Sunteți pe pagina 1din 4

Laboratory No.

12
Program the following requirements in the
EASY SOFT PLC
Names of the members: Yheruslava Galarza
Department: Santa Cruz de la Sierra
College: UCB - SCZ
Teacher's name: Fernando Vargas
Code and name of the discipline: IND-203 P2
Department of Mechatronic and Industrial Engineering
Date of realization: 28/05/2020
1.- Entrance Control of people, the process is as follows: With a Switch the
People Counting system will be turned on, which will detect with a
photoelectric sensor the amount of 100 people (10 for the simulation) after
that a pilot light will come on for 5 seconds that after the time will turn off,
there will also be an extra button to reset the counter at any time and the
working hours of this system will be 6 continuous hours between 18:00 and
24:00 hours from Monday to Friday (any 1 minute for the simulation).

3.- You have a manual pneumatic pressing machine and you want to
implement an automatic polyethylene thermal pressing system for the
manufacture of plastic plates, the system will work as follows: With a start
button, the air compressor and two electric heating elements will be
activated. 200 watts located in the base plate and in the press and when a
capacitive sensor detects material in the base plate and pressing the
pressing button and wait a time of 5 seconds (this for the safety of the
2.- Count of Juice Cans, the process is as follows: With a start button, a operator) and a cylinder will descend to press this work will last 3 minutes
conveyor belt will be switched on, which will move the juice cans, they will since it is a thermal pressing the temperature relationship is already
be detected by a photo-electric sensor and when registering the quantity of available work which at that time reaches 80 ° C, after this time the cylinder
50 cans (5 for the simulation) a sound beacon will light up permanently will rise, this process will be repeated continuously and also desired To
and the conveyor belt will turn off, there will be a button for the reset. know the quantity of pressing plates in an hour of work, it should be noted
that to start work the cylinder must be suspended for safety, there will be a
button stop and reset and an emergency stop button in case of any
eventuality.
- Conclusions
Once we introduced some basic concepts about PLCs, we
learned the most popular programming language, it is the
LADDER language. Using examples and exercises, the
language was developed from the wiring diagram of an
electromechanical system (relays). After describing the
symbols for the processor used in the course, we combine
them on a Ladder diagram.

S-ar putea să vă placă și