PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA LOCALIDAD
PROYECTO
DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
COSTO DIRECTO 2,456,166.33
2 6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2 6 2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2 6 2 3 OTRAS ESTRUCTURAS
2 6 2 3 99 OTRAS ESTRUCTURAS DIVERSAS
2 6 2 3 99 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 423,225.99
OPERARIO hh 4,936.56 21.91 108,160.01 108,160.01
OFICIAL hh 1,986.88 17.59 34,949.16 34,949.16
PEON hh 17,706.50 15.82 280,116.82 280,116.82
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 1,827,480.27
ASFALTO LIQUIDO MC-30 gal 1,107.1090 13.46 14,901.69 14,901.69
BREA kg 19.8400 6.00 119.04 119.04
ALAMBRE NEGRO RECOCIDO N° 8 kg 114.0960 5.00 570.48 570.48
ALAMBRE NEGRO RECOCIDO N° 16 kg 217.1073 5.00 1,085.54 1,085.54
ANGULO DE FIERRO DE 1 1/2" X 1 1/2" X 3/16" m 275.6000 8.32 2,292.99 2,292.99
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 5,761.4320 3.10 17,860.44 17,860.44
FIERRO LISO DE 5/8" PARA ESC. DE GATO m 1,038.4000 6.16 6,396.54 6,396.54
FIERRO CUADRADO LISO DE 1/2" X 1/2" m 891.0000 3.72 3,314.52 3,314.52
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 420.3123 4.20 1,765.31 1,765.31
CLAVOS PARA MADERA CON CABEZA DE 3" kg 20.3086 4.20 85.30 85.30
CLAVOS PARA CALAMINA 2 1/2" kg 6.2000 6.50 40.30 40.30
PLANCHA METALICA DE ACERO ESTRUCTURAL A36 DE 60 X 60 X 1/2" C/ AGUERO SEGUN PLAN m2 2.3760 447.70 1,063.74 1,063.74
PLANCHA METALICA DE ACERO DE 1/2" (BRIDA) INC. AGUJEROS m2 11.6800 447.70 5,229.14 5,229.14
TUBERIA PVC-SAP C-10 C/R DE 3" X 5 m m 210.0000 16.80 3,528.00 3,528.00
TUBERIA PVC-SAP C-7.5 C/R DE 3" X 5 m m 320.5125 12.48 4,000.00 4,000.00
TUBERIA PVC-SAP C-7.5 C/R DE 2" X 5 m m 320.5125 6.00 1,923.08 1,923.08
TUBERIA CORRUGADA DE POLIETILENO PERFORADA DE 4" m 3,007.7670 20.00 60,155.34 60,155.34
CODO PVC SAP 16" X 45° PESADO und 5.0000 250.00 1,250.00 1,250.00
CODO PVC SAP C/R 3" X 90° und 6.0000 18.00 108.00 108.00
CODO PVC SAP C/R 3" X 45° und 6.0000 16.00 96.00 96.00
CODO PVC SAP C/R 2" X 45° und 6.0000 8.00 48.00 48.00
CODO PVC SAP 6" X 45° und 2.0000 25.00 50.00 50.00
CODO PVC SAP 12" X 45° und 4.0000 60.00 240.00 240.00
TEE PVC-SAP C/R DE 3" X 3" PESADO und 8.0000 28.00 224.00 224.00
ADAPTADOR UPR MIXTO PVC DE 3" und 10.0000 12.00 120.00 120.00
REDUCCION PVC SAP C/R DE 3" A 2" PESADO und 6.0000 9.00 54.00 54.00
REDUCCION PVC SAP C/R DE 3" A 1" PESADO und 6.0000 6.00 36.00 36.00
TUBERIA UF DE 16" m 198.5311 132.00 26,206.11 26,206.11
TUBERIA UF DE 12" m 251.9900 85.00 21,419.15 21,419.15
TUBERIA UF DE 6" m 18.0000 25.00 450.00 450.00
CODO PVC 4"X45° und 304.0000 5.90 1,793.60 1,793.60
TUBERIA PVC SEL x 1" x 3 M m 250.0000 4.00 1,000.00 1,000.00
TAPON PVC-SAL 1" und 6.0000 6.00 36.00 36.00
YEE PVC-SAP 16" X 16" - PESADO und 5.0000 350.00 1,750.00 1,750.00
PIEDRA CHANCADA 1/2" m3 112.9599 85.00 9,601.59 9,601.59
PIEDRA CHANCADA 3/8" - 1/2" m3 224.2380 85.00 19,060.23 19,060.23
ARENA FINA m3 28.4016 65.00 1,846.10 1,846.10
ARENA GRUESA m3 715.1696 60.00 42,910.18 42,910.18
ARENA PARA CAMPO DE JUEGO SEGUN GRANULOMETRIA 0,5 mm A 1,5 mm PUESTO EN OBRA m3 3,045.7512 68.00 207,111.08 207,111.08
HORMIGON m3 57.2525 60.00 3,435.15 3,435.15
MATERIAL GRANULAR PARA BASE m3 1,047.6000 45.00 47,142.00 47,142.00
MATERIAL ORGANICO m3 147.8520 130.00 19,220.76 19,220.76
GEOTEXTIL NT CLASE 1 - 190 P m2 11,224.1614 6.30 70,712.22 70,712.22
MALLA CERCADORA NARANJA rll 14.0000 100.00 1,400.00 1,400.00
TECNOPOR DE 1" m2 4.9600 4.20 20.83 20.83
ANILLO UNION FLEXIBLE PARA PVC DE 16" - DESAGUE und 70.0000 48.00 3,360.00 3,360.00
ANILLO UNION FLEXIBLE PARA PVC DE 12" - DESAGUE und 76.0000 33.00 2,508.00 2,508.00
ANILLO UNION FLEXIBLE PARA PVC DE 6" - DESAGUE und 10.0000 8.00 80.00 80.00
TUBERIA FLEXIBLE DE POLIETILENO DE 32 MM m 1,250.0000 1.90 2,375.00 2,375.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 2,130.2245 24.50 52,190.50 52,190.50
YESO bol 70.0000 15.00 1,050.00 1,050.00
TUBERIA PVC - SAP ELECTRICAS DE 1 1/2" m 6.1800 3.63 22.43 22.43
TUBERIA PVC - SAP ELECTRICAS DE 3/4" m 206.0000 1.32 271.92 271.92
TUBERIA PVC - SAP ELECTRICAS DE 2" m 2,080.6000 6.00 12,483.60 12,483.60
TUBO DE PVC 12.50 MM O X 1500 MM und 10.3000 3.40 35.02 35.02
VIGAS DE MADERA 2" X 4" p2 91.8400 4.50 413.28 413.28
SEMILLA DE GRASS VARIEDAD BERMUDA kg 88.5839 200.00 17,716.78 17,716.78
BUZON DE RECEPCION DE CABLES EN BAJA TENSION 60X60X60 DE C°A° C/TAPA und 8.0000 85.00 680.00 680.00
CAJA DE CONCRETO DRENAJES DE 30X60X1.20 und 2.0000 120.00 240.00 240.00
CAJA DE CONCRETO DRENAJES DE 30X40X60, CON TAPA und 2.0000 60.00 120.00 120.00
BAYPOOR 300 (POLIURETANO) l 2,514.2520 29.00 72,913.31 72,913.31
BAYPOOR 250 (POLIURETANO) l 1,257.1260 29.00 36,456.65 36,456.65
BAYPOOR 200 (POLIURETANO) l 1,257.1260 29.00 36,456.65 36,456.65
BAYPOOR UNIVERSAL (POLIURETANO) l 1,257.1260 29.00 36,456.65 36,456.65
EPDM - IMPORTADO (ROJO CLASICO) kg 3,352.3360 10.50 35,199.53 35,199.53
ACETATO DE BUTILO l 2,095.2100 7.50 15,714.08 15,714.08
PEGAMENTO PARA PVC gal 15.0000 105.00 1,575.00 1,575.00
LUBRICANTE PARA TUBERIAS gal 2.2500 40.00 90.00 90.00
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA LOCALIDAD
PROYECTO
DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
ADITIVO DESMOLDEADOR DE ENCOFRADOS gal 17.1144 110.00 1,882.58 1,882.58
CAUCHO NEGRO kg 10,476.0500 6.00 62,856.30 62,856.30
MADERA PARA ENCOFRADO p2 1,198.0080 3.00 3,594.02 3,594.02
