INDEX

S. No. Particular Page No.

1 Title Page

2 Index Page

3 Report

4 Ref to Sanction

5 Specification

6 Summary of Cost

7 Analysis

8 Detail of Bridge

9 Detail of Protection Work

10 Detail of Approch Road

11 Drawings
SUMMARY OF ESTIMATED COST

dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢


vUrxZr fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny
>wyk iqy dk fuekZ.k dk;Z A

Sl. No. ITEM OF WORK ESTIMATED COST

1 Cost of Bridge 80034061.00


2 Cost of Protection Work 21537030.00

3 Cost of Approach Road 597691.00

Sub-Total (A) 102168782.00


Quality Control & Contingency @ 4% on A 4086751.00
Structural Design & Drawing(150*7140) 1071000.00
G.Total 107326533.00
Say ` in Lacs 1073.26

JE AE Executive Engineer
Analysis of Rate as per PWD SOR Block Bhatwari Distt. :- Uttarkashi

S. No. Item of Work Unit Rate SOR Reff. No.


1 Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
T&P etc required for proper completion of work.
Cum 251.20 75476 16-1
2 Cement concrete with 20-40mm gaugeapproved
stone ballast coarse sand and cement in
proportion of 6:3:1 in foundation including supply
of all material, labour T&P etc. required for
proper completion of the work.
Cum 4734.80 75588 17-4
3 Plain/reinforced cement concrete in substructure
as per drawings R.C.C. grade M 25
Cum 7003.50 75363 12-5
4 Cement plum masonry with 40% plum & 60%
1:3:7 cement concrete.(As per PWD
Uttarakhand specifications
Cum 4811.30 75482 16-7
SOR Building
4A Centering shuttering including struttings, 81084 1-4-
propping etc. and removal of form work Sqm 430.50 3-3
5 Providing & laying reinforced cement concrete in
superstructure M20 Cum 8934.00 75382 13-1-1-1
6 15 mm thick Cement plaster 15 mm thick 1:4 on
stone masonry supply of all material, labour T&P
etc. required for proper completion of the work.
Sqm 136.50 75313 12-4
7 Providing and laying cement concrete wearing
course M 30 grade including reinforcement
complete
Cum 13456.30 75390 13-5
8 Finishing walls with water proofing cement paint
of required shade
New work (Two or more coats) Sqm 72.80 75943 19-16
9 Providing and fixing 1mm thick M.S. sheet door
with frame of 40x40x6 mm angle iron and 3 mm
M.S. gusset plates at the junctions and
corners,all necessary fittings mplete,including
applying a priming coat of approved steel 3073.85 From DSR
primer.10.5.1 Using M.S. angels 40x40x6 mm S.no.- 10.5 add 19%
for diagonal braces extra for dist.
Sqm 3657.88 Uttarkashi
10 Painting two coats including prime coat on new
concrete surface . Sqm 102.50 75184 8-8
11 Cement concrete flooring 1:2:4 (1 cement: 2
coarse sand : 4 graded stone aggregate) 40mm
thick with 20mm nominal size stone aggregate.
SOR Building
Sqm 436.60 81739 1-11-3-1
12 Supplying, fitting and placing HYSD bar inas
reinforcement including bending for proper
completion of work . MT 55977.90 75834 18-7
13 Supply & Providing 5mm thick Chequare Plate
including Supply of all materials T & P etc.
complete. MT 82306.40 75483 16-8
14 Supply and fabrication of structural steel
confirming to IS 226 and fabrication of steel
suspension bridge as per detail drawing and
MoRTH specification No 1904 i/c one coat of
anticorrosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts, washers etc. i/c
supply and fixing of shop rivets cutting and
threading etc. referred as per drawing i/c supply
of all material, labour and T&P etc. required for
proper completion of the work for X -girder,
Stringer diagonal bracing gusset plate deck
plate etc.

MT 82306.40 75483 16-8


15 Supply and fabrication of structural steel
confirming to IS 226 and fabrication of steel
suspension bridge as per detail drawing and
MoRTH specification No 1904 i/c one coat of
anticorosive red oxide paint confirming to IS 102
i/c all T&P nuts, bolts, washers etc. ilc supply
and fixing of shop rivets cutting and threading
etc. reffered as per drawing i/c supply of all
material, labour and T&P etc. required for proper
completion of the work.
MT 82306.40 75483 16-8
16 Supply of 20mm dia MS iron suspenders true to
shape as per details drawing i/c cutting filling
welding, makings threads id one coat of anti
corosive red oxide paint confirming to IS 102 i/c
all T&P nuts, bolts, washers etc. i/c supply and
fixing of shop rivets cutting and threading etc.
reffered as per drawing i/c supply of all material,
labour and T&P etc. required for proper
completion of the work.
MT 82306.40 75483 16-8
17 Dewatering from foundation of abutments and
wing walls including hours wages of operator
and fuel including supply of all material, labour
and T&P etc. required for proper completion of
the work.
Hours 209.80 75534 16-29
18 Fabrication and supply of bottle nuts made of
75x10mm flats for suspenders as per drawing
complete, i/c cutting, filling, welding, making
holess i/c one coat of anticorosive red oxide
paint confirming to IS 102 i/c supply of all
material, labour T&P etc. required for proper
completion of the work.
MT 82306.40 75483 16-8
19 Fabrication and supply of main cable cIa imps
for 4 Nos 44mm dia wire rope i/c cutting, filling,
machining drilling holes i/c one coat of
anticorosive red oxide paint confirming to IS 102
i/c all T&P nuts, bolts washers etc. i/c supply
and fixing of shop rivets cutting, threading etc.
reffeed as per drawing i/c supply of all material,
labour and T&P etc. required for proper
completion of the work.
MT 82306.40 75483 16-8
20 Fabrication and supply of wind cable clamps for
2 Nos 44 mm dia wire ropes as per drawing. i/c
cutting, filling, machining drilling holes. i/c one
coat of anticorrosive red oxide paint confirming
to IS 102 i/c supply of all material labours and
T&P etc. required for proper completion of the
work.
MT 82306.40 75483 16-8
21 Supply fabrication and fixing of CI saddle for 6
Nos wire ropes as per detail drawing i/c cutting,
filling, machining etc. i/c one coat of anti
corrosive red oxide paint confirming to IS 102 i/c
all T&P nuts, boltswashers etc, i/c supply of all
material labours and T&P etc. required for
proper completion of the work. (46mm dia)

MT 82306.40 75483 16-8


22 Supply and fixing of MS clips for 20mm dia
suspender as per detail drawing i/c supply of all
material, labour T&P etc. required for proper
completion of the work.
Nos. 2x82.31=164.62 75483 16-8
23 Supply and fixing of bull dog clamps (U Clamps)
for 44mm dia wire ropes as per detail drawing i/c
supply of all material, labour and T&P etc.
required for proper comoletion of the work.

