1. Scope
2. Surface Preparation
- Dry blast cleaning to a visual standard of Sa 2.1/2 near-white metal finish (SIS 05
59 00).
- For local touch up/repair work power tool cleaning to a visual standard of St 3 (SIS
05 59 00).
- Hand tool cleaning to a minimum visual standard of St 2 (SIS 05 59 00) only for
specific applications.
3. Coating System
- Prime Coat :
Inorganic zinc silicate to a d.f.t. of 75 microns minimum.
(Minimum pure Zinc content in d.f.t shall be 85%)
- Second Coat :
Polyamide cured tie coat of d.f.t 40 microns minimum.
- Third Coat :
Amine or Polyamide cured high-build epoxy of marine environment type to a d.f.t. of
125-175 microns.
- Fourth Coat :
Polyurethane high gloss finish to a d.f.t. of 50-75 microns, with finishing colour to
match the existing.
Client ADWEA
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: SPECIFICATION FOR PAINTING & EXTERNAL COATING OF METAL PIPES &
STRUCTURES