedures and Writing design instructions (material, coating,
fittings, and basis of Design etc)
Site surveys
Risk assessments
Projects: UNIVERSAL ENERGY LIMITED/SIPEC – July 2008 to Dec. 2008
Detailed Design of 25km pipeline from Universal CPF to Tank farm of a capacity of 10,000 bbl/d.
Review of Client Basis of Design, Preparation of Specification and Report, Preparation of
technical query, check and review of engineers deliverables, pipeline design calculation.
FUN (FRONTIER, UNIVERSAL ENERGY & NETWORK) – July 2008 to Date
Detailed Design of Common Crude oil injection manifold for three marginal field operators and a
2km pipeline from Frontier CPF/ farm of a total capacity of 35,000 bbl/d. Preparation of
Conceptual Design, review and review of Client comment, Preparation of Specification and
Report, Preparation of technical query, Check and review of engineers deliverables, pipeline
design calculation.
INTELS: Design of Tanker Berthing Facility (FLT-ONNE PIPELINES)
Preliminary/Conceptual Design and detail design of Loading arm, Pipeline and piping
arrangement for 8” lines for loading and off loading of (AGO, Base Oil and Spare Line).
SPDC: Detail Design of Okoloma (Afam Power Plant) Pipelines
ADDAX/BERGESEN OFFSHORE: Okwori II (Senje Berge) FPSO Fabrication, Inspection,
Installation / hook-up of piping spools, Refabrication and Site design modification.
NETWORK EXPLORATION AND PRODUCTION NIGERIA LIMITED: Detail Design of
Qua Iboe Flowlines and Pipelines

Mechanical/Piping Engineer (DeltaAfrik Engineering Limited) March 2004-Oct 2005


Job Description:
Detailed Engineering design, Preparation of As-built, Design Modification of Process Engineering
Flow Scheme, Piping General Arrangement, Plot Plan & Piping Isometric Drawings.
Management and control of teams of designers
Preparation of Piping/pipeline specifications (material, coating, fittings, basis of Design etc)
Confirmation and Capturing of data on site
Preparation of Bill of Materials and Bulk Materials Take off.
Carrying out quality/accuracy checks on drawings.
Creation of, and updating of Plant G.A’s (General Arrangement Drawings).

Validation of existing equipments and Line listing


ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Projects: SPDC: K C Platform isometric Inplot piping


EPNL: EPNL-NIGERIA OML 58 UPGRADES which comprises of OBAGI Flow Station,
OBITE Treatment Centre and IBEWA Production Centre (Basic Engineering Design)

Mechanical/Piping Engineer (Titan Engineers and Constructors, Port-Harcourt) February, 2003 to


February 2004

 Use of Microstation 2D & 3D modeling tool for designs & Piping General Arrangement

 As-built and design modification of process Engineering flow scheme

Projects: Forcados Yokri Integrated Project. (FYIP)


Utapate Oil and Gas Integrated Project (Field Study)

Mechanical/Piping Engineer (Shell Petroleum Development Company Nigeria Limited, Port-


Harcourt) April. 2002 to January 2003
 As-built and design modification of process Engineering flow scheme

 Piping General Arrangement

 Drafting of Plotplan, P&ID’s, Isometrics
Projects: SPDC Rumuekpe, Kolocreek Flowstation, Water Injection Plant, Agbada I & II
Flowstation, Loop-line Manifold, Nkpoku Manifold, Obigbo, Ogbotobo, Nkali
Umuechem and Ahia Flowstation

Mechanical/Piping Engineer (Pronational Limited, Port-Harcourt) Nov.2001- March 2002.


 As-built and design modification of process Engineering flow scheme

 Piping General Arrangement

 Drafting of Plot plan, P&ID’s, Isometrics

Projects: Production of SPDC EAST "As-Built” pipeline manifold project


Alakiri, and Awoba (Pump Piping Design) Flowstation

NYSC Instructor (Nigerian college of Aviation, Zaria) Dec.1996-Nov.1997.


Taught discussion sessions for several material science courses, carried out corrosion control on cesna 175,
inspection of engines before and after landing and general maintenance.

SPECIAL SKILLS
Computer: Microsoft office 2000, MS word MS excel, AutoCAD R14 & 2000, 2009, 2009, 2011, Mathcad
professional 2000, PDMS, Microstation 2D & 3D, Microsoft Project 2013, Power Point, Navisworks, MCAD

Referees:
Available on request
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
ENGR. DOROH EFEMENA
[MECHANICAL DESIGNS ENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

PERSONAL DATA

DATE OF BIRTH: 7TH JANUARY 1968

PLACE OF BIRTH: IDO TOWN, ASARI-TORU L.G.A., RIVERS STATE

SEX: MALE

MARITAL STATUS: WIDOWER

NUMBER/AGE OF CHILDREN: THREE (16YEARS, 14YEARS & 11YEARS)

NATIONALITY: NIGERIAN

STATE OF ORIGIN: RIVERS STATE

LOCAL GOVERNMENT AREA: ASARI-TORU

HOME TOWN/VILLAGE: BUGUMA CITY

PERMANENT ADDRESS: LATE ELDER GRAHAM OWUKOLO’S

HOUSE, OPUWARIBOKO COMPOUND, IDO

TOWN, ASARI-TORU L.G.A., RIVERS STATE.

