Item Type Of Work Quantity

CONCRETE
1 Concrete C-7 Cement = 1.82 qts/m3
Mechanical Mix Sand = 0.50m3/m3
Mix ratio = 1:2:5:6 Gravel = 0.85/m3
2 Concrete C-15 Cement = 2.75 qts/m3
Mechanical Mix Sand = 0.53m3/m3
Mix ratio = 1:2:5:3.5 Gravel = 0.75/m3
3 Concrete C-20 Cement = 3.18 qts/m3
Mechanical Mix Sand = 0.50m3/m3
Mix ratio = 1:2:3 Gravel = 0.75/m3
4 Concrete C-15 Cement = 2.94qts/m3
Hand Mix Sand = 0.46m3/m3
Mix ratio = 1:2:3.5 Gravel = 0.80/m3
5 Concrete C-20 Cement = 3.47qts/m3
Hand Mix Sand = 0.41m3/m3
Mix ratio = 1:1.5:3 Gravel = 0.82/m3
6 Concrete C-30 Cement = 3.82 qts/m3
Mix ratio = 1:1.5:2:5 Sand = 0.45m3/m3
Gravel = 0.75/m3
7 Concrete C-15 Cement = 2.40 qts/m3
Total Agg. = 1850 kg Sand = 35.50%
Gravel =
8 Concrete C-15 Cement = 2.80 qts/m3
Total Agg. = 1800 kg Sand = 35.50%
Gravel = X
9 Concrete C-15 Cement = 3.20 qts/m3
Total Agg. = 1800 kg Sand = 30.40%
Gravel = X
10 Concrete C-30 Cement = 4.0 qts/m3
Total Agg. = 1700 kg Sand = 30.40%
Gravel = X
11 Steel Reinforcement (with 5% wastage)
12 Concrete C-25 Cement = 3.6 qts/m3
Total Agg. = 1750 kg Gravel = X
Item Type Of Work Quantity
1 Form Work for sides of the walls:
(Usages for boards)
a) 2.5 cm thick board ( with 5% wastage) 0.53m2/m2
b) 50x75mm battens (with 5% wastage) ( 5 Usages) 0.84m/m2
c) Beam 50x125mm (with 5% wastage) (10 Usages) 0.10m/m2
d) Strut (# 60cm eucalyptus) (10 Usages) 0.10kg/m2
e) Nails 0.2kg/m2
f) Mould oil 0.06 lit/m2
2 Soffit form work for slab,props height not exceeding/300mm
a) 2.5 cm thick board ( with 5% wastage)( 4 Usages) 0.27m2/m2
b) 30x100mm battens ( 10 Usages)4.0m/m2 0.42m/m2
c) 75x125mm beams (10 Usages) 1.0m/m2 0.15m/m2
d) 20x100mm bracings ( 20 Usages) 2m/m2 0.10m/m2
e) Nails 0.20kg/m2
g) Mould oil 0.06 lit/m2
3 Form work for edges of the slab width not exceeding 200mm
a) 2.5mm thick boards (4 Usages) 0.053m/m2
b) 50x50mm battens (8 Usages)2m/m 0.25 m/m2
c) Nails 0.05m/m2
4 Form work for face of the steps & edges of the slab width over
200mm not exceeding 250mm
a) 25x250 mm boards (5 Usages) 0.21m/m
b) 50x50mm battens (10 Usages)1.0m/m 0.11 m/m
c) Nails 0.05kg/m
d) Mould oil 0.015 lit/m
5 Form work for sides of the footing depth, not exceeding 250mm
a) 25mm thick boards (4 Usages) 0.07m/m2
b) 50x50mm battens (10 Usages) 0.32m/m2
c) Nails 0.05kg/m
d) Mould oil 0.015 lit/m
6 Ditto, but depth over 250mm but not exceeding 350mm
a) 25mm thick boards (4 Usages) 0.10m/m2
b) 50x50mm battens (10 Usages) 3.5m/m 0.38m/m2
c) Nails 0.07kg/m
d) Mould oil 0.021 lit/m
7 Form work for sides of the ground beams & footing width over 450mm
a) 25mm thick boards (4 Usages) 0.27m/m2
b) 50x50mm battens (10 Usages) 3.0m/m2 0.32m/m2
c) Struts # 60mm (10 Usages) 2.0m/m2 0.21m/m2
d) Nails 0.20kg/m2
e) Mould oil 0.21 lit/m
Item Type Of Work Quantity
8 Form work for sides of the foundation wall
a) 25mm thick boards (4 Usages) 0.27m/m2
b) 50x75mm battens ( 10 Usages) 4.5m/m2 0.47m/m2
c) 50x125mm beams (10 Usages) 1.05m/m2 0.11m/m2
d) Strut # 60cm eucalyptus (10 Usages)1.0m/m2 0.10m/m2
e) Nails 0.25kg/m2
f) Mould oil 0.06 lit/m2
9 Form work for sides of the foundation columns
a) 25mm thick boards (4 Usages) 0.27m/m2
b) 50x100mm battens ( 10 Usages) 4.6m/m2 0.27m/m2
c) 50x125mm beams (10 Usages) 1.05m/m2 0.10m/m2
d) Nails 0.20kg/m2
e) Mould oil 0.06 lit/m2
10 Form work for sides of the columns
a) 25mm thick boards (4 Usages) 0.27m/m2
b) 50x75mm battens ( 10 Usages) 4.6m/m2 0.46m/m2
c) Struts # 60mm (10 Usages) 2.0m/m2 0.20m/m2
d) Nails 0.30kg/m2
e) Mould oil 0.06 lit/m2
11 Form work for sides of the beam
a) 25mm thick boards (1 Usages) 0.27m/m2
b) 50x75mm battens ( 10 Usages) 4.2m/m2 0.46m/m2
c) Beam 50x100mm (10 Usages)2.1m/m2 0.20m/m2
d) Nails 0.30kg/m2
e) Mould oil 0.06 lit/m2
12 Form Work for sides of the walls:
a) 25mm thick boards (4 Usages) 0.27m/m2
b) 50x75mm battens ( 10 Usages) 4.2m/m2 0.42m/m2
c) 50x125mm beams (10 Usages) 1.05m/m2 0.105m/m2
d) Struts # 6mm eucalyptus (10 Usages) 1m/m2 0.10m/m2
e) Nails 0.30kg/m2
f) Mould oil 0.06 lit/m2
Item Type Of Work Quantity
Concrete Block For Foundation
1 150mm thick concrete hollow block foundation wall bedded in
cement mortar 1:4
a) Concrete hollow block 12.5pcs/m2
b) Mortar (10m joints + 5% waste) 0.0138m3/m2
c) Cement 0.01m3/m2
d) Sand 0.01m3/m2
e) Hollows filled with concrete mortar 1;5 0.08m3/m2
f) Cement 0.19qts/m2
g) Sand 0.07m3/m2
2 Ditto, but 200mm thick
a) Concrete hollow block 12.5pcs/m2
b) Mortar 0.0184m2/m2
c) Cement 0.05qts/m2
d) Sand 0.01m3/m2
e) Hollows filled with concrete mortar 1;5 0.11m3/m2
f) Cement 0.26qts/m2
g) Sand 0.09m3/m2
3 Ditto, but 250mm thick
a) Concrete hollow block 12.5pcs/m2
b) Mortar 0.023m2/m2
c) Cement 0.06qts/m2
d) Sand 0.02m3/m2
e) Hollows filled with concrete mortar 1;5 0.14m3/m2
f) Cement 0.33qts/m2
g) Sand 0.12m3/m2
4 Natural Stone masonry Foundation:-
400mm thick hard basaltic stone measonry foudation:-
Wall bedded in cement mortar 1:4 in full joints
a) Basaltic Stone 1.25m3/m3 x 0.40 m3 x 1.05 waste 0.53m3/m2
b) Mortar 0.34m3/m3 x 0.40mm x 0.40 1.05 waste 0.14m3/m2
c) Cement 0.392qts/m2
d) Sand 0.112m3/m2
5 Ditto but one side roughly dressed & left for pointing:
a) Basaltic Stone 1.34m3/m3 x 0.40 m3 x 1.05 waste 0.56m3/m2
b) Mortar 0.34m3/m3 x 0.40mm x 0.40 1.05 waste 0.14m3/m2
c) Cement 0.392qts/m2
d) Sand 0.112m3/m2
Item Type Of Work Quantity
Burnt brick walls for super structures:
6 120mm thick burnt brick wall bedded in cement lime mortar
1:2:9 both side left for plastering.
a) Brick 57.7pcs/m2
b) Mortar (with 5% waste) 0.026m3/m2
c) Cement 0.031qts/m2
d) lime 0.048qts/m2
e) Sand 0.02m3/m2
7 Ditto, but 250mm thick
a) Brick 115.4pcs/m2
b) Mortar (with 5% waste) 0.062m3/m2
c) Cement 0.07qts/m2
d) lime 0.11qts/m2
e) Sand
8 Ditto, but 150mm thick
a) Hollow concrete block 12.5pcs/m2
b) Mortar (with 5% waste) 0.0138m3/m2
c) Cement 0.16qts/m2
d) lime 0.02qts/m2
e) Sand 0.01m3/m2
9 Ditto, but 200mm thick
a) Hollow concrete block 12.5pcs/m2
b) Mortar (with 15% waste) 0.0184m3/m2
c) Cement 0.021qts/m2
d) lime 0.34qts/m2
e) Sand 0.014m3/m2
10 Ditto, but 250mm thick
a) Hollow concrete block 12.5pcs/m2
b) Mortar (with 15% waste) 0.023m3/m2
c) Cement 0.027qts/m2
d) lime 0.042qts/m2
e) Sand 0.017m3/m2
Natural Stone masonry for super structure:-
11 350mm thick trachytic stone wall bedded in cement mortar 1:4
one side left for plastering & one side dressed & left for pointing
a) Trachytic Stone 1.33m3/m3 x 0.65 m3 x 1.05m waste 0.9m3/m3
b) Cement Mortar 0.264m3/m3 x 0.35mm x 1.05 waste 0.1m3/m2
c) Cement 0.28qts/m3
d) Sand 0.80m3/m3

Item Type Of Work Quantity


12 Detto, but dressed & left for pointing:-
a) Trachytic Stone 1.33m3/m3 x 0.35 m3 x 1.10m waste 0.52m3/m2
b) Cement Mortar 0.264m3/m3 x 0.35mm x 1.05 waste 0.1m3/m2
c) Cement 0.10m3/m2
d) Sand 0.28qts/m
0.08m3/m2
1 Lime mortar 1:2
a) Lime 4.26qts/m3
b) Sand 0.09m3/m3
2 Cement lime mortar 1:1:6
a) Cement 2.21qts/m3
b) Lime 1.73qts/m3
c) Sand 1.08m3/m3
3 Cement lime mortar 1:2:9
a) Cement 1.47qts/m3
b) Lime 2.31qts/m3
c) Sand 1.08m3/m3
4 Cement mortar 1:1
a) Cement 0.72qts/m3
b) Sand 0.72m3/m3
5 Cement mortar 1:2
a) Cement 5.88qts/m3
b) Sand 0.96m3/m3
6 Cement mortar 1:2:3
a) Cement 4.41qts/m3
b) Sand 1.08m3/m3
7 Cement mortar 1:4
a) Cement 3.53qts/m3
b) Sand 1.15m3/m3
8 Cement mortar 1:5
a) Cement 2.94qts/m3
b) Sand 1.2m3/m3
9 Cement mortar 1:6
a) Cement 2.52qts/m3
b) Sand 1.23m3/m3
10 Cement pumice light weight screed 1:6
a) Cement 2.52qts/m3
b) Pumice 1.23m3/m3
11 Ditto, but 1:8
a) Cement 1.96qts/m3
b) Pumice 1.28m3/m3
Item Type Of Work Quantity
12 Two coats of plaster in cement lime mortar 1:2:9
(13mm thick plaster 1:2:9:-6mm thcikness for irregularities in
wall 10% waste)
a) Mortar (with 10% wastage) 0.21m3/m2
b) Cement 0.03qts/m2
c) Lime 0.1qts/m2
d) Sand 0.02m3/m2
13 Two coats of plaster in cement lime mortar 1:2:9
(13mm thick plaster 1:2:9:-6mm thcikness for irregularities in
wall 10% waste)
a) Mortar (with 10% wastage) 0.0176m3/m3
b) Cement 0.08qts/m2
c) Lime 0.02m3/m2
Second coaten cement lime mortar 1:1:6
a) Mortar 0.0066m3/m2
b) Cement 0.01qts/m2
c) Lime 0.01m3/m2
14 Three coats of plaster cement lime mortar 1:2:9
13mm thick plaster 1:2:9x6mm thickness for irreglarities in
wall x 10% waste)
a) Mortar 0.21m3/m2
b) Cement 0.03qts/m2
c) Sand 0.02qts/m2
d) Lime 0.05m3/m2
3mm thick fine lime mortar 1:2:-10% wastes
a) Mortar 0.0033m3/m2
b) Lime 0.02qts/m2
c) Sand 0.003m3/m2
15 30mm thick cement sand screed 1:3:-6mm thickness for
irregularities 5% waste
a) Mortar 0.038m3/m2
b) Cement 0.168qts/m2
c) Sand 0.041m3/m2
d) Cement grout 1:1 1.5lit/m2
16 Ditto, but 40mm thick:-
a) Mortar 0.048m3/m2
b) Cement 0.212 qts/m2
c) Sand 0.052m3/m2
d) Cement grout 1:1 1.5lit/m2

