CONTENTS
Status
Sl No Name of Document Identification Page No
Rev No Date
AMENDMENT RECORD
PROCESS PROCEDURE
1.0.0 OBJECTIVE
Define responsibilities and establish design process thereby to handle the project received from the Client.
2.0.0 SCOPE
Design of structures ensuring Quality, Economy, Environmental & Safety requirements.
3.0.0 RESPONSIBILITY
Head of Division along with supporting team members are responsible for the Scope.
4.0.0 PLANNED RESULTS
Assignments are handled so as to finish the task of Design Engineering in scheduled time.
5.3.0 The drawings and documents are verified by the concerned section.
Design Review shall be carried out, at least once in a month, to evaluate timely progress of design activities,
need of additional design inputs from client/ projects, etc. Review shall be carried out by the Design
coordinator.
START
TRANSPORTATION
PROJECTS
IRRIGATION
PROJECTS
X
POWER & TRANSMISSION
PROJECTS
PREPARATION PREPARATION OF
OF QUANTITIES DESIGN & DRAWINGS.
SUBMISSION
REVIEW & FREEZE
TO DIVISION
DISTRIBUTION
PREPARATION OF AS BUILTS
DOCUMENTS & DRAWINGS
DISTRIBUTION OF AS-BUILT
DOCUMENTS & DRAWINGS
DESIGN ENGINNERING
COMPLETION REPORT
CERTIFICATE FROM
END
THE CLIENT
Design Data
1 Optimum Design +/- 3% Project Wise
Engineering Analysis
EPC Tender
4 Strike Rate in Bids >10% Once in 6 months Data Sheet
Work