EDUCATIONAL INSTITUTIONS ATTENDED WITH DATES

1. ENITONNA HIGH SCHOOL, P.O. BOX 30, PORT HARCOURT. 1978-1983

2. RIVERS STATE UNIVERSITY OF SCIENCE AND TECHNOLOGY,

P.M.B 5080, NKPOLU-OROWORUKWO, PORT HARCOURT. 1984-1988

3. RIVERS STATE UNIVERSITY OF SCIENCE AND TECHNOLOGY

P.M.B 5080, NKPOLU-OROWORUKWO, PORT HARCOURT. 1991-1999

ACADEMIC QUALIFICATIONS OBTAINED WITH DATES

1. WASC/GCE MAY/JUNE 1983

2. B. TECH. ARCHITECTURE, (2ND CLASS LOWER DIVISION) 1988

3. M. Sc. ARCHITECTURE 1999

PROFESSIONAL QUALIFICATIONS OBTAINED WITH DATES

1. PASSED NIGERIAN INSTITUTE OF ARCHITECTS (NIA)/

ARCHITECTS REGISTRATION COUNCIL OF NIGERIA (ARCON)


WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

PROFESSIONAL PRACTICE (PPE) EXAMINATION. 2013

2. FULL MEMBER,

NIGERIAN INSTITUTE OF ARCHITECTS 2013

UNPUBLISHED WORKS

1. M.Sc. THESIS “ARCHITECTURAL DESIGN OF A PRIVATE RADIO & TV

BROADCASTING STATION” 1998

2. PAPER ON “THE INFLUENCE OF FENCE ON THE

ENVIRONMENT” 1996

INDUSTRIAL / WORKING EXPERIENCE


COMPANY/ESTABLISHMENT JOB DESIGNATION JOB DESCRIPTION

1. MINISTRY OF EDUCATION, WORKS

DEPARTMENT, RIVERS STATE (1985) INDUSTRIAL TRAINEE

i. ARCHITECTURAL DESIGN OF

PRIMARY AND SECONDARY

SCHOOL BUILDINGS.

ii. APPRAISAL AND EVALUATION

OF PROJECTS

iii. SUPERVISION OF BUILDING

CONSTRUCTION AT PROJECT

SITES

2. RIVERS STATE HOUSING AND PROPERTY

DEVELOPMENT AUTHORITY, PORT

HARCOURT (1986).

INDUSTRIAL TRAINEE

i. ARCHITECTURAL DESIGNS OF

GOVERNMENT, RESIDENTIAL

AND OFFICE BUILDINGS

ii. APPRAISAL AND EVALUATION

OF PROJECTS.
WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

iii. SUPERVISION OF BUILDING

CONSTRUCTION AT PROJECT

SITE

3. BUI LOCAL GOVERNMENT COUNCIL,

BORNO STATE (1988-1989)

COUNCIL’S ARCHITECT

(N.Y.S.C)

i. APPRAISAL AND EVALUATION

OF PROJECTS

ii. SUPERVISION OF BUILDING

CONSTRUCTION AT PROJECT

SITES

4. BRAIDARCH TEAM, PORT HARCOURT

(1990-1991)

RESIDENT-ARCHITECT,

NEW FINIMA HOUSING

PROJECT, BONNY L.G.A,

RIVERS STATE

i. TOWN PLANNING DESIGNS

ii. SUPERVISION OF BUILDING

CONSTRUCTION PROJECT SITES

iii. APPRAISAL AND EVALUATION

OF PROJECTS

iv. PREPARATION OF MONTHLY

PROGRESS REPORTS

5. BRAIDARCH TEAM, PORT HARCOURT

(1990-1991)

RESIDENT ARCHITECT,

AHOADA, YENAGOA AND

SAGBAMA INDUSTRIAL
WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

ESTATES, RIVERS STATE

i. ARCHITECTURAL DESIGNS

ii. APPRAISAL AND EVALUATION

OF PROJECTS

iii. SUPERVISION OF BUILDING

CONSTRUCTION AT PROJECT

SITES

6. BRAIDARCH TEAM, PORT HARCOURT

(1991).

RESIDENT ARCHITECT,

NNPC HOUSING ESTATE,

AKPAJO, TAI-ELEME L.G.A,

RIVERS STATE

i. REVIEW OF ARCHITECTURAL

DESIGNS

ii. SUPERVISION OF BUILDING

CONSTRUCTION AT PROJECT

SITES.

iii. APPRAISAL AND EVALUATION

OF PROJECTS

iv. PREPARATION OF MONTHLY

PROGRESS REPORTS

7. WESTARCH ASSOCIATES LTD. PORT

HARCOURT (1998-2001)

PRINCIPAL PARTNER

i. SOURCING, FINANCING AND

EXECUTION OF BUILDING

PROJECTS

ii. ARCHITECTURAL DESIGN OF

RESIDENTIAL AND PUBLIC


WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

BUILDINGS

iii. CO-ORDINATION OF BUILDING

CONSTRUCTION AT PROJECT

SITES

PREVIOUS EMPLOYMENT
COMPANY: DAEWOO ENGINEERING & CONSTRUCTION NIG. LTD. PORT

HARCOURT (2001-2003)

JOB DESIGNATION: PROJECT ARCHITECT.

CAWTHORNE CHANNEL ASSOCIATED GAS GATHERING

PROJECT (CCAGGP), RIVERS STATE.