LISTONES DE MADERA 2" X 3" X 10' p2 233.3333 3.00 700.00 700.00
LISTONES DE MADERA 2" X 4" X 10' p2 156.6667 3.00 470.00 470.00
TABLAS P/ANDAMIOS 1" X 10" X 10' p2 100.0000 3.00 300.00 300.00
TABLAS P/PARIHUELAS 1" X 4" X 10' p2 144.0000 3.00 432.00 432.00
MADERA PARA ESTACA p2 519.2249 2.50 1,298.06 1,298.06
TRIPLAY DE 1.20X2.40 m X 18 mm und 80.0000 105.00 8,400.00 8,400.00
TRIPLAY DE 1.20X2.40 m X 4 mm und 10.0000 27.00 270.00 270.00
LISTONES DE MADERA 3" X 3" und 60.0000 20.00 1,200.00 1,200.00
FOCO DE 50 W und 4.0000 45.00 180.00 180.00
PLASTICO NEGRO X 50m rll 1.0000 105.00 105.00 105.00
REGLA DE MADERA p2 25.7280 4.50 115.78 115.78
LIJA PARA METAL und 940.9535 2.50 2,352.38 2,352.38
PINTURA LATEX gal 196.7645 26.00 5,115.88 5,115.88
PINTURA ESMALTE gal 246.4937 49.00 12,078.19 12,078.19
PINTURA ESMALTE SINTETICO VENCEAMEL VENCEDOR gal 11.0000 40.80 448.80 448.80
PINTURA BASE ZINCROMATO AUTOMOTRIZ gal 2.0000 47.90 95.80 95.80
PINTURA GLOSS BLANCO gal 2.0000 74.90 149.80 149.80
PINTURA EPOXICA BLANCO gal 209.5210 184.80 38,719.46 38,719.46
PINTURA ANTICORROSIVA ZINCROMATO gal 13.0000 38.00 494.00 494.00
THINNER gal 61.3675 18.00 1,104.62 1,104.62
SELLADOR A BASE DE LATEX gal 95.1174 20.00 1,902.35 1,902.35
PASTA MURAL gal 190.2348 30.00 5,707.04 5,707.04
CINTA AISLANTE rll 3.0000 6.00 18.00 18.00
CINTA TEFLON und 17.5000 2.00 35.00 35.00
PERNOS DE ANCLAJE DE ACERO G- 8 1.20 M X 3/4" und 48.0000 260.00 12,480.00 12,480.00
PERNOS DE ACERO G- 8 DE 3" X 3/4" und 192.0000 30.00 5,760.00 5,760.00
PERNOS DE ACERO G- 8 DE 2" X 5/8" und 28.0000 20.00 560.00 560.00
GANCHO SUSPENSION PAS/CAN + TUE. C2 und 12.0000 80.00 960.00 960.00
ACCESORIOS DE SUCCION Y DESCARGA glb 1.0000 3,920.00 3,920.00 3,920.00
ACCESORIOS EN TANQUE INODORO und 15.0000 20.00 300.00 300.00
SOLDADURA ELECTRICA CELLOCORD P 1/8" kg 10.0000 15.70 157.00 157.00
SOLDADURA ELECTRICA SUPERCITO DE 1/8" kg 118.0000 16.40 1,935.20 1,935.20
SOLDADURA ELECTRICA SELLOCOR P 1/8" kg 1.0000 15.50 15.50 15.50
TUBO METÁLICO NEGRO CIRCULAR - PESADO DE 4" m 31.2400 82.30 2,571.05 2,571.05
ELECTROBOMBA 15 HP SALIDA DE 3" und 1.0000 9,200.00 9,200.00 9,200.00
CALAMINA GALVANIZADA 22mm x 1.80m x 0.83m und 53.1600 16.00 850.56 850.56
LUMINARIA - LAMPARA und 16.0000 8.00 128.00 128.00
INTERRUPTOR THERMOMAGNETICO MONOFASICO 2 x 20 TIPO RIEL und 9.0000 26.35 237.15 237.15
INTERRUPTOR THERMOMAGNETICO TRIFASICO 3 x 40A, TIPO RIEL und 1.0000 82.50 82.50 82.50
INTERRUPTORES und 5.0000 6.00 30.00 30.00
TOMACORRIENTE MONOFOSICO DOBLE und 5.0000 12.00 60.00 60.00
TOMACORRIENTE TRIPLE UNIVERSAL 16A P/SOBREPONER und 4.0000 15.00 60.00 60.00
TUBO METALICO CIRCULAR DE 16" X 1/4" X 6.40 M m 38.4400 517.96 19,910.38 19,910.38
TUBO METALICO CIRCULAR DE 12" X 1/4" X 6.40 M m 37.4400 325.00 12,168.00 12,168.00
TUBO METALICO CIRCULAR DE 10" X 1/4" X 6.40 M m 37.4400 233.60 8,745.98 8,745.98
TUBO METALICO CIRCULAR DE 8" X 1/4" X 6.40 M. m 18.5200 192.97 3,573.80 3,573.80
TUBO METALICO CIRCULAR DE 4" X 4 MM X 6.4 M m 24.0000 110.80 2,659.20 2,659.20
TUBO METALICO GALVANIZADO CIRCULAR - PESADO DE 2" m 8.8000 34.60 304.48 304.48
CASCO BLANCO NACIONAL 6 PUNTOS und 18.0000 15.00 270.00 270.00
CASCO AMARILLO NACIONAL 6 PUNTOS und 30.0000 12.00 360.00 360.00
CASCO AZUL NACIONAL 6 PUNTOS und 18.0000 12.00 216.00 216.00
LENTES DE POLICARBONATO LUNA CLARA und 54.0000 8.00 432.00 432.00
RESPIRADORES DESCARTABLES und 42.0000 6.00 252.00 252.00
GUANTES DE CUERO par 42.0000 12.00 504.00 504.00
CHALECO REFLECTIVO und 48.0000 10.00 480.00 480.00
UNIFORME PARA OBRERO jgo 48.0000 60.00 2,880.00 2,880.00
BOTINES DE SEGURIDAD CON PUNTA DE ACERO par 56.0000 55.00 3,080.00 3,080.00
EXTINTOR DE POLVO QUIMICO SECO DE 8 KG und 5.0000 180.00 900.00 900.00
BOTIQUIN DE PRIMEROS AUXILIOS PARA LA OBRA glb 1.0000 350.00 350.00 350.00
COLLARINES DE PE DE 63 MM X 1" und 24.0000 15.00 360.00 360.00
COLLARIN DE PE DE 90 MM X 1" und 18.0000 24.00 432.00 432.00
CINTA DE SEÑALIZACION und 5.1500 45.00 231.75 231.75
BANDERINES PARA CORNER und 4.0000 180.00 720.00 720.00
REDES PARA ARCO DE FUTBOL - PESADO, TIPO PROFESIONAL und 2.0000 1,750.00 3,500.00 3,500.00
SEÑALIZACION DEFENSA CIVIL glb 1.0000 1,400.00 1,400.00 1,400.00
CABLE ELECTRICO AWG N° 12 - 14 m 52.8571 3.50 185.00 185.00
CABLE ELECTRICO AWG N° 16 - 18 m 1,400.0000 2.20 3,080.00 3,080.00
CABLE UTP DE 4 PARES m 226.6000 2.50 566.50 566.50
CABLE NYY 3X1X25 mm2 (FASE) m 4,944.0000 31.20 154,252.80 154,252.80
CABLE NYY 3X1X50 mm2 m 556.2000 50.25 27,949.05 27,949.05
CABLE NYY 1X1X50 mm2 m 82.4000 16.26 1,339.82 1,339.82
CABLE LSOH 1X10 mm2 (TIERRA) m 206.0000 3.80 782.80 782.80
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA LOCALIDAD
PROYECTO
DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
PROYECTOR LED DE LUZ BLANCA DE 2000W TIPO ARENAVISION und 24.0000 8,326.08 199,825.92 199,825.92
CAJA PARA VALVULA IRRTEC und 5.0000 70.00 350.00 350.00
CONDUCTOR NYY 3X1X50MM2 (FASE + TIERRA) m 185.4000 14.04 2,603.02 2,603.02
ARANDELA A PRESION DE ACERO G- 8 DE 3/8" CON AGUJERO DE 3/4" und 248.0000 8.00 1,984.00 1,984.00
ARANDELA A PRESION DE ACERO G- 8 DE 3/8" CON AGUJERO DE 5/8" und 28.0000 6.00 168.00 168.00
ARGOLLAS PARA TUBOS METÁLICOS und 80.0000 5.00 400.00 400.00
TUERCA Y CONTRATUERCA DE ACERO G-8 DE 3/4" und 496.0000 14.00 6,944.00 6,944.00
TUERCA Y CONTRATUERCA DE ACERO G-8 DE 5/8" und 56.0000 10.00 560.00 560.00
CONECTOR BIMETALICO PARA AI DE 25 MM2 Y COBRE DE 16 MM2 TIPO CUÑA und 10.0000 8.50 85.00 85.00
