LISTADO DE RUBROS DEL PROYECTO

CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

C01 C-1. GENERAL Y PRELIMINARES C-1. GENERAL AND PRELIMINARIES

4691 R-1.1 PUESTA EN MARCHA Y ENTRENAMIENTO COMMISSIONING AND TRAINING

C02 C-2. DEMOLICIÓN, PREPARACIÓN DEL SITIO C-2. DEMOLITION, SITE PREPARATION

3414 R-2.1 CONFORMACION DE TALUD-PEINADO E= 20 CM. SLOPE SHAPING -COMBING T= 20 CM.

3438 R-2.2 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE SHAPPING AND COMPACTION OF THE SUBGRADE

3630 R-2.3 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE EN RÍO SHAPPING AND COMPACTION OF THE SUBGRADE, RIVER

4304 R-2.4 DERROCAMIENTO DE ESTRUCTURA EXISTENTE CON MAQUINARIA DEMOLITION OF EXISTING STRUCTURE

3659 R-2.5 DESBROCE Y LIMPIEZA DEL TERRENO GRUBBING AND CLEANING OF TERRAIN

3305 R-2.6 DESBROCE, DESBOSQUE Y LIMPIEZA GRUBBING, FOREST CLEARING AND REMOVAL

3631 R-2.7 DESBROCE, DESBOSQUE Y LIMPIEZA EN RÍO GRUBBING, FOREST CLEARING AND REMOVAL, RIVER

3541 R-2.8 DESVÍO DE RÍO TEMPORARY DIVERSION OF RIVER FOR STRUCTURE CONSTRUCTION

3721 R-2.9 LETRERO INFORMATIVO DE OBRA (3.60x2.40)m PROJECT INFORMATIVE SIGN (3.60X2.40)m

3559 R-2.10 LEVANTADA Y COLOCADA DE ADOQUIN. REMOVAL AND PLACEMENT OF INTERLOKING BLOCK .
RASANTEO DE TUNEL A MANO
3519 R-2.11 GRADING OF TUNNEL BY LABOUR

3338 R-2.12 RASANTEO MANUAL EN ZANJA GRADING BY LABOUR IN TRENCHES

3521 R-2.13 REPLANTEO Y NIVELACION GRADING AND LINEAR LEVELLING

3358 R-2.14 REPLANTEO Y NIVELACION LINEAL GRADING AND LEVELLING FOR ROAD WORKS

3320 R-2.15 REPLANTEO Y NIVELACIÓN PARA ALCANTARILLADO. GRADING AND LEVELLING FOR PIPE WORKS

3508 R-2.16 REPLANTEO Y NIVELACIÓN TUNEL GRADING AND LEVELLING TUNNELING

3560 R-2.17 ROTURA A MAQUINA DE PAVIMENTO ASFALTICO CUT BY MACHINE OF ASPHALTIC PAVEMENT

3653 R-2.18 ROTURA Y REPOSICION ACERA 7 cm INC. SUB-BASE 15 cm CUT BY MACHINE AND REINSTATEMENT OF SIDEWALK 7 cm, includes Sub-base 15 cm

C03 C-3. EXCAVACIONES C-3. EXCAVATIONS

3498 R-3.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. EXCAVATION BY MACHINE IN THE RIVERBED.

3329 R-3.2 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M

3542 R-3.3 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M

3543 R-3.4 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M

3639 R-3.5 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M EN RÍO TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M, RIVER

3544 R-3.6 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M

4539 R-3.7 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M EN RÍO TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M, RIVER

3306 R-3.8 EXCAVACION EN SUELO SOIL EXCAVATION


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3642 R-3.9 EXCAVACION EN SUELO EN RÍO SOIL EXCAVATION, RIVER

4355 R-3.10 EXCAVACION MANUAL EXCAVATION BY LABOUR

3440 R-3.11 EXCAVACIÓN PARA CONFORMACION DE TALUD - (PEINADO) EXCAVATION FOR SLOPE SHAPPING - (COMBING)

3517 R-3.12 EXCAVACIÓN TUNEL A MANO EN CONGLOMERADO (INC. DESALOJO HORIZONTAL Y/O VERTICAL) TUNNEL EXCAVATION BY LABOUR, CONGLOMERATE (INCLUDES HORIZONTAL AND/OR VERTICAL DISPOSAL )

EXCAVACIÓN TUNEL A MANO EN ROCA -COMPRESOR PERFORADOR Y EXPLOSIVOS (INC. DESALOJO TUNNEL EXCAVATION BY LABOUR, ROCK-DRILLER COMPRESSOR AND EXPLOSIVES (INCLUDES HORIZONTAL AND/OR
3518 R-3.13 HORIZONTAL Y/O VERTICAL) VERTICAL DISPOSAL )

3516 R-3.14 EXCAVACIÓN TUNEL A MANO EN TIERRA (INC. DESALOJO HORIZONTAL Y/O VERTICAL) TUNNEL EXCAVATION BY LABOUR IN SOIL (INCLUDES HORIZONTAL AND/OR VERTICAL DISPOSAL )

C04 C-4. RELLENOS C-4. BACKFILLING

3341 R-4.1 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND )

3622 R-4.2 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER

3587 R-4.3 RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE CLASE 3) COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3)

3623 R-4.4 RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE CLASE 3) EN RÍO COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER

4825 R-4.5 RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (LASTRE) BACKFILL COMPACTION BY MACHINE - IMPROVEMENT MATERIAL (BALLAST)

3400 R-4.6 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL

3625 R-4.7 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN EN RÍO COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL, RIVER

3626 R-4.8 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO COMPACTING BACKFILL WITH STONE BALL, RIVER

3555 R-4.9 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS COMPACTING BACKFILL WITH STONE BALL IN MANHOLES

3454 R-4.10 RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE CLASE 3) COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3)

3627 R-4.11 RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE CLASE 3) EN RÍO COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER

3339 R-4.12 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL

3629 R-4.13 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN EN RÍO COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL, RIVER

3367 R-4.14 RELLENO CON MATERIAL FILTRANTE BACKFILL WITH FILTERING MATERIAL

3475 R-4.15 ESCOMBRERA (disposición final y tratamiento paisajístico de zonas de depósito) DUMP PIT (final disposal and landscaping treatment to dump pit zones)

C05 C-5. AGREGADOS C-5. AGGREGATES

3307 R-5.1 BASE CLASE 1A PREPARATION OF BASE, CLASS 1A

4822 R-5.2 BASE CLASE 1A EN RÍO PREPARATION OF BASE, CLASS 1A, RIVER

3612 R-5.3 ENROCADO DE PROTECCION CON MORTERO PROTECTION RIPRAP WITH MORTAR

3415 R-5.4 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm)

3632 R-5.5 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER

3532 R-5.6 MATERIAL FILTRANTE EN DRENES EN TUNEL FILTERING MATERIAL IN DRAINS IN TUNNEL

3552 R-5.7 MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO PREPARATION OF SUB-GRADE WITH SELECTED SOIL
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3319 R-5.8 SUB-BASE CLASE 3 PREPARATION OF SUB-BASE, CLASS 3

C06 C-6. PAVIMENTOS C-6. PAVEMENTS

3469 R-6.1 ADOQUIN 0.28x0.14x0.08M INTERLOKING BLOCK 0.28x0.14x0.08M

3363 R-6.2 ASFALTO EMULSIONADO TIPO SS-1H PARA RIEGO DE ADHERENCIA EMULSIFIED ASPHALT TYPE SS-1H FOR ADHERENCE IRRIGATION

3362 R-6.3 ASFALTO MC PARA IMPRIMACIÓN ASPHALT MC FOR PRIMING

3619 R-6.4 CAPA DE BASE DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 10cm DE ESPESOR LAYER OF BASE OF ASPHALTIC CONCRETE MIXED IN PLANT 10cm THICK

3361 R-6.5 CAPA DE RODADURA DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 5cm DE ESPESOR WEARING COURSE OF ASPHALTIC CONCRETE MIXED IN PLANT 5cm THICK

C07 C-7. GEOSINTETICOS C-7. GEOSYNTHETICS

3495 R-7.1 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS

3586 R-7.2 GEOTEXTIL TEJIDO PARA ESTABILIZACIÓN DE LA SUBRASANTE GEOTEXTILE WOVEN FOR STABILIZATION OF THE SUBGRADE

C08 C-8. HORMIGONES C-8. CONCRETE

3613 R-8.1 BASE DE HORMIGON SIMPLE f`c=180kg/cm2 PARA BARANDALES SIMPLE CONCRETE BASE f`c=180kg/cm2 FOR HANDRAILS

4689 R-8.2 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm

3790 R-8.3 CONCRETO ESTAMPADO STAMPED CONCRETE

4041 R-8.4 DINTEL H.S 180Kg/cm2 SIMPLE CONCRETE LINTEL f'c=180Kg/cm2

3576 R-8.5 EMPATE A POZO REVISION MORTERO 1:3 JOINT TO MANHOLE MORTAR 1:3

4374 R-8.6 HORMIGON CICLOPEO 180Kg/cm2 ( 60% HS+40%PIEDRA) CYCLOPEAN CONCRETE f'c=180Kg/cm2 (60% SIMPLE CONCRETE+40% STONE)

3459 R-8.7 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) LEAN CONCRETE - (f´c=180 kg/cm2)

3648 R-8.8 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO LEAN CONCRETE - (f´c=180 kg/cm2), RIVER

3425 R-8.9 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) STRUCTURAL CONCRETE - (f´c=210 kg/cm2)

3649 R-8.10 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER

3460 R-8.11 HORMIGÓN ESTRUCTURAL - (f´c=240 kg/cm2) STRUCTURAL CONCRETE - (f´c=240 kg/cm2)

3553 R-8.12 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) STRUCTURAL CONCRETE - (f´c=280 kg/cm2)

3650 R-8.13 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) EN RÍO STRUCTURAL CONCRETE - (f´c=280 kg/cm2), RIVER

4581 R-8.14 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) STRUCTURAL CONCRETE - (f´c=350 kg/cm2)

3588 R-8.15 HORMIGÓN SIMPLE 180 kg/cm2 SIMPLE CONCRETE f'c=180 kg/cm2

3507 R-8.16 HORMIGÓN SIMPLE 210 kg/cm2 SIMPLE CONCRETE f'c=210 kg/cm2

4033 R-8.17 HORMIGON SIMPLE EN CONTRAPISO f´c=180Kg/cm2. E = 6 CM SIMPLE CONCRETE SUBFLOOR f'c=180Kg/cm2 T=6cm

3800 R-8.18 HORMIGON SIMPLE EN CONTRAPISO f´c=240Kg/cm2. E = 10 CM SIMPLE CONCRETE SUBFLOOR f'c=240Kg/cm2 T=10cm

3801 R-8.19 HORMIGON SIMPLE EN CONTRAPISO f´c=240Kg/cm2. E = 20 CM SIMPLE CONCRETE SUBFLOOR f'c=240Kg/cm2 T=20cm
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3718 R-8.20 HORMIGON SIMPLE EN ESCALERA DE f´c= 280Kg/cm2 INCL ENCOFRADO SIMPLE CONCRETE IN STAIRCASE f'c=280Km/cm2 INCL.

4028 R-8.21 HORMIGON SIMPLE EN PLINTOS f´c=210 Kg/cm2. INCL. ENCOFRADO SIMPLE CONCRETE IN PLINTH f'c=210Kg/cm2 INCL. FORMWORK

4360 R-8.22 HORMIGÓN SIMPLE EN RAMPA f´c=210 Kg/cm2. INCL. ENCOFRADO SIMPLE CONCRETE IN RAMP f'c=210Kg/cm2 INCL. FORMWORK
LOSA DE TAPA H.A F´C=210KG/CM2 PARA POZO DE REVISION D=1.05M E=0.15M
3610 R-8.23 CONCRETE COVER f'c=210KG/CM2 FOR MANHOLE D=1.05M T=0.15M

3579 R-8.24 MORTERO 1:4 PARA FONDO DE POZOS MORTAR 1:4 FOR BOTTOM OF MANHOLES

3600 R-8.25 SEPARADORES DE MORTERO 1:6 SEPARATORS OF MORTAR 1:6

4575 R-8.26 SUMINISTRO E INSTALACIÓN DE PILOTE PHC SUPPLY AND INSTALLATION OF PILE PHC
TAPA H.A D=0.85M PARA POZO DE REVISION
3611 R-8.27 REINFORCED CONCRETE COVER D=0.85M FOR MANHOLE

C09 C-9. ENCOFRADOS C-9. FORMWORKS


ANDAMIOS
4580 R-9.1 SCAFFOLDING

4574 R-9.2 ENCOFRADO DE APOYO FORMWORK SUPPORT


ENCOFRADO PARA ESTRUCTURAS
3397 R-9.3 FORMWORK OF STRUCTURE
ENCOFRADO/DESENCOFRADO METALICO BOVEDA-ARCO

3526 R-9.4 SET UP/ REMOVAL OF FRAMEWORK VAULT METAL


ENCOFRADO/DESENCOFRADO METÁLICO RECTO

3524 R-9.5 SET UP/ REMOVAL OF FRAMEWORK STRAIGHT METAL

3723 R-9.6 ENCOFRADO-DESENCOFRADO PARA LOSA SET UP/REMOVAL OF FORMWORK FOR SLAB

C10 C-10. ENTIBACIÓN C-10. SHORING


ENTIBADO CONTINUO PERMANENTE DE TUNEL
3525 R-10.1 PERMANENT CONTINUOUS SHORING OF TUNNEL

3643 R-10.2 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M EN RÍO SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M, RIVER

3582 R-10.3 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M. SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M

4538 R-10.4 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 5< H <9 M EN RÍO SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M, RIVER

3583 R-10.5 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 5< H<9 M SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M

C11 C-11. TUBERÍAS DE GRP (FIBRA DE VIDRIO REFORZADO) C-11. GRP PIPES

3483 R-11.1 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA GRP PARA ALCANTARILLADO D(i)=1500 mm SUPPLY, INSTALLATION AND TEST OF GRP PIPE FOR SEWAGE D(i)=1500 mm

3484 R-11.2 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA GRP PARA ALCANTARILLADO D(i)=1650 mm SUPPLY, INSTALLATION AND TEST OF GRP PIPE FOR SEWAGE D(i)=1650 mm

C12 C-12. TUBERÍAS DE PE (POLIETILENO) C-12. PE PIPES

4516 R-12.1 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=200 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm, RIVER

4517 R-12.2 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=250 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=250mm, RIVER

4518 R-12.3 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=300 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=300mm, RIVER

4519 R-12.4 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=350 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=350mm, RIVER

4520 R-12.5 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=400 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4522 R-12.6 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=500 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=500mm, RIVER

4523 R-12.7 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=600 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=600mm, RIVER

4524 R-12.8 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=700 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=700mm, RIVER

4736 R-12.9 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=800 mm EN RÍO SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=800mm, RIVER

4727 R-12.10 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=200 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm

4728 R-12.11 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=250 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=250mm

4729 R-12.12 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=300 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=300mm

4731 R-12.13 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=400 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm

4732 R-12.14 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=450 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=450mm

4734 R-12.15 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=600 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=600mm

4738 R-12.16 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO D(i)=1000 mm SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=1000mm

C13 C-13. TUBERÍAS DE DCIP (HIERRO DUCTIL) C-13. DCIP PIPES


SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=80 mm
4569 R-13.1 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=80 mm

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=500 mm EN RÍO


4532 R-13.2 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=500 mm, RIVER

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=700 mm EN RÍO


4534 R-13.3 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=700 mm, RIVER

4741 R-13.4 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=200 mm SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=200 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=300 mm

4743 R-13.5 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=300 mm

4745 R-13.6 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=400 mm SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=400 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=500 mm
4748 R-13.7 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=500 mm

4749 R-13.8 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=600 mm SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=600 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=800 mm
4751 R-13.9 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=800 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO D(i)=1000 mm
4752 R-13.10 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=1000 mm

C14 C-14. TUBERÍAS DE STS (ACERO INOXIDABLE) C-14. STS PIPES

4560 R-14.1 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO D(i)=32 mm SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=32mm

4562 R-14.2 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO D(i)=50 mm SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=50mm

4563 R-14.3 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO D(i)=80 mm SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=80mm

4564 R-14.4 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO D(i)=100 mm SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=100mm

4565 R-14.5 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO D(i)=150 mm SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=150mm

4567 R-14.6 SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO D(i)=200 mm SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=200mm

C15 C-15. TUBERÍAS DE PVC C-15. PVC PIPES


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3601 R-15.1 TUBERÍA DE DESAGUE PVC DE 50mm x 3m PARA MECHINALES PVC PIPE FOR DRAINAGE 50mm x 3m FOR CHANNELS

3533 R-15.2 TUBERÍA PARA SUBDRÉN - (PVC PERFORADA, D=110mm) PIPE FOR SUBDRAIN - (DRILLED PVC , D=110mm)

4661 R-15.3 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=1 " PP THREADABLE PIPE FOR HOT WATER D=1"

4660 R-15.4 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=1 1/2" PP THREADABLE PIPE FOR HOT WATER D=1 1/2"

4663 R-15.5 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=1/2" PP THREADABLE PIPE FOR HOT WATER D=1/2"

4659 R-15.6 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=2" PP THREADABLE PIPE FOR HOT WATER D=2"

4662 R-15.7 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=3/4" PP THREADABLE PIPE FOR HOT WATER D=3/4"

4665 R-15.8 TUBERÍA PVC DE DESAGUE D=110mm PVC DRAIN PIPE D=110mm

4668 R-15.9 TUBERÍA PVC DE DESAGUE D=160mm PVC DRAIN PIPE D=160mm

4667 R-15.10 TUBERÍA PVC DE DESAGUE D=50mm PVC DRAIN PIPE D=50mm

4666 R-15.11 TUBERÍA PVC DE DESAGUE D=75mm PVC DRAIN PIPE D=75mm

4632 R-15.12 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1 1/2" PVC THREADABLE PIPE FOR COLD WATER D= 1 1/2"

4633 R-15.13 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1 1/4" PVC THREADABLE PIPE FOR COLD WATER D=1 1/4"

4634 R-15.14 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1" PVC THREADABLE PIPE FOR COLD WATER D=1"

4636 R-15.15 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1/2" PVC THREADABLE PIPE FOR COLD WATER D=1/2"

4631 R-15.16 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=2" PVC THREADABLE PIPE FOR COLD WATER D=2'

4635 R-15.17 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=3/4" PVC THREADABLE PIPE FOR COLD WATER D=3/4"

C16 C-16. TUBERÍAS DE HORMIGÓN C-16. CONCRETE PIPES

3577 R-16.1 TUBERÍA DE HORMIGÓN ARMADO PARA ALCANTARILLAS D=800mm REINFORCED CONCRETE PIPE FOR SEWAGE D=800mm

C17 C-17. POZOS DE HORMIGÓN C-17. CONCRETE MANHOLE

4219 R-17.1 POZO DE REVISIÓN 0< H<2 M (Di=900mm) CONCRETE MANHOLE 0<H<2 M (Di=900mm)

4220 R-17.2 POZO DE REVISIÓN 2< H<4 M (Di=900mm) CONCRETE MANHOLE 2<H<4 M (Di=900mm)

4221 R-17.3 POZO DE REVISIÓN 4< H<6 M (Di=900mm) CONCRETE MANHOLE 4<H<6 M (Di=900mm)

4222 R-17.4 POZO DE REVISIÓN 6< H<8 M (Di=900mm) CONCRETE MANHOLE 6<H<8 M (Di=900mm)

4223 R-17.5 POZO DE REVISIÓN 8< H<10 M (Di=900mm) CONCRETE MANHOLE 8<H<10 M (Di=900mm)

4224 R-17.6 POZO DE REVISIÓN 0< H<2 M (Di=1200mm) CONCRETE MANHOLE 0<H<2 M (Di=1200mm)

4225 R-17.7 POZO DE REVISIÓN 2< H<4 M (Di=1200mm) CONCRETE MANHOLE 2<H<4 M (Di=1200mm)

4226 R-17.8 POZO DE REVISIÓN 4< H<6 M (Di=1200mm) CONCRETE MANHOLE 4<H<6 M (Di=1200mm)

4227 R-17.9 POZO DE REVISIÓN 6< H<8 M (Di=1200mm) CONCRETE MANHOLE 6<H<8 M (Di=1200mm)

4229 R-17.10 POZO DE REVISIÓN 0< H<2 M (Di=1500mm) CONCRETE MANHOLE 0<H<2 M (Di=1500mm)
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4240 R-17.11 POZO DE REVISIÓN 2< H<4 M (Di=2100mm) CONCRETE MANHOLE 2<H<4 M (Di=2100mm)

4241 R-17.12 POZO DE REVISIÓN 4< H<6 M (Di=2100mm) CONCRETE MANHOLE 4<H<6 M (Di=2100mm)

4242 R-17.13 POZO DE REVISIÓN 6< H<8 M (Di=2100mm) CONCRETE MANHOLE 6<H<8 M (Di=2100mm)

4243 R-17.14 POZO DE REVISIÓN 8< H<10 M (Di=2100mm) CONCRETE MANHOLE 8<H<10 M (Di=2100mm)

C18 C-18. POZOS DE PE C-18. PE MANHOLE

3602 R-18.1 MANHOLE DE PE H=1.70M PE MANHOLE H=1.70M

3603 R-18.2 MANHOLE DE PE H=2.20M PE MANHOLE H=2.20M

3604 R-18.3 MANHOLE DE PE 2.20<H<2.7M PE MANHOLE 2.20<H<2.7M

3605 R-18.4 MANHOLE DE PE 2.7<H<3.2M PE MANHOLE 2.7<H<3.2M

3608 R-18.5 MANHOLE DE PE 3.2<H<3.7M PE MANHOLE 3.2<H<3.7M

3609 R-18.6 MANHOLE DE PE 3.7<H<4.2M PE MANHOLE 3.7<H<4.2M

C19 C-19. ACEROS - METÁLES C-19. STEEL WORKS

4375 R-19.1 ACERO DE REFUERZO fy=4200 kg/cm2 STEEL REINFORCEMENT fy=4200 kg/cm2

4035 R-19.2 ACERO ESTRUCTURAL A36, INCLUYE MONTAJE STRUCTURAL STEEL A36, INCLUDES INSTALLATION

3431 R-19.3 ACERO ESTRUCTURAL EN CERCHA STRUCTURAL STREEL IN GIRDERS

3515 R-19.4 CERCHAS METÁLICAS METALLIC GIRDERS

3656 R-19.5 CONJUNTO DE ANCLAJE Y SOPORTE DE TUBERIA ANCHORAGE AND SUPPORT FOR PIPE

4311 R-19.6 MALLA ELECTROSOLDADA 5 mm a 10 cm (MALLA R-196). ELECTROWELDED MESH 5 mm to 10 cm (MALLA R-196)

3405 R-19.7 MURO DE GAVIONES TRIPLE TORSIÓN (2x1x1) GABIONS WALL, TRIPLE TORSION (2x1x1)

3652 R-19.8 MURO DE GAVIONES TRIPLE TORSIÓN (2x1x1) EN RÍO GABIONS WALL, TRIPLE TORSION (2x1x1), RIVER

3666 R-19.9 PLACA COLABORANTE DE ACERO GALVANIZADO e=0.65mm PARA LOSA, SUMINISTRO Y COLOCACIÓN PERMANENT FORMWORK OF GALVANIZED STEEL PLATE T=0.65mm FOR SLAB, SUPPLY AND INSTALLATION

4577 R-19.10 REJILLA DE ACERO (800x800)mm STEEL GRATING COVER (800X800)mm

3590 R-19.11 REJILLA TRANSVERSAL DE H.D (580 x 830)mm DUCTILE IRON GRATING COVER (580 x 830)mm

3591 R-19.12 SUMINISTRO E INSTALACIÓN DE TABLESTACA DE a=801mm, e=6mm SUPPLY AND INSTALLATION OF SHEETPILE, T=6mm

3424 R-19.13 TAPA DE HD D=0.60m PARA POZOS DE REVISION COVER OF DUCTIL IRON D=0.60m FOR MANHOLES

C20 C-20. IMPERMEABILIZANTES C-20. WATERPROOFING

4571 R-20.1 IMPERMEABLE DE GOMA ASFÁLTICA ASPHALTIC RUBBER WATERPROOF

4572 R-20.2 IMPERMEABLE EPÓXICO EPOXIC WATERPROOF

4573 R-20.3 IMPERMEABLE THOROSEAL THOROSEAL WATERPROOF


JUNTAS IMPERMEABLES PVC 22 CM
3530 R-20.4 PVC WATERTIGHT JOINTS 22 CM
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

C21 C-21. TRANSPORTES C-21. TRANSPORT

3534 R-21.1 ACARREO MANUAL MATERIAL 100m MATERIAL TRANSPORT BY LABOUT, L=100m APPROX.

4823 R-21.2 TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE 500m) TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE TRANSPORT 500m)

4824 R-21.3 TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE 500m) EN RÍO TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE TRANSPORT 500m), RIVER

3426 R-21.4 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m)

3645 R-21.5 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER

C22 C-22. ALBAÑILERIA C-22. MASONRY


BORDILLO PERDIDO DE H.S. 0.10*0.23 f`c=180 kg/cm2
3472 R-22.1 SIMPLE CONCRETE LOSS CURB 0.10*0.23 f'c=180 kg/cm2

3788 R-22.2 BORDILLO TINETA BAÑO SHOWER BASE BORDER

3781 R-22.3 BORDILLOS LIVIANOS SECCION CURVA 8*25*100cm LIGHT BORDER CURVE SECTION 8*25*100cm

3701 R-22.4 MAMPOSTERIA DE BLOQUE E=10 CM CON MORTERO 1:6 BLOCK MASONRY T=10CM WITH MORTAR 1:6

3702 R-22.5 MAMPOSTERIA DE BLOQUE E=15 CM CON MORTERO 1:4 BLOCK MASONRY T=15CM WITH MORTAR 1:4

3802 R-22.6 MAMPOSTERIA DE BLOQUE E=20 CM CON MORTERO 1:4 BLOCK MASONRY T=20CM WITH MORTAR 1:4

3794 R-22.7 MESON DE ACERO INOXIDABLE STAINLESS STEEL TOPPED KITCHEN TABLE

4006 R-22.8 MESON DE COCINA CON RECUBRIMIENTO DE GRANITO GRANITE TOPPED KITCHEN TABLE

C23 C-23. ENLUCIDOS Y MASILLADOS C-23. PLASTERING AND CAULKING

4022 R-23.1 ENLUCIDO CON IMPERMEABILIZANTE MORTERO 1:3 PLASTERING WITH WATERTPROOFING MORTAR 1:3

4386 R-23.2 ENLUCIDO DE FILOS Y FAJAS PLASTERING OF BORDERS AND STRIPS

4043 R-23.3 ENLUCIDO HORIZONTAL MORTERO 1:4 HORIZONTAL PLASTERING MORTAR 1:4

4042 R-23.4 ENLUCIDO VERTICAL MORTERO 1:4 VERTICAL PLASTERING MORTAR 1:4

C24 C-24. RECUBRIMIENTOS EN PISOS C-24. FLOOR LININGS

3797 R-24.1 ADOQUIN TIPO ECOLOGICO, 60*40*10cm INTERLOKING BLOCK TYPE ECOLOGIC, 60*40*10cm

3779 R-24.2 ADOQUIN TIPO ESPAÑOL, 30*30*8 CM INTERLOKING BLOCK TYPE ESPAÑOL, 30*30*8cm

3782 R-24.3 ADOQUIN TIPO ESPAÑOL, 30*60*8 CM INTERLOKING BLOCK TYPE ESPAÑOL, 30*60*8cm

3783 R-24.4 ADOQUIN TIPO ZARAGOZA, 18*23-18*8cm INTERLOKING BLOCK TYPE ZARAGOZA, 18*23-18*8cm

4391 R-24.5 ALISADO DE PISOS PARA RAMPA, (MORTERO 1:3, E = 1.5 CM) TROWELLED FLOORS FOR RAMP, (MORTAR 1:3, W=1.5CM)

4048 R-24.6 BARREDERAS DE PORCELANATO e=10cm SKIRTING BOARDS OF PORCELLANATO T=10cm

4046 R-24.7 CERAMICA PARA PISOS FLOOR CERAMIC

3791 R-24.8 MASILLADO Y ALISADO DE GRADAS PASTING AND SMOOTHING OF STAIRCASE

3789 R-24.9 MASILLADO Y ALISADO DE PISOS PASTING AND SMOOTHING OF FLOORS


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4047 R-24.10 PORCELANATO EN PISOS PORCELAIN IN FLOORS

3795 R-24.11 HORMIGON PULIDO EN PISOS POLISHED CONCRETE IN FLOORS

3705 R-24.12 PISO FLOTANTE, SUMINISTRO Y COLOCACIÓN FLOATING FLOOR, SUPPLY AND INSTALLATION

C25 C-25. RECUBRIMIENTOS EN PAREDES Y TECHO C-25. COVERINGS FOR WALLS AND ROOF

4044 R-25.1 CERAMICA EN PAREDES WALL CERAMIC

4383 R-25.2 CIELO RASO FALSO GYPSUM GYPSUM CEILING

4384 R-25.3 EMPASTADO EXTERIOR. EXTERIOR PLASTERING

4385 R-25.4 EMPASTADO INTERIOR. INTERIOR PLASTERING

3704 R-25.5 IMPERMEABILIZANTE ACRILICO PARA CUBIERTAS ACRILIC WATERPROOFING FOR ROOF

3793 R-25.6 MASILLADO Y ALISADO DE LOSA DE CUBIERTA PASTING AND SMOOTHING THE ROOF SLAB

4051 R-25.7 PINTURA EXTERIOR EXTERIOR PAINT

4050 R-25.8 PINTURA INTERIOR INTERIOR PAINT

3730 R-25.9 REVESTIMIENTO CON ALUCOBOND SUPPLY AND INSTALL ALUCOBOND

4389 R-25.10 REVESTIMIENTO DE GRANITO EN MONUMENTO LINING OF GRANITE IN MONUMENT

3728 R-25.11 REVESTIMIENTO DE PIEDRA PARA EXTERIORES LINING OF STONE FOR EXTERIOR

C26 C-26. CARPINTERIA METÁLICA, MADERA, ALUMINIO Y ACERO INOXIDABLE C-26. METALLIC, WOOD, ALUMINUM, STAINLESS STEEL CARPENTRY

3780 R-26.1 CERRAMIENTO METALICO CON TUBO GALVANIZADO DE 2" H=2.4 METAL FENCE WITH GALVANIZED PIPE 2" H=2.4

3758 R-26.2 MAMPARA DE ALUMINIO Y VIDRIO ALUMINUM AND GLASS SCREEN

3731 R-26.3 PASAMANO PASANTE EN ACERO INOXIDABLE AISI A304 STAINLESS STEEL HANDRAIL, AISI A304

3670 R-26.4 SUMINISTRO E INSTALACIÓN DE DIVISIONES DE BAÑO EN ACERO INOXIDABLE STAINLESS STEEL BATHRROM DIVISIONS SUPPLY AND INSTALLATION

3671 R-26.5 SUMINISTRO E INSTALACIÓN DE DIVISIONES PARA URINARIO EN ACERO INOXIDABLE STAINLESS STEEL URINARY DIVISIONS SUPPLY AND INSTALLATION

4556 R-26.6 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS

4576 R-26.7 SUMINISTRO E INSTALACIÓN DE PASAMANOS, STS SUPPLY AND INSTALLATION OF HANDRAIL, STS

4579 R-26.8 SUMINISTRO E INSTALACIÓN DE PORTON DE ENTRADA (W=550xH=12000mm, STS) SUPPLY AND INSTALLATION OF MAIN GATE =550XH=12000mm, STS)

4543 R-26.9 TAPA DE ACERO INOXIDABLE (1200x1200)mm - TIPO B STAINLESS STEEL COVER (1200X1200)mm-TYPE B

4544 R-26.10 TAPA DE ACERO INOXIDABLE (1500x1500)mm - TIPO A STAINLESS STEEL COVER (1500X1500)mm-TYPE A

4545 R-26.11 TAPA DE ACERO INOXIDABLE (800x1000)mm - TIPO A STAINLESS STEEL COVER (800X1000)mm-TYPE A

4546 R-26.12 TAPA DE ACERO INOXIDABLE (800x3500)mm - TIPO A STAINLESS STEEL COVER (800X3500)mm-TYPE A

4547 R-26.13 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A STAINLESS STEEL COVER (800X800)mm-TYPE A

4548 R-26.14 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B STAINLESS STEEL COVER (800X800)mm-TYPE B
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4549 R-26.15 TAPA DE ACERO INOXIDABLE (1000x1000)mm - TIPO A STAINLESS STEEL COVER (1000X1000)mm-TYPE A

