Madam / Gentlemen:
Thank you for giving ASM Steel Buildings, the opportunity to submit a proposal on this project.
This proposal is based on ASM Steel’s Standard Design criteria and Standard material Specifications.
However, the overall dimensions and layout are in general accordance with your inquiry.
We are committed to deliver quality workmanship and extraordinary services for your esteemed project
with great perfection and customer satisfaction.
Sincerely yours,
Building Parameters
1 Type Clear Span (CS)
2 Width (m) 15.24 O/O
3 Width Module (m) 1@15.240 O/O
4 Length (m) 30.48 O/O
5 Bay Spacing (m) 1@4.20 + 1@7.044 + 1@6.096 + 2@6.570
6 Clear Height (m) 5.0
7 Roof Slope 1 : 10
8 Type of end Frames Both: Post & Beam;
Partitions
The supply of partitions includes all the necessary framing in addition to 0.5mm thick
PebRoof(R) painted sheeting as described in the table below. Insulation for partitions (if
required) is included in the special buyouts portion of this building.
Partition
Open Wall
No. Type Length Height
Condition
(m) (m)
1 Longitudinal 15.240 Full height Fully Sheeted
2 Longitudinal 13.140 Full height Fully Sheeted
3 Longitudinal 11.244 Full height Fully Sheeted
Quote No. Q000.17 Rev. 00 Date 03-05-2020 Page 2 of 8
Building Parameters
1 Type Lean To
2 Width (m) 6.096 O/O
3 Width Module (m) 1@6.096 O/O
4 Length (m) 6.096 O/O
5 Bay Spacing (m) 1@6.096
6 Clear Height (m) 5.0
7 Roof Slope 1 : 10
8 Type of end Frames Both: Rigid frame Ends;
Design Loads
1 Design Live Load (kN/M2) on Frame 0.57 (57 Kg/M2)
2 Design Live Load (kN/M2) on Purlin/Roof 0.57 (57 Kg/M2)
3 Wind Speed (KM/Hr) – 3 Sec Gust 130 (Exposure C)
4 Additional Collateral Load (KN/M2) 0.50
5 Earthquake Zone Zone 4
6 Maximum Rain Fall Intensity 150 mm/Hr.
Building Parameters
1 Type Clear Span (CS)
2 Width (m) 16.533 C/C of Steel columns
3 Width Module (m) 1@16.533 C/C of Steel columns
4 Length (m) 68.268 C/C of Steel columns
5 Bay Spacing (m) 1@6.821 + 1@6.840 + 2@6.831 + 1@9.742 + 1@8.60
1@9.741 + 1@8.093 + 1@4.769
6 Clear Height (m) 7.314
7 Roof Slope 1 : 10
8 Type of end Frames Both: Rigid frame Ends;
Design Loads
1 Design Live Load (kN/M2) on Frame 0.57 (57 Kg/M2)
2 Design Live Load (kN/M2) on Purlin/Roof 0.57 (57 Kg/M2)
3 Wind Speed (KM/Hr) – 3 Sec Gust 130 (Exposure C)
4 Additional Collateral Load (KN/M2) 0.50
5 Earthquake Zone Zone 4
6 Maximum Rain Fall Intensity 150 mm/Hr.
ASM STEEL RESERVES THE RIGHT TO USE OTHER CODES WHEN NEEDED
Deflection
Deflection Structural Member Load Case
Limitation
Live or 10 years
1 Main frame rafters Span/ 180
Wind
Snow or 10
2 Roof purlins Span/ 150 years Wind or
Vertical Live
Deflection 3 Mezzanine beams and joists Span/ 360 Dead Load
4 Top running crane (TRC) beams Span/ 600 Crane load
5 Underhung crane (UHC) beams Span/ 450 Crane load
6 Monorail crane (MR) beams Span/ 450 Crane load
Main frame columns with eave
1 Eave height/60 10 year Wind
height (EH) up to 9.0 m
Main frame columns with eave
2 height (EH) greater or equal to 9.0 Eave height/100 10 year Wind
Lateral m
Deflection Main frames supporting top 10 year Wind or
3 Height/100
running cranes Crane lateral
4 Wall Girt Span/ 120 10 year Wind
5 Endwall wind columns Span/ 120 10 year Wind
6 Portal frames Height/120 10 Year Wind
Quote No. Q000.17 Rev. 00 Date 03-05-2020 Page 5 of 8
Material Specifications
Minimum
No Components Specifications Applicable Design Code
yield strength
ASM Steel reserves the right to substitute partly some of the materials in case of material non-
availability or supply shortages
Quote No. Q000.17 Rev. 00 Date 03-05-2020 Page 6 of 8
2. The Delivery Period is considered to start on the date of first delivery of the materials to the
carrier.