Item Type Of Work Quantity


17 Ditto, but 30mm thick 1:4
a) Mortar 0.038m3/m2
b) Cement 0.134 qts/m2
c) Sand 0.044m3/m2
d) Cement grout 1:1 1.5lit/m2
18 Ditto, but 50mm thick 1:4
a) Mortar 0.059m3/m2
b) Cement 0.208qts/m2
c) Sand 0.068m3/m2
d) Cement grout 1:1 1.5lit/m2
19 Average 50mm thick ligh weight screeding in cement pumic
screed 1:6 to roof slab
45mm thick cement pumice screed 1:6 = 6mm thickness for
irregularities in slab +5% waste.
a) Mortar 0.054m3/m2
b) Cement 250kg/m3 0.135qts/m2
c) Pumice 915kg/m3 0.067m3/m2
(5mm thick cement screes for smooth in surface+5%waste)
a) Mortar 0.0053m3/m2
b) Cement 0.0013qts/m2
c) Sand 0.0007m3/m2
d) Cement grout 1.5lit/m2
20 Ditto, but 100mm thick
95mm thick (1:6)
a) Mortar 0.106m3/m2
b) Cement 0.267qts/m2
c) Pumice 0.131m3/m2
5mm thick cement screed:-
a) Mortar 0.0053m3/m2
b) Cement 0.0013qts/m2
c) Sand 0.0007m3/m2
d) Cement grout 1:1 1.5lit/m2
21 One coat of tyrolean type rendering in cement lime mortar 1:1:6
with cement coulour+5% waste:-
a) Mortar 0.008m3/m2
b) Cement 0.018qts/m2
c) Lime 0.014qts/m2
d) Sand 0.009m3/m2

Item Type Of Work Quantity


22 Pointing of burns brick wall with cement mortar 1:3
Cement mortar 1:3 with 15% waste joints 10mm
a) Mortar 0.003m3/m2
b) Cement 0.0013qts/m2
c) Sand 0.003m3/m2
23 Pointing of fair faced concrete block wall with cement mortar1:3
a) Cement mortar 1:3=15% 0.002m3/m2
b) Cement 0.009qts/m2
c) Sand 0.002m3/m2
24 Pointing of dressed stone masonry wall with cement mortar 1:3
a) Cement mortar 15% waste 0.0055m3/m2
b) Cement 0.024qts/m2
c) Sand 0.006m3/m2
25 15x75mm cement sand 1:3 skirting finished smooth with steel trowt:-
a) Cement sand screed 1:3+6mm thickness for irregularities in
beds+5% waste
b) Cement 0.0017m3/ml
c) Sand 0.007qts/ml
26 20mm thick terrazo flooring in cement marble chippings screed 1:03
a) Cement sand screed 1:3+6mm thickness for irregularities in
beds+5% waste 0.027m3/m2
b) Cement 0.0119qts/m2
c) Sand 0.29m3/m2
Item Type Of Work Quantity
1 6x150x150mm glazed ceramic wall tiles bedded in cement
mortar 1:3
a) Ceramic tiles (with 2% waste) 45.3pcs/m2
b) Mortar for bedding (with 10% waste) 0.011m3/m2
c) Cement 0.49qts/m2
d) Sand 0.001m3/m2
e) Cement grout for pointing with 20% waste
2 Ditto, but 7x73x145mm ceramic wall tiles:-
a) Ceramic tiles (with 2% waste) 96.4pcs/m2
b) Mortar for bedding (with 10% waste) 0.011m3/m2
c) Cement 0.49qts/m2
d) Sand 0.12m3/m2
e) Sand as above 0.012m3/m2
3 Ditto, but 7x50x100mm cement wall tiles:-
a) Cement tiles (with 2% waste) 204.0pcs/m2
b) Sand as above
4 Ceramic tile skriting in 7x73x145mm tiles bedded
a) Ceramic tiles (with 5% waste) 7.24pca/ml
b) Mortar 1.3 for bedding+10% waste 0.001m3/m2
c) Cement 0.004qts/ml
d) Sand 0.001m3/m2
5 20x20x200 terrazzo tile (cement tile) flooring bedded in cement
screed 1:3
a) Terrazzo tiles(cement tile) flooring 2% waste) 25.5pcs/m2
b) 20mm thick bedding screed (with 10% waste) 0.022m3//m2
c) Cement 0.097qts/m2
d) Sand 0.24m3/m2
e) Cement grout for pointing (with 20% waste) 0.001m3/m2
f) Polish 0.04kg/m2
6 20x20x200 terrazzo tile (cement tile) skirting beddeding cement
screed 1:3
a) Terrazzo tiles(cement tile)skirting (with 5% waste) 5.3pcs/ml
b) Mortar for bedding (10% waste 0.0011m3/m2
c) Polish 0.01kg/ml
d) Cement 0.005qts/ml
e) Sand 0.001m3/m2

Item Type Of Work Quantity


7 20mm thick marble slate flooring bedded in cement
a) Marble slate with waste 1.02m2/m2
b) 20mm thick bedding screed 1.3+10% waste 1.022m3/m2
c) Cement 0.097qts/m2
d) Sand 0.024m3/m2
e) Cement grout for pointing with 20% waste 0.001m3/m2
f) Polish 0.04kg/m2
8 15x75mm marble skirting bedded in cement mortar 1:3
a) Marble slate (with 5% waste) 1.05m/ml
b) Mortar for bedding (with 10% waste) 0.001m3/m2
c) Cement 0.004qts/ml
d) Sand 0.001m3/ml
e) Polish 0.01kg/ml
9 2x200x200 mm plastic tile:-
a) Plastic (with 2% wastage) 25.5pcs/m2
b) Adhesive including waste 0.4li/m2
c) Polishing 0.04kg/m2
10 8mm thick pannel woira parquet:-
a) Woira wood (with 3% wate) 1.03m2/m2
b) Mastic including waste 1.66kg/m2
11 4mm thick Debre Barhan carpet flooring:-
a) Woolen carpent ( with 3% waste) 1.03m2/m2
b) Adhensive including waste 0.40lit/m2
12 15x100mm terrazzo skirting in white cement marble chippings
screed 1:3
a) Terrazzo screed+6mm thickness for irregulareties in base+5%
waste 0.0022m3/ml
b) Cement grout 1:1 0.11lit/ml
c) Polish 0.01kg/ml
13 Wooden skirting in Tid wood fixed on to walls:-
a) 15x60mm tid wood +fixed on to walls 1.1m/ml
b) Fixed+5% waste 0.1pcs/ml
Wooden Flooring:-
a) Boarding 1.1m2/m2
b) Nails 0.6kg/m3
c) Floor joint(c/c 30cm) 2.2m/m2
d) Nails for floor joint 0.14kg/m2

Item Type Of Work Quantity


1 2 coats of plastic compulsion to plastered surface
a) Priming coat 0.1lit/m2
b) Finishing coat 0.08lit/m2
2 Ditto, but 3 coats
a) Priming coat 0.1lit/m2
b) Under coat 0.08lit/m2
c) Finishing coat 0.07lit/m2
3 2 coats of plastic emulasion paint to wooden wall surface:-
a) Priming coat 0.1lit/m2
b) Finishing coat 0.08lit/m2
4 Ditto, but 3 coats
a) Priming coat 0.08lit/m2
b) Under coat 0.08lit/m2
c) Finishing coat 0.07lit/m2
5 2 coats oil paint(emanal) to wooden surface:-
a) Priming coat 0.1lit/m2
b) Finishing coat 0.08lit/m2
6 3 coats of varnish paint to wooden surface:-
a) First coat 0.08lit/m2
b) Second coat 0.08lit/m2
c) Finishing coat 0.07lit/m2
d) knotting 0.006lit/m2
7 One coat of cement paint to smooth plastered surface:-
a) One coat of cement paint to smooth plastered surface:-
Cement paint with fine sand 6.0kg/m2
8 3 coats of plastic emulation paint to wooden (chipwood) Ets.surface:-
a) Priming coat 0.08lit/m2
b) Under coat 0.08lit/m2
c) Finishing coat 0.07lit/m2
9 2 coats of oil paint to wooden skirting girth not exceeding 100mm
a) Priming & finishing coat 0.032lit/m2
10 2 coats of varnish paint wooden floor surface:-
a) Priming coat 7 0.08lit/m2
b) Finishing coat 0.08lit/m2
c) knotting 0.006lit/m2
11 2 coats of varnish paint to wooden skirting girth not exceeding 100mm
a) knotting 0.0014lit/m2
b) Priming coat 0.012lit/m2
c) Finishing Coat 0.12lit/m2

Item Type Of Work Quantity


12 3 coat of plastic emulsion paint to plastered ceiling surface:-
a) Priming coat 0.1lit/m2
b) Under coat 0.08lit/m2
c) Finishing coat 0.07lit/m2
13 3 coats of hard glass oil paint (enamel) to wooden door surface;
a) Priming coat 0.015lit/m2
b) Under coat 0.13lit/m2
c) Finishing coat 0.12lit/m2
d) Knotting 0.113lit/m2
e) Putty 0.003lit/m2
14 3 coats of hard glass oil paint (enamel)to wooden parts of the windows:-
a) Priming coat 0.07lit/m2
b) Under coat 0.06lit/m2
c) Finishing coat 0.06lit/m2
d) Knotting coat 0.01lit/m2
e) Putty 0.02lit/m2
15 3 coats of hard glass oil paint (enamel)to steel door surface:-
a) Priming coat 0.15lit/m2
b) Under coat 0.013lit/m2
c) Finishing coat 0.12lit/m2
16 3 coats of hard glass oil paint to steel parts of the windows
(window area measured one side):-
a) Priming coat 0.07lit/m2
b) Under coat 0.06lit/m2
c) Finishing coat 0.06lit/m2
17 3 coats of varnish paint to wooden door surface:-
a) Knotting coat 0.13lit/m2
b) Priming coat 0.13lit/m2
c) Under coat 0.12lit/m2
d) Finishing coat 0.12lit/m2
18 3 coats of varnish paint to wooden parts of the window:-
(window area measured in one side):-
a) Knotting coat 0.01lit/m2
b) Priming coat 0.13lit/m2
c) Under coat 0.12lit/m2
d) Finishing coat 0.13lit/m2