CAJA DE REGISTRO PARA POZO A TIERRA und 10.0000 45.00 450.00 450.00
ELECTRODO DE ACERO RECUBIERTO DE COBRE DE 16 mm O x 2.4 m. X 2,40 M. und 10.0000 78.40 784.00 784.00
TABLERO GENERAL DE DISTRIBUCION PARA RIEGO und 1.0000 2,990.00 2,990.00 2,990.00
TABLERO DE DISTRIBUCION TD-02, 380/220V, 26 POLOS, ADOSADO und 1.0000 380.00 380.00 380.00
ASPERSOR EMERGENTE DE BASTAGO RETRACTIL Y ROTOR ALC. 19.80 M und 35.0000 360.00 12,600.00 12,600.00
QUIMICOS PARA POZO A TIERRA UND/5 KG und 20.6000 75.16 1,548.30 1,548.30
SWIN JOINT DE 1" X 12" und 35.0000 65.00 2,275.00 2,275.00
END CAP TUB DE 4" und 76.0000 18.80 1,428.80 1,428.80
END CAP TUB DE 16" und 4.0000 95.00 380.00 380.00
MARCADOR DE CAMPO DE PRESIÓN CONTINUA hm 7.2550 30.00 217.65 217.65
BIDON DE AGUA TRATADA und 700.0000 4.50 3,150.00 3,150.00
INSECTICIDAS Y FUNJICIDAS l 410.7000 15.31 6,287.82 6,287.82
PANTALLA LED P 10 - DIP 346 - RA 960 MM X 960 MM (24 GABINETES) - EXTERIOR und 24.0000 5,916.00 141,984.00 141,984.00
TRANSMISOR MCTRL-300 NOVASTAR INC. SOFWARE und 1.0000 3,540.00 3,540.00 3,540.00
TERMOMETRO und 12.0000 30.00 360.00 360.00
ABONOS NATURALES kg 197.1360 8.00 1,577.09 1,577.09
HUMUS DE LOMBRIS ton 41.8914 350.00 14,661.99 14,661.99
HERBICIDA l 664.5126 10.61 7,050.48 7,050.48
REGULADOR DE PH l 1.6428 100.00 164.28 164.28
UREA kg 299.8110 10.00 2,998.11 2,998.11
FERTILIZANTES SINTETICO NPK kg 3,999.3966 1.85 7,398.88 7,398.88
FERTILIZANTES FOLIARES, ADITIVOS Y MICRO ELEMENTOS kg 2,000.1090 4.15 8,300.45 8,300.45
CORREAS DE MADERA 2.5" X 2" p2 47.8800 4.50 215.46 215.46
ANDAMIO p2 1,211.8914 3.00 3,635.67 3,635.67
CAMILLA PARA EXAMENES Y CURACION und 4.0000 220.00 880.00 880.00
EQUIPO TEMPORIZADOR PARA ASPERSORES DE RIEGO und 1.0000 620.00 620.00 620.00
ELECTROVALVULA DE PE DIAM. 3" 24 V HI FLOW (HF) und 5.0000 1,220.00 6,100.00 6,100.00
CORDEL rll 51.9224 15.00 778.84 778.84
ARNÉS DE SEGURIDAD (INC. LINEA DE VIDA ESTÁNDAR) und 4.0000 219.90 879.60 879.60
HERRAMIENTAS MANUALES - 9,625.49
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS 205,460.07
ESTACION TOTAL día 69.2299 120.00 8,307.59 8,307.59
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.0000 5,000.00 5,000.00 5,000.00
BOMBA PARA PRUEBA DE AGUA hm 32.4200 15.00 486.30 486.30
PROCESO RODILLO LISO VIBRATORIO AUTOPROPULSADO 8-10 tn hm 114.7398 140.00 16,063.57 16,063.57
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 395.1629 20.00 7,903.26 7,903.26
EQUIPO DE PINTURA hm 725.6750 10.00 7,256.75 7,256.75
ENSAYO, RESISTENCIA A LA COMPRESION PROB 27.0000 20.00 540.00 540.00
ENSAYO PROCTOR MODIFICADO glb 4.0000 80.00 320.00 320.00
PRUEBA DE INSTALACION ELECTRICA EN SISTEMA DE RIEGO und 1.0000 250.00 250.00 250.00
PRUEBA DE INSTALACION ELECTRICA EN SISTEMA DE ILUMINACION DE CAMPO und 4.0000 150.00 600.00 600.00
PRUEBA DE INSTALACION ELECTRICA EN SISTEMA DE MARCADOR ELECTRONICO und 1.0000 250.00 250.00 250.00
PRUEBA DE INSTALACION DE POZO A TIERRA und 8.0000 150.00 1,200.00 1,200.00
PRUEBA DE INSTALACION ELECTRICA EN TABLEROS und 4.0000 100.00 400.00 400.00
PRUEBA DE DENSIDAD DE CAMPO glb 6.0000 70.00 420.00 420.00
EQUIPO DE FUMIGACION hm 376.2020 10.00 3,762.02 3,762.02
MAQUINA DE SPRAY hm 16.7617 60.00 1,005.70 1,005.70
MAQUINA DEMARCADOR DE LINEA hm 16.7617 50.00 838.09 838.09
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 52.1522 180.00 9,387.40 9,387.40
MINI CARGADOR BOB CAT 953 hm 210.8481 85.00 17,922.09 17,922.09
PROCESO RETROEXCAVADORA SOBRE LLANTAS 58 HP 1/2 y3 hm 1.2908 150.00 193.62 193.62
TRACTOR DE TIRO DE 63 HP hm 16.7617 80.00 1,340.94 1,340.94
TRACTOR DE ORUGAS D7 hm 75.1393 240.00 18,033.43 18,033.43
RODILLO DE VEREDA (1 ROLA) hm 368.2000 80.00 29,456.00 29,456.00
MOTONIVELADORA 125 HP hm 114.7398 180.00 20,653.16 20,653.16
CAMION VOLQUETE DE 15 m3 hm 157.9825 150.00 23,697.38 23,697.38
PROCESO
CAMION CISTERNA (500 GLNS.) hm 74.0928 100.00 7,409.28 7,409.28
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl hm 16.7617 125.00 2,095.21 2,095.21
MAQUINA DE SOLDAR 295 A hm 144.0000 15.00 2,160.00 2,160.00
MAQUINA DE SOLDADURA AUTOGENA P/CORTE DE PLANCHA INC. CARB. Y OXIGENO hm 72.0000 80.00 5,760.00 5,760.00
VIBRADOR DE CONCRETO 4 HP 1" hm 130.9680 15.00 1,964.52 1,964.52
APISONADOR VIBRATORIO DE 80 KG hm 50.8133 10.00 508.13 508.13
MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 105.9628 25.00 2,649.07 2,649.07
MEZCLADORA DE 9 P3 PARA CAUCHO GRANULADO hm 167.6168 20.00 3,352.34 3,352.34
PAVIMENTADORA SOBRE ORUGAS DE 3,000 mm 69 HP hm 16.7617 200.00 3,352.34 3,352.34
BARREDORA MECANICA 10-20 HP 7 P.LONG. hm 16.7617 55.00 921.89 921.89
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA LOCALIDAD
PROYECTO
DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
GASTOS GENERALES 245,700.00
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES CANT TIEMPO(MES) MONTO S/. TOTAL S/.
30,600.00
EQUIPO DE COMPUTO UND 3.00 - 3300.00 9,900.00
IMPRESORA MULTIFUNCIONAL DE OFICINA UND 1.00 - 4500.00 4,500.00
MOBILIARIO (ESCRITORIO, SILLAS Y ESTANTES) GLB 1.00 - 5000.00 5,000.00
ÚTILES DE OFICINA GLB 1.00 - 1500.00 1,500.00
PAPEL BOND A4 MILL 40.00 - 25.00 1,000.00
CARTUCHO DE TINTAS UND 8.00 - 200.00 1,600.00
CUADERNO DE OBRA UND 2.00 - 100.00 200.00
VESTUARIOS E IMPLEMENTOS DE SEGURIDAD (PERS. OFIC.) UND 15.00 - 400.00 6,000.00
MEDICAMENTOS (BOTIQUÍN) GLB 1.00 - 900.00 900.00
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS CANT TIEMPO(MES) MONTO S/. TOTAL S/.
