Sunteți pe pagina 1din 2

BJ SERVICES PV DRILLING JOINT VENTURE COMPANY

PET R O IE T NA M
LABORATORY REPORT
PV Drilling
BJ - PV Dril li ng J V

Company : VSP Date : 18-Oct-13


Well Name : 2005-BK2 Ref. No. : VSP/2005/13/05
Job Type : Squeeze cement to top up 5 1/2 liner Test Ref. : Silo sample (11/10)
(Use Blended cement)
WELL DATA
Depth (MD) : 2,680.00 mRT Csg. Size : 5 1/2 in Mud Wt : 1.23 SG
Depth (TVD) : 2,620 mRT Hole Size : 6 1/2 in Mud Type :
BHST : 90 deg.C deg.C Temp. Gradient : 2.8-3.0 C/100 m
BHSqT 74 deg.C Hydrostatic Pres. :
LOG TEMP : deg.C @ m hrs (since circulation)
WASHER DATA
Type : DW Volume : 20 bbls Density : 8.34 ppg Compatibility : Yes
SPACER DATA
Type : Volume : bbls Density : ppg Compatibility :
SLURRY DATA
Tail
Chemicals Function Quantity in 10
Concentration
bbls total fluid
DMC Cement Cement 94.00 pps N/A
S-8 Silica Flour 35.00% bwoc N/A
BJ-Ultra Multi-function 0.25 gps 15.49 gals
FP-9L Defoamer 0.05 gps 3.10 gals
R-21LS Retarder 0.10 gps 6.19 gals
CD-33L Dispersant 0.40 gps 24.78 gals
BA-58L Bonding Agent 0.55 gps 34.07 gals
Sea water Mixing water 5.43 gps 8.01 bbls

SLURRY PROPERTIES
Tail
Slurry Weight : ppg. 15.80
Slurry Yield : cu.ft / sx 1.58
Mixing Water : gal / sx 5.43
Total Fluid : gal / sx 6.78
Mixwater Type : Sea water
Thickening Time : hr:min
@ 70 Bc 4:12
@ 100 Bc 4:17
Free Water : ml Nil
Fluid loss : ml N/A
Compressive Strengths : at Temperature 90 C
12 hrs
24 hrs Testing
36 hrs
Rheologies @ Temperature : 28 C / 74 C
300 182 / 160
200 126 / 119
100 73 / 63
6 9 / 8
3 6 / 6
600 300+ / 275
Pv 164 / 146
Yp 19 / 15
Gel-10" 6 / 8
Gel-10' 15 / 16
Heat up time : 41 minutes Final pressure : 6,800 psi. Tested by: Luan
Remarks: Mixing order: FP-9L, BA-58L, BJ-Ultra, CD-33L, R-21LS
Using blended cement

S-ar putea să vă placă și