11.

Work undertaken that best


illustrates capability to handle
the tasks assigned:

Name of Assignment or Project: 1) Contract XV- KPLC1/6E/2/A15 -Design, Supply and installation of Bays
and Substation a)Lot-1- Design, supply, installation and commissioning of 132 KV bay at Eldoret (Existing
Rivatex substation) and proposed Kitale 132/33KV substation b) Lot-2- Design, supply, installation and
commissioning of 132 KV bay at Existing Kisli substation) and proposed Awendo 132/33KV substation.

2) Contract XV- KPLC1/6E/2/A17 -Procurement of Plant Design, Supply & erection of 132 KV Tr. Line 132
KV Single Transmission line from existing Kindaruma Power Station to new proposed 132/33 KV Mwingi
Substation and onwards to proposed 132/33/11 KV Garissa Substation (Approx. 224 Km).

3) Contract: R8 -- Design, Supply and Installation of a Substation & Lines Construction of 1 substation, and
lines at Nayeri (2x7.5MVA, 33/11kV & 33 kV Line - 18 Kms, 11 KV Line - 20 Kms).

4) Contract XV- KPLC1/6E/2/A18 -Procurement of Plant Design, Supply & erection of 132 KV Tr. Line a) Lot
- 1: 132 KV Single Transmission line from existing Eldoret (Rivates) Substation to new proposed 132/33 KV
Kitale Substation (Approx. 60 Km) b) Lot - 2: 132 KV Single Transmission line from existing 132/33 KV Kissi
Substation to proposed 132/33 KV Awendo Substation (Approx. 44Km)

5) Contract - X : Design , supply and installation of substations :- Lot 1-Nairobi - Design, Supply And
Installation Of Substations (Githunguri , Kirigiti , Ndenderu , Lower Kabete , Lukenya , Rironi , Villa Franca ,
and Magumu).

a) 2 x 23 MVA ,66KV/11KV substation at (Githunguri , Kirigiti , Ndenderu , Lower Kabete , Lukenya , Rironi
Villa Franca).

b) 2x7.5 MVA, 33/11 KV substation at (Magumu)

Lot 2 - western Kenya -Design, Supply And Installation Of Substations (Ahero, Chapseon, Elgon View,
Kipsarman, Kibos, Majengo, Kabarak and Maseno).

a) 2 x 7.5 MVA, 33/11 KV substation at AHREO

b) 1 x 7.5 MVA ,33KV/11KV substation at (Chapseon, Elgon View, Kipsarman, Kibos, Majengo, Kabarak and
Maseno).

Lot 3 –Mount Kenya - Design, Supply and Installation Of Substations (Gatundu, Juja, Kangema ,Tala and
Mwea).

a) 2 x 7.5 MVA,33/11 KV substation at (Gatundu, Juja)

b) 1 x 23 MVA ,66KV/11KV substation at (Kangema ,Tala and Mwea).

Lot 4 – Coast (Mombasa) - Design, Supply And Installation Of Substations ( Jomvu and Mishomoroni).

a) 2 x 23 MVA ,132KV/33KV substation at (Jomvu)

b) 1x7.5 MVA,33/11 KV substation at (Mishomoroni)

Year: July 2011 – Dec 2011


Location: Nairobi
Client: Kenya Power & Lighting Company Ltd, Nairobi
Main Project Features: Powering people for better lives. KETRACO Construct new transmission lines
with Government funding to accelerate infrastructure development.
Position Held: Assistant General Manager (Electrical)
Activities performed:

 Preparation of Bid Documents for the 132kV Transmission lines and 132/33kV, 66/11 KV, 33/11KV
substations.

 Evaluation of bids for the transmission and substation works and procurement of the contractors.

 Preparation of a database of all the basic information that is common requested during the tendering
process.
 Preparation of pre-bid questionnaires.

 Attend pre-bid meeting.

 Price bid evaluation and estimation preparation for price bid.

 Preparation of Detailed with supporting evidence and additional documentation clearly referenced.

 Prepare check list for documents as per tender requirements before submission of tender.