See Para 7.4
4. Summary of the Project Proposals scrutinized indicating district wise road details of length and cost. The
summary including the No. of Packages and total value.
5. Whether schedule for scrutiny was fixed in advance (give details) and difficulty in adhering to schedule.
6. Actual scrutiny process and time taken for scrutiny (please indicate the datas).
9. Reliability of data obtained through investigation and used in the design / estimation.
10. Compliance of the provision / instructions give in the guidelines/circlars/operation manual/IRC codes etc. in
the preparation of DPRs including Environmental/RR/Road safety aspects etc.
11. Levels of response from the Senior Engineers of the Executing Agencies for the suggestions given by the
STAs for revision/modification in the DPRs.
12. If DPRs outsourced, perceived level of competence of outsourced consultants and suggestions.
13. Overall comments and impressions of the STAs, if any on the process of the preparation of DPRs and their
technical scrutiny.
Annexure-7.3
See Para 7.4
1. OR-23-265 3.75 325mm 2361.08 401803.91 4.02 562.43 382640.36 3.83 57.38 167403.62 1.67 300.94 856146.89 8.56 15300.00 893520.00 8.94 #NAME? #NAME? #NAME?
PRADHAN MANTRI GRAM SADAK YOJANA
CONTRIBUTION OF DIFFERENT COMPONENTS ON THE COST ONE KM LENGTH C.C. ROAD
Name of Division:- R.W.Division, Nayagarh
Name of Section:- R. W. Section ,Odagaon
Package Earth Work If any G.S.B W.B.M.-II Pavement Quality Concrete (M-30)
Total Cost of
Sl. No,./ Carriage Depth of
Km. of C.C.
No. Road No. Width Crust Average Amount (Rs. Average Amount (Rs. Average Amount (Rs. Average Amount (Rs.
Quantity Quantity Quantity Quantity Road
(N/U) Rate In Lakh) Rate In Lakh) Rate In Lakh) Rate In Lakh)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1. OR-23-265 3.75 330 mm 229.50 62440.06 0.62 67.50 312468.97 3.12 90.00 100683.90 1.01 60.00 0.00 0.00 4.76
PRADHAN MANTRI GRAM SADAK YOJANA
Package Summary
Name of Division:- R.W.Division, Nayagarh
0 R. W. Section ,Odagaon
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
OR-23- Nandighore
1. Odagaon A 3.75 5.40% UG 6.00 2.54 3.46 34.35 87.24 31.64 109.49 2.00 3.69 460 25.71 0.0 0.00 3.48 229.60 38.27 20.26 3.38
265 to Saliajhari
HORIZONTAL CURVE DESIGN & LAYOUT
Va (Velocity allowable)
Lc=∆/360x2πR 19.5564444
Length of transition (Ls)
S.E = 0.07
II f = (V2/(127 x R)-0.07) 0.28995501 > 0.15
Va (Velocity allowable)
Va (Velocity allowable)
Lc=∆/360x2πR 9.429
Length of transition (Ls)
CHAPTER 8
8 Alignment Design
8.1 General
The basic aim of highway design is to identify technically sound, environment-friendly and economically feasible
highway alignment. The ensuing sections deals with obligatory points, which control highway alignment, design of
cross-section, highway geometry.
The main components included in the highway design are:
Ø Cross-sectional elements
Ø Embankment
Ø Horizontal alignment
Ø Vertical profile
Ø Junctions and/or Interchanges
Ø Road furniture
Ø Miscellaneous items
8.2 Horizontal alignment
{ Insert a table (example given below) on the physical features of the existing alignment and
possible geometric improvement required }
Table 8.1 – Features of Horizontal Alignment (Example
Chainage Length Description Reason for deviation from existing
alignment, if necessary
From (km) To (km) (km)
0 0.85 0.85 Retained existing
centre line
Checklist
{Tick the relevant box}
a) Centre line of the existing and proposed horizontal alignment coincide
b) Centre line of the existing and proposed horizontal alignment deviate at certain sections
Figure
Various8.1horizontal
Schematicgeometric
diagram showing location and offsets from existing alignment
improvement
carried out and their details
Development of Junctions
No Chaina Junct Area of Description
of ge (M) ion Junctio
junc Type n
tion
s
3
3.870 Sqm
.
0
AT JUNCTION =2X0.215Xr²
M
3.0 M
Granit Products Tapanga 107
Moorum Rohibanka 14
Sand Sidhamula 68
Cement Nayagarh 20
Steel. Nayagarh 20
Bitumen bhubaneswar 107
Emulsion Paharpur 393
Hump Pipe saranakula 21
Bricks Local 5
DETAILS OF ROADS UNDER P.M.G.S.Y DETAILS OF ROADS UNDER P.M.G.S.Y
32 Column Format of Rural Works Division:- R.W.Division, Nayagarh 32 Column Format of Rural Works Division:- R.W.Division, Nayagarh
Overhead Charge-15%
Type Road Proper Works Protection Work Other Like
Total Habitation Benefited Cost of Maintenance in lakhs Traffic Data Carriage
Road of Pavement C.C. Road No. of Cost of Cost of Total Cost Average Designed Remarks
Name of the Length Traffic Way
Sl.No
Block
Package No. Code L / Name of the road Propos CD CD DPR,Km
(7+9) in
(8+10+12+ Cost Per Total Cost of No. of C.B.R.
Category width in Value
Remarks TOTAL
T al Length Length Works Works Stone Misc. 14+15) KM 1st 2nd 3rd 4th 5th 6th COST
Cost Cost Length in M Cost km Name Population Maintenance Motorised ESAL m.
N/UG in km in km etc. Year Year Year Year Year Year (20 to 24) Vehicle
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 24 25 26 27 28 29 30 31 32
Waste
plastic-
Nandighara,Go
2.54
Nandighore to udaputa,Bandh
1. Odagaon OR-23-265 T-01 UG 2.54 95.25 3.46 122.62 460.00 28.79 2.00 4.13 6.36 6.00 257.15 42.86 6873,, 2.89 3.47 4.052 4.63 5.21 0 20.26 192 308674 T6 3.75 5.40% km,Panell 277.41
Saliajhari asahi,SALIAJH
ed
ARI,Tikarpali,,
concrete-
3.46 km
Overhead Charge-12.5%
Type Road Proper Works Protection Work Other Like
Total Habitation Benefited Cost of Maintenance in lakhs Traffic Data Carriage
Road of Pavement C.C. Road No. of Cost of Cost of Total Cost Average Designed Remarks
Name of the Length Traffic Way
Sl.No
Block
Package No. Code L / Name of the road Propos CD CD DPR,Km
(7+9) in
(8+10+12+ Cost Per Total Cost of No. of C.B.R.
Category width in Value
Remarks TOTAL
T al Length Length Works Works Stone Misc. 14+15) KM 1st 2nd 3rd 4th 5th 6th COST
Cost Cost Length in M Cost km Name Population Maintenance Motorised ESAL m.
N/UG in km in km etc. Year Year Year Year Year Year (20 to 24) Vehicle
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 24 25 26 27 28 29 30 Waste
31 32
plastic-
Nandighara,Go
2.54
Nandighore to udaputa,Bandh
1. Odagaon OR-23-265 T-01 UG 2.54 93.336 3.46 120.1589 460 28.21 2 4.0481 6.23 6 251.98 42.86 6873,, 2.84 3.40 3.97 4.54 5.11 0.00 19.85 192 308674 T6 3.75 5.40% km,Panell 271.83
Saliajhari asahi,SALIAJH
ed
ARI,Tikarpali,,
concrete-
3.46 km
Length in Km
Stage
Sl Package L Route/T Carriageway
District Block N/U I/Stage Name of road
no No route No width in m
II/Complete CC
1 2 3 4 5 6 7 8 9 10
OR-23- Nandighore to
Nayagarh Odagaon T-01 3.75 U 3.46
265 Saliajhari
Note : All earth work cost for pavement including cutting, filling, scarifying, earthwork for earthen drain, shoulder e
Sub Base - GSB or gravel soling for pavement
Base - WBM Gr II, III and WMM
Surfacing - Prime coat, Tack coat, PC with SC
If more than 6 m span slab culvert / box culvert, details of such CDs (no and cost) may be provided in the remark
Component wise cost of roads proposed
CD works
Length in Km Cost of pavement (Rs in Lakhs) Pucca drain
Hume pipe
CC
Earth Sub Surfacin Cost per Length
BT Total Base paveme Total Cost Nos
work base g Km in M
nt cost
11 12 13 14 15 16 17 18 19 20 21 22
2.54 6 #NAME? 10.89 29.12 25.42 122.62 #NAME? #NAME? 0.00 0.00 2.00
C
may be provided in the remarks column
Cost in Lakhs
CD works
Minor bridges Protection work
Hume pipe Slab culvert Total Traffic
Road
Others Total Cost per categor
Span in Lenth in furnitures
Cost Nos Cost Cost Cost Km y
m M
23 24 25 26 27 28 29 30 31 32 33 34
4.13 0.00 0.00 0.00 0.00 460.00 28.79 2.46 3.90 #NAME? #NAME? T6
Cost in Lakhs
Remark
CBR
s
35 36
5.40%
FORMAT F-9A
1. a). Certified that the Land Width for the Road is available and that no additional land is required; or
b). Certified that land width for the Road is likely to be available as certified by the Panchayats.
2. a). Certified that no forest land is involved along the entire road way; or
b). Certified that the case for permission under Forest conservation Act has been moved to the Forest
Department on Dated and File or Case no.
Executive Enginer
Head of PIU.
Superintending Engineer
Central Circle,
COMMUNITY CONSULTATION CHECK LIST - ENGINEERING
Cost Estimate of the project has been framed amounting to Rs. 277.41 Lakh to meet the
probable cost for construction of the road with flexible and rigid pavement under the package.
TOTAL 277.41
A. Nandighore to Saliajhari
to improve all curves. Horizontal curves have been designed for a design speed of 40 km / hr with appropriate
transition curves & super elevations.The maximum super elevation is 7.0% & minimum normal camber is 3.5%.
7.0 RECOMMENDATION
The following items of works have been provided in the estimate ;- Road-A (L)
1 Widening of road embankment - 2540
2 Provision of granular sub-base- 2540
3 WBM-Gr-II - 2540
4 WBM-Gr-III - 2540
5 Black topping with 20mm thick PMC and seal coat - 2540
6 Construction of 600mm single rowHPC– 0 Nos
7 Construction of 1000mm single rowHPC– 2 Nos
10 Construction of RCC Box cell Culvert- (1x4x4) 0 Nos
12 Construction of CC Road - 3460
14 Construction of Drain - 0.00
Years
Sl.No Name of the Block Maximum
2006 2007 2008 2009 2010
1 2 3 4 5 6 7 8
Certified the Rainfall Data Collected from the District Office is correct.
PACKAGE NO
DESIGN DATA
(a). Cumulative Esal applications 308674
(b). C.B.R. of the sub-grade 5.40%
©. Maxmim Rainfall 1638.24 mm / year
Unconnected Habitations
Sl. Name of the Total No. of 250-499
Code Total Eligible
No. Block Habitations >1000 500-999 <250
Total Eligible Habitations
1 2 3 4 5 6 7 8 9 10
1. Odagaon T-01 1 ---- --- 1 1 ---- 1
2.
4. Other
Upgradation
Total=
PACKAGE NO
Name of the Road :- Nandighore to Saliajhari
Length of Road(KM):- 6.000 District:-Nayagarh
Sl. L B D
Description of item No. Quantity Unit Rate (Rs) Amount (Rs)
No. (m) (m) (m)
1 2 3 4 5 6 7 8 9 10
1. 1000mm 1Row 2 184427.04 368854.08
Analysis of Rates:-
Sl No. as per
Sl.
No.
MORD SDB for Description Units Qty. Rate (Rs) Amount (Rs)
Rural Roads
A. Construction
Activities Earth Work Cum 14960.55 161.15 2410823.43
GSB Cum 2726.06 673.75 1836686.16
WBM GR-II Cum 457.14 1692.20 773571.48
WBM GR-III Cum 764.39 2844.90 2174613.11
Prime Coat sqm 9715.50 30.23 293699.57
Tack Coat sqm 9715.50 10.50 102012.75
OGPC sqm 9715.50 141.80 1377657.90
seal coat sqm 9715.50 51.07 496170.59
CD Structure Nos 2 184427.04 368854.08
Protection wall Mtre 460 931.35 428421.68
Concrete Drain Mtre 0 #DIV/0! 0.00
Road Logo, other Road Furniture etc. 219249.97
Total
B. Maintenance
Activities (year
Wise)
1st Year 258419.16
2nd Year 310103.04
3rd Year 361786.86
4th Year 413470.68
5th Year 465154.50
Total
Note:-
1. Rate Analysis shall cover all the items such as site clearance, Eart Work, Drainage, Granular Sub Base, &
Surface Course, CD works, Traffic Signs, PMGSY Board, Logo & Maintenance activities.
2. Where Local Material is used at site and the specifications & Rate analysis are not found in BOS & SDB, for
Rural Roads, the analysis & nomenclature of the item can be suitably used based on other standarda such as
3. PWD Schedule
Completed itemsorrates
Rateincluding
or assessment based
lead for on field
carriage of observation.
materials should shown.
FORMAT F-8
Sl.N
o Chapter Description Ranking Review 1 Review 2
1. Introduction: Name of work, its status vis-à-vis master plan, core network,
priority, terrain, geography, climatic conditions, habitation(s)
served, population of the habitation(s) connected, population
(direct + indirect) served by the proposed road, land use,
predominant type of agriculture.
6. Hydrological Local drainage system plan for the area of the road, catchment
Survey: identification, data required for hydraulic design of cross
drainage works, agricultural irrigation crossings.
7. Geometric Roadway width, carriageway width, shoulders, design speed,
Design horizontal curves, vertical gradient, cross slopes, etc.
Standards:
8. Alignment Horizontal profile, vertical profile, cross sections, utilities and
Design: services, intersection layouts, road safety treatments. Existing
road alignment and proposed road alignment. Consideration of
alternative alignments, alignment improvements, bypasses.
9. Pavement Design life, design traffic and ESALs, subgrade CBR, design
Design: alternatives, embankment design, type of pavement, thickness
design, use of local materials, type of surfacing adopted, layer
wise design of the pavement along with a sketch of
dimensioned cross section indicating the pavement layers,
carriageway, roadway and road land width. Location of earth
shoulders and hard shoulders. Location of BT pavement and
CC pavement.
10. Design of Cross Types of culverts, submersible bridges, paved dips, high level
Drainage: structures, bridges, irrigation crossings, catchment and
discharge calculations, high flood level estimates and
justification for selection.
11. Protective Retaining walls, breast walls, check walls, stone pitching,
Works: turfing and planting.
12. Land Obtain existing village plans from the revenue authorities,
Acquisition: determine requirement for land acquisition, prepare plans
showing the land acquisition.
13. Utility ShiftingIT IS MANDATORY THAT A COST ESTIMATE FOR
& Relocation: RELOCATION OF UTILITIES IS PROVIDED.
Details of existing utilities and
details of new locations of utilities to be relocated, the
departments responsible for each utility, the rules pertaining to
the shifting/relocation of utilities and cost estimates for
relocation of utilities.
14. Road Safety and Details and locations of speed breakers, line markings and
Traffic edge lines, traffic advisory and warning signs, stone markers
Management: and guide posts. Audit the design at a stage when the major
conceptual and layout decisions have already been made.
Ensure that safety measures are incorporated into design,
especially when design is constrained, eg narrow carriageway
section, or speed needs to be controlled.
Sl.
No. Chapter Description Ranking Review 1 Review 2
1. Key Map: Showing the state in relation to India, district in relation to
state, and a district map showing all the blocks, with the
names of each block marked.
2. Block Road Showing the master plan and the core network and the
Map: proposed road.
3. Index Road Showing the full road to a suitable scale, topographical
Map: features like rivers, canals, streams, railway lines, villages,
market centres, other roads and legend. Alternative
alignments, alignment improvements, bypasses.