4550 R-26.16 TAPA DE ACERO INOXIDABLE (1500x1500)mm - TIPO B STAINLESS STEEL COVER (1500X1500)mm-TYPE B

4551 R-26.17 TAPA DE ACERO INOXIDABLE (3300x1000)mm - TIPO A STAINLESS STEEL COVER (3300X1000)mm-TYPE A

4552 R-26.18 TAPA DE ACERO INOXIDABLE (600x1200)mm - TIPO A STAINLESS STEEL COVER (600X1200)mm-TYPE A

4553 R-26.19 TAPA DE ACERO INOXIDABLE (800x1500)mm - TIPO A STAINLESS STEEL COVER (800X1500)mm-TYPE A

4554 R-26.20 TAPA DE ACERO INOXIDABLE (800x1800)mm - TIPO A STAINLESS STEEL COVER (800X1800)mm-TYPE A

4037 R-26.21 TAPA DE TOL GALV. 2.8 mm MARCO ANG. 25*3 mm GALVANIZED STEEL COVER 2.8 mm FRAME ANG. 25*3mm

4756 R-26.22 VENTANA V1, EDIFICIO ADMINISTRATIVO WINDOW V1, Administration Building

4757 R-26.23 VENTANA V2, EDIFICIO ADMINISTRATIVO WINDOW V2, Administration Building

4758 R-26.24 VENTANA V3, EDIFICIO ADMINISTRATIVO WINDOW V3, Administration Building

4759 R-26.25 VENTANA V4, EDIFICIO ADMINISTRATIVO WINDOW V4, Administration Building

4760 R-26.26 VENTANA V5, EDIFICIO ADMINISTRATIVO WINDOW V5, Administration Building

4761 R-26.27 VENTANA V6, EDIFICIO ADMINISTRATIVO WINDOW V6, Administration Building

4762 R-26.28 VENTANA V7, EDIFICIO ADMINISTRATIVO WINDOW V7, Administration Building

4763 R-26.29 VENTANA V8, EDIFICIO ADMINISTRATIVO WINDOW V8, Administration Building

4764 R-26.30 VENTANA V9, EDIFICIO ADMINISTRATIVO WINDOW V9, Administration Building

4765 R-26.31 VENTANA V10, EDIFICIO ADMINISTRATIVO WINDOW V10, Administration Building

4766 R-26.32 VENTANA V11, EDIFICIO ADMINISTRATIVO WINDOW V11, Administration Building

4767 R-26.33 VENTANA V12, EDIFICIO ADMINISTRATIVO WINDOW V12, Administration Building

4768 R-26.34 VENTANA V13, EDIFICIO ADMINISTRATIVO WINDOW V13, Administration Building

4769 R-26.35 VENTANA V14, EDIFICIO ADMINISTRATIVO WINDOW V14, Administration Building

4770 R-26.36 VENTANA V15, EDIFICIO ADMINISTRATIVO WINDOW V15, Administration Building

4771 R-26.37 PUERTA P1, EDIFICIO ADMINISTRATIVO DOOR P1, Administration Building

4772 R-26.38 PUERTA P2, EDIFICIO ADMINISTRATIVO DOOR P2, Administration Building

4773 R-26.39 PUERTA P3, EDIFICIO ADMINISTRATIVO DOOR P3, Administration Building

4774 R-26.40 PUERTA P4, EDIFICIO ADMINISTRATIVO DOOR P4, Administration Building

4775 R-26.41 PUERTA P5, EDIFICIO ADMINISTRATIVO DOOR P5, Administration Building

4776 R-26.42 PUERTA P6, EDIFICIO ADMINISTRATIVO DOOR P6, Administration Building

4777 R-26.43 PUERTA P7, EDIFICIO ADMINISTRATIVO DOOR P7, Administration Building

4778 R-26.44 PUERTA P8, EDIFICIO ADMINISTRATIVO DOOR P8, Administration Building
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4779 R-26.45 PUERTA P10, EDIFICIO ADMINISTRATIVO DOOR P10, Administration Building

4780 R-26.46 PUERTA P11, EDIFICIO ADMINISTRATIVO DOOR P11, Administration Building

4781 R-26.47 PUERTA P12, EDIFICIO ADMINISTRATIVO DOOR P12, Administration Building

4782 R-26.48 PUERTA P13, EDIFICIO ADMINISTRATIVO DOOR P13, Administration Building

4783 R-26.49 PUERTA P14, EDIFICIO ADMINISTRATIVO DOOR P14, Administration Building

4784 R-26.50 PUERTA P15, EDIFICIO ADMINISTRATIVO DOOR P15, Administration Building

4785 R-26.51 PUERTA P16, EDIFICIO ADMINISTRATIVO DOOR P16, Administration Building

4786 R-26.52 PUERTA P17, EDIFICIO ADMINISTRATIVO DOOR P17, Administration Building

4787 R-26.53 PUERTA P18, EDIFICIO ADMINISTRATIVO DOOR P18, Administration Building

4788 R-26.54 PUERTA P19, EDIFICIO ADMINISTRATIVO DOOR P19, Administration Building

4789 R-26.55 PUERTA P20, EDIFICIO ADMINISTRATIVO DOOR P20, Administration Building

4790 R-26.56 PUERTA P21, EDIFICIO ADMINISTRATIVO DOOR P21, Administration Building

4791 R-26.57 PUERTA P22, EDIFICIO ADMINISTRATIVO DOOR P22, Administration Building

4792 R-26.58 PUERTA P23, EDIFICIO ADMINISTRATIVO DOOR P23, Administration Building

4793 R-26.59 PUERTA P24, EDIFICIO ADMINISTRATIVO DOOR P24, Administration Building

4794 R-26.60 PUERTA P25, EDIFICIO ADMINISTRATIVO DOOR P25, Administration Building

4820 R-26.61 PUERTA P26, EDIFICIO ADMINISTRATIVO DOOR P26, Administration Building

4795 R-26.62 VENTANA V1, EDIFICIO MULTIPROPOSITO WINDOW V1, Complex Building

4796 R-26.63 PUERTA P1, EDIFICIO MULTIPROPOSITO DOOR P1, Complex Building

4797 R-26.64 PUERTA P2, EDIFICIO MULTIPROPOSITO DOOR P2, Complex Building

4798 R-26.65 PUERTA P3, EDIFICIO MULTIPROPOSITO DOOR P3, Complex Building

4799 R-26.66 PUERTA P4, EDIFICIO MULTIPROPOSITO DOOR P4, Complex Building

4800 R-26.67 PUERTA P5, EDIFICIO MULTIPROPOSITO DOOR P5, Complex Building

4801 R-26.68 PUERTA P6, EDIFICIO MULTIPROPOSITO DOOR P6, Complex Building

4802 R-26.69 PUERTA P7, EDIFICIO MULTIPROPOSITO DOOR P7, Complex Building

4803 R-26.70 VENTANA V1, EDIFICIO DESHIDRATACIÓN DE LODOS WINDOW V1, Sludge Dewatering Building

4804 R-26.71 VENTANA V2, EDIFICIO DESHIDRATACIÓN DE LODOS WINDOW V2, Sludge Dewatering Building

4805 R-26.72 VENTANA V3, EDIFICIO DESHIDRATACIÓN DE LODOS WINDOW V3, Sludge Dewatering Building

4806 R-26.73 VENTANA V4, EDIFICIO DESHIDRATACIÓN DE LODOS WINDOW V4, Sludge Dewatering Building

4807 R-26.74 VENTANA V5, EDIFICIO DESHIDRATACIÓN DE LODOS WINDOW V5, Sludge Dewatering Building
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4808 R-26.75 PUERTA P1, EDIFICIO DESHIDRATACIÓN DE LODOS DOOR P1, Sludge Dewatering Building

4809 R-26.76 PUERTA P2, EDIFICIO DESHIDRATACIÓN DE LODOS DOOR P2, Sludge Dewatering Building

4810 R-26.77 PUERTA P3, EDIFICIO DESHIDRATACIÓN DE LODOS DOOR P3, Sludge Dewatering Building

4811 R-26.78 PUERTA P4, EDIFICIO DESHIDRATACIÓN DE LODOS DOOR P4, Sludge Dewatering Building

4812 R-26.79 VENTANA V1, OFICINA DE SEGURIDAD WINDOW V1, Guard Room

4813 R-26.80 VENTANA V2, OFICINA DE SEGURIDAD WINDOW V2, Guard Room

4814 R-26.81 VENTANA V3, OFICINA DE SEGURIDAD WINDOW V3, Guard Room

4815 R-26.82 VENTANA V4, OFICINA DE SEGURIDAD WINDOW V4, Guard Room

4816 R-26.83 PUERTA P1, OFICINA DE SEGURIDAD DOOR P1, Guard Room

4817 R-26.84 PUERTA P2, OFICINA DE SEGURIDAD DOOR P2, Guard Room

4818 R-26.85 PUERTA P3, OFICINA DE SEGURIDAD DOOR P3, Guard Room

4819 R-26.86 PUERTA P4, OFICINA DE SEGURIDAD DOOR P4, Guard Room

C27 C-27. CUBIERTA C-27. COVER

3706 R-27.1 SUMINISTRO E INSTALACIÓN DE CUBIERTA DE POLICARBONATO POLICARBONATE COVER SUPPLY AND INSTALLATION

4559 R-27.2 SUMINISTRO E INSTALACIÓN DE LA CUBIERTA DEL DOMO SUPPLY AND INSTALLATION OF DOME COVER

4558 R-27.3 SUMINISTRO E INSTALACIÓN DE SEPARADOR, T=4mm SUPPLY AND INSTALLATION OF BAFFLE, T=4MM

4557 R-27.4 SUMINISTRO E INSTALACIÓN RANURA-V,STS, T=4mm SUPPLY AND INSTALLATION WEIR (V-NOTCH), STS, T=4mm

C28 C-28. MOBILIARIOS C-28. FURNITURE

4009 R-28.1 MUEBLES DE COCINA KITCHEN FURNITURE

4127 R-28.2 SILLAS EJECUTIVAS GIRATORIAS EXECUTIVE OFFICE CHAIRS

4129 R-28.3 SILLAS PARA VISITA VISITORS CHAIRS

3674 R-28.4 SILLON GIRATORIO DE OFICINA OFFICE SWIVEL CHAIRS

3720 R-28.5 SUMINISTRO DE BANCA BENCH SUPPLY

3675 R-28.6 SUMINISTRO DE CAMA BED SUPPLY

3672 R-28.7 SUMINISTRO DE COUNTER 2.00 X 0.60 X 1.25 M COUNTER SUPPLY 2.00 X 0.60 X 1.25 M

3708 R-28.8 SUMINISTRO DE ESCRITORIO DE OFICINA OFFICE DESK SUPPLY

3709 R-28.9 SUMINISTRO DE ESCRITORIO SENCILLOS DE OFICINA SIMPLE OFFICE DESK SUPPLY

3676 R-28.10 SUMINISTRO DE ESCRITORIO TIPO L PARA OFICINAS L TYPE DESK SUPPLY

3719 R-28.11 SUMINISTRO DE JUEGO DE SALA LIVING ROOM FURNITURE

3669 R-28.12 SUMINISTRO DE LOCKERS LOCKERS SUPPLY


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3673 R-28.13 SUMINISTRO DE MESA PARA REUNIONES MEETING TABLE SUPPLY

3667 R-28.14 SUMINISTRO DE MOBILIARIO PARA COMEDOR FURNITURE FOR DINNING HALL SUPPLY

3707 R-28.15 SUMINISTRO DE SELF-SERVICE SELF SERVICE COUNTER SUPPLY

C29 C-29.EQUIPOS C-29. EQUIPMENTS OF ADMINISTRATION BUILDING

4466 R-29.1 EQUIPOS DE OFICINA (COMPUTADORES) OFFICE EQUIPMENT (COMPUTERS )

3740 R-29.2 SUMINISTRO DE PROYECTOR PROJECTOR SUPPLY

3727 R-29.3 SUMINISTRO E INSTALACIÓN CUARTO DE REFRIGERACIÓN REFRIGERATING ROOM SUPPLY AND INSTALLATION

4010 R-29.4 SUMINISTRO E INSTALACION DE COCINA DE INDUCCION EMPOTRABLE 5 INDUCTORES INDUCTION KITCHEN RECESSED 5 INDUCTORS SUPPLY AND INSTALLATION

4149 R-29.5 SUMINISTRO E INSTALACION DE TV DE 42" TV 42" SUPPLY AND INSTALLATION

C30 C-30. ACCESORIOS PARA INSTALACIONES HIDROSANITARIAS C-30. ACCESSORIES FOR HYDRO SANITARY INSTALLATIONS

4643 R-30.1 CODO PP ROSCABLE D=1 1/2" x 90º PP THREADABLE ELBOW D=1 1/2" X90 degree

4644 R-30.2 CODO PP ROSCABLE D=1" x 90º PP THREADABLE ELBOW D1" X90 degree

4645 R-30.3 CODO PP ROSCABLE D=1/2" x 90º PP THREADABLE ELBOW D=1/2" X90 degree

4642 R-30.4 CODO PP ROSCABLE D=2" x 90º PP THREADABLE ELBOW D=2" X90 degree

4646 R-30.5 CODO PP ROSCABLE D=3/4" x 90º PP THREADABLE ELBOW D=3/4" X90 degree

3654 R-30.6 CODO PVC D=400mm; ø=90 PVC ELBOW D=400m, Degree=90

4677 R-30.7 CODO PVC DE DESAGUE D=110mm x 45º PVC DRAIN ELBOW D=110m x 45 degrees

4676 R-30.8 CODO PVC DE DESAGUE D=110mm x 90º PVC DRAIN ELBOW D=110m x 90 degrees

4679 R-30.9 CODO PVC DE DESAGUE D=50mm x 45º PVC DRAIN ELBOW D=50m x 45 degrees

4681 R-30.10 CODO PVC DE DESAGUE D=50mm x 90º PVC DRAIN ELBOW D=50m x 90 degrees

4678 R-30.11 CODO PVC DE DESAGUE D=75mm x 45º PVC DRAIN ELBOW D=75m x 45 degrees

4680 R-30.12 CODO PVC DE DESAGUE D=75mm x 90º PVC DRAIN ELBOW D=75m x 90 degrees

4317 R-30.13 DISPENSADOR DE JABON DE ACERO INOXIDABLE 800ML STAINLESS STEEL SOAP DISPENSER 800ml

4318 R-30.14 DISPENSADOR PARA PAPEL HIGIENICO TOILET PAPER DISPENSER

3668 R-30.15 DUCHA BIMANDO TWO HANDLE SHOWER

3732 R-30.16 FREGADERO ACERO INOXIDABLE DOS POZOS INCL. ACCESORIOS STAINLESS STEEL SINK OF TWO BARRELS INCL. ACCESSORIES
INODORO BLANCO CON FLUXOMETRO
4365 R-30.17 WHITE TOILET WITH FLOW SYSTEM
INODORO BLANCO PARA DISCAPACITADOS CON FLUXOMETRO. INCL. ACCESORIOS.
4367 R-30.18 WHITE TOILET FOR SPECIAL NEEDS USERS WITH FLOW SYSTEM. INCL. ACCESSORIES

4005 R-30.19 INODORO TANQUE BAJO INCL. ACCESORIOS WHITE TOILET LOW TANK INCL. ACCESSORIES

3738 R-30.20 LAVAMANOS EMPOTRADO BLANCO WHITE SINK RECESSED


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3739 R-30.21 LAVAMANOS PARA DISCAPACITADOS BLANCO WHITE SINK FOR SPECIAL NEEDS USERS

4651 R-30.22 REDUCTOR PP ROSCABLE D=1 1/2" A 1 1/4" PP THREADABLE REDUCTOR D=1 1/2" TO 1 1/4"

4652 R-30.23 REDUCTOR PP ROSCABLE D=1 1/2" A 1" PP THREADABLE REDUCTOR D=1 1/2" TO 1"

4653 R-30.24 REDUCTOR PP ROSCABLE D=1" A 3/4" PP THREADABLE REDUCTOR D=1" TO 3/4"

4648 R-30.25 REDUCTOR PP ROSCABLE D=2" A 1 1/2" PP THREADABLE REDUCTOR D=2" TO 1 1/2"

4649 R-30.26 REDUCTOR PP ROSCABLE D=2" A 1 1/4" PP THREADABLE REDUCTOR D=2" TO 1 1/4"

4647 R-30.27 REDUCTOR PP ROSCABLE D=2" A 1" PP THREADABLE REDUCTOR D=2" TO 1"

4650 R-30.28 REDUCTOR PP ROSCABLE D=2" A 3/4" PP THREADABLE REDUCTOR D=2" TO 3/4"

4654 R-30.29 REDUCTOR PP ROSCABLE D=3/4" A 1/2" PP THREADABLE REDUCTOR D=3/4" TO 1/2"

4674 R-30.30 REDUCTOR PVC DE DESAGUE D=110mm a 50mm PVC DRAIN REDUCTOR D=110mm to 50mm

4673 R-30.31 REDUCTOR PVC DE DESAGUE D=110mm a 75mm PVC DRAIN REDUCTOR D=110mm to 75mm

4675 R-30.32 REDUCTOR PVC DE DESAGUE D=75mm a 50mm PVC DRAIN REDUCTOR D=75mm to 50mm

4688 R-30.33 REJILLA METÁLICA DE PISO D=110mm FLOOR METAL GRID D=110mm

4685 R-30.34 REJILLA METÁLICA DE PISO D=50mm FLOOR METAL GRID D=50mm

4684 R-30.35 REJILLA METÁLICA DE PISO D=75mm FLOOR METAL GRID D=75mm

4319 R-30.36 SECADOR MANOS 120V BL 1850W HAND DRIER 120V BL 1850W

4686 R-30.37 SIFON PVC DE PISO D=110mm PVC FLOOR SIFON D=110mm

4683 R-30.38 SIFON PVC DE PISO D=50mm PVC FLOOR SIFON D=50mm

4682 R-30.39 SIFON PVC DE PISO D=75mm PVC FLOOR SIFON D=75mm

4687 R-30.40 SUMIDERO METÁLICO DE PISO TIPO T D=160-100mm METAL SUMP FOR FLOOR TYPE T D=160-100mm

4638 R-30.41 TEE PP ROSCABLE D=1 1/2" PP TEE THREADABLE D=1 1/2"

4639 R-30.42 TEE PP ROSCABLE D=1 1/4" PP TEE THREADABLE D=1 1/4"

4640 R-30.43 TEE PP ROSCABLE D=1" PP TEE THREADABLE D=1"

4637 R-30.44 TEE PP ROSCABLE D=2" PP TEE THREADABLE D=2"

4641 R-30.45 TEE PP ROSCABLE D=3/4" PP TEE THREADABLE D=3/4"

3655 R-30.46 TEE PVC D=400 mm PVC TEE D=400mm

4664 R-30.47 TERMOCALENTADOR (ELECTRICO) CAP. 50 LITROS HEATER (ELECTRIC) CAP. 50 LITTERS

4672 R-30.48 UNIÓN PVC DE DESAGUE D=110mm PVC DRAIN JOINT D=110mm

4366 R-30.49 URINARIO BLANCO CON FLUXOMETRO WHITE URINARY WITH FLOW SYSTEM

4655 R-30.50 VÁLVULA CHECK CHECK VALVE


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4657 R-30.51 VÁLVULA DE CONTROL D=1 1/4" CONTROL VALVE D= 1 1/4"

4658 R-30.52 VÁLVULA DE CONTROL D=1/2" CONTROL VALVE D= 1/2"

4656 R-30.53 VÁLVULA DE CONTROL D=2" CONTROL VALVE D=2"

4671 R-30.54 YEE PVC DE DESAGUE D=110mm PVC DRAIN YEE PIPE D=110mm

4669 R-30.55 YEE PVC DE DESAGUE D=50mm PVC DRAIN YEE PIPE D=50mm

4670 R-30.56 YEE PVC DE DESAGUE D=75mm PVC DRAIN YEE PIPE D=75mm

C31 C-31. INSTALACIONES ELECTRICAS - CAMINERIA C- 31. ELECTRICAL WORKS OF WALKWAY

3651 R-31.1 ACOM. RED DE ALUMBRADO CONNECTION TO POWER NETWORK

3412 R-31.2 LUMINARIA ORNAMENTAL 175W TIPO PLATO DECORATIVE LUMINAIRES 175W TYPE PLATO

C32 C-32. INSTALACIONES ELECTRICAS - EDIFICICACIONES C- 32. ELECTRICAL WORKS OF ADMINISTRATION BUILDING - WWTP

6002 R-32-1 CONSTRUCCION RED DE MEDIO VOLTAJE SUBTERRANEO CONSTRUCTION OF MEDIUM VOLTAGE UNDERGROUND

6025 R-32-2 CONSTRUCCION DE RED DE MEDIO VOLTAJE 4.7Km AEREO CONSTRUCTION OF MEDIUM VOLTAGE, L = 4.7 KM

1936 R-32-3 BANCO DE DUCTOS - EU0-0B1X2B CONDUIT BANK- EU0-0B1X2B

3031 R-32-4 EXCAVACIÓN A MÁQUINA EN TIERRA H=2-4M EXCAVATION BY MACHINE, SOIL, H=2-4M

4063 R-32-5 TABLERO PRINCIPAL 8 PUNTOS 110/220V 125A MAIN BOARD 8 POINTS 110/220V 125A

4352 R-32-6 EXCAVACION A MAQUINA EXCAVATION BY MACHINE

6009 R-32-7 CAJA TERMICA 16 PUNTOS 125A THERMAL BREAKER DEVICE 16 POINTS 125A

6011 R-32-8 PUNTO DE ILUMINACIÓN NORMAL EN EMT BAJO 4m ALTURA LUMINAIR NORMAL IN EMT UNDER 4m HEIGHT

6012 R-32-9 PUNTO DE TOMACORRRIENTE NORMAL EMT 120V POWER OUTLET NORMAL EMT 120V

6013 R-32-10 PUNTO DE TOMACORRIENTE ESPECIAL220v 50A POWER OUTLET SPECIALIZED 220v 50A

6014 R-32-11 PUNTO DE TOMACORRIENTE REGULADO POWER OUTLET REGULATED

6015 R-32-12 PUNTO DE ILUMINACION EXTERIOR EN POSTE ORNAMENTAL EXTERIOR LIGHTING DECORATIVE POLE

6016 R-32-13 LUMINARIA 60X60CM CON REJILLA Y FOCOS LED CIELO FALSO LUMINAIRE 60X60CM WITH GRILLE AND LED LIGHT FALSE CEILING

6017 R-32-14 LUMINARIA 1.20x.60 LED PARA CIELO FALSO LUMINAIRE 1.20x.60 LED FOR FALSE CEILING

6018 R-32-15 POSTE METALICO TELESCOPICO 10m TELESCOPIC METAL POLE 10m

6019 R-32-16 LUMINARIA ALUMBRADO VEHICULAR 150W LUMINAIRE VEHICLES LIGHTING 150W

6020 R-32-17 LUMINARIA LED 90W TIPO ZWECK LUMINAIRE LED 90W TYPE ZWECK

6021 R-32-18 LUMINARIA TIPO PERFIL 2.5MM LUMINAIRE PROFILE TYPE, 2.5MM

6022 R-32-19 LUMINARIA TIPO LED COLGANTE IP65 LUMINAIRE HANGING LED IP65

6023 R-32-20 TRANSFORMADOR SECO 220KVA 460/220/127 DRY TYPE CAST RESING TRANSFORMER 220KVA 460/220/127
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

C33 C-33. OBRAS ELÉCTRICAS PARA LAS INSTALACIONES DE LA PTAR C- 33. ELECTRICAL WORKS - WWTP

7001 R-33.1 CANAL DE CABLES DE ENERGÍA POWER CABLE TRUNKING

7002 R-33.2 INSTALACIÓN DE CONDUCTO EN EXTERIORES OUTDOOR CONDUIT INSTALLATION

7003 R-33.3 MCC-A100 MCC-A100

7004 R-33.4 MCC-A200 MCC-A200

7005 R-33.5 MCC-A300 MCC-A300

7006 R-33.6 MCC-A700 MCC-A700

7007 R-33.7 MCC-A400 MCC-A400

7008 R-33.8 MCC-A500 MCC-A500

7009 R-33.9 MCC-A600 MCC-A600

7010 R-33.10 EDIFICIO MULTIPROPOSITO COMPLEX BUILDING

7103 R-33.11 CLARIFICADOR PRIMARIO. PRIMARY CLARIFIER

7011 R-33.12 CLARIFICADOR SECUNDARIO TIPO 1 SECONDARY CLARIFIER TYPE 1

7012 R-33.13 EDIFICIO DE DESHIDRATACIÓN DE LODOS SLUDGE DEWATERING FACILITY

7013 R-33.14 BIO REACTOR BIO REACTOR

7014 R-33.15 EDIFICIO ADMINISTRATIVO ADMINISTRATIVE BUILDING

7015 R-33.16 EDIFICIO ELÉCTRICO ELECTRIC ROOM

7016 R-33.17 DESHIDRATACIÓN DE LODOS SLUDGE DEWATERING

7017 R-33.18 UNIDAD PRINCIPAL DEL ANILLO (RMU) RING MAIN UNIT

7018 R-33.19 HV-1 HV-1

7019 R-33.20 HV-2 HV-2

7020 R-33.21 HV-3 HV-3

7021 R-33.22 HV-4 HV-4

7022 R-33.23 HV-5 HV-5

7023 R-33.24 MTR-1 MTR-1

7024 R-33.25 MTR-2 MTR-2

7025 R-33.26 LV-A1 LV-A1

7026 R-33.27 LV-A2 LV-A2

7027 R-33.28 LV-A3 LV-A3

7028 R-33.29 LV-A4 LV-A4


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7029 R-33.30 LV-A5 LV-A5

7030 R-33.31 DC-1 DC-1

7031 R-33.32 BAT-1 BAT-1

7032 R-33.33 MCC-A100 (H) MCC-A100 (H)

7033 R-33.34 MCC-A200 (H) MCC-A200 (H)

7034 R-33.35 MCC-A300 (H) MCC-A300 (H)

7035 R-33.36 MCC-A400 (H) MCC-A400 (H)

7036 R-33.37 MCC-A500 (H) MCC-A500 (H)

7037 R-33.38 MCC-A600 (H) MCC-A600 (H)

7038 R-33.39 MCC-A700 (H) MCC-A700 (H)

7039 R-33.40 MCC-A800 (H) MCC-A800 (H)

7040 R-33.41 BASE DE MCC BASE OF MCC

7104 R-33.42 CIRCUITO LIP 1 LIP 1Circuit

7105 R-33.43 CIRCUITO LIP 2 LIP 2Circuit

7106 R-33.44 CIRCUITO LIP 3 LIP 3Circuit

7043 R-33.45 PIEZAS DE REPUESTO SPARE PARTS

7107 R-33.46 DISTRIBUTE POWER TRANSPORT COST DISTRIBUTE POWER TRANSPORT COST

7044 R-33.47 GENERADOR DE ENERGÍA GENERATOR

7108 R-33.48 CONTENEDOR CONTAINER

7109 R-33.49 TANQUE COMBUSTIBLE FUEL TANK

C34 C-34. INSTALACIONES ELECTRONICAS - EDIFICIO ADMINISTRATIVO C- 34. ELECTRONIC WORKS OF ADMINISTRATION BUILDING - WWTP

1201 R-34.1 TUBERIA CONDUIT 1/2" CONDUIT 1/2"

1202 R-34.2 TUBERIA CONDUIT 3/4" (PROVISION E INSTALACION) CONDUIT 3/4" (SUPPLY AND INSTALLATION)

1306 R-34.3 CANALIZACIÓN CENTRAL (ESCALERRILLA, TIPO MALLA Ó ELECTROCANAL) Y ACCESORIOS CENTRAL CHANNEL (LADDER, MESH OR ELECTROCHANNEL TYPE) AND ACCESSORIES

1308 R-34.4 CABLEADO ESTRUCTURADO CAT 6 STRUCTURAL CABLE CAT 6

PRUEBA UNIDIRECCIONAL DE TRANSMISIÓN FIBRA ÓPTICA POR PUNTA Y VENTANA + PRUEBA DE


2058 R-34.5 UNIDIRECTIONAL TEST OF TRANSMISSION BY OPTICAL FIBER BY POINT AND WINDOW+ FORCE TEST
POTENCIA

4144 R-34.6 INSTALACION DE RACK DE PARED 12 UR INSTALLATION OF WALL RACK 12 UR

4145 R-34.7 SWITCH CAPA 2-24 PUERTOS 10/100/1000 12 PUERTOS POE 2 PUERTOS SFP SWITCH LAYER 2-24 PORTS 10/100/1000 12 POE PORTS 2 SFP PORTS

4147 R-34.8 PATCH PANEL PATCH PANNEL

4154 R-34.9 CERTIFICACION DE PUNTOS DE DATOS DATA POINT CERTIFICATION


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4158 R-34.10 INSTALACION Y CONFIGURACION DEL SISTEMA CAMARAS IP INSTALLATION AND CONFIGURATION OF IP CAMERA SYSTEM

4206 R-34.11 SIRENA 65dB, 110V ALARM 65dB, 110v

4209 R-34.12 PANEL DE ALARMA CENTRAL DE INCENDIO DIRECCIONABLE CENTRAL FIRE ALARM PANEL, DIRECTIONABLE

4210 R-34.13 LUZ ESTROBOSCOPICA CON SIRENA STROB LIGHT WITH ALARM

4211 R-34.14 DETECTOR HUMO FOTOELÉCTRICO PHOTOELECTRIC SMOKE DETECTOR

4212 R-34.15 ESTACION MANUAL DE INCENDIOS FIREFIGTHING MANUAL STATION

4213 R-34.16 CABLE 2X16 AWG ANTIFLAMA CABLE 2X16 AWG FIRE RETARDANT

4214 R-34.17 MODULO DE CONTROL CONTROL MODULE

4215 R-34.18 MODULO AISLAMIENTO ISOLATION MODULE

4582 R-34.19 CABLE UTP CAT 6 CABLE UTP CAT 6

4583 R-34.20 RACK DE PISO 44 UR FLOOR RACK 44 UR

4584 R-34.21 PATCH CORD 3FT CAT 6 PATCH CORD 3FT CAT 6

4585 R-34.22 PATCH CORD 7FT CAT 6 PATCH CORD 7FT CAT 6

4586 R-34.23 ACCESS POINT ACCESS POINT

4587 R-34.24 SISTEMA DE CLIMATIZACION CLIME SYSTEM

4588 R-34.25 SISTEMA PISO FALSO FALSE FLOOR SYSTEM

4589 R-34.26 CANALIZACION POR TIERRA 2X2" PVC ELECTRONICO CONDUIT BY GROUND 2X2" PVC ELECTRONIC

4590 R-34.27 CAJA DE REVISION HORMIGON CON TAPA (0.60X0.60X0.60) SIMPLE CONCRETE CHECK BOX WITH COVER (0.60X0.60X0.60)

4591 R-34.28 TUBERIA CONDUIT 1" CON ACCESORIOS CONDUIT 1" WITH ACCESSORIES

4592 R-34.29 TUBERÍA EMT DE 1 1/4" CON ACCESORIOS EMT PIPE 1 1/4" WITH ACCESSORIES

4593 R-34.30 TUBERIA EMT DE 1 1/2" CON ACCESORIOS EMT PIPE 1 1/2" WITH ACCESSORIES

4594 R-34.31 BANDEJA DE PISO PULL BOX (BANDEJA DE PISO)

4595 R-34.32 CENTRAL TELEFÓNICA IP IP TELEPHONIC CENTRAL

4596 R-34.33 TELÉFONO IP IP TELEPHONE

4597 R-34.34 LUZ DE EMERGENCIA EMERGENCY LIGHTNING

4598 R-34.35 LETRERO LUMINOSO DE SALIDA ELECTRIC EXIT SIGN

4599 R-34.36 INSTALACIÓN Y CONFIGURACIÓN CAMARA IP BALA BULLET IP CAMERA, INSTALLATION AND CONFIGURATION

4600 R-34.37 BOTON DE SALIDA EXIT BUTTON

4601 R-34.38 CERRADURA ELECTROMAGNETICA ELECTROMAGNETIC LOCK

4602 R-34.39 SENSOR DE MOVIMIENTO MOVEMENT SENSOR


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4603 R-34.40 MOTOR PUERTA DOOR MOTOR

4604 R-34.41 INSTALACIÓN Y CONFIGURACIÓN CONTROL DE ACCESO CON HUELLA ACCESS CONTROL WITH FINGERPRINT INSTALLATION AND CONFIGURATION