JOB DESCRIPTION:

i REVIEW OF ARCHITECTURAL AND ENGINEERING

DRAWINGS.

ii SUPERVISION AND COORDINATION OF BUILDING

AND CIVIL CONSTRUCTION AT THE (CCAGGP)

PROJECT SITE.

iii APPRAISAL AND EVALUATION OF PROJECTS.

iv PREPARATION OF DAILY AND MONTHLY

PROGRESS REPORTS.

CONSULTANCY SERVICES
i. COMPANY- SOLENIN NIGERIA LIMITED- 2015-DATE

JOB DESCRIPTION: Architectural Designs

ii. COMPANY: PORT HARCOURT REFINING COMPANY LTD – 2008

JOB DESCRIPTION: ARCHITECTURAL DESIGNS AND SUPERVISION

OF BUILDING CONSTRUCTION PROJECTS.

ii. L.G.A COUNCIL: BONNY LOCAL GOVERNMENT COUNCIL. - 2008

JOB DESCRIPTION: ARCHITECTURAL DESIGNS AND SUPERVISION

OF BUILDING CONSTRUCTION PROJECTS.


WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

POSITIONS OF RESPONSIBILITY
i SPECIAL ADVISER ON POLITICAL AND ADMINISTRATIVE

MATTERS TO THE EXECUTIVE CHAIRMAN OF ASARI-TORU

LOCAL GOVERNMENT AREA, RIVERS STATE 1999-2000

ii SECRETARY TO ASARI-TORU LOCAL GOVERNMENT COUNCIL

RIVERS STATE 2000-2001

iii DIRECTOR, WESTMARK CONSTRUCTION COMPANY.

iv HEAD, DEPARTMENT OF ARCHITECTURAL TECHNOLOGY,

PORT HARCOURT POLYTECHNIC, RUMUOLA, PORT HARCOURT.

v CHIEF ARCHITECT, DABERE INTEGRATED SERVICES, NIG. LTD.

COMPUTER SKILLS
PROFICIENT IN ARCHICAD AND MICROSOFT WORD PACKAGES

COURSE ATTENDED
NATIONAL TRAINING ON RECORDS MANAGEMENT AND CONTROL

ASCON, BADAGRY, LAGOS STATE 1999


WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
WEST IPALIBO
[ARCHITECT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
MUSA AYUBA MUSA
[QUANTITY SURVEYOR]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

SUMMARY

Flexibile and enthusiastic, time management, skilfully applying professional knowledge


with less supervision, motivating teammates, purpose driven, versatile and hardworking
individual.

To apply my exceptional communication, interpersonal and organizational skills, as well


as knowledge acquired through a bachelor’s degree in Quantity Surveying, in an entry‐
level position in this great firm.

BIO DATA

Date of Birth: 07 October, 1990

Sex: Male

Marital Status: Single

Nationality: Nigerian

State of Origin: Edo

L.G.A: Etsako East

EDUCATIONAL QUALIFICATION

 Ahmadu Bello University, Zaria, Nigeria 2010‐2015


Bachelor of Science (B Sc. Hons), Quantity Surveying (Second Class Lower)
 Federal Government College, Kaduna, Nigeria 2002‐2008
Secondary School Certificate Examination (WAEC & NECO)
 Command Children’s School, Dantuku, Kaduna, Nigeria 1996‐2002

ACADEMIC CONTRIBUTION

Appraising the effectiveness of the un‐priced bill of quantities (submitted for the award
of B Sc.)

WORK EXPERIENCE

May 2017 – Date: Quantity Surveyor‐ Solenin Nigeria Limited

Carryout quantity surveyor job for 455 BSG NAF base project, Kano

BOQ Estimation

BOM Estimation

Bidding and Tendering

QA/QC Checker
MUSA AYUBA MUSA
[QUANTITY SURVEYOR]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Material Requisition

Costing and Evaluation

E.M.S Associates Kaduna, Nigeria

Consultant June, 2014 – December, 2014

Achievement

Gained practical and detail experience about the working relationship between the
consultants and contractors in the construction industry.

Languages:

English, Hausa and Yoruba

Interests and activities:

Reading computer books about latest technology, listening to soft music, playing and
watching soccer.
MUSA AYUBA MUSA
[QUANTITY SURVEYOR]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Executive Summary
A Performance driven Civil/Structural Engineer and a Project management professional with over 22
years’ experience. Committed to project delivery through strong leadership and relationship – building
skills.

15+ years experience on a variety of oil & gas engineering, petroleum product storage and hazardous
waste storage facilities projects.

Sound knowledge of Civil & Structural Engineering principles, codes and standards, and the ability to
reflect these in Brownfield & Greenfield engineering projects.

Short courses/trainings in Finite Element Analysis, Offshore Platform Design, Project Management,
Safety & Security.

Progressively responsible for site visits to gas plants, onshore/offshore facilities locations, and broad‐
based responsibilities in equipment support structures design.

Demonstrate ability to build long‐term relationships and determine cost‐effective solutions. Exceptional
computer skills including spreadsheet programming and modeling

Core Qualifications
Project Management/ People Management

Construction Management Team Building

Civil Engineer Contract Negotiation

Operations Management Motivation

Professional Experience
 LEAD ENGINEER/ CIVIL/ENVIRONMENTAL ENGINEERING CONSULTANT, (SOLENIN NIGERIA
LTD) 04/2016 – TO DATE

SPDC/Pan Ocean Oil/Newcross Exploration & Prod Ltd OML 24 Creeks Rivers Nigeria

Bund walls design and construction

Preparation of Foundation Layout Drawing and Detailed drawings.