4. Plan and IT IS MANDATORY THAT ALL OF THE
Longitudinal FOLLOWING INFORMATION (AS A MINIMUM) IS
Sections: SHOWN ON THE DRAWINGS. Drawings
showing 1 km in each sheet with chainage, level information,
gradient details, horizontal and vertical curve details. Utilities
and services, intersection layouts, road safety treatments,
longitudinal drainage and drainage in built up (village) areas.
Existing road alignment and proposed road alignment.
Location of earth shoulders and hard shoulders. Location of
BT pavement and CC pavement. Obligatory points including
existing features and fixed obstacles (eg bridges, ponds,
temples, etc), existing tracks, intersections, schools and
government buildings. LARGE SCALE DRAWINGS
WHERE ALIGNMENT DEVIATES FROM EXISTING
CENTRELINE AND WHERE CLEARANCE IS TIGHT.
2. Review DPR Report chapter by chapter. Rank each as not included (0), poor standard (1), fair
standard (2) or good standard (3) in the ranking cell.
3. Review Drawings section by section. Rank each as not included (0), poor standard (1), fair
standard (2) or good standard (3) in the ranking cell.
4. DPR Report chapters 2, 5 and 18 and Drawing sections 2, 3, 4, 5, 6 and 7 are critical categories
and have higher weighting.
5. If mandatory information is not included (Report Chapters 2 & 5 and Drawing Section 4), score is
zero and DPR will not be approved.
6. Ranking less than (1), or less than (2) for critical categories, means the chapter/drawing cannot
be reviewed and the DPR will not be approved.
7. The outcome for each chapter and section will be automatically displayed. If it is CHECKED (cell
highlights green), the review continues.
8. All report chapters and drawing sections must achieve CHECKED status to proceed to check the
overall score.
9. If any report chapter or drawing section does not achieve CHECKED status, the DPR will not be
approved and the overall score will not be checked.
10. If the Total Score is not greater than 70%, the DPR will not be approved.
11. If the Total Score is greater than 70%, the decision will automatically be APPROVED (cell
highlights green).
12. Only when all review cells give result of CHECKED and APPROVED (all review cells highlighted
green) will the DPR be approved for issue.
DETAILED ESTIMATE
FOR
IMPROVEMENT TO ROAD & CD WORK UNDER PMGSY
PACKAGE NO OR-23-265
VOLUME - I
ESTIMATED COST:-
Part-I - Rs. 231.57 LAKHS
Part-II - Rs. 18.09 LAKHS
Add GST- RS. 29.96 LAKHS
Total AMOUNT:-Rs. 279.62 LAKHS
Prepared By :
ASIAN GEOTECH RESEARCH SERVICES
PlOT NO-4704/5004,ADIMATA COLONY,NEAR SAINIK SCHOOL,BHUBANESWAR-17
GENERAL ABSTRACT
PART - I (ROAD)
PART - II (MAINTENANCE)
Chief Engineer
Rural Works -I, Odisha
Bhubaneswar
ABSTRACT
PACKAGE NO OR-23-265
Name of the Road :- Nandighore to Saliajhari
Total Length of Road (m) :- 6000 M
Length of Flexible Pavement (m) :- 2540 M District :- Nayagarh
Length of Rigid Pavement(m) :- 3460 M Block : Odagaon
PART - I (ROAD)
1. Road Work
i). Upto BT surface from 1/040 to 2/340,2/770 to 3/270, 4/050 to 4/590,5/800 2540 Mtrs. Rs. 8723755.23
to 6/000
0/000 to 1/040,2/340 to 2/770,3/270 to 4/050,4/590
ii). Concrete Road to 5/800 3460 Mtrs. Rs. 10948538.34
Rs. 22242823.67
2. Cross-Drainage Structures
i). 1000mm dia Single Row At RD-4/857,5/338,5/618,,,,, 2 Nos Rs. 368854.08
Total Nos. of C.D 2 Nos Rs. 368854.08
PART - II (MAINTENANCE)
5 Maintenance of Road for five years
i). 1st Year 6 km 43069.86 Rs. 258419.16
ii). 2nd Year 6 km 51683.84 Rs. 310103.04
iii). 3rd Year 6 km 60297.81 Rs. 361786.86
iv). 4th Year 6 km 68911.78 Rs. 413470.68
v). 5th Year 6 km 77525.75 Rs. 465154.50
1
Scarifying the existing bituminous road surface to a depth of
150mm (By Mechanical means) and disposal of scarified
material with a lift upto 3m and lead upto 1000m as per
technical specification clause 301.4 of MoRD & as per
direction of the Engineer-in-Charge.
Considering 70% area 5334.00 Sqm 6.70 35737.80
2
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled material,
6.75 Cum 390.48 2635.74
disposal of unserviceable material and stacking the serviceable
material with all lifts and lead as per Technical Specification
Clause 202 of MoRD by manual means & as per direction of the
Engineer-in-Charge.
3
Construction of embankment with approved material obtained
from borrow pits and transporting to site with all lifts & leads,
spreading, grading to required slope and compacting to meet
12389.31 Cum 192.04 2379243.09
requirement of Tables 300.1 and 300.2 as per Technical
Specification Clause 301.5 of MoRD & as per direction of the
Engineer-in-Charge.
4
Construction of embankment with approved materials deposited
at site from roadway cutting / excavation of foundation of CD
sturctures, retaining walls, drain etc. by mechanical means
1110.42 cum 28.44 31580.34
graded and compacted to meet requirement of Tables 300.1 and
300.2 as per Technical Specification Clause 301.5 & MORD
clause 301.5 as directed by Engineer in charge.
9
Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification Clause
305 and 1104 of MoRD includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious 666.75 cum 272.07 181402.67
material and disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material upto
3mt. as per direction of Engineer-in-Charge.
10
Construction of Granular sub-base by providing well graded
material of moorum and sand admixture to required proportion,
spreading in uniform layers with grader on prepared surface,
mixing by mix in place method if required with rotavator to
1428.56 cum 680.34 971906.51
achieve P.I value less than 6 and compacting at OMC with
smooth wheel roller to achieve the the desired density complete
as per technical specification clause 401 of MoRD for rural
roads and as per direction of Engineer-in-Charge.
Sl. Amount
No. Items Quantity Unit Figure Words
12
Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening to fill-up
the interstices of coarse aggregate, watering and compacting to
the required density as per Technical Specification Clause 405
of MoRD by mechanical means and as per direction of the
Engineer-in-Charge.
a.
Grading No. -II (63-45mm size) with crusable screening like
145.74 Cum 2917.56 425205.19
moorum and sand admixure
14
15
13. Providing and laying seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using
Type C as per Technical Specification Clause 510 of MORD 9715.50 Sqm 51.07 496170.59
with VG-30 grade bitumen & as per direction of the Engineer-
in-Charge.
Sl. Amount
No. Items Quantity Unit Figure Words
16
17
Earthwork in excavation of foundation of structures upto 3 m
depth in ordinary soil as per drawing and technical specification
Clause 305.1(11.1) includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious 1246.03 Cum 272.07 339007.38
material and disposal upto a lead of 50m, dressing of sides and
bottom and backfilling with approved material and as per
direction of the Engineer-in-Charge.
21
28
Providing and laying reinforced cement concrete NP3 pipe for
culverts jointing with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry
works in head walls and parapets as per Clause 1100 of MoRD
& as per direction of Engineer-in-Charge.
30
Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the 184 Nos. 135.02 24843.68
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing
31
32
33
34
i) 900mm equilateral triangle ( turn & reduced carriage way ) 10 NO 1638.31 16383.10
Total in Words
Executive Engineer
Rural Works Division,Nayagarh
ABSTRACT
Name of the Road :- Nandighore to Saliajhari
Total Length of Road (m) :- 6000 M
Length of Flexible Pavement (m) :- 2540 M District :- Nayagarh
Length of Rigid Pavement(m) :- 3460 M Block : Odagaon
PART - I (ROAD)
1. Road Work
i). Upto BT surface from 1/040 to 2/340,2/770 to 3/270, 4/050 to 4/590,5/800 2540 Mtrs. Rs. 9770605.86
to 6/000
0/000 to 1/040,2/340 to 2/770,3/270 to 4/050,4/590
ii). Concrete Road to 5/800 3460 Mtrs. Rs. 12262362.94
Rs. 24911962.51
2. Cross-Drainage Structures
i). 1000mm dia Single Row At RD-4/857,5/338,5/618,,,,, 2 Nos Rs. 413116.57
Total Nos. of C.D 2 Nos Rs. 413116.57
PART - II (MAINTENANCE)
5. Maintenance of Road for five years
i). 1st Year Rs. 262893.49
ii). 2nd Year Rs. 322914.35
iii). 3rd Year Rs. 380164.24
iv). 4th Year Rs. 642185.34
v). 5th Year Rs. 862469.99
Package Summary
overhead charges 15%
PACKAGE NO OR-23-265 State:-ODISHA . District:- Nayagarh Cost Rs. In Lakh
No. of Cost of
Type of Proposed Cost of
Name of the Road CD Cost of CD works Protection Misc. Total estimated cost Average cost per Km.
Sl. Name of the proposal length pavement Works
works
No. Block
Rs Rs.
From To *N/U Km Rs. Nos. Rs. Rs. Rs.
Constn. Maintaince Constn. Maintaince
1. Odagaon Nandighore Saliajhari U 6.000 220.33 2 4.13 28.79 3.90 257.15 20.26 42.86 3.38
TOTAL 6.000 220.33 2 4.13 28.79 3.90 257.15 20.26 42.86 3.38
No. of Cost of
Type of Proposed Cost of
Name of the Road CD Cost of CD works Protection Misc. Total estimated cost Average cost per Km.
Sl. Name of the proposal length pavement Works
works
No. Block
Rs Rs.
From To *N/U Km Rs. Nos. Rs. Rs. Rs.
Constn. Maintaince Constn. Maintaince
1. 2540 Nandighore Saliajhari U 6.000 215.55 2 4.04 28.17 3.82 251.57 19.82 41.93 3.30
TOTAL 6.000 215.55 2 4.04 28.17 3.82 251.57 19.82 41.93 3.30
DIFFERENECE 5.58 0.44
Total Estimated cost of the package : Rs. 277.41 Lakhs
*N-New connectivity *U-Upgradation (UG)
7. a). Whether the Proposed Road has the desired carriage way with, Roadway width and
Road Land Width (RLW). YES / NO
b). Indicate the actual widths of the following for the Proposed road. In the Built Up Area(m) In the open Area (m)
District : Nayagarh
State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded
From 5.00Hrs.
To 9.00 Hrs. 4 21 2 3 3 0 3 3 0 0 0 0 31 3 0 0
From 17.00Hrs.
To 21.00 Hrs. 5 21 4 3 4 0 3 2 0 0 0 0 21 4 0 0
District : Nayagarh
State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded
From 5.00Hrs.
To 9.00 Hrs. 4 21 2 2 4 0 2 3 0 0 0 0 38 2 0 0
From 17.00Hrs.
To 21.00 Hrs. 5 37 3 4 4 0 4 4 0 0 0 0 31 3 0 0
District : Nayagarh
State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
Hour wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded
From 5.00Hrs.
To 9.00 Hrs. 5 26 3 3 2 0 3 2 0 0 0 0 25 3 0 0
From 17.00Hrs.
To 21.00 Hrs. 4 28 4 5 4 0 5 4 0 0 0 0 26 4 0 0
There is only one harvesting period in a year for which the post harvest traffic occurs only once a year. Which is normaly a
post harvest traffic period in a year .
It is informed by the local people that the lean traffic during non harvesting season will be about half of that in post harvest
traffic. Also it was known locally that the post harvest traffic period last for about 75 days in a year in which it takes about 20% of time to
built from lean to peak and then rremain at its peak for 20% of time and then recedes to lean traffic again in 20% of post harvest traffic
period.
The Traffic Survey yielded the following results for the Average Daily Traffic.
Car, Jeep, Van, Three Wheelers = 18
Motorised two Wheelers = 104
Pick up / Vans = 12
Trucks = 30 L UL OL
Agricultural tractors/ Trailers = 28 MCV 14 14 0
Buses = 0 HCV 14 16 0
Cycles = 127
Cycle Riksaw = 13
Animal Drawn Vehicles = 0
(Motorised and Non-Motorised/day) = 331
B). TRAFFIC (ESAL) CALCULATIONS:
Computation of the Design Traffic Parameter
Average daily traffic = 331
From the above T = Average daily traffic in lean season = 330
Post harvest traffic period factor
Durarion of peak period (t1) = 75 days t2 = 0 days
No of times traffic in peak period than in lean period n1 = 1 n2 = 0
(0.6 n1 x T x t1) +(0.6n2 x T x t2)
AADT = T + = 371
365
Before opening of road to traffic AADT after 1 year (cosidering construction period as 1 year) ,
assuming initial growth rate @6% AADT = 371
(1.06)2 417
From the above traffic count data, the proprtions of HCV and MCV out of the AADT work out as under
14
Laden HCV (Truck & Bus) = 417 18
330
16
Un-Laden HCV (Truck & Bus) = 417 20
330
0
Over Loaded HCV (Truck & Bus) = 417 0
330
14
Laden MCV (Mini Bus /Tractor) = 417 18
330
14
Un-Laden MCV (Mini Bus/ Tractor) = 417 18
330
0
Over Loaded MCV (Mini Bus / Tractoar) = 417 0
330
Taking VDF value as per para 3.4.4 of IRC-SP-72, the ESAL application per day
To= 18 2.86 20 0.31 0 0 18 0.34 18 0.02
0 = 0 64.16
Assuming a uniform traffic growth rate of 6% over 10 years cumulative ESAL applications(N)over the design life will be as
per the formula (as per IRC SP-72)
To x 365 x (1+0.01 r)n x L
N =
0.01 r
Where To = ESAL per day = number of commercial vehicles per day in year of opening X VDF, and L= lane distribution factor, L=1 for
single lane/ intermidiate lane
= To x 4811 x L = 308674
Hence it comes under traffic category T 6 of IRC, SP-72, 2015
C). SUBGRADE STRENGTH EVALUATION:
The properties of subgraded soil given by Asian Geatech Research Services is attached.
It was observed from the field and also local inquary that the ground water table at various points on proposed road during or just after
rainy season was about 1.8 mtr from normal ground surface.
Shallowest water table from road surface 1.80 1.00 2.80 mtr.
PI value = 21%
Maximum rain fall of the area (collected from block office) = 1535.00 mm
As water table will within 3m of road surface and the soil is clayey type (CI), with P.I. Value= 21% (i.e. between 0 to 20%)
4 days soaked C.B.R. is considered.
Soaked CBR (4days) of subgrade in %= 0.00 0.00 0.00
Hence design CBR = 3.0% to 4.0 %
D). PAVEMENT DESIGN:
Design ESAL = 308674 T6 Category as per IRC, SP-72-2015 )
Sub-grade strength = 3.0% to 4.0 %
Design Catalogues as (given in IRC-SP-72) pavement crust is provided as follows:
Pavement crust required = 325mm
Design crust to be provided = 325mm
75 mm WBM GradeIII
As annual rainfal is 1535.00 mm, 20mm thick P.M.C. with 6mm thick seal coat surfacing has been provided.
