A. Pipes laid in trenches and pipes fixed to A. It is provided in between the lower end of
walls are measured separately the house drain and the street sewer
B. Cutting through walls and floors are B. It is provided a cleaning eye at the top of
included with the item the trap
C. Pipes are classified according to their C. The height of fresh air inlet pipe fixed
sizes and quality vertically with wall is 3 m
D. In laying pipes, the method of jointing D. The mica flap valve which opens inwards
and fixing is specifically specified only, is fitted at the top of the inlet pipe
E. All the above. E. The water seal is less than that of
ordinary traps.
12. In case of laying gullies, siphons,
intercepting traps, the cost includes 17. The concrete work for the following part
A. Setting and laying of the building of specified thickness is
B. Bed concreting measured in square metres
C. Connection to drains A. Root slabs B. Floors
D. All of these. C. D.P.C. D. Wall panels
E. All the above.
13. In long and short wall method of
estimation, the length of long wall is the 18. Pick up the correct statement from the
centre to centre distance between the walls following:
and A. The estimated value of the work excluding
A. breadth of the wall the amount for contigencies, work charged
B. half breadth of wall on each side establishment, tool and plants, is called
work value
C. one fourth breadth of wall on each side
B. The actual expenditure involved to
D. None of these.
complete a work including incidental,
establishment and travelling charges, is
14. The height of the sink of wash basin called actual cost
above floor level is kept
C. The formal acceptance by the
A. 60 cm B. 70 cm administrative department for incurring an
C. 75 cm to 80 cm D. 80 cm expenditure on the work, is called
administrative approval
15. While preparing a detailed estimate D. The order of a competent authority
A. Dimension should be measured correct to sanctioning a properly detailed estimate of
0.01 m the cost of a work of construction or repair
B. Area should be measured correct to 0.01 is called technical sanction
sqm E. All the above.
C. Volume should be measured correct to
0.01 cum 19. The expected out turn of cement
D. All the above. concrete 1 : 2 : 4 per mason per day is
A. 1.5 m3 B. 2.5 m3
16. Pick up the incorrect statement C. 3.5 m3 D. 5.0 m3
regarding a master trap from the following :
20. The area of the cross-section of a road
fully in banking shown in the given figure, is
29. The area of a sloping surface of a uniform up-gradient of the road 120 in 1,
protective embankment of mean height d, the chainage of the point with no filling or
side slopes S : 1 and length L is cutting is
A. d x d x s B. �𝑑 2 𝑥 (𝑑𝑠)2
C. L.D √1 + 𝑠2 D. 2 LD √1 + 𝑠2
SECTION - 2 A. 25 cm B. 30 cm
1. For 100 sq. m cement concrete (1 : 2: 4) 4 C. 40 cm D. 45 cm
cm thick floor, the quantity of cement
required, is 6. Referring of given figure, pick up the
A. 0.90 m3 B. 0.94 m3 correct statement from the following:
C. 0.98 m3 D. 1.00 m3
5. The value of 'A' of Indian type W.C. shown 9. The expected out turn for earth work in
in the given figure is : excavation in ordinary soil per mazdoor per
day is
A. 1.00 cum B. 2.00 cum
C. 3.00 cum D. 4.00 cum
11. Pick up the incorrect statement from A. Product of the centre line of the walls and
the following: area of cross-section of any item, gives total
A. The built up covered area at the floor level quantity of the item
of any storey of a building is called plinth B. The centre line is worked out separately
area for different sections of walls of a building
B. The usable covered area of the rooms of C. The centre line length is reduced by half
any storey of a building is called carpet area the layer of main wall joining the partition
C. The carpet area of a building along with wall
area of its kitchen, pantry, store, lavatory, D. All the above.
bath room and glazed verandah, is called
floor area 16. Pick up the correct statement from the
D. None of these. following:
A. Pointing is measured in sq.m
12. Carpet area does not include the area of B. Plastering is measured in sq.m
A. the walls along with doors and other C. Glazing is measured in sq.m
openings D. Striking is measured in sq.m
B. verandah, corridor and passage E. All the above.
C. bath room and lavatory
D. kitchen and pantry 17. The expected out turn of half brick
E. All the above. partition wall per mason per day is
A. 1.5 m3 B. 2.0 m3
13. The trap which is provided to disconnect C. 4.0 m2 D. 5.0 m2
the house drain from the street sewer is
called
18. If B is the width of formation, d is the
A. Master trap height of the embankment, side slope S : 1,
B. Intercepting trap for a highway with no transverse slope, the
C. Interception manhole area of cross-section is
D. Intercepter chamber A. B + d + Sd B. Bd + Sd2
E. All the above. C. B x d - Sd1/2 D. (Bd + Sd2)
14. Pick up the incorrect statement from the 19. The floor area includes the area of the
following: balcony up to
A. Lead is the average horizontal straight A. 100% B. 75%
distance between the borrow pit and the C. 50% D. 25%
place of spreading soil
B. The lead is calculated for each block of 20. The cross-section of a road partly in
the excavated area banking and partly in cutting is shown in
C. The unit of lead is 50 m for a distance the given figure. The area of the shaded
upto 500 m portion is
D. The unit of lead is 1 km where the lead
exceeds 2 km.
30. The following item of earth work is not 35. The weight of an item is measured
measured separately. correct to nearest
A. Setting out of works A. 0.25 kg B. 0.50 kg
B. Site clearence C. 0.75 kg D. 1.00 kg
C. dead men E. 5 kg
D. Steps in deep exavaction
E. All the above. 36. The rate of payment is made for 100 cu
m (per % cu m) in case of
31. Pick up the correct statement from the A. Earth work in excavation
following: B. Rock cutting
A. In order to check up the average depth of C. Excavation in trenches for foundation
excavation, 'Dead mans' are left at the mid- D. Earth work in filling the plinth
widths of borrow pits E. all the above.
B. The earthwork calculation in excavation
is made from the difference in levels
37. The cost of the earthwork in excavation
obtained with a level
for the surface drain of cross-section shown
C. The earth work in excavation to form the in the given figure for a total length of 5
road embankment includes the formation of metres @ Rs. 450% cum, is
correct profile and depositing the soil in
layers
D. All the above.
A. 1/2 (b1+b2)h
SECTION-2
1 B 2 E 3 E 4 E 5 B 6 D 7 E 8 C 9 C 10 C
11 D 12 E 13 E 14 D 15 D 16 E 17 B 18 B 19 C 20 A
21 C 22 E 23 D 24 B 25 D 26 D 27 E 28 B 29 E 30 E
31 D 32 B 33 B 34 E 35 D 36 E 37 C 38 E 39 E 40 B
41 D 42 C 43 A 44 E 45 E