4605 R-34.42 SALIDA PARA AUDIO F4 AUDIO EXIT F4

4606 R-34.43 PARLANTE TIPO CAJA CON TAP DE POTENCIA F4 SPEAKER TYPE BOX WITH TAP WITH POTENCY F4

4607 R-34.44 AMPLIFICADOR DE AUDIO F4 AUDIO F4 AMPLIFIER

4608 R-34.45 CENTRAL CONTROLADORA AUDIO F4 AUDIO F4 CENTRAL CONTROL

4609 R-34.46 CABLE DE AUDIO F4 AUDIO CABLE F4

4610 R-34.47 ENRUTADOR / EXPANSOR DE ZONAS F4 ROUTER/ ZONES EXPANSON F4

4611 R-34.48 PARLANTE TIPO MEGAFONO EXTERIOR F4 SPEAKER TYPE MEGAPHONE EXTERIOR F4

4612 R-34.49 ESTACION DE LLAMADA F4 CALLING STATION F4

4613 R-34.50 KIT CONTROL REMOTO F4 REMOTE CONTROL KIT F4

4614 R-34.51 FUENTE DE SONIDO F4 SOUND SOURCE F4

4615 R-34.52 PUESTA EN MARCHA Y CONFIGURACION SONIDO F4 COMMISSIONING AND CONFIGURATION SOUND F4

4616 R-34.53 SISTEMA DE GRABACION NVR RECORDING SYSTEM NVR

4617 R-34.54 MONITOR MONITOR

4618 R-34.55 TV MONITOREO MONITORING TV

4619 R-34.56 PUNTO DE INCENDIO FIREFIGTHING POINT

4620 R-34.57 SWITCH 24 PUERTOS + POE SWITCH 24 PORTS + POE

4621 R-34.58 FIBRA OPTICA OPTICAL FIBER

4621 R-34.59 FIBRA OPTICA OPTICAL FIBER

4622 R-34.60 ODF ODF

4623 R-34.61 Rack para exterior 12 ur EXTERIOR RACK 12 UR

4624 R-34.62 CÁMARA TIPO DOMO PTZ CAMAR TYPE DOME PTZ

4626 R-34.63 INSTALACIÓN Y PUESTAEN MARCHA DETECCION DE INCENDIOS FIREFIGTHING DETECTION INSTALLATION AND COMMISSIONING

4627 R-34.64 INSTALACIÓN Y CONECTIVIDAD PARA SERVICIO DE INTERNET SATELITAL SATELLITAL INTERNET SERVICE INSTALLATION AND CONNECTIVITY

C35 C-35. INSTRUMENTACIÓN Y SISTEMA DE CONTROL C-35. INSTRUMENTATION AND CONTROL SYSTEM -WWTP

7046 R-35.1 INSTALACIÓN DE TANQUES DE DESARENADOR & CRIBADO GRIT REMOVAL & SCREENING TANK FACILITY

7047 R-35.2 CLARIFICADOR PRIMARIO PRIMARY CLARIFIER

7048 R-35.3 BIO REACTOR Y EDIFICIO MULTIPROPOSITO BIO REACTOR & COMPLEX BUILDING

7049 R-35.4 CLARIFICADOR SECUNDARIO TIPO 2 SECONDARY CLARIFIER TYPE 2


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7050 R-35.5 INSTALACIÓN DE DESINFECIÓN PARA LA REUTILIZACIÓN DE AGUAS TRATADAS DISINFECTING TREATED WATER REUSE FACILITY

7051 R-35.6 INSTALACIÓN DE DESHIDRATACION DE LODOS SLUDGE DEWATERING FACILITY

7052 R-35.7 EDIFICIO ADMINISTRATIVO Y ETC. ADMINISTRATIVE BUILDING AND ETC.

7053 R-35.8 POS (Estación de trabajo) POS (PROCESS OPERATOR STATION)

7054 R-35.9 PROGRAMA DE SOFTWARE HMI SOFTWARE HMI PROGRAM

7055 R-35.10 SERVIDOR DE BASE DE DATOS DATA BASE SERVER

7056 R-35.11 PANTALLA LED - 50"(127cm) LED SCREEN -50"(127cm)

7057 R-35.12 IMPRESORA PRINTER

7058 R-35.13 RCS #1 (ESTACIÓN DE CONTROL REMOTO) RCS # 1 (REMOTE CONTROL STATION)

7059 R-35.14 RCS #2 (ESTACIÓN DE CONTROL REMOTO) RCS # 2 (REMOTE CONTROL STATION)

7060 R-35.15 EQUIPO DE RED NETWORK EQUIPMENT

7110 R-35.16 UPS #M,1,2 UPS#M(7.5KV), UPS#1(3KVA), UPS#2(3KVA)

7062 R-35.17 PIEZA DE REPUESTO SPARE PARTS

7063 R-35.18 HERRAMIENTAS DE MANTENIMIENTO MAINTENANCE TOOLS

7064 R-35.19 MEDICIÓN DE CAUDAL ( Tipo magnético ) 50A FLOW METER (MAGNETIC TYPE) 50A

7065 R-35.20 MEDICIÓN DE CAUDAL ( Tipo magnético ) 80A FLOW METER (MAGNETIC TYPE) 80A

7066 R-35.21 MEDICIÓN DE CAUDAL ( Tipo magnético ) 125A FLOW METER (MAGNETIC TYPE) 125A

7067 R-35.22 MEDICIÓN DE CAUDAL ( Tipo magnético ) 300A FLOW METER (MAGNETIC TYPE) 300A

7068 R-35.23 MEDICIÓN DE CAUDAL ( Ultrasovic Tipo ) 800A FLOW METER (ULTRASONIC TYPE) 800A

7111 R-35.24 MEDIDOR DE FLUJO FLOW METER (ULTRASONIC TYPE) 1000A

7069 R-35.25 MEDICIÓN DE CAUDAL (Tipo de orificio ) 200A FLOW METER (ORIFICE TYPE) 200 A

7070 R-35.26 MEDICIÓN DE NIVEL ( Ultrasovic Tipo ) LEVEL METER (ULTRASONIC TYPE)

7071 R-35.27 MEDIDOR DE PH PH METER

7072 R-35.28 MEDIDOR DE SS SS METER

7073 R-35.29 MEDIDOR DO DO METER

7074 R-35.30 MEDIDOR DE MLSS MLSS METER

7075 R-35.31 MEDIDOR DE DBO BOD METER

7076 R-35.32 INTERRUPTOR DE NIVEL ( Tipo flotador rápido ) LEVEL SWITCH (QUICK FLOAT TYPE)

7112 R-35.33 MDIDOR DE DENSIDAD DENSITY METER 80A

7077 R-35.34 MEDIDOR DE DENSIDAD 200A DENSITY METER 200A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7078 R-35.35 MEDIDOR DE DENSIDAD 300A DENSITY METER 300A

7079 R-35.36 PANEL LIP LIP PANEL

7080 R-35.37 PROTECTOR DE ENERGÍA POWER ARRESTER

7081 R-35.38 PARARRAYOS DE LA SEÑAL SIGNAL ARRESTER

7082 R-35.39 PARARRAYOS DE ENERGÍA UPS FIRST UPS POWER ARREST

7083 R-35.40 TARIFA DE INSTALACIÓN INSTALLATION FEE

7084 R-35.41 CALIBRACIÓN Y AJUSTE DEL INSTRUMENTO INSTRUMENT SETTING & CALIBRATION

7085 R-35.42 SUPERVISIÓN Y CAPACITACIÓN SUPERVISION AND TRAINING WORK

7086 R-35.43 COSTO DE EMBALAJE PACKING COST

7087 R-35.44 CÁMARA INTERIOR Y AMPLIACIÓN, INCLINACIÓN INTERIOR CHAMBER AND EXPANSION, INCLINATION

7088 R-35.45 CÁMARA AL AIRE LIBRE Y AMPLIACIÓN, INCLINACIÓN OUTDOOR CHAMBER AND EXPANSION, INCLINATION

7089 R-35.46 DVR (DIGITAL VIDEO RECORDER) HDD 1TB DVR (DIGITAL VIDEO RECORDER) HDD 1TB

7090 R-35.47 CONTROLADOR CONTROLLER

7091 R-35.48 MONITOR PTAR MONITOR WWTP

7092 R-35.49 POLO 6" X 4m POLE 6" X 4m

7093 R-35.50 ESCRITORIO DESK

C36 C-36. OBRA MECÁNICA - PTAR C-36. MECHANIC WORKS - WWTP

7500 R-36.1 CODO DE 45 GRADOS (FRP) D(i)=100mm 45 DEGREE ELBOW(FRP), 100A

7501 R-36.2 CODO DE 45 GRADOS (FRP) D(i)=125mm 45 DEGREE ELBOW(FRP), 125A

7502 R-36.3 CODO DE 45 GRADOS (FRP) D(i)=150mm 45 DEGREE ELBOW(FRP), 150A

7503 R-36.4 CODO DE 45 GRADOS (FRP) D(i)=200mm 45 DEGREE ELBOW(FRP), 200A

7504 R-36.5 CODO DE 45 GRADOS (FRP) D(i)=300mm 45 DEGREE ELBOW(FRP), 300A

7505 R-36.6 CODO DE 45 GRADOS (FRP) D(i)=350mm 45 DEGREE ELBOW(FRP), 350A

7506 R-36.7 CODO DE 45 GRADOS (FRP) D(i)=400mm 45 DEGREE ELBOW(FRP), 400A

7507 R-36.8 CODO DE 45 GRADOS (FRP) D(i)=450mm 45 DEGREE ELBOW(FRP), 450A

7508 R-36.9 CODO DE 90 GRADOS (FRP) D(i)=125mm 90 DEGREE ELBOW(FRP), 125A

7509 R-36.10 CODO DE 90 GRADOS (FRP) D(i)=150mm 90 DEGREE ELBOW(FRP), 150A

7510 R-36.11 CODO DE 90 GRADOS (FRP) D(i)=200mm 90 DEGREE ELBOW(FRP), 200A

7511 R-36.12 CODO DE 90 GRADOS (FRP) D(i)=300mm 90 DEGREE ELBOW(FRP), 300A

7512 R-36.13 CODO DE 90 GRADOS (FRP) D(i)=350mm 90 DEGREE ELBOW(FRP), 350A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7513 R-36.14 CODO DE 90 GRADOS (FRP) D(i)=400mm 90 DEGREE ELBOW(FRP), 400A

7514 R-36.15 CODO DE 90 GRADOS (FRP) D(i)=450mm 90 DEGREE ELBOW(FRP), 450A

7515 R-36.16 CODO DE 90 GRADOS (PE) D(i)=32mm 90 DEGREE ELBOW(PE), 32A

7516 R-36.17 CODO DE 90 GRADOS (SPP) D(i)=80mm 90 DEGREE ELBOW(SPP), 80A

7517 R-36.18 CODO DE 90 GRADOS (SPP) D(i)=100mm 90 DEGREE ELBOW(SPP), 100A

7518 R-36.19 CODO DE 90 GRADOS (SPP) D(i)=125mm 90 DEGREE ELBOW(SPP), 125A

7519 R-36.20 CODO DE 90 GRADOS (SPP) D(i)=200mm 90 DEGREE ELBOW(SPP), 200A

7520 R-36.21 CODO DE 90 GRADOS (SPP) D(i)=250mm 90 DEGREE ELBOW(SPP), 250A

7521 R-36.22 CODO DE 90 GRADOS (SPP) D(i)=400mm 90 DEGREE ELBOW(SPP), 400A

7522 R-36.23 CODO DE 90 GRADOS (STS) 10S D(i)=20mm 90 DEGREE ELBOW(STS)10S, 20A

7523 R-36.24 CODO DE 90 GRADOS (STS) 10S D(i)=32mm 90 DEGREE ELBOW(STS)10S, 32A

7524 R-36.25 CODO DE 90 GRADOS (STS) 10S D(i)=50mm 90 DEGREE ELBOW(STS)10S, 50A

7525 R-36.26 CODO DE 90 GRADOS (STS) 10S D(i)=80mm 90 DEGREE ELBOW(STS)10S, 80A

7526 R-36.27 CODO DE 90 GRADOS (STS) 10S D(i)=125mm 90 DEGREE ELBOW(STS)10S, 125A

7527 R-36.28 CODO DE 90 GRADOS (STS) 10S D(i)=150mm 90 DEGREE ELBOW(STS)10S, 150A

7528 R-36.29 CODO DE 90 GRADOS (STS) 10S D(i)=200mm 90 DEGREE ELBOW(STS)10S, 200A

7529 R-36.30 CODO DE 90 GRADOS (STS) 10S D(i)=250mm 90 DEGREE ELBOW(STS)10S, 250A

7530 R-36.31 CODO DE 90 GRADOS (STS) 10S D(i)=300mm 90 DEGREE ELBOW(STS)10S, 300A

7531 R-36.32 M16X190L PERNO DE ANCLAJE ANCHOR BOLT, M16X190L

7532 R-36.33 75X75X9T ANGULO (SS400) ANGLE(SS400), 75X75X9T

7533 R-36.34 VÁLVULA DE BOLA (LATÓN) D(i)=20mm BALL VALVE(BRASS), 20A

7534 R-36.35 VÁLVULA DE BOLA (LATÓN) D(i)=80mm BALL VALVE(BRASS), 80A

7535 R-36.36 VÁLVULA DE BOLA (PVC) D(i)=32mm BALL VALVE(PVC), 32A

7536 R-36.37 PLACA BASE (SS400) 9T BASE PLATE(SS400), 9T

7537 R-36.38 BRIDA BL. (PE) D(i)=32mm BL.FLANGE(PE), 32A

7538 R-36.39 BRIDA BL. (SS400) D(i)=80mm BL.FLANGE(SS400), 80A

7539 R-36.40 BRIDA BL. (SS400) D(i)=125mm BL.FLANGE(SS400), 125A

7540 R-36.41 BRIDA BL. (SS400) D(i)=200mm BL.FLANGE(SS400), 200A

7541 R-36.42 BRIDA BL. (SS400) D(i)=400mm BL.FLANGE(SS400), 400A

7542 R-36.43 BRIDA BL. (STS) D(i)=32mm BL.FLANGE(STS), 32A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7543 R-36.44 BRIDA BL. (STS) D(i)=50mm BL.FLANGE(STS), 50A

7544 R-36.45 BRIDA BL. (STS) D(i)=80mm BL.FLANGE(STS), 80A

7545 R-36.46 BRIDA BL. (STS) D(i)=125mm BL.FLANGE(STS), 125A

7546 R-36.47 BRIDA BL. (STS) D(i)=150mm BL.FLANGE(STS), 150A

7547 R-36.48 BRIDA BL. (STS) D(i)=200mm BL.FLANGE(STS), 200A

7548 R-36.49 BRIDA BL. (STS) D(i)=300mm BL.FLANGE(STS), 300A

7549 R-36.50 BRIDA BL. (STS) D(i)=400mm BL.FLANGE(STS), 400A

7550 R-36.51 VÁLVULA DE MARIPOSA D(i)=80mm BUTTERFLY VALVE, 80A

7551 R-36.52 VÁLVULA DE MARIPOSA D(i)=100mm BUTTERFLY VALVE, 100A

7552 R-36.53 VÁLVULA DE MARIPOSA D(i)=200mm BUTTERFLY VALVE, 200A

7553 R-36.54 VÁLVULA DE MARIPOSA D(i)=250mm BUTTERFLY VALVE, 250A

7554 R-36.55 CANAL 200X80X7.5T (SS400) CHANNEL(SS400), 200X80X7.5T

7555 R-36.56 PLACA CHECK (SS400) 3.2T CHECK PLATE(SS400), 3.2T

7556 R-36.57 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=50mm CHECK VALVE(CAST-STEEL)10K, 50A

7557 R-36.58 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=80mm CHECK VALVE(CAST-STEEL)10K, 80A

7558 R-36.59 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=100mm CHECK VALVE(CAST-STEEL)10K, 100A

7559 R-36.60 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=125mm CHECK VALVE(CAST-STEEL)10K, 125A

7560 R-36.61 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=300mm CHECK VALVE(CAST-STEEL)10K, 300A

7561 R-36.62 INSTALACIÓN DE DRENAJE DE CONDENSADO D(i)=50mm CONDENSATE DRAIN INSTALLATION, 50A

7562 R-36.63 INSTALACIÓN AMORTIGUADOR D(i)=100mm DAMPER INSTALLATION, 100A

7563 R-36.64 INSTALACIÓN AMORTIGUADOR D(i)=150mm DAMPER INSTALLATION, 150A

7564 R-36.65 INSTALACIÓN AMORTIGUADOR D(i)=200mm DAMPER INSTALLATION, 200A

7565 R-36.66 AMORTIGUADOR (STS) D(i)=100mm DAMPER(STS), 100A

7566 R-36.67 AMORTIGUADOR (STS) D(i)=150mm DAMPER(STS), 150A

7567 R-36.68 AMORTIGUADOR (STS) D(i)=200mm DAMPER(STS), 200A

7568 R-36.69 JUNTA CONTRABRIDA D(i)=20mm FLANGE JOINT, 20A

7569 R-36.70 JUNTA CONTRABRIDA D(i)=32mm FLANGE JOINT, 32A

7570 R-36.71 JUNTA CONTRABRIDA D(i)=50mm FLANGE JOINT, 50A

7571 R-36.72 JUNTA CONTRABRIDA D(i)=65mm FLANGE JOINT, 65A

7572 R-36.73 JUNTA CONTRABRIDA D(i)=80mm FLANGE JOINT, 80A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7573 R-36.74 JUNTA CONTRABRIDA D(i)=100mm FLANGE JOINT, 100A

7574 R-36.75 JUNTA CONTRABRIDA D(i)=125mm FLANGE JOINT, 125A

7575 R-36.76 JUNTA CONTRABRIDA D(i)=150mm FLANGE JOINT, 150A

7576 R-36.77 JUNTA CONTRABRIDA D(i)=200mm FLANGE JOINT, 200A

7577 R-36.78 JUNTA CONTRABRIDA D(i)=250mm FLANGE JOINT, 250A

7578 R-36.79 JUNTA CONTRABRIDA D(i)=300mm FLANGE JOINT, 300A

7579 R-36.80 JUNTA CONTRABRIDA D(i)=400mm FLANGE JOINT, 400A

7580 R-36.81 BRIDA (FRP) D(i)=100mm FLANGE(FRP), 100A

7581 R-36.82 BRIDA (FRP) D(i)=150mm FLANGE(FRP), 150A

7582 R-36.83 BRIDA (FRP) D(i)=200mm FLANGE(FRP), 200A

7583 R-36.84 BRIDA (FRP) D(i)=450mm FLANGE(FRP), 450A

7584 R-36.85 BRIDA (FRP) D(i)=600mm FLANGE(FRP), 600A

7585 R-36.86 BRIDA (PE) D(i)=32mm FLANGE(PE), 32A

7586 R-36.87 BRIDA (SS400) D(i)=80mm FLANGE(SS400), 80A

7587 R-36.88 BRIDA (SS400) D(i)=100mm FLANGE(SS400), 100A

7588 R-36.89 BRIDA (SS400) D(i)=125mm FLANGE(SS400), 125A

7589 R-36.90 BRIDA (SS400) D(i)=200mm FLANGE(SS400), 200A

7590 R-36.91 BRIDA (SS400) D(i)=250mm FLANGE(SS400), 250A

7591 R-36.92 BRIDA (SS400) D(i)=400mm FLANGE(SS400), 400A

7592 R-36.93 BRIDA (STS) 10K D(i)=20mm FLANGE(STS)10K, 20A

7593 R-36.94 BRIDA (STS) 10K D(i)=32mm FLANGE(STS)10K, 32A

7594 R-36.95 BRIDA (STS) 10K D(i)=50mm FLANGE(STS)10K, 50A

7595 R-36.96 BRIDA (STS) 10K D(i)=65mm FLANGE(STS)10K, 65A

7596 R-36.97 BRIDA (STS) 10K D(i)=80mm FLANGE(STS)10K, 80A

7597 R-36.98 BRIDA (STS) 10K D(i)=100mm FLANGE(STS)10K, 100A

7598 R-36.99 BRIDA (STS) 10K D(i)=125mm FLANGE(STS)10K, 125A

7599 R-36.100 BRIDA (STS) 10K D(i)=150mm FLANGE(STS)10K, 150A

7600 R-36.101 BRIDA (STS) 10K D(i)=200mm FLANGE(STS)10K, 200A

7601 R-36.102 BRIDA (STS) 10K D(i)=250mm FLANGE(STS)10K, 250A

7602 R-36.103 BRIDA (STS) 10K D(i)=300mm FLANGE(STS)10K, 300A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7603 R-36.104 BRIDA (STS) 10K D(i)=400mm FLANGE(STS)10K, 400A

7604 R-36.105 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=50mm FLEX. INSTALLATION(FLANGE TYPE), 50A

7605 R-36.106 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=80mm FLEX. INSTALLATION(FLANGE TYPE), 80A

7606 R-36.107 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=100mm FLEX. INSTALLATION(FLANGE TYPE), 100A

7607 R-36.108 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=125mm FLEX. INSTALLATION(FLANGE TYPE), 125A

7608 R-36.109 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=200mm FLEX. INSTALLATION(FLANGE TYPE), 200A

7609 R-36.110 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=250mm FLEX. INSTALLATION(FLANGE TYPE), 250A

7610 R-36.111 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=300mm FLEX. INSTALLATION(FLANGE TYPE), 300A

7611 R-36.112 INSTALACIÓN JUNTA FLEXIBLE DE D(i)=100mm FLEX. INTALLATION, 100A

7612 R-36.113 INSTALACIÓN JUNTA FLEXIBLE DE D(i)=150mm FLEX. INTALLATION, 150A

7613 R-36.114 JUNTA FLEXIBLE (GOMA) D(i)=100mm FLEXIBLE JOINT(RUBBER), 100A

7614 R-36.115 JUNTA FLEXIBLE (GOMA) D(i)=150mm FLEXIBLE JOINT(RUBBER), 150A

7615 R-36.116 JUNTA FLEXIBLE (STS) 10K D(i)=50mm FLEXIBLE JOINT(STS)10K, 50A

7616 R-36.117 JUNTA FLEXIBLE (STS) 10K D(i)=80mm FLEXIBLE JOINT(STS)10K, 80A

7617 R-36.118 JUNTA FLEXIBLE (STS) 10K D(i)=100mm FLEXIBLE JOINT(STS)10K, 100A

7618 R-36.119 JUNTA FLEXIBLE (STS) 10K D(i)=125mm FLEXIBLE JOINT(STS)10K, 125A

7619 R-36.120 JUNTA FLEXIBLE (STS) 10K D(i)=200mm FLEXIBLE JOINT(STS)10K, 200A

7620 R-36.121 JUNTA FLEXIBLE (STS) 10K D(i)=250mm FLEXIBLE JOINT(STS)10K, 250A

7621 R-36.122 JUNTA FLEXIBLE (STS) 10K D(i)=300mm FLEXIBLE JOINT(STS)10K, 300A

7622 R-36.123 JUNTA CONTRABRIDA FRP D(i)=100mm FRP FLANGE JOINT, 100A

7623 R-36.124 JUNTA CONTRABRIDA FRP D(i)=150mm FRP FLANGE JOINT, 150A

7624 R-36.125 JUNTA CONTRABRIDA FRP D(i)=200mm FRP FLANGE JOINT, 200A

7625 R-36.126 JUNTA CONTRABRIDA FRP D(i)=400mm FRP FLANGE JOINT, 400A

7626 R-36.127 JUNTA CONTRABRIDA FRP D(i)=450mm FRP FLANGE JOINT, 450A

7627 R-36.128 INSTALACIÓN DE TUBERÍA FRP D(i)=100mm FRP PIPE INSTALLATION, 100A

7628 R-36.129 INSTALACIÓN DE TUBERÍA FRP D(i)=125mm FRP PIPE INSTALLATION, 125A

7629 R-36.130 INSTALACIÓN DE TUBERÍA FRP D(i)=150mm FRP PIPE INSTALLATION, 150A

7630 R-36.131 INSTALACIÓN DE TUBERÍA FRP D(i)=200mm FRP PIPE INSTALLATION, 200A

7631 R-36.132 INSTALACIÓN DE TUBERÍA FRP D(i)=250mm FRP PIPE INSTALLATION, 250A

7632 R-36.133 INSTALACIÓN DE TUBERÍA FRP D(i)=300mm FRP PIPE INSTALLATION, 300A
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7633 R-36.134 INSTALACIÓN DE TUBERÍA FRP D(i)=350mm FRP PIPE INSTALLATION, 350A

7634 R-36.135 INSTALACIÓN DE TUBERÍA FRP D(i)=400mm FRP PIPE INSTALLATION, 400A

7635 R-36.136 INSTALACIÓN DE TUBERÍA FRP D(i)=450mm FRP PIPE INSTALLATION, 450A

7636 R-36.137 INSTALACIÓN DE TUBERÍA FRP D(i)=600mm FRP PIPE INSTALLATION, 600A

7637 R-36.138 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=50mm GATE VALVE(CAST-IRON)10K, 50A

7638 R-36.139 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=80mm GATE VALVE(CAST-IRON)10K, 80A

7639 R-36.140 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=125mm GATE VALVE(CAST-IRON)10K, 125A

7640 R-36.141 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=200mm GATE VALVE(CAST-IRON)10K, 200A

7641 R-36.142 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=250mm GATE VALVE(CAST-IRON)10K, 250A

7642 R-36.143 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=300mm GATE VALVE(CAST-IRON)10K, 300A

7643 R-36.144 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=400mm GATE VALVE(CAST-IRON)10K, 400A

7644 R-36.145 VIGA H (SS400) 200X100X8mm H BEAM(SS400), 200X100X8T

7645 R-36.146 CAMPANA (FRP) 500X500mm HOOD(FRP), 500X500A

7646 R-36.147 INSTALACIÓN DEL CONECTOR DE MANGUERA D(i)=20mm HOSE CONNECTOR INSTALLATION, 20A

7647 R-36.148 EQUIPOS DE LABORATORIO LABORATORY EQUIPMENTS,

7648 R-36.149 M-101 PUERTA PRINCIPAL MOTORIZADA (PARADA DE EMERGENCIA), TAMAÑO: W1.0M × H1.0M M-101 MAIN GATE, MOTORIZED SLUICE GATE (EMERGENCY SHUTDOWN GATE), SIZE : W1.0M × H1.0M

7649 R-36.150 M-102 COMPUERTA DE DISTRIBUCIÓN MOTORIZADA (CONTROL DE LA ABERTURA), TAMAÑO: Φ1,0 M M-102 DISTRIBUTION GATE, MOTORIZED SLUICE GATE(OPENING CONTROL), SIZE :Φ1.0M

7650 R-36.151 M-103 COMPUERTA DE ENTRADA MOTORIZADA , TAMAÑO: W1.0M × H1.0M M-103 INLET GATE, MOTORIZED SLUICE GATE, SIZE : W1.0M × H1.0M

7651 R-36.152 M-104 CRIBA GRUESA (BARRA TIPO PLANA), LA BARRA ESPACIADO DE 50 MM, TAMAÑO: W1.0M × H3.5M M-104 COARSE SCREEN, AUTO BAR SCREEN(FLAT BAR TYPE), BAR SPACING 50MM, SIZE : W1.0M × H3.5M

7652 R-36.153 M-105 TRANSPORTADOR DE CRIBADO GRUESO (A) A TRAVÉS DE TIPO CINTA, TAMAÑO: W0.6M × L7.0M M-105 COARSE SCREENING CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6M × L7.0M

M-106 TRANSPORTADOR DE CRIBADO GRUESO (B) A TRAVÉS DE TIPO CINTA, TAMAÑO: W0.6 M × L7.0M,
7653 R-36.154 M-106 COARSE SCREENING CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M, ANGLE 20˚
ÁNGULO DE 20 °
M-107 DESARENADOR DE CUBO-V Y CADENA INTERMINABLE CON VUELO, TAMAÑO: W1.5M X H4.0M X
7654 R-36.155 M-107 GRIT REMOVER, V-BUCKET ENDLESS CHAIN FLIGHT, SIZE : W1.5M × H4.0M X L10.0M
L10.0M

7655 R-36.156 M-108 CANAL TRANSPORTADOR (A) TIPO CINTA, TAMAÑO: W0.6M × L7.0M M-108 GRIT CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6M × L7.0M

7656 R-36.157 M-109 CANAL TRANSPORTADOR (B) TIPO CINTA , TAMAÑO: W0.6 M × L7.0M, ÁNGULO DE 20 ° M-109 GRIT CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M, ANGLE 20˚

M-110 PANTALLA DE BARRA FINA (BARRA TIPO PLANA), BARRA DE ESPACIAMIENTO DE 10 M M, TAMAÑO:
7657 R-36.158 M-110 FINE SCREEN, AUTO BAR SCREEN(FLAT BAR TYPE), BAR SPACING 10MM, SIZE : W1.0M × H3.5M
W1.0M × H3.5M

7658 R-36.159 M-111 TRANSPORTADOR DE CRIBADO FINA (A) A TRAVÉS DE CINTURÓN DE TIPO, TAMAÑO: W0.6 M × L7.0M M-111 FINE SCREENING CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M

M-112 TRANSPORTADOR DE CRIBADO FINA (B) A TRAVÉS DE CINTURÓN DE TIPO, TAMAÑO: W0.6 M × L7.0M,
7659 R-36.160 M-112 FINE SCREENING CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M, ANGLE 20˚
ÁNGULO DE 20 °

7660 R-36.161 M-113 CONTENEDOR DE BRAZO TIPO RODILLO, CAPACIDAD: PARA 11TONS M-113 CONTAINER, ARM ROLL TYPE, CAPACITY : FOR 11TONS

7661 R-36.162 M-114 ESCLUSA DE SALIDA DE COMPUERTA MANUAL, TAMAÑO: W1.0M × H1.0M M-114 OUTLET GATE, MANUAL SLUICE GATE, SIZE : W1.0M × H1.0M

7662 R-36.163 M-201 COMPUERTA MANUAL DE PUERTA DE ENTRADA , TAMAÑO: Φ 0,5 M M-201 INLET GATE, MANUAL SLUICE GATE, SIZE : Φ0.5M
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7663 R-36.164 M-202 CENTRO COLECTOR DE LODOS DE TIPO IMPULSIÓN, TAMAÑO: D16.0M × 4.0MHE M-202 SLUDGE COLLECTOR, CENTER DRIVE TYPE, SIZE : D16.0M × 4.0MHE

7664 R-36.165 M-203 VÁLVULA DE ESCAPE DE LODOS CON PUERTA MOTORIZADA, TAMAÑO: Φ 200 MM × 10 KG / ㎠ M-203 SLUDGE EXHAUST VALVE, MOTORIZED GATE VALVE, SIZE : Φ200MM × 10 KG/㎠

M-204 BOMBA HORIZONTAL CENTRÍFUGA DE LODOS CRUDOS CON TORNILLO IMPULSOR, CAPACIDAD:
7665 R-36.166 M-204 RAW SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER, CAPACITY : 0.21㎥/MIN × 5MH
0,21 ㎥ / MIN × 5MH
M-205 LODO CRUDO SALIDA VÁLVULA MARIPOSA MOTORIZADA VÁLVULA (CONTROL DE LA ABERTURA),
7666 R-36.167 M-205 RAW SLUDGE OUTLET VALVE, MOTORIZED BUTTERFLY VALVE(OPENING CONTROL), SIZE : Φ80MM × 10 KG/㎠
TAMAÑO: Φ80 MM × 10 KG / ㎠
M-206 MONTACARGAS DE ESCORIA DE 1 TONELADA, LONGITUD DEL BRAZO: 2,5 M, ALTURA DE LEVANTE:
7667 R-36.168 M-206 SCUM HOIST, JIB CRANE 1TON, ARM LENGTH : 2.5M, LIFT HEIGHT : 5.0M
5.0 M

7668 R-36.169 M-207 ESPUMA ENVASE CAJA DE ACOPLAMIENTO STS, TAMAÑO: 0.1 ㎥ M-207 SCUM CONTAINER, STS MESH BOX, SIZE : 0.1㎥

7669 R-36.170 M-208 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-208 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7670 R-36.171 M-209 BOMBA SUMIDERO DE MEDIDOR DE FLUJO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-209 FLOWMETER SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7671 R-36.172 M-210 COMPUERTAS DE MANTENIMIENTO DE ESCLUSA, TAMAÑO: W0.8M × H0.8M M-210 MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W0.8M × H0.8M

7672 R-36.173 M-211 BOMBA SUMERGIBLE DE DRENAJE (TIPO VORTEX), CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-211 MANHOLE PUMP, SUBMERSIBLE MOTOR PUMP(VORTEX TYPE), CAPACITY : 0.1㎥/MIN × 10MH

M-212 CONJUNTO DE COMPUERTAS MOTORIZADAS DE VERTEDERO (CONTROL DE APERTURA), TAMAÑO:


7673 R-36.174 M-212 CONJUNTION GATE, MOTORIZED SLUICE WEIR GATE(OPENING CONTROL), SIZE : W1.5M × H0.8M
W1.5M × H0.8M

7674 R-36.175 M-301 VLAVULA DE COMPUERTA MOTORIZADA (CONTROL DE APERTURA), TAMAÑO: W1.0M × H1.0M M-301 INLET GATE, MOTORIZED SLUICE GATE(OPENING CONTROL), SIZE : W1.0M × H1.0M

7675 R-36.176 M-302 SOPLADOR TURBO (SOLA OPERANDO ETAPA TURBO TYPE,V.V.V.F), CAPACIDAD: 65 ㎥ / MIN X 6,
M-302 BLOWER, TURBO BLOWER( SINGLE STAGE TURBO TYPE,V.V.V.F OPERATNG), CAPACITY : 65㎥/MIN X 6,000MMAQ
000MMAQ
M-303 VÁLVULA MARIPOSA DE CONTROL DE AIRE MOTORIZADA (CONTROL DE LA ABERTURA),
7676 R-36.177 M-303 AIR CONTROL VALVE, MOTORIZED BUTTERFLY VALVE(OPENING CONTROL), SIZE : Φ200MM × 10 KG/㎠
TAMAÑO: Φ 200 MM × 10 KG / ㎠
M-304 DIFUSOR DE AIRE CON MEMBRANA DISCO FINO (CON EL DIFUSOR DE TUBERÍA), CAPACIDAD: 120 ~
7677 R-36.178 M-304 AIR DIFFUSER, FINE BUBBLE MEMBRANE DISK(WITH DIFFUSER PIPING), CAPACITY: 120~150ℓ/MIN X 1,120EA
150ℓ/MIN X 1, 120U
M-305 CUARTO DEL POLIPASTO MONORAIL DEL VENTILADOR , CAPACIDAD: 2 TONELADAS X LARGO 42 M X
7678 R-36.179 M-305 HOIST OF BLOWER ROOM, MONORAIL HOIST, CAPACITY : 2TON X LENGTH 42M X LIFT HEIGHT 4M
4 M DE ALTURA