2.5 202 Dismantling of existing structures like culverts, bridges, retaining walls
and other sturcture comprising of masonry, cement concrete wood work,
steel work, including T&P and scaffolding wherever necessary, sorting
the dismantled material, disposal of unserviceable materials and
stacking the serviceable materials with all lifts and lead of 1000m as per
Technical Specification Clause 202
DEDUCTION
i). Granular Sub-base Cum 1428.56
ii). Quantity of Earth work reused from exacavation
(70% of culverts) Cum 45.89
iii). Quantity of Earth work from roadway cutting 100%
Cum 666.75
iii). Quantity of Earth work reused from exacavation
(70% of Retaining Wall, Toe Wall & Drain)
Cum 270.48
iv). WBM Gr-II & Gr-III Cum 910.13
v). Less Earth work due to R.Wall & T.Wall Cum 0.00
Vi). PMC & SC Cum 194.31
vi). Quantity from concrete road Cum 794.07
vi). Quantity from Shoulder Cum 1297.50
Cum 5607.69
Net quantity = (Final Section - Deduction) 17997.00 --- 5607.69 Cum 12389.31
3.4 (B) With mechanical lead upto 1000m 100% Cum 12389.31 192.04 2379243.09
3.3 301.5 Construction of embankment with approved materials deposited at site
from roadway cutting and excavation from drain and foundation of other
Granular Sub-Base
Carraige way(G.S.B) Widening portion 2 2540.00 0.525 0.175 Cum 466.730
Add extra for widening 2% 466.73 Cum 9.335
2 2540.00 1.875 0.100 Cum 952.500
Cum 1428.560 680.340 971906.510
I. Providing and fixing of typical informatory sign board with Logo as per
MORD specifications and drawing. Three MS Plates of 1.6 mm thick,
top and middle plate duly welded with MS flat iron 25mm x 5m size on
back on edges. The lower plate will be welded with MS angle iron frame
of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate
and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75
mm of 12 SWG sheet tubes posts duly embedded in cement concrete
M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground
level. The top most diamond plate will be welded to middle plate by
47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows, border etc. will
be painted with ready mixed synthetic enamel paint of superior quality in
required shade and colour. All sections of framed posts and steel tube
will be painted with primer and two coats of epoxy paint as per drawing
Clause Annexure 300,800,1700 of MORD as per direction of the
Engineer in charge
I. Shifting of Electri Poles & Telephone poles Nos. 60.00 4464.29 267857.00
I. Add for prepearation for project report. L.S. Km 6.00 13392.86 80357.00
(C) 348214.00
Total :- (A+B) 8723755.2300
Sr. Claus
Description of Items Nos L(m) B(m) D(m) Unit Quantity Rate Amount
No. e No.
1 2 3 4 5 6 7 8 9 10 11
TOTAL Rs 10948538.34
Sr. Clause Nos Description of Items
Description of Items Unit Quantity Rate Amount
No. No. . L(m) B(m) D(m)
1 2 3 4 5 6 7 8 9 10 11
Junior Engineer Assistant Executive Engineer Executive Enginer
R. W. Section ,Odagaon R.W.Sub-Division, Nayagarh R.W.Division, Nayagarh
OMBAD C
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. SLAB CULVERT
Foundation
Abutments 2 × 7.40 × 3.20 × 1.50 Cum 71.04
Piers 0 × 7.33 × 1.97 × 1.50 Cum 0.00
Cut off U/S 1 × 3.50 × 1.00 × 1.20 Cum 4.20
Cut off D/S 1 × 4.50 × 1.00 × 1.50 Cum 6.75
D/S Bed 1 × -0.50 × 1.70 × 0.60 Cum -0.51
U/S Bed 1 × -0.50 × 1.20 × 0.60 Cum -0.36
CD Bed 1 × 6.00 × 3.40 × 0.60 Cum 12.24
Wing walls 4 × 1.65 × 2.52 × 1.50 Cum 24.95
Total Cum 0.00 @ 272.07 0.00
3 Providing concrete for plain / reinforced concrete in open foundation
complete as per drawing and MORD technical specification Clause
800,1100,1200 and as per direction of Engineer-in-Charge.
PCC M 10
in Foundation
Abutments 1st Step 2 × 7.40 × 3.20 × 0.20 Cum 9.47
Cut off D/S 1st step 1 × 4.50 × 1.00 × 0.30 Cum 1.35
Cut off D/S 2nd step 1 × 4.50 × 0.60 × 1.00 Cum 2.70
Cut off U/S 1st step 1 × 3.50 × 1.00 × 0.30 Cum 1.05
Cut off U/S 2nd step 1 × 3.50 × 0.60 × 0.70 Cum 1.47
Wing 1st Step 4 × 1.65 × 2.52 × 0.40 Cum 6.65
CD Bed 1 × 6.00 × 2.50 × 0.15 Cum 2.25
U/S Bed 1 × -0.50 × 1.40 × 0.15 Cum -0.11
D/S Bed 1 × -0.50 × 1.90 × 0.15 Cum -0.14
Toe wall 4 × 15.00 × 0.60 × 1.20 Cum 43.20
Total Cum 0.00 @ 4,696.88 0.00
4 Plain/reinforced cement concrete in sub-structure complete as per
drawings and MORD technical specification Clauses 800,1200 and as
per direction of the Engineer in charge
PCC M 15
A. In Sub-structure
Abutments 2nd Step 2 × 7.00 × 2.80 × 0.20 Cum 7.84
RCC M 25
Deck Slab 1 × 3.80 × 6.00 × 0.275 Cum 0
Parapet 0 × 3.80 × 0.40 × 0.400 Cum 0.00
0.00 @ 6806.73 0.00
Providing and laying reinforced cement concrete of M-25 grade in Sub-
structure complete as per drawings and technical specifications Clause
800 & 1200 of MoRD and as per the direction of the Engineer-in-charge
Total 0.00
Rs.
Sl. Ht / Th
No
Description of item Nos. Length Width Unit Quantity Rate in Rs. Amount in Rs.
in M
1 2 3 4 5 6 7 8 9 10
1. Earthwork in excavation for foundation of structures in all types of soil as per
drawing and technical specification Clause 305 and 1104 of MoRD includding
setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material upto 3mt. as per
direction of Engineer-in-Charge.
1 2 3 4 5 6 7 8 9 10
R. W. Section ,Odagaon R.W.Sub-Division, Nayagarh R.W.Division, Nayagarh
1
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS.
Foundation
Abutments 2 × 7.40 × 3.20 × 1.50 Cum 71.04
Cut off U/S 1 × 9.70 × 1.00 × 1.20 Cum 11.64
Cut off D/S 1 × 10.70 × 1.00 × 1.50 Cum 16.05
D/S Bed 1 × 5.70 × 1.70 × 0.60 Cum 5.81
U/S Bed 1 × 5.70 × 1.20 × 0.60 Cum 4.10
CD Bed 2 × 6.00 × 3.40 × 0.60 Cum 24.48
Wing walls 4 × 1.65 × 2.52 × 1.50 Cum 24.95
179.42
No of culverts=3 Total Cum 0.00 @ 272.07 0.00
2 Filling Sand in foundation in trenches as per drawing and
technical specification clause 305.3.9.
Foundation
Abutments 2 × 7.40 × 3.20 × 0.20 Cum 9.47
Cut off U/S 1 × 9.70 × 1.00 × 0.20 Cum 1.94
Cut off D/S 1 × 10.70 × 1.00 × 0.20 Cum 2.14
Wing walls 4 × 1.65 × 2.52 × 0.20 Cum 3.33
D/S Bed 1 × 5.70 × 1.90 × 0.20 Cum 2.17
U/S Bed 1 × 5.70 × 1.40 × 0.20 Cum 1.60
CD Bed 2 × 6.00 × 2.50 × 0.20 Cum 6.00
29.50
No of culverts=3 Total Cum 0.00 @ 1125.35 0.00
3 Providing concrete for plain / reinforced concrete in open
foundation complete as per drawing and MORD technical
specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.
PCC M 10
PCC M 15
A. In Sub-structure
Abutments 2nd Step 2 × 7.00 × 2.80 × 0.20 Cum 7.84
RCC M 25
Deck Slab 2 × 3.80 × 6.00 × 0.275 Cum 12.54
Parapet 2 × 3.80 × 0.40 × 0.400 Cum 1.22
No of culverts=3 0.00 6806.73 0.00
Providing and laying reinforced cement concrete of M-25 grade
in Sub-structure complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD and as per the
direction of the Engineer-in-charge
6
Abutment Cap 2 × 6.00 × 0.45 × 0.150 Cum 0.81
Dirt wall 2 × 6.00 × 0.30 × 0.500 Cum 1.80
No of culverts=3 Cum 0.00 @ 6276.55 0.00
7 Providing and laying cement concrete wearing course M 30
grade including reinforcement complete as per drawing and
technical specifications Clauses 800 and 1206.3
In super structure
a - Deck Slab - R.C.C 12.54 Cum @ 1.00 Qntl. 12.540
No of culverts=3 0.000 @ 6,185.95 0.00
In sub structure
b- Cap & Dirt wall 0.00 Cum @ 1.00 Qntl. 0.000
c.- Abutments Piers 19.81 Cum @ 0.08 Qntl. 1.585
1.585
No of culverts=3 Qntl. 0.000 @ 6,040.09 0.00
9 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and MORD technical specification
Clauses 614, 709, 1204 and as per direction of the Engineer in
charge
Abutment 2 × 11 Nos. Nos. 22
Wing wall 4 × 8 Nos. Nos. 32
54
No of culverts=3 Nos. 0.00 @ 155.57 0.00
10 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted to
firm condition complete as per drawing and MORD technical
specification Clause 1204.3.8 and as per direction of the
Engineer in charge
Rs. 0.00
Total 0.00
Rs. 4005.88
The Cost for fixing of Logo 2 x 4005.88 Rs. 8011.76
Ht / Th Quant Amount in
Sl. No Description of item Nos. Length Width Unit Rate in Rs.
in M ity Rs.
1 2 3 4 5 6 7 8 9
1. Earthwork in excavation for foundation of structures in
all types of soil as per drawing and technical
specification Clause 305 and 1104 of MoRD includding
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material
upto 3mt. as per direction of Engineer-in-Charge.
i) R.C.C grade M 20
1 × 0.786 × (.175x.175) × 1.10 Cum 0.03 @ 6276.55 188.30
ii) Supplying, fitting and placing HYSD bar reinforcement
3. Stripping excess soil from the shoulder surface to achieve the approved level and
compacting with plate compactor at OMC as per drawings and Technical Specification
Clause 1903.
Area/Km 2x1000x1.125=3000.00Sqm
1st year Take 10% of the area 228.60 Sqm 12.79 2923.79
2nd year 20% excess over 1st year 342.90 Sqm 12.79 4385.69
3rd year 40% excess over 1st year 342.90 Sqm 12.79 4385.69
4th year 60% excess over 1st year 662.94 Sqm 12.79 8479.00
5th year 80% excess over 1st year 582.93 Sqm 12.79 7455.67
4. Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface
by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD
technical specification Clause 503,508,510,1904 as per direction of the Engineer in
charge.
Area/Km 1000x3.75=3000.00Sqm
1st year Take 0.7% of the area 137.16 Sqm 222.61 30533.19
2nd year 2 times of 1st year 274.32 Sqm 222.61 61066.38
3rd year 3 times of 1st year 425.20 Sqm 222.61 94652.88
4th year 4 times of 1st year 685.80 Sqm 222.61 152665.94
5th year 5 times of 1st year 1097.28 Sqm 222.61 244265.50
7. Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones
repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone
and 5th km stone as per drawing and technical specification Clause 1912 of MORD as
per direction of the Engineer in charge.
9. Cutting of shurb from the road way or with in R.O.W including disposal of wood and
leaves to suitable location as per technical specification Clause 1914 of MORD as per
direction of the Engineer in charge.
Considering 40 Nos per Km
1st year 40 Nos per Km 102.00 Nos. 6.80 693.60
2nd year Same as 1st year 102.00 Nos. 6.80 693.60
3rd year Same as 1st year 102.00 Nos. 6.80 693.60
4th year Same as 1st year 102.00 Nos. 6.80 693.60
5th year Same as 1st year 102.00 Nos. 6.80 693.60
10. Maintenance and repair of RCC railing to bring it to the original shape cleaning and
repainting as per drawings and technical specification clause 1911 as per direction of
Engineer in Charge.
Considering 0.540 per Km
1st year per Km 1.370 RM 1350.62 1850.35
2nd year Same as 1st year 1.370 RM 1350.62 1850.35
3rd year Same as 1st year 1.370 RM 1350.62 1850.35
4th year Same as 1st year 1.370 RM 1350.62 1850.35
5th year Same as 1st year 1.370 RM 1350.62 1850.35
11. Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs
to cracks, parapet walls and Protection works as per drawing and technical specification
Clasue 1908 of MORD as per direction of the Engineer in charge.
12. Triming of grass and weeds from the shoulder/berms and disposal the same to suitable
location as per technical specification Clause 1914 of MORD as per direction of the
Engineer in charge
Area/Km 2x1000x1.125=3000.00Sqm
1st year Take11.5% of the area 114.30 Sqm 2.26 258.32
2nd year 20% excess over 1st year 137.16 Sqm 2.26 309.98
3rd year 40% excess over 1st year 160.02 Sqm 2.26 361.65
4th year 60% excess over 1st year 182.88 Sqm 2.26 413.31
5th year 80% excess over 1st year 205.74 Sqm 2.26 464.97
13. White washing two coats on parapet walls and tree trunks including preparation of
surface by cleaning scraping etc. as per MORD technical specifications Clause 1915
as per direction of the Engineer in charge.
Considering 24 Sqm per Km
1st year Take 24 Sqm / Km 60.96 Sqm 27.67 1686.76
2nd year Same as 1st year 60.96 Sqm 27.67 1686.76
3rd year Same as 1st year 60.96 Sqm 27.67 1686.76
4th year Same as 1st year 60.96 Sqm 27.67 1686.76
5th year Same as 1st year 60.96 Sqm 27.67 1686.76
Total 2205917.33
Cost of % of Costn.
YEAR Maintain- ance Total Cost
Supplying
PM-001 Air Compressor 210 cfm cfm 210.00 per hour 179.13
compressed air
BM, DBM,
PM-002 Batch mix HMP 100 TPH t/h 50.00 per hour 6,217.39
SDBC, PM
Applying
PM-003 Bitumen emulsion pressure distributor bitumen tack sqm/h 1750.00 per hour 448.70
coat
Electricity
PM-004 Electric generator set, 125 KVA KVA 100.00 per hour 786.96
generation
Loading
PM-005 Front end-loader 1 cum bucket capacity @ 45 cum/h 45.00 452.17
Aggregates per hour
cum/hour
Loading Soil cum/h 100.00 452.17
PM-006 Hydraulic broom with tractor Surface cleaning sqm/h 1250.00 per hour 200.00
PM-007 Tractor Grader per hour 251.30
Paver finisher Hydrostatic with sensor control
PM-008 Laying/spreading t/h 75.00 per hour 1,605.22
100TPH
Compaction of
PM-009 Smooth wheeled 80-100 kN tandem roller Sub-base/ cum/h 30.00 per hour 641.74
Asphalt
Compaction/
PM-010 Three wheel 80-100 kN Static Roller 294.78
Rolling
Earth:-
Embankment or
sub-grade cum/h 80/70 294.78
Plant-Machinary
0 Block:- HarichandanpDist:- Keonjhar
Name of the Road :
Usage Rates of Plant and Machinery
(Ref : MORTH Data Book Chapter-17/Page-555)
Sr. Description of Machine Output of Usage Rates in Govt. of Accepted Rate
No Machine Rupees Orissa Rate by GOO
Machine Activity Unit Output Unit Rates Unit Rates Unit Rates
1 Dozer D-50- Spreading cum/hour 200 per hour 1592.17 1592.17
A 15 Cutting cum/hour 100 1592.17 1592.17
Cleaning cum/hour 150
2 Dozer D-80- Spreading cum/hour 300 per hour 2190.43 2190.43
A 12 Cutting cum/hour 150 2190.43 2190.43
Cleaning cum/hour 250 2190.43 2190.43
3 Tractor with Cleaning cum/hour 200 per hour 251.30 251.30
ordinary Spreading cum/hour 200
Grader 3.35 GSB cum/hour 50
meter blade WMM cum/hour 50
4 Hydraulic per hour 730.43 730.43
Excavater of Soil Ordinarry cum/hour 60
1 cum Soil Marshy cum/hour 60
bucket Soil Unsuitable cum/hour 60
5 Front end Soil Loading cum/hour 60 per hour 452.17 452.17
loader 1 Aggregate
cum bucket loading cum/hour 45
6 capacity
Tipper-5 Transportation Capacity 5.5 Per km 20.87 0 20.87
cum of soil, GSB, in cum Per
WMM, Hotmix tonne.k
etc. m 2.17 2.17
ROYALTY
M-001
AC pipe 100mm mtr. Keonjhar 70.52 70.52
M-002
Aggregate 10 mm cum Tapanga 107.00 900.21 1066.67 1966.88
M-003
Aggregate 20 mm cum Tapanga 107.00 900.21 1007.62 1907.83
M-004
Aggregate 25 mm cum Tapanga 107.00 900.21 738.52 1638.73
M-004
Aggregate 40 mm chips cum Tapanga 107.00 900.21 706.67 1606.88
M-011
Deduct for empty Drums Bitumen (S-65) MT bhubaneswar 107.00 930.50 30169.58 31100.08
M-012
Deduct for empty Drums Bitumen Emulsion RS-1 MT Paharpur 393.00 2929.64 26080.70 29010.34
M-013
Deduct for empty Drums Bitumen Emulsion SS-1 MT Paharpur 393.00 2929.64 25520.70 28450.34
M-014
Deduct for empty Drums Bitumen Emulsion MS MT Paharpur 393.00 2929.64 26280.70 29210.34
M-015
Cement(excluding cost of empty gunny bags) MT Nayagarh 20.00 285.02 4776.80 5061.82
M-016
Cement Primer litre 119.69 119.69
M-017
Compressible fibre board sqm 850.14 850.14
M-031 RCC Pipe NP3 (1200 mm dia) mtr. saranakula 21.00 262.84 4367.21 4630.05
M-032 Red-oxide Primer litre 96.06 96.06
M-033 Road marking paint litre 108.34 108.34
M-034 Sand for filling cum Sidhamula 68.00 657.63 46.67 704.30
M-035 Sand for mortar cum Sidhamula 68.00 657.63 41.90 699.53
M-036 Steel HYSD Bars (8mm to 16mm) MT Nayagarh 20.00 285.02 45460.00 45745.02
M-037 Steel HYSD Bars (20mm to 25mm) MT Nayagarh 20.00 285.02 45460.00 45745.02
M-038
Stone Chips 12 mm size cum Tapanga 107.00 900.21 1047.62 1947.83
Certified that the leads provided in this statement are correct to the best of my knowledge.