Item Type Of Work Quantity


19 2 coats of plastic emulasion paint to wooden barge board &
soffit boarding:-
a) Priming coat 0.011lit/m2
b) Finishing coat 0.09lit/m2
20 3 coats of paint (enamel) to glavanized steel sheet eaves gutter
size 150x150( girth 400mm)
a) Priming coat 0.03lit/ml
b) Under coat 0.03lit/ml
c) Finishing coat 0.04lit/ml
21 3 coats of oil paint (enamel) to glavanized steel sheet down pipe0.03lit/ml
size 150x150mm( girth )400mm
a) Priming coat 0.03lit/ml
b) Under coat 0.04lit/ml
c) Finishing coat 0.03lit/ml
22 3 coats of oil paint (enamel) to glavanized steel sheet flashing:-
a) Priming coat 0.07lit/m2
b) Under coat 0.08lit/m2
c) Finishing coat 0.07lit/m2
Flat aspestos sheet chipwood, & on+5% wastage per m2 area
for wall covering.
Chipwood, hard board, soft board flat asbestoes sheet & so
on+5% wastage per m2 area for ceiling covering.
a) mmthick glass + 10% wastage per m2 area.
b) Putty 0.50 kg/m2 area.
Item Type Of Work Quantity
1 50x150mm zigba wood ground floor joint on peates+10%waste
a) 10%waste 1.1m/ml
b) Nails 0.07kg/ml
2 50x100mm zigba wood stud (poles)
a) 10%waste 1.1m/ml
3 25x150mm zigba wood lower & upper cord in trusses
a) 10%waste 1.1m/ml
b) Nails 0.1kg/ml
4 25x150mm zigba wood diagonals & vertical trusses
a) 10%waste 1.1m/ml
b) Nails 0.1kg/ml
5 50x100mm zigba wood refters
a) 10%waste 1.1m/ml
b) Nails 1.1m/ml
6 50x100mm zigba wood purline
a) 10%waste 1.1m/ml
b) Nails 0.07kg/ml
7 8mm eucalyptus wood lower & upper cord in trusses
a) 15%waste 1.15m/m
b) Nails 0.04kg/ml
c)Fixing bands 0.12kg/ml
8 60mm eucalyptus wood diagonals & verticals in trusses
a) 15%waste 1.15m/m
b) Nails 0.04kg/ml
c)Fixing bands 0.12kg/ml
9 100mm eucalyptus wood rafters
a) 15%waste 1.15m/m
b) Nails 0.07kg/ml
c)Fixing bands 0.06kg/ml
10 70mm eucalyptus wood purline + 15% waste
a) 15%waste 1.15m/m
b) Nails 0.07kg/ml
c )Fixing bands 0.06kg/ml
11 30x70mm zigba wood battens for wooden wall frames
a) 10%waste 1.1m/ml
b) Nails 0.7kg/ml
12 Planned 1 sawn tid wood fascia board, barge board
a) 10%waste 1.1m/ml
b) Gal. Nails 0.03kg/molar
8pcs/ml

Item Type Of Work Quantity


13 50x50mm zigba wood battens for chipwood ceiling+10%waste
a) 10%waste 1.1m/ml
b) Nails 0.05/ml
14 15x40mm planned wood fillets + 10% waste
a) 10%waste 1.1m/ml
b) Gal. Nails 0.01kg/ml
with 10m open joints 1.10ml/ml
Concerls: 0.01kg/ml
2.5x2cm .75ml/m2
Item Type Of Work Quantity
1 Bituminious damp proofing walls:
Bituminious damp proofing toplastered walls surface:
a) One coat bituninious emulsion for promer + 5% waste 0.42kg/m2
b) One coat of hot bitumen + 5% waste 1.58kg/m2
c) Heating gas
2 Ditto, but 2 coats of hot bitumen:-
a) Same as above 0.42kg/m2
b) Two coats of hot bitumen + waste 3.15kg/m2
c) Heating gas 0.10kg/m2
3 Damp proofing course under walls, width not exceeding 25cm.
a) One coat bituninious emulsion for promer = + 5% waste 0.11kg/ml
b) One coat of hot bitumen + 5% waste 0.4kg/ml
c) Heating gas 0.013kg/ml
4 Damp-proofing course plastered walls surface:-
a) One coat bituninious emulsion for promer + 5% waste 0.42kg/m2
b) One coat of hot bitumen + 5% waste 0.79kg/m2
5 Ditto, but two coats of bitumen emulsion:-
a) Same as above
b) Two coats of hot bitumen emulsion + 5% waste 1.58kg/m2
Bituminous water proofing for walls:-
1 Bituminous water proofing for plastered walls:-
a) One coat for bitumen emulasion for promer + 5% waste 0.32kg/m2
b) One play of glass fibre memberance + 5% waste 1.15m2/m2
c) Bitument emulsion for embedding (2x075 kg/m2)+5% waste 0.79kg/m2
2 Ditto, but two plies of glass fiber membrean:-
a) Same as above 1.5kg/m2
b) Two plies glass fibre memereane + 5% overlap + waste 2.3m2/m2
c) Bitument emulsion for embedding (4x075 kg/m2)+5% waste 3.15kg/m2
d) Sealing coats + 5% waste 0.79kg/m2
Bituminous damp-Proofing floors:-
1 Damp proofing for ground slab(Screeded base)
a) One coat of bitument emulsion for primer coat + 5% waste 0.42kg/m2
b) One coat of hot bitumen in to ground slab + 5% waste 1.58kg/m2
c) Heating gas 0.03kg/m2
2 Ditto, but two coats of bitumen :-
a) Same as above 0.42kg/m2
b) Hot bitumen (20coats x/m2 waste) 3.15kg/m2
c) Heating gas 0.1kg/m2
3 Damp proofing on screeded base:-
a) One coat of bitument emulsion for frimer coat + 5% waste 0.42kg/m2
b) One coat of bitument emulation layer +5% waste 0.79kg/m2
Item Type Of Work Quantity
4 Ditto, but two coat of bitument emulsion:-
a) Same as above
b) Bitument emulsion ( 2 coats x 0.75 kg/m2+ 5% waste) 1.58kg/m2
Bituminious water - proofing for flooring:-
1 Bituminous water - proofing for screeded base:-
a) One coat of bitument emulsion for promer + 5% waste 0.32kg/m2
b) One play of glass fibre memberance 15% overlap waste 1.15m3/m2
c) Bitument emulsion for embedding (2x075 kg/m2)+5% waste 1.58kg/m2
d) Sealing coats + 5% waste 0.79kg/m2
2 Ditto, but two plies of glass fiber membrean:-
a) Same as above
b) Two plies glass fibre memereane + 15% overlap & waste 2.3m2/m2
c) Oitument emulation for embedding (4x0.75kg/m2)+5%waste 3.16kg/m2
d) Sealing coats + 5% waste 0.79kg/m2
1 Bituminous roofing:-
a) One coat of bitument emulsion promer + 5% waste 0.32kg/m2
b) One play of glass fibre memberance+5%overlapping & waste1.15m2/m2
c) Bitument emulsion for embedding (2 layers x075 kg/m2)+5%3.15kg/m2
d) Reflecting finish( 2 Coats x 0.15kg/m2) + 5% waste 0.32kg/m2
2 Ditto, but two plies of glass fiber membrean:-
a) Same as above
b) One play of glass fibre memberance+5%overlapping & waste2.3m2/m2
c) Bitument emulsion for embedding (6 layers x075 kg/m2)+5%4.75kg/m2
d) Reflecting finish( 2 Coats x 0.15kg/m2) + 5% waste 0.32kg/m2
Asphalt bitument for
2.5 kg/m2 1st
2.0 kg/m2 2nd
1.0 kg/m2 3rd
5.5

Item Type Of Work Quantity


1 Supply & insall 100mm concrete pipe layed on a leveled base &
joints cowared in 100mm wide bitumentes folt strip
a) 100mm C.P + 5% waste 1.05m/m
b) Bitumionous falt strip 100mm wide 5% waste 0.43/m
2 100mm concrete ring ispection pit on a levelled ground with joints
filled in cement mortar 1:2 including R.C cover & connections for
inst.
a) 300mm concrete ring (1-1000mm ) + 5% waste 1.05pcs/No
b) Concrete for cover 1:4 0.02m/No
c) Mortar for joints 0.005m3/No
d) Reniforcement 1.0kg/inc
3 Ditto, but 400mm
a) Same as above
b) Concrete for cover 1:4 0.3m3/No
c) Same as above
d) Same as above
4 Supply & insall 100mm concrete pipe in trenohes layed on a sand
bed with joints filled in cement mortar 1:2)
a) 100mm C.P + 5% waste 1.03m/m
b) Mortar 1:2 for joints 0.002m3/m
5 Ditto, but 150mm
a) 150mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.003m3/m
6 Ditto, but 150mm
a) 150mm C.P + 5% waste 1.03m/m
b) Mortar 1:2 for joints 0.004m3/m
7 Ditto, but 300mm
a) 300mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.006m3/m
8 Ditto, but 400mm
a) 400mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.008m3/m
9 Ditto, but 500mm
a) 500mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.01m3/m
10 Ditto, but 600mm
a) 600mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.013m3/m
11 Ditto, but 800mm
a) 800mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.017m3/m
Item Type Of Work Quantity
12 Ditto, but 1000mm
a) 1000mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.18m3/m
13 Supply & install 100mm concrete pipe surrounded with sand layer
under ground slab with joints filled in cement mortar 1:2
a) 100mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.002m3/m
c) Sand surroundings 0.14m3/m
14 Ditto, but 150mm
a) 150mm C.P + 5% waste 1.05m/m
b) Mortar 1:2 for joints 0.003m/m
c) Sand surroundings 0.14m3/m
15 Ditto, but 200mm
a) 200mm C.P + 5% waste 1.05m3/m
b) Mortar 1:2 for joints 0.004m3/m
c) Sand surroundings 0.18m3/m
Roofing nails - 1kg = 105 pcs
Roofing nails = pkts = 3kgs = 315
Plastic washer = 1 pkts = 300pcs
Assumption
a) Roof Works:-
- Roofing nails = 14pcs per C.I.S.
- Purlin = 8cm nails (8pc/ml)
- Truss = 10or12cm nails =20=35pcs per truss
b) Ceiling Work:-
- Battens = 8cm nails - 16 pcs m2
- Chipwood = 4cm nails - 80pcs per pc of chipwood of
25 pcs per m2
c) Beams:- ( Pim works)
6cm nails 60pcs IML
12cm nails 6-8 pcs LML ( stiffening)
1. Gallon of paint = 4 kilograms
meers band iron = 1 kilogram
liter = 0.22 gallon
16pcs for bamd iron (6cm nails)

Item Type Of Work Quantity


1 Fence Work
a) 100x100mm over all length 2400mm fence post with wood sank
in to concrete base + 5% waste
b) Strut to 2400mm fence post 1.05pcs/No
c) Barbed wire fencing + 2% waste 1.02m/ml
d) fixing clips + 5% waste 0.52pcs/ml
Hard Coring
20cm thick basaltic stones hard coring:
a) Basaltic stone:- 0.20mx1.15 decrease & waste 0.23m3/m3
0.25mx1.15 decrease & waste 0.23m3/m3
Coarse gravel filling for hard core to a finished thickness of 15cm
a) Corase gravel 0.15 decrease & waste
Roof Work
1 28 guage roofing sheet 1.25m2
b) fixers with plastic washer +5% waste 4.2pcs/m2
2 400mm wide 28 guage roof ridge 0.46m2/ml
b) fixers + 5% waste 4.3pcs/ml
3 500mm wide roof valley covers in 28 guage sheet + 5% waste 0.57m2/ml
b) Fixers + 5% waste 4.3pcs/ml
4 Eaves gutter 100x100mm ( girth not exceeding 400mm)
a) 0.5mm gal, steel sheet + 5% waste(0.42m2/ml x 4.12kg/m2) 0.2kg/ml
b) 3x20mm 1-400mm steel brackes + 5% waste 0.02kg/ml
c) Fixers
5 Down pipes 100x100mm in 0.5mm thick gal. steel sheet
a) 0.5mm gal, steel sheet + 5% waste(0.5m2/ml x 4.12kg/m2) 2.06kg/ml
b) 3x20mm 1-600mm steel brackes + 5% waste 0.30kg/ml
c) Fixers 0.03kg/ml
3mm thick clear glass 1.1m2/m2
a) 1+(10% waste) 0.25kg/m2
b) Putty with linsed oil 0.25kg/m2
4mm thick clear glass
a) 1+(10% waste) 1.1m2/m2
b) Putty with linsed oil 0.20kg/m2
EGA sheet mas length-400cmx80.6cm sile overlapping 3cm
10cm = 20cm
400-20= 3.80ml
806-3=0.776ml
3.80x776=2.95m2
EGA sheet of 400x806cm
cover an area 2.95m2