Development of roof beam layout and roof beam details

Operations Management

Development of bar bending schedule


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Pre-Dredge survey

Post Dredge survey

Batrimetric Calculation

Preparation of roof thrust layout and roof thrust details and roof thrust connection details

Generation of steel column and elevation drawings

Generation of roof plan drawings and tank elevation drawings and sections

Root pipes connections and routing.

 Manager, Operations & Project Management (Amalgamated Oil Coy. Nig Ltd) 11/2015 –
04/2016

Drilling Locations Preparation DL1, DL2…….DL11 OPL 452 Oron, Akwa Ibom, Nigeria

Supervises operations involving over 100 personnel

Geophysical Survey works

Monitoring Evaluation and learning of location preparation

Seismic works

20km Access road construction to Drilling Locations over

Location preparation for rig movement

Levelling Compaction cut & fill calculation

Drilling Location Stabilisation

Cellar Slab, Cellar Pit, Mud Tank, Cutting Pit, Waste/Auxiliary Pit Gen Slab etc

 General Manager, Operations & Projects (Prime Devco Nig Ltd) 04/2014 to 06/2015

Nigerian Mining Company Ltd Abakaliki, Ebonyi Nigeria

Project Title Pb Zn Mining Plant Construction

Supports the CEO in providing strategic direction and guidance for team to achieve company’s vision, mission
and objectives i.e. Contractor compliance with contract terms and conditions

Prepare, schedule, coordinate and monitor the assigned engineering projects & Operations

Managed Team of 10 Professionals


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Served as mentor to junior team members

Increased profits by developing, initiating, and managing construction method using Work Brekdown Structure
WBS

Headed Technical / Budget meeting

Implemented bonuses as motivations for good operational output

Support the Project monitoring especially in validation of milestones achieved

 General Manager, Operations & Projects (Prime Devco Nig Ltd) 01/2012 to 10/2013

Nigerian Gas Plant Kwale Delta, Nigeria

Project Title Facility Upgrade Kwale Gas Plant

Project/Operations/Logistics Planning for facility upgrade

Oversaw general project operations personnel, Equipment, Materials, Waste management, Safety HSE

Increased profits by developing, initiating, and managing construction method using WBS

Contract Management

Labor Negotiation and Managemnt

 General Manager, Operations & Projects (Prime Devco / Baklang Group) 01/2011 to
01/2012

GE VETCO GREY Port Harcourt, Nigeria

Project Title SCP Facility Construction Project Onne

Developed strategy and business plan for Tendering

Project Negotiation for SCP Facility Construction Project

Initiated methods for construction works / operations management

 Project Manager (Chemtronics) 04/2010 to 09/2011

Ministry of Niger Delta Affairs Abuja, FCT Nigeria

Project Title Niger Delta Skills Acquisition Centre

Project Management / Consultancy Niger Delta Acquisition Centre Nigeria

Consulted as third party

Monitored Logistics/operations and Project Progress


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Analysed Project viability/ Work estimates etc

Operations management/ financial management issues - Strategic solutions offered.

 Project Manager (Prime Devco/ Emmanuella Consulting) 04/2010 to 09/2010

Rivers State Ministry of Environment. Semi Mechanised Landfill Proj. Oyigbo Port Harcourt ,Nigeria

Project Title Waste Management/Semi Mechanised Landfill Project

Project Management / Construction/Operations/Consultancy

Designed, constructed semi mechanised Landfill with retaining walls etc

Managed over 70 workers both skilled and unskilled i.e constr/laying & sewing joint of terram sheet/etc

Designed/Constructed Leachate ponds, underground leachate piping for water and gas/

Monitored Logistics/operations and Project Progress

Analysed Project Output

Recommended strategic solutions.

 Lead Engineer / Construction Manager (Prime Devco Nig Ltd) 02/2010 to 06/2010

Niger Delta Development Commission NDDC Port Harcourt, Rivers Nigeria

Design and construction supervision of Road 10km

Increased Profits by developing, initiating, and managing construction works

Achieved early completion / delivery period

Inspired and motivated construction crew

Served as mentor to junior team members

 Construction Project Manager (Prime Devco / Baklang Group) 09/2008 to 10/2009

GE Oil & Gas Infrastructure Omoku Port Harcourt Rivers Nigeria

Project Title Design and Construction of GE Workshop Office Warehouse at NAOC Gas Plant

Managed Team of over 70 personnel skilled and unskilled of multicultural races.

Reduced and controlled expenses by initiated cost controlled department

Initiated Construction Methods


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Spearheaded operations start up.

Instituted internal checks and controls on construction output.

Achieved early completion project duration time of 18 months.

