Contrat ID :16JO0004

Name of Project:Upgrading (Unpaved toPaved) of Eastern Bobongan-Sominot-Midsalip-Dumingag Road, Zamboanga del Sur
Station :Chainage:10818-11698 (Km.1674+230, -Km. 1674+880.00 L=650.00 Ln.m.),Chainage:11728-13998(K1675+140.00-Km.1677+410.00, L=227
Location Zamboanga del Sur
Contractor: :ESR Construction and Development Corporation
Subject: :Monthly Accomplishment Report
Date:
STATEMENT OF WORK ACCOMPLISHMENT (SWA)
AS OF :

% ACCOM
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL RELATIVE QUANTITY ACCOMPLISHMENT % ACCOM
Wt. PREV. THIS PERIOD TO DATE PREV.
Removal of Structures & Obstruction( RCPC 610mm dia.)
101(4a) 26.00 ln.m. 1,300.65 33,816.90 0.037%
(Removalof
Removal ofStructures
Existing ACP)
& Obstruction( RCPC 1070mm dia.)
101(4b) 9.00 ln.m. 1,660.95 14,948.55 #DIV/0!
(Removal of Existing ACP)
102(2) Surplus Common Excavation 21,682.00 cu.m. 121.79 2,640,650.78 2.900%
103 Structure Excavation 1,047.00 cu.m. 213.88 223,932.36 0.246%
103(3) Foundation Fill 22.00 cu.m. 780.45 17,169.86 0.019%
103(6) Pipe Culvert and Drain Excavation 332.00 cu.m. 180.10 59,793.20 0.066%
104(1) Embankment from Excavation 47,683.00 cu.m. 223.15 10,640,461.45 11.685%
105 Subgrade Preparation 20,840.00 sq. m. 19.78 412,215.20 0.453%
200 Aggregate Sub-base Course 13,090.00 cu. m. 902.06 11,807,965.40 12.968%
300 Aggregate Surface Course 633.00 cu. m. 1,085.11 686,874.63 0.754%
311a PCCP-using Conventional Method, 0.28m Thick 23,435.00 sq. m. Err:522 Err:522 42.093%
311b PCCP, 0.15m Thick 6,887.00 sq. m. - 7.638%
404 Reinforcing Steel Bar, Grade 40 18,328.00 kg. Err:522 Err:522 1.446%
405 Structural Concrete, Class A 453.00 cu.m. Err:522 Err:522 4.079%
500(1a) RC Culvert Pipe, 910 mm (36'') 171.00 ln.m. Err:522 Err:522 1.243%
505(5) Grouted Riprap, Class A 397.00 cu.m. - 1.789%
506 Stone Masonry 173.00 cu.m. Err:522 Err:522 0.876%
611(1) Trees(Furnishing and Transplanting) 339.00 each Err:522 Err:522 0.705%
612(1) Reflectorized Thermoplastic Pavement markings (white) 916.00 sq. m. Err:522 Err:522 2.108%
612(2) Reflectorized Thermoplastic Pavement markings (yellow) 517.00 sq. m. Err:522 Err:522 1.180%
622(1) Bio-Engineered Erosion Coco Fiber Erosion Control Net (CGN-700) 8,415.00 sq. m. Err:522 Err:522 1.919%
622(2) Bio-Engineered Erosion Coco Logs/ Fascine Control System 1,510.00 ln.m. Err:522 Err:522 0.973%
622(3) Bio-Engineered Erosion Control System Vegetation 8,415.00 sq. m. Err:522 Err:522 1.732%
FEA 1.1a Bunkhouse, (7.00 x 9.00) 1.00 LS Err:522 Err:522 0.768%
FEA 1.1b Facilities for the Engineers 1.00 LS Err:522 Err:522 0.154%
FEA 1.2 Project Billboard 3.00 unit Err:522 Err:522 0.010%
FEA 1.3 Construction Safety and Health Program 1.00 LS Err:522 Err:522 0.274%
FEA 1.4 Provision of a service vehicle for engineers 1.00 LS Err:522 Err:522 0.801%
SPL-1 Mobilization and Demobilization 1.00 LS Err:522 Err:522 0.520%
SPL-2 Construction Survey and Staking 3.37 Km. Err:522 Err:522 0.181%
500 RC Culvert Pipe, 610 mm 18.00 ln.m. Err:522 Err:522 0.094%
502(1) Manhole 6.00 each Err:522 Err:522 0.014%
502(4) Concrete Cover 6.00 each Err:522 Err:522 0.004%
503 Metal Frame & Grating 6.00 set Err:522 Err:522 0.007%
600(3) Concrete Curb and Gutter 122.00 ln.m. Err:522 Err:522 0.000%
601 Sidewalk 244.00 sq. m. Err:522 Err:522 0.248%
605(3) Informatory Signs 2.00 units - 0.000%
TOTAL 91,057,696.73 100.00%

Prepared by: Checked & Verified by:


ENGR. JESUS A. MANIAGO JR.
Project Engineer Authorized Managing Officer
10.00, L=2270.00)

ACCOMPLISHMENT %
% ACCOMPLISHMENT VALUE OF ACCOMPLISHMENT WEIGHTED REMARKS
THIS PERIODTO DATE PREV. THIS PERIOD TO DATE ACCOMP.

Approved by:
TESSIE J. YU
Proprietor