215,100.00
RESIDENTE DE OBRA ESPECIALISTA (INC. LIQUIDACION) MES 1.00 4.50 6,000.00 27,000.00
INGENIERO ASISTENTE DE RESIDENTE MES 1.00 4.00 3,500.00 14,000.00
ESPECIALISTA EN SEGURIDAD E HIGIENE (TIEMPO PARCIAL) MES 1.00 4.00 4,000.00 16,000.00
ESPECIALISTA EN GRASS NATURAL (ING. AGRÓNOMO) MES 1.00 3.00 4,500.00 13,500.00
COORDINADOR DE OBRA MES 1.00 4.00 5,500.00 22,000.00
TECNICO ADMINISTRATIVO MES 1.00 4.00 1,500.00 6,000.00
MAESTRO DE OBRA Y/O CAPATAZ MES 1.00 4.00 4,000.00 16,000.00
ESPECIALISTA EN TOPOGRAFÍA MES 1.00 4.00 3,500.00 14,000.00
SECRETARIA MES 1.00 4.00 1,500.00 6,000.00
ALMACENERO MES 1.00 4.00 1,800.00 7,200.00
ASISTENTE DE ALMACÉN MES 1.00 4.00 1,200.00 4,800.00
GUARDIAN MES 3.00 4.00 1,200.00 14,400.00
IMPRESIÓN DE PLANOS MES 1.00 4.00 500.00 2,000.00
SERVICIO DE LUZ MES 1.00 4.00 250.00 1,000.00
GASTOS NOTARIALES MES 1.00 4.00 1,000.00 4,000.00
PÓLIZA DE SEGUROS DE PERSONAL ADMINISTRATIVO MES 1.00 4.00 800.00 3,200.00
PÓLIZA DE SEGUROS DE PERSONAL OBRERO MES 1.00 4.00 2,000.00 8,000.00
ALQUILER DE CAMIONETA 4X4 (INCLUY. CHOFER Y COMBUSTIB.) MES 1.00 4.00 8,500.00 34,000.00
ALQUILER DE OFICINA MES 1.00 4.00 500.00 2,000.00
SUPERVISION 64,900.00
2 6 8 1 4 2 GASTO POR LA COMPRA DE BIENES CANT TIEMPO(MES) MONTO S/. TOTAL S/.
5,700.00
MOBILIARIO, ENSERES, MENAJE, ETC GLB 1.00 - 500.00 500.00
EQUIPO DE COMPUTO UND 1.00 - 2,000.00 2,000.00
IMPRESORA LASER UND 1.00 - 800.00 800.00
CAMARA DIGITAL UND 1.00 - 400.00 400.00
ESCRITORIO SILLAS Y ARCHIVADORES GLB 2.00 - 400.00 800.00
UTILES DE ESCRITORIO Y OFICINA GLB 1.00 - 800.00 800.00
UTILES DE LIMPIEZA GBL 1.00 - 400.00 400.00
2 6 8 1 4 3 GASTO POR LA CONTRATACION DE SERVICIOS CANT TIEMPO(MES) MONTO S/. TOTAL S/.
59,200.00
JEFE DE SUPERVISION MES 4.00 8,000.00 32,000.00 32,000.00
INGENIERO ASISTENTE DE SUPERVISION MES 4.00 3,000.00 12,000.00 12,000.00
SECRETARIA MES 4.00 1,500.00 6,000.00 6,000.00
IMPRESIONES DE COPIAS Y OTROS MES 4.00 200.00 800.00 800.00
ALQUILER DE OFICINA MES 4.00 500.00 2,000.00 2,000.00
LUZ Y AGUA MES 4.00 250.00 1,000.00 1,000.00
TELECOMUNICACIONES (TELEFONO) MES 4.00 - 100.00 400.00
DENSIDAD DE CAMPO, CBR Y OTROS CANT. 50.00 100.00 5,000.00 5,000.00
EXPEDIENTE TECNICO 32,000.00
2 6 8 1 3 1 ELABORACION DE EXPEDIENTES TECNICOS 32,000.00

LIQUIDACION ( TECNICA Y FINANCIERA ) 10,000.00


GASTOS POR LA CONTRATACION DE PERSONAL
2 6 7 1 6 1 10,000.00
RESUMEN
COSTO DIRECTO 2,456,166.33
2 6 2 3 99 3 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 423,225.99
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 1,827,480.27
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS 205,460.07
GASTOS GENERALES 245,700.00
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 30,600.00
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS 215,100.00
SUPERVISION 64,900.00
2 6 8 1 4 2 GASTO POR LA COMPRA DE BIENES 5,700.00
2 6 8 1 4 3 GASTO POR LA CONTRATACION DE SERVICIOS 59,200.00
EXPEDIENTE TECNICO 32,000.00
2 6 8 1 3 1 ELABORACION DE EXPEDIENTES TECNICOS 32,000.00
LIQUIDACION 10,000.00
2 6 7 1 6 1 GASTOS POR LA CONTRATACION DE PERSONAL 10,000.00
TOTAL 2,808,766.33
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
COSTO DIRECTO 2,456,166.33
2 6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2 6 2 CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2 6 2 3 OTRAS ESTRUCTURAS
REAL SALDO POR MONTO DEL
2 6 2 3 99 OTRAS ESTRUCTURAS DIVERSAS REQUERIDO REQUERIR SALDO N° TRAMITE UBICACIÓN ESTADO
2 6 2 3 99 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 423,225.99
OPERARIO hh 4,936.56 21.91 108,160.01 108,160.01
OFICIAL hh 1,986.88 17.59 34,949.16 34,949.16
PEON hh 17,706.50 15.82 280,116.82 280,116.82
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 1,827,480.27 1,116,501.30
ASFALTO LIQUIDO MC-30 gal 1,107.1090 13.46 14,901.69 14,901.69 1,107.00 0.1090 1.47
BREA kg 19.8400 6.00 119.04 119.04 19.50 0.3400 2.04
ALAMBRE NEGRO RECOCIDO N° 8 kg 114.0960 5.00 570.48 570.48 114.00 0.0960 0.48
ALAMBRE NEGRO RECOCIDO N° 16 kg 217.1073 5.00 1,085.54 1,085.54 217.00 0.1073 0.54 624-2019 OL FALTA ATENDER
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 5,761.4320 3.10 17,860.44 17,860.44 5,761.00 0.4320 1.34
ANGULO DE FIERRO DE 1 1/2" X 1 1/2" X 3/16" m 275.6000 8.32 2,292.99 2,292.99 270.00 5.6000 46.59
FIERRO LISO DE 5/8" PARA ESC. DE GATO m 1,038.4000 6.16 6,396.54 6,396.54 1,038.00 0.4000 2.46
FIERRO CUADRADO LISO DE 1/2" X 1/2" m 891.0000 3.72 3,314.52 3,314.52 888.00 3.0000 11.16
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 420.3123 4.20 1,765.31 1,765.31 240.00 180.3123 757.31
CLAVOS PARA MADERA CON CABEZA DE 3" kg 20.3086 4.20 85.30 85.30 20.00 0.3086 1.30
CLAVOS PARA CALAMINA 2 1/2" kg 6.2000 6.50 40.30 40.30 6.00 0.2000 1.30
PLANCHA METALICA DE ACERO ESTRUCTURAL A36 DE 60 X 60 X 1/2" C/ AGUERO SEG m2 2.3760 447.70 1,063.74 1,063.74 2.00 0.3760 168.34
PLANCHA METALICA DE ACERO DE 1/2" (BRIDA) INC. AGUJEROS m2 11.6800 447.70 5,229.14 5,229.14 11.00 0.6800 304.44
TUBERIA PVC-SAP C-10 C/R DE 3" X 5 m m 210.0000 16.80 3,528.00 3,528.00 210.00 0.0000 0.00
TUBERIA PVC-SAP C-7.5 C/R DE 3" X 5 m m 320.5125 12.48 4,000.00 4,000.00 320.00 0.5125 6.40
TUBERIA PVC-SAP C-7.5 C/R DE 2" X 5 m m 320.5125 6.00 1,923.08 1,923.08 320.00 0.5125 3.07
TUBERIA CORRUGADA DE POLIETILENO PERFORADA DE 4" m 3,007.7670 20.00 60,155.34 60,155.34 3,007.00 0.7670 15.34
CODO PVC SAP 16" X 45° PESADO und 5.0000 250.00 1,250.00 1,250.00 5.00 0.0000 0.00
CODO PVC SAP C/R 3" X 90° und 6.0000 18.00 108.00 108.00 6.00 0.0000 0.00
CODO PVC SAP C/R 3" X 45° und 6.0000 16.00 96.00 96.00 6.00 0.0000 0.00
CODO PVC SAP C/R 2" X 45° und 6.0000 8.00 48.00 48.00 6.00 0.0000 0.00