 Lead Engineer (Prime Devco Nig Ltd) 10/2006 to 01/2008

Nigerian LNG Ltd Port Harcourt Rivers, Nigeria

Project Title Quay Side Construction

Managed team of 42 personnel skilled and unskilled

Achieved zero Lost Time Injury LTI on Quayside works

Achieved success in a brown field project

Developed method statement for construction

 Lead Engineer (Prime Devco Nig Ltd) 04/2005 to 10/2005

Amni Petroleum Dev. Company Ltd Aisa Craig Offshore Port Harcourt Rivers Nigeria

Project Title FPSO Water Ballast Tank Repairs

Achieved corrosion / dent repairs on FPSO Water Ballast Tank

Provided on site training for Project crew for strategic repairs on FPSO Water Ballast Tank

Ensured safety for a confined space work

Managed Live work environment (brown field) with zero Lost Time Injury LTI

 Lead Engineer (Prime Devco / Weco / Harliburton) 09/2003 to 03/2004

Nigerian Agip Oil Company Ltd Obite Port Harcourt Rivers, Nigeria

Project Title Idu Piping Construction at Idu Flowstation

Proposed budget in house for project activities

Coordinated all Piping activities on the field

Prepared welding, Pipe joint, MPI reports

Represented Client on Technical issues

Managed Project operations (Logistics)

Proposed for NDT Non Destructive Testing


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Established good community relations with host community

 Team Leader (Prime Devco / Ofram Dovam) 02/2001 to 05/2002

Nigerian LNG Ltd Bonny Island Port Harcourt Rivers Nigeria

Project Title Foundation Construction for Heavy Duty Workshop

Achieved first indigenous Team for early delivery and Quality project for the project

Developed construction methods

Represented Ofram Dovam in Technical, Negotiation matters with the client NLNG

Proposed method of dewatering underground water table through suction pressure pump days before
construction operations commenced.

Initiated double working hours and double teams viz 8am to 6pm and 8pm to 6am for early completion.

 Head Internal Control, Technical Leader, Project Engineer (Pet Jibson Nig Ltd) 02/1997 to
03/2000

Nigeria Agip Oil Company Ltd Omoku Port Harcourt Rivers Nigeria

Project Titles Upgrades of #23 Oil well Locations, 15km road construction at OBOB, access location roads,

A comprehensive water project scheme for Akri community

Comprehensive water scheme project for Rivers State University of Science & Technology

Monitored the Upgrade construction works on Mbede 23 Oil fields construction, Oil location access roads and
Water scheme project.

Prepared project take off budget

Initiated cost tracking system for work stages WBS

Handled all Technical Matters

Prepared schedules for projects

Identified Project details and communicated same to project crew.

Ensure hitch free day to day construction works by the project Engineer

Documented field reports and field instructions memos etc.

Prepared Technical and commercial proposal Tendering

Managed, Supervised field operations


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

 Technical Superintendent (Elshcon Oil Service Company) 09/1996 to 01/1997

Shell Petroleum Dev Company Ltd Buguma Flowstation Port Harcourt Rivers Nigeria

Project Title Bundwall Construction at Buguma Flowstation

Established detailed Project Supervision procedure for Shell Facility

Ensure Day to Day field construction activities

Coordinated all field construction activities

Created Project retreat weekend to review and refresh on project matters

Prepared, monitored construction methods

Initiated Quality / Safety / Environmental audit

 Technical Superintendent (Elshcon Oil Service Company) 04/1996 to 06/1996

Shell Petroleum Dev Company Kolo Creek Bayelsa Nigeria

Project Title Facility Upgrade at Kolo Creek

Established detailed project supervision procedure for Upgrade

Ensured day to day field construction management

Coordinated all field construction activities

Created Project retreat for review and refresh on project matters

Prepared, monitored construction methods

Initiated Quality/Safety/Environmental audit

 Senior Operations Engineer (Weco Engineering) 05/1993 to 04/1996

Chevron Nig Ltd, Nigerian Agip Oil Company Ltd Port Harcourt Rivers Nigeria

Project Titles Construction of 4 Swamp flowline viz Utonana, Makaraba, Abiteye, Robertcreek flowstation, 2 nos
Opuekeba Production Platforms Deck Construction, Fire Fighting Installation Project (NAOC)

Initiate Project Planning and take off for Offshore/Swamp flow line construction

Established structural detailing work for production platform deck construction

Coordinated Fabrication activities for production platform deck construction

Monitored welding activities


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Ensured welding joint assessment i.e. NDT / MPI

Initiated project reporting system

Enhanced good community relationship on the project

 Senior Operations Engineer, Project Engineer (Weco Engineering) 05/1993 to 07/1994

Nigerian Agip Oil Company Ltd (NAOC) NAOC Main Base Port Harcourt, Nigeria

Project Title : Fire Fighting Installation (Construction of Tank 10,000 Cubic meters)

Under ground ring concrete Tank Foundation 4m deep x 30m diameter x 1.2m thick

Soil Test/Filling/Compaction at 150mm layers of tank foundation/Man hole construction

Pre fabrication works for Tank shell using 1200mm x 2400mm x 25mm thick Plates

Tank Base Assembly/Pre fabricated plates welding.

Plates welding Horizontal/Vertical

Use of stiffeners

Scaffolding works

Tank Calibration

Oil Tank leak test – Pressure Testing ASTM 1739-95

 Pupil Engineer (Nigerian National Petr. Corp/ NYSC) 09/1991 to 08/1992

NNPC Port Harcourt Refining Company Alesa Eleme Port Harcourt Rivers Nigeria

Ensured Project Follow up and Take off planning for Refinery Contractors

Participated as training supervisor in Tank Farm operations

Supervised minor Tank Farm roads

Represented supervisor in charge of works in Tank Farm repairs, curtailment bond wall pipeline inspection

Achieved the first work training in NNPC

Education
Monitoring & Evaluation (M&E) Course 2016

CLONESHOUSE NIGERIA ABUJA NIGERIA


OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Masters in Engineering: ENGINEERING MANAGEMENT 2013