7679 R-36.180 M-306 SISTEMA DE LIMPIEZA FILTRO DE AIRE, TIPO CAPACIDAD: 130 ㎥ / MIN M-306 AIR CLEANING FILTER, STATIC ELECTRICITY, TYPE CAPACITY : 130㎥/MIN

7680 R-36.181 M-307 PAC BOMBA DE DIAFRAGMA, CAPACIDAD: 0.13 L / MIN × 20MH M-307 PAC PUMP, DIAPHRAM PUMP, CAPACITY : 0.13L/MIN × 20MH

7681 R-36.182 M-308 PAC TANQUE CILINDRICO PE, CAPACIDAD: 1 ㎥ M-308 PAC TANK, CYLINDRICAL PE TANK, CAPACITY : 1㎥

7682 R-36.183 M-309 BOMBA DE DIAFRAGMA DE NAOH , CAPACIDAD: 0.75 L / MIN × 20MH M-309 NAOH PUMP, DIAPHRAM PUMP, CAPACITY : 0.75L/MIN × 20MH

7683 R-36.184 M-310 TANQUE CILÍNDRICO DE PE PARA NAOH, CAPACIDAD: 3 ㎥ M-310 NAOH TANK, CYLINDRICAL PE TANK, CAPACITY : 3㎥

7684 R-36.185 M-311 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-311 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7685 R-36.186 M-312 BOMBA SUMERGIBLE SUMIDERO PARA MEDICIÓN DE FLUJO, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-312 FLOWMETERSUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7686 R-36.187 M-401 COMPUERTA MANUAL DE PUERTA DE ENTRADA , TAMAÑO: Φ 0,5 M M-401 INLET GATE, MANUAL SLUICE GATE, SIZE : Φ0.5M

7687 R-36.188 M-402 CENTRO COLECTOR DE IMPULSIÓN DE LODOS, TAMAÑO: D17M × 4.5MHE M-402 SLUDGE COLLECTOR, CENTER DRIVE TYPE, SIZE : D17M × 4.5MHE

7688 R-36.189 M-403 VÁLVULA DE ESCAPE DE LODO CON PUERTA MOTORIZADA, TAMAÑO: Φ 200 MM × 10 KG / ㎠ M-403 SLUDGE EXHAUST VALVE, MOTORIZED GATE VALVE, SIZE : Φ200MM × 10 KG/㎠

M-404 BOMBA HORIZONTAL CENTRÍFUGA CON TORNILLO IMPULSOR PARA EXCESO DE LODOS ,
7689 R-36.190 M-404 EXCESS SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER, CAPACITY : 1.0㎥/MIN × 5MH
CAPACIDAD: 1.0 ㎥ / MIN ×5MH
M-405 VÁLVULA MARIPOSA MOTORIZADA PARA SALIDA DE EXCESO DE LODOS (CONTROL DE LA
7690 R-36.191 M-405 EXCESS SLUDGE OUTLET VALVE, MOTORIZED BUTTERFLY VALVE(OPENING CONTROL), SIZE : Φ125MM × 10 KG/㎠
ABERTURA), TAMAÑO: Φ 125 MM × 10 KG / ㎠
M-406 BOMBA PARA RETORNO DE LODOS CON TORNILLO CENTRÍFUGO HORIZONTAL (VVVF), CAPACIDAD:
7691 R-36.192 M-406 RETURN SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER(VVVF), CAPACITY : 6.4㎥/MIN × 8MH
6.4 ㎥ / MIN × 8MH

7692 R-36.193 M-407 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-407 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

M-408 MANTENIMIENTO POLIPASTO MONORRIEL, CAPACIDAD: 1 TONELADA X LONGITUD 10 M X 6 M DE


7693 R-36.194 M-408 MAINTENANCE HOIST, MONORAIL HOIST, CAPACITY : 1TON X LENGTH 10M X LIFT HEIGHT 6M
ALTURA

7694 R-36.195 M-409 PUERTA MANUAL DE MANTENIMIENTO CON COMPUERTAS DE ESCLUSA, TAMAÑO: W0.8M × H0.8M M-409 MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W0.8M × H0.8M

7695 R-36.196 M-410 MONTACARGAS DE ESCORIA 1 TONELADA, LONGITUD DEL BRAZO: 2,5 M, ALTURA DE LEVANTE: 5.0 M M-410 SCUM HOIST, JIB CRANE 1TON, ARM LENGTH : 2.5M, LIFT HEIGHT : 5.0M

7696 R-36.197 M-411 ESPUMA ENVASE CAJA DE ACOPLAMIENTO STS, TAMAÑO: 0.1 ㎥ M-411 SCUM CONTAINER, STS MESH BOX, SIZE : 0.1㎥

7697 R-36.198 M-501 PUERTA DE ENTRADA MOTORIZADA PARA U/V, TAMAÑO: W0.6M × H0.8M M-501 U/V INLET GATE, MOTORIZED SLUICE GATE, SIZE : W0.6M × H0.8M

7698 R-36.199 M-502 PUERTA DE SALIDA MANUAL PARA VERTEDERO U/V, TAMAÑO: W0.6M × H0.8M M-502 U/V OUTLET GATE, MANUAL WEIR GATE, SIZE : W0.6M × H0.8M

M-503 DESINFECCIÓN HORIZONTAL TIPO ULTRAVIOLETA (U/V)(INCLUDE LIFTING DEVICE), CAPACIDAD:


7699 R-36.200 M-503 U/V DISINFECTION, HORIZONTAL TYPE ULTRAVIOLET(INCLUDE LIFTING DEVICE), CAPACITY : 20,000㎥/DAY
20.000 ㎥ / DÍA

7700 R-36.201 M-504 BOMBA DE DIAFRAGMA DE NAOCL , CAPACIDAD: 1,49 L / MIN × 20MH M-504 NAOCL PUMP, DIAPHRAM PUMP, CAPACITY : 1.49L/MIN × 20MH

7701 R-36.202 M-505 TANQUE CILINDRICO DE PE PARA NAOCL, CAPACIDAD: 15 ㎥ M-505 NAOCL TANK, CYLINDRICAL PE TANK, CAPACITY : 15㎥

7702 R-36.203 M-506 MANTENIMIENTO PUERTA MANUAL COMPUERTAS DE ESCLUSA, TAMAÑO: 1.0MW X 1.0MH M-506 MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : 1.0MW X 1.0MH

7703 R-36.204 M-507 BOMBA SUMIDERO SUMERGIBLE DE FLUJÓMETRO, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-507 FLOWMETER SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7704 R-36.205 M-601 BOMBA DE REFUERZO AUTOMÁTICO PARA SISTEMA DE SUMINISTRO DE AGUA, CAPACIDAD: 1.5 ㎥ /
M-601 WATER SUPPLY SYSTEM, AUTOMATIC BOOSTER PUMP, CAPACITY : 1.5㎥/MIN × 50MH × 3PUMPS
MIN× 50MH × 3PUMPS

7705 R-36.206 M-602 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-602 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

M-701 BOMBA PARA LODOS CON IMPULSOR DE TORNILLO CENTRÍFUGO HORIZONTAL (OPERACIÓN
7706 R-36.207 M-701 SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER (V.V.V.F OPERATING), CAPACITY : 0.7㎥/MIN × 15MH
V.V.V.F), CAPACIDAD: 0,7㎥ / MIN × 15MH

7707 R-36.208 M-702 DESHIDRATADOR TIPO CENTRÍFUGO, CAPACIDAD: 35 ㎥ / H M-702 DEHYDRATOR, CENTRIFUGE TYPE, CAPACITY : 35㎥/HR

7708 R-36.209 M-703 TRANPORTADOR DE TORTA (A) CINTA TIPO CANAL, TAMAÑO: W0.6M × L17.0M M-703 CAKE CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6M × L17.0M

7709 R-36.210 M-704 TRANPORTADOR DE TORTA (B) CINTA TIPO CANAL, TAMAÑO: W0.6M × L7.0M, ÁNGULO DE 20 ° M-704 CAKE CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6M × L7.0M, ANGLE 20˚

7710 R-36.211 M-705 CONTENEDOR DE TORTA CON BRAZO TIPO RODILLO, CAPACIDAD: PARA 11TONS M-705 CAKE CONTAINER, ARM ROLL TYPE, CAPACITY : FOR 11TONS

M-706 SISTEMA AUTOMATICO DE SOLUCIÓN DE POLÍMERO, CAPACIDAD: 7ANTIADHERENTE /H (TOLVA,


7711 R-36.212 M-706 POLYMER SOLUTION SYSTEM, AUTO SOLUTION SYSTEM, CAPACITY : 7㎏/H (HOPPER, FEEDER)
ALIMENTADOR)
M-707 BOMBA DE ALIMENTACIÓN DE POLÍMERO TIPO TORNILLO (OPERACIÓN V.V.V.F), CAPACIDAD: 40 L /
7712 R-36.213 M-707 POLYMER FEED PUMP, SINGLE SCREW PUMP(V.V.V.F OPERATING), CAPACITY : 40L/MIN × 10MH
MIN × 10MH

7713 R-36.214 M-708 VENTILADOR DEL TANQUE DE FOSAS DE LODOS, CAPACIDAD: 7.5 ㎥ / MIN X 6, 000MMAQ M-708 BLOWER OF SLUDGE TANK, ROOTS BLOWER, CAPACITY : 7.5㎥/MIN X 6,000MMAQ

7714 R-36.215 M-709 DIFUSOR DE AIRE (A) TIPO TUBERÍA, 50A X 8,4 M × 12U M-709 AIR DIFFUSER(A), PIPE TYPE, 50A × 8.4M × 12EA

7715 R-36.216 M-710 DIFUSOR DE AIRE (B) TIPO TUBERÍA, 50A X 1,9 M × 8U M-710 AIR DIFFUSER(B), PIPE TYPE, 50A × 1.9M × 8EA

7716 R-36.217 M-711 POLIPASTO MONORAIL DE MANTENIMIENTO, CAPACIDAD: 1 TONELADA X LARGO 80 M X ALTURA 8 M M-711 MAINTENANCE HOIST, MONORAIL HOIST, CAPACITY : 1TON X LENGTH 80M X LIFT HEIGHT 8M

M-712 POLIPASTO MONORRIEL DEL DESHIDRATADOR , CAPACIDAD: 7,5 TONELADAS X LONGITUD 50 M X 12


7717 R-36.218 M-712 HOIST OF DEHYDRATOR, MONORAIL HOIST, CAPACITY : 7.5TON X LENGTH 50M X LIFT HEIGHT 12M
M DE ALTURA
M-713 BOMBA FLOTANTE DE RETORNO HORIZONTAL CON TORNILLO CENTRIFUGO IMPULSOR, CAPACIDAD:
7718 R-36.219 M-713 SUPERNATANT RETURN PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER, CAPACITY : 1.1㎥/MIN×13MH
1.1 ㎥ / MIN ×13MH
M-714 ESCLUSA DE COMPUERTA MANUAL PARA MANTENIMIENTO DE TANQUE DE LODOS, TAMAÑO:
7719 R-36.220 M-714 SLUDGE TANK MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W1.0M × H1.0M
W1.0M × H1.0M
M-715 ESCLUSA DE COMPUERTA PARA MANTENIMIENTO DEL TANQUE AGUA DE RETORNO, TAMAÑO:
7720 R-36.221 M-715 RETURN WATER TANK MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W1.0M × H1.0M
W1.0M × H1.0M

7721 R-36.222 M-716 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-716 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7722 R-36.223 M-801 VENTILADOR DESODORIZADOR TURBO HORIZONTAL, TIPO CAPACIDAD: 180 ㎥ / MIN × 300MMAQ M-801 DEODORIZED FAN, HORIZONTAL TURBO, TYPE CAPACITY : 180㎥/MIN × 300MMAQ
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7723 R-36.224 M-802 DESODORIZADPR TIPO BIO-FILTRO, CAPACIDAD: 180 ㎥ / MIN M-802 DEODORIZER, BIO-FILTER TYPE, CAPACITY : 180㎥/MIN

7724 R-36.225 M-803 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH M-803 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH

7725 R-36.226 BOQUILLA DE D(i)=20mm NOZZLE, 20A

7726 R-36.227 PINTURA (MEZCLA LISTA) 2 VECES POR LADO PAINTING(READY MIXED), SIDE PER 2 TIMES

7727 R-36.228 PINTURA (MOHO-RESISTIR) 2 VECES POR LADO PAINTING(RUST-RESIST), SIDE PER 2 TIMES

7728 R-36.229 INSTALACIÓN DE TUBERÍA DE PE D(i)=32mm PE PIPE INSTALLATION, 32A

7729 R-36.230 PERFORACIÓN DE D(i)=600mm PERFORATION, 600A

7730 R-36.231 TUBERÍA (FRP) D(i)=100mm PIPE(FRP), 100A

7731 R-36.232 TUBERÍA (FRP) D(i)=125mm PIPE(FRP), 125A

7732 R-36.233 TUBERÍA (FRP) D(i)=150mm PIPE(FRP), 150A

7733 R-36.234 TUBERÍA (FRP) D(i)=200mm PIPE(FRP), 200A

7734 R-36.235 TUBERÍA (FRP) D(i)=250mm PIPE(FRP), 250A

7735 R-36.236 TUBERÍA (FRP) D(i)=300mm PIPE(FRP), 300A

7736 R-36.237 TUBERÍA (FRP) D(i)=350mm PIPE(FRP), 350A

7737 R-36.238 TUBERÍA (FRP) D(i)=400mm PIPE(FRP), 400A

7738 R-36.239 TUBERÍA (FRP) D(i)=450mm PIPE(FRP), 450A

7739 R-36.240 TUBERÍA (FRP) D(i)=600mm PIPE(FRP), 600A

7740 R-36.241 TUBERÍA (PE) D(i)=32mm PIPE(PE), 32A

7741 R-36.242 TUBERÍA (SPP) D(i)=80mm PIPE(SPP), 80A

7742 R-36.243 TUBERÍA (SPP) D(i)=100mm PIPE(SPP), 100A

7743 R-36.244 TUBERÍA (SPP) D(i)=125mm PIPE(SPP), 125A

7744 R-36.245 TUBERÍA (SPP) D(i)=200mm PIPE(SPP), 200A

7745 R-36.246 TUBERÍA (SPP) D(i)=250mm PIPE(SPP), 250A

7746 R-36.247 TUBERÍA (SPP) D(i)=300mm PIPE(SPP), 300A

7747 R-36.248 TUBERÍA (SPP) D(i)=350mm PIPE(SPP), 350A

7748 R-36.249 TUBERÍA (SPP) D(i)=400mm PIPE(SPP), 400A

7749 R-36.250 TUBERÍA (STS)10S D(i)=20mm (2.5T) PIPE(STS)10S, 20A(2.5T)

7750 R-36.251 TUBERÍA (STS)10S D(i)=32mm (2.8T) PIPE(STS)10S, 32A(2.8T)

7751 R-36.252 TUBERÍA (STS)10S D(i)=50mm (2.8T) PIPE(STS)10S, 50A(2.8T)

7752 R-36.253 TUBERÍA (STS)10S D(i)=80mm (3.0T) PIPE(STS)10S, 80A(3.0T)


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7753 R-36.254 TUBERÍA (STS)10S D(i)=100mm (3.0T) PIPE(STS)10S, 100A(3.0T)

7754 R-36.255 TUBERÍA (STS)10S D(i)=125mm (3.5T) PIPE(STS)10S, 125A(3.5T)

7755 R-36.256 TUBERÍA (STS)10S D(i)=150mm (3.5T) PIPE(STS)10S, 150A(3.5T)

7756 R-36.257 TUBERÍA (STS)10S D(i)=200mm (4.0T) PIPE(STS)10S, 200A(4.0T)

7757 R-36.258 TUBERÍA (STS)10S D(i)=250mm (4.0T) PIPE(STS)10S, 250A(4.0T)

7758 R-36.259 TUBERÍA (STS)10S D(i)=300mm (4.5T) PIPE(STS)10S, 300A(4.5T)

7759 R-36.260 TUBERÍA (STS)10S D(i)=400mm (5.0T) PIPE(STS)10S, 400A(5.0T)

7760 R-36.261 REDUCTOR (FRP) 125X100mm REDUCER(FRP), 125X100A

7761 R-36.262 REDUCTOR (FRP) 150X125mm REDUCER(FRP), 150X125A

7762 R-36.263 REDUCTOR (FRP) 200X150mm REDUCER(FRP), 200X150A

7763 R-36.264 REDUCTOR (FRP) 250X125mm REDUCER(FRP), 250X125A

7764 R-36.265 REDUCTOR (FRP) 250X150mm REDUCER(FRP), 250X150A

7765 R-36.266 REDUCTOR (FRP) 250X200mm REDUCER(FRP), 250X200A

7766 R-36.267 REDUCTOR (FRP) 300X200mm REDUCER(FRP), 300X200A

7767 R-36.268 REDUCTOR (FRP) 300X250mm REDUCER(FRP), 300X250A

7768 R-36.269 REDUCTOR (FRP) 350X250mm REDUCER(FRP), 350X250A

7769 R-36.270 REDUCTOR (FRP) 350X300mm REDUCER(FRP), 350X300A

7770 R-36.271 REDUCTOR (FRP) 400X300mm REDUCER(FRP), 400X300A

7771 R-36.272 REDUCTOR (FRP) 450X250mm REDUCER(FRP), 450X250A

7772 R-36.273 REDUCTOR (FRP) 450X400mm REDUCER(FRP), 450X400A

7773 R-36.274 REDUCTOR (FRP) 600X400mm REDUCER(FRP), 600X400A

7774 R-36.275 REDUCTOR (FRP) 600X450mm REDUCER(FRP), 600X450A

7775 R-36.276 REDUCTOR (SPP) 100X80mm REDUCER(SPP), 100X80A

7776 R-36.277 REDUCTOR (SPP) 125X100mm REDUCER(SPP), 125X100A

7777 R-36.278 REDUCTOR (SPP) 300X200mm REDUCER(SPP), 300X200A

7778 R-36.279 REDUCTOR (SPP) 350X300mm REDUCER(SPP), 350X300A

7779 R-36.280 REDUCTOR (SPP) 400X350mm REDUCER(SPP), 400X350A

7780 R-36.281 REDUCTOR (STS) 32X20mm REDUCER(STS), 32X20A

7781 R-36.282 REDUCTOR (STS) 50X32mm REDUCER(STS), 50X32A

7782 R-36.283 REDUCTOR (STS) 65X32mm REDUCER(STS), 65X32A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7783 R-36.284 REDUCTOR (STS) 80X32mm REDUCER(STS), 80X32A

7784 R-36.285 REDUCTOR (STS) 80X50mm REDUCER(STS), 80X50A

7785 R-36.286 REDUCTOR (STS) 80X65mm REDUCER(STS), 80X65A

7786 R-36.287 REDUCTOR (STS) 100X32mm REDUCER(STS), 100X32A

7787 R-36.288 REDUCTOR (STS) 100X50mm REDUCER(STS), 100X50A

7788 R-36.289 REDUCTOR (STS) 100X80mm REDUCER(STS), 100X80A

7789 R-36.290 REDUCTOR (STS) 125X80mm REDUCER(STS), 125X80A

7790 R-36.291 REDUCTOR (STS) 125X100mm REDUCER(STS), 125X100A

7791 R-36.292 REDUCTOR (STS) 150X80mm REDUCER(STS), 150X80A

7792 R-36.293 REDUCTOR (STS) 150X100mm REDUCER(STS), 150X100A

7793 R-36.294 REDUCTOR (STS) 150X125mm REDUCER(STS), 150X125A

7794 R-36.295 REDUCTOR (STS) 200X125mm REDUCER(STS), 200X125A

7795 R-36.296 REDUCTOR (STS) 200X100mm REDUCER(STS), 200X100A

7796 R-36.297 REDUCTOR (STS) 250X150mm REDUCER(STS), 250X150A

7797 R-36.298 REDUCTOR (STS) 250X200mm REDUCER(STS), 250X200A

7798 R-36.299 REDUCTOR (STS) 300X200mm REDUCER(STS), 300X200A

7799 R-36.300 REDUCTOR (STS) 300X250mm REDUCER(STS), 300X250A

7800 R-36.301 REJILLA PARA CARRETERA DE ACERO DE 38 X 5 X 3mm ROAD STEEL GRATING, 38X5X3

7801 R-36.302 BARRA DE ACERO INOXIDABLE D(i)=32mm STAINLESS STEEL BAR, 32A

7802 R-36.303 FABRICACIÓN DE ESTRUCTURA DE ACERO INSTALACIÓN SIMPLE STEEL STRUCTURE MANUFACTURE AND INSTALLATION, SIMPLE

7803 R-36.304 INSTALACIÓN DE TUBERÍA STS D(i)=20mm STS PIPE INSTALLATION, 20A

7804 R-36.305 INSTALACIÓN DE TUBERÍA STS D(i)=32mm STS PIPE INSTALLATION, 32A

7805 R-36.306 INSTALACIÓN DE TUBERÍA STS D(i)=50mm STS PIPE INSTALLATION, 50A

7806 R-36.307 INSTALACIÓN DE TUBERÍA STS D(i)=80mm STS PIPE INSTALLATION, 80A

7807 R-36.308 INSTALACIÓN DE TUBERÍA STS D(i)=100mm STS PIPE INSTALLATION, 100A

7808 R-36.309 INSTALACIÓN DE TUBERÍA STS D(i)=125mm STS PIPE INSTALLATION, 125A

7809 R-36.310 INSTALACIÓN DE TUBERÍA STS D(i)=150mm STS PIPE INSTALLATION, 150A

7810 R-36.311 INSTALACIÓN DE TUBERÍA STS D(i)=200mm STS PIPE INSTALLATION, 200A

7811 R-36.312 INSTALACIÓN DE TUBERÍA STS D(i)=250mm STS PIPE INSTALLATION, 250A

7812 R-36.313 INSTALACIÓN DE TUBERÍA STS D(i)=300mm STS PIPE INSTALLATION, 300A
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7813 R-36.314 INSTALACIÓN DE TUBERÍA STS D(i)=350mm STS PIPE INSTALLATION, 350A

7814 R-36.315 INSTALACIÓN DE TUBERÍA STS D(i)=400mm STS PIPE INSTALLATION, 400A

7815 R-36.316 TE (FRP) D(i)=450mm TEE(FRP), 450A

7816 R-36.317 TE (FRP) D(i)=600mm TEE(FRP), 600A

7817 R-36.318 TE (PE) D(i)=32mm TEE(PE), 32A

7818 R-36.319 TE (SPP) D(i)=80mm TEE(SPP), 80A

7819 R-36.320 TE (SPP) D(i)=125mm TEE(SPP), 125A

7820 R-36.321 TE (SPP) D(i)=200mm TEE(SPP), 200A

7821 R-36.322 TE (SPP) 100X80mm TEE(SPP), 100AX80A

7822 R-36.323 TE (SPP) 125X80mm TEE(SPP), 125X80A

7823 R-36.324 TE (SPP) 125X100mm TEE(SPP), 125X100A

7824 R-36.325 TE (SPP) 300X200mm TEE(SPP), 300X200A

7825 R-36.326 TE (SPP) 350X200mm TEE(SPP), 350X200A

7826 R-36.327 TE (SPP) 400X200mm TEE(SPP), 400X200A

7827 R-36.328 TE (SPP) 400X250mm TEE(SPP), 400X250A

7828 R-36.329 TE (STS)10S D(i)=20mm TEE(STS)10S, 20A

7829 R-36.330 TE (STS)10S D(i)=32mm TEE(STS)10S, 32A

7830 R-36.331 TE (STS)10S 32X20mm TEE(STS)10S, 32X20A

7831 R-36.332 TE (STS)10S D(i)=50mm TEE(STS)10S, 50A

7832 R-36.333 TE (STS)10S 50X32mm TEE(STS)10S, 50X32A

7833 R-36.334 TE (STS)10S D(i)=80mm TEE(STS)10S, 80A

7834 R-36.335 TE (STS)10S 80X50mm TEE(STS)10S, 80X50A

7835 R-36.336 TE (STS)10S 100X80mm TEE(STS)10S, 100X80A

7836 R-36.337 TE (STS)10S D(i)=125mm TEE(STS)10S, 125A

7837 R-36.338 TE (STS)10S D(i)=150mm TEE(STS)10S, 150A

7838 R-36.339 TE (STS)10S 150X125mm TEE(STS)10S, 150X125A

7839 R-36.340 TE (STS)10S 150X65mm TEE(STS)10S, 150X65A

7840 R-36.341 TE (STS)10S 150X80mm TEE(STS)10S, 150X80A

7841 R-36.342 TE (STS)10S D(i)=200mm TEE(STS)10S, 200A

7842 R-36.343 TE (STS)10S 200X100mm TEE(STS)10S, 200X100A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7843 R-36.344 TE (STS)10S 200X125mm TEE(STS)10S, 200X125A

7844 R-36.345 TE (STS)10S D(i)=300mm TEE(STS)10S, 300A

7845 R-36.346 TE (STS)10S 400X300mm TEE(STS)10S, 400X300A

7846 R-36.347 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=20mm) M10X50L U-BOLT,NUT,WASHER(SS400), (20A)M10X50L

7847 R-36.348 U-PERNO, TUERCA, ARANDELA (SS400) M10X60L (D(i)=32mm) U-BOLT,NUT,WASHER(SS400), (32A)M10X60L

7848 R-36.349 U-PERNO, TUERCA, ARANDELA (SS400) M10X65L (D(i)=50mm) U-BOLT,NUT,WASHER(SS400), (50A)M10X65L

7849 R-36.350 U-PERNO, TUERCA, ARANDELA (SS400) M12X85L (D(i)=80mm) U-BOLT,NUT,WASHER(SS400), (80A)M12X85L

7850 R-36.351 U-PERNO, TUERCA, ARANDELA (SS400) M16X100L (D(i)=100mm) U-BOLT,NUT,WASHER(SS400), (100A)M16X100L

7851 R-36.352 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=125mm) M16X120L U-BOLT,NUT,WASHER(SS400), (125A)M16X120L

7852 R-36.353 U-PERNO, TUERCA, ARANDELA (SS400) M16X130L (D(i)=150mm) U-BOLT,NUT,WASHER(SS400), (150A)M16X130L

7853 R-36.354 U-PERNO, TUERCA, ARANDELA (SS400) M20X165L (D(i)=200mm) U-BOLT,NUT,WASHER(SS400), (200A)M20X165L

7854 R-36.355 U-PERNO, TUERCA, ARANDELA (SS400) M20X195L (D(i)=250mm) U-BOLT,NUT,WASHER(SS400), (250A)M20X195L

7855 R-36.356 U-PERNO, TUERCA, ARANDELA (SS400) M24X240L (D(i)=300mm) U-BOLT,NUT,WASHER(SS400), (300A)M24X240L

7856 R-36.357 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=350mm) M24X260L U-BOLT,NUT,WASHER(SS400), (350A)M24X260L

7857 R-36.358 U-PERNO, TUERCA, ARANDELA (SS400) M24X280L (D(i)=400mm) U-BOLT,NUT,WASHER(SS400), (400A)M24X280L

7858 R-36.359 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=450mm) M24X310L U-BOLT,NUT,WASHER(SS400), (450A)M24X310L

7859 R-36.360 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=20mm VALVE INSTALLATION(FLANGE TYPE), 20A

7860 R-36.361 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=32mm VALVE INSTALLATION(FLANGE TYPE), 32A

7861 R-36.362 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=50mm VALVE INSTALLATION(FLANGE TYPE), 50A

7862 R-36.363 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=80mm VALVE INSTALLATION(FLANGE TYPE), 80A

7863 R-36.364 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=100mm VALVE INSTALLATION(FLANGE TYPE), 100A

7864 R-36.365 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=125mm VALVE INSTALLATION(FLANGE TYPE), 125A

7865 R-36.366 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=200mm VALVE INSTALLATION(FLANGE TYPE), 200A

7866 R-36.367 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=250mm VALVE INSTALLATION(FLANGE TYPE), 250A

7867 R-36.368 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=300mm VALVE INSTALLATION(FLANGE TYPE), 300A

7868 R-36.369 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=400mm VALVE INSTALLATION(FLANGE TYPE), 400A

7869 R-36.370 SOLDADURA (FRP) D(i)=100mm WELDING(FRP), 100A

7870 R-36.371 SOLDADURA (FRP) D(i)=125mm WELDING(FRP), 125A

7871 R-36.372 SOLDADURA (FRP) D(i)=150mm WELDING(FRP), 150A

7872 R-36.373 SOLDADURA (FRP) D(i)=200mm WELDING(FRP), 200A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7873 R-36.374 SOLDADURA (FRP) D(i)=250mm WELDING(FRP), 250A

7874 R-36.375 SOLDADURA (FRP) D(i)=300mm WELDING(FRP), 300A

7875 R-36.376 SOLDADURA (FRP) D(i)=350mm WELDING(FRP), 350A

7876 R-36.377 SOLDADURA (FRP) D(i)=400mm WELDING(FRP), 400A

7877 R-36.378 SOLDADURA (FRP) D(i)=450mm WELDING(FRP), 450A

7878 R-36.379 SOLDADURA (FRP) D(i)=600mm WELDING(FRP), 600A

7879 R-36.380 SOLDADURA (SPP) D(i)=80mm WELDING(SPP), 80A

7880 R-36.381 SOLDADURA (SPP) D(i)=100mm WELDING(SPP), 100A

7881 R-36.382 SOLDADURA (SPP) D(i)=125mm WELDING(SPP), 125A

7882 R-36.383 SOLDADURA (SPP) D(i)=200mm WELDING(SPP), 200A

7883 R-36.384 SOLDADURA (SPP) D(i)=250mm WELDING(STS), 250A

7884 R-36.385 SOLDADURA (SPP) D(i)=300mm WELDING(SPP), 300A

7885 R-36.386 SOLDADURA (SPP) D(i)=350mm WELDING(SPP), 350A

7886 R-36.387 SOLDADURA (SPP) D(i)=400mm WELDING(SPP), 400A

7887 R-36.388 SOLDADURA (STS) D(i)=20mm WELDING(STS), 20A

7888 R-36.389 SOLDADURA (STS) D(i)=32mm WELDING(STS), 32A

7889 R-36.390 SOLDADURA (STS) D(i)=50mm WELDING(STS), 50A

7890 R-36.391 SOLDADURA (STS) D(i)=65mm WELDING(STS), 65A

7891 R-36.392 SOLDADURA (STS) D(i)=80mm WELDING(STS), 80A

7892 R-36.393 SOLDADURA (STS) D(i)=100mm WELDING(STS), 100A

7893 R-36.394 SOLDADURA (STS) D(i)=125mm WELDING(STS), 125A

7894 R-36.395 SOLDADURA (STS) D(i)=150mm WELDING(STS), 150A

7895 R-36.396 SOLDADURA (STS) D(i)=200mm WELDING(STS), 200A

7896 R-36.397 SOLDADURA (STS) D(i)=250mm WELDING(STS), 250A

7897 R-36.398 SOLDADURA (STS) D(i)=300mm WELDING(STS), 300A

7898 R-36.399 SOLDADURA (STS) D(i)=400mm WELDING(STS), 400A

7899 R-36.400 Y-TE (FRP) 100X100mm Y-TEE(FRP), 100X100A

7900 R-36.401 Y-TE (FRP) 125X100mm Y-TEE(FRP), 125X100A

7901 R-36.402 Y-TE (FRP) 125X125mm Y-TEE(FRP), 125X125A

7902 R-36.403 Y-TE (FRP) 150X100mm Y-TEE(FRP), 150X100A


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7903 R-36.404 Y-TE (FRP) 150X125mm Y-TEE(FRP), 150X125A