Nos. 7x82.31=576.17 75483 16-8


24 High tensile G.I steel 44mm dia round wires
rope including all accessories for supply of all
material, labour and T&P etc. required for proper
completion of the work.(As per IS 9282-2002) As per Quotation
Rm. 1443.75 Attached
25 Fixing of wire rope in position including supply of
all material, labour, T&P etc complete required
for proper completion of the work. Rm. 173.25 Analysed Rate
26 Providing, fitting and fixing mild steel railing
complete required for proper completion of the
work. Rm. 2845.10 75935 19-8
27 Tow coat painting on each part of bridge with
enamel paint. Over prime coat SI No 414 i/c
supply of all material, labour and T&P etc.
required for proper completion of the work.
Job 150000.00 L.S.
27 Errectiori of Steel Truss bridge i/c supply of all
material, labours and T&P etc. required for
proper completion of the work. (Add 12% extra
& For spane more then add 1% per meter extra
and for height more then 8 meter add 1% per
meter for bridge)
MT. 15407.77 75527 16-26
28 Providing weepholes in brick masonry/stone
masonry, Nos. plain/reinforced concrete
abutment, wing wall
No. 195.80 75335 12-9

PROTECTION WORK
29 Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
T&P etc required for proper completion of work.

Cum 251.20 75476 16-1


30 Random Rubble Stone Masonry laid in 1:6
cement and sand mortar.(As per PWD
Uttarakhand specification)
Cum 2887.80 75480 16-5
31 Backfilling behind abutment, wing wall and
return wall HP stone filling Cum 608.40 75479 16-4
32 Cement plum masonry with 40% plum & 60%
1:3:7 cement concrete(as per PWD uttarakhand Cum 4811.30 75482 16-7
specifications
APPROACH ROAD

33 Earthwork in foundation for R/wall,B/wall in all


types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
T&P etc required for proper completion of work.

Cum 251.20 75476 16-1


34 RR stone masonry laid dry with approved quality
stone in kharanja i/c supply of all material,
labour T&P etc. required for proper completion
of the work. Cum 1589.50 75478 16-3
35 Cement concrete with 20-40mm gauge
approved stone ballast coarse sand and cement
in proportion of 1:2:4 in foundation including
supply of all material, labour T&P etc. required
for proper completion of the work.

Cum 6907.40 75286 11-4-3-2


Analysis of Rate

S.no Item Description Unit Rate


Erection of suspension bridge i/c s/o all
material, labours & T&P etc required for proper
1 completion of the work
12%of basic rate 9876.77
50% for span 4938.39
6% for height more than 8 mt(10
m ht.)
592.61
Total MT 15407.77
Supply of wire ropes in i/c s/o all labour
material, T&P etc complete required for proper
completion of work as per quotation of Usha
Martin Supplier
2 Rm 1375.00
Add 5% VAT
Rm 68.75
Total
Rm 1443.75
3 Fixing of wire ropes in position i/c s/o all
labour material, T&P etc complete required for
proper completion of work

Basic rate of wire rope

1443.75
12% of basic rate 173.25
Total Rm 173.25
4 Structural Design Consultancy
Rate of suspension bridge more than 130 m span
as letter of CE L1 PWD dated 24-07-2010

6000 per mt
Add 19% index 1140
Total 7140 per Mt
or 0.071 lac per RMT

JE AE EE
dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢ vUrxZr
fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny >wyk iqy dk
fuekZ.k
BILL dk;Z A
OF QUANTITY
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
1 Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
T&P etc required for proper completion of work.

5936.10 Cum 251.20 Cum 1491148.32


2 Cement concrete with 20-40mm
gaugeapproved stone ballast coarse sand and
cement in proportion of 6:3:1 in foundation
including supply of all material, labour T&P etc.
required for proper completion of the work.

208.00 Cum 4734.80 Cum 984838.40


3 Plain/reinforced cement concrete in
substructure as per drawings R.C.C. grade M
25
2308.50 Cum 7003.50 Cum 16167579.75
4 Cement plum masonry with 40% plum & 60%
1:3:7 cement concrete.(As per PWD
Uttarakhand specifications
5387.00 Cum 4811.30 Cum 25918473.10
4A Centering shuttering including struttings,
propping etc. and removal of form work 5126.50 Sqm 430.50 Sqm 2206958.25
5 Providing and laying reinforced cement
concrete in superstructure For nominal mix
1:2:4
37.10 Cum 8934.00 Cum 331451.40
6 15 mm thick Cement plaster 15 mm thick 1:4
on stone masonry supply of all material, labour
T&P etc. required for proper completion of the
work.
5116.00 Sqm 136.50 Sqm 698334.00
7 Providing and laying cement concrete wearing
course M 30 grade including reinforcement
complete 51.00 Cum 13456.30 Cum 686271.30
8 Finishing walls with water proofing cement
paint of required shade
New work (Two or more coats)
5137.90 Sqm 72.80 Sqm 374039.12
9 Providing and fixing 1mm thick M.S. sheet door
with frame of 40x40x6mm angle iron
Using M.S. angels 40x40x6 mm for diagonal
braces.
10.20 Sqm 3657.88 Sqm 37310.38
10 Painting two coats including prime coat on new
concrete surface . 22.44 Sqm 102.50 Sqm 2300.10
11 Cement concrete flooring 1:2:4 (1 cement: 2
coarse sand : 4 graded stone aggregate)
40mm thick with 20mm nominal size stone
aggregate.
210.65 Sqm 436.60 Sqm 91969.79
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
12 Supplying, fitting and placing HYSD bar inas
reinforcement including bending for proper
completion of work .
28.10 MT 55977.90 MT 1572978.99
13 Supply & Providing 5mm thick Chequare Plate
including Supply of all materials T & P etc.
complete.
14.00 MT 82306.40 MT 1152289.60
14 Supply and fabrication of structural steel
confirming to IS 226 and fabrication of steel
suspension bridge as per detail drawing and
MoRTH specification No 1904 i/c one coat of
anticorrosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts, washers etc. i/c
supply and fixing of shop rivets cutting and
threading etc. referred as per drawing i/c
supply of all material, labour and T&P etc.
required for proper completion of the work for X
-girder, Stringer diagonal bracing gusset plate
deck plate etc.

125.80 MT 82306.40 MT 10354145.12


15 Supply and fabrication of structural steel
confirming to IS 226 and fabrication of steel
suspension bridge as per detail drawing and
MoRTH specification No 1904 i/c one coat of
anticorosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts, washers etc. ilc
supply and fixing of shop rivets cutting and
threading etc. reffered as per drawing i/c supply
of all material, labour and T&P etc. required for
proper completion of the work.
22.00 MT 82306.40 MT 1810740.80
16 Supply of 20mm dia MS iron suspenders true
to shape as per details drawing i/c cutting filling
welding, makings threads id one coat of anti
corosive red oxide paint confirming to IS 102 i/c
all T&P nuts, bolts, washers etc. i/c supply and
fixing of shop rivets cutting and threading etc.
reffered as per drawing i/c supply of all
material, labour and T&P etc. required for
proper completion of the work.
10.80 MT 82306.40 MT 888909.12
17 Dewatering from foundation of abutments and
wing walls including hours wages of operator
and fuel including supply of all material, labour
and T&P etc. required for proper completion of
the work.
800.00 Hrw. 209.80 Hrw. 167840.00
18 Fabrication and supply of bottle nuts made of
75x10mm flats for suspenders as per drawing
complete, i/c cutting, filling, welding, making
holess i/c one coat of anticorosive red oxide
paint confirming to IS 102 i/c supply of all
material, labour T&P etc. required for proper
completion of the work.
2.01 MT 82306.40 MT 165139.56
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
19 Fabrication and supply of main cable cIa imps
for 4 Nos 44mm dia wire rope i/c cutting, filling,
machining drilling holes i/c one coat of
anticorosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts washers etc. i/c
supply and fixing of shop rivets cutting,
threading etc. reffeed as per drawing i/c supply
of all material, labour and T&P etc. required for
proper completion of the work.