UNIVERSITY OF PORT HARCOURT NIGERIA PORT HARCOURT RIVERS, NIGERIA

With Distinction

Top 10% of Class

4.0 GPA

Project Management Practitioner (PMP): PROJECT MANAGEMENT 2013

BRITISH SCHOOL OF PROJECT MANAGEMENT (BSPM-UK) UNITED KINGDOM

With Distinction

Top Class

87% in Project In Controlled Environment PRINCE 2

85% in Project Management

Bachelors of Engineering: CIVIL ENGINEERING 1991

UNIVERSITY OF ILORIN ILORIN NIGERIA

Certifications
Chartered Registered Engineer, Certified by Council For The Regulations of Engineering In Nigeria
(COREN)

Certified by Nigerian Society of Engineers (NSE)

Project Management Practitioner (PMP) Certified by British School of Project Management UK /


Global PMC UK/ Project Management College UK

Monitoring & Evaluation Personnel. Cloneshouse Abuja, Nigeria

Affiliations
The British Project Professional Society UK (Membership no BPP-0158-80450)

Council for Engineering Regulations In Nigeria (COREN) Registered Engineer (since 2003)

Nigerian Society of Engineers MNSE (since 2001)

Skills
OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Monitoring & Evaluation

Attention to details

Management

Motivation

Computer Proficiency

Operations & Project Engineering

Creative Problem Solving

Team Work
OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
OLAYINKA OLAWALE-PHILS (Formerly Olayinka Olaniyi-Phils)
[CIVIL/ENVIRONMENTALENGINEERING CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

PERSONAL DETAILS
DATE OF BIRTH: JULY 30, 1973
NATIONALITY: Nigerian
STATE OF ORIGIN: Akwa Ibom State
LOCAL GOVT AREA: Etim Ekpo

EXPERTISE AREAS
Financial Tracking/ Budget Control, Change management, Staff management, Project Team Mentoring, Project
planning, Project reporting, Resource management, Risk management, Product development, Contract
administration, Supply Chain Management, Process improvement, Supervising, Managing project quality, Proposal
creation, project development, and program deliverables.

PERSONAL SUMMARY
I am bright, talented and an ambitious project manager with PMI accredited
Masters of Science (MSPM) qualification in Project Management along with a 20+ quality years of experience in
Mechanical infrastructural design background. Able to produce innovative, yet realistic customer focused solutions.

Adaptable and possesses superior communication and interpersonal skills.


comparable experience of working to the highest standards. With experience of delivering clinical strategic
change at very senior managerial levels. I have a long track record of ensuring projects are delivered to the highest
quality and within budget, by effectively organizing, managing, and utilizing all resources. I lead teams
on Mechanical designs, construction, industrial, and oil and gas projects where the highest standards are routinely
demanded.

I always seek to be actively involved in all aspects of a project life-cycle to deliver high-value projects in matrixed
organizations and across different geographies. I take direction well and works hard to manage stakeholders’
expectations.

ACADEMIC QUALIFICATIONS
 2015 -2017 Walden University, Minneapolis, USA;
Doctor of Business Administration (DBA) - Project Management (In-view)
 2012 – 2013 Walden University, Minneapolis, USA;
M.Sc., Project Management (MSPM [PMI Accredited])
 2000 - 2005 University of Uyo, Uyo, Nigeria
Masters of Public Administration (MPA)
 2004 Fine Particles Software Institute, Bexhil-On-Sea, UK.
FPS Certificate (Hydro-cyclone Design)
 2003 RGU, Aberdeen, UK (Shell Intensive Training Program [SITP/1])
Post Graduate Certificate – Oil & Gas Engineering
 1995 – 1998 University of Agriculture, Makurdi, Nigeria
B.Eng. Mechanical Engineering

CURRENT JOB EXPERIENCE


2014 – Date: Kudzy Konzult Limited, Eket, Akwa Ibom State, Nigeria
Position: Snr. Advisor, Projects and Portfolios Management
Accountable for leading project teams who make sure that client requirements and
deliverables are consistently met.
Job Role:
_ Directing and guiding project managers and project teams to meet projects and
business objectives.
_ Alignment of project objectives to those of the client.
_ Alignment of strategic projects to the business strategy
_ Carrying out Business Development for the organization and enhancing
company reputation and building successful working relationship with the
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

customer/clients.
_ Delivering complex programs across organizational boundaries where there are
significant benefits and risks at stake
_ Directing personnel responsible for HSEQ, engineering, procurement,
construction, and business services, including sub-contracts, planning, and cost
control and information management.
_ Ensuring clear goals so that all project personnel are aligned to project
requirements.
_ Taking decisions on new projects initiation and business portfolios.
_ Negotiation of contracts and new business lines as well as ensuring that all
contractual requirements are complied with.
_ Establishing of effective communication and interfaces with the client, project
personnel, and other contractors within the project.
_ Carrying out oversight functions and guidance on current projects.
_ Review and management of the organization enterprise wide risk.
_ Issuing of work progress, cost, and information reports as required by the
project. Receiving and distributing all relevant communications, with adequate
guidance where action by others is required.
_ Appraisal of management of project performance against project objectives.
_ Mentoring and motivation of the project organization members of staff.