Item Type Of Work Quantity


25mm,band iron of 7 meter length wrigh weight/kg
/joint take 1.2meter/ meter joint
1.2
714x1 0.17kg/joint
16mm band iron weigth/kg/15ml
take 1.2 meter/joint
1.2mlx1 0.8kg/joint
15ml
1mm thick steel sheet weigth 7.85kg/m2
1mm thick Aluminium steel sheet weigth 2.75kg/m2
1mm thick galvanized iron steel sheet weigth 0.381kg/m2
Angle iron 7.09kg/ml of 8mm thick
Angle iron 2.79kg/ml of 3mm thick
6mm nails for band iron 20pcs/joints
Ceiling battens-1pcs/m2= cl pcs-1m2
8cm nails 12pcs/m2
Abujeded iron covers=28m2
Ceiling fillets 1pcs -4ml, cover/m2
IUSA gallon -4ml 0.8 3254 in gallon
Limp gallon - 1.2 USA gallon
Putty 0.25kg/m2
L/M/M thick chipwood 1.05m2/m2 including 10% wastage
3mm thick chipwood 1.10m2/m2 including 10% wastage
6mm thick chipwood 1.05m2/m2 including 5 % wastage
H.C.B production
Cement = 0.02qty/m2 of HCB
Sand =0.04m3/m2 of HCB
Fine=0.14m3/m2 of HCB
Bituminious damp-proofing for floor = 0.42kg/m2
HCB Bituminious on top of ground slab 45% 1.58kg/m2
1pcs if iron work
Nails for form work
6cm nails
75pcs/m2
12cm nails
15pcs/m2 for stiffing
For purline =8cm nails -pcs/ml
For Eucalyptus this 10cm nails 20.25 pcs/Truss
One log of 1.5mm iron wire in =50ml
"J" hooks for asbestoas sheet 9-10 pcs sheet
16mm band iron -15ml/kg
Item Type Of Work Quantity
p/reservation oil =0.p gallon truss
2mm iron wire 60cm/stirrup or 0.5 kg/m3 of concrete
Roofing nails per zigba truss of 15cm double braced 136pcs/truss
Wire mesh 1 rool = 25ml
Barbed wire 1 rool=200ml
U nails 5 kg
480 pcs of "U" nails weight 1kg
1pkt of "U" nails 5x480 =2400pcs
3mm thick clear glass 130x120cm
1case = 15pcs
1case 41m2
4mm thick clear glass size =120x240cm
1 case 14pcs
1 case 40.3 pm2
5mm thick clear glass size 200x300cm
1 case 6pcs
1 case 30pcs
15cm thick light-weight concrete
Mortar = 0.16m3/m2
Cement = 0.403 qty/m3
Sand purlin = 0.19m3/m2

Man+Hours used for claculation unit prices


Item Descrption
A. Excavation Man Power
1 Excavation over site overage 20cm deep inordinary 1.12h/m2(laboures)
2 Ditto but on wet clay & wet black soil 1.9h/m2(laboures)
3 Excavation for basement to a depth not exceeding 150cm
(oridnary) soil 4.8h/m3(laboures)
4 Ditto but wet clay & wet black soil
5 Excavation for foundation trench not exceeding 150cm depth
(oridnary) soil 6.6h/m3(laboures)
6 Ditto but on wet clay & wet black soil 10.5h/m3(laboures)
7 Excavation for foundation trench to a depth of 150cm but not
exceeding 300cm (Ordinary soil0 10.8h/m3(laboures)
8 Ditto but on wet clay & wet black soil 14.7h/m3(laboures)
9 Excavation for foundation pits not exceeding 150mm(ordinary)
soil 6.95/m3(laboures)
10 Ditto but on wet clay & wet black soil 10.85h/m3(laboures)
11 Excavation for foundation pits a depth of 150m not exceeding
300cm(ordinary)soil 12h/m3(laboures)
12 Ditto but on wet clay & wet black soil 15.9/m3(laboures)
13 Exceeding excavated material 1.3h/m3 (laboures)
14 Excavation for besement in soft roof to adepth not exceeding
150cm 15.59/m3(laboures)
15 Ditto but in hard rock 50.5h/m3(laboures)
B. Back filling
16 Back filling around foundation tenches & in pits with excvated
materials 4.27h/m3(laboures)
17 Ditto but on ground floors 3.26h/m3(laboures)
C.Concrete
18 Concrete mixing, placing & curing in footing 15.98h/m3(laboures)
19 Ditto but in foundation column 15.18h/m3(laboures)
20 Hoisting concrete in every 3m excess of height above cm 2.46h/m3(laboures)
D .Steel Reinforcement
21 Cutting bending & positioning 8mm reinforceing bar 0.11h/kg(steel bender)
22 Ditto but 10-12bars 0.11h/kg
0.14/kg(steeel bender)
0.14h/kg
23 RHS hoisting steel bar in every 3m excess of height above 3m
allow 0.002h/kg

Item Descrption
E. Form Work
24 Form work for footing 1.52h/m2(carpenter)
1.5h/m2( carpenter)
0.77h/m2(labourer)
25 Ditto but sides of columns 2.25h/m3(carpenter)
2.25h/m2( carpenter)
1.4h/m2(labourer)
26 Ditto but for flat slabs 1.31h/m2(carp.)+31h
m2(ass.Carp.)+65m(lab.)
27 Ditto but for edgesof slabs(average 20cm high) 0.41/m(carpenter)
0.41h/m(ass.Carp.)
0.13h/m(laboburer)
F.Masonry Stone
28 Constructing 50cm thick stone foundation wall 8.25h/m3(mason)+10.35hm3
29 Ditto but above ground level with one side roughly dressed 10.98h/m3(mason)+11.25h/m3
30 40cm thick stone wall one side left for plastering & the other for
pointing 9.86h/m3(mason)+12.30h/m3
31 Ditto but both sides dressed & laft for pointing 10.76h/m3(mason)+13.5h/m3
G. Block Work
32 12cm thick wall both side left for plastering 1.73h/m2+(mason)+1.73h/m3
33 Ditto but one side left for plastering the other for pointing 1.92h/m2(mason)+1.92h/m2
34 Ditto but 25cm thick brick wall both sides left for pointing 2.89h/m2(mason)+
2.89h/m2(labourer)
35 Ditto but one side left for plastering the other for pointing 3.15h/m2(mason)+3.15h/m2
36 10cm thick H.C.B wall both sides left for plastering 1.18h/m2(mason)+1.18h/m2
37 Ditto but one side left plastering & the other for pointing 1.28h/m2(mason)+1.28h/m2
38 Ditto but 15cm H.C.B wall both sides left for plastering 1.23h/m3 (labourer)
39 Ditte but one side left for plastaring the other for pointing 1.34h/m3 (massone) +1
40 Ditto but 20 cm C.H.B. wall both sides left for plastering 1.28h/m2(mason)+1.28h/m2
41 Ditto but one side left for plastering the other for pointing 1.41h/m2(masson)+1,41h/m2
H. Plastering
42 Plastering in first coat 0.18h/m2(Plaster)+0,18h/m2
43 Ditto but in second coat 0.54h/m2(labourer)
44 Ditto but in finishing coat 0.18h/m2(Plasterer)+0.18 H/m2 (Plasterar)
45 Tyrolen rendering 0.63h/m2(plasterer)+0.63h/m2(plasterer)
0.63h/m2(labourer)
I. Pointing
46 Pointing to brick wall 1.41h/m2(plasterer)m2(labourer)
47 Ditto but H.C.B wall 0.69h/m2(plasterer)+1.041/m2(labourer)
48 Ditto but to stone wall 1.13h/m2(plasterer)+1.7h/m2

Item Descrption
J.Morter & Screeding
49 Mixing cemp-morter manually 12h/m3(labourer)
50 Ditto but cement mortar of 1:2 13.8h/m3(labourer)
51 Cement screeding (3.5cm thick) 1h/m2(prvier)+1.19h/m2(labourer)
52 5x10cm tid joint on ground floor 0.11h/m(carpenter)+0.11h/m
53 2.5x15cm zigba for trussing 0.25h/m(carpenter)+0.11h/m(labourer)
54 5x10cm zigba diagonal & vertical for trussing 0.38h/m(carpenter)+0.3h
55 5x10cm zigba rafter intruss 0.19h/m(carpenter)+0.19h/m
56 5x10cm zigba purlin 0.14h/m(carpenter)+0.19h/m
57 5x50cm zigba for surpension of ceiling 0.14h/m(carpenter)+0.14h/m
58 8cm eucalyptus for lower & upper cord in truss 0.38h/m(carpenter)+0.38h/m
59 6cm eucalptus for diagonal & vertical in truss 0.22h/m(carpenter)+0.2h/m
60 Tid wood flooring 1.32h/m2(carpenter)+0.59h/m2
L. Flooring
61 Glazed ceramic wall tile of size 15x15x0.6cm & 1.8x1.8x0.04cm
mostick tiles 3.51h/m2(tiler)+3.54h/m2
62 Terazzo tiles of size 20x20x2cm 1.67h/m2(tiler)+2.24h/m2
63 100x30x2cm marble slate paving 1.8h/m(mason)+1.98h/m2
64 Flooring in plastic tiles of 20x20x.02cm 0.99h/m(teller)+1.11h/m2
65 25cm thick hard-core 1.47h/m2(labour)
M. Painting
66 Painting in 3 coat of plastic paint 1.08h/m2(painter)
67 Ditto but in oil paint 0.75h/m2(painter)
N. Water Proofing
68 Bituminous roofing 1 coat of primer & one play of glass fiber
behberane 2.64h/m2(roofer)+2.64h/m2(labourer)
69 Ditto but glass fiber memberance in two plies 3.63h/m2(roofer)+3.63h/m2(;abourer)
O. Concrete pipe Laying
70 Laying 15cm cement pipe 0.6h/m(mason)+1.34h/m(labour)
71 Ditto but 50cm pipes 0.22h/m(mason)+2.43h/m(labour)
72 Ditto but 20cm pipes 0.71h/m(mason)+1.55h/m(labour)
73 Ditto but 40cm pipes 0.07h/m(mason)+2.27h/m(labour)
74 Bitumen P-pavement 1 coat of primer one surface dressing coat
two layers of chippeings 0.32h/m2/m(sparayer)+0.12h/m2(labour)
75 Ditto but with two surface dressing coats & 3 layers of chipping (Driver)+1.53h/m2(labourer)
76 Complaction of sub-bars to 10cm consolidated thickness 0.04h/m3(rolver driver)+0.11h/m2
Q. Glazing
77 Glazing with putty in 3mm thick clear glass 2.07h/m2(glazier)+2.07h/m2
78 Ditto but in 4mm clear glass 2.58h/m2(glazier)+2.58h/m2
79 Ditto but in 5mm clear glass 2.58h/m2(glazier)
80 Ditto but in 6mm clear glass 2.94h/m2(glazier)
Item Descrption
R. Doors & Windows
81 Fixing flush door of size 90x210cm 2.10h/pc(carpenter)+2.1h/pc(labourer)
82 Fixing wooden window of size 100x100cm 2.13h/pc(carpenter)+2.13h/pc(labourer)
S. Sanitary Line & Installation
83 Installing 50mm PVC pipe under ground bedded with sand 0.2h/m(plumber)+0.73h/m(labour)
84 Ditto but in 75mm 0.26h/m(plumber)+0.92h/m(labour)
85 Ditto but in 110mm 0.26h/m(plumber)+0.92h/m(labour)
86 Installing 1/2" glavanzed steel pipe in walls 0.42h/m(plumber)+1.98h/m)
(plasterer)+0.53h/m(labourer)
87 Ditto but in 3/4" pipe 0.74h/m(plumber)+1.98h/m)
(plasterer)+0.53h/m(labourer)
88 Installing 12 glavanized steel pipe increnahes(excluding)excavation
89 Ditto but 2" galvanized steel pipe 0.36h/m(plumber)+0.5h/m(labourer)
90 Installing wash basing 3.75/m(plumber)+0.5h/m(labourer)
91 Ditto But both tub 5.31h/pc(labourer)+3.31h/pc
92 Ditto but W.C 4.73h/pc(labourer)+4.73h/pc
93 Ditto but water heater(No lit) 4.2h/pc(labourer)+1.5h/pc
(electrician )+1.5h/pc
94 Installing electrical outer or socket outlet 2.32h/outlet(electrician)+2.32h/outlet
(asst electrician)

GENERAL FORMULA
A. Assumed Concrete mix ratio =1:2:4
Volume of concrete = XM3
a. Cement =1/6xXm3x1400 kg/m3x1.05wastage
b. Sand =2/6xXm3x1.30shrinkage x 1.15wastage
c. Gravel =4/6xXm3x1.30shrinkage x 1.15wastage
B. Mix Ratio =1:1
Volume of lime morter = YM3
a. Lime = 1/4xYm3x1.20shrinkage x1100kg/m3x1.05wastage
b. Sand =2/7xYm3x1.20shrinkage x 1.20wastage
C. Mix Ratio =1:2:9
Volume of cement lime mortar =Zm3
a. Cement =1/12xZm3x1.20shrinkage x 1400 kg/m3x1.05wastage
b. Sand =2/12xZm3x1.20shrinkage x 1100kg/m3x1.05wastage
c. Gravel =9/12xZm3x1.20shrinkage x 1.2wastage
D. Mix Ratio = 1:3
Volume of cement mortar =Ym3
a. Cement =1/4xYm3x1.20shrinkage x 1400 kg/m3xwastage
b. Sand =1/4xYm3x1.20shrinkage x 1.2wastage
E. Maximum amount of water that is needed to mix & place either
R.C or plane concrete is =500wt.
a) For concrete =500liters or 0.5m3/m3
b) For Mortar =400 liters or 0.4m3/m3