Unit = hectare
Taking output = 1 hectare
(I) By Manual Means
(A) In area of non-thorny jungle
a) Labour
Mate day 6.00 320.00 1,920.00
Mazdoor (Unskilled) day 150.00 280.00 42,000.00
b) Machinery
Tractor with trolley hour 1.00 231.00 231.00
c) Overheads @ 15 % on (a+b) 6,622.65
Unit = cum
Tacking output = 1.25 cum
(i) By Manual Means
(C) Reinforced Cement Concrete
a) Labour
Mate day 0.15 320.00 48.00
Blacksmit day 0.25 370.00 92.50
Mazdoor (Unskilled) day 3.5 280.00 980.00
Sr. Ref. to Rate
Description Unit Quantity Amount (Rs.)
No. MORD Spe. (Rs.)
b) Machinery
Tractor with trolley hour 0.27 231.00 62.37
c) Overheads @ 15% on (a+b) 177.43
Cost for 1.25 cum = a+b+c 1,360.30
Rate per Cum (a+b+c+d)/1.25 1088.24
Labour welfare Cess 1% 10.88
1,099.12
b) Machinery
Tractor with trolley hour 0.27 231.00 62.37
c) Overheads @ 15% on (a+b) 64.26
Cost for 1.25 cum = a+b+c 492.63
Rate per Cum (a+b+c+d)/1.25 394.10
Labour welfare Cess 1% 3.94
398.04
CHAPTER -3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Name of the Road : Nandighore to Saliajhari
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. (Rs.) (Rs.)
Spe.
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @60 cum per hour Hour 1.67 730.43 1,219.82
Tipper 5.5 cum with 10t capacity Hour 8.59 506.09 4,347.31
Loading of earth as per item 1.1(ii) cum 100.00 33.33 3,332.55
Unloading of earth as per item 1.1(iv) cum 100.00 19.95 1,995.27
Dozer D-50 for spreading @200 cum per hour Hour 0.50 1,592.17 796.09
Tractor grader for grading @200 cum per hour Hour 0.50 251.30 125.65
Three wheel 80-100 kN static roller hour 1.43 294.78 421.54
Water tanker 6 kl capacity hour 2.00 506.09 1,012.18
c) Material
Water kl 12.00 0.00 0.00
Compensation for earth cum 100.00
d) Over head charge 15% on (a+b+c) 2,031.48
301.5
(B) From road way cutting & excavation of Foudation
for 100 cum
a) Labour
Mate day 0.02 320.00 6.40
Mazdoor(Unskilled) day 0.50 280.00 140.00
b) Machinery
Dozer D-50 for spreading @200 cum per hour Hour 0.50 1,592.17 796.09
Tractor motor grader for grading @200 cum per hour Hour 0.50 251.30 125.65
Three wheel 80-100 kN static roller hour 1.25 294.78 368.48
Water tanker 6 kl capacity hour 2.00 506.09 1,012.18
c) Material
Water kl 12.00
d) Over head charge 15% on (a+b+c) 367.32
Unit = Cum
Talking output = 100 Cum
a) Labour
Mate day 0.02 320.00 6.40
Mazdoor (Unskilled) day 0.50 280.00 140.00
b) machinery
Dozer D-50 for Spreading @ 200cum per hour Hour 0.50 1,592.17 796.09
Tractor mounted ordinary grade for grading @ 200cum per hour Hour 0.50 251.30 125.65
Water tanker 6 KL Capacity Hour 2.00 506.09 1,012.18
Three wheel 80-100 KN static Roller Hour 1.25 294.78 368.48
c) Material 0.00
Water KL 12.00 0.0 0.0
d) Over head charge @ 15% on (a+b+c) 367.32
Rate Cost for 100 sqm = a+b+c+d 2,816.12
Rate per sqm = (a+b+c+d)/100 28.16
Labour welfare Cess 1% 0.28
28.44
2.4 302 Excavation
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, inaccordance
with requirements of lines, grades and cross sections, and transporting to the
embankement location with a lift of up to 1.5m and lead up to 1000m as per techincal
specification clause 302.3.
Unit = Cum
Talking output = 360 Cum
a) Labour
Mate day 0.08 320.00 25.60
Mazdoor (Unskilled) day 2.00 280.00 560.00
b) Machinery
Tipper Hour 15.00 506.09 7,591.35
Hydraulic Excavation Hour 3.60 730.43 2,629.55
c) Over head charge @ 15% on (a+b) 1,620.98
Rate Cost for 100 sqm = a+b+c+d 12,427.48
Rate per sqm = (a+b+c+d)/360 34.52
Labour welfare Cess 1% 0.35
34.87
1. Excavation in Hard Rock
a. Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation clause 302
Unit = Cum
Talking output = 36 Cum
a) Labour
Mate day 0.40 320.00 128.00
Mazdoor (Unskilled) day 10.00 280.00 2,800.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @60 cum per hour Hour 6.00 730.43 4,382.58
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. (Rs.) (Rs.)
Spe.
Tipper 6.05 cum with 10t capacity Hour 5.909 506.09 2,990.49
Credit for excavated rock found suitable for use @ 50% of excavated quantity 3,564.00
Cum 18.000 198.00
6,737.07
Unit = Cum
Talking output = 240 Cum
a) Labour
Mate day 0.08 320.00 25.60
Mazdoor (Unskilled) day 2.00 280.00 560.00
b) Machinery
Hydraulic Excavator 0.9cum Bucket capacity @60cum/hour Hour 6.00 840.00 5,040.00
Tipper 6.05cum with 10T capacity Hour 10.00 582.00 5,820.00
c) Over head charge @ 15% on (a+b) 1,716.84
Rate Cost for 100 sqm = a+b+c 13,162.44
Rate per sqm = (a+b+c)/240 54.84
Labour welfare Cess 1% 0.55
55.39
(iv). Cuting in Disintegrated rocks not requiring blasting to be removed by picked axes and
crow bars and depositing materials with 50m. Initial lead and 1.5m initial lift including
rock dressing as per direction and specification of thhe department including stacking
the usefull materials separately as order .
Unit = Cum
Talking output = 100 Cum
a) Labour
Mate day 55.00 280.00 15,400.00
Mazdoor (Unskilled) day 54.00 280.00 15,120.00
Mazdoor For Disposing of Earth upto 20m day 0.00 280.00 0.00
c) Over head charge @ 15% on (a+b) 4,578.00
Rate Cost for 100 sqm = a+b+c 35,098.00
Rate per sqm = (a+b+c)/100 350.98
Labour welfare Cess 1% 3.51
354.49
CHAPTER -4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) SHOULDER
Name of the Road : Nandighore to Saliajhari Format - 8
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
300 Filling Sand in foundation in trenches as per drawing and technical specification
&
11.2
1200 clause 305.3.9.
1 Sand filling
Unit cum
a) Labour
Mate day 0.01 320.00 3.20
Mazdoor (Skilled) day 0.30 280.00 84.00
c) Material
Sand (assuming 20 percent voids) cum 1.20 704.30 845.16
d) Overheads @ 15% on (a+b) 139.85
e) Royalty
Sand (assuming 20 percent voids) cum 1.20 35.00 42.00
Rate per cum (a+b+c+d) 1,114.21
Labour welfare Cess 1% 11.14
1,125.35
(iii) (Moorum )
Unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.04 320.00 12.80
Mazdoor (Skilled) day 1.00 280.00 280.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60cum per hour hour 1.00 730.43 730.43
Tipper 6.05 Cum hour 4.09 506.09 2,069.91
loading of earth as per item 1.1(ii) Cum 100.00 33.66 3,366.00
unloading of earth as per item 1.1(iv) Cum 100.00 20.15 2,015.00
Dozer D-50 for spreading @ 200 Cum per hour hour 0.50 1,592.17 796.09
Tractor Grader hour 0.50 251.30 125.65
Water Tanker 6kl capacity hour 2.00 506.09 1,012.18
Three wheel 80-100kN Static Roller @ 80 Cum hour 1.43 641.74 917.69
c) Material
Moorum cum 100.00 276.50 27,650.00
487.70
c) Material
Water kl 144.00
d) Overheads @ 15% on (a+b+c) 75,049.84
e) Royalty
Aggregate
Grade-II ( 63 mm to 45 mm) @ 0.91 cum per 10 sqm cum 435.60 1,030.21 448,759.48
11.2 MM stone screening cum 96.01 1,030.21 98,910.46
Unit = cum
Taking output = 300 cum (525t)
For 3 percent quantity of cement by weight of soil.
a) Labour
Mate day 0.4 320.00 128.00
Mazdoor (Skilled) day 2.00 370.00 740.00
Mazdoor (Un-Skilled) day 8.00 280.00 2240.00
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
b) Material
Cement at site @ 3% (of 525t) day 15.75 5,061.82 79723.67
Moorum 97% day 349.20 276.50 96553.80
Water day 30.00
c) Machinary
Hydraulic Excavator 0.90 cum bucket capacity@60 cum per
hour hour 5.00 840.00 4200.00
Tipper 5.5 cum,4 trips per hour hour 14.00 582.00 8148.00
Motor grader 110 HP @ 50 cum per hour hour 6.00 1545.00 9270.00
Three wheel 80-100 KN static roller @ 70 percent per hour hour 4.30 339.00 1457.70
Tractor with rotavator and blade @ 25 cum per hour hour 12.00 242.00 2904.00
Water tanker 6 kl capacity hour 5.00 582.00 2910.00
208275.17
d) Overhead charges @ 15 % on (a+b+c) 31241.27
e) Carriage & Royalty
Moorum 349.20 - 0.00
Unit = cum
Taking output = 300 cum (525t)
For 6 percent quantity of cement by weight of soil.
a) Labour
Mate day 0.4 320.00 128.00
Mazdoor (Skilled) day 2.00 370.00 740.00
Mazdoor (Un-Skilled) day 8.00 280.00 2240.00
b) Material
Cement at site @ 6% (of 525t) day 31.50 5,061.82 159447.33
Moorum 94% day 338.40 276.50 93567.60
Water day 30.00
c) Machinary
Hydraulic Excavator 0.90 cum bucket capacity@60 cum per
hour hour 5.00 840.00 4200.00
Tipper 5.5 cum,4 trips per hour hour 14.00 582.00 8148.00
Motor grader 110 HP @ 50 cum per hour hour 6.00 1545.00 9270.00
Three wheel 80-100 KN static roller @ 70 percent per hour hour 4.30 339.00 1457.70
Tractor with rotavator and blade @ 25 cum per hour hour 12.00 242.00 2904.00
Water tanker 6 kl capacity hour 5.00 582.00 2910.00
285012.63
d) Overhead charges @ 15 % on (a+b+c) 42751.89
e) Carriage & Royalty
Moorum 338.40 - 0.00
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
5.9 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration
grade/modified bitumen)
Providing, laying and Binder
rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates using S-65 penetration grade bitumen @ 14.6 kg/10 sqm to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a suitable hot mix plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per
Technical Specification Clause 508 of MoRD and as per direction of Engineer-in-Charge (Excluding cost of Seal Coat).
Case - I By Manual Means
(II) Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day 1.08 320.00 345.60
Mazdoor (Unskilled) day 21.00 280.00 5,880.00
Mazdoor (Semi-Skilled) day 6.00 320.00 1,920.00
b) Machinery
Mixall 6/10 t capacity hour 4.00 891.30 3,565.20
Bitumen boiler oil fired1000 litre capacity fitted with spray set hour 4.00 111.30 445.20
Three wheel 80-100 kN static roller hour 2.00 294.78 589.56
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 0.73 31,100.08 22,703.06
Crushed stone chipps 13.2 mm @ 0.18 cum / 10 sqm cum 9.00 1,924.97 17,324.73
Crushed stone chipps 11.2mm @ 0..09 cum / 10 sqm cum 4.50 1,949.73 8,773.79
d) Overheads @ 15% on (a+b+c) 9,232.07
e) Royalty
Crushed stone chipping, 13.2 mm to 5.6 mm cum 13.50 130.00 1,755.00
Cost of 500 sqm = a+b+c+d 72,534.20
Rate per sqm = (a+b+c+d+e)/500 145.07
Labour welfare Cess 1% 1.45
146.52
5.9 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen)
Binder(Waste Plastic)
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates using S-65 penetration grade bitumen @ 14.6 kg/10 sqm to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a suitable hot mix plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per
Technical Specification Clause 508 of MoRD and as per direction of Engineer-in-Charge (Excluding cost of Seal Coat).
Case - I By Manual Means (Waste plastic)
(II) Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day 1.08 320.00 345.60
Mazdoor (Unskilled) day 21.00 280.00 5,880.00
Mazdoor (Semi-Skilled) day 6.00 320.00 1,920.00
b) Machinery
Mixall 6/10 t capacity hour 4.00 891.30 3,565.20
Bitumen boiler oil fired1000 litre capacity fitted with spray set hour 4.00 111.30 445.20
Three wheel 80-100 kN static roller hour 2.00 294.78 589.56
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 0.67 31,100.08 20,886.81
Cost of waste plastic t 0.06 30,000.00 1,800.00
Crushed stone chipps 13.2 mm @ 0.18 cum / 10 sqm cum 9.00 1,924.97 17,324.73
Crushed stone chipps 11.2mm @ 0..09 cum / 10 sqm cum 4.50 1,949.73 8,773.79
d) Overheads @ 15% on (a+b+c) 9,229.63
e) Royalty
Crushed stone chipping, 13.2 mm to 5.6 mm cum 13.50 130.00 1,755.00
Cost of 500 sqm = a+b+c+d 72,515.52
Rate per sqm = (a+b+c+d+e)/500 145.03
Labour welfare Cess 1% 1.45
146.48
5.12 510 Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall
using Type C as per Technical Specification Clause 510 of MORD with S-65 grade bitumen laid by manual means and
as per direction of Engineer-in-Charge.