7.60 MT 82306.40 MT 625792.02


20 Fabrication and supply of wind cable clamps for
2 Nos 44 mm dia wire ropes as per drawing. i/c
cutting, filling, machining drilling holes. i/c one
coat of anticorrosive red oxide paint confirming
to IS 102 i/c supply of all material labours and
T&P etc. required for proper completion of the
work.
1.64 MT 82306.40 MT 135153.69
21 Supply fabrication and fixing of CI saddle for 6
Nos wire ropes as per detail drawing i/c cutting,
filling, machining etc. i/c one coat of anti
corrosive red oxide paint confirming to IS 102
i/c all T&P nuts, boltswashers etc, i/c supply of
all material labours and T&P etc. required for
proper completion of the work. (46mm dia)

16.00 MT 82306.40 MT 1316902.40


22 Supply and fixing of MS clips for 20mm dia
suspender as per detail drawing i/c supply of all
material, labour T&P etc. required for proper
completion of the work.
352.00 Nos. 164.62 Nos. 57946.24
23 Supply and fixing of bull dog clamps (U
Clamps) for 44mm dia wire ropes as per detail
drawing i/c supply of all material, labour and
T&P etc. required for proper comoletion of the
work.
320.00 Nos. 576.17 Nos. 184374.40
24 High tensile G.I steel 44mm dia round wires
rope including all accessories for supply of all
material, labour and T&P etc. required for
proper completion of the work.(As per IS 9282-
2002) 4840.00 Rm 1443.75 Rm 6987750.00
25 Fixing of wire rope in position including supply
of all labour,material T&P etc complete
required for proper completion of the work

4840.00 Rm 173.25 Rm 838530.00


26 Providing, fitting and fixing mild steel railing
complete required for proper completion of the
work.
300.00 Rm. 2845.10 Rm. 853530.00
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
27 Tow coat painting on each part of bridge with
enamel paint. Over prime coat SI No 414 i/c
supply of all material, labour and T&P etc.
required for proper completion of the work.
1.00 Job 150000.00 Job 150000.00
28 Erection of suspension bridge i/c supply of all
material, labours and T&P etc. required for
proper completion of the work. 245.10 M.T. 15407.77 M.T. 3776470.31
29 Providing weepholes in brick masonry/stone
masonry, Nos. plain/reinforced concrete
abutment, wing wall 25.00 No. 195.80 No. 4895.00
Total 80034061.16

Total 80034061.16
Say 80034061.00
dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢ vUrxZr
fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny >wyk iqy dk
fuekZ.k dk;Z A
DETAILS OF MEASUREMENT

S.N. ITEM OF WORK NO. L B H/D Qty. Unit

1 Earthwork in foundation for R/wall,B/wall in all


types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all
m/l,Labour T&P etc required for proper
completion of work.

Abutment A 1 1 12.50 14.50 8.40 1522.50


Abutment A 2 1 12.50 14.50 5.18 938.87
Main Anchor block 2 17.00 12.00 6.17 2515.32
4 12.00 7.71 370.20
Wind Anchor block 4 5.50 8.00 2.58 454.08
8 5.50 3.07 135.09
Total 5936.06 Cum
Say 5936.10 Cum

2 Cement concrete with 20-40mm


gaugeapproved stone ballast coarse sand and
cement in proportion of 6:3:1 in foundation
including supply of all material, labour T&P
etc. required for proper completion of the
work.

Abutment A 1 1 12.50 14.50 0.30 54.38


Abutment A 2 1 12.50 14.50 0.30 54.38
Main Anchor block 2 17.00 12.00 0.20 81.60
Wind Anchor block 4 5.50 8.00 0.10 17.60
Total 207.95 Cum
Say 208.00 Cum

3 Plain/reinforced cement concrete in


substructure as per drawings R.C.C. grade M
25
Abutment A1 1 14.00 12.00 2.30 386.40
1 14.00 6.50 7.40 673.40
1 14.00 5.90 1.80 148.68
Tower Padestal 2 2.30 2.36 0.10 1.09
Side Taper -2 6.50 1.62 -21.06
Center Duect -1 2.70 3.25 1.90 -16.67
Abutment A2 1 14.00 12.00 2.30 386.40
1 14.00 6.50 7.40 673.40
1 14.00 5.90 1.80 148.68
Tower Padestal 2 2.30 2.36 0.10 1.09
Side Taper -2 6.50 1.62 -21.06
S.N. ITEM OF WORK NO. L B H/D Qty. Unit
Center Duect -1 2.70 3.25 1.90 -16.67
Main Anchor block (2 No.) 2 17.00 12.00 5.96 2431.68
(4X0.5X12.0X2.50X5.93 ) 2 12.00 2.50 5.93 355.80
2 12.00 12.00 7.54 2171.52
(2X0.5X12.0X12.0X1.0 ) 1 12.00 12.00 1.00 144.00
Inspection Gallry -2 11.00 2.30 2.50 -126.50
Cable Gallry -4 10.10 1.40 1.00 -56.56
Wind Anchor block 4 5.00 8.00 2.38 380.80
(4X2X5.0X0.5X2.63X2.38 ) 4 5.00 2.63 2.38 125.19
Gallry -4 4.20 2.00 1.88 -63.17
Cable Gallry -4 4.83 0.75 0.754 -10.93
Total 7695.50 Cum

D.d for Plum Concrete @ 70 % Total 5387.00 Cum

Total Qty. For R.C.C. Total 2308.50 Cum


Say 2308.50 Cum

4 Cement plum masonry with 40% plum & 60%


1:3:7 cement concrete.(As per PWD
Uttarakhand specifications

Qty. Same as Item No. 3 Total 5387.00 Cum


Say 5387.00 Cum

4A Centering shuttering including struttings,


propping etc. and removal of form work
Abutment A 1 & A 2 4 12.00 2.30 110.40
4 14.00 2.30 128.80
4 6.50 9.20 239.20
4 14.00 9.20 515.20
(8X0.5X1.8X1.8) -4 1.80 1.80 -12.96
Tower Padestal 8 4.66 0.10 3.73
4 3.25 1.80 23.40
40 2.35 1.60 150.40
40 2.40 1.60 153.60
60 2.70 2.00 324.00
60 2.40 2.00 288.00
Main Anchor block (2 No.) 4 17.00 5.96 405.28
4 2.50 5.96 59.60
4 12.00 7.53 361.44
2 12.00 1.00 24.00
4 12.00 7.53 361.44
2 12.00 1.00 24.00
48 3.11 2.00 298.56
48 1.50 2.00 144.00
32 1.50 2.00 96.00
64 1.50 2.00 192.00
64 3.00 2.00 384.00
Inspection Gallry 4 11.00 2.50 110.00
S.N. ITEM OF WORK NO. L B H/D Qty. Unit
2 11.00 1.52 33.44
Cable Gallry 8 10.10 1.00 80.80
4 10.10 1.40 56.56
Wind Anchor block (4 No.) 8 8.00 2.85 182.40
(4X2X0.5X2.63X2.58) 4 2.63 2.58 27.14
4 5.00 5.42 108.40
4 5.00 4.92 98.40
4 7.50 0.50 15.00
Inspection Gallry 8 4.20 1.88 63.17
4 4.20 2.00 33.60
Cable Gallry 8 4.83 0.75 28.98
4 4.83 0.75 14.49
Total 5126.47 Sqm
Say 5126.50 Sqm

5 Providing and laying reinforced cement


concrete in superstructure For nominal mix
1:2:4
Maáicablegallery slab 4 10.10 1.60 0.20 12.93
Windcablegallery slab 4 4.83 0.77 0.20 2.98
Mi cable inspection gallery slab 2 11.50 2.50 0.20 11.50
Wind cable inspection gallery slab 4 5.50 2.20 0.20 9.68
Total 37.08 Cum
Say 37.10 Cum

6 15 mm thick Cement plaster 15 mm thick 1:4


on stone masonry supply of all material, labour
T&P etc. required for proper completion of the
work.