Item Type of work Quanities


1 Cart away (with 25% bulkage) 1/25m3/m3
2 Backfill (with 15% decrease) after consolidation 1.15m3
Concrete
3 Concrete C-7 Cement 1.82qts/m3
Mechanical Sand 0.50m3/m3
Mix Ratio1:3:5:6 Gravel 0.85m3/m3
4 Concrete C-15 Cement 2.73qts/m3
Mechanical Sand 0.53m3/m3
Mix Ratio1:2:5:3:5 Gravel 0.75m3/m3
5 Concrete C-20 Cement 3.18qts/m3
Mechanical Sand 0.50m3/m3
Mix Ratio1:2:3 Gravel 0.75m3/m3
6 Concrete C-15 Cement 2.94qts/m3
Hand Mix Sand 0.46m3/m3
Mix Ratio1:2:3:5 Gravel 0.80m3/m3
7 Concrete C-7 Cement 3.47qts/m3
Hand Mix Sand 0.41m3/m3
Mix Ratio1:1:5:3 Gravel 0.82m3/m3
8 Concrete-30 Cement 3.82qts/m3
Mix Ratio 1:1:5:2:5 Gravel 0.45m3/m3
9 Concrete-10 Cement 2.40qts/m3
Total Agg. 1850kg Sand 35.50%
Gravel
10 Concrete-15 1800kg Sand 35.50%
Gravel
11 Concrete-20 1800kg Sand 30.40%
Gravel
Cement 3.6qts/m3
12 Concrete-25 1700kg Sand 30.40%
Total Agg.
13 Concrete-30 Cement 4.0qts/m3
Total Agg. 1700kg Sand 30.40%
14 Steel Reinforcement (with 5% wastage) 1.05kg/kg

Item Type of work Quanities


1 Form Work For Sides Of The Walls:
4(2Usage for boards)
a. 2.5cm thick boards (with 5% wastage) 0.53m2/m2
b. 50x75mm battens with 5% wastage (5 usages) 0.84m/m2
c. Beam 50x125mm (with 5% wastage)(10 usages) 0.105m/m2
d. Strut(60mm eucalyptus)(10 usages) 0.10m/m2
e. Nails claps etc 0.2kg/m2
f. Mould oil 0.06 lit/m2
2 Soffit form work for slab purpose height not exceeding 300mm:
a. 2.5cm thick boards (with 5% wastage)(4 Usages) 0.27m/m2
b. 30x100mm battens (10 usages)(4.0m/m2 0.42m/m2
c. 75x125mm beams (10 usages)1.0m/m2 0.105m/m2
d. Props 60mm (20 Usages 3m/m2 0.15m/m2
e. 20x100mm bracings (20Usages)2m/m2 0.10m/m2
f. Nails 0.2kg/m2
g. Mould oil 0.06 lit/m2
3 Formwork for edges of the slab width not exceeding 200mm:
a. 2.5cm thick boards(4 Usages) 0.53m2/m2
b. 50x50mm battens (8 usages)2m/m 0.25m/m2
c. Nails 0.05 lit/m2
4 Formwork for edges of the steps & edges of the slab with over
200mm but not exceeding 250mm
a. 25x25mm thick boards(4 Usages) 0.21m3/m2
b. 50x50mm battens (10 usages)1.0m/m 0.11m/m
c. Nails 0.05kg/m
d. Mould oil 0.015lit/m
5 Formwork for sides of the footing width not exceeding 250mm:
a. 25mm thick boards(4 Usages) 0.07m2/m
b. 50x50mm battens (10 usages) 0.32m/m
c. Nails 0.05kg/m
d. Mould oil 0.015lit/m
6 Ditto but width over 250mm but not exceeding 350mm:
a. 25mm thick boards(4 Usages) 0.1m2/m
b. 50x50mm battens (10 usages)3.5m/m 0.38m/m
c. Nails 0.07kg/m
d. Mould oil 0.021lit/m

Item Type of work Quanities


7 Formwork for sides of the ground beams & footing wigth over 450mm:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x100mm battens(10 usages)3.0m/m2 0.32m/m2
c. Strut 60mm (10 usages)2.0m/m2 0.20m/m2
d. Nails 0.20kg/m2
e. Mould oil 0.06lit/m2
8 Formwork for sides of the foundation wall:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x75mm battens (10 usages)4.5m/m2 0.47m/m2
c. 50x125mm beams(10 usages)1.05m/m2 0.11m/m2
d. Strut 60mm eucalyptus(10 usages)1.0m/m2 0.10m/m2
e. Nails 0.20kg/m2
f. Mould oil 0.06lit/m2
9 Formwork for sides of the foundation columns:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x100mm battens(10 usages)4.6m/m2 0.49m/m2
c. Strut 60mm eucalytus (10 usages)2.0m/m2 0.10m/m2
d. Nails 0.20kg/m2
e. Mould oil 0.06lit/m2
10 Formwork for sides of the columns:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x100mm battens(10 usages)4.6m/m2 0.46m/m2
c. Strut 60mm eucalytus (10 usages)2.0m/m2 0.20mm2
d. Nails 0.30kg/m2
e. Mould oil 0.06lit/m2
11 Formwork for sides of the beams:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x100mm battens(10 usages)4.2m/m2 0.46m/m2
c. Beams 50x100mm (10 usages)2.1m/m2 0.20m/m2
d. Nails 0.30kg/m2
e. Mould oil 0.06lit/m2
12 Formwork for sides of the walls:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x75mm battens (10 usages)4.2m/m2 0.42m/m2
c. 50x125mm beams(10 usages)1.05m/m2 0.105m/m2
d. Strut 60mm eucalyptus(10 usages)1.0m/m2 0.10m/m2
e. Nails 0.30kg/m2
f. Mould oil 0.06lit/m2

Item Type of work Quanities


13 Formwork for sides of the beams:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x75mm battens(10 usages)4.2m/m2 0.46m/m2
c. Beams 50x100mm (10 usages)2.1m/m2 0.20m/m2
d. Nails 0.30kg/m2
e. Mould oil 0.06lit/m2
14 Formwork for sides of the walls:
a. 25mm thick boards (4 Usages) 0.27m2/m2
b. 50x75mm battens (10 usages)4.2m/m2 0.42m/m2
c. 50x125mm beams(10 usages)1.05m/m2 0.105m/m2
d. Strut 60mm eucalyptus(10 usages)1.0m/m2 0.10m/m2
e. Nails 0.30kg/m2
f. Mould oil 0.06lit/m2

Item Type of work Quanities


Block Works
1 Concrete blocks works for foundation:
150mm thick concrete hollow block foundation wall
bedded in cement mortar 1:4
a. Concrete hollow block 12.5pcs/m2
b. Mortar (10mm joints+5% waste) 0.0138m3/m2
c. Cement 0.04qts/m2
d. Sand 0.01m3/m2
e. Hollow filled with concrete mortar 1:5 0.08m3/m2
f. Cement 0.19qts/m2
g. Sand 0.07m3/m2
2 Ditto, but 200mm thick:
a. Concrete hollow block 12.5pcs/m2
b. Mortar 0.0184m3/m2
c. Cement 0.05qts/m2
d. Sand 0.01m3/m2
e. Hollow filled with concrete mortar 1:5 0.11m3/m2
f. Cement 0.26qts/m2
g. Sand 0.09m3/m2
3 Ditto, but 200mm thick:
a. Concrete hollow block 12.5pcs/m2
b. Mortar 0.023m3/m2
c. Cement 0.06qts/m2
d. Sand 0.02m3/m2
e. Hollow filled with concrete mortar 1:5 0.14m3/m2
f. Cement 0.33qts/m2
g. Cement 0.12m3/m2
4 Natural stone masonry for foundation:
400mm thick hard basaltic stone masonry foundation wall bedded
in cement mortar 1:4 in full joints
a. Basaltic stone 1.25m3/m3x0.40mx1.05 waste 0.53m3/m2
b. Mortar 0.34m3/m3x0.40x1.05 waste 0.14m3/m2
c. Cement 0.06qts/m2
5 Ditto but one side roughly dressed & left for pointing
a. Basaltic stone 1.35m3/m3x0.40mx1.05 waste 0.56m3/m2
b. Mortar 0.34m3/m3x0.40x1.05 waste 0.14m3/m2
c. Cement 0.392qts/m2
d. Sand 0.112m3/m2

Item Type of work Quanities


6 Burnt brick walls for super structure
120mm thick burnt wall bedded in cement lime mortar 1:2:9
both sides left for plastering
a. Brick 57.7pcs/m2
b. Mortar (with 15% waste) 0.0263m3/m2
c.Cement 0.031qts/m2
d. Lime 0.048qts/m2
e. Sand 0.02m3/m2
7 Ditto, but 250mm thick
a. Brick 115.4pcs/m2
b. Mortar (with 15% waste) 0.062m3/m2
c.Cement 0.07qts/m2
d. Lime 0.11qts/m2
e. Sand 0.05m3/m2
8 Concrete block walls for super structure:
100mm thick hollow concrete block wall bedded in cement lime
mortar 1:2:9 both sides left for plastering:
a. Hollow concrete block 12.5pcs/m2
b. Mortar (with 15% waste) 0.0092m3/m2
c.Cement 0.011qts/m2
d. Lime 0.02qts/m2
e. Sand 0.01m3/m2
9 Ditto, but 150mm thick
a. Hollow concrete block 12.5pcs/m2
b. Mortar (with 15% waste) 0.0138m3/m2
c.Cement 0.016qts/m2
d. Lime 0.02qts/m2
e. Sand 0.01m3/m2
10 Ditto, but 200mm thick
a. Hollow concrete block 12.5pcs/m2
b. Mortar (with 15% waste) 0.018m3/m2
c.Cement 0.021qts/m2
d. Lime 0.034qts/m2
e. Sand 0.014m3/m2
11 Ditto, but 250mm thick
a. Hollow concrete block 12.5pcs/m2
b. Mortar (with 15% waste) 0.023m3/m2
c.Cement 0.27qts/m2
d. Lime 0.042qts/m2
e. Sand 0.017m3/m2

Item Type of work Quanities


12 Natural stone masonry for super structure:
350mm thick trachytic stone wall bedded in cement mortar 1:4
one side lift for plastering & one sides dressed & left for pointing:
a. Trachytic stone 1.33m3/m3 x 0.35m x 1.05 waste 0.49m3/m2
b. Cement mortar 0.264m3/m3 x 0.35m x 1.05 waste 0.10m3/m2
c. Cement 0.28qts/m3
d. Sand 0.08m3/m3
13 Ditto but both sides dressed & left for pointing
a. Trachytic stone 1.33m3/m3 x 0.35m x 1.10 waste 0.52m3/m2
b. Cement mortar 0.26m3/m3 x 0.35m x 1.05 waste 0.10m3/m2
c. Cement 0.28qts/m3
d. Sand 0.08m3/m3

Item Type of work Quanities


Mortar
1 Lime mortar 1:2
a. Lime 4.52qts/m3
b. Sand 0.96m3/m3
2 Cement lime mortar 1:1:6
a. Cement 2.21qts/m3
b. Lime 1.73m3/m3
c.Sand 1.08m3
3 Cement lime mortar 1:2:9
a. Cement 1.47qts/m3
b. Lime 2.31m3/m3
c.Sand 1.08m3
4 Cement mortar 1:1
a. Cement 8.82qts/m3
b. Sand 0.96m3/m3
5 Cement mortar 1:2
a. Cement 5.88qts/m3
b. Sand 0.96m3/m3
6 Cement mortar 1:3
a. Cement 4.41qts/m3
b. Sand 1.08m3/m3
7 Cement mortar 1:4
a. Cement 3.53qts/m3
b. Sand 1.15m3/m3
8 Cement mortar 1:5
a. Cement 2.94qts/m3
b. Sand 1.20m3/m3
9 Cement mortar 1:6
a. Cement 2.52qts/m3
b. Sand 1.23m3/m3
10 Cement pumice light weight screed 1:6
a. Cement 2.52qts/m3
b. Sand 1.25m3/m3
11 Ditto, but 1:8
a. Cement 1.96qts/m3
b. Sand 1.28m3/m3