CODO PVC SAP 6" X 45° und 2.0000 25.00 50.00 50.00 2.00 0.0000 0.00
CODO PVC SAP 12" X 45° und 4.0000 60.00 240.00 240.00 4.00 0.0000 0.00
TEE PVC-SAP C/R DE 3" X 3" PESADO und 8.0000 28.00 224.00 224.00 8.00 0.0000 0.00
ADAPTADOR UPR MIXTO PVC DE 3" und 10.0000 12.00 120.00 120.00 10.00 0.0000 0.00
REDUCCION PVC SAP C/R DE 3" A 2" PESADO und 6.0000 9.00 54.00 54.00 6.00 0.0000 0.00
REDUCCION PVC SAP C/R DE 3" A 1" PESADO und 6.0000 6.00 36.00 36.00 6.00 0.0000 0.00
TUBERIA UF DE 16" m 198.5311 132.00 26,206.11 26,206.11 198.00 0.5311 70.11
TUBERIA UF DE 12" m 251.9900 85.00 21,419.15 21,419.15 251.00 0.9900 84.15
TUBERIA UF DE 6" m 18.0000 25.00 450.00 450.00 18.00 0.0000 0.00
CODO PVC 4"X45° und 304.0000 5.90 1,793.60 1,793.60 304.00 0.0000 0.00
TUBERIA PVC SEL x 1" x 3 M m 250.0000 4.00 1,000.00 1,000.00 250.0000 1,000.00
TAPON PVC-SAL 1" und 6.0000 6.00 36.00 36.00 6.00 0.0000 0.00
YEE PVC-SAP 16" X 16" - PESADO und 5.0000 350.00 1,750.00 1,750.00 5.00 0.0000 0.00
PIEDRA CHANCADA 1/2" m3 112.9599 85.00 9,601.59 9,601.59 112.00 0.9599 81.59
PIEDRA CHANCADA 3/8" - 1/2" m3 224.2380 85.00 19,060.23 19,060.23 224.00 0.2380 20.23
ARENA FINA m3 28.4016 65.00 1,846.10 1,846.10 28.00 0.4016 26.10 630-2019 OBS FALTA ATENDER
ARENA GRUESA m3 715.1696 60.00 42,910.18 42,910.18 715.00 0.1696 10.18
HORMIGON m3 57.2525 60.00 3,435.15 3,435.15 57.00 0.2525 15.15
MATERIAL GRANULAR PARA BASE m3 1,047.6000 45.00 47,142.00 47,142.00 1,047.00 0.6000 27.00
PROCESO ARENA PARA CAMPO DE JUEGO SEGUN GRANULOMETRIA 0,5 mm A 1,5 mm PUESTO E m3 3,045.7512 68.00 207,111.08 207,111.08 3,045.00 0.7512 51.08 633-2019 OL FALTA ATENDER
MATERIAL ORGANICO m3 147.8520 130.00 19,220.76 19,220.76 147.8520 19,220.76
GEOTEXTIL NT CLASE 1 - 190 P m2 11,224.1614 6.30 70,712.22 70,712.22 11,224.00 0.1614 1.02
MALLA CERCADORA NARANJA rll 14.0000 100.00 1,400.00 1,400.00 14.00 0.0000 0.00
TECNOPOR DE 1" m2 4.9600 4.20 20.83 20.83 4.96 0.0000 0.00
ANILLO UNION FLEXIBLE PARA PVC DE 16" - DESAGUE und 70.0000 48.00 3,360.00 3,360.00 70.00 0.0000 0.00
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
ANILLO UNION FLEXIBLE PARA PVC DE 12" - DESAGUE und 76.0000 33.00 2,508.00 2,508.00 76.00 0.0000 0.00
ANILLO UNION FLEXIBLE PARA PVC DE 6" - DESAGUE und 10.0000 8.00 80.00 80.00 10.00 0.0000 0.00
TUBERIA FLEXIBLE DE POLIETILENO DE 32 MM m 1,250.0000 1.90 2,375.00 2,375.00 1,250.0000 2,375.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 2,130.2245 24.50 52,190.50 52,190.50 2,130.00 0.2245 5.50
YESO bol 70.0000 15.00 1,050.00 1,050.00 70.00 0.0000 0.00
TUBERIA PVC - SAP ELECTRICAS DE 1 1/2" m 6.1800 3.63 22.43 22.43 6.1800 22.43
TUBERIA PVC - SAP ELECTRICAS DE 3/4" m 206.0000 1.32 271.92 271.92 206.0000 271.92
TUBERIA PVC - SAP ELECTRICAS DE 2" m 2,080.6000 6.00 12,483.60 12,483.60 2,080.6000 12,483.60
TUBO DE PVC 12.50 MM O X 1500 MM und 10.3000 3.40 35.02 35.02 10.3000 35.02
VIGAS DE MADERA 2" X 4" p2 91.8400 4.50 413.28 413.28 86.67 5.1700 23.27
SEMILLA DE GRASS VARIEDAD BERMUDA kg 88.5839 200.00 17,716.78 17,716.78 88.5839 17,716.78
BUZON DE RECEPCION DE CABLES EN BAJA TENSION 60X60X60 DE C°A° C/TAPA und 8.0000 85.00 680.00 680.00 8.0000 680.00
CAJA DE CONCRETO DRENAJES DE 30X60X1.20 und 2.0000 120.00 240.00 240.00 2.0000 240.00
CAJA DE CONCRETO DRENAJES DE 30X40X60, CON TAPA und 2.0000 60.00 120.00 120.00 2.0000 120.00
BAYPOOR 300 (POLIURETANO) l 2,514.2520 29.00 72,913.31 72,913.31 2,514.2520 72,913.31
BAYPOOR 250 (POLIURETANO) l 1,257.1260 29.00 36,456.65 36,456.65 1,257.1260 36,456.65
BAYPOOR 200 (POLIURETANO) l 1,257.1260 29.00 36,456.65 36,456.65 1,257.1260 36,456.65
BAYPOOR UNIVERSAL (POLIURETANO) l 1,257.1260 29.00 36,456.65 36,456.65 1,257.1260 36,456.65
EPDM - IMPORTADO (ROJO CLASICO) kg 3,352.3360 10.50 35,199.53 35,199.53 3,352.3360 35,199.53
ACETATO DE BUTILO l 2,095.2100 7.50 15,714.08 15,714.08 2,095.2100 15,714.08
PEGAMENTO PARA PVC gal 15.0000 105.00 1,575.00 1,575.00 15.00 0.0000 0.00
LUBRICANTE PARA TUBERIAS gal 2.2500 40.00 90.00 90.00 2.00 0.2500 10.00
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
ADITIVO DESMOLDEADOR DE ENCOFRADOS gal 17.1144 110.00 1,882.58 1,882.58 17.1144 1,882.58
CAUCHO NEGRO kg 10,476.0500 6.00 62,856.30 62,856.30 10,476.0500 62,856.30
MADERA PARA ENCOFRADO p2 1,198.0080 3.00 3,594.02 3,594.02 1,196.67 1.3380 4.01
LISTONES DE MADERA 2" X 3" X 10' p2 233.3333 3.00 700.00 700.00 230.00 3.3333 10.00
LISTONES DE MADERA 2" X 4" X 10' p2 156.6667 3.00 470.00 470.00 153.33 3.3367 10.01
TABLAS P/ANDAMIOS 1" X 10" X 10' p2 100.0000 3.00 300.00 300.00 100.00 0.0000 0.00
TABLAS P/PARIHUELAS 1" X 4" X 10' p2 144.0000 3.00 432.00 432.00 143.00 1.0000 3.00
MADERA PARA ESTACA p2 519.2249 2.50 1,298.06 1,298.06 516.67 2.5549 6.39
TRIPLAY DE 1.20X2.40 m X 18 mm und 80.0000 105.00 8,400.00 8,400.00 80.00 0.0000 0.00
TRIPLAY DE 1.20X2.40 m X 4 mm und 10.0000 27.00 270.00 270.00 10.00 0.0000 0.00
LISTONES DE MADERA 3" X 3" und 60.0000 20.00 1,200.00 1,200.00 60.00 0.0000 0.00
FOCO DE 50 W und 4.0000 45.00 180.00 180.00 4.0000 180.00
PLASTICO NEGRO X 50m rll 1.0000 105.00 105.00 105.00 1.0000 105.00
REGLA DE MADERA p2 25.7280 4.50 115.78 115.78 23.33 2.3980 10.79
LIJA PARA METAL und 940.9535 2.50 2,352.38 2,352.38 940.00 0.9535 2.38
PINTURA LATEX gal 196.7645 26.00 5,115.88 5,115.88 196.00 0.7645 19.88
PINTURA ESMALTE gal 246.4937 49.00 12,078.19 12,078.19 246.00 0.4937 24.19
PINTURA ESMALTE SINTETICO VENCEAMEL VENCEDOR gal 11.0000 40.80 448.80 448.80 11.00 0.0000 0.00
PINTURA BASE ZINCROMATO AUTOMOTRIZ gal 2.0000 47.90 95.80 95.80 2.00 0.0000 0.00
PINTURA GLOSS BLANCO gal 2.0000 74.90 149.80 149.80 2.00 0.0000 0.00
