Progress Report
Prepared by;-
CONTENTS
Page 1 of 5
Progress Report 27 October 2016
1. INTRODUCTION
1.1. Project Description
1.2 Design Team
2. TARGET DATES
3. TECHNICAL
3.1 Geotechnical Information
3.2 Environmental Information
3.3 Scope of Work
4. COMMUNITY INVOLVEMENT
5. FINANCIAL
5.1 Source of Funding
5.2 Financial Year
5.3 Breakdown (Total Budget, Professional Fees, Sub-consultants, Construction)
6. PROGRESS ON PROJECT
6.1 Achieved
6.2 Not Achieved
6.3 Revisions (Design and Scope Changes, Additional Work/Variation orders)
6.5 Claims
7. EMPLOYMENT GENERATION
1. INTRODUCTION
Page 2 of 5
Progress Report 27 October 2016
The community of White city was identified by community leaders (Ward Councilors etc.) in conjunction with Ulundi
Local Municipality as one of the communities with need for the upgrading of the access roads. This project was
prioritized on the Ulundi Local Municipality Integrated Development Plan (IDP).
The project is intended to provide construction of tar access roads in the area to upgrade the living
conditions for White city. The project is situated in White city within Ulundi Local Municipality, under
jurisdiction of Zululand District Municipality
2. TARGET DATES
The project is planned to be completed and handed over to the client by 28 April 2017
3.
3.1 Geotechnical Information
The geotechnical engineering assessment was done on site and the report is available.
4. COMMUNITY INVOLVEMENT
Page 3 of 5
Progress Report 27 October 2016
During the planning phase of the project, the Ward Councilor involving the development committee in the
identification of community needs; also, local authorities was represented in the planning process. Project Labour
Desk came from the communities within the project area. The criteria used for identifying committee members
were based on the guidelines outlined in the RDP policy of South Africa. In addition, the Community Liaison Officer
(CLO) was recruited and will be a direct link between the Contractor and the community.
.
5. FINANCIAL
6. PROGRESS ON PROJECT
6.1 Achieved
Design Issues
6.2 Achievements
None
6.4 Claims
None
Page 4 of 5
Progress Report 27 October 2016
7. EMPLOYMENT GENERATION
As per the contractors list of employed labour on site as per EPWP. At present, there are 8 labourers on site who
are employed from the local community.
Clerical 0 0 0 0 0 0 1 0 0 0 0 0 0 0
Labourer 0 0 2 0 0 0 0 0 3 0 0 0 0 0
Managerial 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Semi skilled 0 0 0 0 2 0 0 0 0 0 0 0 0 0
Skilled 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 2 0 2 0 1 0 3 0 0 0 0 0
Page 5 of 5