Sunteți pe pagina 1din 14

GA & DATASHEET AVAILABLE WITH US STATUS

BUFFER HOPPER
1 BUFFER HOPPER BLOWER Available
2 BUFFER HOPPER AERATION BLOWER Available
SILO UTILITY BUILDING
3 SILO AERATION BLOWER Available
4 HEATER FOR SILO AERATION BLOWER Available
5 WASH WATER PP NA
6 ASH CONDITIONER WATER PUMP NA
COMPRESSOR HOUSE
7 IAC DRIER Available
8 TAC DRIER Available
9 IAC Available
10 TAC Available
11 TRANSFER PUMP TO ST#1 & 2 Available
12 COOLING TOWER Available
13 COOLING WATER PUMP ST#1 Available
14 IA RECVR TANK (10 M3) Available
15 TAC RECVR TANK (4 M3) Available
SILO EQUIPMENTS
16 ASH CONDITIONER Available
17 ROTARY VANE FEEDER Available
18 TELESCOPIC CHUTE Available
19 SUMP DRAINAGE PUMP Available
ELECTRICAL EQUIPMENTS
20 1 MVA , 1.6MVA XMERS
21 PLC PANEL
22 UPS BATTERY SYSTEM
Type
Make
Duty
Model no.
Operating/Rated speed of Blower shaft(RPM)
Discharge Pressure(kg/cm2)
Discharge Capacity(kg/cm2)
IAC
1
Model:
2
Make:
3 Type:
4 FAD(Fire Air Delivery):
5
Discharge Pressure:
6 ST#2
7 ST#1
8 Cooling water Inlet Pressure
9 Cooling water pressure drop across
compressor
10 Safety valve set pressure(outlet)
11 No. of screws(screw arrangement)
12 No. Of stages
13 Motor rating
Motor RPM
Main components
Intercooler
After cooler
Air Intake filter
Lub oil
Oil Qty
Method of lubrication
INSTRUMENT AIR RECEIVER NEAR SILO AREA
ST#1
ST#II
capacity
Working pressure
Desigh Pressure
Hydro Test Pressure

INSTRUMENT AIR RECEIVER


TAC
1
Model:
2
Make:
3 Type:
4 FAD(Fire Air Delivery):

5
Discharge Pressure:
6 ST#2
7 ST#1
8 Cooling water Inlet Pressure
9 Cooling water pressure drop across
compressor

Cooling water requirement

10 Safety valve set pressure(outlet)


11 No. of screws(screw arrangement)
Gear Ratio
12 No. of stages
13 Motor rating
Motor RPM
Motor Make
Main components
Intercooler
After cooler
Air Intake filter
Lub oil
Oil Qty
TRANSPORT AIR RECEIVER

TAC

Total 3 nos.( TAC+ TAD) / unit.

U#1 & 2 compressor house:

U# 3 & 4 compressor house:

U# 5 & 6 compressor house:

IAC
Total 1 nos. ( IAC+ IAD) / unit.

U#1 & 2 compressor house:

U# 3 compressor house:

U# 4 &5 & 6 compressor house:


ZR 132

Atlas Copco India ltd.

Oil free screw- water cooled

1100 m3/hr @ 8 Ksc

8 ksc
4 Nos.(3W+1S)
3 Nos.(2W+1S)
2.5-3 bar

1 bar

9.3 bar

2 nos.(1 male+ 1 female)per stage


2 stages
145 KW
2980

ROTO Z
35 L
Forced Feed

1 no.
2 nos.
4 M3
8 KSC
10 KSC
Minimum 10 min as per IS 2825
ZA6

Atlas Copco India ltd.

Single stage:Oil free screw , water cooled

5443 m3/hr at 2KSC

5100 m3/hr at 1.5 KSC

2 Ksc
6 no+3 no.
6 no.
2.5-3 ksc

3.7

2 nos.(1 male+1 female)


G-250
1
365 KW
1485 RPM
Marathon
ORT AIR RECEIVER

2 no.(W)+ 1 no.(S)

ST#1 compressor house: 6 (TAC+ TAD)


U#1- 3 (TAC+ TAD)
U#2- 3 (TAC+ TAD)

ST#2 compressor house:6 (TAC+ TAD)


U#3- 3(TAC+ TAD) ( existing)
U#4- 3 (TAC+ TAD)( new)

