10A - MOTORCYCLE BOX CULVERT AND VEHICULAR BOX CULVERTS


10A/02 EXISTING TRACK AT CH. 232457.551 (KG. TITI BESI)
VERSION NO. : 2.3

Temporary road diversion and additional earthwork for VBC Kg. Titi Besi

Item Description Unit Qty Rate Amount

1.0 Temporary Road Diversion


1.1 Site Clearing m2 160
1.2 Excavation and removal of top soil 150mm thk m3 24
1.3 Sand backfilling m3 48
1.4 300mm thk crusher run m3 48

2.0 Additional earthwork


2.1 Excavation and removal of unsuitable material m3 360
2.2 Supply and compact 1m suitable material m3 117
2.3 Supply and compact 300mm hardcore m3 35.1