Qty. Same as 4A Total 5126.50 Sqm


Deduction for Doors
-2 1.00 2.10 -4.20
-4 0.75 2.10 -6.30
Total 5116.00 Sqm
Say 5116.00 Sqm

7 Providing and laying cement concrete wearing


course M 30 grade including reinforcement
complete
Deck Slab 1 170.00 2.10 0.065 23.21
Side Strut 2 170.00 0.075 0.075 1.91
Approch Road 2 5.00 4.00 0.100 4.00
Top of main Anchor block 2 12.00 12.00 0.050 14.40
Top of wind Anchorblock 4 5.00 7.50 0.050 7.50
Total 51.02 Cum
Say 51.00 Cum
S.N. ITEM OF WORK NO. L B H/D Qty. Unit
8 Finishing walls with water proofing cement
paint of required shade
New work (Two or more coats)
Same as Plaster work 5116.00
Top of main Anchor block 2 12.00 12.00 0.050 14.40
Top of wind Anchorblock 4 5.00 7.50 0.050 7.50
Total 5137.90 Sqm

9 Providing and fixing 1mm thick M.S. sheet


door with frame of 40x40x6mm angle iron
Using M.S. angels 40x40x6 mm for diagonal
braces.
2 1.00 2.10 4.20
4 0.75 2.00 6.00
Total 10.20 Sqm

10 Painting two coats including prime coat on


new concrete surface .
2 1.00 2.10 4.20
4 0.75 2.00 6.00
Total 10.20 Sqm
Using Factor 2.20 Total 22.44 Sqm

11 Cement concrete flooring 1:2:4 (1 cement: 2


coarse sand : 4 graded stone aggregate)
40mm thick with 20mm nominal size stone
aggregate.

Main /gallery 4 10.10 1.40 56.56


Wind/gallery 4 4.83 0.75 14.49
Main Cable gallery 4 11.00 2.30 101.20
Wind Cable gallery 4 4.80 2.00 38.40
Total 210.65 Sqm

12 Supplying, fitting and placing HYSD bar inas


reinforcement including bending for proper
completion of work .

Wt. @ 1.20 Qtl / cum of Item no. 3 2308.50 1.20 2770.20 QtI
Wt. @ 0.80 Qtl. / cum of Item no. 5 37.10 0.80 29.68 QtI
0.25% of item no 7 51.00 0.0025 78.50 10.01 QtI
Total 2809.89 QtI
Say 28.10 MT

13 Supply & Providing 5mm thick Chequare Plate


including Supply of all materials T & P etc.
complete.
1 170.00 2.10 357.00
Total 357.00 Sqm
Wt. @ 39.3 Kg. / Sqm Total 14030.10 Kg.
Say 14.00 MT
S.N. ITEM OF WORK NO. L B H/D Qty. Unit

14 Supply and fabrication of structural steel


confirming to IS 226 and fabrication of steel
suspension bridge as per detail drawing and
MoRTH specification No 1904 i/c one coat of
anticorrosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts, washers etc. i/c
supply and fixing of shop rivets cutting and
threading etc. referred as per drawing i/c
supply of all material, labour and T&P etc.
required for proper completion of the work for
X -girder, Stringer diagonal bracing gusset
plate deck plate etc.

As per Design Total 125.80 MT

15 Supply and fabrication of structural steel


confirming to IS 226 and fabrication of steel
suspension bridge as per detail drawing and
MoRTH specification No 1904 i/c one coat of
anticorrosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts, washers etc. i/c
supply and fixing of shop rivets cutting and
threading etc. referred as per drawing i/c
supply of all material, labour and T&P etc.
required for proper completion of the work for
X -girder, Stringer diagonal bracing gusset
plate deck plate etc.

As per Designe Total 22.00 MT

16 Supply of 20mm dia MS Iron Suspenders Tru


shapr as per detail drawing i/c cutting, filling,
welding, making holess i/c one coat of
anticorosive red oxide paint confirming to IS
102 i/c supply of all material, labour T&P etc.
required for proper completion of the work.
8
Main Suspenders(2*2*58) 232 10.70(Average Length) 3573.80
Extra For Joints 4X58 0.15 34.80
Wind Cable Suspender 2X2X30 6.34 760.80
Extra For Joints 4X30 0.15 18.00
Total 4387.40 Rm
Wt. @ 2.47 Kg. / Rm. Total 10836.88 Kg.
Say 10.80 MT

17 Dewatering from foundation of abutments and


wing walls including hours wages of operator
and fuel including supply of all material, labour
and T&P etc. required for proper completion of
the work. (Using Two No. of
Pumps)
50 16 Total 800.00 Hrw.
S.N. ITEM OF WORK NO. L B H/D Qty. Unit
18 Fabrication and supply of bottle nuts made of
75x10mm flats for suspenders as per drawing
complete, i/c cutting, filling, welding, making
holess i/c one coat of anticorosive red oxide
paint confirming to IS 102 i/c supply of all
material, labour T&P etc. required for proper
completion of the work.

Wt. of each nut made of Ms Flat 75X10 mm @


5.90 Kg./Rm.
(0.35X2+0.11X2)+5% wastage = 5.70 Kg. 352 5.70 Total 2006.40 Kg.
(2*2*58+2*2*30= 352) 2.01 MT
19 Fabrication and supply of main cable cIa imps
for 4 Nos 44mm dia wire rope i/c cutting, filling,
machining drilling holes i/c one coat of
anticorosive red oxide paint confirming to IS
102 i/c all T&P nuts, bolts washers etc. i/c
supply and fixing of shop rivets cutting,
threading etc. reffeed as per drawing i/c supply
of all material, labour and T&P etc. required for
proper completion of the work.

Wt. of each cable clamp as per analysis


20.57+5% wastage = 21.60 kg. 352 21.60 Total 7603.20 Kg.
7.60 MT
20 Fabrication and supply of wind cable clamps
for 2 Nos 44 mm dia wire ropes as per
drawing. i/c cutting, filling, machining drilling
holes. i/c one coat of anticorrosive red oxide
paint confirming to IS 102 i/c supply of all
material labours and T&P etc. required for
proper completion of the work.

Wt. of each cable clamp as per analysis


8.89+5% wastage = 9.33 kg. 176 9.33 Total 1642.08 Kg.
1.64 MT
21 Supply fabrication and fixing of CI saddle for 6
Nos wire ropes as per detail drawing i/c
cutting, filling, machining etc. i/c one coat of
anti corrosive red oxide paint confirming to IS
102 i/c all T&P nuts, boltswashers etc, i/c
supply of all material labours and T&P etc.
required for proper completion of the work.
(46mm dia)
4x1 Total 4.00 No.
wt. of each saddle 4.0 MT. as Per Design Total 16.00 MT

22 Supply and fixing of MS clips for 20mm dia


suspender as per detail drawing i/c supply of
all material, labour T&P etc. required for
proper completion of the work.

For suspenders 352 Total 352.00 Nos.