A. By Manual Means
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
Unit = sqm
(II) Bitumen (MS)
Taking output = 900 sqm (24.3 cum)
a) Labour
Mate day 0.80 320.00 256.00
Mazdoor (Unskilled) day 18.00 280.00 5040.00
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with spray hour 2.25 128.00 288.00
set
Three wheel 80-100 KN static roller hour 2.25 339.00 762.75
Add : 0.5 Percent of (a) Labour for Sundries LS 86.96
c) Material
Bitumen(VG-30@0.9kg/sqm) t 0.90 31,100.08 27,990.07
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
crushed stone chipping,13.2mm nominal size @ 0.010 cum 9.00 1,924.97 17,324.73
cum per sqm
d) Overheads @ 15% on (a+b+c) 9,864.68
e) Royalty
crushed stone chipping,13.2mm nominal size @ 0.010 cum 9.00 130.00 1,170.00
cum per sqm
Cost of 900 sqm = a+b+c+d+e 76,799.19
Rate per sqm = (a+b+c+d+e)/900 85.33
Labour welfare Cess 1% 0.85
86.19
5.4 508 Providing and laying surface dressing as wearing course consisting of a layer of bitumen
Binder(-65) laid on the prepared surface,followed by a cover of crushed stone chippings of 9.5
mm nominal Precoat Chips with1% bitumen by weight of chips crushed stone chipping 9.5mm
size and rolling with Three wheel 80-100KN Static roller including cleaning the road surface as
per Technical specification clause 506.(Second coat surface dressing)
A) By Manual Means
Bitumen VG-30
Case-II:Nominal Chipping size -9.5 mm
Unit = sqm
Taking output = 1000 sqm
Taki Labour
a) Labour
Mate day 2.60 320.00 832.00
Bitumen Emulsion Sprayer day 1.00 320.00 320.00
Mazdoor (Unskilled) day 58.00 280.00 16,240.00
Mazdoor ( Semi skilled) day 6.00 320.00 1,920.00
0.00
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with spray hour 2.00 128.00 256.00
set
Three wheel 80-100 KN static roller hour 2.00 339.00 678.00
c) Material
BitumenEmulsion Rs 0.7 Kg/sqm t 0.70 31,100.08 21,770.06
crushed stone chipping,9.5mm nominal size @ 0.008 cum 8.00 1,966.88 15,735.04
cum per sqm
d) Overheads @ 15% on (a+b+c) 8,662.66
e) Royalty
crushed stone chipping,9.5mm nominal size @ 0.008 cum 8.00 130.00 1,040.00
cum per sqm
Cost of 1000 sqm = a+b+c+d+e 67,453.76
Rate per sqm = (a+b+c+d+e)/1000 67.45
Labour welfare Cess 1% 0.67
68.13
Batch mix HMP 100 - 120 TPH @ 75 tonne per hour hour 6.00 6217.39 37,304.34
Paver finisher Hydrostatic with sensor control @ hour 6.00 1605.22 9,631.32
75 cum per hour
Generator 250 KVA hour 6.00 1125.00 6,750.00
Front end loader 1 cum capacity hour 6.00 452.17 2,713.02
Tipper 10 tonne capacity ton.Km 2.00 506.09 1,012.18
Add 10% of cost of carriage to cover cost of 101.22
loading and unloading
Smooth whelled Roller 8 - 10 tonne for initial hour 3.90 641.74 2,502.79
break down rolling
Vibratory Roller 8 tonne for intermediate rolling hour 3.90 864.35 3,370.97
Finishing rolling with 6-8 tonne smooth wheeled hour 3.90 738.00 2,878.20
tandem roller
c) Grading - II (19mm nominal size)
i Material
ii Bitumen (S-65) @ 3.3% of weight of mix t 14.85 31100.08 461,836.19
iii Crushed stone chipping, 25 mm to 10mm @ 40% cum 116.04 1638.73 190,158.23
d) Crushed stone chipping, 5 mm & below @ 20% cum 58.02 1604.97 93,120.36
1,045,628.76
e) Overheads @ 15% on (a+b+c) 156,844.31
Royality
Crushed stone chipping, 25 mm to 10mm @ 40% cum 116.04 15,085.20
130.00
Crushed stone chipping, 10 mm to 5mm @ 40% cum 116.04 15,085.20
130.00
CostCrushed stone chipping, 5 mm & below @ 20% cum 58.02 7,542.60
130.00
1,240,186.07
Rate Add for Cess@1% 124018.61
5,456.82
70 508 Semi Dense Bituminous Concrete
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
b) Machinery
Batch mix HMP 100-120TPH hour 6.00 6217.39 37,304.34
@ 75 tonne per hour -
Paver finisher hydrostatic with sensor hour 6.00 1605.22 9,631.32
control @ 75 cum per hour -
Generator 250 KVA hour 6.00 1125.00 6,750.00
Front end loader 1 cum bucket hour 6.00 452.17 2,713.02
Tipper 10 tonne capacity tonne.km 2.00 506.09 1,012.18
Add 10 per cent of cost of carriage to cover cost
of loading and unloading 101.22
Smooth wheeled roller 8-10 tonnes for initial
break down rolling (6.00 X 0.65* = 3.90) hour 3.90 641.74 2,502.79
Vibratory roller 8 tonnes for intermediate rolling
(6.00 x 0.65* = 3.90) hour 3.90 864.35 3,370.97
Finish rolling with 6-8 tonnes smooth wheeled
tandem roller.(6.00 x 0.65* = 3.90) hour 3.90 738.00 2,878.20
66,264.03
Add for Cess@1% 6626.40
72890.43
(A) c) Material
Grading II (25 mm Nominal Size) -
i) 60/70 penetration grade of Bitumen @ 4.5
per cent of mix tonne.km20.250 31100.08 629,776.62
ii) Aggregate -
Total weight of mix = 450 tonnes -
Weight of bitumen = 20.25 tonnes -
Weight of aggregate = 450.00 - 20.25 =429.75 tonnes -
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.50 cum
25 - 10 mm @ 30 per cent cum 85.950 1638.73 140,848.84
10 - 5 mm @ 28 per cent cum 80.220 1966.88 157,783.11
5 mm and below @ 40 per cent cum 114.600 1604.97 183,929.56
Filler @2 percent of weight of aggregates. cum 5.730 50.00 1,112,338.14
d) Overhead charges @ 15% on (a+b+c) 178,686.27
e) Royalty
25 - 10 mm @ 45 per cent cum 85.950 130.00 11,173.50
10 - 5 mm @ 25 per cent cum 80.220 130.00 10,428.60
5 mm and below @ 15 per cent cum 114.600 130.00 14,898.00
36,500.10
Add for Cess@1% 3650.01
1403451.74
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
7,197.19
70 508 20mm thick Open-Graded Premix Carpet using Bituminous (Paver finisher)
b) Machinery
i) Batch type HMP 75 tonne per hour . hour 6.00 6217.39 37,304.34
-
ii) Electric Generator Set 250 KVA hour 6.00 1125.00 6,750.00
-
iii) Front end loader 1 cum bucket capacity hour 6.00 452.17 2,713.02
Tipper 10 tonne capacity tonne.km 45*l 2.17 6,640.20
Add 10 per cent of cost of carriage to cover cost
of loading and unloading 664.02
v) Paver finisher hydrostatic with sensor
attachment hour 6.00 1605.22 9,631.32
iv) Smooth wheeled/tandom roller 8-10 tonnes
weight hour 6.00 641.74 3,850.44
(A) c) Material
-
Bitumen@
Crushed 14.60
stone kg per 10 sqm
chipping,13.2 mm to 5.6 mm @ tonne 14.970 31100.08 465,568.20
0.27 cum per 10 sqm cum 276.65 1764.67 488,195.96
1,027,958.29
d) Overhead charges @ 15% on (a+b+c) 155,273.32
TOTAL 1,183,231.62
Rate per SQM SQM 115.44
Unit = cum
Taking output = 7858 sqm (47.16 cum)
a) Labour
Mate each 0.16 320.00 51.20
Mulia unskilled working with HMP,mechanical broom, paver, each
rol 4.00 280.00 1120.00
b) Machinery
HMP of 75 tonnes/hour. hour 2.00 13130.43 26,260.86
-
Electric Generator Set 250 KVA hour 2.00 1125.00 2,250.00
-
Front end loader 1 cum bucket capacity hour 2.00 452.17 904.34
Tipper 10 tonne capacity tonne.km 104*l 2.17 10,155.60
Add 10 per cent of cost of carriage to cover cost
of loading and unloading 1,015.56
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of cum 33.75 699.53 23,609.14
concrete
(iii) Cement @ 350 kg/cum of concrete t 26.25 5,061.82 132,872.78
(iv) Polythene sheet 125 micron sqm 412.50 3.00 1,237.50
(v) Bitumen primer @ 200 ml per joint for 23 joints t 0.005 28,450.34 142.25
Bituminous sealant 800 ml per joint for 23 joints litre 19.00 20.00 380.00
Plasticizer 0.5 per cent by weight of cement litre 122.00 40.00 4,880.00
Curing compound litre 131.25 20.00 2,625.00
Joint filler board 20 mm thick as per IS:1838 (4 x 3.75 x 0.200 = 3 sqm) sqm 3.00 852.94 2,558.82
d) Formwork @ 3% of (a+b+c) 10,666.69
e) Overheads @ 15% on (a+b+c+d) 54,933.46
f) Royalty
(i) Crushed stone coarse aggregates ,grading will be as per Clause cum 67.50 130.00 8,775.00
1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum/cum of concrete
(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum 33.75 35.00 1,181.25
Cost for 75 cumcum/cum of concrete
= a+b+c+d+e+f 431,112.74
Rate per cum = (a+b+c+d+e+f)/75 5,748.17
Labour welfare Cess 1% 57.48
5,805.65
CHAPTER -9
PIPE CULVERTS
Name of the Road : Nandighore to Saliajhari
9.3 1100 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in
Single Row
Providing and laying reinforced cement concrete NP3 pipe for culverts jointing
with cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets as per Clause 1100 of
MoRD & as per direction of Engineer-in-Charge.
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
(C) 1200 mm dia
a) Labour
Mate day 0.14 320.00 44.80
Mason (1st Class) day 0.50 430.00 215.00
Mazdoor (Unskilled) day 3.00 280.00 840.00
b) Material
Sand cum 0.050 699.53 34.98
Cement t 0.070 5,061.82 354.33
RCC pipe NP3 concrete pipe including collar at site m 7.50 4,630.05 34,725.37
c) Overheads @ 15% (a+b) 5,432.17
d) Royalty
Sand cum 0.050 35.00 1.75
Cost for 7.5 m = a+b+c+d 41,648.39
Rate per m = (a+b+c+d)/7.5 5,553.12
Labour welfare Cess 1% 55.53
5,608.65
d) Royalty
Sand cum 0.04 35.00 1.40
Cost for 7.5 m = a+b+c+d 38,191.66
Rate per m = (a+b+c+d)/7.5 5,092.22
Labour welfare Cess 1% 50.92
5,143.14
b) Material
Sand cum 0.024 699.53 16.79
Cement t 0.018 5,061.82 91.11
RCC pipe NP3 concrete pipe including collar at site m 7.50 1,993.82 14,953.64
Sr. Ref. to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Spe. (Rs.)
c) Overheads @ 15% (a+b) 2,309.21
d) Royalty
Sand cum 0.024 35.00 0.84
Cost for 7.5 m = a+b+c+d+e 17,704.79
Rate per m = (a+b+c+d)/7.5 2,360.64
Labour welfare Cess 1% 23.61
2,384.25
culverts jointing with cement mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonry works in head walls and parapets as per
Clause 1100 of MoRD & as per direction of Engineer-in-Charge.
Unit = m
Taking output = 7.5 m
(6 pipes of 2.5 m length each in two rows)
(C) 1000 mm dia
a) Labour
Mate day 0.220 320.00 70.40
Mason 1st Class day 0.60 430.00 258.00
Mazdoor (Unskilled) day 4.80 280.00 1,344.00
b) Material
Sand cum 0.08 699.53 55.96
Cement t 0.060 5,061.82 303.71
RCC pipe NP3 pipe including collar at site m 15.00 4,311.04 64,665.58
c) Overheads @ 15% on (a+b) 10,004.65
d) Royalty
Sand cum 0.08 35.00 2.80
Cost for 7.5 m = a+b+c+d 76,705.10
Rate per m = (a+b+c+d)/7.5 10,227.35
Labour welfare Cess 1% 102.27
10,329.62
d) Royalty
Sand at site cum 0.04 35.00 1.40
Cost for 7.5 m = a+b+c+d 35,406.55
Rate per m = (a+b+c+d)/7.5 4,720.87
Labour welfare Cess 1% 47.21
Sr. Ref. to Rate
MORD Description Unit Quantity Amount (Rs.)
No. Spe. (Rs.)
4,768.08
CHAPTER -10
TRAFFIC SIGNS, MARKING AND OTHER ROAD APPURTENANCES
Name of the Road Nandighore to Saliajhari
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. Spe. (Rs.) (Rs.)
960x1.7=1632
Words 80x3=240
Total 9289 per cm height per letter
As per item no 10.1 per cm height per letter
4532.50 0.54 2447.55
a) Labour(for fixing at site)
Mazdoor(unskilled) day 0.75 280.00 210.00
Mate day 0.03 320.00 9.60
b) Materials
MS tubes 75mmx75mm of 12SWG sheet 8400mm long kg 63.15 42.00 2652.30
Mild steel flat iron 50x5mm for lugs kg 2.12 42.00 89.04
2mm thick MS sheet strengthened by 25mmx5MS flat iron on Logo & middle
plate angle iron 25mmx25mmx5mm on bottom plate painting with stove enamel
paint on both sides (1.375 sqm) sqm 1.440 570.00 820.80
Add 3% of cost of MS tube & angle towords cost of fabrication,
Drilling,Nuts,Bolts etc. 106.86
c) Tractor with trolley hour 0.24 231.00 55.44
d) Overhead charges@15% on (a+b+c) 591.61
10.10 1700 Reinforced cement concrete M15 grade kilometre stone of standard design as
per IRC:8 fixing in position including painting and printing, etc as per drawing and
MORD technical Specification Clause 1703 as per direction of the Engineer in
charge
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. (Rs.) (Rs.)
Spe.
11.1 300 Excavation for Structures
Earthwork in excavation for foundation of structures in all types of soil as per
drawing and technical specification Clause 305 and 1104 of MoRD includding setting
out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto all lead & lift, dressing of sides and bottom and back
filling with excavated suitable material upto 3mt. as per direction of Engineer-in-
Charge.
I. Ordinary soil
A. Without dewatering and shoring, shuttering
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 320.00 102.40
Mazdoor (Unskilled) day 8.00 280.00 2,240.00
b) Overheads @ 15% on (a) 351.36
Cost for 10 cum = a+b 2,693.76
Rate per cum = (a+b)/10 269.38
Labour welfare Cess 1% 2.69
272.07
11.2 300 & Providing and constructing well compacted drainage layer above the subgrade of roadwork with
1200 approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of
SP:20-2002.
I. Sand filling
Unit = cum
a) Labour
Mate day 0.01 320.00 3.20
Mazdoor (Unskilled) day 0.30 280.00 84.00
b) Material
Sand (assuming 20 percent voids) cum 1.20 704.30 845.16
c) Overheads @ 15% on (a+b) 139.85
d) Royalty
Sand (assuming 20 per cent voids) cum 1.20 35.00 42.00
Rate per cum = a+b+c+d 1,114.21
Labour welfare Cess 1% 11.14
1,125.35
11.4 800 & Providing concrete for plain / reinforced concrete in open foundation complete as per drawing
1200 and MORD technical specification Clause 800,1100,1200 and as per direction of Engineer-in-
Charge.