Item Type of work Quanities


12 Two coats of plaster in cement lime mortar 1:2:9
(13mm thick plaster 1:2:9+6mm thickness for irregularities in
wall + 10% waste)
a. Mortar (with 10% waste) 0.0218m3/m2
b. Cement 0.03qts/m2
c. Lime 0.05qts/m2
d. Sand 0.02m3/m3
13 Two coats of plaster:-
First coats in cement mortar 1:3
a. Mortar (with 10% waste) 0.0176m3/m2
b. Cement 0.08qts/m2
c. Sand 0.02m3/m3
Second Coat in cement lime mortar 1:1:6
a. Mortar 0.0066m3/m2
b. Cement 0.01qts/m2
c. Lime 0.01qts/m2
d. Sand 0.01m3/m3
14 Three coats of plaster in cement lime mortar 1:2:9
(13mm thick plaster 1:2:9+6mm thickness for irregularities in
wall + 10% waste)
a. Mortar 0.021m3/m2
b. Cement 0.03qts/m2
c. Lime 0.05qts/m2
d. Sand 0.02m3/m3
15 3mm thick cement sand screed 1:3+6mm thickness for
irregularities +5% waste
a. Mortar 0.038m3/m2
b. Cement 0.168qts/m2
c. Sand 0.041m3/m2
d. Cement ground 1:1 0.02m3/m3
16 Ditto, but 40mm thick:
a. Mortar 0.048m3/m2
b. Cement 0.22qts/m2
c. Sand 0.052m3/m2
d. Cement ground 1:1 1.5lit/m2
17 Ditto, but 30mm thick 1:4:
a. Mortar 0.038m3/m2
b. Cement 0.134qts/m2
c. Sand 0.044m3/m2
d. Cement ground 1:1 1.5lit/m2

Item Type of work Quanities


18 Ditto, but 50mm thick 1:4:
a. Mortar 0.059m3/m2
b. Cement 0.208qts/m2
c. Sand 0.068m3/m2
d. Cement ground 1:1 1.5lit/m2
19 Average 50mm thick light weight screeding in cement pumice
screed 1:6 to roof slab
(45mm thick cement pumice screed +6mm thickness for
irregularities in slab + 5% waste
a. Mortar 0.054m3/m2
b. Cement 0.136qts/m2
c. Pumice 0.2067m3/m3
(5mm thick cement screed for smoothing surface +5% waste)
a. Mortar 0.0053m3/m2
b. Cement 0.013qts/m2
c. Sand 0.007m3/m2
d. Cement grout 1.5lit/m2
20 Ditto, but 100mm thick
95mm thick (1:6)
a. Mortar
b. Cement 0.267qts/m2
c. Pumice 0.131m3/m3
5mm thick cement screed:
a. Mortar 0.106m3/m2
b. Cement 0.013qts/m2
c. Pumice 0.007m3/m2
d. Cement grout 1:1 1.5lit/m2
21 One coat of tyrolean type rendering in cement lime mortar 1:1:6
with cement colour + 5% waste
a. Mortar 0.008m3/m2
b. Cement 0.018qts/m2
c. Lime 0.014qts/m2
d. Sand 0.009m3/m2
22 Pointing of burnt brick wall with cement mortar 1:3 cement
mortar 1:3 with 15% waste joints 10mm
a. Mortar 0.003m3/m2
b. Cement 0.013qts/m2
c. Sand 0.003m3/m2

Item Type of work Quanities


23 Pointing of fair faced concrete block wall with cement mortar 1:3
a. Cement mortar + 15% waste 0.002m3/m2
b. Cement 0.009qts/m2
c. Sand 0.002m3/m2
24 Pointing of dressed stone masonry wall with cement mortar 1:3
a. Cement mortar + 15% waste 0.0055m3/m2
b. Cement 0.024qts/m2
c. Sand 0.006m3/m2
25 15x75mm cement sand 1:3 skirting finished smooth with steel trowt
a. Cement sand screed 1:3+6mm thickness for irregularities in
beds + 5% waste 0.0017m3/m2
b. Cement 0.007qts/m2
c. Sand 0.002m3/m2
26 20mm thick terrazzo flooring in cement marble chipping screed 1:3
a. Cement sand screed 1:3+6mm thickness for irregularities in
floor beds + 5% waste 0.027m3/m2
b. Cement 0.119qts/m2
c. Sand 0.029m3/m2

Item Type of work Quanities


1 6X150X150mm glazed ceramic wall tiles bedded in cement
mortar 1:3:
a. Ceramic tiles(with 5% waste) 43.3pcs/m2
b. Mortar for bedding (with 5% waste) 0.011m3/m2
c. Cement 0.049qts/m2
d. Sand 0.012m3/m2
e. Cement grout for pointing (with 20% waste) 0.001m3/m2
2 Ditto, but 7x73x145mm Ceramic wall tiles
a. Ceramic tiles(with 2% waste) 95.4pcs/m2
b. Mortar for bedding (with 10% waste) 0.0011m3/m2
c. Cement 0.049qts/m2
d. Sand 0.012m3/m2
e. Same as above 0.0012m3/m2
3 Ditto, but 7x50x100mm Cement wall tiles
a. Ceramic tiles(with 2% waste) 204.0pcs/m2
b. Same as above
4 Ceramic tile skirting in 7x72x145 tiles bedded in cement sand
screed 1:3
a. Ceramic tiles(with 5% waste) 7.24pcs/ml
b. Mortar for bedding (with 10% waste) 0.001m3/ml
c. Cement 0.004qts/ml
d. Sand 0.001m3/ml
5 20x200x200mm terrazzo tile (cement tile flooring bedded in
cement screed 1:3
a. Terrazzo tiles(cement tile with 5% waste) 25.5pcs/m2
b. 200mm thick for bedding (with 10% waste) 0.0022m3/m2
c. Cement 0.097qts/m2
d. Sand 0.0024m3/m2
e. Cement grout for pointing (with 20% waste) 0.001m3/m2
f. Polish 0.001m3/m2
6 20x100x200mm terrazzo tile (cement tile skirting bedded in
cement screed 1:3
a. Terrazzo tiles(cement tile skirting with 5% waste) 5.3pcs/ml
b. Mortar for bedding (with 10% waste) 0.0011m3/ml
c. Polish 0.01kg/ml
d. Cement 0.005qts/ml
e. Sand 0.001m3/ml
Item Type of work Quanities
7 20mm thick marble slab flooring bedded in cement sand screed1:3
a. Marble slab with 2% waste) 1.02m2/m2
b. 20mm thick for bedding screed 1:3+ 10% waste) 0.022m3/m2
c. Cement 0.097qts/m2
d. Sand 0.024m3/m2
e. Cement grout for pointing (with 20% waste) 0.001m3/m2
f. Polish 0.04kgm2
8 15x75mm marble skirting bedded in cement mortar 1:3
a. Marble slate( with 5% waste) 1.05m/ml
b. Mortar for bedding ( 10% waste) 0.001m3/ml
c. Cement 0.004qts/ml
d. Sand 0.001m3/ml
e. Polish 0.01kg/ml
9 2x200x200mm plastic tiles:
a. Plastic tile (with 2% wastage) 25.5pcs/m2
b. Adhesive including waste 0.04lit/m2
c. Polishing 0.04kg/m2
10 8mm thick panel woira wood parquet:
a. Woira wood (with 3% waste) 1.03m2/m2
b. Mastic including waste 1.66kg/m2
11 4mm thick deber berhan carpet flooring
a. Woolen carpet (with 3% waste) 1.03m2/m2
b. Adhesive including waste 0.40lit/m2
12 15x100mm terrazzo skirting in white cement marble chipping
screed 1:3
a. Terrazzo screed +6mm thickness for irreguaities in base +5%
waste 0.0022m3/ml
b. Cement grout 1:1 0.11lit/ml
c. polish 0.01kg/ml
13 Wooden skirting in tid wood fixed on the walls:
a. 15x60mm tid wood + 10% waste 1.10m/ml
b. Fixers + 5% waste 2.1pcs/ml
Wooden Flooring
a. Boarding 1/10m2/m2
b. Nails 0.6kg/m2
c. Floor joint (c/c 30cm) 2.20m/m2
d. Nails for joint 0.14kg/m2
Item Type of work Quanities
1 2 coats of plastic emulation paint to plastered surface:
a. Priming Coat 0.10lit/m2
b. Finishing Coat 0.08lit/m2
2 Ditto, but 3 coats:
a. Priming Coat 0.10lit/m2
b. Under Coat 0.08lit/m2
c. Finishing Coat 0.07lit/m2
3 2 coats of plastic emulation paint to wooden wall surface:
a. Priming Coat 0.10lit/m2
b. Finishing Coat 0.08lit/m2
4 Ditto, but 3 coats:
a. Priming Coat 0.08lit/m2
b. Under Coat 0.08lit/m2
c. Finishing Coat 0.07lit/m2
5 2 coats of oil paint(enamal to wooden surface)
a. Priming Coat 0.10lit/m2
b. Finishing Coat 0.08lit/m2
6 3 coats of varnish paint to wooden surface:
a. First coat 0.08lit/m2
b. Second coat 0.08lit/m2
c. Finishing Coat 0.07lit/m2
d. Knotting 0.006lit/m2
7 One coat of cement paint to smooth plastered surface:
a. Cement paint with fine sand 6.0kg/m2
8 3 coats of plastic emulasion paint to wooden (chipwood)etc. surface
a. Priming Coat 0.08lit/m2
b. Under Coat 0.08lit/m2
c. Finishing Coat 0.07lit/m2
9 2 coats of oil paint to wooden skirting girth not exceeding 100mm
a. Priming & Finishing Coat 0.032lit/m2
10 2 Coats of varnish paint to wooden floor surface:
a. Priming Coat 0.08lit/m2
b. Finishing Coat 0.08lit/m2
c. Knotting 0.006lit/m2
11 2 coats of varnish paint to wooden skirting not exceeding 100mm
a. knotting 0.0014lit/m2
b. Priming coat 0.012lit/m2
c. Finishing Coat 0.012lit/m2
Item Type of work Quanities
12 3 coats of plastic emulasion paint to plastered ceiling surface:
a. Priming Coat 0.10lit/m2
b. Under Coat 0.08lit/m2
c. Finishing Coat 0.07lit/m2
13 3 coats of hard glass oil paint (emamel)to wooden parts of the
window:
a. Priming Coat 0.15lit/m2
b. Under Coat 0.13lit/m2
c. Finishing Coat 0.12lit/m2
d. Knotting 0.013lit/m2
e. Putty 0.035lit/m2
14 3 coats of hard glass oil paint (emamel)to wooden parts of the
window:
a. Priming Coat 0.07lit/m2
b. Under Coat 0.06lit/m2
c. Finishing Coat 0.06lit/m2
d. Knotting 0.01lit/m2
e. Putty 0.02lit/m2
15 3 coats of hard glass oil paint (emamel)to steel door surface:
a. Priming Coat 0.15lit/m2
b. Under Coat 0.13lit/m2
c. Finishing Coat 0.12lit/m2
16 3 coats of hard glass oil paint to steel part of the window.
(window area measured one side)
a. Priming Coat 0.07lit/m2
b. Under Coat 0.06lit/m2
c. Finishing Coat 0.06lit/m2
17 3 coats of varnish paint to wooden door surface:
a. Knotting 0.13lit/m2
b. Priming coat 0.13lit/m2
c. Under coat 0.12lit/m2
d. Finishing coat 0.12lit/m2
18 3 coats of varnish paint to wooden parts of the windows:
(window area measured in one side)
a. Knotting 0.13lit/m2
b. Priming coat 0.13lit/m2
c. Under coat 0.12lit/m2
d. Finishing coat 0.12lit/m2
Item Type of work Quanities
19 2 coats of plastic emulsion paint to wooden barge board &
soffit boarding:
a. Priming coat 0.03lit/m2
b. Under coat 0.09lit/m2
20 3 coats of oil paint (enamel) to galvnized steel sheet caves qutter
size 150x150mm (girth 400mm):
a. Priming coat 0.03lit/m2
b. Under coat 0.04lit/m2
c. Finishing Coat 0.03lit/m2
21 3 coats of oil paint (enamel) to galvnized steel sheet down pipe
size100x100mm:
a. Priming coat 0.04lit/m2
b. Under coat 0.03lit/m2
c. Finishing Coat 0.03lit/m2
22 3 coats of oil paint(enamel) to galvnized steel sheet fashing:
a. Priming coat 0.07lit/m2
b. Under coat 0.08lit/m2
c. Finishing Coat 0.07lit/m2
1. Flat asbestossheet, chipwood, & so on 5% waste per m2 area for wall covering.
2. Chipwwod, hard board, soft board, flat asbestos sheet & so on +5% waste
per m2 area for ceiling covering
3. a. 4mm thick glass 10% wastage per m2 area.
b. Putty 050kg/m2 area.
Item Type of work Quanities
1 50x150mm zigba wood ground floor joint on peates
a. 10% waste 1.1m/ml
b. Nails 0.07kg/ml
2 50x100mm zigba wood stand(poles)
a. 10% waste 1.1m/ml
3 25x150mm zigba wood lower & upper cord in trusses
a. 10% waste 1.1m/ml
4 50x100mm zigba wood diagonals & verticals intrusses+10% waste
a. 10% waste 1.1m/ml
b. Nails 0.07kg/ml
5 50x100mm zigba wood refters
a. 10% waste 1.1m/ml
b. Nails 0.07kg/ml
6 50x100mm zigba wood refters
a. 15% waste 1.1m/ml
b. Nails 0.07kg/ml
7 80mm eucalyptus wood lower & upper cord in trusses
a. 15% waste 1.15m/ml
b. Nails 0.04kg/ml
c. Fixing bands 0.12kg/ml
8 60mm eucalyptus wood diagonals & verticals in trusses
a. 15% waste 1.15m/ml
b. Nails 0.07kg/ml
c. Fixing bands 0.12kg/ml
9 100mm eucalyptus wood refters
a. 15% waste 1.15m/ml
b. Nails 0.07kg/ml
c. Fixing bands 0.12kg/ml
10 70mm eucalyptus wood puriling
a. 15% waste 1.15m/ml
b. Nails 0.04kg/ml
c. Fixing bands 0.06kg/ml
11 Planed 1 swan tid wood facia board, brage board
a. 10% waste 1.1m/ml
b. Nails 0.03kg/ml
12 50x50mm zigba wood battens for chipwood ceiling
a. 10% waste 1.1m/ml
b. Nails 0.05kg/ml
13 15x40mm planed wood fillets
a. 10% waste 1.1m/ml
b. Nails 0.01kg/ml
Item Type of work Quanities
Bituninious Damp Proofing For Walls:
1 Bituninious Damp Proofing For plastered wall surface
a. One coat bituninious emulsion for primer+ 5% waste 0.42kg/m2
b. One coat of hot bitumen + 5% waste 1.58kg/m2
c. Heating gas 0.05kg/m2
2 Ditto, but 2 coats of hot bitumen
a. Same as above 0.42kg/m2
b.Two coats of hot bitumen 5% waste 3.15kg/m2
c. Heating gas 0.01kg/m2
3 Damp proofing course under walls, width not exceeding 25cm
a. One coat bitumen emulsion for primer+ 5% waste 0.11kg/ml
b. One coat of hot bitumen + 5% waste 0.40kg/ml
c. Heating gas 0.013kg/ml
4 Damp proofing plastered wall surface:-
a. One coat bitumen emulsion for primer+ 5% waste 0.42kg/m2
b. One coat of hot bitumen + 5% waste 0.79kg/m2
5 Ditto, but 2 coats of hot bitumen emulsion
a. Same as above
b.Two coats of hot bitumen 5% waste 1.58kg/m2
Bituninious Water Proofing For Walls:
1 Bituninious Water Proofing For plastered Concrete walls:
a. One coat of bitumen emulsion for primer + 5% waste 0.32kg/m2
b. One play of glass fiber memberane 15% waste & overlap 1.15m2/m2
c. Sealing coats 50% waste 0.79kg/m2
d. Bitumen emulsion for embedding(2x0.75kg/m2+5%waste) 1.58kg/m2
2 Ditto, but two plies of glass fiber memberance:
a. Same as above
b. Two plies of glass fiber membrance 15% overlap +waste 2.3m2/m2
c. Bitumen emulsion for embedding(4x0.75kg/m2+5%waste) 3.15kg/m2
d. Sealing coats 50% waste 0.79kg/m2
Bituninious damp Proofing For Floors:
1 Damp Proofing For ground slab(screeded base):
a. One coat of bitumen emulsion for primer coat + 5% waste 0.42kg/m2
b. One coat of hot bitumen on to ground slab + 5% waste 1.58kg/m2
c. Heating gas 0.05kg/m2
2 Ditto, but two coats of hot bitumen:
a. Same as above 0.42kg/m2
b. Hot bitumen(2 coat x 1.5kg/m2)5% waste 3.15kg/m2
c. Heating gas 0.10kg/m2

