Sunteți pe pagina 1din 8

TL 305.

15
PL 0.089
Tc 293.15
Pc 6.4
TN 293.15
PN 1.013

Zona A
QL 201.08326930839
QC 2.686349375
QC+5% 2.82066684375

Zona B
QL 391.2308882767
QC 5.22660515625
QC+5% 5.4879354140625

Calculo Tuberia principal C - 1


QcTotal+5% 16.517
Temp 288.150
Presion 7.000

Q 0.198
Δp tabla 0.005
D(pulg) 2.000
D(mts) 0.051
Demanda probable (m3/min) QN
Zona A 16.972
Zona B 33.021
Zona C 33.929
Zona D 12.699
Zona E 2.761

Zona C Zona E
QL 401.988819488815 QL 32.712167485
QC 5.37032453125 QC 0.4370145313
QC+5% 5.6388407578125 QC+5% 0.4588652578

Zona D
QL 150.457013725381
QC 2.01001359375
QC+5% 2.1105142734375

Calculo tuberia 1 - A Calculo tuberia 1 - 2 Calculo tuberia 2 - B


QcTotal+5% 2.821 QcTotal+5% 13.696 QcTotal+5%
Temp 288.150 Temp 288.150 Temp
Presion 7.000 Presion 7.000 Presion

Q 0.034 Q 0.164 Q
Δp tabla 0.006 Δp tabla 0.013 Δp tabla
D(pulg) 1.000 D(pulg) 1.500 D(pulg)
D(mts) 0.025 D(mts) 0.038 D(mts)
alculo tuberia 2 - B Calculo tuberia 2 - C Calculo tuberia 2 - 3
5.488 QcTotal+5% 5.639 QcTotal+5% 2.569
288.150 Temp 288.150 Temp 288.150
7.000 Presion 7.000 Presion 7.000

0.066 Q 0.068 Q 0.031


0.019 Δp tabla 0.019 Δp tabla 0.005
1.000 D(pulg) 1.000 D(pulg) 1.000
0.025 D(mts) 0.025 D(mts) 0.025
no importa cuanto cambies igual tienes que pagar las cosas que hicistes

Calculo tuberia 3 - D Calculo tuberia 3 - E


QcTotal+5% 2.111 QcTotal+5% 0.459
Temp 288.150 Temp 288.150
Presion 7.000 Presion 7.000

Q 0.025 Q 0.006
Δp tabla 0.046 Δp tabla 0.051
D(pulg) 0.500 D(pulg) 0.250
D(mts) 0.013 D(mts) 0.006
Tramo D(pulg) Qc (m3/min) LT=Le+Lt Δp EΔp
C -- 1 2 16.5168 176.5824 0.0092 0.0092
1 -- A 1 2.8207 147.4125 0.0088 0.0180

C -- 1 2 16.5168 176.5824 0.0092 0.0092


1 -- 2 1 1/2" 13.6962 24.5790 0.0032 0.0124

1 -- 2 1 1/2" 13.6962 24.5790 0.0032 0.0124


2 -- B 1 5.4879 25.500 0.0048 0.0172
2 -- C 1 5.6388 27.013 0.0051 0.0224

1 -- 2 1 1/2" 13.6962 24.5790 0.0032 0.0124


2 -- 3 1 2.5694 20.513 0.0010 0.0134

2 -- 3 1 2.5694 20.513 0.0010 0.0134


3 -- D 1/2" 2.1105 22.649 0.0104 0.0238

2 -- 3 1 2.5694 20.513 0.0010 0.0134


3 -- E 1/4" 0.4589 53.927 0.0272 0.0407
Cant D(mts) Long equiv Le
Tramo C - 1 Tramo 1 - 2
Valvula compuerta 1 0.051 8.000 0.406 Tee Branch
Valvula Check 1 0.051 100.000 5.080 Reductor 2" a 1 1/2"
Codos 90° 2 0.051 30.000 3.048
Tee Branch 1 0.051 60.000 3.048
Le total 11.582
Recorrido 165.000
LT 176.582
Tramo 2 - B
Cant D(mts) Long equiv Le Tee Flow
Tramo 1 - A Codo 90°
Reductor 2" a 1" 1 0.025 0.500 0.013 Reductor 1 1/2" a 1"
Valvula compuerta 1 0.025 8.000 0.200
Codos 90° 1 0.025 30.000 0.750
Tee Flow 1 0.025 20.000 0.500
Tee Branch 1 0.025 60.000 1.500
Le total 2.963
Recorrido 144.450 Tramo 2 - C
LT 147.413 Codo 90°
Reductor 1 1/2" a 1"
Cant D(mts) Long equiv Le Cant
Tramo 2 - 3
2 0.038 60.000 4.560 Tee Branch 1
1 0.038 0.500 0.019 Reductor 1 1/2" a 1" 1
Le total 4.579
Recorrido 20.000
LT 24.579

Cant D(mts) Long equiv Le Cant


Tramo 3 - D
1 0.025 20.000 0.500 Tee Branch 1
1 0.025 30.000 0.750 Codo 90° 1
1 0.025 0.500 0.013 Reductor 1" a 1/2" 1
Le total 1.263
Recorrido 25.500
LT 26.763

Cant D(mts) Long equiv Le Cant


Tramo 3 - D
2 0.025 30.000 1.500 Tee Branch 2
1 0.025 0.500 0.013 Codo 90° 4
Le total 1.513 Reductor 1" a 1/4" 1
Recorrido 25.500
LT 27.013
D(mts) Long equiv Le

0.025 20.000 0.500


0.025 0.500 0.013
Le total 0.513
Recorrido 20.000
LT 20.513

D(mts) Long equiv Le

0.013 60.000 0.762


0.013 30.000 0.381
0.013 0.500 0.006
Le total 1.149
Recorrido 21.500
LT 22.649

D(mts) Long equiv Le

0.006 60.000 0.762


0.006 30.000 0.762
0.006 0.500 0.003
Le total 1.527
Recorrido 52.400
LT 53.927