Sunteți pe pagina 1din 6

SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J03

PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL


CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDAYRIYAT ISLAND TMP4
TESTING COMPANY ALPHA POWER LLC PAGE Page 1 of 6

OC&EF RELAY TEST

1. RELAY NAME PLATE DETAILS


MAKE SIEMENS AUX. VOLTAGE 48 V DC
TYPE ARGUS 7SR1103 CT RATIO 100/1 A
SERIAL NO BF 1709505270 TRANSFORMER RATING 1500 kVA

2. VISUAL INSPECTION CHECKS:

 Check any physical damage on the Relay. :NO

 Check installation & terminal tightness. :OK

 Check wiring as per approved/manufacturer drawing. : OK

 Ensure correct labelling on Relay. : OK

 Check case / body ear thing completed. : OK

3. MEASUREMENT CHECKS: Adopted CT Ratio: 100/1A

Injected Secondary Relay Display Current


Phase Ref. Remarks
Current (A) (A)
R - Phase 1.0 1.01 OK
Y - Phase 1.0 1.00 OK
B - Phase 1.0 1.00 OK
N - Neutral 0.5 0.50 OK

4. SECONDARY CURRENT INJECTION TEST:

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J03
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDAYRIYAT ISLAND TMP4
TESTING COMPANY ALPHA POWER LLC PAGE Page 2 of 6

Curve Ref: I > Phase Fault: Extremely Inverse (IEC)


Ie> Earth Fault: Normal Inverse (IEC)
Operating Time (Sec) TRIP
Pick-up
Phase Current 2X Is 5XIs OPERATIO
Current TMS
Ref. Settings (Is) N
(A) Measured Measured
R-
0.85 0.88 0.9 24.06 3.008 OK
Phase
Y-
0.85 0.88 0.9 24.04 3.003 OK
Phase
B - Phase 0.85 0.87 0.9 24.08 3.005 OK
EF 0.4 0.42 0.05 0.510 0.219 OK

INSTANTANEOUS OC STAGE 1: I >>

Set Current Set Time Operating Time


Phase Ref. Trip Test Remark
(A) (ms) (ms)
R - Phase 6.0 150 182 OK OK
Y - Phase 6.0 150 180 OK OK
B - Phase 6.0 150 182 OK OK
EF - Phase 2.0 100 129 OK OK

INSTANTANEOUS OC STAGE 1: I >>>

Set Current Set Time (m Operating Time


Phase Ref. Trip Test Remark
(A) (ms) (ms)
R - Phase 15.0 0 33 OK OK
Y - Phase 15.0 0 31 OK OK
B - Phase 15.0 0 35 OK OK

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J03
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDAYRIYAT ISLAND TMP4
TESTING COMPANY ALPHA POWER LLC PAGE Page 3 of 6

5. FUNCTIONAL CHECKS:

 Check Relay Watchdog Contacts :OK

 Check Relay Output Contacts :OK

 Check LED Indication : OK

 Check Relay Event Record : OK

 Check Relay Reset Function : OK

6. FINAL SETTING:

Curve Ref: I > Phase Fault: Extremely Inverse (IEC)


Ie> Earth Fault: Normal Inverse (IEC)

Phase Fault Setting (A) TMS Earth Fault Setting (A) TMS

I> 0.85 0.9 Ie> 0.4 0.05


I >> 6.0 0.15 sec Ie>> 2.0 0.1 sec
I >>> 15.0 0 Ie>>> OFF ---

7. FINAL RECORD

Record No 1 Threshold 51G-1

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J03
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDAYRIYAT ISLAND TMP4
TESTING COMPANY ALPHA POWER LLC PAGE Page 4 of 6

Fault EARTH Magnitude 0.044 kA

SBEF RELAY TEST

1. RELAY NAME PLATE DETAILS

MAKE SIEMENS AUX. VOLTAGE 48 V DC


TYPE ARGUS 7SR1101 CT RATIO 2000/1 A
SERIAL NO BF 1709505264 TRANSFORMER RATING 1500 kVA

2. VISUAL INSPECTION CHECKS:

 Check any physical damage on the Relay. :NO

 Check installation & terminal tightness. :OK

 Check wiring as per approved/manufacturer drawing. : OK

 Ensure correct labelling on Relay. : OK

 Check case / body ear thing completed. : OK

3. SECONDARY CURRENT INJECTION TEST:


a) Curve Ref: Extremely Inverse (IEC): Ie> Earth Fault

Pick-up Operating Time (Sec)


Phase Current Trip
Current TMS 2X Is 5XIs
Ref. Settings (Is) Operation
(A) Measured Measured
E/F 1.1 1.13 1 26.69 1.337 OK

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J03
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDAYRIYAT ISLAND TMP4
TESTING COMPANY ALPHA POWER LLC PAGE Page 5 of 6

b) Instantaneous OC Stage 1: Ie>>


Test Current Setting Trip
Time in ms Operating time in ms
Point (A) Operation
E/F 8.0 150 180 OK

4. FINAL SETTING:

c) Characteristic curve setting: Extremely Inverse (IEC)

Tms
Earth Fault Setting

Ie> 1.1 1
Ie>> 8.0 0.15 Sec

5. FINAL RECORD

Record No 1 Threshold 51G-1


Fault EARTH Magnitude 2.349 kA

6. REMARKS:

7. TEST EQUIPMENT DETAILS:

Description of Test
Serial Number Calibration Due Date
Equipment

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J03
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDAYRIYAT ISLAND TMP4
TESTING COMPANY ALPHA POWER LLC PAGE Page 6 of 6

Secondary Injection Kit 1100491 09.12.2020

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020