Documente Academic
Documente Profesional
Documente Cultură
C e n t r i c o b y Vo r a S k y l i n e
CONTENTS
Project Highlights
Location Highlights
Annexures:
- Project layouts & floor plans
- View from the top
- Home loan approvals
Proposition
- Fully loaded property @ stand alone property rates
Connectivity
- Sits between the SV road & Link road at Malad west
- Easy access to the new business hub – Mind space
- Excellent connectivity with Western Line
Details
- One tower comprising of 32 habitable floors
- Two 2 BHKs & two 3.5 BHKs on each floor
- All amenities like Gym, Swimming pool,
Indoor play area, jogging track etc.
USP
- Pricing
- Fully loaded project
- Developed infrastructure around the project
- Around 60% of land of the project will be
an open area
- Peaceful surrounding (at a comfortable
distance from SV Road as well as Link Road)
Approvals
Jaswanti Gold
Base Rate ‘15.5 k
5
2 Possession Dec 15
Distance 1.1 Km
Lotus Sky garden
Shreeji Atlantis Base Rate ‘13 k
Base Rate ‘12k Possession Dec 17
Possession Dec 18 Distance 0.1 Km
Distance 0.1 Km
4
1 Agarwal Residency
Base Rate `20 k
Possession Ready
Distance 1.2
Raheja Interface
Base Rate `16 k Centrico
Possession Ready
Distance 0.9
Adarsh Residency
2 Base Rate `17 k
Possession Ready
Distance 1.0
Royal Sapphire
Auris serenity
3 Base Rate ‘13 k
Possession Dec 16
Base Rate ‘14 k Distance 0.7 Km
Possession Jun 18 4
Distance 1.1 Km
CONSTRUCTION
UNDER
Distance 0.9
READY
Has been in the Construction business since 1982 Renowned developer in the suburbs
Mr. Shailesh Vora, CMD of the group has an having completed more than 10
overall industry experience of more than 30 years projects between Borivali & Malad
Successfully delivered > 5 lac sq. ft. of
real estate development
SALE BUILDING
2 BHK LAYOUT
I N D O O R G A M E S FA C I L I T I E S
SWIMMING POOL
M E D I TAT I O N A N D YO G A L AW N
L AW N W I T H B A R B E Q U E
C O U N T E R TO H O S T
L AV I S H PA R T I E S A N D
OT H E R E V E N T S
R A I N WAT E R
HARVESTING
SYSTEM
P L E A S E C A L L YO U R R E L AT I O N S H I P M A N A G E R AT
This document is provided for assistance only and is not intended to be and must not alone be taken as the basis for an investment decision. The user assumes the entire risk of any use made of
this information. Each recipient of this document should make such investigation as it deems necessary to arrive at an independent evaluation of an investment in the property referred to in this
document (including the merits and risks involved), and should consult his own advisors to determine the merits and risks of such investment. The investment discussed or views expressed may not
be suitable for all investors. The information contained herein is from the data provided by the developer. Edelweiss is not responsible for the accuracy or completeness of the data provided by the
developer and it should not be relied on as such. Edelweiss or any of its affiliates/ group companies shall not be in any way responsible for any loss or damage that may arise to any person from
any inadvertent error in the information. We and our affiliates, group companies, officers, directors, and employees may have any positions in the property of the developer mentioned herein or have
other potential conflict of interest with respect to any recommendation and related information and opinions. Past performance is not necessarily a guide to future performance.
The data or images of the property contained in this document are only indicative / illustrative.
This information is subject to change without any prior notice. Edelweiss reserves the right to make modifications and alterations to this statement as may be required from time to time. However,
Edelweiss is under no obligation to update or keep the information current.
Investors should note that investment in property involves a high degree of risk such as delay in construction, insolvency of developer, international delay, high interest rate scenario, force majeure,
government policy changes, Price changes, technical reasons viz, title clearance, court stay order, change in environment policy, approvals from authority, occupation certificate etc..
This service / information is strictly confidential and is being furnished to you solely for your information. This information should not be reproduced or redistributed or passed on directly or indirectly
in any form to any other person or published, copied, in whole or in part, for any purpose unless otherwise expressly authorized. This service / information is not directed or intended for distribution
to, or use by, any person or entity who is a citizen or resident of or located in any locality, state, country or other jurisdiction, where such distribution, publication, availability or use would be contrary
to law, regulation or which would subject Edelweiss and affiliates/ group companies to any registration or licensing requirements within such jurisdiction. The distribution of this document in certain
jurisdictions may be restricted by law, and persons in whose possession this document comes, should inform themselves about and observe, any such restrictions.
The data would be provided to the clients on an "as is" and "where-is" basis, without any warranty. Edelweiss or its subsidiaries and associated companies shall not be liable for any delay or any
other interruption which may occur in providing the data due to any reason including network (Internet) reasons or snags in the system, break down of the system or any other equipment, server
breakdown, maintenance shutdown, breakdown of communication services or inability of the Edelweiss or its subsidiaries and associated companies to provide the data. In no event shall the
Edelweiss be liable for any damages, including without limitation direct or indirect, special, incidental, or consequential damages, losses or expenses arising in connection with the data provided by
the Edelweiss or its subsidiaries and associated companies.
Edelweiss Global Wealth Management Ltd. (Edelweiss) is a distributor and excludes any liability with respect to below points:
(a) any title issues that may arise in properties that may be purchased by the applicant relying on information and / or assistance provided by Edelweiss;
(b) future changes in the price of property so purchased;
(c) any loss in transit of title documents of such property;
(d) any loss of earnest money by reason of the arrangement between the applicant and seller not materializing;
(e) any discrepancies between details mentioned in the brochure/information memorandum(if any) of the developer / builder and the end product;
(f) any failure on part of the builder / developer to obtain requisite approvals for pre launch projects;
(g) any delay in taking over possession of the property/s;
(h) completion of the project, construction update, project updates other than construction one e.g. delay in receipt of approvals/delay in obtaining OC; Approval; news in media; slow progress
Edelweiss is responsible for clear and marketable title of the project and investor has to take decision based on its own judgment.