S.N. ITEM OF WORK NO. L B H/D Qty. Unit
23 Supply and fixing of bull dog clamps (U
Clamps) for 44mm dia wire ropes as per detail
drawing i/c supply of all material, labour and
T&P etc. required for proper comoletion of the
work.

Main Cables 4x6 10.00 240.00


Wind cables 4x2 7.00 56.00
Tower cables 4x1 6.00 24.00
Total 320.00 Nos.

24 High tensile G.I steel 44mm dia round wires


rope including all accessories for supply of all
material, labour and T&P etc. required for
proper completion of the work.(As per IS
9282-2002)

Main Cables 6x2 300.00 3600.00


Wind cables 2x2 210.00 840.00
Lower cables 1x2 200.00 400.00
Total 4840.00 Rm
25 Fixing of wire rope in position including supply
of all labour,material T&P etc complete
required for proper completion of the work

Qty same as item no. 24 4840.00


Total 4840.00 Rm
26 Providing, fitting and fixing mild steel railing
complete required for proper completion of the
work.

2x1 150.00 300.00 Rm.

27 Tow coat painting on each part of bridge with


enamel paint. Over prime coat SI No 414 i/c
supply of all material, labour and T&P etc.
required for proper completion of the work.

1 Total 1.00 Job


28 Erection of suspension bridge i/c supply of all
material, labours and T&P etc. required for
proper completion of the work.

Qty. Same as Item no. 13 14.00


Qty. Same as Item no. 14 125.80
Qty. Same as Item no. 15 22.00
Qty. Same as Item no. 16 10.80
Qty. Same as Item no. 18 2.01
Qty. Same as Item no. 19 7.60
Qty. Same as Item no. 20 1.64
Qty. Same as Item no. 21 16.00
Qty. Same as Item no. 24 45.25

Total 245.10 M.T.


S.N. ITEM OF WORK NO. L B H/D Qty. Unit
29 Providing weepholes in brick masonry/stone
masonry, Nos. plain/reinforced concrete
abutment, wing wall 25 25.00 No.

JE AE
Unit

484730296 12-5-4
Unit

2232 30409 16-7


Unit

114X2

57X2

114X2
Unit

290.00
190.00
180.00 48024

199.85
dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢ vUrxZr
fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny >wyk iqy dk
fuekZ.k dk;Z A
BILL OF QUANTITY
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
1 T&P etc required for proper completion of work.

1500.00 Cum 251.20 Cum 376800.00


Random Rubble Stone Masonry laid in 1:6
2 cement and sand mortar.(As per PWD
Uttarakhand specification) 1950.00 Cum 2887.80 Cum 5631210.00
Backfilling behind abutment, wing wall and
3 return wall HP stone filling
1800.00 Cum 608.40 Cum 1095120.00
Cement plum masonry with 40% plum & 60%
4 1:3:7 cement concrete.(As per PWD
Uttarakhand specifications 3000.00 Cum 4811.30 Cum 14433900.00

TOTAL 21537030.00
SAY 21537030.00
PROTECTION WORK
DETAILS OF MEASUREMENT
S.N. ITEM OF WORK NO. L B H/D Qty. Unit

Earthwork in foundation for R/wall,B/wall in all types


of soils,rocks i/c lead,lift & disposal of surplus
1 excavated material i/c s/o all m/l,Labour T&P etc
required for proper completion of work.

LHS BANK 1 100.00 2.00 2.50 500.00


RHS BANK 1 200.00 2.00 2.50 1000.00
Total 1500.00 Cum
Random Rubble Stone Masonry laid in 1:6 cement
2 and sand mortar.(As per PWD Uttarakhand
specification)
LHS BANK 1 100.00 (2.0+.60)/2 5.00 650.00
RHS BANK 1 200.00 (2.0+.60)/2 5.00 1300.00
Total 1950.00 Cum
Backfilling behind abutment, wing wall and return
3 wall HP stone filling

1 100.00 1.00 6.00 600.00


1 200.00 1.00 6.00 1200.00
Total 1800.00 Cum
Cement plum masonry with 40% plum & 60% 1:3:7
4 cement concrete.(As per PWD Uttarakhand
specifications
BILL OF QUANTITY
S. No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
1 surplus excavated material i/c s/o all
m/l,Labour T&P etc required for proper
completion of work.
160.00 Cum 251.20 Cum 40192.00
RR stone masonry laid dry with approved
quality stone in kharanja i/c supply of all
2 material, labour T&P etc. required for proper
completion of the work.
90.00 Cum 1589.50 Cum 143055.00
Cement concrete with 20-40mm gauge
approved stone ballast coarse sand and
cement in proportion of 1:2:4 in foundation
3 including supply of all material, labour T&P etc.
required for proper completion of the work.
60.00 Cum 6907.40 Cum 414444.00

TOTAL 597691.00
SAY 597691.00
APPROACH ROAD
DETAILS OF MEASUREMENT

S.No. ITEM OF WORK NO. L B H/D Qty. Unit

1 Earthwork in foundation for R/wall,B/wall in


all types of soils,rocks i/c lead,lift & disposal
of surplus excavated material i/c s/o all
m/l,Labour T&P etc required for proper
completion of work.

RHS 1x1 100.00 2.00 0.20 40.00


LHS 1x1 200.00 2.00 0.20 80.00
Total 160.00 Cum
2 RR stone masonry laid dry with approved
quality stone in kharanja i/c supply of all
material, labour T&P etc. required for proper
completion of the work.

1x1 100.00 2.00 0.15 30.00


1x1 200.00 2.00 0.15 60.00
Total 90.00 Cum
3 Cement concrete with 20-40mm gauge
approved stone ballast coarse sand and
cement in proportion of 1:2:4 in foundation
including supply of all material, labour T&P
etc. required for proper completion of the
work.

1x1 100.00 2.00 0.10 20.00


1x1 200.00 2.00 0.10 40.00
Total 60.00 Cum
Analysis of Rate as per PWD SOR Block 43 Dogadda Distt. :- Pauri
S. No. Item of Work Unit Rate SOR Reff. No.
1 Earth work in excavation of foundation of
structure as per drawing and technical
specification including setting out , construction
of shoring and bracing , removal of stumps and
other deleterious matter derssing of side and
bottom , backfilling the excavation earth to the
extent required and utilising theremaning earth
locally for road work. 304-3.13

Cum 124.10 30148 8-8-(i)


2 Cement concrete with 20-40mm gaugeapproved
stone ballast coarse sand and cement in
proportion of 6:3:1 in foundation including supply
of all material, labour T&P etc. required for
proper completion of the work.
Cum 3079.80 33277 17-4
3 Stone masonry work in cement mortar in
foundation complete as per drawing and
technical specificatio Random Rubble Masonry
In cement mortar 1:4
#REF! 1975.90 30264 11-6-3-2
4 Plain/Reinforced Cement Concrete in Open
Foundation complete as per Drawing and
Technical Specificat PCC Grade M15
Cum 3569.00 33285 17-8-A
5 Furnishing and Placing Reinforced/ Prestressed
cement concrete in super-structure as per
drawing and RCC Grade M20

A Height 5m to 10m 33761 19-1-A-I-(i)-


#REF! 4996.00 (q)

B Height above 10m 33762 19-1-A-Case


#REF! 5174.40 I-(i)-r
6 Providing and laying reinforced cement concrete
in superstructure For nominal mix 1:2:4
Cum 4884.20 30309 13-1-1-1
7 15 mm thick Cement plaster 15 mm thick 1:4 on
stone masonry supply of all material, labour T&P
etc. required for proper completion of the work.
Sqm 85.00 30135 8-5-5
8 Providing and laying cement concrete wearing
course M 30 grade including reinforcement
complete
Cum 8410.50 30317 13-5
9 Finishing walls with water proofing cement paint
of required shade
New work (Two or more coats) Sqm 40.10 24443 1-13-44-1
10 Providing and fixing 1mm thick M.S. sheet door
with frame of 40x40x6mm angle iron
Using M.S. angels 40x40x6 mm for diagonal
braces. Sqm 2341.70 24155 1-10-5-1
11 Painting two coats including prime coat on new
concrete surface . Sqm 66.20 30151 8-8-(iv)
12 Cement concrete flooring 1:2:4 (1 cement: 2
coarse sand : 4 graded stone aggregate) 40mm
thick with 20mm nominal size stone aggregate.