3. Please allow minimum of 02 weeks for Approval Drawings submittal, 05 weeks if buildings
are complex.
4. Customer is required to return Approval Drawings to ASM Steel office within 02 weeks
from the dated of receipt. Any delay in the return of the Approval Drawings back to ASM
Steel office may result in a change to our delivery commitment and contract price.
1. This proposal is valid for 07 days from the above noted date. Any extension of validity by
ASM Steel must be in writing.
2. If the job (project) is not “Released for Production” within 30 days from the date of entering
this order at ASM Steel head office, it will be subject to delivery change and price change
in accordance with the prevailing delivery schedules and prices at the end of the above
noted period
Quote No. Q000.17 Rev. 00 Date 03-05-2020 Page 7 of 8
“Released for Production” means that the Approval Drawings has been returned by the
buyer “Approved as Noted” or “Approved as Is”, the agreed upon payment terms, as per
Section 10, have been fulfilled by the buyer and the job has been released for final
engineering production and fabrication at ASM Steel.
3. The portion of this order that is not shipped within Two months from the date of entering
this order at ASM Steel head office will be subject to a price change in accordance with the
prevailing prices posted at the above noted time period.
Total 100%
Note:
Down payment shall be made within 7 days of signing the contract.
The completion period mentioned for supply and erection is subject to the enforcement of force
majeure i.e. Act of God, War, Military operation, Flood and disease etc. or any other things
beyond human control.
5. Our price does not include doors/windows not specifically mentioned in the offer.
6. Any additional inspection or Special Testing is excluded. Charges will be applied to
customer if any additional or special testing is requested.
7. Third Party inspection is excluded. The Cost for any Third Party inspection is to be totally
borne by Customer.
8. All Prices are without any taxes
9. We have based our offer on present day market prices of materials. Any variation in the
market prices will be applicable to this offer.
10. Any change in government laws that effect theour prices shall change the price
accordingly.
Total 490,090
1. Adequate supply of water and power will be given to us at construction site free of any cost
from the very beginning.
2. Sufficient space for accommodation of our staff & labor will be provided to us at site free of
any cost.
3. The construction / erection site shall be clear in all respects for the cranes to operate and
space is available to place steel members where required. Site clearance shall be the
responsibility of customer.
4. The construction / erection site shall have enough space for off-loading and de-stuffing
containers once they arrive on site.
5. Space for storage of material will be provided near the work area and covered store for
small parts, insulation and T&P will also be provided nearby.
6. The surplus material at site after the completion of work shall be the property of ASM Steel.
7. ASM payments shall be cleared within 3 days from the date of submission of the invoice.
8. Third Party inspection is excluded. The Cost for any Third Party inspection is to be totally
borne by Employer.
Quote No. Q000.17 Rev. 00 Date 03-05-2020 Page 9 of 8
9. In case of any dispute between the two parties third party arbitration (acceptable to both
subject parties) shall come into place for the purpose of dispute resolution and the decision
of the third party in this regard shall be considered as final argument.
10. Any working day lost due to instruction of client/client requirements or any other reason
beyond the control of ASM STEEL, the client shall compensate for the idle labour and the
corresponding working day lost shall be added to the completion time.
11. Any changes in tax structure by the Government during the project shall be added in the
contract price.
12. If any re-work is required due to any reason other than our contractual obligations then it
will be compensated by the client.
13. The Erection price does not include the cost of anchor bolt setting. ASM Steel Shall
provide complete supervision for the installation of anchor bolts to the civil contractor free
of any cost.
14. Payment Terms of Erection:
15. The erection time shall start from the day the material will arrive on site and the site is clear
for erection works as well as RCC columns and pedestals (where our column or rafter base
plate shall be placed) are properly poured with the anchor bolts and well cured.
Located in :
Construction Site :
And represented by :
Located in : 191-COM-A DHA Phase 5 Ext Bedian Road, Lahore Cantt, Pakistan.
1. ASM Steel’s Proposal No. Q000.17, Rev. 00 Dated _____________ with agreed and
initiated amendments (if any).
IN WITNESS HEREOF, the authorized parties hereto have executed this Contract.
_______________________________ _________________________
Name : Name : Ali Sajid Malik
Title : Title : Principal Engineer
Date :……/……/……. Date :……/……/….