7904 R-36.405 Y-TE (FRP) 200X125mm Y-TEE(FRP), 200X125A

7905 R-36.406 Y-TE (FRP) 200X150mm Y-TEE(FRP), 200X150A

7906 R-36.407 Y-TE (FRP) 250X125mm Y-TEE(FRP), 250X125A

7907 R-36.408 Y-TE (FRP) 250X150mm Y-TEE(FRP), 250X150A

7908 R-36.409 Y-TE (FRP) 300X125mm Y-TEE(FRP), 300X125A

7909 R-36.410 Y-TE (FRP) 300X150mm Y-TEE(FRP), 300X150A

7910 R-36.411 Y-TE (FRP) 300X200mm Y-TEE(FRP), 300X200A

7911 R-36.412 Y-TE (FRP) 350X150mm Y-TEE(FRP), 350X150A

7912 R-36.413 Y-TE (FRP) 400X200mm Y-TEE(FRP), 400X200A

7913 R-36.414 Y-TE (FRP) 400X300mm Y-TEE(FRP), 400X300A

7914 R-36.415 Y-TE (FRP) 450X350mm Y-TEE(FRP), 450X350A

C37 C-37. OBRA MECANICA EDIFICIO ADMINISTRATIVO C-37. MECHANIC WORKS OF ADMINISTRATION BUILDING - WWTP

7200 R-37.1 UNIDAD TIPO CASSETTE 12,000 BTU/H, VRV, R410-A CASSETTE UNIT TYPE 12,000 BTU/H, VRV, R410-A

7201 R-37.2 UNIDAD TIPO CASSETTE 24,000 BTU/H, VRV, R410-A CASSETTE UNIT TYPE 24,000 BTU/H, VRV, R410-A

7202 R-37.3 UNIDAD TIPO CASSETTE 38,000 BTU/H, VRV, R410-A CASSETTE UNIT TYPE 38,000 BTU/H, VRV, R410-A

7203 R-37.4 UNIDAD EXTERIOR VRV 136,500 BTU/H, R410 A EXTERIOR UNIT VRV 136,500 BTU/H, R410 A

7204 R-37.5 UNIDAD EXTERIOR VRV 153,600 BTU/H, R410 A EXTERIOR UNIT VRV 153,600 BTU/H, R410 A

7205 R-37.6 REFRIGERANTE 410 A REFRIGERANT 410A

7206 R-37.7 JUNTA DE DERIVACION PARA SISTEMAS VRV PARA UNIDADES INTERNA MENOR A 112,6 KBTU/H DERIVATION JOINT FOR SYSTEMS VRV FOR INTERNAL UNITS MINOR TO 112,6 KBTU/H

7207 R-37.8 JUNTA DE DERIVACIÓN PARA SISTEMAS VRV PARA UNIDADES INTERNA MENOR A 202,6 KBTU/H DERIVATION JOINT FOR SYSTEMS VRV FOR INTERNAL UNITS MINOR TO 202,6 KBTU/H

7208 R-37.9 JUNTA DE DERIVACIÓN PARA SISTEMAS VRV PARA UNIDADES INTERNA MENOR A 242,3KBTU/H DERIVATION JOINT FOR SYSTEMS VRV FOR INTERNAL UNITS MINOR TO 242,3KBTU/H

7209 R-37.10 JUNTA DE DERIVACIÓN PARA JUNTAR UNIDADES CONDENSADORAS VRV DERIVATION JOINT TO UNIFY VRV CONDENSER UNITS

7210 R-37.11 CONTROL INDIVIDUAL , HASTA 16 EQUIPOS AIRE ACONDICIONADO INDIVIDUAL CONTROL, UNTIL 16 EQUIPMENTS OF AIR CONDITIONING

7211 R-37.12 TUBERÍA COBRE TIPO ACR 1/4" AISLADA COPPER PIPE TYPE ACR 1/4" INSULATED

7212 R-37.13 TUBERÍA COBRE TIPO ACR 3/8" AISLADA COPPER PIPE TYPE ACR 3/8" INSULATED

7213 R-37.14 TUBERÍA COBRE TIPO ACR 1/2" AISLADA COPPER PIPE TYPE ACR 1/2" INSULATED

7214 R-37.15 TUBERÍA COBRE TIPO ACR 5/8" AISLADA COPPER PIPE TYPE ACR 5/8" INSULATED

7215 R-37.16 TUBERÍA COBRE TIPO ACR 3/4" AISLADA COPPER PIPE TYPE ACR 3/4" INSULATED

7216 R-37.17 TUBERÍA COBRE TIPO ACR 1 1/8" AISLADA COPPER PIPE TYPE ACR 1 1/8" INSULATED
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

7217 R-37.18 TUBERÍA COBRE TIPO ACR 1 3/8" AISLADA COPPER PIPE TYPE ACR 1 3/8" INSULATED

7218 R-37.19 SOPORTE TIPO COLUMPIO PARA TUBERÍA COBRE SUPPORT FOR COPPER PIPE TYPE SWING

7219 R-37.20 TUBERÍA PARA DESAGUE DE UNIDADES EVAPORADORAS, PVC DIAM. 1" PIPE FOR DRAINAGE OF EVAPORATED UNITS, PVC DIAM. 1"

7220 R-37.21 BOMBA PARA EVACUACIÓN DE CONDENSADO PUMP FOR CONDENSE EVACUATION

7221 R-37.22 VENTILADOR EXTRACTOR CENTRIFUGO 3400 CFM @2" SP CENTRIFUGE EXTRACTOR FAN 3400 CFM @2" SP

7222 R-37.23 VENTILADOR EXTRACTOR CENTRIFUGO 2600 CFM @2 " SP CENTRIFUGE EXTRACTOR FAN 2600 CFM @2 " SP

7223 R-37.24 DUCTERIA METALICA PARA VENTILACIÓN MECÁNICA METAL DUCT FOR MECHANIC VENTILATION

7224 R-37.25 MANGAS SIN AISLAMIENTO DIAMETRO 4 PULGADAS NO INSULATION SLEEVE DIA. 4 INCHES

7225 R-37.26 MANGAS SIN AISLAMIENTO DIAMETRO 8 PULGADAS NO INSULATION SLEEVE DIA. 8 INCHES

7226 R-37.27 REJILLA DE EXTRACCIÓN DE 10"X10" INCLUYE DAMPERS DE REGULACIÓN EXTRACTION GRILLE 10"X10" INCLUDES REGULATION DAMPERS

7227 R-37.28 REJILLA DE EXTRACCIÓN DE 12"X12" INCLUYE DAMPERS DE REGULACIÓN EXTRACTION GRILLE 12"X12" INCLUDES REGULATION DAMPERS

7228 R-37.29 REJILLA DE EXTRACCIÓN 8"X8" INCLUYE DAMPERS DE REGULACIÓN EXTRACTION GRILLE 8"X8" INCLUDES REGULATION DAMPERS

7229 R-37.30 SOPORTE PARA DUCTERIA METÁLICA (PARA AIRE ACONDICIONADO Y VENTILACIÓN MECÁNICA) SUPPORT FOR METAL DUCTS (A/C AND MECHANIC VENTILATION)

7230 R-37.31 CABLE DE CONTROL 1030A CONTROL CABLE 1030A

7231 R-37.32 CABLE DE FUERZA POWER CABLE

7232 R-37.33 CUADRO DE CONTROL PARA VENTILADORES FANS CONTROL PANEL

7233 R-37.34 SUMINISTRO E INSTALACIÓN DE GABINETE CONTRA INCENDIOS CLASE II SUPPLY AND INSTALLATION OF FIRE FIGHTING CASE CLASS II

7234 R-37.35 SUMINISTRO E INSTALACIÓN DE EXTINTOR CO2 10 LIBRAS SUPPLY AND INSTALLATION OF FIRE EXTINGUISHER CO2 10 POUNDS

7235 R-37.36 SUMINISTRO E INSTALACIÓN DE EXTINTOR PQS ABC 10 LIBRAS SUPPLY AND INSTALLATION OF FIRE EXTINGUISHER PQS ABC 10 POUNDS

7236 R-37.37 SUMINISTRO E INSTALACION DE SIAMESA 4" X 2 1/2" X 2 1/2" SUPPLY AND INSTALLATION SIAMESA 4" X 2 1/2" X 2 1/2"

7237 R-37.38 SUMINISTRO E INSTALACIÓN DE VÁLVULA CHECK 2" SUPPLY AND INSTALLATION CHECK VALVE 2"

7238 R-37.39 SUMINISTRO E INSTALACIÓN DE TUBERÍA ACERO NEGRO SCH 40, DIAM 2 " SUPPLY AND INSTALLATION BLACK STEEL PIPE CH 40, DIA 2"

7239 R-37.40 SUMINISTRO E INSTALACIÓN DE TUBERÍA ACERO NEGRO SCH 40, DIAM 1 1/2" SUPPLY AND INSTALLATION BLACK STEEL PIPE CH 40, DIA 1/2"

7240 R-37.41 PINTURA PARA TUBERÍAS CON FONDO ANTICORROSIVO Y PINTURA ROJA. PAINT FOR PIPES WITH ANTICORROSIVE BASE AND RED PAINT

7241 R-37.42 SUMINISTRO E INSTALACIÓN BOMBA PRINCIPAL , 15 HP 3F-220/440V, TABLERO DE CONTROL SUPPLY AND INSTALLATION OF MAIN PUMP, 15 HP 3F-220/440V, CONTROL PANEL

7242 R-37.43 SUMINISTRO E INSTALACIÓN DE BOMBA JOCKEY, 1.5 HP, 3F-220/440V SUPPLY AND INSTALLATION OF JOCKEY PUMP, 1.5 HP, 3F-220/440V

C38 C-38. VEGETACIÓN C-38. PLANTING

4399 R-38.1 ALMENDRO DE 1.20 M DE ALTO ALMOND TREE 1.20 m HIGH

3477 R-38.2 ARBUSTO LIRIOPE BUSH LIRIOPE

3370 R-38.3 AREA SEMBRADA PLANTING GRASS


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3511 R-38.4 BAMBÚ ENANO SHORT BAMBOO

3815 R-38.5 CAUCHO DE MONTAÑA (hevea brasiliensis) MOUNTAIN RUBBER (hevea brasiliensis)

3811 R-38.6 CEDRO (Cedrela odorata) PLANTING, CEDAR (Cedrela odorata)

3478 R-38.7 CESPED MANI FORRAJERO ARACHIS PINTOI GRASS

3512 R-38.8 CINTA TAPE

3808 R-38.9 CITRICOS INJERTOS DE 1.50 M DE ALTO (MANDARINA, NARANJA, LIMÓN) CITRUS GRAFTS 1.5 m HIGH (TANGARINE, ORANGE, LEMON)

4401 R-38.10 CROTO MONALIZA PLANTING, GARDEN CROTON (monalisa)

3821 R-38.11 CUCARDA (Hibiscus) PLANTING, CUCARDA (Hibiscus)

3823 R-38.12 DAMA DE NOCHE (Cestrum nocturnum) PLANTING, DAMA DE NOCHE (Cestrum nocturnum)

4402 R-38.13 DURANTA PLANTING, DURANTA (bush)

3803 R-38.14 ESCANCEL PLANTING, ESCANCEL (AERVA SANGUINOLENTA ) 20-25cm high

3818 R-38.15 FERNAN SÁNCHEZ (Triplaris cumingiana) PLANTING, FERNAN SÁNCHEZ (Triplaris cumingiana)

3809 R-38.16 FICUS BLANCO DE 2.75 M DE ALTO WHITE FICUS 2.75m HIGH

3813 R-38.17 GUAYACAN AMARILO (Handroanthus chrysanthus) PLANTING, YELLOW GUAYACAN (Handroanthus chrysanthus)

3814 R-38.18 GUAYACAN ROSADO (Tabebuia rosea) PLANTING, PINK GUAYACAN (Tabebuia rosea)

3820 R-38.19 JIHUA (nectandra hihua) PLANTING, JIHUA (nectandra hihua)

3817 R-38.20 LAUREL (Cordia alliodora ) PLANTING, LAUREL (Cordia alliodora )

3810 R-38.21 MANGO ROJO DE EXPORTACIÓN DE 2.5 M DE ALTO PLANTING, RED MANGO imported 2.5M HIGH

3819 R-38.22 MARAÑÓN (Syzygium malaccense) PLANTING, MARAÑÓN (Syzygium malaccense)

3816 R-38.23 MORAL BOBO (Claricia racemosa) PLANTING, MORAL BOBO (Claricia racemosa)

3812 R-38.24 MORAL FINO (Chlorophora tinctoria) PLANTING, MORAL FINO (Chlorophora tinctoria)

3804 R-38.25 PALMA AZUL DE 1.5 M DE ALTO PLANTING, PALMERA AZUL (BRAHEA ARMATA) 1.5 M HIGH

4411 R-38.26 PALMA BOTELLA ENANA DE 1.20 M DE ALTO PLANTING, PALMA BOTELLA ENANA (HYOPHORBE LANGENICAULIS) 1.20 M HIGH

3806 R-38.27 PALMA BOTELLA GIGANTE DE 2.5 M DE ALTO PLANTING, PALMA BOTELLA GIGANTE (HYOPHORBE VERSCHAFFELTII) 2.5 M HIGH

4407 R-38.28 PALMA CICA DE 1.20 M DE ALTO PLANTING, PALMA CICA (CYCAS REVOLUTA) 1.20 M HIGH

3805 R-38.29 PALMA ROJA DE 3 M DE ALTO PLANTING, PALMA ROJA (CYRTOSTACHYS RENDA) 3M HIGH

4409 R-38.30 PASTO SAN AGUSTIN PLANTING, SAN AGUSTIN GRASS

3807 R-38.31 PINO VELA DE 1.40 M DE ALTO PLANTING, PINO VELA (CUPRESSUS SEMPERVIRENS) 1.4 M HIGH

3822 R-38.32 YERBA LUISA (Aloysia citrodora) PLANTING, YERBA LUISA (Aloysia citrodora)

C39 C-39. SEÑALIZACIÓN C-39. SIGNALING


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

3378 R-39.1 DELINEADORES CON MATERIAL REFLECTIVO - (postes delineadores h= 1.5 m / incluye: plinto de cimentación) DELINEATOR WITH REFLECTIVE MATERIAL - (liner poles h= 1.5 m / includes: foundation plinth )

3585 R-39.2 GUARDACAMINO SIMPLE GUARDRAIL SIMPLE

3379 R-39.3 MARCAS DE PAVIMENTO - (franja de pintura amarilla, ancho = 15.0 cm / homigón asfáltico) PAVEMENT MARKING - (paint stripe yellow, width = 15.0 cm / homigón asfáltico)

3491 R-39.4 MARCAS DE PAVIMENTO - (franja de pintura blanca, ancho = 15.0 cm / homigón asfáltico) PAVEMENT MARKING - (paint stripe white, width = 15.0 cm / homigón asfáltico)

3380 R-39.5 MARCAS SOBRESALIDAS DE PAVIMENTO - (tachas reflectivas / bidireccionales) HIGH RELIEVE PAVEMENT MARKS - (eye cats / bidirectionals)

SEÑALES AL LADO DE LA CARRETERA - (0.75 m x 0.75 m / señal reglamentaria / incluye: tubo cuadrado de 2" x y
3375 R-39.6 SIGNS NEXT TO THE ROAD - (0.75 m x 0.75 m / regulatory sign / includes: square pipe 2" x and foundation plinth )
plinto de cimentación)

4368 R-39.7 PINTURA DE CAUCHO IMPERMEABILIZANTE PARA BORDILLOS RUBBER WATERPROOFING PAINT FOR CURBS

3796 R-39.8 PINTURA SEÑALIZACIÓN PARQUEADEROS SIGNALING PAINT FOR PARKING LOT

SEÑALES AL LADO DE LA CARRETERA - (2.40 m x 1.2 m / informativa / incluye: pórtico metálico y plinto de
3374 R-39.9 SIGNS NEXT TO THE ROAD - (2.40 m x 1.2 m / informative / includes: metallic frame/portico and foundation plinth )
cimentación)

C40 C-40. MISCELANEOS C-40. MISCELLANEOUS

3785 R-40.1 ASTAS Y BASE DE HORMIGON PARA BANDERAS FLAGPOLE AND CONCRETE FOUNDATION FOR FLAGS f'c=210 kg/cm2

3614 R-40.2 BARANDAL DE MADERA MORAL FINO HANDRAIL OF FINE MORAL WOOD

3784 R-40.3 OBELISCO CONCRETE FOUNDATION FOR OBELISK 150X150X20CM;f'c=210kg/cm2


BOMBEO DE AGUA IGUAL/MAYOR 2"

3529 R-40.4 WATER PUMPING EQUAL/BEYOND 2"


CONTROL Y DESALOJO DE DERRUMBE POR IMPREVISTO GEOLÓGICO EN TUNEL
3522 R-40.5 CONTROL AND CLEARING OF COLLAPSE IN TUNNEL

3437 R-40.6 LIMPIEZA DE DERRUMBES SLOPE CREARING AND FORMATION

3616 R-40.7 LIMPIEZA DE POZOS MANHOLES CLEANING

3615 R-40.8 PINTURA EN TAPAS DE H.A EN POZOS PAINTING OF REINFORCED CONCRETE COVERS OF MANHOLES

4536 R-40.9 PLACAS DE NEOPRENO DUREZA SHORE 60 e=3cm NEOPRENE PLATE SHORE HARDNESS 60 T=3cm
POLIETILENO 2 mm
3531 R-40.10 POLYETHYLENE 2 mm

3663 R-40.11 TOPES PARA VEHÍCULOS BUMPERS FOR VEHICLES

4755 R-40.12 BOMBA DE AGUA DE 3HP WATER PUMP 3HP

4754 R-40.13 BOMBA DE AGUA DE 2HP WATER PUMP 3HP

4821 R-40.14 CASETA PARA PORTICO DE ENTRADA BOOTH FOR MAIN GATE

4692 R-40.15 BARRENADO DE POZO PARA ABASTECIMIENTO DE AGUA DRILLING OF WATER WELL FOR WATER SUPPLY

C41 C-41. PLAN DE MANEJO AMBIENTAL C-41. ENVIRONMENTAL MANAGEMENT PLAN

4444 R-41.1 APLICACIÓN DE AGUA_CONTROL DE POLVO WATER APPLICATION TO CONTROL DUST

4445 R-41.2 MANTENIMIENTO DE FOSA SÉPTICA (12M3) SEPTIC TANK MAINTENANCE (12M3)

4459 R-41.3 ALQUILER DE 2 LAVAMANOS PORTÁTILES (MES) RENT 2 PORTABLE SINKS

4460 R-41.4 ALQUILER DE 2 BATERÍAS SANITARIAS MÓBILES (MES) RENT 2 PORTABLE LAVATORY FACILITIES
LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

TRAMPA DE GRASA (INCLUYE RECOLECCIÓN - TRANSPORTE Y DISPOSICIÓN FINAL DE RESIDUOS 4 VECES


4462 R-41.5 GREASE TRAMP (includes COLLECTING - TRANSPORT AND FINAL DISPOSITION OF RESIDUES 4 TIMES A YEAR)
AL AÑO)

4463 R-41.6 FOSA SÉPTICA 12 M3 SEPTIC TANK12 M3

4471 R-41.7 TANQUE METÁLICO PARA CLASIFICACIÓN EN LA FUENTE METALLIC TANK FOR CLASSIFYING IN THE SOURCE

4472 R-41.8 TANQUE PLASTICO PARA RESIDUOS DE GRASA Y ACEITES PLASTIC TANK FOR RESIDUES OF GREASE AND OILS

4513 R-41.9 CONTINGENCIAS EN CASO DE EMERGENCIA (ANUAL) CONTINGENCIES IN CASE OF EMERGENCY (ANNUAL)

4555 R-41.10 SALUD Y SEGURIDAD OCUPACIONAL OCCUPATIONAL HEALTH AND SAFETY

4504 R-41.11 MONITOREO DE GASES EN AIRE AMBIENTE Y RUIDO (NO INCLUYE IVA) MONITORING OF GAS IN AIR ENVIRONMENT AND NOISE

4505 R-41.12 MONITOREO DE AGUAS EN CUERPOS HÍDRICOS (NO INCLUYE IVA) WATER MONITORING DURING CONSTURCTION PERIOD

C42 C-42. TRABAJOS INESPERADOS SCHEDULE OF DAYWORKS

TRABAJOS INESPERADOS DE MANO DE OBRA DAYWORK-LABOUR

4827 R-42.1 PEÓN NORMAL LABOURER

4828 R-42.2 ALBAÑIL MASON

4829 R-42.3 CARPINTERO CARPENTER

4830 R-42.4 ELECTRICISTA ELECTRICIAN

4831 R-42.5 ENCOFRADOR FORM WORKER

4832 R-42.6 FIERRERO IRON WORKER

4833 R-42.7 OPERADOR DE EQUIPO LIVIANO LIGHT EQUIPMENT OPERATOR

4834 R-42.8 PINTOR PAINTER

4835 R-42.9 PLOMERO PLUMBER

4836 R-42.10 CHOFER DRIVER

4837 R-42.11 MAESTRO SOLDADOR ESPECIALIZADO SPECIALIZED WELDER

4838 R-42.12 OPERADOR DE EQUIPO PESADO HEAVY EQUIPMENT OPERATOR

4839 R-42.13 PERFORADOR DRILLER

4840 R-42.14 OPERADOR EXCAVADORA OPERATOR OF EXCAVATOR

4841 R-42.15 CHOFER DE VOLQUETA DRIVER OF DUMPER TRUCKS

TRABAJOS INESPERADOS DE MATERIALES DAYWORK-MATERIAL

4842 R-42.16 SUMA PROVISIONAL DE MATERIALES UTILIZADOS EN TRABAJOS INESPERADOS PROVISIONAL SUM FOR MATERIALS TO BE USED IN DAYWORKS

TRABAJOS INESPERADOS DE EQUIPOS DAYWORK-EQUIPMENT

4843 R-42.17 BOMBA DE AGUA WATER PUMP

4844 R-42.18 CAMION CISTERNA 10000 LT TANK TRUCK 10000LT


LISTADO DE RUBROS DEL PROYECTO
CÓDIGO OBRAS
CÓDIGO DEL RUBRO DESCRIPCIÓN DESCRIPTION_ENG

4845 R-42.19 CAMION DE CARGA CARGO TRUCK

4846 R-42.20 CAMIONETA DE 1 TONELADA TRUCK OF 1 TON

4847 R-42.21 COMPACTADOR MANUAL 5HP MANUAL COMPRESSOR 5HP

4863 R-42.22 CONCRETERA 1 SACO CONCRETE MIXER 1 SACK

4864 R-42.23 CORTADORA DE HIERRO IRON CUTTER

4848 R-42.24 ENCOFRADO METÁLICO METALLIC FORMWORK

4849 R-42.25 EQUIPO OXICORTE OXY-FUEL WELDING AND CUTTING EQUIPMENT

4850 R-42.26 EXCAVADORA SOBRE ORUGAS EXCAVATOR CRAWLER

4851 R-42.27 GENERADOR GENERATOR

4852 R-42.28 GRÚA CRANE

4853 R-42.29 MARTILLO VIBRATORIO VIBRATORY HAMMER

4854 R-42.30 PERFORADORA AKER DRILLER AKER

4855 R-42.31 PLANCHA COMPACTADORA 5 HP PLATE COMPACTORS 5 HP

4856 R-42.32 RETROEXCAVADORA BACKHOE

4857 R-42.33 RODILLO COMPACTADOR VIBRATORIO VIBRATOR COMPACTOR ROLL

4858 R-42.34 RODILLO NEUMATICO 80 HP PNEUMATIC-TIRED ROLLINGRODILLO NEUMATICO 80 HP

4859 R-42.35 SOLDADORA ELÉCTRICA 300A ELECTRIC WELDER 300A

4860 R-42.36 TRACTOR 165 HP TRACTOR 165 HP

4861 R-42.37 VIBRADOR DE HORMIGÓN CONCRETE VIBRATOR

4862 R-42.38 VOLQUETA 8M3 DUMP TRUCK 8M3

C43 C-43. ITEM MICELANEOS MISCELLANEOUS ITEMS

4865 R-43.1 ADQUISICION DE VEHICULOS (SUMA PROVISIONAL) MAINTENANCE VEHICLE (PROVISIONAL SUM)

4866 R-43.2 OPERACIONES Y MANTENIMIENTO DE EQUIPOS DE MENOR IMPORTANCIA (SUMA PROVISIONAL) MINOR OPERATIONS & MAINTENANCE EQUIPMENT (PROVISIONAL SUM)

4867 R-43.3 EQUIPOS DE LABORATORIO (SUMA PROVISIONAL) LABORATORY EQUIPMENT (PROVISIONAL SUM)

4868 R-43.4 GASTO DE OFICINA PARA COMPUTADORES HARDWARE Y SOFTWARE (SUMA PROVISIONAL) OFFICE EXPENDITURE FOR COMPUTER HARDWARE AND SOFTWARE (PROVISIONAL SUM)

4869 R-43.5 INSPECCIÓN DE MANUFACTURA O FOMENTO DE LA CAPACIDAD EN EL PAÍS EXTRANJERO (SUMA PROVISIONA
MANUFACTORY INSPECTION OR CAPACITY BUILDING AT FOREIGN COUNTRY (PROVISIONAL SUM)
PRESUPUESTO REFERENCIAL

PROJECT: THE CONSTRUCTION OF SEWAGE SYSTEM OF INTERCEPTORS AND COLLECTORS ‘A, D, E’ AND WASTEWATER TREATMENT PLANT
& THE RIVER IMPROVEMENT OF POVE AND CODE IN SANTO DOMINGO CITY, ECUADOR
LOCATION: INTERCEPTOR "A": L= 2.78 km, INTERCEPTOR "D1" : L= 8.27 km, INTERCEPTOR "E2" : L= 12.78 km, COLLECTORS "D1C, D1E, D1a1-D1a17" : L= 8.47 km, COLLECTORS ""E2a - E2e" : L= 8.56 km, WWTP : Q=20000m3/d
BOX CULVERTS : L= 0.73km, TUNNEL : L= 0.38km, GABIONS WALL: L= 5.21km, STONE WORK : L= 6.26km, RIVER BED PROTECTION : 34Nr.
CONTENTS: ESTIMATED BILLS OF QUANTITIES OF CONSTRUCTION.

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

1 GENERAL AND PRELIMINARIES

R-1.1 1.1 COMMISSIONING AND TRAINING L/S 1

2 ACCESS ROAD - INTERCEPTOR A


2.1 DEMOLITTION, SITE PREPARATION
R-2.6 2.1.1 GRUBBING, FOREST CLEARING AND REMOVAL ha 7.28
R-2.4 2.1.2 DEMOLITION OF EXISTING STRUCTURE m3 63
R-2.14 2.1.3 GRADING AND LEVELLING FOR ROAD WORKS km 2.92
R-2.15 2.1.4 GRADING AND LEVELLING FOR PIPE WORKS m 2783
R-2.8 2.1.5 TEMPORARY DIVERSION OF RIVER FOR STRUCTURE CONSTRUCTION ea 2
TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE
R-21.2 2.1.6 m3-km 50960
TRANSPORT 500m)
2.2 EARTH WORKS
R-3.8 2.2.1 SOIL EXCAVATION m3 120535
R-4.6 2.2.2 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 123733
R-2.2 2.2.3 SHAPPING AND COMPACTION OF THE SUBGRADE m2 18403
R-3.11 2.2.4 EXCAVATION FOR SLOPE SHAPPING - (COMBING) m3 3010
R-38.3 2.2.5 PLANTING GRASS m2 40439
R-40.6 2.2.6 SLOPE CREARING AND FORMATION m3 362
2.3 DRAINAGE WORKS
2.3.1 BOX CULVERT
R-3.1 2.3.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 3990
R-4.3 2.3.1.2 COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 1399
R-4.10 2.3.1.3 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 156
R-5.4 2.3.1.4 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm) m3 821
R-19.7 2.3.1.5 GABIONS WALL, TRIPLE TORSION (2x1x1) m3 700
R-7.1 2.3.1.6 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 994
R-19.12 2.3.1.7 SUPPLY AND INSTALLATION OF SHEETPILE, T=6mm m2 347
R-8.12 2.3.1.8 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 4015
R-8.7 2.3.1.9 LEAN CONCRETE - (f´c=180 kg/cm2) m3 215
R-19.1 2.3.1.10 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 445911
R-9.3 2.3.1.11 FORMWORK OF STRUCTURE m2 7568
R-20.4 2.3.1.12 PVC WATERTIGHT JOINTS 22 CM m 1247
R-40.4 2.3.1.13 WATER PUMPING EQUAL/BEYOND 2" hour 500
R-21.4 2.3.1.14 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m) m3-km 2745
2.3.2 CONCRETE PIPE
R-3.3 2.3.2.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 56
R-4.12 2.3.2.2 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 6
R-8.9 2.3.2.3 STRUCTURAL CONCRETE - (f´c=210 kg/cm2) m3 20
R-9.3 2.3.2.4 FORMWORK OF STRUCTURE m2 72
R-16.1 2.3.2.5 REINFORCED CONCRETE PIPE FOR SEWAGE D=800mm m 33
2.3.3 SUB-DRAINS
R-3.2 2.3.3.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 679
R-8.15 2.3.3.2 SIMPLE CONCRETE f'c=180 kg/cm2 m3 1596
R-9.3 2.3.3.3 FORMWORK OF STRUCTURE m2 6002
R-4.12 2.3.3.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 798
R-4.6 2.3.3.5 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 2337
R-4.14 2.3.3.6 BACKFILL WITH FILTERING MATERIAL m3 679
2.3.4 STORM INLET
R-3.2 2.3.4.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 44
R-8.15 2.3.4.2 SIMPLE CONCRETE f'c=180 kg/cm2 m3 1
R-8.16 2.3.4.3 SIMPLE CONCRETE f'c=210 kg/cm2 m3 10
R-19.1 2.3.4.4 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 1246
R-9.3 2.3.4.5 FORMWORK OF STRUCTURE m2 105
R-12.3 2.3.4.6 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=300mm, RIVER m 34
R-19.11 2.3.4.7 DUCTILE IRON GRATING COVER (580 x 830)mm ea 14
2.4 PVAVEMENT WORKS
R-7.2 2.4.1 GEOTEXTILE WOVEN FOR STABILIZATION OF THE SUBGRADE m2 34766
R-5.7 2.4.2 PREPARATION OF SUB-GRADE WITH SELECTED SOIL m3 13093
R-5.1 2.4.3 PREPARATION OF BASE, CLASS 1A m3 4083
R-6.4 2.4.4 LAYER OF BASE OF ASPHALTIC CONCRETE MIXED IN PLANT 10cm THICK m2 18956
R-6.3 2.4.5 ASPHALT MC FOR PRIMING liter 28433
R-6.2 2.4.6 EMULSIFIED ASPHALT TYPE SS-1H FOR ADHERENCE IRRIGATION liter 6634
R-6.5 2.4.7 WEARING COURSE OF ASPHALTIC CONCRETE MIXED IN PLANT 5cm THICK m2 18956
2.5 MISCELLANEOUS WORKS
2.5.1 EXISTING ROAD
R-2.2 2.5.1.1 SHAPPING AND COMPACTION OF THE SUBGRADE m2 450
R-5.1 2.5.1.2 PREPARATION OF BASE, CLASS 1A m3 90
R-6.4 2.5.1.3 LAYER OF BASE OF ASPHALTIC CONCRETE MIXED IN PLANT 10cm THICK m2 450
R-6.3 2.5.1.4 ASPHALT MC FOR PRIMING liter 675
R-6.2 2.5.1.5 EMULSIFIED ASPHALT TYPE SS-1H FOR ADHERENCE IRRIGATION liter 158
R-6.5 2.5.1.6 WEARING COURSE OF ASPHALTIC CONCRETE MIXED IN PLANT 5cm THICK m2 450
R-8.15 2.5.1.7 SIMPLE CONCRETE f'c=180 kg/cm2 m3 8
R-9.3 2.5.1.8 FORMWORK OF STRUCTURE m2 108
2.5.2 ROAD PAINTING
R-39.3 2.5.2.1 PAVEMENT MARKING - (paint stripe yellow, width = 15.0 cm / homigón asfáltico) m 2916
R-39.4 2.5.2.2 PAVEMENT MARKING - (paint stripe white, width = 15.0 cm / homigón asfáltico) m 5832
R-39.5 2.5.2.3 HIGH RELIEVE PAVEMENT MARKS - (eye cats / bidirectionals) ea 293
2.5.3 TRAFFIC CONTROL - VERTICAL SIGNALS
SIGNS NEXT TO THE ROAD - (2.40 m x 1.2 m / informative / includes: metallic frame/portico and
R-39.9 2.5.3.1 ea 1
foundation plinth )
SIGNS NEXT TO THE ROAD - (0.75 m x 0.75 m / regulatory sign / includes: square pipe 2" x and
R-39.6 2.5.3.3 ea 4
foundation plinth )
R-39.1 2.5.3.4 DELINEATOR WITH REFLECTIVE MATERIAL - (liner poles h= 1.5 m / includes: foundation plinth ) ea 83
2.5.4 GUARDRAIL
R-39.2 2.5.4.1 GUARDRAIL SIMPLE m 761
3 INTERCEPTOR AND COLLECTORS
3.1 PRINCIPAL INTERCEPTOR "A", L=2.78 km
3.1.1 TRENCH EXCAVATION AND BACKFILL
R-3.4 3.1.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M m3 8855
R-3.6 3.1.1.2 TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M m3 56868
R-10.3 3.1.1.3 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M m 696
R-10.5 3.1.1.4 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M m 2087
R-40.4 3.1.1.5 WATER PUMPING EQUAL/BEYOND 2" hour 500
R-2.12 3.1.1.6 GRADING BY LABOUR IN TRENCHES m2 8271
R-4.1 3.1.1.7 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 11857
R-4.12 3.1.1.8 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 35446
R-5.7 3.1.1.9 PREPARATION OF SUB-GRADE WITH SELECTED SOIL m3 12302
R-21.4 3.1.1.10 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m) m3-km 68175
3.1.2 PIPE WORKS
R-11.1 3.1.2.1 SUPPLY, INSTALLATION AND TEST OF GRP PIPE FOR SEWAGE D(i)=1500 mm m 831
R-11.2 3.1.2.2 SUPPLY, INSTALLATION AND TEST OF GRP PIPE FOR SEWAGE D(i)=1650 mm m 1915
3.1.3 MANHOLE WORKS
R-3.10 3.1.3.1 EXCAVATION BY LABOUR m3 93
R-4.9 3.1.3.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 43
R-8.7 3.1.3.3 LEAN CONCRETE - (f´c=180 kg/cm2) m3 14