TRAINING
Organizational Leadership,
Stakeholders Management,
Management and Protection

KEY SKILLS AND COMPETENCE


Project Management attributes
_ Good track record of managing complex multifunctional projects in various
environments
_ Creating effective, informed and highly motivated teams focused on delivery
_ Implementation of contract and legal compliance
_ Track record of Project Management at a senior level with a large organization
_ Knowledge of project management tools, techniques & best practice
_ A readiness to change and a strong motivation to drive improvement
_ Strong quantitative and analytical capabilities
_ Identifying road blockers and managing a path through them
_ Comprehensive understanding of project management methodologies
_ Experience of working with sponsors, stakeholders, and solution providers
_ Successful and demonstrable delivery of results from a client site
_ Superb customer facing skills
_ Producing and delivering project documentation, e.g. user manuals and
support, project management plan etc.
_ Accurately identifying clients’ key requirements
_ Managing and supporting the testing and implementation of business
initiatives
Personal attributes
_ Possessing a responsible attitude, tact, patience, and courtesy
_ Comfortable working on numerous, smaller size pieces of work
_ Ability to operate under pressure and deliver to demanding deadlines
_ Achieving results through others
_ Able to self-start own improvement initiatives
_ Good team player
_ Capable of working under limited supervision
_ Motivating Project or Program teams to own and complete tasks assigned to them
_ Conflict management and prioritization skills
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

Professional attributes
_ Ability to assimilate lots of information and present it in a concise and
structured way to aid key decision making
_ Knowledge in developing and administering resource plans and budgets
_ Strong verbal and written communication skills
_ Computer literate, with high level of competence in the use of the Microsoft
Office suite of tools, including Microsoft Excel/PowerPoint/Visio/Project.
_ Full systems development lifecycle experience from requirements gathering
through work scope management to project close-out.

ADDITIONAL SKILLS
PROFESSIONAL:
Project management
Mechanical engineering
Civil engineering structures
Geotechnical engineering
Oil and Gas Processing
Corrosion engineering
Metallurgy
Instrumentation and control

ENGINEERING SKILL
Project Engr. /Subsea Engineer/ Cost Engineer / Construction Engr./ Schedule Engineer/ Maintenance Engr./
Rotation Engr. / Piping Engr./Design Engr./ Planning Engineer/ Piping Engr./ MS Project / Plant Design Management
System (PDMS) / Primavera P6.
Key Skills
o Able to drive through project/business goal, ensure implementation plus performance measurement against
target in subsea construction in pipelines, risers, platforms, and flowlines
o Able to challenge poor performance, provide formative feedback, develop improvement plans and implement.
Knowledgeable in the use Primavera 06 and Microsoft project planner.
o Have in-depth knowledge of standards and codes - ISO, AWS, ABS, DNV, ASTM, ASME, BS, API, NACE, ANSI,
etc, applicable in onshore and offshore design and installation of facilities in the oil and gas, energy and power
sectors.

WORKING EXPERIENCE
Solenin Nigeria Limited (Nov. 2015 till date)
Designation: MECHANICAL ENGINEERING/PROJECT
MANAGEMENT CONSULTANT
o Mechanical Design
o Pipeline Engineering Design
o MTO/BOM
o Stress Analysis
o Plant Model Design
o Project management processes and procedures
development.
o Project performance measurements and audits.
o Project mentoring and leadership.
o Project planning and scope development, schedule development, cost baselining, quality and risks
management. o Project management office growth mentoring.
HirevOil Ltd – Site Rep./Engineer (Oct. 2013 – Oct. 2015)
Construction of a 50,000BPD Modular Petroleum Refinery
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

o Act as main technical adviser on site for subcontractor, crafts people and operatives. Advise on technical and
project engineering or create same in the absence to ensure project delivering meet acceptable industrial
standards.Assess designs, construction procedures/activities, protection and materials to
ensure
compliance with prevailing industrial standards (API-620, API-650, API-651, etc.) in construction of thirty
(30) large low pressure storage tanks (2000CUM and 5000CUM) for crude oil and refined products.
o Verify/Validate piping designs, drawings (PFDs, P&IDs, isometrics, etc.) submittals for construction,
fabrication/weld procedures/activities in accordance with regulatory guidelines and prevailing industrial
standards
(ASME B31.3) for crude and product transportation.
o Ensure work package costs do not exceed set thresholds, Milestones are met, risks are managed and technical
issues are quickly resolved in order to track and monitor project budget.
o Review designs, supervise and manage constructions according to set down project plans and standards in
the construction/installation of refinery modules, pumps, turbines, warehouses, Canopies, loading bay,
treatment plant, etc.

Morpol Engineering Services Nigeria Limited- Site coordinator/Lead Engr. (Apr. 2011-Nov 2011)
Erection and installation of a Single Super Phosphate (SSP) plant and equipment dis-assembled from
Offenbach Germany within a footprint of 14m X 14m and 45m high.
o Assess requirements, recruit/procure, develop, mentor & manage the performance of all project resources,
whilst assuring optimum utilization.
o Provide development of construction plan, plot plan, equipment layout, piping routing, piping isometric, pipe
support design, field mapping, and system schematics.
Carry out preliminary project risk assessment to identify and assess risks and uncertainties associated with
o project
implementation and develop risk management plan and mitigation strategies for areas under consideration.
Construction of a 24” over 23KM gas pipeline
o Verify pipeline grades, sizes and wall-thickness for the various fluid/material transporting systems and verify
pipelines against design and code requirements for installation, commissioning and operation.
o Prepare material take off (MTO) and compile necessary requisition information for the procurement of
materials