Sqm 233.50 24191 1-11-3-3


13 Supplying, fitting and placing HYSD bar inas
reinforcement including bending for proper
completion of work .
MT 4937.90 33844 19-2
14 Dewatering arrangement as per direction of
Engineer-In-Charge i/c supply of all material,
labour and T&P etc required for proper
completion of the work.
Hrw. 230000.00 L.S.

15 Supply and febrication of bridge (Nut & Bolts) Ton 65323.50 30410 16-8
16 Fabrication and supply of main cable cIa imps
for 6 Nos 44mm dia wire rope i/c cutting, filling,
machining drilling holes i/c one coat of
anticorosive red oxide paint confirming to IS 102
i/c all T&P nuts, bolts washers etc. i/c supply
and fixing of shop rivets cutting, threading etc.
reffeed as per drawing i/c supply of all material,
labour and T&P etc. required for proper
completion of the work.
#REF! 65.32 30411 16-8
17 Fabrication and supply of wind cable clamps for
2 Nos 44mm dia wire ropes as per drawing. i/c
cutting, filling, machining drilling holes. i/c one
coat of anti corrosive red oxide paint confirming
to IS 102 i/c supply of all material labours and
T&P etc. required for proper completion of the
work.
#REF! 65.32 30411 16-8
18 Supply fabrication and fixing of CI saddle for 6
Nos wire ropes as per detail drawing i/c cutting,
filling, machining etc. i/c one coat of anti
corrosive red oxide paint confirming to IS 102 i/c
all T&P nuts, boltswashers etc, i/c supply of all
material labours and T&P etc. required for
proper completion of the work.
No. 173204.00 Not In SOR
19 Supply and fixing of MS clips for 18mm dia
suspender as per detail drawing i/c supply
of all material, labour T&P etc. required
for proper completion of the work.
Nos. 143.00 Not In SOR
20 Supply and fixing of bull dog clamps (U Clamps)
for 44mm dia wire ropes as per detail drawing i/c
supply of all material, labour and T&P etc.
required for proper comoletion of the work.
Nos. 503.00 Not In SOR
21 Supply of wire ropes up to work site
manufactured as per IS 1835-1976 and general
requirement as per IS 6594-2008 i/c supply of all
material, labour and T&P etc. required for proper
completion of the work.
Rm 1570.50 Not In SOR
22 Providing, fitting and fixing mild steel railing
complete required for proper completion of the
work. Rm. 2207.20 33851 19-8
23 Tow coat painting on each part of bridge with
enamel paint. Over prime coat SI No 414 i/c
supply of all material, labour and T&P etc.
required for proper completion of the work.
Job 134000.00 L.S.
24 Errectiori of Steel Truss bridge i/c supply of all
material, labours and T&P etc. required for
proper completion of the work. (For suspension
bridge 75% rates of Steel Truss bridge)

M.T. 6215.10 33250 16-26


PROTECTION WORK
25 Earth work in excavation of foundation of
structure as per drawing and technical
specification including setting out , construction
of shoring and bracing , removal of stumps and
other deleterious matter derssing of side and
bottom , backfilling the excavation earth to the
extent required and utilising theremaning earth
locally for road work. 304-3.13

Cum 124.10 30148 8-8-(i)


26 Cement plum masonry with 40% plum & 60%
1:3:7 cement concrete.(As per PWD
Uttarakhand specifications
Cum 2232.00 30409 16-7
27 Random Rubble Stone Masonry laid in 1:6
cement and sand mortar.(As per PWD
Uttarakhand specification) Cum 1556.40 30407 16-5
28 Plain/reinforced cement concrete in sub
structure as per drawings R.C.C grade M 20 Cum 4379.90 30295 12-5-3
29 Supplying, fitting and placing HYSD bar inas
reinforcement including bending for proper
completion of work . Qtl 4937.90 33844 19-2
APPROACH ROAD
30 Excavation in hill side cutting for widening of
road width as per plan and L/S in all type of soils
and rocks what so ever met at the site including
uprooting and cutting tress and bushes and final
dressing of road surface to required level and
cross slopes i/c all lead and lift upto 30m and
1.Sm lift and disposal of excavated material i/c
supply of all materials , labour and T&P etc.
required for proper completion of the work.

Cum 124.10 30148 8-8-(i)


31 RR stone masonry laid dry with approved quality
stone in kharanja i/c supply of all material,
labour T&P etc. required for proper completion
of the work. Cum 715.40 30405 16-3
32 Cement concrete with 20-40mm gauge
approved stone ballast coarse sand and cement
in proportion of 6:3:1 in foundation including
supply of all material, labour T&P etc. required
for proper completion of the work.

Cum 3355.80 30367 14-11-3-1-1


33 S/F of 32mm dia Gl pipe in 4 rows @ 300mm
center to center i/c supply of all material, labour SOR Building
T&P etc. required for proper completion of the 25012 1-18-
work. Rm 311.60 10-4
14 Supply and fabrication of structural steel confirming
to IS 226 and fabrication of steel suspension bridge
as per detail drawing and MoRTH specification No
1904 i/c one coat of anticorrosive red oxide paint
confirming to IS 102 i/c all T&P nuts, bolts, washers
etc. i/c supply and fixing of shop rivets cutting and
threading etc. referred as per drawing i/c supply of
all material, labour and T&P etc. required for proper
completion of the work for X -girder, Stringer
diagonal bracing gusset plate deck plate etc.