Hoja 41 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-8.5 3.1.3.4 JOINT TO MANHOLE MORTAR 1:3 ea 38


R-8.24 3.1.3.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 5
R-19.13 3.1.3.6 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 19
R-17.11 3.1.3.7 CONCRETE MANHOLE 2<H<4 M (Di=2100mm) ea 1
R-17.12 3.1.3.8 CONCRETE MANHOLE 4<H<6 M (Di=2100mm) ea 6
R-17.13 3.1.3.9 CONCRETE MANHOLE 6<H<8 M (Di=2100mm) ea 3
R-17.14 3.1.3.10 CONCRETE MANHOLE 8<H<10 M (Di=2100mm) ea 8
3.2 INTERCEPTOR "E2", L=12.78 km
3.2.1 DEMOLITTION, SITE PREPARATION
R-2.7 3.2.1.1 GRUBBING, FOREST CLEARING AND REMOVAL, RIVER ha 10.67
R-2.14 3.2.1.2 GRADING AND LEVELLING FOR ROAD WORKS km 21.34
R-2.4 3.2.1.3 DEMOLITION OF EXISTING STRUCTURE m3 60
R-2.10 3.2.1.4 REMOVAL AND PLACEMENT OF INTERLOKING BLOCK . m2 176
R-2.17 3.2.1.5 CUT BY MACHINE OF ASPHALTIC PAVEMENT m2 269
R-2.18 3.2.1.6 CUT BY MACHINE AND REINSTATEMENT OF SIDEWALK 7 cm, includes Sub-base 15 cm m2 88
R-2.8 3.2.1.7 TEMPORARY DIVERSION OF RIVER FOR STRUCTURE CONSTRUCTION ea 2
TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE
R-21.3 3.2.1.8 m3-km 74690
TRANSPORT 500m), RIVER
3.2.2 EARTH WORKS
R-3.9 3.2.2.1 SOIL EXCAVATION, RIVER m3 17090
R-4.7 3.2.2.2 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL, RIVER m3 39169
R-2.3 3.2.2.3 SHAPPING AND COMPACTION OF THE SUBGRADE, RIVER m2 9299
R-2.1 3.2.2.4 SLOPE SHAPING -COMBING T= 20 CM. m2 7198
3.2.3 INTERCEPTOR
3.2.3.1 TRENCH EXCAVATION AND BACKFILL
R-3.2 3.2.3.1.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 17733
R-3.5 3.2.3.1.2 TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M, RIVER m3 21206
R-3.7 3.2.3.1.3 TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M, RIVER m3 4296
R-10.2 3.2.3.1.4 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M, RIVER m 5415
R-10.4 3.2.3.1.5 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M, RIVER m 609
R-40.4 3.2.3.1.6 WATER PUMPING EQUAL/BEYOND 2" hour 500
R-2.12 3.2.3.1.7 GRADING BY LABOUR IN TRENCHES m2 17085
R-4.2 3.2.3.1.8 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER m3 15280
R-4.13 3.2.3.1.9 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL, RIVER m3 24968
R-21.5 3.2.3.1.10 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 93969
3.2.3.2 PIPE WORKS
3.2.3.2.1 PIPE WORKS OF PE
R-12.1 3.2.3.2.1.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm, RIVER m 2112
R-12.3 3.2.3.2.1.2 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=300mm, RIVER m 142
R-12.5 3.2.3.2.1.3 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER m 2128
R-12.6 3.2.3.2.1.4 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=500mm, RIVER m 768
R-12.7 3.2.3.2.1.5 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=600mm, RIVER m 2180
R-12.8 3.2.3.2.1.6 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=700mm, RIVER m 4427
3.2.3.2.2 PIPE WORKS DE DCIP (HIERRO DUCTIL)
R-13.2 3.2.3.2.2.1 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=500 mm, RIVER m 274
R-13.3 3.2.3.2.2.2 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=700 mm, RIVER m 56
3.2.3.3 MANHOLE WORKS
3.2.3.3.1 CONCRETE MANHOLE
R-3.10 3.2.3.3.1.1 EXCAVATION BY LABOUR m3 1005
R-4.9 3.2.3.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 464
R-8.8 3.2.3.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 155
R-8.5 3.2.3.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 866
R-8.24 3.2.3.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 35
R-19.13 3.2.3.3.1.6 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 433
R-17.1 3.2.3.3.1.7 CONCRETE MANHOLE 0<H<2 M (Di=900mm) ea 31
R-17.2 3.2.3.3.1.8 CONCRETE MANHOLE 2<H<4 M (Di=900mm) ea 25
R-17.3 3.2.3.3.1.9 CONCRETE MANHOLE 4<H<6 M (Di=900mm) ea 36
R-17.4 3.2.3.3.1.10 CONCRETE MANHOLE 6<H<8 M (Di=900mm) ea 9
R-17.5 3.2.3.3.1.11 CONCRETE MANHOLE 8<H<10 M (Di=900mm) ea 2
R-17.6 3.2.3.3.1.12 CONCRETE MANHOLE 0<H<2 M (Di=1200mm) ea 38
R-17.7 3.2.3.3.1.13 CONCRETE MANHOLE 2<H<4 M (Di=1200mm) ea 274
R-17.8 3.2.3.3.1.14 CONCRETE MANHOLE 4<H<6 M (Di=1200mm) ea 15
R-17.9 3.2.3.3.1.15 CONCRETE MANHOLE 6<H<8 M (Di=1200mm) ea 3
3.2.3.3.2 PREFABRICATED MANHOLE
R-18.1 3.2.3.3.2.1 PE MANHOLE H=1.70M ea 12
R-18.2 3.2.3.3.2.2 PE MANHOLE H=2.20M ea 96
R-18.3 3.2.3.3.2.3 PE MANHOLE 2.20<H<2.7M ea 44
R-18.4 3.2.3.3.2.4 PE MANHOLE 2.7<H<3.2M ea 20
R-18.5 3.2.3.3.2.5 PE MANHOLE 3.2<H<3.7M ea 18
R-18.6 3.2.3.3.2.6 PE MANHOLE 3.7<H<4.2M ea 14
R-8.23 3.2.3.3.2.7 CONCRETE COVER f'c=210KG/CM2 FOR MANHOLE D=1.05M T=0.15M ea 204
R-8.27 3.2.3.3.2.8 REINFORCED CONCRETE COVER D=0.85M FOR MANHOLE ea 204
3.2.4 DRAINAGE
3.2.4.1 SUBDRENES
R-3.2 3.2.4.1.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 1474
R-4.14 3.2.4.1.2 BACKFILL WITH FILTERING MATERIAL m3 1474
R-21.5 3.2.4.1.3 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 7582
3.2.4.2 OVERFLOW DRAIN
R-3.2 3.2.4.2.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 342
R-4.11 3.2.4.2.2 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER m3 68
R-8.10 3.2.4.2.3 STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER m3 105
R-19.1 3.2.4.2.4 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 2175
R-9.3 3.2.4.2.5 FORMWORK OF STRUCTURE m2 661
3.2.4.3 STORM INLET
R-8.10 3.2.4.3.1 STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER m3 2100
R-9.3 3.2.4.3.2 FORMWORK OF STRUCTURE m2 8475
3.2.5 PAVEMENT STRUCTURE
3.2.5.1 WALKWAY
R-5.2 3.2.5.1.1 PREPARATION OF BASE, CLASS 1A, RIVER m3 1480
R-4.2 3.2.5.1.2 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER m3 370
R-6.1 3.2.5.1.3 INTERLOKING BLOCK 0.28x0.14x0.08M m2 7400
3.2.5.2 ROAD UNPAVED
R-5.1 3.2.5.2.1 PREPARATION OF BASE, CLASS 1A m3 64
3.2.5.3 ROAD BLOCK
R-5.8 3.2.5.3.1 PREPARATION OF SUB-BASE, CLASS 3 m3 44
R-5.1 3.2.5.3.2 PREPARATION OF BASE, CLASS 1A m3 35
3.2.5.4 ROAD ASPHALT
R-5.1 3.2.5.4.1 PREPARATION OF BASE, CLASS 1A m3 54
R-6.4 3.2.5.4.2 LAYER OF BASE OF ASPHALTIC CONCRETE MIXED IN PLANT 10cm THICK m2 269
R-6.3 3.2.5.4.3 ASPHALT MC FOR PRIMING liter 403
R-6.2 3.2.5.4.4 EMULSIFIED ASPHALT TYPE SS-1H FOR ADHERENCE IRRIGATION liter 94
R-6.5 3.2.5.4.5 WEARING COURSE OF ASPHALTIC CONCRETE MIXED IN PLANT 5cm THICK m2 269
3.2.6 MISCELLANEOUS
3.2.6.1 ELECTRICAL INSTALLATION
R-31.2 3.2.6.1.1 DECORATIVE LUMINAIRES 175W TYPE PLATO ea 133
R-31.1 3.2.6.1.2 CONNECTION TO POWER NETWORK m 5285
3.2.6.2 RIPRAP(STONE WORK) WITH MORTAR
R-5.3 3.2.6.2.1 PROTECTION RIPRAP WITH MORTAR m3 3744
R-8.10 3.2.6.2.2 STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER m3 368
R-9.3 3.2.6.2.3 FORMWORK OF STRUCTURE m2 1474
3.2.6.3 HANDRAIL
R-8.1 3.2.6.3.1 SIMPLE CONCRETE BASE f`c=180kg/cm2 FOR HANDRAILS ea 3525

Hoja 42 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-40.2 3.2.6.3.2 HANDRAIL OF FINE MORAL WOOD m 5285


3.2.6.4 PAINTING IN WALKWAY
R-40.8 3.2.6.4.1 PAINTING OF REINFORCED CONCRETE COVERS OF MANHOLES ea 204
3.2.6.5 PLANTING
R-38.2 3.2.6.5.1 BUSH LIRIOPE ea 10572
R-38.7 3.2.6.5.2 ARACHIS PINTOI GRASS m2 2643
3.2.6.6 DROP MANHOLE
R-12.5 3.2.6.6.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER m 2
R-30.46 3.2.6.6.2 PVC TEE D=400mm ea 2
R-30.6 3.2.6.6.3 PVC ELBOW D=400m, Degree=90 ea 2
R-19.5 3.2.6.6.4 ANCHORAGE AND SUPPORT FOR PIPE ea 4
3.2.6.7 REVESTIMIENTO DE HORMIGÓN EN TUBERÍA DE PE
R-8.8 3.2.6.7.1 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 713
R-9.3 3.2.6.7.3 FORMWORK OF STRUCTURE m2 2292
3.2.6.8 PUENTE METÁLICO PARA PASO DE TUBERÍA DE DCIP
R-4.11 3.2.6.8.1 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER m3 54
R-8.15 3.2.6.8.2 SIMPLE CONCRETE f'c=180 kg/cm2 m3 0.5
R-8.16 3.2.6.8.3 SIMPLE CONCRETE f'c=210 kg/cm2 m3 6
R-19.1 3.2.6.8.4 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 499
R-19.3 3.2.6.8.5 STRUCTURAL STREEL IN GIRDERS kg 5727
R-40.9 3.2.6.8.6 NEOPRENE PLATE SHORE HARDNESS 60 T=3cm m2 10
R-9.3 3.2.6.8.7 FORMWORK OF STRUCTURE m2 15
3.3 INTERCEPTOR "D1", L=8.27 km
3.3.1 DEMOLITTION, SITE PREPARATION
R-2.7 3.3.1.1 GRUBBING, FOREST CLEARING AND REMOVAL, RIVER ha 8.39
R-2.14 3.3.1.2 GRADING AND LEVELLING FOR ROAD WORKS km 16.79
R-2.10 3.3.1.3 REMOVAL AND PLACEMENT OF INTERLOKING BLOCK . m2 53
R-2.17 3.3.1.4 CUT BY MACHINE OF ASPHALTIC PAVEMENT m2 395
R-2.18 3.3.1.5 CUT BY MACHINE AND REINSTATEMENT OF SIDEWALK 7 cm, includes Sub-base 15 cm m2 620
R-2.8 3.3.1.6 TEMPORARY DIVERSION OF RIVER FOR STRUCTURE CONSTRUCTION ea 2
TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE
R-21.3 3.3.1.7 m3-km 58730
TRANSPORT 500m), RIVER
3.3.2 MOVIMIENTO DE TIERRA
R-3.9 3.3.2.1 SOIL EXCAVATION, RIVER m3 9458
R-4.7 3.3.2.2 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL, RIVER m3 16460
R-2.3 3.3.2.3 SHAPPING AND COMPACTION OF THE SUBGRADE, RIVER m2 14285
R-2.1 3.3.2.4 SLOPE SHAPING -COMBING T= 20 CM. m2 4424
3.3.3 INTERCEPTOR
3.3.3.1 TRENCH EXCAVATION AND BACKFILL
R-3.2 3.3.3.1.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 8104
R-3.5 3.3.3.1.2 TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M, RIVER m3 23204
R-3.7 3.3.3.1.3 TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M, RIVER m3 7093
R-10.2 3.3.3.1.4 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M, RIVER m 4868
R-10.4 3.3.3.1.5 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M, RIVER m 702
R-40.4 3.3.3.1.6 WATER PUMPING EQUAL/BEYOND 2" hour 500
R-2.12 3.3.3.1.7 GRADING BY LABOUR IN TRENCHES m2 12316
R-4.2 3.3.3.1.8 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER m3 11244
R-4.13 3.3.3.1.9 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL, RIVER m3 25000
R-21.5 3.3.3.1.10 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 44609
3.3.3.2 PIPE WORKS
3.3.3.2.1 PIPE WORKS DE PE (POLIETILENO)
R-12.1 3.3.3.2.1.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm, RIVER m 244
R-12.2 3.3.3.2.1.2 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=250mm, RIVER m 419
R-12.5 3.3.3.2.1.3 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER m 44
R-12.6 3.3.3.2.1.4 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=500mm, RIVER m 2902
R-12.7 3.3.3.2.1.5 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=600mm, RIVER m 1278
R-12.8 3.3.3.2.1.6 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=700mm, RIVER m 2744
R-12.9 3.3.3.2.1.6 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=800mm, RIVER m 138
3.3.3.2.2 PIPE WORKS DE DCIP (HIERRO DUCTIL)
R-13.2 3.3.3.2.2.1 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=500 mm, RIVER m 250
3.3.3.3 MANHOLE WORKS
3.3.3.3.1 CONCRETE MANHOLE
R-3.10 3.3.3.3.1.1 EXCAVATION BY LABOUR m3 445
R-4.9 3.3.3.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 205
R-8.8 3.3.3.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 68
R-8.5 3.3.3.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 372
R-8.24 3.3.3.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 21
R-19.13 3.3.3.3.1.6 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 252
R-17.2 3.3.3.3.1.7 CONCRETE MANHOLE 2<H<4 M (Di=900mm) ea 8
R-17.3 3.3.3.3.1.8 CONCRETE MANHOLE 4<H<6 M (Di=900mm) ea 25
R-17.4 3.3.3.3.1.9 CONCRETE MANHOLE 6<H<8 M (Di=900mm) ea 9
R-17.5 3.3.3.3.1.10 CONCRETE MANHOLE 8<H<10 M (Di=900mm) ea 1
R-17.7 3.3.3.3.1.11 CONCRETE MANHOLE 2<H<4 M (Di=1200mm) ea 186
R-17.8 3.3.3.3.1.12 CONCRETE MANHOLE 4<H<6 M (Di=1200mm) ea 19
R-17.9 3.3.3.3.1.13 CONCRETE MANHOLE 6<H<8 M (Di=1200mm) ea 4
3.3.3.3.2 PREFABRICATED MANHOLE
R-18.1 3.3.3.3.2.1 PE MANHOLE H=1.70M ea 12
R-18.2 3.3.3.3.2.2 PE MANHOLE H=2.20M ea 25
R-18.3 3.3.3.3.2.3 PE MANHOLE 2.20<H<2.7M ea 25
R-18.4 3.3.3.3.2.4 PE MANHOLE 2.7<H<3.2M ea 13
R-18.5 3.3.3.3.2.5 PE MANHOLE 3.2<H<3.7M ea 15
R-18.6 3.3.3.3.2.6 PE MANHOLE 3.7<H<4.2M ea 20
R-8.23 3.3.3.3.2.7 CONCRETE COVER f'c=210KG/CM2 FOR MANHOLE D=1.05M T=0.15M ea 110
R-8.27 3.3.3.3.2.8 REINFORCED CONCRETE COVER D=0.85M FOR MANHOLE ea 110
3.3.4 DRAINAGE
3.3.4.1 SUBDRENES
R-3.2 3.3.4.1.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 1143
R-4.14 3.3.4.1.2 BACKFILL WITH FILTERING MATERIAL m3 1143
R-21.5 3.3.4.1.3 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 3805
3.3.4.2 OVERFLOW DRAIN
R-3.2 3.3.4.2.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 345
R-4.11 3.3.4.2.2 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER m3 69
R-8.10 3.3.4.2.3 STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER m3 106
R-19.1 3.3.4.2.4 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 2086
R-9.3 3.3.4.2.5 FORMWORK OF STRUCTURE m2 663
3.3.4.3 STORM INLET
R-8.10 3.3.4.3.1 STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER m3 1628
R-9.3 3.3.4.3.2 FORMWORK OF STRUCTURE m2 6571
3.3.5 PAVEMENT STRUCTURE
3.3.5.1 WALKWAY
R-5.2 3.3.5.1.1 PREPARATION OF BASE, CLASS 1A, RIVER m3 1218
R-4.2 3.3.5.1.2 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER m3 305
R-6.1 3.3.5.1.3 INTERLOKING BLOCK 0.28x0.14x0.08M m2 6091
3.3.5.2 ROAD_UNPAVED
R-5.1 3.3.5.2.1 PREPARATION OF BASE, CLASS 1A m3 14
3.3.5.3 ROAD_BLOCK
R-5.8 3.3.5.3.1 PREPARATION OF SUB-BASE, CLASS 3 m3 13
R-5.1 3.3.5.3.2 PREPARATION OF BASE, CLASS 1A m3 11
3.3.5.4 ROAD_ASPHALT
R-5.1 3.3.5.4.1 PREPARATION OF BASE, CLASS 1A m3 79
R-6.4 3.3.5.4.2 LAYER OF BASE OF ASPHALTIC CONCRETE MIXED IN PLANT 10cm THICK m2 395
R-6.3 3.3.5.4.3 ASPHALT MC FOR PRIMING liter 592

Hoja 43 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-6.2 3.3.5.4.4 EMULSIFIED ASPHALT TYPE SS-1H FOR ADHERENCE IRRIGATION liter 138
R-6.5 3.3.5.4.5 WEARING COURSE OF ASPHALTIC CONCRETE MIXED IN PLANT 5cm THICK m2 395
3.3.6 MISCELLANEOUS
3.3.6.1 ELECTRICAL INSTALLATION
R-31.2 3.3.6.1.1 DECORATIVE LUMINAIRES 175W TYPE PLATO ea 110
R-31.1 3.3.6.1.2 CONNECTION TO POWER NETWORK m 4351
3.3.6.2 RIPRAP(STONE WORK) WITH MORTAR
R-5.3 3.3.6.2.1 PROTECTION RIPRAP WITH MORTAR m3 2903
R-8.10 3.3.6.2.2 STRUCTURAL CONCRETE - (f´c=210 kg/cm2), RIVER m3 286
R-9.3 3.3.6.2.3 FORMWORK OF STRUCTURE m2 1143
3.3.6.3 HANDRAIL
R-8.1 3.3.6.3.1 SIMPLE CONCRETE BASE f`c=180kg/cm2 FOR HANDRAILS ea 2903
R-40.2 3.3.6.3.2 HANDRAIL OF FINE MORAL WOOD m 4351
3.3.6.4 PAINTING IN WALKWAY
R-40.8 3.3.6.4.1 PAINTING OF REINFORCED CONCRETE COVERS OF MANHOLES ea 110
3.3.6.5 PLANTING
R-38.2 3.3.6.5.1 BUSH LIRIOPE ea 8703
R-38.7 3.2.6.5.2 ARACHIS PINTOI GRASS m2 2175
3.3.6.6 DROP MANHOLE
R-12.5 3.3.6.6.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER m 5
R-30.46 3.3.6.6.2 PVC TEE D=400mm ea 2
R-30.6 3.3.6.6.3 PVC ELBOW D=400m, Degree=90 ea 2
R-19.5 3.3.6.6.4 ANCHORAGE AND SUPPORT FOR PIPE ea 9
3.4 COLLECTORS OF RIVER POVE AND CODE, L= 17.03 km
3.4.1 COLLECTORS "E2a" (POVE BASIN), L= 8.56 km
3.4.1.1 TRENCH EXCAVATION AND BACKFILL
R-3.2 3.4.1.1.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 8087
R-3.5 3.4.1.1.2 TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M, RIVER m3 6012
R-3.7 3.4.1.1.3 TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M, RIVER m3 309
R-10.2 3.4.1.1.4 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M, RIVER m 2490
R-10.4 3.4.1.1.5 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M, RIVER m 66
R-40.4 3.4.1.1.6 WATER PUMPING EQUAL/BEYOND 2" hour 500
R-2.12 3.4.1.1.7 GRADING BY LABOUR IN TRENCHES m2 6848
R-4.2 3.4.1.1.8 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER m3 4525
R-4.13 3.4.1.1.9 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL, RIVER m3 9615
R-21.5 3.4.1.1.10 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 23593
3.4.1.2 PIPE WORKS
3.4.1.2.1 PIPE WORKS OF PE
R-12.1 3.4.1.2.1.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm, RIVER m 8235
3.4.1.3 MANHOLE WORKS
3.4.1.3.1 CONCRETE MANHOLE
R-3.10 3.4.1.3.1.1 EXCAVATION BY LABOUR m3 44
R-4.9 3.4.1.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 20
R-8.8 3.4.1.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 7
R-8.5 3.4.1.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 48
R-8.24 3.4.1.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 1
R-40.7 3.4.1.3.1.6 MANHOLES CLEANING ea 77
R-19.13 3.4.1.3.1.7 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 24
R-17.1 3.4.1.3.1.8 CONCRETE MANHOLE 0<H<2 M (Di=900mm) ea 19
R-17.2 3.4.1.3.1.9 CONCRETE MANHOLE 2<H<4 M (Di=900mm) ea 4
R-17.3 3.4.1.3.1.10 CONCRETE MANHOLE 4<H<6 M (Di=900mm) ea 1
3.4.1.3.2 PREFABRICATED MANHOLE
R-18.1 3.4.1.3.2.1 PE MANHOLE H=1.70M ea 242
R-18.2 3.4.1.3.2.2 PE MANHOLE H=2.20M ea 16
R-18.3 3.4.1.3.2.3 PE MANHOLE 2.20<H<2.7M ea 1
R-18.4 3.4.1.3.2.4 PE MANHOLE 2.7<H<3.2M ea 1
R-8.23 3.4.1.3.2.7 CONCRETE COVER f'c=210KG/CM2 FOR MANHOLE D=1.05M T=0.15M ea 260
R-8.27 3.4.1.3.2.8 REINFORCED CONCRETE COVER D=0.85M FOR MANHOLE ea 260
3.4.2 COLLECTORS "D1C, D1E, D1a1-D1a17" (CODE BASIN), L= 8.47 km
3.4.2.1 TRENCH EXCAVATION AND BACKFILL
R-3.2 3.4.2.1.1 TRENCHES EXCAVATION BY LABOUR IN SOIL 0< H <2 M m3 3683
R-3.5 3.4.2.1.2 TRENCHES EXCAVATION BY MACHINE IN SOIL 2< H <5 M, RIVER m3 15313
R-3.7 3.4.2.1.3 TRENCHES EXCAVATION BY MACHINE IN SOIL H>5 M, RIVER m3 2483
R-10.2 3.4.2.1.4 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 2< H <5 M, RIVER m 5748
R-10.4 3.4.2.1.5 SUPPLY, INSTALL AND DISASSEMBLING OF SHORING, 5<H<9 M, RIVER m 462
R-40.4 3.4.2.1.6 WATER PUMPING EQUAL/BEYOND 2" hour 500
R-2.12 3.4.2.1.7 GRADING BY LABOUR IN TRENCHES m2 7221
R-4.2 3.4.2.1.8 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ), RIVER m3 4980
R-4.13 3.4.2.1.9 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL, RIVER m3 16088
R-21.5 3.4.2.1.10 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 26255
3.4.2.2 PIPE WORKS
3.4.2.2.1 PIPE WORKS OF PE
R-12.1 3.4.2.2.1.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm, RIVER m 4583
R-12.2 3.4.2.2.1.2 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=250mm, RIVER m 1232
R-12.3 3.4.2.2.1.3 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=300mm, RIVER m 1759
R-12.4 3.4.2.2.1.4 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=350mm, RIVER m 227
R-12.5 3.4.2.2.1.5 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER m 359
3.4.2.3 MANHOLE WORKS
3.4.2.3.1 CONCRETE MANHOLE
R-3.10 3.4.2.3.1.1 EXCAVATION BY LABOUR m3 55
R-4.9 3.4.2.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 26
R-8.8 3.4.2.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 9
R-8.5 3.4.2.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 60
R-8.24 3.4.2.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 2
R-40.7 3.4.2.3.1.6 MANHOLES CLEANING ea 7
R-19.13 3.4.2.3.1.7 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 30
R-17.1 3.4.2.3.1.8 CONCRETE MANHOLE 0<H<2 M (Di=900mm) ea 1
R-17.2 3.4.2.3.1.9 CONCRETE MANHOLE 2<H<4 M (Di=900mm) ea 4
R-17.3 3.4.2.3.1.10 CONCRETE MANHOLE 4<H<6 M (Di=900mm) ea 19
R-17.4 3.4.2.3.1.11 CONCRETE MANHOLE 6<H<8 M (Di=900mm) ea 5
R-17.5 3.4.2.3.1.12 CONCRETE MANHOLE 8<H<10 M (Di=900mm) ea 1
3.4.2.3.2 PREFABRICATED MANHOLE
R-18.1 3.4.2.3.2.1 PE MANHOLE H=1.70M ea 64
R-18.2 3.4.2.3.2.2 PE MANHOLE H=2.20M ea 80
R-18.3 3.4.2.3.2.3 PE MANHOLE 2.20<H<2.7M ea 67
R-18.4 3.4.2.3.2.4 PE MANHOLE 2.7<H<3.2M ea 49
R-18.5 3.4.2.3.2.5 PE MANHOLE 3.2<H<3.7M ea 22
R-18.6 3.4.2.3.2.6 PE MANHOLE 3.7<H<4.2M ea 21
R-8.23 3.4.2.3.2.7 CONCRETE COVER f'c=210KG/CM2 FOR MANHOLE D=1.05M T=0.15M ea 303
R-8.27 3.4.2.3.2.8 REINFORCED CONCRETE COVER D=0.85M FOR MANHOLE ea 303
3.4.2.3.3 DROP MANHOLE
R-12.5 3.4.2.3.3.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm, RIVER m 3
R-30.46 3.4.2.3.3.2 PVC TEE D=400mm ea 2
R-30.6 3.4.2.3.3.3 PVC ELBOW D=400m, Degree=90 ea 2
R-19.5 3.4.2.3.3.4 ANCHORAGE AND SUPPORT FOR PIPE ea 6
4 RIVER IMPROVEMENT
4.1 POVE RIVER, RIPRAP(STONE WORK) L=2.77 km - GABION L=3.68 km
4.1.1 DEMOLITTION, SITE PREPARATION
R-2.7 4.1.1.1 GRUBBING, FOREST CLEARING AND REMOVAL, RIVER ha 3.22
R-2.14 4.1.1.2 GRADING AND LEVELLING FOR ROAD WORKS km 6.45
TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE
R-21.3 4.1.1.3 m3-km 22540
TRANSPORT 500m), RIVER

Hoja 44 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

RIVER_BED PROTECTION
4.1.2
STONE WORK WITHOUT MORTAR
4.1.2.1
R-3.1 4.1.2.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 3321
R-5.5 4.1.2.1.2 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER m3 3019
R-7.1 4.1.2.1.3 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 3774
R-19.12 4.1.2.1.4 SUPPLY AND INSTALLATION OF SHEETPILE, T=6mm m2 435
R-21.5 4.1.2.1.5 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 14855
SLOPE PROTECTION
4.1.3
GABION WALL
4.1.3.1
R-3.1 4.1.3.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 4048
R-4.8 4.1.3.1.2 COMPACTING BACKFILL WITH STONE BALL, RIVER m3 13503
R-7.1 4.1.3.1.3 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 26597
R-19.8 4.1.3.1.4 GABIONS WALL, TRIPLE TORSION (2x1x1), RIVER m3 17342
R-21.5 4.1.3.1.5 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 18107
4.1.3.2 RIPRAP (STONE WORK)
R-3.1 4.1.3.2.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 12076
R-4.14 4.1.3.2.4 BACKFILL WITH FILTERING MATERIAL m3 3150
R-4.8 4.1.3.2.5 COMPACTING BACKFILL WITH STONE BALL, RIVER m3 7696
R-5.5 4.1.3.2.2 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER m3 10501
R-7.1 4.1.3.2.3 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 11667
R-21.5 4.1.3.2.6 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 54015
DRAINAGE
4.1.4
BOX CULVERT
4.1.4.1
R-3.1 4.1.3.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 4002
R-4.12 4.1.3.1.2 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 418
R-4.6 4.1.3.1.3 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 3584
COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3),
R-4.4 4.1.3.1.4 m3 774
RIVER
R-4.11 4.1.3.1.5 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER m3 86
R-8.13 4.1.3.1.6 STRUCTURAL CONCRETE - (f´c=280 kg/cm2), RIVER m3 696
R-8.8 4.1.3.1.7 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 68
R-19.1 4.1.3.1.8 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 78103
R-9.3 4.1.3.1.9 FORMWORK OF STRUCTURE m2 2590
R-20.4 4.1.3.1.10 PVC WATERTIGHT JOINTS 22 CM m 616
R-40.4 4.1.3.1.11 WATER PUMPING EQUAL/BEYOND 2" hour 100
R-21.5 4.1.3.1.12 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 2643
4.1.4.2 TUNEL S=2.0 m x 3.0 m; L= 71 m
R-2.16 4.1.4.2.1 GRADING AND LEVELLING TUNNELING m 71
R-19.4 4.1.4.2.2 METALLIC GIRDERS kg 17750
TUNNEL EXCAVATION BY LABOUR IN SOIL (INCLUDES HORIZONTAL AND/OR VERTICAL
R-3.14 4.1.4.2.3 m3 400.87
DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, CONGLOMERATE (INCLUDES HORIZONTAL AND/OR
R-3.12 4.1.4.2.4 m3 200.43
VERTICAL DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, ROCK-DRILLER COMPRESSOR AND EXPLOSIVES
R-3.13 4.1.4.2.5 m3 66.81
(INCLUDES HORIZONTAL AND/OR VERTICAL DISPOSAL )
R-2.11 4.1.4.2.6 GRADING OF TUNNEL BY LABOUR m2 191.7
R-40.5 4.1.4.2.7 CONTROL AND CLEARING OF COLLAPSE IN TUNNEL m3 33.41
R-40.4 4.1.4.2.8 WATER PUMPING EQUAL/BEYOND 2" hour 71
R-20.4 4.1.4.2.9 PVC WATERTIGHT JOINTS 22 CM m 190.33
R-40.10 4.1.4.2.10 POLYETHYLENE 2 mm m2 191.7
R-5.6 4.1.4.2.11 FILTERING MATERIAL IN DRAINS IN TUNNEL m3 23.43
R-15.2 4.1.4.2.12 PIPE FOR SUBDRAIN - (DRILLED PVC , D=110mm) m 71.71
R-15.1 4.1.4.2.13 PVC PIPE FOR DRAINAGE 50mm x 3m FOR CHANNELS m 35.5
R-8.25 4.1.4.2.14 SEPARATORS OF MORTAR 1:6 ea 710
R-8.7 4.1.4.2.15 LEAN CONCRETE - (f´c=180 kg/cm2) m3 19.17
R-8.12 4.1.4.2.16 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 221.52
R-19.1 4.1.4.2.17 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 18341.67
R-9.5 4.1.4.2.18 SET UP/ REMOVAL OF FRAMEWORK STRAIGHT METAL m2 284
R-10.1 4.1.4.2.19 PERMANENT CONTINUOUS SHORING OF TUNNEL m2 616.28
R-9.4 4.1.4.2.20 SET UP/ REMOVAL OF FRAMEWORK VAULT METAL m2 222.94
R-21.4 4.1.4.2.21 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m) m3-km 2004.33
R-21.1 4.1.4.2.22 MATERIAL TRANSPORT BY LABOUT, L=100m APPROX. m3 668.11
4.1.4.3 TUNEL S=1.5 m x 1.75 m; L= 183 m
R-2.16 4.1.4.3.1 GRADING AND LEVELLING TUNNELING m 183
R-19.4 4.1.4.3.2 METALLIC GIRDERS kg 11712
TUNNEL EXCAVATION BY LABOUR IN SOIL (INCLUDES HORIZONTAL AND/OR VERTICAL
R-3.14 4.1.4.3.3 m3 564.37
DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, CONGLOMERATE (INCLUDES HORIZONTAL AND/OR
R-3.12 4.1.4.3.4 m3 282.19
VERTICAL DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, ROCK-DRILLER COMPRESSOR AND EXPLOSIVES
R-3.13 4.1.4.3.5 m3 94.06
(INCLUDES HORIZONTAL AND/OR VERTICAL DISPOSAL )
R-2.11 4.1.4.3.6 GRADING OF TUNNEL BY LABOUR m2 402.6
R-40.5 4.1.4.3.7 CONTROL AND CLEARING OF COLLAPSE IN TUNNEL m3 47.03
R-40.4 4.1.4.3.8 WATER PUMPING EQUAL/BEYOND 2" hour 183
R-20.4 4.1.4.3.9 PVC WATERTIGHT JOINTS 22 CM m 450.55
R-40.10 4.1.4.3.10 POLYETHYLENE 2 mm m2 406.26
R-5.6 4.1.4.3.11 FILTERING MATERIAL IN DRAINS IN TUNNEL m3 29.28
R-15.2 4.1.4.3.12 PIPE FOR SUBDRAIN - (DRILLED PVC , D=110mm) m 184.83
R-15.1 4.1.4.3.13 PVC PIPE FOR DRAINAGE 50mm x 3m FOR CHANNELS m 91.5
R-8.25 4.1.4.3.14 SEPARATORS OF MORTAR 1:6 ea 1830
R-8.7 4.1.4.3.15 LEAN CONCRETE - (f´c=180 kg/cm2) m3 40.26
R-8.12 4.1.4.3.16 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 380.64
R-19.1 4.1.4.3.17 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 61305
R-9.5 4.1.4.3.18 SET UP/ REMOVAL OF FRAMEWORK STRAIGHT METAL m2 366
R-10.1 4.1.4.3.19 PERMANENT CONTINUOUS SHORING OF TUNNEL m2 1145.58
R-9.4 4.1.4.3.20 SET UP/ REMOVAL OF FRAMEWORK VAULT METAL m2 431.88
R-21.4 4.1.4.3.21 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m) m3-km 2821.86
R-21.1 4.1.4.3.22 MATERIAL TRANSPORT BY LABOUT, L=100m APPROX. m3 940.62
4.1.4.4 PIPE SUPPORTING
R-19.2 4.1.4.3.1 STRUCTURAL STEEL A36, INCLUDES INSTALLATION kg 4474
4.2 RIVER CODE, RIPRAP(STONE WORK) L=2.72 km - GABION L=1.26 km
4.2.1 DEMOLITTION, SITE PREPARATION
R-2.7 4.2.1.1 GRUBBING, FOREST CLEARING AND REMOVAL, RIVER ha 1.99
R-2.14 4.2.1.2 GRADING AND LEVELLING FOR ROAD WORKS km 3.98
TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE
R-21.3 4.2.1.3 m3-km 13930
TRANSPORT 500m), RIVER
RIVER_BED PROTECTION
4.2.2
STONE WORK WITHOUT MORTAR
4.2.2.1
R-3.1 4.2.2.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 1026
R-5.5 4.2.2.1.2 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER m3 932
R-7.1 4.2.2.1.3 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 1166
R-19.12 4.2.2.1.4 SUPPLY AND INSTALLATION OF SHEETPILE, T=6mm m2 134
R-21.5 4.2.2.1.5 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 3077
SLOPE PROTECTION
4.2.3
GABION WALL
4.2.3.1
R-3.1 4.2.3.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 1384
R-4.8 4.2.3.1.2 COMPACTING BACKFILL WITH STONE BALL, RIVER m3 4591
R-7.1 4.2.3.1.3 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 8812
R-19.8 4.2.3.1.4 GABIONS WALL, TRIPLE TORSION (2x1x1), RIVER m3 5462
R-21.5 4.2.3.1.5 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 4151
RIPRAP (STONE WORK)
4.2.3.2
R-3.1 4.2.2.2.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 15273
R-4.14 4.2.2.2.2 BACKFILL WITH FILTERING MATERIAL m3 3984
R-4.8 4.2.2.2.3 COMPACTING BACKFILL WITH STONE BALL, RIVER m3 8919
R-7.1 4.2.2.2.4 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 14756