EmeryPro Consultancy Nig.-Principal Consultant (Nov. 2009 – Apr 2011)


o Project management processes and procedures development and Project performance measurements and
audits. o Project planning and scope development, schedule development, cost baselining, quality and risks
management.
Rockson Engineering PH- Site Manager (Dec. 2007 –Nov. 2009)
o Interface with the various disciplines for project construction, installation, pre-commissioning and testing of
equipment/machines in the construction of 75MW Power Station.
o Evaluate reports and document submissions; liaise with clients, contractors, manufacturers and components
suppliers.
o Monitor verifiable activities/task against schedule and compile reports and appraisal.
o Formulate and develop conceptual project engineering design into functional scopes of work in power plant
installation.
o Provide functional guidance to the company’s engineering contractor(s) on engineering, design and
construction matters to ensure that work quality is implement to international standards, produced in a timely
and cost effective manner.
o Anticipate, identify future project’s requirement and constraints with a view to effectively manage and
optimize manpower, equipment and material use in order to meet project target.
Rockson Engineering PH – Mechanical Superintendent (Jun 2003-2007)
o Install 4 X 25 MW GE Turbines including ancillary and Balance of Plant involving Compressor, Gas skid, Fire-
Fighting system and others.
o Ensure quality management of work by focusing team on achievement of milestones, key project objectives,
design specifications and engineering standards.
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

o Effectively manage assigned budget by monitoring cost aspect of the project within direct control to forecast
final costs, identifies trend and take actions to avoid cost overruns.
o Coordination of heavy lift (80-200 tons) of equipment involving transportation and skidding unto foundation base.

o Create and develop project plans, tasks with designated time-frame, apportioning resources, track progress,
monitor and control all aspect of mechanical project schedule with a view to meeting set target.
o Installation of MS5001 Simple-cycle, single-shaft Nuevo Pignone gas Turbines with rated capacity of 26MW at
ISO conditions and auxiliary equipment comprising inlet filters units, exhaust units, ventilating air units, lube
oil
cooling units, oil vapour separator units, gas scrubber units, compressor units, Gas skid unit, fire-fighting
pump unit and other.
o Ensure all weld work involving welding procedure specification (WPS), Welder Qualification test (WQT),
Procedure Qualification Record (PQR), NDT and NT tests, meet all relevant standards construction
specification (B31.3, AWS, D1.1,API104) and are in consonance with ISO 9001.
o Undertook pre-commissioning, commissioning and start-up MS 5001 NouvoPignone gas turbine.
o Utility piping involving Gas piping, drain piping, instrument/ service air piping, fuel piping, oil piping, fire
fighting water piping with fittings (ball valves, gate valves, check valves, butterfly valves, ESD, psv, flanges,
etc) , as well as NDT testing to confirm integrity of welds.
Rockson Eng. PH –Maintenance Engineer (Technical Assessment of Sapele Power Station-March 2004)
Technical assessment of Sapele Station with a view to highlight the requirement for a complete revamping of
all machines and equipment, consisting of:
6*120 MW BBC (ABB) steam Turbines and 4*75 MW BBC (ABB) Gas Turbines.
6 boilers (Babcock) with individual capacity of generating High Pressure (HP) 4.35m 3 steam at 120
0C, 181 bar and Low Pressure (LW) 4.05m3 steam at 120 0C, 28 bar.
Ancillary equipment including boiler feed pump, water treatment plant, deaerator unit, booster
pumps, FD fan drives, condensate extraction units, lubricating oil coolers, etc.
Rockson Eng. PH –Operation & Maintenance Eng. (Feb. 2003 – Jun. 2003) Solar Mars 100 Gas turbines
(3*12WM)
o Diagnostic routine maintenance checks through boroscoping of hot gas path, inspection of compressor rotor
vanes, exciter plug, nozzles, etc.
o Carried out scheduled engine compressor ingestive cleaning as at when due to recover recoverable
degradation and ensure optimum performance of system.
o Undertake planned maintenance tasks such as retro-fitting of damaged parts
o Undertook planned scheduled in-shop inspection and maintenance with intent to recover non-recoverable
degradation ( Nozzles, fuel injectors, ignition exciter, torch igniter, igniter plug, magnetic pick-up, bleed
valve,
variable vane system, thermocouple intergrity.
o Operational duties involving control and routine diagnostic task on 11kv 50Hz switchgear panels (6 nos.),
33kv switchgear panel (12 nos.) at 3000A rated bus bar, a 33kv feeder breaker (3 nos.) and incomer breaker
(2 nos.), a 28MVA 11/33KV step up transformer (3 nos.), a PLC load management system, revenue meter,
import and export control facilities as well as synchronization of blackstart voltage with turbine voltage output
prior to switch over and to maintain all three turbine voltage.

Computer Skills
Microsoft Office (Word, Excel, PowerPoint, Access, CorelDraw, Arts and
Software Application: Letter
AutoCAD, MS Project and Primavera P6 Project Planners.
Operating System: MS-DOS, Windows ‘98’ Novel Netware: UNIX
Programming
Language: FORTRAN, BASIC, C++, AND Dbase.
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com
AKPOHO, Uduakobong Willie
[MECHANICAL ENGINEERING/PROJECTS MANAGEMENT CONSULTANT]
321 PH/Aba expressway, Port Harcourt, Rivers State, Nigeria
Phone 1: +234 813 221 8499 snlenergyservices@yahoo.com

S-ar putea să vă placă și