A X grider ISMC 100 double chanel Batten plate


10mm thick 14.SOxl8cm 114 x 2 x 2.60 x 592.80 Rm @ 9.20 Kg/Rm 5453.76 Kg
Nos on each X-girder) 114 x 4 x 0.15 x 0.18 11.90 Sqm @ 78.50 Kg/Sqm 934.28 Kg
Gussets plate for adjoining ends of 112 x 2 x 0.33 x 0.24 17.47 Sqm @ 78.50 Kg/Sqm 1371.55 Kg
and bracing 10mm thick. Gussets plate for ends of
X-girder 2x 2 x 0.33 x 0.24 0.31 Sqm @ 78.50 Kg/Sqm 24.49 Kg
adjoining gussets plate. Gussets plate at center for
bracing. 113 x 1 x 0.24 x 0.48 13.02 Sqm @ 78.50 Kg/Sqm 1021.88 Kg
Stringer grider ISMC 100 3x 1 x 170.00 x 510.00 Rm @ 9.20 Kg/Rm 4692.00 Kg
Packing plate 12mm thick 4 Nos on 114 x 4 x 0.20 x 0.20 18.24 Sqm @ 94.20 Kg/Sqm 1718.21 Kg
of each X-girder. 113 x 1 x 2.46 x 277.98 Rm @ 11.00 Kg/Rm 3057.78 Kg
Wind bracing ISA 75x75x10 113 x 2 x 1.15 x 259.90 Rm @ 11.00 Kg/Rm 2858.90 Kg
Joint plate for stringer 10mm thick 40 x 4 x 0.35 x 0.065 3.64 Sqm @ 78.50 Kg/Sqm 285.74 Kg
Link for wind suspender 12mm thick 114 x 2 x 0.20 x 0.06 2.74 Sqm @ 94.20 Kg/Sqm 257.73 Kg
Lower cable clip ISA lOOxlOOxl2 114 x 4 x 0.15 x 68.40 Rm @ 12.10 Kg/Rm 827.64 Kg
Packing plate 20mm thick 60mm wide 114 x 1 x 0.12 x 0.06 0.82 Sqm @ 157.00 Kg/Sqm 128.87 Kg
Packing plate 20mm thick 60mm wide 114 x 1 x 0.06 x 0.06 0.41 Sqm @ 157.00 Kg/Sqm 64.43 Kg
Packing plate 12mm thick. 114 x 2 x 0.20 x 0.05 2.28 Sqm @ 94.20 KgJSqm 214.78 Kg
7mm thick chequred plate. 114 x 2 x 0.14 x 0.20 6.38 Sqm @ 94.20 KgJSqm 601.3] Kg
Kerb angle 75x75x6mm 1x 1 x 170.00 x 2.00 340.00 Sqm @ 61.10 Kg/Sqm 20774.00 Kg
2x 1 x 170.00 x 340.00 Rm @ 6.80 Kg/Rm 2312.00 Kg
Total 46599.41 Kg
Say 46.60 MT

B Main anchor girder 8x I x 0.60 x 0.60 2.88 Sqm @ 196.20 Kg/Sqm 565.06 Kg
25mm thick bed plate 4x 2 x 4.05 x 32.40 Rm @ 49.40 Kg/Rm 1600,56 Kg
ISMC 400 2 Nos back to back 4x 2 x 0.30 x 4.05 9.72 Sqm @ 196.20 Kg/Sqm 1907.06 Kg
Top plate 25mm thick 4x 2 x 0.37 x 4.05 11.99 Sqm @ 94.20 Kg/Sqm 1129.27 Kg
Flange plate 12mm thick 4x 2 x 125.00 x 1000.00 Rm @ 0.25 Kg/Rm 250.00 Kg
Rivets bottom and top 4x 2 x 125.00 x 1000.00 Rm @ 0.25 Kg/Rm 250.00 Kg
Main anchor rod 100mm dia 6x 2 x 1.70 x 20.40 Rm @ 61.66 Kg/Rm 1257.86 Kg
Side plate 25mm thick fork 6x 2 x 1.10 x 13.20 Rm @ 61.66 Kg/Rm 813.90 Kg
Pin 100mm dia 500mm tong for pulley 24 x 1 x 1.71 x 0.20 8.21 Sqm @ 196.20 Kg/Sqm 1610.41 Kg
(bolts and Nuts) 24x 1 x x 24.00 Nos. @ 30.83 Kg/Nos 739.92 Kg
Nuts for 100 mm dia anchor rod. foundation bolts
40mm dia and 450mm ng 24x 2 x x 48.00 Nos. @ 13.25 Kg/Nos 636.00 Kg
foundation bolts 40mm dia and 900mm 24x 3 x x 72.00 Nos. @ 13.25 KgJNos 954.00 Kg
Nuts for above 8x 4 x x 32.00 Nos. @ 4.44 Kg/Nos 142.08 Kg
8x 2 x x 16.00 Nos. @ 8.87 Kg/Nos 141.92 Kg
48x 2 x x 96.00 Nos. @ 7.00 Kg/Nos 672.00 Kg
Total 12670.06 Kg
Say 12.67 MT
C Wind Anchor girder.
25mm thick bed plate 4x 2 x 0.45 x 0.55 1.98 Sqm @ 196.2 Kg/Sqm 388.48 Kg
25mm thick fork 4x 2 x 1.71 x 0.2 2.74 Sqm @ 196.2 Kg/Sqm 536.8 Kg
ISMC 200 (2 Nos back to back) 4x 2 x 1.8 x 14.4 Rm @ 22.10Kg/Sqm 318.24 Kg
Top and bottom plate 20mm thick
flange. 4x 2 x 0.2 x 1.8 2.88 Sqm @ 157 Kg/Sqm 452.16 Kg
Rivets 28 x 8 x x 224 Nos @ 0.33Kg/Sqm 73.92 Kg
Bolts 8x 4 x x 32 Nos @ 4.0 Kg/Sqm 128 Kg
Lower cable anchor girder ISMC x x
2x 1 x x 5 Rm @ 22.10 Kg/Sqm 110.5 Kg
Nuts for 100mm dia anchor rod 8x 3 x x 24 Nos @ 13.25 Kg/Sqm 318 Kg
Pin 100 mm dia 500 mm long for x x
pulley (bolts and Nuts) 8x 1 x x 8 Nos @ 30.83Kg/Sqm 246.64 Kg
8x 2 x x 16 Nos @ 13.25Kg/Sqm 212 Kg
Foundation bolts 40mm dia and x x
450mm long 6x 4 x x 24 Nos @ 4.44 Kg/Sqm 106.56 Kg
Foundation bolts 40mm dia and x x
900mm long 6x 2 x x 12 Nos @ 8.87 Kg/Sqm 106.44 Kg
Nuts for above 36 x 2 x x 72 Nos @ 7.0 Kg/Sqm 504 Kg
Total 3501.74 Kg
Say 3.50 MT

D CI Pulleys of 250mm dia and 130mm thick.


Main girder 6x 4 x 24 Nos @ 52.60 Kg/Nos 1261.92 Kg
Wind girder 2x 4 x 8 Nos @ 52.60 Kg/Nos 420.64 Kg
Total 1682.56 Kg
Say 1.68 MT

E Supply and fixing of various type of


nuts and bolts.
For tower 38 x 4 x 4x 4 x 2432 Nos @ 0.20 Kg/Nos 486.4 Kg
16 x 1 x 4x 8 x 2048 Nos @ 0.20 Kg/Nos 409.6 Kg
Decking 114 x 23 2622 Nos @ 0.20 Kg/Nos 524.4 Kg
114 x 21 2394 Nos @ 0.20 Kg/Nos 478.8 Kg
Total 1899.20 Kg
Say 1.90 MT

F Supply and fixing of galavnized U-


hooks of 8 114x 18 2052 Nos @ 0.30Kg/Nos 615.6 Kg
Total 615.60 Kg
Say 0.62 MT

G-Total 66.97 MT
Say 67.00 MT
15 Supply and fabrication of structural steel confirming
to IS 226 and fabrication of steel suspension bridge
as per detail drawing and MoRTH specification No
1904 i/c one coat of anticorosive red oxide paint
confirming to IS 102 i/c all T&P nuts, bolts, washers
etc. ilc supply
and fixing of shop rivets cutting and threading etc.
reffered as per drawing i/c supply of all material,
labour and T&P etc. required for proper completion
of the work.