I. P.C.C grade M 10 Nominal mix (1:3:6)
Unit = cum
a) Material
Cement t 0.250 5,061.82 1,265.46
Coarse sand cum 0.48 699.53 335.77
40 mm aggregate cum 0.576 1,606.88 925.56
20 mm aggregate cum 0.288 1,907.83 549.46
10 mm aggregate cum 0.096 1,966.88 188.82
b) Labour
Mate day 0.08 320.00 25.60
Mason (1st Class) day 0.10 430.00 43.00
Mazdoor (Unskilled) day 1.63 280.00 456.40
Bhisti day 0.27 320.00 86.40
c) Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity fitted with water hour 0.40 153.91 61.56
d) measuring device@
Add for formwork and
4%preferably
on cost ofalso with load
material, cell.
labour and machinery 157.52
(a+b+c)
e) Overheads @ 15% on (a+b+c+d) 614.33
f) Royalty
Fine sand cum 0.48 35.00 16.80
40 mm aggregate cum 0.576 130.00 74.88
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. (Rs.) (Rs.)
Spe.
20 mm aggregate cum 0.288 130.00 37.44
10 mm aggregate cum 0.096 130.00 12.48
Rate per cum = a+b+c+d+e+f 4,851.49
Labour welfare Cess 1% 48.51
4,900.00
II. P.C.C grade M 15 Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement t 0.275 5,061.82 1,392.00
Fine sand cum 0.480 699.53 335.77
40 mm aggregate cum 0.480 1,606.88 771.30
20 mm aggregate cum 0.240 1,907.83 457.88
10 mm aggregate cum 0.080 1,966.88 157.35
b) Labour
Mate day 0.080 320.00 25.60
Mason (1st Class) day 0.100 430.00 43.00
Mazdoor (Unskilled) day 1.630 280.00 456.40
Bhisti day 0.270 320.00 86.40
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 153.91 61.56
d) Formwork @ 4% on cost of material, labour and machinery (a+b+c) 151.49
e) Overheads @ 15% on (a+b+c+d) 590.81
f) Royalty
Fine sand cum 0.480 35.00 16.80
40 mm aggregate cum 0.480 130.00 62.40
20 mm aggregate cum 0.240 130.00 31.20
10 mm aggregate cum 0.080 130.00 10.40
Rate per cum = a+b+c+d+e+f 4,650.38
Labour welfare Cess 1% 46.50
4,696.88
b) Labour
Mate day 0.080 233.50 18.68
Mason (1st Class) day 0.120 273.50 32.82
Mazdoor (Unskilled) day 1.730 213.50 369.36
Bhisti day 0.270 233.50 63.05
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 177.00 70.80
d) Formwork @ 3.75% on (a+b+c) 174.48
e) Overhead Charges @ 15% 15.0% 724.09
g) carriage and Royalty
Cement t 0.404 0.00 0.00
Coarse sand cum 0.450 35.00 15.75
20 mm aggregate cum 0.540 130.00 70.20
10 mm aggregate cum 0.360 130.00 46.80
Rate per cum = a+b+c+d+e+f 5,684.08
Labour welfare Cess 1% 56.84
5,740.92
12.6 1000 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) complete as per
engineer-in-charge.
I. Moorum
Unit = cum
a) Labour
Mate day 0.01 233.50 2.34
Mazdoor (Unskilled) day 0.30 213.50 64.05
b) Material
Moorum assuming 20% void cum 1.20 252.40 302.88
C) Overhead charges @ 15% on (a) 15.0% 55.39
d) Royalty
Moorum assuming 20% void cum 1.20 35.00 42.00
Rate per cum = a+b+c+d 466.65
Labour welfare Cess 1% 4.67
471.32
CHAPTER -12
SUBSTRUCTURE
Name of the Road : Nandighore to Saliajhari
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. Spe. (Rs.)
12.1 600 Brick masonry work in cement mortar in foundation complete excluding
pointing and plastering as per drawing and technical specifications Clauses
600, 1202 & 1203.
Unit = cum
II. Brick masonry in 1:3 cement mortar
Unit = cum
a) Material
Brick Nos. 500.00 4.92 2,460.00
Cement mortar 1:4 cum 0.24 3,643.18 874.36
Rates as per sub-analysis
b) Labour
Mate day 0.09 320.00 28.80
Mason (1st Class) day 0.80 430.00 344.00
Mazdoor (Unskilled) day 1.60 280.00 448.00
Bhisti day 0.20 320.00 64.00
Add for formwork @ 5% on cost of material, labour and machinery 210.96
(a+b)
c) Overheads @ 15% on (a+b) 664.52
Royality
Sand cum 0.25 35.00 8.82
b) Labour
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. Spe. (Rs.)
a) Rib (Boxcell)
Basic Rate 6,214.41
Add shuttering 1.75 Sqm @Rs 228.90 400.58
6,614.99
Labour welfare Cess 1% 66.15
6,681.13
12.6 1000 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) complete as
per drawings and MORD technical specification Clauses 1000,1200 as per
direction of the Engineer in charge
Unit = t
Sub-Structure
a) Material
HYSD bars including 5 per cent overlaps and wastage t 1.05 45,745.02 48,032.27
Binding wire kg 6.00 216.90 1,301.40
b) Labour for cutting, bending, shifting to site, tying, and placing in
position
Mate day 0.34 320.00 108.80
Blacksmith day 2.00 370.00 740.00
Mazdoor (Unskilled) day 6.50 280.00 1,820.00
c) Overheads @ 15% on (a+b) 7,800.37
Rate per t = a+b+c 59,802.84
Labour welfare Cess 1% 598.03
60,400.87
12.10 1200 Backfilling behind abutment, wing wall and return wall complete as per
drawings & technical specification Clause 1204.3.8
Unit = cum
Taking output = 10 cum
I) Granular material
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. Spe. (Rs.)
a) Material
Sand cum 12.00 704.30 8,451.60
b) Labour
Mate day 0.40 320.00 128.00
Mazdoor (Unskilled) day 10.00 280.00 2,800.00
Bhisti day 0.40 320.00 128.00
c) Overheads @ 15% on (a+b) 1,726.14
d) Royalty
Granular material cum 12.00 35.00 420.00
Cost for 10 cum of granular backfill = a+b+c+d 13,653.74
Rate per cum = (a+b+c+d)/10 1,365.37
Labour welfare Cess 1% 13.65
1,379.02
12.11 1200 Providing and laying filter media with granular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and MORD technical specification Clause
1204.3.8 and as per direction of the Engineer in charge
Unit = cum
Taking output = 10 cum
a) Material
Filter media as per specification cum 12.00 1,389.73 16,676.76
b) Labour
Mate day 0.40 320.00 128.00
Mazdoor (Unskilled) day 9.00 280.00 2,520.00
Mazdoor (Skilled) day 1.00 370.00 370.00
Bhisti day 0.50 320.00 160.00
c) Overheads @ 15% on (a+b) 2,978.21
d) Royalty
Filter Media cum 12.00 130.00 1,560.00
Cost for 10 cum of filter media = a+b+c+d 24,392.97
Rate per cum = (a+b+c+d)/10 2,439.30
Labour welfare Cess 1% 24.39
2,463.69
12.14 1200 Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter
media base of 500 mm x 500 mm as per drawing and technical specification
Clause 1205.5.7
Unit = Nos
a) Material
AC pipe 100 mm dia i/c wastage of 5 per cent 600 mm long upto the m 0.63 70.52 44.43
bottom of levelling
Filter media course
base with stone aggregate 0.5 m x 0.5 m area 1 m deep cum 0.25 1,389.73 347.43
b) Labour
Mate day 0.031 320.00 9.92
Mason 1st Class day 0.016 430.00 6.88
Mazdoor (Unskilled) day 0.80 280.00 224.00
c) Overheads @ 15% on (a+b) 94.90
d) Royalty
Filter Media cum 0.25 130.00 32.50
Rate per No = (a+b+c+d) 760.06
Labour welfare Cess 1% 7.60
767.66
CHAPTER -13
SUPER STRUCTURE
Name of the Road : Nandighore to Saliajhari
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. Spe. (Rs.) (Rs.)
13.1 800 Providing and laying reinforced cement concrete in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
I. R.C.C grade M- 20
(i) For nominal mix 1:2:4
Unit = cum
a) Material
Cement t 0.35 5,061.82 1,771.64
Coarse sand cum 0.45 699.53 314.79
20 mm aggregate cum 0.54 1,907.83 1,030.23
10 mm aggregate cum 0.36 1,966.88 708.08
b) Labour
Mate day 0.08 320.00 25.60
Mason (1st Class) day 0.12 430.00 51.60
Mazdoor (Unskilled) day 1.73 280.00 484.40
Bhisti day 0.27 320.00 86.40
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 153.91 61.56
d) Add for formwork and staging
Height upto 5 m @20% of (a+b+c) 906.86
e) Overheads @ 15% on (a+b+c+d) 816.17
f) Royalty
Coarse sand cum 0.45 35.00 15.75
20 mm aggregate cum 0.54 130.00 70.20
10 mm aggregate cum 0.36 130.00 46.80
Rate per cum = a+b+c+d+e+f 6,390.08
Labour welfare Cess 1% 63.90
6,453.98
f) Royalty
Coarse sand cum 0.45 35.00 15.75
20 cum aggregates cum 0.54 130.00 70.20
10 mm aggregate cum 0.36 130.00 46.80
Rate per cum = a+b+c+d+e+f 6,250.37
Labour welfare Cess 1% 62.50
6,312.87
II. R.C.C. - M- 25
Unit =cum
a) Material
Cement t 0.400 5,061.82 2,024.73
Coarse sand cum 0.45 699.53 314.79
20 mm aggregate cum 0.54 1,907.83 1,030.23
10 mm aggregate cum 0.36 1,966.88 708.08
b) Labour
Mate day 0.08 320.00 25.60
Mason (1st Class) day 0.12 430.00 51.60
Mazdoor (Unskilled) day 1.73 280.00 484.40
Bhisti day 0.27 320.00 86.40
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 153.91 61.56
d) For formwork and staging add 20% of (a+b+c) for height upto 5m 957.48
13.2 1000 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) complete as per
drawings and MORD technical specification Clauses 1000,1200 as per
direction of the Engineer in charge
Unit = t
SUPER STRUCTURE
a) Material
HYSD bars including 5 per cent for laps and wastage t 1.05 45,745.02 48,032.27
Binding wire kg 8.00 216.90 1,735.20
b) Labour for cutting, bending, tying and placing in position
Mate day 0.44 320.00 140.80
Blacksmith day 3.00 370.00 1,110.00
Mazdoor (Unskilled) day 8.00 280.00 2,240.00
c) Overheads @ 15% on (a+b) 7,988.74
Rate per t = a+b+c 61,247.01
Labour welfare Cess 1% 612.47
61,859.48
13.5 800 Providing and laying cement concrete wearing course M 30 grade including
reinforcement complete as per drawing and technical specifications Clauses
800 and 1206.3
Unit = cum
a) Material
Cement t 0.43 5,061.82 2,176.58
Sand cum 0.45 699.53 314.79
20 mm aggregate cum 0.54 1,907.83 1,030.23
10 mm aggregate cum 0.36 1,966.88 708.08
HYSD bar reinforcement (Rate as per item13.2) t 0.075 53,258.27 3,994.37
b) Labour
Mate day 0.08 320.00 25.60
Mason (1st Class) day 0.12 430.00 51.60
Mazdoor (Unskilled) day 1.88 280.00 526.40
Bhisti day 0.27 320.00 86.40
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 153.91 61.56
d) Overheads @ 15% on (a+b+c+d) 1,346.34
e) Royalty
Sand cum 0.45 35.00 15.75
20 mm aggregate cum 0.54 130.00 70.20
10 mm aggregate cum 0.36 130.00 46.80
Rate per cum = a+b+c+d+e 10,454.70
Labour welfare Cess 1% 104.55
10,559.25
13.6 800
R.C.C. of M 25 grade approach slab including reinforcement and framework
complete as per drawing and technical specifications Clauses 800, and 1211
Unit = cum
a) Material
Reinforcement cement concrete M 25 grade
Rate asper item 13.1 II cum 1.00 6,739.34 6,739.34
HYSD reinforcement
Rate asper item 13.2 t 0.05 61,247.01 3,062.35
Rate per cum 9,801.69
Labour welfare Cess 1% 98.02
9,899.71
14.1 & 1300 Providing and laying boulder appron for bed protection & pitching on slopes with
14.5 stone boulders of minimum size and weight as per Table 1300.1, no fragment
weighing less than 25 kg laid dry complete as per drawing and technical
specifications Clause 1301 & 1302
Unit = cum
a) Material
Stone boulder (25 kg minimum) cum 1.00 1,101.08 1,101.08
Stone spalls cum 0.20 1,042.11 208.42
b) Labour
Mate day 0.04 320.00 12.80
Mason 1st Class day 0.35 430.00 150.50
Mazdoor (Unskilled) day 0.75 280.00 210.00
c) Overheads @ 15% on (a+b) 252.42
d) Royalty
Stone boulder (25 kg minimum) cum 1.00 130.00 130.00
Stone spalls cum 0.20 130.00 26.00
Rate per cum = a+b+c+d 2,091.22
Labour welfare Cess 1% 20.91
2,112.13
14.5 1300 Providing and laying pitching with stone boulders on slopes laid over prepared
filter media as per drawing and MORD technical specifications Clause 1300 and
as per direction of the Engineer in charge
I. Stone/Boulder
Unit = cum
a) Material
Stone boulder (25 kg minimum) cum 1.00 1,101.08 1,101.08
Stone spalls of minimum 25 mm size cum 0.20 1,042.11 208.42
b) Labour
Mate day 0.04 320.00 12.80
Mason 1st Class day 0.35 430.00 150.50
Mazdoor (Unskilled) day 0.75 280.00 210.00
c) Overheads @ 15% on (a+b) 252.42
d) Royalty
Stone boulder (25 kg minimum) cum 1.00 130.00 130.00
Stone spalls of minimum 25 mm size cum 0.20 130.00 26.00
Rate per cum = (a+b+c+d) 2,091.22
Labour welfare Cess 1% 20.91
2,112.13
14.6 1300 Providing and laying filter material underneath pitching in slopes complete as per
drawing and technical specifications Clause 1302 and as per the direction of the
Engineer-in-charge.
Unit = cum
a) Material
Aggregate- Crushable type such as moorum or Gravel cum 1.20 195.38 234.46
for Grading III
b) Labour
Mate day 0.05 320.00 16.00
Mazdoor (Skilled) day 0.25 370.00 92.50
Mazdoor (Unskilled) day 1.02 280.00 285.60
c) Overheads @ 15% on (a+b) 94.28
d) Royalty
Aggregate- Crushable type such as moorum or Gravel cum 1.20 35.00 42.00
for Grading III
Rate per cum = a+b+c+d 764.84
Labour welfare Cess 1% 7.65
772.49
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. Spe. (Rs.) (Rs.)
14.11 1300 Construction of Toe wall For Protection of Slopes as per Drawing and Technical
Specifications Clause 1302.5
I. Random Rubble Masonry in case of stone pitching Laid with Cement
Mortar (1:5)
(iii). In Cement Mortar (1:5)
Unit = cum
a). Material
Stone For RR Masonary cum 1.00 182.00 182.00
Through and Bond Stone
(7nox0.24x0.24mx0.39m=0.16cum) Nos. 7.00 12.00 84.00
b) Labour
Mate day 0.12 320.00 38.40
Mazdo
Mason 1st Class day 1.20 430.00 516.00
Mazdoor (Unskilled) day 1.80 280.00 504.00
Bhisti day 0.08 320.00 25.60
c) Add For Scaffolding @ 5% on (a+b) 67.50
d) Overheads @ 15% on (a+b) 212.63
(e). Royalty
Stone For RR Masonary & Bond Stone cum 1.16 130.00 150.80
Rate per cum = a+b+c+d 1,780.93
Labour welfare Cess 1% 17.81
1,798.74
14.10 1300 Construction of flexible apron 1 m thick comprising of loose stone boulders
weighing not less then 25 kg beyond curtain wall
Unit = cum
a) Material
Stone boulder cum 1.00 1,101.08 1,101.08
Stone spalls cum 0.20 1,042.11 208.42
b) Labour
Mate day 0.05 320.00 16.00
Mason 1st Class day 0.25 430.00 107.50
Mazdoor (Unskilled) day 1.00 280.00 280.00
Add: 1 per cent of cost of (a+b) for trimming and preparation of bed 17.13
c) Overheads @ 15% on (a+b) 259.52
d) Royalty
Stone boulder cum 1.00 130.00 130.00
Stone spalls cum 0.20 130.00 26.00
Rate per cum = a+b+c 2,145.65
Labour welfare Cess 1% 21.46
2,167.11
Suggestive Providing aggregate plugat on sides of drainage layer in road work using Gr-III
agrregate of required size as per drawing & technical specification clause 5.8 of
SP-20 and clause 401.5 of MORD
Unit - cum
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. Spe. (Rs.) (Rs.)
with plate compactor or power rammer to restore the original alignment, level
and slopes as per drawings and MORD technical specifications Clause 1902
15.2 1900 1. Maintenance of Earthen shoulder (filling with fresh selected soil)
Note: Earth stripped from earthen shoulders to be used as shoulders or dumped on the
side slopes locally for disposal.