PINTURA EPOXICA BLANCO gal 209.5210 184.80 38,719.46 38,719.46 12.00 197.5210 36,501.86
PINTURA ANTICORROSIVA ZINCROMATO gal 13.0000 38.00 494.00 494.00 13.00 0.0000 0.00
THINNER gal 61.3675 18.00 1,104.62 1,104.62 61.00 0.3675 6.62
SELLADOR A BASE DE LATEX gal 95.1174 20.00 1,902.35 1,902.35 95.00 0.1174 2.35
PASTA MURAL gal 190.2348 30.00 5,707.04 5,707.04 190.00 0.2348 7.04
CINTA AISLANTE rll 3.0000 6.00 18.00 18.00 3.00 0.0000 0.00
CINTA TEFLON und 17.5000 2.00 35.00 35.00 17.00 0.5000 1.00
PERNOS DE ANCLAJE DE ACERO G- 8 1.20 M X 3/4" und 48.0000 260.00 12,480.00 12,480.00 48.0000 12,480.00
PERNOS DE ACERO G- 8 DE 3" X 3/4" und 192.0000 30.00 5,760.00 5,760.00 192.0000 5,760.00
PERNOS DE ACERO G- 8 DE 2" X 5/8" und 28.0000 20.00 560.00 560.00 28.0000 560.00
GANCHO SUSPENSION PAS/CAN + TUE. C2 und 12.0000 80.00 960.00 960.00 12.0000 960.00
ACCESORIOS DE SUCCION Y DESCARGA glb 1.0000 3,920.00 3,920.00 3,920.00 1.0000 3,920.00
ACCESORIOS EN TANQUE INODORO und 15.0000 20.00 300.00 300.00 15.0000 300.00
SOLDADURA ELECTRICA CELLOCORD P 1/8" kg 10.0000 15.70 157.00 157.00 10.0000 157.00
SOLDADURA ELECTRICA SUPERCITO DE 1/8" kg 118.0000 16.40 1,935.20 1,935.20 118.0000 1,935.20
SOLDADURA ELECTRICA SELLOCOR P 1/8" kg 1.0000 15.50 15.50 15.50 1.0000 15.50
TUBO METÁLICO NEGRO CIRCULAR - PESADO DE 4" m 31.2400 82.30 2,571.05 2,571.05 31.2400 2,571.05
ELECTROBOMBA 15 HP SALIDA DE 3" und 1.0000 9,200.00 9,200.00 9,200.00 1.0000 9,200.00
CALAMINA GALVANIZADA 22mm x 1.80m x 0.83m und 53.1600 16.00 850.56 850.56 53.00 0.1600 2.56
LUMINARIA - LAMPARA und 16.0000 8.00 128.00 128.00 16.0000 128.00
INTERRUPTOR THERMOMAGNETICO MONOFASICO 2 x 20 TIPO RIEL und 9.0000 26.35 237.15 237.15 9.0000 237.15
INTERRUPTOR THERMOMAGNETICO TRIFASICO 3 x 40A, TIPO RIEL und 1.0000 82.50 82.50 82.50 1.0000 82.50
INTERRUPTORES und 5.0000 6.00 30.00 30.00 5.0000 30.00
TOMACORRIENTE MONOFOSICO DOBLE und 5.0000 12.00 60.00 60.00 5.0000 60.00
TOMACORRIENTE TRIPLE UNIVERSAL 16A P/SOBREPONER und 4.0000 15.00 60.00 60.00 4.0000 60.00
TUBO METALICO CIRCULAR DE 16" X 1/4" X 6.40 M m 38.4400 517.96 19,910.38 19,910.38 38.4400 19,910.38
TUBO METALICO CIRCULAR DE 12" X 1/4" X 6.40 M m 37.4400 325.00 12,168.00 12,168.00 37.4400 12,168.00
TUBO METALICO CIRCULAR DE 10" X 1/4" X 6.40 M m 37.4400 233.60 8,745.98 8,745.98 37.4400 8,745.98
TUBO METALICO CIRCULAR DE 8" X 1/4" X 6.40 M. m 18.5200 192.97 3,573.80 3,573.80 18.5200 3,573.80
TUBO METALICO CIRCULAR DE 4" X 4 MM X 6.4 M m 24.0000 110.80 2,659.20 2,659.20 24.0000 2,659.20
TUBO METALICO GALVANIZADO CIRCULAR - PESADO DE 2" m 8.8000 34.60 304.48 304.48 8.8000 304.48
CASCO BLANCO NACIONAL 6 PUNTOS und 18.0000 15.00 270.00 270.00 5.00 13.0000 195.00
CASCO AMARILLO NACIONAL 6 PUNTOS und 30.0000 12.00 360.00 360.00 6.00 24.0000 288.00
CASCO AZUL NACIONAL 6 PUNTOS und 18.0000 12.00 216.00 216.00 24.00 -6.0000 -72.00
LENTES DE POLICARBONATO LUNA CLARA und 54.0000 8.00 432.00 432.00 12.00 42.0000 336.00
RESPIRADORES DESCARTABLES und 42.0000 6.00 252.00 252.00 30.00 12.0000 72.00 626-2019 OL ATENDIDO
GUANTES DE CUERO par 42.0000 12.00 504.00 504.00 6.00 36.0000 432.00
CHALECO REFLECTIVO und 48.0000 10.00 480.00 480.00 30.00 18.0000 180.00
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE
626-2019 OL ATENDIDO
Tipo Espc Espc P. PARCIAL
de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
UNIFORME PARA OBRERO jgo 48.0000 60.00 2,880.00 2,880.00 30.00 18.0000 1,080.00
BOTINES DE SEGURIDAD CON PUNTA DE ACERO par 56.0000 55.00 3,080.00 3,080.00 30.00 26.0000 1,430.00
EXTINTOR DE POLVO QUIMICO SECO DE 8 KG und 5.0000 180.00 900.00 900.00 0.00 5.0000 900.00
BOTIQUIN DE PRIMEROS AUXILIOS PARA LA OBRA glb 1.0000 350.00 350.00 350.00 0.00 1.0000 350.00
COLLARINES DE PE DE 63 MM X 1" und 24.0000 15.00 360.00 360.00 0.00 24.0000 360.00
COLLARIN DE PE DE 90 MM X 1" und 18.0000 24.00 432.00 432.00 0.00 18.0000 432.00
CINTA DE SEÑALIZACION und 5.1500 45.00 231.75 231.75 5.00 0.1500 6.75
BANDERINES PARA CORNER und 4.0000 180.00 720.00 720.00 0.00 4.0000 720.00
REDES PARA ARCO DE FUTBOL - PESADO, TIPO PROFESIONAL und 2.0000 1,750.00 3,500.00 3,500.00 0.00 2.0000 3,500.00
SEÑALIZACION DEFENSA CIVIL glb 1.0000 1,400.00 1,400.00 1,400.00 0.00 1.0000 1,400.00
CABLE ELECTRICO AWG N° 12 - 14 m 52.8571 3.50 185.00 185.00 0.00 52.8571 185.00
CABLE ELECTRICO AWG N° 16 - 18 m 1,400.0000 2.20 3,080.00 3,080.00 0.00 1,400.0000 3,080.00
CABLE UTP DE 4 PARES m 226.6000 2.50 566.50 566.50 0.00 226.6000 566.50
CABLE NYY 3X1X25 mm2 (FASE) m 4,944.0000 31.20 154,252.80 154,252.80 0.00 4,944.0000 154,252.80
CABLE NYY 3X1X50 mm2 m 556.2000 50.25 27,949.05 27,949.05 556.2000 27,949.05
CABLE NYY 1X1X50 mm2 m 82.4000 16.26 1,339.82 1,339.82 82.4000 1,339.82
CABLE LSOH 1X10 mm2 (TIERRA) m 206.0000 3.80 782.80 782.80 206.0000 782.80
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
PROYECTOR LED DE LUZ BLANCA DE 2000W TIPO ARENAVISION und 24.0000 8,326.08 199,825.92 199,825.92 24.0000 199,825.92
CAJA PARA VALVULA IRRTEC und 5.0000 70.00 350.00 350.00 5.0000 350.00
CONDUCTOR NYY 3X1X50MM2 (FASE + TIERRA) m 185.4000 14.04 2,603.02 2,603.02 185.4000 2,603.02
ARANDELA A PRESION DE ACERO G- 8 DE 3/8" CON AGUJERO DE 3/4" und 248.0000 8.00 1,984.00 1,984.00 248.0000 1,984.00
ARANDELA A PRESION DE ACERO G- 8 DE 3/8" CON AGUJERO DE 5/8" und 28.0000 6.00 168.00 168.00 28.0000 168.00
ARGOLLAS PARA TUBOS METÁLICOS und 80.0000 5.00 400.00 400.00 80.0000 400.00
TUERCA Y CONTRATUERCA DE ACERO G-8 DE 3/4" und 496.0000 14.00 6,944.00 6,944.00 496.0000 6,944.00
TUERCA Y CONTRATUERCA DE ACERO G-8 DE 5/8" und 56.0000 10.00 560.00 560.00 56.0000 560.00