Tower (For 2 Nos)


Main Legs of tower ISA
200x200xl2mm 4x 1 19.50 78.00 Rm @ 36.00 Kg/Rm 2854.80 Kg
Batten plate 12mm thick at base.
2x 1 2.50 0.50 2.50 Sqm @ 94.20 Kg/Sqm 235.50 Kg
Base plate 20mm thick lx 1 3.00 3.00 9.00 Sqm @ 157.00 Kg/Sqm 1413.00 Kg
Deduct for hollow mid portion. lx 1 2.10 2.10 4.41 Sqm @ 157.00 Kg/Sqm -692.37 Kg
Base angle ISA 200x200xl2mm 2x 1 2.90 5.80 Rm @ 36.60 Kg/Rm 212.28 Kg
2x 1 2.50 5.00 Rm @ 36.60 Kg/Rm 183.00 Kg
Gussets Plate 12mm thick 4x 1 0.45 0.45 0.81 Sqm @ 94.20 Kg/Sqm 76.30 Kg
Solid vertical plate 10mm thick 2x 1 1/2x(2.5+1.8) 9.45 40.64 Sqm @ 78.5 Kg/Sqm 3189.85 Kg
Horizontal bracing ISA 75x75x8mm
2x 1 3.53 7.06 Rm @ 8.90 Kg/Rm 62.83 Kg
2x 1 3.18 6.36 Rm @ 8.90 Kg/Rm 56.60 Kg
2x 1 2.82 5.64 Rm @ 8.90 Kg/Rrn 50.20 Kg
2x 1 2.54 5.08 Rm @ 8.90 Kg/Rm 45.21 Kg
2x 1 2.19 4.38 Rm @ 8.90 Kg/Rm 38.98 Kg
2x 1 1.90 3.80 Rm @ 8.90 Kg/Rm 33.82 Kg
2x 1 1.62 3.24 Rm @ 8.90 Kg/Rm 28.84 Kg
2x 1 1.41 2.82 Rm @ 8.90 Kg/Rm 25.10 Kg
Vertical bracing ISA lOOxlOOxlOmm
2x 2x 2.80 11.20 Rm @ 14.90 Kg/Rm 166.88 Kg
2x 2x 2.60 10.40 Rm @ 14.90 Kg/Rm 154.96 Kg
2x 2x 2.50 10.00 Rm @ 14.90 Kg/Rm 149.00 Kg
2x 2x 2.40 9.60 Rm @ 14.90 Kg/Rm 143.04 Kg
2x 2x 2.30 9.20 Rm @ 14.90 Kg/Rm 137.08 Kg
2x 2x 2.20 8.80 Rm @ 14.90 Kg/Rm 131.12 Kg
2x 2x 2.10 16.80 Rm @ 14.90 Kg/Rm 250.32 Kg
2x 2x 2.00 16.00 Rm @ 14.90 Kg/Rm 238.40 Kg
2x 2x 1.90 15.20 Rm @ 14.90 Kg/Rm 226.48 Kg
2x 2x 1.70 13.60 Rm @ 14.90 Kg/Rm 202.64 Kg
2x 2x 1.60 12.80 Rm @ 14.90 Kg/Rm 190.72 Kg
2x 2x 1.50 12.00 Rm @ 14.90 Kg/Rm 178.80 Kg
2x 2x 1.40 11.20 Rm @ 14.90 Kg/Rm 166.88 Kg
2x 2x 1.40 11.20 Rm @ 14.90 Kg/Rm 166.88 Kg
8mm thick gusset plate on horizontal crossing. 14x 4 0.20 0.20 2.24 Sqm @ 62.72 Kg/Sqm 140.49 Kg
6mm thick gusset plate at center of vertical crossing. 14x 2 0.40 0.22 2.46 Sqm @ 47.04 Kg/Sqm 115.91 Kg
25mm dia anchor bolts for tower on base plate. 8x 1 0.90 7.20 Rm @ 3.85 Kg/Rm 27.72 Kg
25mm dia U bolts for tower on base 2x 2 2.40 9.60 Rm @ 3.85 Kg/Rm 36.96 Kg
ISMC 250 lateral bracing 2x 1 2.40 4.80 Rm @ 30.40 Kg/Rm 145.92 Kg
2x 2 2.25 9.00 Rm @ 30.40 Kg/Rm 273.60 Kg
2x 1 2.15 4.30 Rm @ 30.40 Kg/Rm 130.72 Kg
2x 2 2.00 8.00 Rm @ 30.40 Kg/Rm 243.20 Kg
2x 1 1.90 3.80 Rm @ 30.40 Kg/Rm 115.52 Kg
2x 2 1.80 7.20 Rm @ 30.40 Kg/Rm 218.88 Kg
2x 1 1.70 3.40 Rm @ 30.40 Kg/Rm 103.36 Kg
2x 2 1.55 6.20 Rm @ 30.40 Kg/Rm 188.48 Kg
2x 1 1.45 2.90 Rm @ 30.40 Kg/Rm 88.16 Kg
2x 2 1.35 5.40 Rm @ 30,40 lKg/Rm 164.16 Kg
2x 1 1.25 2.50 Rm @ 30.40 KgJRm 76.00 Kg
2x 2 1.15 4.60 Rm @ 30.40 Kg/Rm 139.84 Kg
2x 1 1.10 2.20 Rm @ 30.40 Kg/Rm 66.88 Kg
2x 2 1.00 4.00 Rm @ 30.40 Kg/Rm 121.60 Kg
Connecting beam ISMB 300 top. 1x 1/2x6.8 3.40 Rm @ 44.20 Kg/Rm 150.28 Kg
Bottom 1x 1/2x7.4 3.70 Rm @ 44.20 Kg/Rm 163.54 Kg
Vertical 1x 1/2x3.0 1.50 Rm @ 44.20 Kg/Rm 66.30 Kg
Diagonals 2x 1/2x3.2 3.20 Rm @ 44.20 Kg/Rm 141.44 Kg
10mm thick gusset plate 1x 1/2x0.8 0.55 0.22 Sqm @ 78.50 Kg/Sqm 17.27 Kg
Bottom 2x 1/2x0.55 0.72 0.40 Sqm @ 78.50 Kg/Sqm 31.09 Kg
Vertical 1x 1/2x0.28 0.27 0.04 Sqm @ 78.50 Kg/Sqm 2.97 Kg
Total 13287.43 Kg
For 2 Nos Tower 2 x 13287.42 26574.86
or 26.57 MT
Say 27.00 MT
16 Supply of 18mm dia MS iron suspenders true to
shape as per details drawing i/c cutting filling
welding, makings threads id one coat of anti
corosive red oxide paint confirming to IS 102 i/c all
T&P nuts, bolts, washers etc. i/c supply and fixing
of shop rivets cutting and threading etc. reffered as
per drawing i/c supply of all material, labour and
T&P etc. required for proper completion of the
work.

Main suspenders 114 x 2 (20+2)/2 2508.00 Rm @ 2.00 Kg/Rm 5016 Kg

Extra for joints 114 x 4 0.15 68.40 Rm @ 2.00 Kg/Rm 136.8 Kg


wind cable suspenders 57 x 2 (12.5+1)/2 769.50 Rm @ 2.00 Kg/Am 1539 Kg

Extra for joints 57x 4 0.15 34.20 Rm @ 2.00 Kg/Am 68.4 Kg


Total 6760.20 Kg
or 6.76 MT
Say 7.00 MT
Compatibility Report for Block Change EST. of 170 m. suspension
Bridge.xls
Run on 4/15/2014 14:32

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 15
by the selected file format. These formats will be converted to the closest
format available.