Bitumen for pre-mix carpet @ 14.60 kg per 10 sqm = 200 x 14.6 / 10 = 292 tonne 0.290 31,100.08 9,019.02
kg
Bitumen for seal coat @ 6.8 kg per 10 sqm tonne 0.140 31,100.08 4,354.01
= 200 x 6.8 / 10 = 136 kg
Sr. Ref. to Rate Amount
Description Unit Quantity
No. MORD Spe. (Rs.) (Rs.)
Crushed stone aggregate @ 0.27 cum per 10 sqm cum 5.40 1,933.22 10,439.41
= 200 x 0.27 / 10 = 5.4 cum (Rate =( 9cum13.2+4.5cum 11.2mm)/13.5)
Crushed stone chipping passing 6.70 mm sieve and retained on 180 micron cum 1.20 1,604.37 1,925.24
sieve @ 0.06 cum per 10 sqm
200 x 0.09 / 10 = 1.80 cum
d) Overhead charges @ 15% on a+b+c 5,650.16
e) Roalty
Crushed stone aggregate 0 = 5.4 cum cum 5.40 130.00 702.00
Crushed sand = 1.20 cum cum 1.80 35.00 63.00
Cost for 200 sqm = a+b+c+d+e 44,082.89
Rate per sqm = a+b+c+d+e/200 220.41
Labour welfare Cess 1% 2.20
222.61
Unit = 1 km
Assuming 1 km stone, 4 nos 200 metre stone and 1/5th 5km stone
(i) Painting two coats with synthetic enamel paint
200 m stone 4 nos = 0.760 sqm. 6000
One km stone = 0.815 sqm.
5th km stone 1x1/5 = 0.320 sqm.
Total =(1.575+0.320)= 1.895 sqm.
As per item No. 10.5 of chapter 10 sqm 1.895 84.04 159.26
(ii) Printing letters and figures of any shade with synthtic enamel paint of any
approved colour to give an even shade
200 m stone 4 Nos = 40 per cm height per letter
One no km stone = 120 per cm height per letter
5th km stones 1/5th = 60 per cm height per letter
Total =(160+60)= 220 per cm height per letter
Rate as per item no 10.1 of chapter 10 per cm
height per 220.00 0.900 198.00
letter
a) Labour
Mate day 0.024 320.00 7.68
Mazdoor day 0.50 280.00 140.00
Mason 1st Class day 0.10 430.00 43.00
b) Materials
Cement, sand, aggregates etc. LS 100.00
c) Overheads charges @ 15% on (a+b) 43.60
Rate per/km = (i+ii+a+b+c) 691.54
Labour welfare Cess 1% 6.92
698.46
15.12 1900 Cutting of branches of trees shrubs and trimming of grass and
weeds
(i) Cutting of branches of trees from the road way or with in R.O.W including
disposal of wood and leaves to suitable location as per technical specification
(ii) Cutting of shurb from the road way or with in R.O.W including disposal of wood
and leaves to suitable location as per technical specification Clause 1914 of
MORD as per direction of the Engineer in charge.
Unit=Each
Taking output = 100 nos shrubs
a) Labour
Mate day 0.08 320.00 25.60
Mazdoor (Unskilled) day 2.00 280.00 560.00
b) Overhead charges @ 15% on (a) 87.84
Cost for 100 shurbs = a+b 673.44
Rate per shurb = a+b/100 6.73
Labour welfare Cess 1% 0.07
6.80
Sr. Ref. to Rate Amount
Description Unit Quantity
No. MORD Spe. (Rs.) (Rs.)
iii) Triming of grass and weeds from the shoulder/berms and disposal the same to
suitable location as per technical specification Clause 1914 of MORD as per
direction of the Engineer in charge
Unit = sqm
Taking output = 1500 sqm
a) Labour
Mate day 0.40 320.00 128.00
Mazdoor (Unskilled) day 10.00 280.00 2,800.00
b) Overheads charges @ 15% on a 439.20
Cost for 1500 sqm = a+b 3,367.20
Rate per sqm = a+b/1500 2.24
Labour welfare Cess 1% 0.02
2.26
15.13 1900 White washing of parapet walls of CD work and tree truncks
White washing two coats on parapet walls and tree trunks including preparation of
surface by cleaning scraping etc. as per MORD technical specifications Clause 1915
as per direction of the Engineer in charge.
Unit = sqm
Taking output = 9 sqm
a) Labour
Mate day 0.01 320.00 3.20
Mazdoor (Unskilled) day 0.143 280.00 40.00
White washer day 0.143 370.00 52.86
b) Materials
Lime Qntl. 0.045 1,900.00 85.50
Fevicol adhesive kg 0.10 321.32 32.13
Indigo kg 0.013 59.06 0.77
c) Overhead charges @ 15% on a+b 32.17
REPORT
During coducting compass survey on the road to find out / select the suitable alignment
Nandighara,Goudap
public representatives of village uta,Bandhasahi,SAL Discussion was made with them &
IAJHARI,Tikarpali
they have agreed for construction of the road on the exsting alignment.Required land
width is available, how ever if required the villagers/land owners agreed to extend their
construction of the road,since entire length of the road is passing through revenue land.
Executive Enginer
R.W.Division, Nayagarh
RANSECT WALK REPORT
REPORT
mpass survey on the road to find out / select the suitable alignment
rquired land available for improvement of the road.No forest land or private land
Executive Enginer
R.W.Division, Nayagarh
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS.
Name of the road: Nandighore to Saliajhari
Type of cross Drainage Work: Hume Pipe Culvert (1000mm dia Double row) PACKAGE NO
2
Sl. Ht / Th
Description of item Nos. Length Width Unit Quantity Rate in Rs.
No in M
1 2 3 4 5 6 7 8 9
1000 mm dia Double row 1 × 7.50 RM 7.50
For 0 no culverts 7.50 x 0 RM 0.00 @ 10329.62
6 Plain/reinforced cement concrete in sub-
structure complete as per drawings and MORD
technical specification Clauses 800,1200 and
as per direction of the Engineer in charge
2
Format-F-7
NO
Nayagarh
Odagaon
Amount in
Rs.
10
0.00
0.00
0.00
0.00
2
Amount in
Rs.
10
0.00
0.00
0.00
ve Enginer
on, Nayagarh
2
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY) Format-F-7
Foundation
Abutments 2 × 7.40 × 3.20 × 0.20 Cum 9.47
Piers 0 × 7.40 × 2.00 × 0.20 Cum 0.00
Cut off U/S 1 × 8.00 × 1.00 × 0.20 Cum 1.60
Cut off D/S 1 × 9.00 × 1.00 × 0.20 Cum 1.80
Wing walls 4 × 1.65 × 2.52 × 0.20 Cum 3.33
D/S Bed 1 × 3.00 × 2.40 × 0.20 Cum 1.44
U/S Bed 1 × 3.00 × 1.90 × 0.20 Cum 1.14
CD Bed 1 × 6.00 × 3.50 × 0.20 Cum 4.20
Total Cum 0.00 @ 1125.35 0.00
3 Providing concrete for plain / reinforced concrete in open foundation
complete as per drawing and MORD technical specification Clause
800,1100,1200 and as per direction of Engineer-in-Charge.
U/S & D/S River Bed 1 × 6.00 × 2.50 × 0.60 Cum 16.85
1 × 6.00 × 3.00 × 0.60 Cum 23.33
Cum 0@ 2112.13 0.00
Total 0.00
For
0 Nos. of slab culvert Rs. 0.00
Cut off U/S(with side cut off) 1 × 17.90 × 1.00 × 2.00 Cum 35.80
Cut off D/S 1 × 18.90 × 1.00 × 2.50 Cum 47.25
Bridge proper and appron 1 × 9.90 × 4.90 × 0.80 Cum 38.81
Flexible appron U/S 1 × 6.10 × 2.50 × 1.00 Cum 15.25
Flexible appron D/S 1 × 6.10 × 3.00 × 1.00 Cum 18.30
Wing walls 4 × 2.20 × 2.52 × 2.00 Cum 44.35
199.76
No of culverts=2 Cum 0.00 @ 272.07 0
2 Filling Sand in foundation in trenches as per drawing and technical
specification clause 305.3.9.
PCC M 10
2 × 4.90 Rm 9.80
No of culverts=2 0.00 @ 2,581.32 0
6 Providing and laying cement concrete wearing course M 30 grade
including reinforcement complete as per drawing and technical
specifications Clauses 800 and 1206.3
In super structure
a - Deck Slab 0.00 Cum @ 1.00 Qntl. 0
No of culverts=2 0@ 6,185.95 0
In foundation
c.- Raft 0.00 Cum @ 1.00 Qntl. 0
No of culverts=2 0@ 5852.53 0
In sub structure
d-Rib & Hunch 0.00 Cum @ 0.80 Qntl. 0.000
e-Wing wall 45.79 Cum @ 0.075 Qntl. 3.434
No of culverts=2 Qntl. 0.000 @ 6,040.09 0
8 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall with 100
mm dia AC pipe extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face complete as per
drawing and MORD technical specification Clauses 614, 709,
1204 and as per direction of the Engineer in charge
Rs. 0.00
Cut off U/S(with side cut off) 1 × 22.70 × 1.00 × 2.00 Cum 45.40
Cut off D/S 1 × 23.70 × 1.00 × 2.50 Cum 59.25
Bridge proper and appron 1 × 9.90 × 9.70 × 0.80 Cum 76.82
Flexible appron U/S 1 × 10.90 × 2.50 × 1.00 Cum 27.25
Flexible appron D/S 1 × 10.90 × 3.00 × 1.00 Cum 32.70
Wing walls 4 × 2.20 × 2.52 × 2.00 Cum 44.35
Total Cum 0.00 @ 272.07 0
2 Filling Sand in foundation in trenches as per drawing and technical specification
clause 305.3.9.
( Below bed)
Rigid Appron U/S 1 × 11.30 × 2.50 × 0.30 Cum 8.48
D/S 1 × 11.30 × 3.00 × 0.30 Cum 10.17
Wing 4 × 2.20 × 2.12 × 0.40 Cum 7.46
Wing walls 4 × 2.20 × 1.92 × 0.40 Cum 6.76
4 × 3.00 × 1.06 × 3.60 Cum 45.79
Total Cum 0.00 @ 4,960.82 0
Sl. Ht / Th Amount in
Description of item Nos. Length Width Unit Quantity Rate in Rs.
No in M Rs.
1 2 3 4 5 6 7 8 9 10
5 Providing and laying reinforced cement concrete of M-25 grade in foundation
complete as per drawings and technical specifications Clause 800 & 1200 of
MoRD and as per the direction of the Engineer-in-charge
RCC M 25
(a) Raft 1 × 6.00 × 9.70 × 0.50 Cum 0.00 @ 5740.92 0
Providing and laying reinforced cement concrete of M-25 grade in Super
structure complete as per drawings and technical specifications Clause 800 &
1200 of MoRD and as per the direction of the Engineer-in-charge
In super structure
a - Deck Slab 0.00 Cum @ 1.00 Qntl. 0@ 6,185.95 0
In foundation
c.- Raft 0.00 Cum @ 1.00 Qntl. 0@ 5852.53 0
In sub structure
d-Rib & Hunch 0.00 Cum @ 0.80 Qntl. 0.000
e-Wing wall 45.79 Cum @ 0.075 Qntl. 3.434
Total Qntl. 0@ 6,040.09 0
8 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete
abutment, wing wall, return wall with 100 mm dia AC pipe extending through the
full width of the structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and MORD technical specification Clauses 614, 709,
1204 and as per direction of the Engineer in charge
Rs. 0.00
RCC M 25
(a) Raft 1 × 6.00 × 18.50 × 0.60 Cum 0.00 @ 5740.92 0
Sl. Ht / Th Amount in
Description of item Nos. Length Width Unit Quantity Rate in Rs.
No in M Rs.
1 2 3 4 5 6 7 8 9 10
Providing and laying reinforced cement concrete of M-25 grade in Super
structure complete as per drawings and technical specifications Clause 800 &
1200 of MoRD and as per the direction of the Engineer-in-charge
In super structure
a - Deck Slab 0.00 Cum @ 1.00 Qntl. 0@ 6,185.95 0
In foundation
c.- Raft 0.00 Cum @ 1.00 Qntl. 0@ 5852.53 0
In sub structure
d-Rib & Hunch 0.00 Cum @ 0.80 Qntl. 0.000
e-Wing wall 45.79 Cum @ 0.075 Qntl. 3.434
Total Qntl. 0@ 6,040.09 0
8 Providing weepholes in brick masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending
through the full width of the structures with slope of 1(V):20(H) towards
drawing face complete as per drawing and MORD technical specification
Clauses 614, 709, 1204 and as per direction of the Engineer in charge
Rs. 0.00
Cut off U/S(with side cut off) 1 × 15.40 × 1.00 × 2.00 Cum 30.80
Cut off D/S 1 × 16.40 × 1.00 × 2.50 Cum 41.00
Bridge proper and appron 1 × 7.40 × 4.90 × 0.80 Cum 29.01
Flexible appron U/S 1 × 6.10 × 2.50 × 1.00 Cum 15.25
Flexible appron D/S 1 × 6.10 × 3.00 × 1.00 Cum 18.30
Wing walls 4 × 2.20 × 2.52 × 2.00 Cum 44.35
Total Cum 0.00 @ 272.07 0
2 Filling Sand in foundation in trenches as per drawing and technical specification
clause 305.3.9.
( Below bed)
Rigid Appron U/S 1 × 6.50 × 2.50 × 0.30 Cum 4.88
D/S 1 × 6.50 × 3.00 × 0.30 Cum 5.85
Wing 4 × 2.20 × 2.12 × 0.40 Cum 7.46
RCC M 25
In super structure
a - Deck Slab 0.00 Cum @ 1.00 Qntl. 0@ 6,185.95 0
In foundation
c.- Raft 0.00 Cum @ 1.00 Qntl. 0@ 5852.53 0
In sub structure
d-Rib & Hunch 0.00 Cum @ 0.80 Qntl. 0.000
e-Wing wall 45.79 Cum @ 0.075 Qntl. 3.434
Total Qntl. 0@ 6,040.09 0
8 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete
abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full
width of the structures with slope of 1(V):20(H) towards drawing face complete as
per drawing and MORD technical specification Clauses 614, 709, 1204 and as
per direction of the Engineer in charge
0.00
Sl. Ht / Th
Description of item Nos. Length Width Unit Quantity Rate in Rs. Amount in Rs.
No in M
1 2 3 4 5 6 7 8 9 10
Junior Engineer Assistant Executive Engineer Executive Enginer
R. W. Section ,Odagaon R.W.Sub-Division, Nayagarh R.W.Division, Nayagarh
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY) Format-F-7
SAND Filling
Retaning Wall 1 × 0 × 1.100 × 0.150 Cum 0.00
Total 0.00 @ 1125.35
3. Providing M15 concrete for plain / reinforced concrete
in open foundation complete as per drawing and
MORD technical specification Clause 800,1100,1200
and as per direction of Engineer-in-Charge.
