Documente Academic
Documente Profesional
Documente Cultură
In this post I want to share some of my experiences with past ByDesign implementation projects. This is
not meant to be implementation guide but more of just takeaways and thoughts how the
implementation works, what to remember when doing a project to be successful with it etc.
First tenant
When you order Your system from SAP or from Your partner it will come as blank as it gets. There is no
data, no activated processes, no users. You will get first technical user and then need to create project
users and confirm some configuration elements. Then you will be able to go to the next step.
When you select this element, you get the process and you can configure it in the question section:
Going through the scoping and questions takes quite long time the first couple of projects since you
need to read all the descriptions and understand it. It gets quicker with experience like everything. You
can always activate new functionalities after first scoping the project but you cannot always deactivate
everything so be careful with that.
Fine tuning
Fine tuning is more like master data entry. This is where you create new payment terms, chart of
accounts, account determination etc. Its something between system configuration and master data
entry. First thing to do is set up the organization structure. This needs to be scalable and done correctly,
it will cause huge problems later if not done correctly.
Excel based tool for large sets:
Printouts
ByDesign comes with standard printouts for all business processes and they are fully customizable.
Adding new fields or deleting some fields can be done from inside SAP using the easy editor.
Easy Editor:
However, if You need to do complex changes to printouts, translate them, add business logic etc. then
You need to use Adobe LiveCycle Editor. This is complex software and takes time to master. However,
much can be done there. You can use JavaScript to program the printouts which is nice.
Remote implementation
Doing remote project implementation using Skype or something else is quite doable. We have done it
many times and it works great. Since doing ByDesign implementation is much less time consuming then
doing ECC or some other large ERP project doing it remotely gives the project good agility. We are
usually having a Skype call with customer, getting their feedback, doing changes and presenting again.
This means that we can make changes and show them even few times a day. In our experience doing
projects remotely works quite well in ByDesign context.