Hoja 45 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-5.5 4.2.2.2.5 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER m3 13281
R-21.5 4.2.2.2.6 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 45818
DRAINAGE
4.2.4
BOX CULVERT
4.2.4.1
R-3.1 4.2.4.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 851
R-4.12 4.2.4.1.2 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 75
R-4.6 4.2.4.1.3 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 776
COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3),
R-4.4 4.2.4.1.4 m3 128
RIVER
R-4.11 4.2.4.1.5 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER m3 14
R-8.13 4.2.4.1.6 STRUCTURAL CONCRETE - (f´c=280 kg/cm2), RIVER m3 157
R-8.8 4.2.4.1.7 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 13
R-19.1 4.2.4.1.8 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 19084
R-9.3 4.2.4.1.9 FORMWORK OF STRUCTURE m2 571
R-20.4 4.2.4.1.10 PVC WATERTIGHT JOINTS 22 CM m 91
R-40.4 4.2.4.1.11 WATER PUMPING EQUAL/BEYOND 2" hour 100
R-21.5 4.2.4.1.12 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 467
4.2.4.2 TUNEL S=2.0 m x 3.0 m; L= 40 m
R-2.16 4.2.4.2.1 GRADING AND LEVELLING TUNNELING m 40
R-19.4 4.2.4.2.2 METALLIC GIRDERS kg 10000
TUNNEL EXCAVATION BY LABOUR IN SOIL (INCLUDES HORIZONTAL AND/OR VERTICAL
R-3.14 4.2.4.2.3 m3 225.84
DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, CONGLOMERATE (INCLUDES HORIZONTAL AND/OR
R-3.12 4.2.4.2.4 m3 112.92
VERTICAL DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, ROCK-DRILLER COMPRESSOR AND EXPLOSIVES
R-3.13 4.2.4.2.5 m3 37.64
(INCLUDES HORIZONTAL AND/OR VERTICAL DISPOSAL )
R-2.11 4.2.4.2.6 GRADING OF TUNNEL BY LABOUR m2 108
R-40.5 4.2.4.2.7 CONTROL AND CLEARING OF COLLAPSE IN TUNNEL m3 18.82
R-40.4 4.2.4.2.8 WATER PUMPING EQUAL/BEYOND 2" hour 40
R-20.4 4.2.4.2.9 PVC WATERTIGHT JOINTS 22 CM m 107.23
R-40.10 4.2.4.2.10 POLYETHYLENE 2 mm m2 108
R-5.6 4.2.4.2.11 FILTERING MATERIAL IN DRAINS IN TUNNEL m3 13.2
R-15.2 4.2.4.2.12 PIPE FOR SUBDRAIN - (DRILLED PVC , D=110mm) m 40.4
R-15.1 4.2.4.2.13 PVC PIPE FOR DRAINAGE 50mm x 3m FOR CHANNELS m 20
R-8.25 4.2.4.2.14 SEPARATORS OF MORTAR 1:6 ea 400
R-8.7 4.2.4.2.15 LEAN CONCRETE - (f´c=180 kg/cm2) m3 10.8
R-8.12 4.2.4.2.16 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 124.8
R-19.1 4.2.4.2.17 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 10333.33
R-9.5 4.2.4.2.18 SET UP/ REMOVAL OF FRAMEWORK STRAIGHT METAL m2 160
R-10.1 4.2.4.2.19 PERMANENT CONTINUOUS SHORING OF TUNNEL m2 347.2
R-9.4 4.2.4.2.20 SET UP/ REMOVAL OF FRAMEWORK VAULT METAL m2 125.6
R-21.4 4.2.4.2.21 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m) m3-km 1129.2
R-21.1 4.2.4.2.22 MATERIAL TRANSPORT BY LABOUT, L=100m APPROX. m3 376.4
4.2.4.3 TUNEL S=1.5 m x 1.75 m; L= 87.5 m
R-2.16 4.2.4.3.1 GRADING AND LEVELLING TUNNELING m 87.5
R-19.4 4.2.4.3.2 METALLIC GIRDERS kg 5600
TUNNEL EXCAVATION BY LABOUR IN SOIL (INCLUDES HORIZONTAL AND/OR VERTICAL
R-3.14 4.2.4.3.3 m3 269.85
DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, CONGLOMERATE (INCLUDES HORIZONTAL AND/OR
R-3.12 4.2.4.3.4 m3 134.93
VERTICAL DISPOSAL )
TUNNEL EXCAVATION BY LABOUR, ROCK-DRILLER COMPRESSOR AND EXPLOSIVES
R-3.13 4.2.4.3.5 m3 44.98
(INCLUDES HORIZONTAL AND/OR VERTICAL DISPOSAL )
R-2.11 4.2.4.3.6 GRADING OF TUNNEL BY LABOUR m2 192.5
R-40.5 4.2.4.3.7 CONTROL AND CLEARING OF COLLAPSE IN TUNNEL m3 22.49
R-40.4 4.2.4.3.8 WATER PUMPING EQUAL/BEYOND 2" hour 87.5
R-20.4 4.2.4.3.9 PVC WATERTIGHT JOINTS 22 CM m 215.43
R-40.10 4.2.4.3.10 POLYETHYLENE 2 mm m2 194.25
R-5.6 4.2.4.3.11 FILTERING MATERIAL IN DRAINS IN TUNNEL m3 14
R-15.2 4.2.4.3.12 PIPE FOR SUBDRAIN - (DRILLED PVC , D=110mm) m 88.38
R-15.1 4.2.4.3.13 PVC PIPE FOR DRAINAGE 50mm x 3m FOR CHANNELS m 43.75
R-8.25 4.2.4.3.14 SEPARATORS OF MORTAR 1:6 ea 875
R-8.7 4.2.4.3.15 LEAN CONCRETE - (f´c=180 kg/cm2) m3 19.25
R-8.12 4.2.4.3.16 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 182
R-19.1 4.2.4.3.17 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 29312.5
R-9.5 4.2.4.3.18 SET UP/ REMOVAL OF FRAMEWORK STRAIGHT METAL m2 175
R-10.1 4.2.4.3.19 PERMANENT CONTINUOUS SHORING OF TUNNEL m2 547.75
R-9.4 4.2.4.3.20 SET UP/ REMOVAL OF FRAMEWORK VAULT METAL m2 206.5
R-21.4 4.2.4.3.21 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m) m3-km 1349.28
R-21.1 4.2.4.3.22 MATERIAL TRANSPORT BY LABOUT, L=100m APPROX. m3 449.75
4.3 RIVER CODE - LATERALS, RIPRAP(STONE WORK), L=0.77 km - GABION L=0.28 km
4.3.1 DEMOLITTION, SITE PREPARATION
R-2.7 4.3.1.1 GRUBBING, FOREST CLEARING AND REMOVAL, RIVER ha 0.52
R-2.14 4.3.1.2 GRADING AND LEVELLING FOR ROAD WORKS km 1.05
TRANSPORT OF GRUBBING AND FOREST CLEANING MATERIAL RESIDUES (FREE
R-21.3 4.3.1.3 m3-km 3640
TRANSPORT 500m), RIVER
RIVER_BED PROTECTION
4.3.2
STONE WORK WITHOUT MORTAR
4.3.2.1
R-3.1 4.3.2.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 329
R-5.5 4.3.2.1.2 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER m3 299
R-7.1 4.3.2.1.3 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 374
R-19.12 4.3.2.1.4 SUPPLY AND INSTALLATION OF SHEETPILE, T=6mm m2 43
R-21.5 4.3.2.1.5 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 987
SLOPE PROTECTION
4.3.3
GABION WALL
4.3.3.1
R-3.1 4.3.3.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 304
R-4.8 4.3.3.1.3 COMPACTING BACKFILL WITH STONE BALL, RIVER m3 974
R-7.1 4.3.3.1.4 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 1735
R-19.8 4.3.3.1.5 GABIONS WALL, TRIPLE TORSION (2x1x1), RIVER m3 865
R-21.5 4.3.3.1.2 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 912
RIPRAP (STONE WORK)
4.3.3.2
R-3.1 4.3.3.2.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 3120
R-4.14 4.3.3.2.2 BACKFILL WITH FILTERING MATERIAL m3 814
R-4.8 4.3.3.2.3 COMPACTING BACKFILL WITH STONE BALL, RIVER m3 2051
R-7.1 4.3.3.2.4 GEOTEXIL NON-WOVEN FOR RIPRAP AND GABIONS m2 3014
R-5.5 4.3.3.2.5 RIPRAP(STONE WORK) WITHOUT MORTAR - (Diam. >=50 cm), RIVER m3 2713
R-21.5 4.3.3.2.6 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 9359
DRAINAGE
4.3.4
BOX CULVERT
4.3.4.1
R-3.1 4.3.4.1.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 1519
R-4.12 4.3.4.1.2 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 167
R-4.6 4.3.4.1.3 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 1352
COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3),
R-4.4 4.3.4.1.4 m3 317
RIVER
R-4.11 4.3.4.1.5 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3), RIVER m3 35
R-8.13 4.3.4.1.6 STRUCTURAL CONCRETE - (f´c=280 kg/cm2), RIVER m3 261
R-8.8 4.3.4.1.7 LEAN CONCRETE - (f´c=180 kg/cm2), RIVER m3 26
R-19.1 4.3.4.1.8 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 28741
R-9.3 4.3.4.1.9 FORMWORK OF STRUCTURE m2 977
R-20.4 4.3.4.1.10 PVC WATERTIGHT JOINTS 22 CM m 263
R-40.4 4.3.4.1.11 WATER PUMPING EQUAL/BEYOND 2" hour 250
R-21.5 4.3.4.1.12 TRANSPORT OF EXCAVATION MATERIAL (FREE TRANSPORT 500m), RIVER m3-km 1070
5 WASTEWATER TREATMENT PLANT
5.1 CIVIL WORK
5.1.1 SITE PREPARATION
R-2.5 5.1.1.1 GRUBBING AND CLEANING OF TERRAIN m2 58638
R-2.13 5.1.1.2 GRADING AND LINEAR LEVELLING m2 58638

Hoja 46 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-2.9 5.1.1.3 PROJECT INFORMATIVE SIGN (3.60X2.40)m ea 1


5.1.2 EARTH WORK
R-3.8 5.1.2.1 SOIL EXCAVATION m3 226734
R-3.10 5.1.2.2 EXCAVATION BY LABOUR m3 372
R-4.5 5.1.2.3 BACKFILL COMPACTION BY MACHINE - IMPROVEMENT MATERIAL (BALLAST) m3 111331
R-4.3 5.1.2.4 COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 6045
R-4.10 5.1.2.5 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 318
R-2.2 5.1.2.6 SHAPPING AND COMPACTION OF THE SUBGRADE m2 8919
R-4.15 5.1.2.7 DUMP PIT (final disposal and landscaping treatment to dump pit zones) m3 261052
5.1.3 IDT / INLET DISTRIBUTION TANK
5.1.3.1 STRUCTURE
R-8.7 5.1.3.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 4
R-8.14 5.1.3.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 144
R-19.1 5.1.3.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 8784
5.1.3.2 FORMWORK
R-9.3 5.1.3.2.1 FORMWORK OF STRUCTURE m2 419
R-9.2 5.1.3.2.2 FORMWORK SUPPORT space-m3 153
R-9.1 5.1.3.2.3 SCAFFOLDING m2 24
5.1.3.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.3.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 16
R-26.13 5.1.3.3.2 STAINLESS STEEL COVER (800X800)mm-TYPE A ea 1
R-26.18 5.1.3.3.3 STAINLESS STEEL COVER (600X1200)mm-TYPE A ea 2
5.1.3.4 WATERPROOF
R-20.4 5.1.3.4.1 PVC WATERTIGHT JOINTS 22 CM m 24
R-20.2 5.1.3.4.2 EPOXIC WATERPROOF m2 439
R-20.1 5.1.3.4.3 ASPHALTIC RUBBER WATERPROOF m2 165
R-20.3 5.1.3.4.4 THOROSEAL WATERPROOF m2 233
5.1.4 GRT / GRIT REMOVAL TANK
5.1.4.1 STRUCTURE
R-8.7 5.1.4.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 22
R-8.14 5.1.4.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 453
R-19.1 5.1.4.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 41031
5.1.4.2 FORMWORK
R-9.3 5.1.4.2.1 FORMWORK OF STRUCTURE m2 1251
R-9.2 5.1.4.2.2 FORMWORK SUPPORT space-m3 465
R-9.1 5.1.4.2.3 SCAFFOLDING m2 166
5.1.4.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.4.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 18
R-26.20 5.1.4.3.2 STAINLESS STEEL COVER (800X1800)mm-TYPE A ea 1
R-26.19 5.1.4.3.3 STAINLESS STEEL COVER (800X1500)mm-TYPE A ea 4
5.1.4.4 WATERPROOF
R-20.4 5.1.4.4.1 PVC WATERTIGHT JOINTS 22 CM m 84
R-20.2 5.1.4.4.2 EPOXIC WATERPROOF m2 1282
R-20.1 5.1.4.4.3 ASPHALTIC RUBBER WATERPROOF m2 442
R-20.3 5.1.4.4.4 THOROSEAL WATERPROOF m2 626
5.1.5 PST / PRIMARY CLARIFIER
5.1.5.1 STRUCTURE
R-8.7 5.1.5.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 114
R-8.14 5.1.5.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 1691
R-19.1 5.1.5.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 188162
5.1.5.2 FORMWORK
R-9.3 5.1.5.2.1 FORMWORK OF STRUCTURE m2 4649
R-9.2 5.1.5.2.2 FORMWORK SUPPORT space-m3 470
R-9.1 5.1.5.2.3 SCAFFOLDING m2 111
5.1.5.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.5.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 64
R-26.7 5.1.5.3.2 SUPPLY AND INSTALLATION OF HANDRAIL, STS m 321
R-26.13 5.1.5.3.3 STAINLESS STEEL COVER (800X800)mm-TYPE A ea 9
R-26.14 5.1.5.3.4 STAINLESS STEEL COVER (800X800)mm-TYPE B ea 3
R-26.15 5.1.5.3.5 STAINLESS STEEL COVER (1000X1000)mm-TYPE A ea 5
R-26.16 5.1.5.3.6 STAINLESS STEEL COVER (1500X1500)mm-TYPE B ea 1
R-27.3 5.1.5.3.7 SUPPLY AND INSTALLATION OF BAFFLE, T=4MM m 164
R-27.4 5.1.5.3.8 SUPPLY AND INSTALLATION WEIR (V-NOTCH), STS, T=4mm m 356
5.1.5.4 CUBIERTAS
R-27.2 5.1.5.4.1 SUPPLY AND INSTALLATION OF DOME COVER L/S 1
5.1.5.5 WATERPROOF
R-20.4 5.1.5.5.1 PVC WATERTIGHT JOINTS 22 CM m 351
R-20.2 5.1.5.5.2 EPOXIC WATERPROOF m2 6803
R-20.1 5.1.5.5.3 ASPHALTIC RUBBER WATERPROOF m2 1279
R-20.3 5.1.5.5.4 THOROSEAL WATERPROOF m2 4200
5.1.6 BRT / BIO-REACTOR TANK
5.1.6.1 STRUCTURE
R-8.7 5.1.6.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 245
R-8.14 5.1.6.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 3297
R-19.1 5.1.6.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 685297
R-8.26 5.1.6.1.4 SUPPLY AND INSTALLATION OF PILE PHC ea 396
5.1.6.2 FORMWORK
R-9.3 5.1.6.2.1 FORMWORK OF STRUCTURE m2 7036
R-9.2 5.1.6.2.2 FORMWORK SUPPORT space-m3 10759
R-9.1 5.1.6.2.3 SCAFFOLDING m2 1956
5.1.6.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.6.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 37
R-26.7 5.1.6.3.2 SUPPLY AND INSTALLATION OF HANDRAIL, STS m 678
R-19.10 5.1.6.3.3 STEEL GRATING COVER (800X800)mm ea 4
R-26.13 5.1.6.3.4 STAINLESS STEEL COVER (800X800)mm-TYPE A ea 9
5.1.6.4 WATERPROOF
R-20.4 5.1.6.4.1 PVC WATERTIGHT JOINTS 22 CM m 369
R-20.2 5.1.6.4.2 EPOXIC WATERPROOF m2 10078
R-20.1 5.1.6.4.3 ASPHALTIC RUBBER WATERPROOF m2 1397
R-20.3 5.1.6.4.4 THOROSEAL WATERPROOF m2 6270
5.1.7 SST / SECUNDARY CLARIFIER
5.1.7.1 STRUCTURE
R-8.7 5.1.7.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 130
R-8.14 5.1.7.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 1841
R-19.1 5.1.7.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 288929
R-8.26 5.1.7.1.4 SUPPLY AND INSTALLATION OF PILE PHC ea 203
5.1.7.2 FORMWORK
R-9.3 5.1.7.2.1 FORMWORK OF STRUCTURE m2 4622
R-9.2 5.1.7.2.2 FORMWORK SUPPORT space-m3 688
R-9.1 5.1.7.2.3 SCAFFOLDING m2 148
5.1.7.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.7.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 57
R-26.7 5.1.7.3.2 SUPPLY AND INSTALLATION OF HANDRAIL, STS m 374
R-26.13 5.1.7.3.3 STAINLESS STEEL COVER (800X800)mm-TYPE A ea 8
R-26.14 5.1.7.3.4 STAINLESS STEEL COVER (800X800)mm-TYPE B ea 2
R-26.15 5.1.7.3.5 STAINLESS STEEL COVER (1000X1000)mm-TYPE A ea 6
R-26.16 5.1.7.3.6 STAINLESS STEEL COVER (1500X1500)mm-TYPE B ea 1
R-27.3 5.1.7.3.7 SUPPLY AND INSTALLATION OF BAFFLE, T=4MM m 181
R-27.4 5.1.7.3.8 SUPPLY AND INSTALLATION WEIR (V-NOTCH), STS, T=4mm m 382
5.1.7.4 WATERPROOF
R-20.4 5.1.7.4.1 PVC WATERTIGHT JOINTS 22 CM m 359
R-20.2 5.1.7.4.2 EPOXIC WATERPROOF m2 6855
R-20.1 5.1.7.4.3 ASPHALTIC RUBBER WATERPROOF m2 1448
R-20.3 5.1.7.4.4 THOROSEAL WATERPROOF m2 3911
5.1.8 UV / UV DISINFECTION TANK

Hoja 47 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

5.1.8.1 STRUCTURE
R-8.7 5.1.8.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 6
R-8.14 5.1.8.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 38
R-19.1 5.1.8.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 7559
5.1.8.2 FORMWORK
R-9.3 5.1.8.2.1 FORMWORK OF STRUCTURE m2 180
R-9.2 5.1.8.2.2 FORMWORK SUPPORT space-m3 31
R-9.1 5.1.8.2.3 SCAFFOLDING m2 18
5.1.8.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.8.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 8
R-26.13 5.1.8.3.2 STAINLESS STEEL COVER (800X800)mm-TYPE A ea 1
R-26.11 5.1.8.3.3 STAINLESS STEEL COVER (800X1000)mm-TYPE A ea 2
R-26.17 5.1.8.3.4 STAINLESS STEEL COVER (3300X1000)mm-TYPE A ea 2
5.1.8.4 WATERPROOF
R-20.4 5.1.8.4.1 PVC WATERTIGHT JOINTS 22 CM m 30
R-20.2 5.1.8.4.2 EPOXIC WATERPROOF m2 201
R-20.1 5.1.8.4.3 ASPHALTIC RUBBER WATERPROOF m2 63
R-20.3 5.1.8.4.4 THOROSEAL WATERPROOF m2 105
5.1.9 TWR / TREATED WATER REUSE TANK
5.1.9.1 STRUCTURE
R-8.7 5.1.9.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 13
R-8.14 5.1.9.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 90
R-19.1 5.1.9.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 6590
5.1.9.2 FORMWORK
R-9.3 5.1.9.2.1 FORMWORK OF STRUCTURE m2 235
R-9.2 5.1.9.2.2 FORMWORK SUPPORT space-m3 90
R-9.1 5.1.9.2.3 SCAFFOLDING m2 25
5.1.9.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.9.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 7
R-26.11 5.1.9.3.2 STAINLESS STEEL COVER (800X1000)mm-TYPE A ea 1
R-26.9 5.1.9.3.3 STAINLESS STEEL COVER (1200X1200)mm-TYPE B ea 1
5.1.9.4 WATERPROOF
R-20.4 5.1.9.4.1 PVC WATERTIGHT JOINTS 22 CM m 28
R-20.2 5.1.9.4.2 EPOXIC WATERPROOF m2 383
R-20.1 5.1.9.4.3 ASPHALTIC RUBBER WATERPROOF m2 130
R-20.3 5.1.9.4.4 THOROSEAL WATERPROOF m2 188
5.1.10 FMC / FLOW METER CHAMBER
5.1.10.1 STRUCTURE
R-8.7 5.1.10.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 6
R-8.14 5.1.10.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 61
R-19.1 5.1.10.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 5126
5.1.10.2 FORMWORK
R-9.3 5.1.10.2.1 FORMWORK OF STRUCTURE m2 189
R-9.2 5.1.10.2.2 FORMWORK SUPPORT space-m3 30
R-9.1 5.1.10.2.3 SCAFFOLDING m2 13
5.1.10.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.10.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 6
R-26.14 5.1.10.3.2 STAINLESS STEEL COVER (800X800)mm-TYPE B ea 3
5.1.10.4 WATERPROOF
R-20.4 5.1.10.4.1 PVC WATERTIGHT JOINTS 22 CM m 31
R-20.2 5.1.10.4.2 EPOXIC WATERPROOF m2 254
R-20.1 5.1.10.4.3 ASPHALTIC RUBBER WATERPROOF m2 133
R-20.3 5.1.10.4.4 THOROSEAL WATERPROOF m2 80
5.1.11 CHLO / CHLORINE DISINFECTION TANK
5.1.11.1 STRUCTURE
R-8.7 5.1.11.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 20
R-8.14 5.1.11.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 240
R-19.1 5.1.11.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 50892
5.1.11.2 FORMWORK
R-9.3 5.1.11.2.1 FORMWORK OF STRUCTURE m2 997
R-9.2 5.1.11.2.2 FORMWORK SUPPORT space-m3 450
R-9.1 5.1.11.2.3 SCAFFOLDING m2 113
5.1.11.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.11.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 15
R-26.7 5.1.11.3.2 SUPPLY AND INSTALLATION OF HANDRAIL, STS m 37
R-26.13 5.1.11.3.3 STAINLESS STEEL COVER (800X800)mm-TYPE A ea 3
R-26.12 5.1.11.3.4 STAINLESS STEEL COVER (800X3500)mm-TYPE A ea 1
5.1.11.4 WATERPROOF
R-20.4 5.1.11.4.1 PVC WATERTIGHT JOINTS 22 CM m 82
R-20.2 5.1.11.4.2 EPOXIC WATERPROOF m2 1045
R-20.1 5.1.11.4.3 ASPHALTIC RUBBER WATERPROOF m2 190
R-20.3 5.1.11.4.4 THOROSEAL WATERPROOF m2 705
5.1.12 SDF / SLUDGE DEWATERING TANK
5.1.12.1 STRUCTURE
R-8.7 5.1.12.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 51
R-8.14 5.1.12.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 947
R-19.1 5.1.12.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 99974
5.1.12.2 FORMWORK
R-9.3 5.1.12.2.1 FORMWORK OF STRUCTURE m2 1805
R-9.2 5.1.12.2.2 FORMWORK SUPPORT space-m3 1923
R-9.1 5.1.12.2.3 SCAFFOLDING m2 401
5.1.12.3 STEEL, METAL AND WOOD WORK
R-26.7 5.1.12.3.1 SUPPLY AND INSTALLATION OF HANDRAIL, STS m 10
R-26.10 5.1.12.3.2 STAINLESS STEEL COVER (1500X1500)mm-TYPE A ea 1
5.1.12.4 WATERPROOF
R-20.4 5.1.12.4.1 PVC WATERTIGHT JOINTS 22 CM m 132
R-20.2 5.1.12.4.2 EPOXIC WATERPROOF m2 2735
R-20.1 5.1.12.4.3 ASPHALTIC RUBBER WATERPROOF m2 550
R-20.3 5.1.12.4.4 THOROSEAL WATERPROOF m2 1656
5.1.13 DIM / DISCHARGE MANHOLE
5.1.13.1 STRUCTURE
R-8.7 5.1.13.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 6
R-8.14 5.1.13.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 21
R-19.1 5.1.13.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 2832
5.1.13.2 FORMWORK
R-9.3 5.1.13.2.1 FORMWORK OF STRUCTURE m2 89
R-9.2 5.1.13.2.2 FORMWORK SUPPORT space-m3 10
R-9.1 5.1.13.2.3 SCAFFOLDING m2 4
5.1.13.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.13.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 6
R-26.14 5.1.13.3.2 STAINLESS STEEL COVER (800X800)mm-TYPE B ea 2
5.1.13.4 WATERPROOF
R-20.4 5.1.13.4.1 PVC WATERTIGHT JOINTS 22 CM m 10
R-20.2 5.1.13.4.2 EPOXIC WATERPROOF m2 44
R-20.1 5.1.13.4.3 ASPHALTIC RUBBER WATERPROOF m2 85
R-20.3 5.1.13.4.4 THOROSEAL WATERPROOF m2 27
5.1.14 PM - PUMPING MANHOLE
5.1.14.1 STRUCTURE
R-8.7 5.1.14.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 2
R-8.14 5.1.14.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 21
R-19.1 5.1.14.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 1419
5.1.14.2 FORMWORK

Hoja 48 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-9.3 5.1.14.2.1 FORMWORK OF STRUCTURE m2 89


