APPENDIX II

OUTLINE OF NEW FACILITIES

Base Building Works Interior Fit-out Works


1 Façade Design (Tower) 1 WTC Club House Design
2 Additional Floors on 8F for Club Game Centre 2 Hotel Guest Rooms Design
3 Structural Audit and Design (Item 2) 3 Hotel Executive Lounge Design
4 MEP Audit and Allocation 4 Back of House Interior Design
5 Exterior Lighting Design 5 Club and Hotel Common Area Design
6 STP/ ETP , Boundary wall, Landscaping Design 6 Electro-Mechanical Design for Interior
7 Parking Area Realignment 7 Roof top Restaurant Interior Design
8 WTC Club Layout Design 8 Restaurants and Café Design
9 Hotel Guest Rooms Layout Design 9 Convention Hall and Banquet Interior
10 Pool with Support Facilities Design 10 Branding, Wayfinding and Signage (Interior)
11 Back of House Layout (Kitchen, Laundry, Etc.) 11 Spa and Health Club Design
12 Reception Lobby Redesign 12 Furniture, Fixture and Equipment (FF&E)
13 Wayfinding and Circulation Design (Base Building) 13 Operating Services and Equipment (OS&E)

Extended Floor (if structurally


possible)
The Project should demonstrate excellence of design, offer value for money, meet business needs and be
environmentally friendly.

A. Basements
a. Parking management system
b. Ventilation
c. CO or other gas monitoring system
d. Driver’s waiting room
e. Emergency light
f. Fire Stair
g. Drainage system at 3rd basement
h. Roller Shutter/ Gate in each Basement entrances
i. Auto Signal system
j. Signage

B. Ground Floor (Outside)


a. Security check post with related utility facilities
b. Redesign of the entry gate
c. LED/ or any other Display to show AD / Digital Banner/ATM Booth Zone (Min 10 Nos) -24/7 accessible
from road
d. Boundary wall with Exterior Lighting Design
e. Traffic isolation and circulation management
f. Building directory Sign
g. Counter for Parking Management system (For information and billing management)
h. CAR wash zone
i. Waste collection zone
j. Mechanism for Temporary barrier in case of water logging (upto 1 M)

C. Ground Floor (Inside)


a. Security check point (Arch way/Scanner etc.)
b. Filling up the existing void at the ceiling of GF ( ie. 1st floor)
c. Small coffee zone
d. Reception & information booth
e. Security observation room/BMS Room
f. Traffic isolation (based on functionalities)
g. Separate Entry for Exclusive Members/Hotel Lobby (Guest Entry)/ Club Entry/ Office users/ Fair Visitors
etc.
h. Door/ Gate /Access control in Stair

D. 1st to 6th floor


a. Way finding
b. Emergency Exit
c. Smoking zone
d. Improvement in the common area with flower bouquet Tub, Bench & Recycle bin etc.
e.

E. 7th, 8th & 9th Floor (Structural modification for extension, if Structurally possible)
a. Reception
b. Common lounge
c. WTC Convention hall
d. Banquet hall
e. Restaurants / Glass Restaurants
f. Kitchen
g. Bakery
h. Smoking zone
i. WTC Club (Including club facilities for 1500 members)
j. Access control facility
k. Lounge
l. Health Club
m. Indoor Game zone
n. Meeting area
o. Open lobby
p. Lake view lobby
q. Drinking corner
r. Change room/Powder Room
s. Admin office
t. Executive committee office
u. Store
v. Roof top gardening
w. outdoor game
x. Swimming Pool with Support Facilities

F. 10th to 16th floor


a. Commercial office space (Design adaptable to hotel in future)

G. 17th to 20th floor & roof top Helipad


a. Guest Rooms with Upscale 5-star standard facilities
b. Junior Suits/Executive Lounge
c. Pool & Roof-top Restaurants
d. Helipad (if possible)

G. Other/General requirements
a. Overall improvement of the Entire Building including Base building.
b. MEP Audit and Allocation
c. Electrical Substation/ Generator/BBT Audit and Allocation
d. Modified Elevation with LED display , SIGNAGE and provisions for outside glass Maintenance ( should try
to dismantle existing Corbel for smooth maintenance )
e. Back of House Layout (Kitchen/Laundry etc.)
f. Way finding and Circulation Design (Base Building)
g. Façade Design with modification in the Cornish and signage
h. Structural Audit and Design for modification / extension (To be vetted by Base building Structural
designer i.e. Engr. Prof. S Z Basunia)
i. STP/ETP/CMS/WTP Design
j. Waste collection and dumping planning
k. Car washing zone
l. Low voltage system (Telephone, Cable TV network, FADS, FPS, CCTV, PA, Internet etc.)
m. Separate Cooling system for servers in different floors, lift machine rooms and sub station
n. Waiting room and toilet facilities for drivers
o. Electronic Security System
p. Uninterrupted power supply for lift, Server and CCTV system
q. Under vehicle surveillance system (UVSS)
r. Stairwell Pressurization (For Fire Exit Stairs)
s. Access control of different users
t. Store with management facilities (Separate for Permanent, Dumping, saleable or scrap)
u. Workshop
v. 24/7 Building management office
w. Dinning for office staffs with kitchen (staff /officer)
x. Change room
y. Training room
z. Residence for Security guard/ staffs
aa. Fire fighting Lift
bb. Emergency generator for fire fighting
cc. Smoking Zone at different floor of the building
dd. Central server room
ee. Utility billing system
ff. Redesign of IBMS room
gg. Waste water line to wash Mop up utensils
hh. Roof top restaurants / gardening with lighting
ii. Building illuminations
jj. Removal of existing Escalator up to 4th floor and convert the voids as atrium.
kk. Installation of additional Lift from GF or below( if required)
ll. Mechanism to Monitor Service Duct with detection system
mm. Fire Barrier
nn. Automatic Utility Billing system for Electricity, Water, HVAC etc. for each user of the entire building to be
developed as per consumption,( Modification will be allowed, if required).
oo. Floor directory and safety instruction in the Lift cars

IMPORTANT NOTE:
The Bidder may suggest /recommend any other facilities which have not been covered. They
may also recommend any new modern item in order to make the business club more attractive
and comfortable.