Nos. 0 @ 155.57
Total Rs.
Junior Engineer Assistant Executive Engineer Executive Enginer
R. W. Section ,Odagaon R.W.Sub-Division, Nayagarh R.W.Division, Nayagarh
Format-F-7
PACKAGE NO
Nayagarh
Odagaon
Amount in
Rs.
10
0.00
0.00
0.00
0.00
0.00
0.00
Executive Enginer
W.Division, Nayagarh
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY) Format-F-7
PACKAGE NO
Name of the Road :- Nandighore to Saliajhari
Clearing grass and remocval of rubbish up to a distance of 30m outside the periphry of the
24000.00 Cum 1.36
area as per technical specification
2.
#NAME? #NAME? Sqm #NAME?
3
Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture
comprising of masonry, cement concrete wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable 6.75 Sqm 390.48
materials and stacking the serviceable materials with all lifts and lead of 1000m as per
Technical Specification Clause 202
3. Construction of embankment with approved material obtained from borrow pits with all lead
and lift, transporting to site, spreading, grading to required slope and compacting to meet
requirement as per MoRD Rural roads Specification Clause 301as per the direction of
Engineer in charge by manual means.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with three wheel 80-100 kN static roller in stages to proper grade and camber,
145.74 Cum 2917.56
applying and brooming, crushable screening(morum and sand admixture) to fill-up the
interstices of coarse aggregate, watering and compacting to the required density as per
Technical Specification Clause 405 of MoRD & as per direction of Engineer-in-Charge.
8.
Grading No. -III (53-22.4 mm size) with crusable screening 764.39 Cum 2844.90
9. 9715.50 30.23
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of
granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0
Cum
kg/sqm using mechanical means as per MORD Technical Specification Clause 502 for low
porosity surface and as per direction of Engineer-in-Charge.
a. Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor
at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer &
cleaned with Hydraulic broom as per Technical Specification Clause 503 of MoRD & as per 9715.50 Cum 10.50
direction of Engineer-in-Charge.
b. Providing and laying surface dressing as wearing course consisting of a layer of bitumen
Binder(-65) laid on the prepared surface,followed by a cover of crushed stone chippings of
9.5 mm nominal Precoat Chips with1% bitumen by weight of chips crushed stone chipping
9.5mm size and rolling with Three wheel 80-100KN Static roller including cleaning the road
surface as per Technical specification clause 506.(Second coat surface dressing) 0.00 Cum 76.36
11. Fine dressing and turfing including transportation by mechanical means with all lead and lift
and placing of turf in position and ramming with thapies and including watering and cost of
0.00 Sqm 17.83
all labour, materials etc. complete as per Clause 309 of MORD Specification and as per
direction of the Engineer in Charge.
C.C ROAD
14.
Providing concrete for plain / reinforced concrete in open foundation complete as per
drawing and MORD technical specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.M15
15. Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with three wheel 80-100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening(morum and sand admixture) to fill-up the
interstices of coarse aggregate, watering and compacting to the required density as per
Technical Specification Clause 405 of MoRD & as per direction of Engineer-in-Charge.
Filling Sand in foundation in trenches as per drawing and technical specification clause
305.3.9. 72.45 Cum 1125.35
17. Providing M15 concrete for plain / reinforced concrete in open foundation complete as per
drawing and MORD technical specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge. 72.45 Cum 4629.17
M15 Plain/reinforced cement concrete in sub-structure complete as per drawings and
MORD technical specification Clauses 800,1200 and as per direction of the Engineer in
414.00 Cum 4889.19
charge
Providing and laying pitching with stone boulders on slopes laid over prepared filter media
as per drawing and MORD technical specifications Clause 1300 and as per direction of the
Engineer in charge 0.00 Cum 2112.13
Providing and laying filter material underneath pitching in slopes complete as per drawing
and technical specifications Clause 1302 and as per the direction of the Engineer-in-charge. 0.00 Cum 772.49
Grouting approns & revertments 2.3cm deep with (1:3:6) with 40mm down graded size
H.G.metal 0.00 Cum 312.33
18.
TOTAL COST OF PROTECTION WALL
19.
HUME PIPE CULVERT
Earthwork in excavation for foundation of structures in all types of soil as per drawing and
technical specification Clause 305 and 1104 of MoRD includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious material and disposal upto all Cum
lead & lift, dressing of sides and bottom and back filling with excavated suitable material
upto 3mt. as per direction of Engineer-in-Charge.
65.56 272.07
Filling Sand in foundation in trenches as per drawing and technical specification clause
305.3.9. 37.04 Cum 1125.35
20. Providing M15 concrete for plain / reinforced concrete in open foundation complete as per
drawing and MORD technical specification Clause 800,1100,1200 and as per direction of 4.20 Cum 4629.17
Engineer-in-Charge.
21. Plain/reinforced cement concrete M-15 in sub-structure complete as per drawings and
MORD technical specification Clauses 800,1200 and as per direction of the Engineer in 35.94 Rm 5074.82
charge M-15
22. Providing and laying reinforced cement concrete NP3 Double Row pipe for culverts jointing
with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets as per Clause 1100 of MoRD & as per direction
of Engineer-in-Charge.
25.
SLAB & BOXCELL CULVERT
Earthwork in excavation for foundation of structures in all types of soil as per drawing and
technical specification Clause 305 and 1104 of MoRD includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious material and disposal upto all
lead & lift, dressing of sides and bottom and back filling with excavated suitable material 0.00 Cum 272.07
upto 3mt. as per direction of Engineer-in-Charge.
Filling Sand in foundation in trenches as per drawing and technical specification clause
305.3.9. 0.00 Cum 1125.35
26. Providing concrete for plain / reinforced concrete in open foundation complete as per
drawing and MORD technical specification Clause 800,1100,1200 and as per direction of 0.00 Cum 4696.88
Engineer-in-Charge.
24
Plain/reinforced cement concrete in sub-structure complete as per drawings and MORD
technical specification Clauses 800,1200 and as per direction of the Engineer in charge
31. Supplying, fitting and placing HYSD bar reinforcement (Fe 415) complete as per drawings
and MORD technical specification Clauses 1000,1200 as per direction of the Engineer in
charge
b). Providing and laying boulder appron for bed protection & pitching on slopes with stone
boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 0.00 No 2112.13
25 kg laid dry complete as per drawing and technical specifications Clause 1301 & 1302
c). Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size towards
the wall and providing over the entire surface behind abutment, wing wall, return wall to the
full height, compacted to firm condition complete as per drawing and MORD technical 0.00 No 2463.69
specification Clause 1204.3.8 and as per direction of the Engineer in charge
TOTAL COST
Providing and fixing of typical OMBADC informatory sign board with Logo as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly
welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most
plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG
sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm
x 600mm, 600mm below ground level. The top most diamond plate will be welded to
middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled
2.00 8656.90
on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed
synthetic enamel paint of superior quality in required shade and colour. All sections of
framed posts and steel tube will be painted with primer and two coats of epoxy paint as per
drawing Clause Annexure 300,800,1700 of MORD as per direction of the Engineer in
charge
Providing and fixing of typical OMBADC citizen information board as per MORD
specifications and drawing. Three MS Plates of 50x5mm mm thick, back plate duly welded
with 75mm dia steel tubes back on edges as per drawings. The upper & lower plate will be
welded with MS flat iron frame of 50mmx5mm. The steel tubes duly embedded in cement
concrete M-15 grade blocks of 600mm x 600mm x 750mm below ground level.All M.S. will
be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted 3.00 12777.33
with ready mixed synthetic enamel paint of superior quality in required shade and colour.
All sections of framed posts and steel tube will be painted with primer and two coats of
epoxy paint as per drawing Clause 1701 and Annexture 1700.1.
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as
per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour
on back with red reflective border of 65 mm width and required letters and figures with
reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of
required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube 2.00 1968.58
firmly fixed to the ground by mean of properly designed foundations with M-15 grade
cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing
Clause 300,800,1700 as per direction of the Engineer in charge.(600 mm square)
Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8
fixing in position including painting and printing, etc as per drawing and MORD technical
Specification Clause 1703 as per direction of the Engineer in charge
#NAME?
#NAME?
35737.80
#NAME?
32640.00
#NAME?
2635.74
0.00
2379243.09
0.00
0.00
0.00
31580.34
971906.51
425205.19
2174613.11
293699.57
102012.75
0.00
0.00
#NAME?
1081142.65
0.00
1193689.62
2839241.18
105127.85
81531.61
335383.37
2024124.66
0.00
0.00
0.00
24843.68
2571011.17
17836.91
41682.96
19442.51
182389.03
0.00
0.00
96806.55
0.00
0.00
358157.96
0.00
0.00
0.00
0.00
0.00
155397.65
0.00
59074.07
0.00
59448.58
25296.94
0.00
0.00
0.00
0.00
0.00
299217.24
17313.80
38331.99
3937.16
3156.85
13529.39
12644.88
0.00
#NAME?
81736.2
#NAME?
258419.16
310103.04
361786.86
413470.68
465154.50
1808934.24
#NAME?
Executive Enginer
R.W.Division, Nayagarh
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. BOX-CELL CULVERT
Rs. 0.00
(1:2:4) Nominal Mix M-20 1 x 0.150 x 0.150 ###1.200 Cum 0.03 @ 5520.55 149.05
(1:2.5:5) Nominal Mix M-15 Wall 1 x 0.450 x 0.450 ###0.300 Cum 0.06 @ 4960.82 301.37
Total Rs. 595.90
The Cost for TBM Pillar 595.90 x 24 Rs. 14301.60
Sl. Ht / Th Quant
Description of item Nos. Length Width Unit Rate in Rs. Amount in Rs.
No in M ity
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for foundation of
structures upto 3 mtr debth as per
drawing and technical specification
clause 1104 including setting out
construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing sides and bottom and
back filling with approved materials.
(a) Deck slab 1 × 3.10 × 2.40 × 0.220 1.64 Cum @ 3760.65 6167.00
(b) Abutment cap 2 × 3.10 × 0.50 × 0.150 0.47 Cum @ 3010.28 1415.00
(c) Wearing Coat(M-25)
1 × 3.10 × 2.40 × 0.075 0.56 Cum @ 3034.82 1699.00
(D) Parapet 2 × 3.10 × 0.40 × 0.400 0.99 Cum @ 3010.28 2980.00
CANAL SLOPE
4 × 3.00 × 1.40 × 0.150 2.52 Cum @ 322.95 814.00
Total cost Rs 70344.00
Foundation
Abutments 2× 8.20 × 2.20 × 1.70 Cum 61.34
Pier 1× 8.20 × 1.60 × 1.70 Cum 22.3
Cut off U/S 1× 14.10 × 0.60 × 1.40 Cum 11.84
Cut off D/S 1× 16.80 × 0.60 × 1.70 Cum 17.14
Bed
D/S Bed 1× 10.60 × 2.50 × 0.75 Cum 19.88
U/S Bed 1× 10.60 × 1.50 × 0.75 Cum 11.93
CD Bed 2× 7.50 × 4.10 × 0.75 Cum 46.13
Foundation
Wing walls 4× 3.40 × 1.65 × 1.40 Cum 31.42
Total Cum 223.98 @ 296.24 66351.84
2 Backfilling in foundation trenches as per drawing and technical clause 1108
(Sand filling)
Foundation
Abutments 2× 8.20 × 2.20 × 0.20 Cum 7.22
Pier 1× 8.20 × 1.60 × 0.20 Cum 2.62
Cut off U/S 1× 14.10 × 0.60 × 0.20 Cum 1.69
Cut off D/S 1× 16.80 × 0.60 × 0.20 Cum 2.02
Wing walls 4× 3.40 × 1.65 × 0.20 Cum 4.49
Bed
D/S Bed 1× 10.80 × 3.60 × 0.20 Cum 7.78
U/S Bed 1× 10.80 × 2.60 × 0.20 Cum 5.62
CD Bed 2× 7.50 × 4.40 × 0.20 Cum 13.2
Total Cum 46.64 @ 1114.21 51966.75
3 Plain cement concrete M-10 (1:3:6) Nominal mix in levelling coarse below
open foundation of head walls as per drawing and technical clause 1109
B. SHUTTERING
Abutments 8.0+7.5 0+0.9 2.00 Cum 13.95
2 X x x
2 2
1st Step 2× 7.5 × 0.3 × 2.00 Cum 9
2nd Step 2× 7.5 × 0.3 × 2.00 Cum 9
Pier 1× 7.5 × 0.90+0.50 × 2.00 Cum 10.5
2
Wing 4× 4.5 × 0.3 × 2.00 Cum 5.4
2
4 × 4.5+3.6 × 0+0.65 × 2.00 Cum 10.53
2 2
Total Cum 58.38 @ 5,578.77 325688.30
5 R.C.C. M-25 in super structure using 12mm size chips including centrering
centering shuttering cost, conveyance, royalty, taxes etc. of all materials
complete
(a) Deck Slab 2× 5.60 × 7.50 × 0.43 Cum 36.12 @ 6739.34 243424.96
U/S & D/S River Bed 1× 10.8 × 2.6 × 0.6 Cum 16.85
1× 10.8 × 3.6 × 0.6 Cum 23.33
Cum 40.18 @ 2,091.22 84025.22
9 Providing and Fixing 25mm dia anchor bars in abutments & piers as per
approved design for holding down deck slab with abutment & piers etc.
complete.
Free end
Abutment & Pier = 8 Nos. @ Rs. 250.00 2000.00
Fixed end
Abutment & Pier = 8 Nos. @ Rs. 61.60 492.80
10 Providing and laying filter media with granular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and technical specification Clause
1204.3.8
Total 2092663.19
For
1 Nos. of slab culvert 1x 2092663.19 Rs. 2092663.19
13.1 R.C.C. M-20 in super structure using 12mm size chips including centrering
.II centering shuttering cost, conveyance, royalty, taxes etc. of all materials
complete
13.2 Supplying, fitting and palcing HYSD bar reinforcement (Fe-415) complete as
per drawing and technical specification Cluses 1002, 1005, 1010 & 1202
(d) Abutment 2× 5 No 10
Wing wall 4× 2 No 8
No 18 @ 121.84
12 Providing and laying filter media with granular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size
towards the soil and bigger size towards the wall and providing over the
entire surface behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8
14.1 Providing and laying boulder appron for bed protection with stone boulders
of minimum size & weight as per table 1300.1, no fragment weighing less
than 25 kg. laid dry complete as per drawing and technical specification
clause 1301
1x 450151 Rs.
PACKAGE NO
Nayagarh
Odagaon
Amount in Rs.
4473.00
1967.00
41894.00
33389.00
152738.00
34244.00
8125.00
76451.00
68699.00
2193.00
10443.00
3544.00
7092.00
3714.00
1185.00
450151.00
450151.00
Executive Engineer
W.Division, Nayagarh
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY) Format-F-7
COST ESTIMATE FOR REPAIR TO EXISTING CD WORK
Name of the road: Nandighore to Saliajhari PACKAGE NO
0 no District : Nayagarh
Type of soil : All kinds of soil Block : Odagaon
Ht / Th
Sl. No Description of item Nos. Length Width Unit Quantity Rate in Rs. Amount in Rs.
in M
1 2 3 4 5 6 7 8 9
1 Dismantling of existing structures like
culverts, bridges, retaining walls and
other sturcture comprising of masonry,
cement concrete wood work, steel work,
including T&P and scaffolding wherever
necessary, sorting the dismantled
material, disposal of unserviceable
materials and stacking the serviceable
materials with all lifts and lead of 1000m
as per Technical Specification Clause
202
0.785 ×
U/S D/S revetment 0 × 1.35 × 1.45 × 0.15 Cum 0.00 @ 772.49 0.00
0.785 ×
U/S D/S revetment 0 × 1.35 × 1.45 × 0.30 Cum 0.00 @ 2112.13 0.00