CONECTOR BIMETALICO PARA AI DE 25 MM2 Y COBRE DE 16 MM2 TIPO CUÑA und 10.0000 8.50 85.00 85.00 10.0000 85.00
CAJA DE REGISTRO PARA POZO A TIERRA und 10.0000 45.00 450.00 450.00 10.0000 450.00
ELECTRODO DE ACERO RECUBIERTO DE COBRE DE 16 mm O x 2.4 m. X 2,40 M. und 10.0000 78.40 784.00 784.00 10.0000 784.00
TABLERO GENERAL DE DISTRIBUCION PARA RIEGO und 1.0000 2,990.00 2,990.00 2,990.00 1.0000 2,990.00
TABLERO DE DISTRIBUCION TD-02, 380/220V, 26 POLOS, ADOSADO und 1.0000 380.00 380.00 380.00 1.0000 380.00
ASPERSOR EMERGENTE DE BASTAGO RETRACTIL Y ROTOR ALC. 19.80 M und 35.0000 360.00 12,600.00 12,600.00 35.0000 12,600.00
QUIMICOS PARA POZO A TIERRA UND/5 KG und 20.6000 75.16 1,548.30 1,548.30 20.6000 1,548.30
SWIN JOINT DE 1" X 12" und 35.0000 65.00 2,275.00 2,275.00 35.0000 2,275.00
END CAP TUB DE 4" und 76.0000 18.80 1,428.80 1,428.80 76.00 0.0000 0.00
END CAP TUB DE 16" und 4.0000 95.00 380.00 380.00 4.0000 380.00
MARCADOR DE CAMPO DE PRESIÓN CONTINUA hm 7.2550 30.00 217.65 217.65 7.2550 217.65
BIDON DE AGUA TRATADA und 700.0000 4.50 3,150.00 3,150.00 250.00 450.0000 2,025.00
INSECTICIDAS Y FUNJICIDAS l 410.7000 15.31 6,287.82 6,287.82 410.7000 6,287.82
PANTALLA LED P 10 - DIP 346 - RA 960 MM X 960 MM (24 GABINETES) - EXTERIOR und 24.0000 5,916.00 141,984.00 141,984.00 24.0000 141,984.00
TRANSMISOR MCTRL-300 NOVASTAR INC. SOFWARE und 1.0000 3,540.00 3,540.00 3,540.00 1.0000 3,540.00
TERMOMETRO und 12.0000 30.00 360.00 360.00 12.0000 360.00
ABONOS NATURALES kg 197.1360 8.00 1,577.09 1,577.09 197.1360 1,577.09
HUMUS DE LOMBRIS ton 41.8914 350.00 14,661.99 14,661.99 41.8914 14,661.99
HERBICIDA l 664.5126 10.61 7,050.48 7,050.48 664.5126 7,050.48
REGULADOR DE PH l 1.6428 100.00 164.28 164.28 1.6428 164.28
UREA kg 299.8110 10.00 2,998.11 2,998.11 299.8110 2,998.11
FERTILIZANTES SINTETICO NPK kg 3,999.3966 1.85 7,398.88 7,398.88 3,999.3966 7,398.88
FERTILIZANTES FOLIARES, ADITIVOS Y MICRO ELEMENTOS kg 2,000.1090 4.15 8,300.45 8,300.45 2,000.1090 8,300.45
CORREAS DE MADERA 2.5" X 2" p2 47.8800 4.50 215.46 215.46 46.67 1.2100 5.45
ANDAMIO p2 1,211.8914 3.00 3,635.67 3,635.67 1,207.50 4.3914 13.17
CAMILLA PARA EXAMENES Y CURACION und 4.0000 220.00 880.00 880.00 4.0000 880.00
EQUIPO TEMPORIZADOR PARA ASPERSORES DE RIEGO und 1.0000 620.00 620.00 620.00 1.0000 620.00
ELECTROVALVULA DE PE DIAM. 3" 24 V HI FLOW (HF) und 5.0000 1,220.00 6,100.00 6,100.00 5.0000 6,100.00
CORDEL rll 51.9224 15.00 778.84 778.84 51.9224 778.84
ARNÉS DE SEGURIDAD (INC. LINEA DE VIDA ESTÁNDAR) und 4.0000 219.90 879.60 879.60 4.0000 879.60
HERRAMIENTAS MANUALES - 9,625.49 9,625.49 0.0000 0.00 631-2019 OL FALTA ATENDER
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS 205,460.07
ESTACION TOTAL día 69.2299 120.00 8,307.59 8,307.59 69 0.2299 27.59
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.0000 5,000.00 5,000.00 5,000.00 1.0000 5,000.00
BOMBA PARA PRUEBA DE AGUA hm 32.4200 15.00 486.30 486.30 32.4200 486.30
PROCESO RODILLO LISO VIBRATORIO AUTOPROPULSADO 8-10 tn hm 114.7398 140.00 16,063.57 16,063.57 114.5 0.2398 33.57
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 395.1629 20.00 7,903.26 7,903.26 395 0.1629 3.26
EQUIPO DE PINTURA hm 725.6750 10.00 7,256.75 7,256.75 725.6750 7,256.75
ENSAYO, RESISTENCIA A LA COMPRESION PROB 27.0000 20.00 540.00 540.00 27 0.0000 0.00
ENSAYO PROCTOR MODIFICADO glb 4.0000 80.00 320.00 320.00 4 0.0000 0.00
PRUEBA DE INSTALACION ELECTRICA EN SISTEMA DE RIEGO und 1.0000 250.00 250.00 250.00 1.0000 250.00
PRUEBA DE INSTALACION ELECTRICA EN SISTEMA DE ILUMINACION DE CAMPO und 4.0000 150.00 600.00 600.00 4.0000 600.00
PRUEBA DE INSTALACION ELECTRICA EN SISTEMA DE MARCADOR ELECTRONICO und 1.0000 250.00 250.00 250.00 1.0000 250.00
PRUEBA DE INSTALACION DE POZO A TIERRA und 8.0000 150.00 1,200.00 1,200.00 8.0000 1,200.00
PRUEBA DE INSTALACION ELECTRICA EN TABLEROS und 4.0000 100.00 400.00 400.00 4.0000 400.00
PRUEBA DE DENSIDAD DE CAMPO glb 6.0000 70.00 420.00 420.00 6 0.0000 0.00
EQUIPO DE FUMIGACION hm 376.2020 10.00 3,762.02 3,762.02 376 0.2020 2.02
MAQUINA DE SPRAY hm 16.7617 60.00 1,005.70 1,005.70 16 0.7617 45.70
MAQUINA DEMARCADOR DE LINEA hm 16.7617 50.00 838.09 838.09 16.5 0.2617 13.09
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 52.1522 180.00 9,387.40 9,387.40 52 0.1522 27.40
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
MINI CARGADOR BOB CAT 953 hm 210.8481 85.00 17,922.09 17,922.09 210 0.8481 72.09
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1/2 y3 hm 1.2908 150.00 193.62 193.62 1 0.2908 43.62
TRACTOR DE TIRO DE 63 HP hm 16.7617 80.00 1,340.94 1,340.94 16.5 0.2617 20.94
TRACTOR DE ORUGAS D7 hm 75.1393 240.00 18,033.43 18,033.43 75 0.1393 33.43
RODILLO DE VEREDA (1 ROLA) hm 368.2000 80.00 29,456.00 29,456.00 368 0.2000 16.00
MOTONIVELADORA 125 HP hm 114.7398 180.00 20,653.16 20,653.16 114.7398 20,653.16
CAMION VOLQUETE DE 15 m3 hm 157.9825 150.00 23,697.38 23,697.38 157 0.9825 147.38
CAMION CISTERNA (500 GLNS.) hm 74.0928 100.00 7,409.28 7,409.28 74 0.0928 9.28
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl hm 16.7617 125.00 2,095.21 2,095.21 16 0.7617 95.21
MAQUINA DE SOLDAR 295 A hm 144.0000 15.00 2,160.00 2,160.00 144 0.0000 0.00
MAQUINA DE SOLDADURA AUTOGENA P/CORTE DE PLANCHA INC. CARB. Y OXIGENO hm 72.0000 80.00 5,760.00 5,760.00 72 0.0000 0.00
VIBRADOR DE CONCRETO 4 HP 1" hm 130.9680 15.00 1,964.52 1,964.52 130.5 0.4680 7.02
APISONADOR VIBRATORIO DE 80 KG hm 50.8133 10.00 508.13 508.13 50.5 0.3133 3.13
MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 105.9628 25.00 2,649.07 2,649.07 105.5 0.4628 11.57
MEZCLADORA DE 9 P3 PARA CAUCHO GRANULADO hm 167.6168 20.00 3,352.34 3,352.34 167.5 0.1168 2.34