Item Type of work Quanities


3 Damp proofing on screeded base:
a. One coat of bitumen emulsion for primer coat + 5% waste 0.42kg/m2
b. One coat of bitumen emulsion layer + 5% waste 0.79kg/m2
4 Ditto,but two coat of bitumen emulsion:
a. Same as above
b. Bitumen emulsion(2 coat x 0.75kg/m2)5% waste 1.58kg/m2
Bitumionious Water = Proofing for floors
1 Bitumionious Water = Proofing for screeded base
a. One coat of bitumen emulsion for primer + 5% waste 0.32kg/m2
b. One play of glass fiber memberane 15% waste & overlap 0.15m3/m2
c. Bitumen emulsion for embedding(2x0.75kg/m2+5%waste) 1.58kg/m2
d. Sealing coats +5% waste 0.79kg/m2
2 Ditto, but two plies of glass fiber membrance;
a. Same as above 2.30m2/m2
b. Two plies glass fiber membrance 3.16kg/m2
c. Bitumen emulsion for embedding(4x0.75kg/m2+5%waste) 0.19kg/m2
d. Sealing coats +15% waste
1 Bituminious Roofing:
a. One coat of bitumen emulsion for primer + 5% waste 0.32kg/m2
b. One play of glass fiber memberane 15% waste & overlapping1.15kg/m2
c. Bitumen emulsion for embedding(2layersx0.75kg/m2+5%was3.15kg/m2
d. Reflecting finish( 2coats x0.15kg/m2)+5% waste 0.32kg/m2
2 Ditto, but two plies of glass fiber membrance;
a. Same as above
b. Two plies glass fiber membrance+5% for overlapping& wast 2.3m2/m2
c. Bitumen emulsion for embedding(6layersx0.15kg/m2+5%was4.73kg/m2
d. Sealing coats +15% waste 0.32kg/m2
Item Type of work Quanities
1 Supply & insall 100mm concrete pipe layed on levelled base &
joints covered in 100mm wide bituminious felt strip
a. C. 100mm C.P +5% waste 1.05m/m
b. Bituminious falt strip 100mm wide + 5% waste 0.45m/m
2 300mm concrete ring ispection pit on a levelled ground with
joints filled in cement mortar 1:2 including R.C cover &
connections for in let & out let pipes
a. C. 100mm concrete ring (L=1000mm +5% waste 1.05pcs/No
b. C. concrete for cover 1:4 0.02m3/No
c. Mortar for joints 0.005m/No
d. Reinforcement 1.0kg/No
3 Ditto, but 400mm
a. Same as above
b. Concrete for cover 0.03m3/No
c. Same as above
d. Same as above
4 Supply & insall 100mm concrete pipe in trenches levelltion a
sand bed with joints filled in cement mortar 1:2
a. 100mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.002m3/m
5 Ditto, but 150mm
a. 150mm C.P +5% waste 0.003m3/m
b. Mortar 1:2 for joints 0.03m3/m
6 Ditto, but 200mm
a. 300mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.004m3/m
7 Ditto, but 300mm
a. 300mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.006m3/m
8 Ditto, but 400mm
a. 400mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.008m3/m
9 Ditto, but 500mm
a. 500mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.010m3/m
10 Ditto, but 600mm
a. 600mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.013m3/m
11 Ditto, but 800mm
a. 800mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.017m3/m
Item Type of work Quanities
12 Ditto, but 1000mm
a. 1000mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.018m3/m
13 Supply & install 100mm concrete pipe surrounded with sand
layer ground slab with joints filled in cement mortar 1:2
a. 100mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.002m/m
c. Sand surroundings 0.14m3/m
14 Ditto, but 150mm
a. 150mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.003m/m
c. Sand surroundings 0.14m3/m
15 Ditto, but 200mm
a. 200mm C.P +5% waste 1.05m/m
b. Mortar 1:2 for joints 0.004m/m
c. Sand surroundings 0.18m3/m
COVERING CAPACITY OF PAINT ETC ON VARIOUS SURFACE
Item Descrptions Square Meters Covered
1 Special aluminum priming coat on planed timber 20
2 Lead priming wat coat on pland timber 12
3 First a coat of all paint after priming 16
4 Second Coat 18
5 Thrid coat 22
6 First coat of oil paint on previously painter timber 18
7 Second Coat 20
8 Oil glass paint applied as a finishing coat 24
9 Under coat for enamel 20
10 Enamel on prepared surface- first coat 14
11 Enamel on prepared surface- Second coat 18
12 Flat finish for varnish 22
13 Varnish on prepares surface - first coat 16
14 Varnish on prepares surface - second coat 20
15 Sain applied to planned timber 10
16 Sain applied to unwrought timber 10
17 Priming coat on brick or stucco 8
18 Priming coat 1 concrete, compo or stone 10
19 Priming coat on plastor 18
20 First coat oil paint after priming 12
21 Oil glass paint applied as a finishing coat 18
22 Priming coat on smooth iron 20
23 Priming coat on slightly rusted iron 14
24 Priming coat on rust-pitted iron 10
25 First coat of tea priming 20
26 Second coat after priming 21
Paint requried in Kgs
1 Almuninium priming coat on planed timber m2 0.1
2 Lead priming coat on planned timber m2 0.22
3 First coat of paint on priming m 0.15
4 Second coat m 0.14
5 Thrid coat m 0.11
6 Oil glass finishing coat as thrid coat m 0.11
7 First coat of paint on proviously coat of timber m 0.1
8 Second coat m 0.11
9 Oil glass finishing coat as thrid coat m2 0.16
10 Margins to floors-first coat m2 0.14
11 Margins to floors-Second coat m2 0.13
12 Margins to floors-thrid coat m2 0.11
13 Margins to read & riscrs- first coat m2 0.16
14 Margins to read & riscrs- second coat m2 0.16
15 Margins to read & riscrs- thrid coat m2 0.14
16 Narrow moulding skirting, etc,75mm girth 100 meter 1.1
17 Narrow moulding skirting, etc,150mm girth 100 meter 2.2
18 Narrow moulding skirting, etc,225mm girth 100 meter 3.3
19 Priming coat on brick or stucco m2 0.35
20 Priming coat on concrete, stone,cramp m2 0.28
21 Priming coat on brick ot stucco m2 0.35
22 First coat of paint after mriming m2 0.21
23 Oil glass paint as finishing coat m2 0.14
24 Rafter ends per 300mm length of less each 0.02
25 Sash frames 100 meter 0.35
26 Small sash squares m2 0.18
27 Sash squares m2 0.18
28 Large sash squares m2 0.08
29 Extra large sash squares m2 0.06
30 Sash edges m2 0.02
31 Shelf edges m2 0.01
Weight in kilogrammes
Types of paint per litter
1 With the lead paint without colcut 3.00
2 Lead based paints of light colour-cream grey, stone etc 2.75
3 Lead based paints of dark colour-red brown 2.60
4 Lead based paint of green colours 2.50
5 Black paint 2.20
6 Oil glass paint 3.00
7 Lead priming coat for wrought timber 3.00
8 Special aluminum coat for wrought timber 2.00
9 Priming coat for brick, stucco & plaster 2.60
10 Priming coat for concrete , compo & stone 3.00
11 Priming coat for iron (oxide paint) 2.00
12 Varnish 1.40
Type of work
FENCE WORK
100x100mm over all length 2400mm fence post with wood sank
into concrete base + 5% waste
a. Strut to 2400mm fence post 1.05pcs/m3
b. Barded wire fencing + 2% waste 1.02m/ml
c. Fixing clips + 5% waste 0.52pcs/ml

