The Ceiba Field is located in
T
he Ceiba Field Early Production System consists of four Cameron
meters (150 miles) south of the
SpoolTree Production Systems each tied back to individual, retrievable country’s capital, Malabo. The
subsea manifolds. Each manifold ties one tree to two export flowlines via a water depth is approximately
are then tied back to the Floating Production Storage Offloading (FPSO) vessel.
(18 miles) offshore and has a crude oil storage capacity of 2 million barrels.
The wells in the Ceiba Field have been completed using field-proven,
modular components that are part of Cameron’s MOSAIC product line. The
subsea production trees are 5000 psi WP Cameron SpoolTree Systems. Each tree
The Ceiba Field Early Production System set a deepwater industry record, with a discovery to first oil time of less than 14 months. The
following indicates the fast pace of this project and the successful use of Cameron MOSAIC systems to provide pre-engineered
components with application-specific components within a tight delivery schedule:
Start Triton Energy announces Ceiba Field discovery. Month 8 Cameron delivers fourth SpoolTree Christmas tree;
Month 1 Triton Energy confirms Ceiba Field discovery. Cameron delivers first manifold.
Month 2 Cameron submits proposal for MOSAIC system. Month 9 Cameron delivers two more manifolds;
Month 3 Cameron is awarded contract for MOSAIC system. Cameron delivers CAMTROL topsides equipment;
Month 4 Cameron delivers STM wellheads and tools; First tree is installed.
Triton Energy signs contract with FPSO manufacturer. Month 10 Second and third trees and four manifolds are installed.
Month 6 Cameron delivers first SpoolTree Christmas tree. Month 13 FPSO arrives in Ceiba Field.
Month 7 Cameron delivers two more SpoolTree Christmas trees. Month 14 First oil achieved.
Cameron MOSAIC Systems and Subsystems
for the Ceiba Field Early Production System
Subsea Manifolds
Retrievable Pigging Loops
CVC Connectors
FLS Hydraulically Actuated Gate Valves
Piping as Required
Dual Header Piping
Manifold Support Structure
Manifold Running Tool
Debris Cap
Production Well Jumper Systems
CVC Running Tools
CVC Connectors
Adjustable Well Spreader Beams
Fabricated Piping
STM Wellhead Systems
Completion Guide Bases
Casing Hangers, Seal Assemblies, Wear Bushings
Running and Testing Tools
SpoolTree Christmas Tree Systems
FLS Gate Valves
CM Actuators
DWH Tree Connectors
Hydraulic Tubing Hanger and Running Tool
Isolation Sleeve
Electro-Hydraulic Umbilical Junction Hubs
Running Tools
Debris Caps
High Pressure Caps
Integral Spool Bodies and Protective Structures
All Related Running and Testing Tools
CAMTROL Production Control System
Surface Components
Master Control Station (MCS)
Electrical Power Unit (EPU)
Uninterruptible Power Supply (UPS)
Hydraulic Power Unit (HPU)
Return Reservoir Unit (RRU)
Topside Umbilical Termination Unit (TUTU)
Manifold-Mounted Subsea Components
Umbilical Termination Assembly (UTA)
Subsea Distribution Unit (SDU)
Subsea Control Module (SCM)
Subsea Accumulator Module (SAM)
UTA-to-SDU Umbilical Jumper
SDU-to-Tree Control and Monitoring Jumper
SDU-to-Manifold Pigging Jumper
Tree-Mounted Subsea Components
Fixed Junction Plate
Production Pressure/Temperature Transmitter
Annulus Pressure Transmitter
Downhole Pressure/Temperature Transmitter Jumper
Intervention Equipment
Deepwater Liftline Running Tool (DLRT)
System Analyses
Reliability Availability Maintainability Analysis
Hydraulic Analysis
Electrical Communication Analysis
Electrical Power Analysis
Ceiba Field Early Production System Components
T he Ceiba Field project utilizes the SDU. Insulation is applied to the and tested, the running tools and spreader
Cameron MOSAIC Production loop pipe and insulated enclosures are beam are retrieved.
Systems for the Christmas tree and provided for the CVC connectors.
related systems. Several of the key The dual header piping includes STM™ Wellhead System
elements are described in detail below. two 8" CVC connectors hubs, one for the The Ceiba Field wellhead system is a
pigging loop, one for the export line. One Cameron Single Trip Metal Sealing (STM)
CAMERON MOSAIC COMPONENTS header also includes a branch tie-in to Type S Wellhead rated for 10,000 psi WP.
the Manifold Isolation Valve (MIV), a The 18-3/4" housing hub incorporates
Subsea Manifolds Cameron 6" manual gate valve with a profile designed to accommodate the
Each Ceiba Field manifold is used ROV interface. The second header also Cameron tree connector.
to tie one Cameron SpoolTree production incorporates two CVC hubs along with a
system to two export flowlines. All Cameron 1/2" manual gate valve for the SpoolTree™ Christmas Trees
annulus bleed line. The header lines are The Ceiba Field Christmas Trees are
fully piggable and the branch tie-inline 5" x 2" 5000 psi WP Cameron SpoolTree
has a pig-excluding device. systems. Although primarily intended
Each manifold contains four ROV- for guidelineless installation, guideline
installed flying leads: UTA-to-SDU, capability is also incorporated into
SDU-to-tree, SDU-to-pigging valve, the design.
and manifold-to-tree.
Manifold Being Installed
Cameron Controls
Cooper Cameron (Singapore) Pte, Ltd. ICS House Badentoy Park
Subsidiary Of Cooper Cameron Corporation Badentoy Avenue
2 Gul Circle, Jurong Industrial Est Portlethen
Singapore 629560 Aberdeenshire, Scotland AB12 4YB
Republic Of Singapore Tel 44 1224 282 000
Tel 65 861 3355 Fax 44 1224 781 800