PAVIMENTADORA SOBRE ORUGAS DE 3,000 mm 69 HP hm 16.7617 200.00 3,352.34 3,352.34 16 0.7617 152.34
BARREDORA MECANICA 10-20 HP 7 P.LONG. hm 16.7617 55.00 921.89 921.89 16 0.7617 41.89
PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2 REAL
GASTOS GENERALES 245,700.00 REQUERIDO SALDO POR MONTO DEL
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES CANT TIEMPO(MES) MONTO S/. TOTAL S/. REQUERIR SALDO
30,600.00
EQUIPO DE COMPUTO UND 3.00 - 3300.00 9,900.00 0 3.00 9,900.00
IMPRESORA MULTIFUNCIONAL DE OFICINA UND 1.00 - 4500.00 4,500.00 1 0.00 0.00
MOBILIARIO (ESCRITORIO, SILLAS Y ESTANTES) GLB 1.00 - 5000.00 5,000.00 1 0.00 0.00
ÚTILES DE OFICINA GLB 1.00 - 1500.00 1,500.00 1 0.00 0.00
PAPEL BOND A4 MILL 40.00 - 25.00 1,000.00 40 0.00 0.00
CARTUCHO DE TINTAS UND 8.00 - 200.00 1,600.00 0 8.00 1,600.00
CUADERNO DE OBRA UND 2.00 - 100.00 200.00 2 0.00 0.00
VESTUARIOS E IMPLEMENTOS DE SEGURIDAD (PERS. OFIC.) UND 15.00 - 400.00 6,000.00 12 3.00 1,200.00
MEDICAMENTOS (BOTIQUÍN) GLB 1.00 - 900.00 900.00 REAL 1 0.00 0.00
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS CANT TIEMPO(MES) MONTO S/. TOTAL S/. REQUERIDO SALDO POR MONTO DEL
215,100.00 REQUERIR SALDO
RESIDENTE DE OBRA ESPECIALISTA (INC. LIQUIDACION) MES 1.00 4.50 6,000.00 27,000.00 27,000.00 0.0000 0.00
INGENIERO ASISTENTE DE RESIDENTE MES 1.00 4.00 3,500.00 14,000.00 14,000.00 0.0000 0.00
ESPECIALISTA EN SEGURIDAD E HIGIENE (TIEMPO PARCIAL) MES 1.00 4.00 4,000.00 16,000.00 16,000.00 0.0000 0.00
ESPECIALISTA EN GRASS NATURAL (ING. AGRÓNOMO) MES 1.00 3.00 4,500.00 13,500.00 13,500.00 0.0000 0.00
COORDINADOR DE OBRA MES 1.00 4.00 5,500.00 22,000.00 22,000.00 0.0000 0.00
TECNICO ADMINISTRATIVO MES 1.00 4.00 1,500.00 6,000.00 6,000.00 0.0000 0.00
MAESTRO DE OBRA Y/O CAPATAZ MES 1.00 4.00 4,000.00 16,000.00 16,000.00 0.0000 0.00
ESPECIALISTA EN TOPOGRAFÍA MES 1.00 4.00 3,500.00 14,000.00 14,000.00 0.0000 0.00
SECRETARIA MES 1.00 4.00 1,500.00 6,000.00 6,000.00 0.0000 0.00
ALMACENERO MES 1.00 4.00 1,800.00 7,200.00 7,200.00 0.0000 0.00
ASISTENTE DE ALMACÉN MES 1.00 4.00 1,200.00 4,800.00 4,800.00 0.0000 0.00
GUARDIAN MES 3.00 4.00 1,200.00 14,400.00 14,400.00 0.0000 0.00
IMPRESIÓN DE PLANOS MES 1.00 4.00 500.00 2,000.00 0.00 2,000.0000 2,000.00
SERVICIO DE LUZ MES 1.00 4.00 250.00 1,000.00 0.00 1,000.0000 1,000.00
GASTOS NOTARIALES MES 1.00 4.00 1,000.00 4,000.00 4,000.00 0.0000 0.00
PÓLIZA DE SEGUROS DE PERSONAL ADMINISTRATIVO MES 1.00 4.00 800.00 3,200.00 0.00 3,200.0000 3,200.00
PÓLIZA DE SEGUROS DE PERSONAL OBRERO MES 1.00 4.00 2,000.00 8,000.00 0.00 8,000.0000 8,000.00
ALQUILER DE CAMIONETA 4X4 (INCLUY. CHOFER Y COMBUSTIB.) MES 1.00 4.00 8,500.00 34,000.00 0.00 34,000.0000 34,000.00
ALQUILER DE OFICINA MES 1.00 4.00 500.00 2,000.00 0.00 2,000.0000 2,000.00
SUPERVISION 64,900.00
2 6 8 1 4 2 GASTO POR LA COMPRA DE BIENES CANT TIEMPO(MES) MONTO S/. TOTAL S/. REAL SALDO POR MONTO DEL
5,700.00 REQUERIDO REQUERIR SALDO
MOBILIARIO, ENSERES, MENAJE, ETC GLB 1.00 - 500.00 500.00 500.00 - 0.00
EQUIPO DE COMPUTO UND 1.00 - 2,000.00 2,000.00 0 2,000.00 2,000.00
IMPRESORA LASER UND 1.00 - 800.00 800.00 0 800.00 800.00
CAMARA DIGITAL UND 1.00 - 400.00 400.00 0 400.00 400.00
ESCRITORIO SILLAS Y ARCHIVADORES GLB 2.00 - 400.00 800.00 0 800.00 800.00
UTILES DE ESCRITORIO Y OFICINA GLB 1.00 - 800.00 800.00 800.00 - 0.00
UTILES DE LIMPIEZA GBL 1.00 - 400.00 400.00 0 400.00 400.00
2 6 8 1 4 3 GASTO POR LA CONTRATACION DE SERVICIOS CANT TIEMPO(MES) MONTO S/. TOTAL S/. REAL SALDO POR MONTO DEL
59,200.00 REQUERIDO REQUERIR SALDO
JEFE DE SUPERVISION MES 4.00 8,000.00 32,000.00 32,000.00 32,000.00 0.0000 0.00
INGENIERO ASISTENTE DE SUPERVISION MES 4.00 3,000.00 12,000.00 12,000.00 0 4.0000 12,000.00
SECRETARIA MES 4.00 1,500.00 6,000.00 6,000.00 0 4.0000 6,000.00
IMPRESIONES DE COPIAS Y OTROS MES 4.00 200.00 800.00 800.00 0 4.0000 800.00
ALQUILER DE OFICINA MES 4.00 500.00 2,000.00 2,000.00 0 4.0000 2,000.00
LUZ Y AGUA MES 4.00 250.00 1,000.00 1,000.00 0 4.0000 1,000.00
TELECOMUNICACIONES (TELEFONO) MES 4.00 - 100.00 400.00 0 4.0000 400.00
DENSIDAD DE CAMPO, CBR Y OTROS CANT. 50.00 100.00 5,000.00 5,000.00 0 50.0000 5,000.00
EXPEDIENTE TECNICO 32,000.00
2 6 8 1 3 1 ELABORACION DE EXPEDIENTES TECNICOS 32,000.00

LIQUIDACION ( TECNICA Y FINANCIERA ) 10,000.00


PRESUPUESTO ANALÍTICO MODIFICADO N°01

:“REMODELACION DE CAMPO DEPORTIVO; CONSTRUCCIÓN DE PISTA; EN EL ESTADIO MUNICIPAL CARLOS VIDAURRE GARCIA, EN LA
PROYECTO
LOCALIDAD DE TARAPOTO, DISTRITO DE TARAPOTO, PROVICIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN ”

UBICACIÓN : DISTRITO DE TARAPOTO, PROVINCIA Y REGION DE SAN MARTIN


EJECUTA : MUNICIPALIDAD PROVINCIAL DE SAN MARTIN
PLAZO DE EJEC. : 120 DIAS
FECHA : SETIEMBRE

Tipo Espc Espc P. PARCIAL


de Gen Sub Sub DESCRIPCION UNIDAD CANTIDAD PRECIO S/. TOTAL S/.
1 2 S/.
trans Gen 1 Gen 2
GASTOS POR LA CONTRATACION DE PERSONAL
2 6 7 1 6 1 10,000.00
RESUMEN
COSTO DIRECTO 2,456,166.33
2 6 2 3 99 3 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 423,225.99
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 1,827,480.27
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS 205,460.07
GASTOS GENERALES 245,700.00
2 6 2 3 99 4 COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 30,600.00
2 6 2 3 99 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACION DIRECTA - SERVICIOS 215,100.00
SUPERVISION 64,900.00
2 6 8 1 4 2 GASTO POR LA COMPRA DE BIENES 5,700.00
2 6 8 1 4 3 GASTO POR LA CONTRATACION DE SERVICIOS 59,200.00
EXPEDIENTE TECNICO 32,000.00
2 6 8 1 3 1 ELABORACION DE EXPEDIENTES TECNICOS 32,000.00
LIQUIDACION 10,000.00
2 6 7 1 6 1 GASTOS POR LA CONTRATACION DE PERSONAL 10,000.00
TOTAL 2,808,766.33