CHECK LIST FOR INSTALLATION AND TERMINATION


OF LV, MV & HV POWER CABLES

Project IRAQ 4X400KV GIS SUBSTAIONS Project No.

Employer MINISTRY OF ELECTRICAL OF THE REPUBLIC OF IRAQ Report No.

Contractor TOYOTA TSUSHO CORPORATION IR Ref. No.

Subcontractor ELSEWEDY ELECTRIC POWER SYSTEM PROJECTS Date

Drawing Ref. Unit/Area

Description

Cable Tag No. Cable Size

Sl. Signature
Activity Observations
No. S/C CONTRACTOR EMPLOYER

1 Check the cables size ,type and tag no. are correct

2 check the cables marking/phasing are correct

3 check that all cable glands are terminated satisfactory

4 check that all cables are terminated satisfactory from both sides

5 check for cable laying route as per approved documents

Check cables are dressed , tied and secured properly.


6 In case of outdoor laying , suitable clamps/tie-raps must be used.

7 check that the cable trays/conduits are free of dents , dirt and sharp edges before pulling

8 Check the distance between control cable and power cables within the allowable range

check that marking tape or red tiles are installed after compacted fine sand layer for
9 direct buried cables .

10 Check for cable bending meet manufacture's minimum allowable bending radius

11 Check for any visual damage in cable insulation

12 check that all block outs has been sealed with suitable material (fire rated is preferable)

13 Check drawing marked up (As-built) if any changes made.

14

15
Remarks:-

RESULT: ACCEPTED ACCEPTED AS NOTED REJECTED


DETAILS SUBCONTRACTOR CONTRACTOR EMPLOYER (If Req.)

Name
Signature
Designation
Date

3003/FP110 Att.04 Rev.0 21 Jun. 2019 Page 1 of 100+000.