ST#2 compressor house:6 (TAC+ TAD)


U#5- 3 (TAC+ TAD)
U#6- 3 (TAC+ TAD)

ST#1 compressor house: 3(IAC+ IAD): (1W+1S)


U#1- 1 (IAC+ IAD)
U#2- 1 (IAC+ IAD)

2 NOS. ( 1W + 1S)
U#3- 1 IAC+ IAD ( existing)

ST#2 compressor house:4 (IAC+ IAD): (3 W+1S)


U#4-1 IAC+ IAD
U#5- 1 IAC+ IAD
U#6- 1 IAC+ IAD
UTILITY BUILDING
SR.NO. EQUIPMENT NAME ST#1 ST#2
1 WASH WATER PP 2 2

2 ASH CONDITIONER WATER PUMP 3 3

3 AERATION BLOWER 5 7

4 AIR HEATER 5 7

5 TOTAL EQUIPMENTS 15 19

COMPRESSOR BUILDING
SR.NO. EQUIPMENT NAME ST#1 ST#2
1 IAC 3 4

2 IA R ( 10 M3) 3 4

3 IAD 3 4

4 TAC (03 NO. Already exist in ST#1) 6 6

5 TA R(3 M3) 6 6

6 TAD (03 NO. Already exist in ST#1) 6 6

6 TOTAL EQUIPMENTS 27 30

SILO ST#1 1 & ST# 2


SR.NO. EQUIPMENT NAME ST#1 ST#2
IA R(4M3) 1 2

COOLING TOWER 2
One no. IAC per Unit and one Standby.

(2 no. TAC per Unit, 1 no. Standby)


ST#2 compressor house has 6 TAC for U#5 & 6.
ST#1 compressor house has 6 TAC for U#1 & 2.

For U#3: 3 TAC are already there.


For Unit#4
ST#2 SILO UTILITY BUILDING EQUIPMENT DETAILS
SR.NO. EQUIPMENT NAME ST#2 ST#2 SUCTION DISCHARGE

Pump Suction
1 WASH WATER PP 2 ( 1W+1S) header-200 NB 100lines
NB WATER PIPE LINE-discharge
from two pp make one
pipe from RCC
tank. common header of 100 NB

Pump Suction
2 ASH CONDITIONER WATER PUMP 3 ( 2W+1S) header-200 NB 100 NB WATER PIPE LINE-discharge
lines from three pp make one
pipe from RCC common header of 125NB.
tank.

125 NB BLOWER PIPE LINE discharge


from each blower.
7th spare Fludizing blower is connected
to all running blowers having individual
3 AERATION OR FLUIDIZING BLOWER 7 ( 6W+1S) valve. if blower 1 is out, its
discharge valve will be closed and 7th
blower will be connected to discharge
pipeline of 1ST BLOWER.

4 AIR HEATER 7 ( 6W+1S)

5 TOTAL EQUIPMENTS 19

Note: Total there will be 9 no. of pipe lines coming out below Cable & pipe rake-Silo Utility building
1 Silo fluidizing air pipe-125NB--6 nos.
2 Wash water Pipe- 100 NB-1 no.
3 Ash conditioner water Pipe- 125 NB-1 no.
4 Transfer water line-150NB-1 no. Make up for RCC water tank

100 NB(transfer water line) -Cooling water make-up


100 NB(transfer water line)- ash slurry wash water in Silo. 03 no. Pipe lines
from Pump house
near U#3 TACH
03 no. Pipe lines
from Pump house
near U#3 TACH
150 NB(transfer water line)- RCC water tank make-up in Silo UB
SR.NO. EQUIPMENT NAME
1 IAC

2 IA R ( 10M3)

3 IAD

4 TAC

5 TA R(3 M3)

6 TAD

6 TOTAL EQUIPMENTS

04 no. IA line 125 NB will emerge from 04 no. IAC


80 NB IA line
20 NB IA line
01no. 250 NB cooling water inlet line to IAC & IAD from Cooling tower
01no. 250 NB RETURN cooling water outlet line
65 NB drain pipe
04 NO. 125 NB IA line emerges from 4 NO. IAR making header of 200 NB

03 NO. 250 NB TAC line


ST#1 ST#2
3 4

3 4

3 4

6 6

6 6

6 6

27 30

S-ar putea să vă placă și