Type of work
HARDCORING
20cm thick basaltic stone hard coring :
a. Basaltic stone0.20mx1.15 decrease & waste 0.23m3/m2
Coarse gravel filling for hard core to a finished thickness of 15cm
a. Coarse gravel 0.15mx x1.15decrease & waste 0.17m3/m2
Roof Work
28 gauge roofing sheet
a. Fixers with plastic washers + 5% waste 1.25m2/m2
4.2pcs/m2
400mm wide roof valley covers in 28 gauge
a. Sheet + 5% waste 0.57m2/ml
b. Fixers + 5% waste 4.3pcs/ml
500mm wide roof valley covers in 28 gauge
a. Sheet + 5% waste 0.57m2/ml
b. Fixers + 5% waste 4.3pcs/ml
Eaves gutter 100x100m (girth not exceeding room)
a. 0.5mm gal. steel sheet + 5% waste(0.42m2/mlx4.12kg/m2) 1.73kg/ml
b. 3.20mm L-400mm steel brackets + 5% waste 0.2kg/ml
c Fixers 0.02kg/ml
1 The absolute volume of material, is the minimum volume of the material with all voids
removed, is given by the equations.
Absolute volumes wight of material in kilogrammes
specific gravity x weight of 1m3 of water
wt of material in kgs
S.B x 100kg
1 Nails Pcs kilogramme
1cm 950 1
2cm 815 1
4cm 546 1
6cm 275 1
7cm 180 1
8cm 127 1
10cm 63 1
12cm 44 1
15cm 29 1

Roofing nails = 1 kg = 105pcs


Roofing nails = 1 pkts = 315pcs
Plastic washers = 1 pkts = 300pcs

Assumption
a. Roofing Work:
- Roofing nails = 14pcs/G.I.S
- Purlin = 8cm nails
- Truss = 10 or 12 cm nails 20-35 pcs per truss
b. Ceiling Work
- Bateens = 8cm nails -16per m2
- Chipwood = 4cm nails - 80 pcs per chipwood
or 25 pcs per m2
c. Beams:
- 6cm nails = 60pcs 1ml
- 12cm nails = 6-8pcs 1ml(stiffening)

1 gallon of paint = 4 kilograms


7 meters band iron = 1 kilograms
Item Type of work Quanities
Item Type of work Quanities
.)+65m(lab.)

ason)+10.35hm3
mason)+11.25h/m3
ason)+12.30h/m3
mason)+13.5h/m3

mason)+1.73h/m3
ason)+1.92h/m2

ason)+3.15h/m2
ason)+1.18h/m2
ason)+1.28h/m2

.34h/m2 (labourer)
ason)+1.28h/m2
asson)+1,41h/m2

aster)+0,18h/m2

asterer)+0.18 H/m2 (Plasterar)


asterer)+0.63h/m2(plasterer)

asterer)m2(labourer)
asterer)+1.041/m2(labourer)
asterer)+1.7h/m2

r)+1.19h/m2(labourer)
penter)+0.11h/m
penter)+0.11h/m(labourer)
penter)+0.3h
penter)+0.19h/m
penter)+0.19h/m
penter)+0.14h/m
penter)+0.38h/m
penter)+0.2h/m
rpenter)+0.59h/m2
er)+3.54h/m2
er)+2.24h/m2
on)+1.98h/m2
er)+1.11h/m2

ofer)+2.64h/m2(labourer)
ofer)+3.63h/m2(;abourer)

on)+1.34h/m(labour)
son)+2.43h/m(labour)
son)+1.55h/m(labour)
son)+2.27h/m(labour)

(sparayer)+0.12h/m2(labour)
3h/m2(labourer)
lver driver)+0.11h/m2

azier)+2.07h/m2
azier)+2.58h/m2

penter)+2.1h/pc(labourer)
penter)+2.13h/pc(labourer)

mber)+0.73h/m(labour)
mber)+0.92h/m(labour)
mber)+0.92h/m(labour)
mber)+1.98h/m)
.53h/m(labourer)
mber)+1.98h/m)
.53h/m(labourer)
mber)+0.5h/m(labourer)
mber)+0.5h/m(labourer)
ourer)+3.31h/pc
ourer)+4.73h/pc
urer)+1.5h/pc

electrician)+2.32h/outlet
GENERAL FORMULA
A. Assumed concrete mix ratio = 1:2:4
Volume of concrete = xm3
a) Cement = 1/7xXm3x1400kg/m3x1.30 shrinkage x1.05 wastage
b) Sand = 2/7xXm3x1.30 shrinkagex1.15 wastage
c) Gravel = 4/7xXm3x1.30 shrinkagex1.15 wastage
B. Mix ratio = 1:2
Volume of lime mortar = Ym3
a)      lime = 1/3xYm3x1.20 shrinkage x700/m3x1.05 wastage
b)      Sand = 2/3xYm3x1.20 shrinkage x1.20 wastage
C. Mix ratio = 1:2:9
Volume of cement lime mortar = Zm3
a)      Cement = 1/12xZm3x 1.20 shrinkage x 1400 kg/m3 x1.05 wastage
b)      Lime = 2/12 xZm3 x1.20 shrinkage x 700/m3 x1.05 wastage
c)      Sand = 9/12 xZm3 x1.20 shrinkage x 1.20wastage
D. Mix ratio = 1:3
Volume of cement mortar = Ym3
a)      Cement = 1/4x Ym3 x1.20 shrinkage x 1400kg/m3 x1.05 wastage
b)      Sand = 3/4x Ym3 x1.20 shrinkage x 1.20 wastage
UNIT WEIGHT
-         Measured unit weight of fresh concrete = 2300 kg/m3
-         Measured unit weight of R.C = 2400 kg/m3
-         Measured unit weight of cement = 1400 kg/m3
-         Measured unit weight of lime = 700 kg/m3
-         Measured unit weight of sand = 1350 kg/m3
-         Measured unit weight of gravel = 1300 kg/m3
-         Measured unit weight of steel = 7850 kg/m3
WORK ACTUAL WORK
ITEM DESCRIPTION GANG TIME EXCCUTED TO BE EXECUTED
1 Excavation 1 dylb 1 day 0.5-0.75m3 0.75-1m3
2 Back fill(loose volume) 1 dylb 1 day 1.2m3 1.5-3m3
3 Cartaway 1 dylb 1 day 1.5-3m3 3-5m2
4 Hard Coreing imas+2L 1 day 6-10m 12-15m2
5 Masonry (B.G.L) imas+2L 1 day 0.5-1m3 1.2-3m3
6 Masonry (A.G.L) 1mas+2L 1 day 0.5-0.75 1.00-2.3m3
7 Form Work
1. Beam B.G.L 1 cap-2L 1 day 5-8m2 10-20m2
2. Footing 1 cap-2L 1 day 5-8m2 10-20m2
3. Beam A.G.L 1 cap-2L 1 day 5-8m2 10-25m2
8 Reinforcement
1. Bending & Cutting 21-2L 1 day 1 qt-15qt 11qt-3qt
2. Erecting 21-10L 1 day 10 qt-20qt 15qt-25qt
9 Concrete Work
Beam B.G.L 1 day
Slab ( Ground Floor) 1 day
Tie beam above 2m 1 day
Column up to 2m 1 day
Column above 2m 1 day
10 Bricks
Double Wall 1m+2L 1 day 1.5-3m2 2.5m2-4m2
Single Wall 1m+2L 1 day 3m2-6m2 5m2-8m2
11 Hollow Block
Double Wall 1m=2L 1 day 2-3.5 2-5m2
Single Wall 1m=2L 1 day 3-6m2 5-8m2
12 Plastering
1st Coat 1p+2L 1 day 1.0-15m2 16-24m2
2nd Coat 1p+2L 1 day 2-4m2 3-6m2
3rd Coat 1p+2L 1 day 5-7m2 8-10m2
13 Roofing
1. Truss (ground) 1cap+2L 1 day 2.3 truss 4-6trusses
2. Truss erecting 2cap+81 1 day 8-10truss 15-20trusses
3. Purlin 2cap+4L 1 day 50-100ml 200-300ml
4. Corr-iron sheet 1cap+2L 1 day 10-15sheds 20-35sheds
5. Asbestos 1cap+2L 1 day 10-15sheds
14 Fascia board 1cap+2L 1 day 10-15ml 20-35ml
15 Gutter aground work 1plumber+2L 1 day 20-30ml
Gutter (fixing) 1plumber+2L 1 day 50-70ml
WORK ACTUAL WORK
ITEM DESCRIPTION GANG TIME EXCCUTED TO BE EXECUTED
16 Flooring
Cement screed 1mas+2L 1 day 5-10m2 15-20m2
Plastic tiles 1mas+2L 1 day 15-20m2 25-30m2
Ceramic tiles parque 1mas+2L 1 day 5-10m2 15-25m2
17 Wall tileing 1 day 7.5-9m2 10-20m2
18 Window oil:-
Precast window cill (marble etc) 1mas+2L 1 day 5-10ml 8-15ml
Un precast window cill 1mas+2L 1 day 3-5ml 3-35ml
19 Door & Window
Metal door 1skiled+2L 1-2pcs 2-3pcs
Metal Window 1skiled+2L 1-2pcs 2-3pcs
Wood door 1skiled+2L 2-4pcs 3-5pcs
Wood Window 1skiled+2L 1-3pcs 2-4pcs
Door list 1car+11 25-39ml 40-55ml
Door keys 1car+11 1 day 5-10pcs 8-15ml
Window handle 1car+2L 1 day 8-13pcs 8-15ml
20 Glazing
Cutting 2cap+2L 1 day 50-100m2
Fixing 1 cap+1L 1 day 15-20m2
21 Pointing
H.B.C pointing 1p=2l 1 day
Brick pointing 1pl+2L 1 day
Masonary pointing 1pl+2L 1 day
Masonary dressed stone 1pl+2L 1 day
22 Painting
Plastic painting
1. Ceiling (adujdid) 1pt+1L 1 day 10-15G 10-20g
2. Ceiling (concrete) 1pt+1L 1 day 15-20G 15-20g
3. Wall 1pt+1L 1 day 15-20G 25-40g
4. Oil painting wall 1pt+1L 1 day 10-20G 20-20g
5. Oil painting door 1pt+1L 1 day 10-15G 20-30m
23 Sanitary Installation
G.I. pipe around 1plum-2L 1 day 10-15ml 20-30ml
Fixtures(W.C wash basin)bidit Lpc+20 1 day 1-2ptc 1-4qty
24 Electrical Installation
Fixing conduites Lec+2L 1 day 10-75ml 50-100ml
Pulling wires Lec+2L 1 day 30-50ml 50-75ml
Fixing sockets,switch 1E+1L 1 day 10pcs-30pcs 35pcs-65pcs
Fixing fittings 1E+1L 1 day 3-8pcs 15pcs-30pcs
Distribution board
WORK ACTUAL WORK
ITEM DESCRIPTION GANG TIME EXCCUTED TO BE EXECUTED
25 Cement copping
(40-50 wide) 1E+1L 1 day 3-5ml 5-10ml
Curb stone 1m+2L 1 day 5-10ml 8-20ml
Pavement 1m+2L 1 day 3-5m2 5-10m2
Rate of Production perAmount
crew of work done/breigade
Labour needed in Work No to crew Work
Item Type Of Activity a single crem Done/Day Per brigage Done/Day Remark
1 Mobilization a) Engineering aid - 1 -
b) Skilled labour 6
c) Labourer 14
d) Assistant 6
2 Excavation D7-Dozer 100m3 1 100m3
3 Masonry a) 1 Mason 1m3 23 23m3
b) 1 Asst/Mason
c) 2 Labourers
4 Form Work a) Carpenter 3m2 29 87m2
b) 1 Asst/Carpenter
c) 2 Labourers
5 Concrete a) 4 Skilled 35m3 1 35m3
b) 23 Labourers
6 Reinforcement a) 2 Skilled 75 14 1050kg
b) 2 Assistant
c) 4 Labourers
7 H.C.B & Brick a) 1 Mason 4m2 35 140m2
b) 3 Labourers
8 Pavior a) 1 Mason 15m2 23 345m2
b) 1 Assistant
c) 3 Labourers
9 Plaster a) Plasterer 4m2 20 80m2
b) 1 Asst/Plasterer
c) 2 Labourers
10 Sanitary a) Plumber 2pcs 4 8m2
b) 1 Asst/Plumber
c) 2 Labourers
11 Carpentry a) 1 Carpenter 2pcs 9 58pcs Fixing doors
b) 1 Asst/Carpenter & Windows
12 Painter a) 1 Painter 25m2 10 250m2
b) 2 Labourer
13 Glazier a) 1 Glazier 40m2 1 40m2
b) 2 Labourer
14 Roofer a) 1 Carpenter 4m2 29 116m
b) 1 Asst/Electrician
c) 4 Labourers
15 Electrical a) 1 Electrician
b) 1 Asst/Electrician
c) 2 Labourers
16 Misclianeous