TO : CONTRACTOR
We request your approval on the following Document(s) : “ERECTION ITP FOR BLDG-15 UTILITY BUILDING”
Document Type : A4 Hard Copy Discipline : Steel (Structural)
Area of Application : PEB Steel structure system BOQ Ref. No : GC-00-QDC-X11-011 page 2/5/2
Drawing Ref. : Project IFC Drawings Standards : QCS 2010
Specification : As Per BOQ Other : N/A
Enclosure : N/A Document No. : GC-10-ATC-S13-011
We certify that the above submitted documents have been reviewed in detail and are correct and in strict conformity with the
contract drawings specification except as otherwise stated.
FOR : THE SUB-CONTRACTOR
Name SOUMEN (QA/AC) 3081-8276 07 September 2015
Name Signature Date
ACTION CODE
A Approved As Submitted B Approved – Approved as Noted C Revise – Resubmit
D Rejected – Resubmit E Receipt acknowledged
TO : THE SUB-CONTRACTOR
We return hereby this actioned Submittal for Approval of Documents. The approval shall not releive the Contractor of its obligations and liabilities
under the Contract or constitute authorization of any change to Contract Documents, and therefore,shall not imply any recognition whatsoever of
additional time or cost to the contract.
FOR : CONTRACTOR
Receiving by Sub-Contractor…
Name Signature Date
FATA GULF
DOCUMENT TITLE :
P
1
1
INSPECTION AND TEST (ITP) PLAN
Discipline ITP Code Insert the Subcontractor
Subcontractor Name ITP Description (see UC-00-FAT-X03-001) (see UC-00-FAT-X03-001)
Logo
STRUCTURAL STEEL INSTALLATION
Al Alia Trading & Contracting WLL (Utility Building) S GC-10-ATC-S13-011
Page 1 of 2
INSPECTION AND TEST (ITP) PLAN
Discipline ITP Code Insert the Subcontractor
Subcontractor Name ITP Description (see UC-00-FAT-X03-001) (see UC-00-FAT-X03-001)
Logo
STRUCTURAL STEEL INSTALLATION
Al Alia Trading & Contracting WLL (Utility Building) S GC-10-ATC-S13-011
Conformance with
3.1 Material Verification GC-10-ATC-S52-010 to 014 H W R
reference documents
Conformance with
3.2 Cladding Installation GC-10-ATC-S52-010 to 014 H W R
reference documents
Touch Up for above said all Erected As per paint Manufacture Conformance with
4.1 H W R
Areas recommendations reference documents
5 HANDING OVER
Conformance with
5.1 Handing Over As Per Contract H W R
reference documents
Page 2 of 2