R-9.2 5.1.14.2.2 FORMWORK SUPPORT space-m3 10
R-9.1 5.1.14.2.3 SCAFFOLDING m2 4
5.1.14.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.14.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 2
R-26.14 5.1.14.3.2 STAINLESS STEEL COVER (800X800)mm-TYPE B ea 1
5.1.14.4 WATERPROOF
R-20.4 5.1.14.4.1 PVC WATERTIGHT JOINTS 22 CM m 10
R-20.2 5.1.14.4.2 EPOXIC WATERPROOF m2 44
R-20.1 5.1.14.4.3 ASPHALTIC RUBBER WATERPROOF m2 85
R-20.3 5.1.14.4.4 THOROSEAL WATERPROOF m2 27
5.1.15 DPDC - DEODORIZING PIPE DRAIN CHAMBER
5.1.15.1 STRUCTURE
R-8.7 5.1.15.1.1 LEAN CONCRETE - (f´c=180 kg/cm2) m3 8
R-8.14 5.1.15.1.2 STRUCTURAL CONCRETE - (f´c=350 kg/cm2) m3 81
R-19.1 5.1.15.1.3 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 5568
5.1.15.2 FORMWORK
R-9.3 5.1.15.2.1 FORMWORK OF STRUCTURE m2 252
R-9.2 5.1.15.2.2 FORMWORK SUPPORT space-m3 40
R-9.1 5.1.15.2.3 SCAFFOLDING m2 17
5.1.15.3 STEEL, METAL AND WOOD WORK
R-26.6 5.1.15.3.1 SUPPLY AND INSTALLATION OF LADDER (TYPE/A), STS m 8
R-26.14 5.1.15.3.2 STAINLESS STEEL COVER (800X800)mm-TYPE B ea 4
5.1.15.4 WATERPROOF
R-20.4 5.1.15.4.1 PVC WATERTIGHT JOINTS 22 CM m 41
R-20.2 5.1.15.4.2 EPOXIC WATERPROOF m2 338
R-20.1 5.1.15.4.3 ASPHALTIC RUBBER WATERPROOF m2 177
R-20.3 5.1.15.4.4 THOROSEAL WATERPROOF m2 107
5.1.16 PAVEMENT WORK
5.1.16.1 ASPHALT PAVEMENT
R-7.2 5.1.16.1.1 GEOTEXTILE WOVEN FOR STABILIZATION OF THE SUBGRADE m2 8920
R-5.7 5.1.16.1.2 PREPARATION OF SUB-GRADE WITH SELECTED SOIL m3 8920
R-5.1 5.1.16.1.3 PREPARATION OF BASE, CLASS 1A m3 1784
R-6.4 5.1.16.1.4 LAYER OF BASE OF ASPHALTIC CONCRETE MIXED IN PLANT 10cm THICK m2 8920
R-6.3 5.1.16.1.5 ASPHALT MC FOR PRIMING liter 13379
R-6.2 5.1.16.1.6 EMULSIFIED ASPHALT TYPE SS-1H FOR ADHERENCE IRRIGATION liter 3122
R-6.5 5.1.16.1.7 WEARING COURSE OF ASPHALTIC CONCRETE MIXED IN PLANT 5cm THICK m2 8920
5.1.16.2 CONCRETE PAVEMENT
R-7.2 5.1.16.2.1 GEOTEXTILE WOVEN FOR STABILIZATION OF THE SUBGRADE m2 847
R-5.7 5.1.16.2.2 PREPARATION OF SUB-GRADE WITH SELECTED SOIL m3 847
R-5.1 5.1.16.2.3 PREPARATION OF BASE, CLASS 1A m3 169
R-8.12 5.1.16.2.4 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 127
R-19.6 5.1.16.2.5 ELECTROWELDED MESH 5 mm to 10 cm (MALLA R-196) m2 847
R-9.3 5.1.16.2.6 FORMWORK OF STRUCTURE m2 85
5.1.16.3 L TYPE GUTTER
R-8.15 5.1.16.3.1 SIMPLE CONCRETE f'c=180 kg/cm2 m3 513
R-9.3 5.1.16.3.2 FORMWORK OF STRUCTURE m2 1889
5.1.17 SEWAGE
5.1.17.1 TRENCH EXCAVATION AND BACKFILL
R-3.3 5.1.17.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 1716
R-2.12 5.1.17.1.2 GRADING BY LABOUR IN TRENCHES m2 696
R-4.1 5.1.17.1.3 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 576
R-4.12 5.1.17.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 1116
5.1.17.2 PIPE WORKS
5.1.17.2.1 PIPE WORKS OF PE
R-12.10 5.1.17.2.1.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=200mm m 396
5.1.17.2.2 PIPE WORKS DCIP
R-13.1 5.1.17.2.2.1 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=80 mm m 175
R-13.4 5.1.17.2.2.2 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=200 mm m 342
5.1.17.3 MANHOLE WORKS
5.1.17.3.1 CONCRETE MANHOLE
R-3.10 5.1.17.3.1.1 EXCAVATION BY LABOUR m3 24
R-4.9 5.1.17.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 11
R-8.7 5.1.17.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2) m3 4
R-8.5 5.1.17.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 26
R-8.24 5.1.17.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 1
R-19.13 5.1.17.3.1.6 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 13
R-17.1 5.1.17.3.1.7 CONCRETE MANHOLE 0<H<2 M (Di=900mm) ea 13
5.1.18 DRAINAGE
5.1.18.1 TRENCH EXCAVATION AND BACKFILL
R-3.3 5.1.18.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 3676
R-2.12 5.1.18.1.2 GRADING BY LABOUR IN TRENCHES m2 1414
R-4.1 5.1.18.1.3 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 1344
R-4.12 5.1.18.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 2209
5.1.18.2 PIPE WORKS
5.1.18.2.1 PIPE WORKS DE PE (POLIETILENO)
R-12.11 5.1.18.2.1.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=250mm m 631
R-12.12 5.1.18.2.1.2 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=300mm m 534
R-12.13 5.1.18.2.1.3 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=400mm m 127
R-12.14 5.1.18.2.1.4 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=450mm m 96
R-12.15 5.1.18.2.1.5 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=600mm m 80
5.1.18.3 MANHOLE WORKS
5.1.18.3.1 CONCRETE MANHOLE
R-3.10 5.1.18.3.1.1 EXCAVATION BY LABOUR m3 40
R-4.9 5.1.18.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 18
R-8.7 5.1.18.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2) m3 6
R-8.5 5.1.18.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 32
R-8.24 5.1.18.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 1
R-19.13 5.1.18.3.1.6 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 16
R-17.6 5.1.18.3.1.7 CONCRETE MANHOLE 0<H<2 M (Di=1200mm) ea 16
5.1.18.4 STORM INLET
R-8.16 5.1.18.4.1 SIMPLE CONCRETE f'c=210 kg/cm2 m3 15
R-9.3 5.1.18.4.2 FORMWORK OF STRUCTURE m2 174
R-19.11 5.1.18.4.3 DUCTILE IRON GRATING COVER (580 x 830)mm ea 30
BOX CULVERT
5.1.18.5
R-3.1 5.1.18.5.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 2597
R-4.12 5.1.18.5.2 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 318
R-4.6 5.1.18.5.3 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 1271
R-4.10 5.1.18.5.4 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 99
R-4.3 5.1.18.5.5 COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 395
R-8.12 5.1.18.5.6 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 524
R-8.7 5.1.18.5.7 LEAN CONCRETE - (f´c=180 kg/cm2) m3 51
R-19.1 5.1.18.5.8 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 57645
R-9.3 5.1.18.5.9 FORMWORK OF STRUCTURE m2 1956
R-20.4 5.1.18.5.10 PVC WATERTIGHT JOINTS 22 CM m 528
5.1.19 PLUMBING
5.1.19.1 TREATED WATER REUSE FLOW
5.1.19.1.1 TRENCH EXCAVATION AND BACKFILL
R-3.3 5.1.19.1.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 1016
R-2.12 5.1.19.1.1.2 GRADING BY LABOUR IN TRENCHES m2 323
R-4.1 5.1.19.1.1.3 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 242
R-4.12 5.1.19.1.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 769

Hoja 49 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

5.1.19.1.2 PIPE WORKS


5.1.19.1.2.1 PIPE WORKS DE STS (ACERO INOXIDABLE)
R-14.1 5.1.19.1.2.1.1 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=32mm m 232
R-14.2 5.1.19.1.2.1.2 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=50mm m 38
R-14.3 5.1.19.1.2.1.3 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=80mm m 36
R-14.4 5.1.19.1.2.1.4 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=100mm m 19
R-14.5 5.1.19.1.2.1.5 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=150mm m 182
R-14.6 5.1.19.1.2.1.6 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=200mm m 34
5.1.19.2 SLUDGE FLOW
5.1.19.2.1 TRENCH EXCAVATION AND BACKFILL
R-3.3 5.1.19.2.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 1004
R-2.12 5.1.19.2.1.2 GRADING BY LABOUR IN TRENCHES m2 478
R-4.1 5.1.19.2.1.3 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 415
R-4.12 5.1.19.2.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 564
5.1.19.2.2 PIPE WORKS
5.1.19.2.2.1 PIPE WORKS OF DCIP
R-13.4 5.1.19.2.2.1.1 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=200 mm m 418
R-13.5 5.1.19.2.2.1.2 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=300 mm m 153
5.1.19.3 WASTEWATER FLOW
5.1.19.3.1 TRENCH EXCAVATION AND BACKFILL
R-3.3 5.1.19.3.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 2262
R-2.12 5.1.19.3.1.2 GRADING BY LABOUR IN TRENCHES m2 1256
R-4.1 5.1.19.3.1.3 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 1629
R-4.12 5.1.19.3.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 294
5.1.19.3.2 PIPE WORKS
5.1.19.3.2.1 PIPE WORKS OF GRP
R-11.2 5.1.19.3.2.1.1 SUPPLY, INSTALLATION AND TEST OF GRP PIPE FOR SEWAGE D(i)=1650 mm m 10
5.1.19.3.2.2 PIPE WORKS OF PE
R-12.16 5.1.19.3.2.2.1 SUPPLY, INSTALLATION AND TEST OF PE PIPE FOR SEWAGE D(i)=1000mm m 160
5.1.19.3.2.3 PIPE WORKS OF DCIP
R-13.6 5.1.19.3.2.3.1 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=400 mm m 65
R-13.7 5.1.19.3.2.3.2 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=500 mm m 230
R-13.8 5.1.19.3.2.3.3 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=600 mm m 7
R-13.9 5.1.19.3.2.3.4 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=800 mm m 114
R-13.10 5.1.19.3.2.3.5 SUPPLY, INSTALLATION AND TEST OF DCI PIPE FOR SEWAGE D(i)=1000 mm m 103
5.1.19.3.3 MANHOLE WORKS
5.1.19.3.3.1 CONCRETE MANHOLE
R-3.10 5.1.19.3.3.1.1 EXCAVATION BY LABOUR m3 19
R-4.9 5.1.19.3.3.1.2 COMPACTING BACKFILL WITH STONE BALL IN MANHOLES m3 9
R-8.7 5.1.19.3.3.1.3 LEAN CONCRETE - (f´c=180 kg/cm2) m3 3
R-8.5 5.1.19.3.3.1.4 JOINT TO MANHOLE MORTAR 1:3 ea 12
R-8.24 5.1.19.3.3.1.5 MORTAR 1:4 FOR BOTTOM OF MANHOLES m3 1
R-19.13 5.1.19.3.3.1.6 COVER OF DUCTIL IRON D=0.60m FOR MANHOLES ea 6
R-17.10 5.1.19.3.3.1.7 CONCRETE MANHOLE 0<H<2 M (Di=1500mm) ea 6
BOX CULVERT
5.1.19.3.4
R-3.1 5.1.19.3.4.1 EXCAVATION BY MACHINE IN THE RIVERBED. m3 4389
R-4.12 5.1.19.3.4.2 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 470
R-4.6 5.1.19.3.4.3 COMPACTING BACKFILL BY MACHINE WITH EXCAVATION MATERIAL m3 1880
R-4.10 5.1.19.3.4.4 COMPACTING BACKFILL BY LABOUR - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 166
R-4.3 5.1.19.3.4.5 COMPACTING BACKFILL BY MACHINE - IMPROVEMENT MATERIAL (SUBBASE CLASS 3) m3 661
R-8.12 5.1.19.3.4.6 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 809
R-8.7 5.1.19.3.4.7 LEAN CONCRETE - (f´c=180 kg/cm2) m3 88
R-19.1 5.1.19.3.4.8 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 93128
R-9.3 5.1.19.3.4.9 FORMWORK OF STRUCTURE m2 3191
R-20.4 5.1.19.3.4.10 PVC WATERTIGHT JOINTS 22 CM m 848
5.1.20 WATER SUPPLY
5.1.20.1 TRENCH EXCAVATION AND BACKFILL
R-3.3 5.1.20.1.1 TRENCHES EXCAVATION BY MACHINE IN SOIL 0< H <2 M m3 625
R-2.12 5.1.20.1.2 GRADING BY LABOUR IN TRENCHES m2 263
R-4.1 5.1.20.1.3 COMPACTING BACKFILL - FINE GRANULAR MATERIAL (SAND ) m3 178
R-4.12 5.1.20.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 447
5.1.20.2 PIPE WORKS
5.1.20.2.1 PIPE WORKS OF STS
R-14.1 5.1.20.2.1.1 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=32mm m 363
R-14.2 5.1.20.2.1.2 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=50mm m 76
5.1.20.3 WELL FOR WATER SUPPLY
R-40.15 5.1.20.3.1 DRILLING OF WATER WELL FOR WATER SUPPLY ea 50
R-14.2 5.1.20.3.2 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=50mm m 50
R-14.4 5.1.20.3.3 SUPPLY, INSTALLATION AND TEST OF STS PIPE FOR SEWAGE D(i)=100mm m 50
R-40.13 5.1.20.3.4 WATER PUMP 3HP ea 1
R-40.12 5.1.20.3.5 WATER PUMP 3HP ea 1
5.1.21 MISCELLANEOUS WORK
5.1.21.1 PAVEMENT MARKING
R-39.3 5.1.21.1.1 PAVEMENT MARKING - (paint stripe yellow, width = 15.0 cm / homigón asfáltico) m 2332
R-39.4 5.1.21.1.2 PAVEMENT MARKING - (paint stripe white, width = 15.0 cm / homigón asfáltico) m 1015
R-39.5 5.1.21.1.3 HIGH RELIEVE PAVEMENT MARKS - (eye cats / bidirectionals) ea 233
5.1.21.2 MAIN GATE
R-40.14 5.1.21.1.2.1 BOOTH FOR MAIN GATE ea 2
R-26.8 5.1.21.1.2.2 SUPPLY AND INSTALLATION OF MAIN GATE =550XH=12000mm, STS) set 1
5.2 ARCHITECTURE WORK
5.2.1 ADMINISTRATION BUILDING
5.2.1.1 STRUCTURE
R-19.1 5.2.1.1.1 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 133174
R-19.2 5.2.1.1.2 STRUCTURAL STEEL A36, INCLUDES INSTALLATION kg 2378
R-8.7 5.2.1.1.3 LEAN CONCRETE - (f´c=180 kg/cm2) m3 35
R-8.9 5.2.1.1.4 STRUCTURAL CONCRETE - (f´c=210 kg/cm2) m3 96
R-8.11 5.2.1.1.5 STRUCTURAL CONCRETE - (f´c=240 kg/cm2) m3 767
R-8.12 5.2.1.1.6 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 1010
R-9.6 5.2.1.1.7 SET UP/REMOVAL OF FORMWORK FOR SLAB m2 1338
R-9.3 5.2.1.1.8 FORMWORK OF STRUCTURE m2 1302
R-8.20 5.2.1.1.9 SIMPLE CONCRETE IN STAIRCASE f'c=280Km/cm2 INCL. m3 3
R-8.18 5.2.1.1.10 SIMPLE CONCRETE SUBFLOOR f'c=240Kg/cm2 T=10cm m2 660
R-8.22 5.2.1.1.11 SIMPLE CONCRETE IN RAMP f'c=210Kg/cm2 INCL. FORMWORK m3 5
R-8.6 5.2.1.1.12 CYCLOPEAN CONCRETE f'c=180Kg/cm2 (60% SIMPLE CONCRETE+40% STONE) m3 18
R-8.21 5.2.1.1.13 SIMPLE CONCRETE IN PLINTH f'c=210Kg/cm2 INCL. FORMWORK m3 7
R-8.4 5.2.1.1.14 SIMPLE CONCRETE LINTEL f'c=180Kg/cm2 m 81
5.2.1.2 MASONRY
R-22.2 5.2.1.2.1 SHOWER BASE BORDER m 10
R-22.8 5.2.1.2.2 GRANITE TOPPED KITCHEN TABLE m 26
R-22.4 5.2.1.2.3 BLOCK MASONRY T=10CM WITH MORTAR 1:6 m2 108
R-22.5 5.2.1.2.4 BLOCK MASONRY T=15CM WITH MORTAR 1:4 m2 1213
5.2.1.3 PLASTERING AND CAULKING
R-23.2 5.2.1.3.1 PLASTERING OF BORDERS AND STRIPS m 686
R-23.4 5.2.1.3.2 VERTICAL PLASTERING MORTAR 1:4 m2 3066
R-23.3 5.2.1.3.3 HORIZONTAL PLASTERING MORTAR 1:4 m2 132
R-23.1 5.2.1.3.4 PLASTERING WITH WATERTPROOFING MORTAR 1:3 m2 52
R-24.5 5.2.1.3.5 TROWELLED FLOORS FOR RAMP, (MORTAR 1:3, W=1.5CM) m2 26
5.2.1.4 FLOOR LINING
R-24.9 5.2.1.4.1 PASTING AND SMOOTHING OF FLOORS m2 1219
R-24.10 5.2.1.4.2 PORCELAIN IN FLOORS m2 900
R-24.7 5.2.1.4.3 FLOOR CERAMIC m2 109
R-24.6 5.2.1.4.4 SKIRTING BOARDS OF PORCELLANATO T=10cm m 582

Hoja 50 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-24.1 5.2.1.4.5 INTERLOKING BLOCK TYPE ECOLOGIC, 60*40*10cm m2 227


R-24.12 5.2.1.4.6 FLOATING FLOOR, SUPPLY AND INSTALLATION m2 40
R-24.11 5.2.1.4.7 POLISHED CONCRETE IN FLOORS m2 187
5.2.1.5 COVERING OF WALL AND ROOF
R-25.1 5.2.1.5.1 WALL CERAMIC m2 281
R-25.4 5.2.1.5.2 INTERIOR PLASTERING m2 2752
R-25.3 5.2.1.5.3 EXTERIOR PLASTERING m2 505
R-25.8 5.2.1.5.4 INTERIOR PAINT m2 2752
R-25.7 5.2.1.5.5 EXTERIOR PAINT m2 505
R-25.2 5.2.1.5.6 GYPSUM CEILING m2 1026
R-25.11 5.2.1.5.7 LINING OF STONE FOR EXTERIOR m2 31
R-25.9 5.2.1.5.8 SUPPLY AND INSTALL ALUCOBOND m2 267
5.2.1.6 STEEL, METAL AND WOOD WORK
R-26.22 5.2.1.6.1 WINDOW V1, Administration Building ea 1
R-26.23 5.2.1.6.2 WINDOW V2, Administration Building ea 1
R-26.24 5.2.1.6.3 WINDOW V3, Administration Building ea 16
R-26.25 5.2.1.6.4 WINDOW V4, Administration Building ea 1
R-26.26 5.2.1.6.5 WINDOW V5, Administration Building ea 1
R-26.27 5.2.1.6.6 WINDOW V6, Administration Building ea 1
R-26.28 5.2.1.6.7 WINDOW V7, Administration Building ea 1
R-26.29 5.2.1.6.8 WINDOW V8, Administration Building ea 1
R-26.30 5.2.1.6.9 WINDOW V9, Administration Building ea 1
R-26.31 5.2.1.6.10 WINDOW V10, Administration Building ea 1
R-26.32 5.2.1.6.11 WINDOW V11, Administration Building ea 1
R-26.33 5.2.1.6.12 WINDOW V12, Administration Building ea 2
R-26.34 5.2.1.6.13 WINDOW V13, Administration Building ea 1
R-26.35 5.2.1.6.14 WINDOW V14, Administration Building ea 1
R-26.36 5.2.1.6.15 WINDOW V15, Administration Building ea 1
R-26.37 5.2.1.6.16 DOOR P1, Administration Building ea 2
R-26.38 5.2.1.6.17 DOOR P2, Administration Building ea 1
R-26.39 5.2.1.6.18 DOOR P3, Administration Building ea 9
R-26.40 5.2.1.6.19 DOOR P4, Administration Building ea 1
R-26.41 5.2.1.6.20 DOOR P5, Administration Building ea 8
R-26.42 5.2.1.6.21 DOOR P6, Administration Building ea 4
R-26.43 5.2.1.6.22 DOOR P7, Administration Building ea 1
R-26.44 5.2.1.6.23 DOOR P8, Administration Building ea 1
R-26.45 5.2.1.6.24 DOOR P10, Administration Building ea 2
R-26.46 5.2.1.6.25 DOOR P11, Administration Building ea 2
R-26.47 5.2.1.6.26 DOOR P12, Administration Building ea 1
R-26.48 5.2.1.6.27 DOOR P13, Administration Building m2 6.16
R-26.49 5.2.1.6.28 DOOR P14, Administration Building ea 1
R-26.50 5.2.1.6.29 DOOR P15, Administration Building ea 1
R-26.51 5.2.1.6.30 DOOR P16, Administration Building ea 1
R-26.52 5.2.1.6.31 DOOR P17, Administration Building ea 1
R-26.53 5.2.1.6.32 DOOR P18, Administration Building ea 1
R-26.54 5.2.1.6.33 DOOR P19, Administration Building ea 20
R-26.55 5.2.1.6.34 DOOR P20, Administration Building ea 1
R-26.56 5.2.1.6.35 DOOR P21, Administration Building ea 3
R-26.57 5.2.1.6.36 DOOR P22, Administration Building ea 1
R-26.58 5.2.1.6.37 DOOR P23, Administration Building ea 1
R-26.59 5.2.1.6.38 DOOR P24, Administration Building ea 1
R-26.60 5.2.1.6.39 DOOR P25, Administration Building ea 1
R-26.61 5.2.1.6.40 DOOR P26, Administration Building ea 1
R-26.2 5.2.1.6.41 ALUMINUM AND GLASS SCREEN m2 207
R-26.4 5.2.1.6.42 STAINLESS STEEL BATHRROM DIVISIONS SUPPLY AND INSTALLATION m2 50
R-26.5 5.2.1.6.43 STAINLESS STEEL URINARY DIVISIONS SUPPLY AND INSTALLATION ea 6
R-26.3 5.2.1.6.44 STAINLESS STEEL HANDRAIL, AISI A304 m 58
R-22.7 5.2.1.6.45 STAINLESS STEEL TOPPED KITCHEN TABLE m2 4
5.2.1.7 COVER
R-27.1 5.2.1.7.1 POLICARBONATE COVER SUPPLY AND INSTALLATION m2 35
R-25.6 5.2.1.7.2 PASTING AND SMOOTHING THE ROOF SLAB m2 678
R-25.5 5.2.1.7.3 ACRILIC WATERPROOFING FOR ROOF m2 678
5.2.1.8 FURNITURE
R-28.14 5.2.1.8.1 FURNITURE FOR DINNING HALL SUPPLY ea 9
R-28.15 5.2.1.8.2 SELF SERVICE COUNTER SUPPLY ea 1
R-29.4 5.2.1.8.3 INDUCTION KITCHEN RECESSED 5 INDUCTORS SUPPLY AND INSTALLATION ea 1
R-29.3 5.2.1.8.4 REFRIGERATING ROOM SUPPLY AND INSTALLATION set 1
R-28.1 5.2.1.8.5 KITCHEN FURNITURE m 11
R-28.12 5.2.1.8.6 LOCKERS SUPPLY ea 1
R-28.5 5.2.1.8.7 BENCH SUPPLY ea 1
R-28.7 5.2.1.8.8 COUNTER SUPPLY 2.00 X 0.60 X 1.25 M ea 1
R-28.8 5.2.1.8.9 OFFICE DESK SUPPLY ea 1
R-28.10 5.2.1.8.10 L TYPE DESK SUPPLY ea 20
R-28.4 5.2.1.8.11 OFFICE SWIVEL CHAIRS ea 1
R-28.9 5.2.1.8.12 SIMPLE OFFICE DESK SUPPLY ea 3
R-28.2 5.2.1.8.13 EXECUTIVE OFFICE CHAIRS ea 24
R-28.13 5.2.1.8.14 MEETING TABLE SUPPLY ea 2
R-28.3 5.2.1.8.15 VISITORS CHAIRS ea 24
R-28.11 5.2.1.8.16 LIVING ROOM FURNITURE ea 1
R-28.6 5.2.1.8.17 BED SUPPLY ea 2
5.2.1.9 EQUIPMENTS
R-29.1 5.2.1.9.1 OFFICE EQUIPMENT (COMPUTERS ) ea 24
R-29.5 5.2.1.9.2 TV 42" SUPPLY AND INSTALLATION ea 2
R-29.2 5.2.1.9.3 PROJECTOR SUPPLY ea 2
5.2.1.10 EXTERIOR WORK
R-8.17 5.2.1.10.1 SIMPLE CONCRETE SUBFLOOR f'c=180Kg/cm2 T=6cm m2 306
R-24.9 5.2.1.10.2 PASTING AND SMOOTHING OF FLOORS m2 306
R-8.3 5.2.1.10.3 STAMPED CONCRETE m2 160
R-24.2 5.2.1.10.4 INTERLOKING BLOCK TYPE ESPAÑOL, 30*30*8cm ea 835
R-24.3 5.2.1.10.5 INTERLOKING BLOCK TYPE ESPAÑOL, 30*60*8cm m2 275
R-24.4 5.2.1.10.6 INTERLOKING BLOCK TYPE ZARAGOZA, 18*23-18*8cm m2 655
R-24.1 5.2.1.10.7 INTERLOKING BLOCK TYPE ECOLOGIC, 60*40*10cm m2 320
R-22.3 5.2.1.10.8 LIGHT BORDER CURVE SECTION 8*25*100cm m 340
R-22.1 5.2.1.10.9 SIMPLE CONCRETE LOSS CURB 0.10*0.23 f'c=180 kg/cm2 m 160
R-40.11 5.2.1.10.10 BUMPERS FOR VEHICLES ea 24
R-23.2 5.2.1.10.11 PLASTERING OF BORDERS AND STRIPS m 560
R-23.4 5.2.1.10.12 VERTICAL PLASTERING MORTAR 1:4 m2 406
R-25.3 5.2.1.10.13 EXTERIOR PLASTERING m2 406
R-39.7 5.2.1.10.14 RUBBER WATERPROOFING PAINT FOR CURBS m2 100
R-39.8 5.2.1.10.15 SIGNALING PAINT FOR PARKING LOT m 85
R-25.7 5.2.1.10.16 EXTERIOR PAINT m2 406
R-25.10 5.2.1.10.17 LINING OF GRANITE IN MONUMENT m2 13
R-40.3 5.2.1.10.18 CONCRETE FOUNDATION FOR OBELISK 150X150X20CM;f'c=210kg/cm2 set 1
R-40.1 5.2.1.10.19 FLAGPOLE AND CONCRETE FOUNDATION FOR FLAGS f'c=210 kg/cm2 set 1
R-26.1 5.2.1.10.20 METAL FENCE WITH GALVANIZED PIPE 2" H=2.4 m 208
5.2.1.11 COOL WATER
R-15.16 5.2.1.11.1 PVC THREADABLE PIPE FOR COLD WATER D=2' m 37
R-15.12 5.2.1.11.2 PVC THREADABLE PIPE FOR COLD WATER D= 1 1/2" m 13
R-15.13 5.2.1.11.3 PVC THREADABLE PIPE FOR COLD WATER D=1 1/4" m 31
R-15.14 5.2.1.11.4 PVC THREADABLE PIPE FOR COLD WATER D=1" m 8
R-15.17 5.2.1.11.5 PVC THREADABLE PIPE FOR COLD WATER D=3/4" m 34
R-15.15 5.2.1.11.6 PVC THREADABLE PIPE FOR COLD WATER D=1/2" m 8

Hoja 51 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-30.44 5.2.1.11.7 PP TEE THREADABLE D=2" ea 9


R-30.41 5.2.1.11.8 PP TEE THREADABLE D=1 1/2" ea 3
R-30.42 5.2.1.11.9 PP TEE THREADABLE D=1 1/4" ea 16
R-30.43 5.2.1.11.10 PP TEE THREADABLE D=1" ea 1
R-30.45 5.2.1.11.11 PP TEE THREADABLE D=3/4" ea 14
R-30.4 5.2.1.11.12 PP THREADABLE ELBOW D=2" X90 degree ea 5
R-30.1 5.2.1.11.13 PP THREADABLE ELBOW D=1 1/2" X90 degree ea 4
R-30.2 5.2.1.11.14 PP THREADABLE ELBOW D1" X90 degree ea 5
R-30.3 5.2.1.11.15 PP THREADABLE ELBOW D=1/2" X90 degree ea 3
R-30.5 5.2.1.11.16 PP THREADABLE ELBOW D=3/4" X90 degree ea 25
R-30.27 5.2.1.11.17 PP THREADABLE REDUCTOR D=2" TO 1" ea 4
R-30.25 5.2.1.11.18 PP THREADABLE REDUCTOR D=2" TO 1 1/2" ea 1
R-30.26 5.2.1.11.19 PP THREADABLE REDUCTOR D=2" TO 1 1/4" ea 4
R-30.28 5.2.1.11.20 PP THREADABLE REDUCTOR D=2" TO 3/4" ea 2
R-30.22 5.2.1.11.21 PP THREADABLE REDUCTOR D=1 1/2" TO 1 1/4" ea 3
R-30.23 5.2.1.11.22 PP THREADABLE REDUCTOR D=1 1/2" TO 1" ea 1
R-30.24 5.2.1.11.23 PP THREADABLE REDUCTOR D=1" TO 3/4" ea 6
R-30.29 5.2.1.11.24 PP THREADABLE REDUCTOR D=3/4" TO 1/2" ea 23
R-30.50 5.2.1.11.25 CHECK VALVE ea 3
R-30.53 5.2.1.11.26 CONTROL VALVE D=2" ea 2
R-30.51 5.2.1.11.27 CONTROL VALVE D= 1 1/4" ea 8
R-30.52 5.2.1.11.28 CONTROL VALVE D= 1/2" ea 16
5.2.1.12 HOT WATER
R-15.6 5.2.1.12.1 PP THREADABLE PIPE FOR HOT WATER D=2" m 18
R-15.4 5.2.1.12.2 PP THREADABLE PIPE FOR HOT WATER D=1 1/2" m 12
R-15.3 5.2.1.12.3 PP THREADABLE PIPE FOR HOT WATER D=1" m 10
R-15.7 5.2.1.12.4 PP THREADABLE PIPE FOR HOT WATER D=3/4" m 40
R-15.5 5.2.1.12.5 PP THREADABLE PIPE FOR HOT WATER D=1/2" m 41
R-30.44 5.2.1.12.6 PP TEE THREADABLE D=2" ea 5
R-30.43 5.2.1.12.7 PP TEE THREADABLE D=1" ea 5
R-30.45 5.2.1.12.8 PP TEE THREADABLE D=3/4" ea 13
R-30.4 5.2.1.12.9 PP THREADABLE ELBOW D=2" X90 degree ea 3
R-30.1 5.2.1.12.10 PP THREADABLE ELBOW D=1 1/2" X90 degree ea 3
R-30.2 5.2.1.12.11 PP THREADABLE ELBOW D1" X90 degree ea 3
R-30.3 5.2.1.12.12 PP THREADABLE ELBOW D=1/2" X90 degree ea 23
R-30.5 5.2.1.12.13 PP THREADABLE ELBOW D=3/4" X90 degree ea 26
R-30.27 5.2.1.12.14 PP THREADABLE REDUCTOR D=2" TO 1" ea 4
R-30.25 5.2.1.12.15 PP THREADABLE REDUCTOR D=2" TO 1 1/2" ea 1
R-30.23 5.2.1.12.16 PP THREADABLE REDUCTOR D=1 1/2" TO 1" ea 2
R-30.24 5.2.1.12.17 PP THREADABLE REDUCTOR D=1" TO 3/4" ea 7
R-30.29 5.2.1.12.18 PP THREADABLE REDUCTOR D=3/4" TO 1/2" ea 23
R-30.52 5.2.1.12.19 CONTROL VALVE D= 1/2" ea 15
R-30.47 5.2.1.12.20 HEATER (ELECTRIC) CAP. 50 LITTERS ea 2
5.2.1.13 SEWAGE
R-8.2 5.2.1.13.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 7
R-15.8 5.2.1.13.2 PVC DRAIN PIPE D=110mm m 70
R-15.11 5.2.1.13.3 PVC DRAIN PIPE D=75mm m 34
R-15.10 5.2.1.13.4 PVC DRAIN PIPE D=50mm m 28
R-15.9 5.2.1.13.5 PVC DRAIN PIPE D=160mm m 8
R-30.55 5.2.1.13.6 PVC DRAIN YEE PIPE D=50mm ea 10
R-30.56 5.2.1.13.7 PVC DRAIN YEE PIPE D=75mm ea 9
R-30.54 5.2.1.13.8 PVC DRAIN YEE PIPE D=110mm ea 8
R-30.48 5.2.1.13.9 PVC DRAIN JOINT D=110mm ea 8
R-30.31 5.2.1.13.10 PVC DRAIN REDUCTOR D=110mm to 75mm ea 10
R-30.30 5.2.1.13.11 PVC DRAIN REDUCTOR D=110mm to 50mm ea 1
R-30.32 5.2.1.13.12 PVC DRAIN REDUCTOR D=75mm to 50mm ea 7
R-30.8 5.2.1.13.13 PVC DRAIN ELBOW D=110m x 90 degrees ea 13
R-30.7 5.2.1.13.14 PVC DRAIN ELBOW D=110m x 45 degrees ea 6
R-30.11 5.2.1.13.15 PVC DRAIN ELBOW D=75m x 45 degrees ea 4
R-30.9 5.2.1.13.16 PVC DRAIN ELBOW D=50m x 45 degrees ea 3
R-30.12 5.2.1.13.17 PVC DRAIN ELBOW D=75m x 90 degrees ea 24
R-30.10 5.2.1.13.18 PVC DRAIN ELBOW D=50m x 90 degrees ea 26
R-30.39 5.2.1.13.19 PVC FLOOR SIFON D=75mm ea 12
R-30.38 5.2.1.13.20 PVC FLOOR SIFON D=50mm ea 8
R-30.35 5.2.1.13.21 FLOOR METAL GRID D=75mm ea 12
R-30.34 5.2.1.13.22 FLOOR METAL GRID D=50mm ea 8
5.2.1.14 DRAINAGE
R-8.2 5.2.1.14.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 19
R-15.8 5.2.1.14.2 PVC DRAIN PIPE D=110mm m 242
R-30.54 5.2.1.14.3 PVC DRAIN YEE PIPE D=110mm ea 7
R-30.8 5.2.1.14.4 PVC DRAIN ELBOW D=110m x 90 degrees ea 4
R-30.7 5.2.1.14.5 PVC DRAIN ELBOW D=110m x 45 degrees ea 21
R-15.9 5.2.1.14.6 PVC DRAIN PIPE D=160mm m 46
R-30.37 5.2.1.14.7 PVC FLOOR SIFON D=110mm ea 40
R-30.40 5.2.1.14.8 METAL SUMP FOR FLOOR TYPE T D=160-100mm ea 11
R-30.33 5.2.1.14.9 FLOOR METAL GRID D=110mm ea 12
5.2.1.15 SANITARY FACILITIES
R-30.17 5.2.1.15.1 WHITE TOILET WITH FLOW SYSTEM ea 10
R-30.49 5.2.1.15.2 WHITE URINARY WITH FLOW SYSTEM ea 8
R-30.18 5.2.1.15.3 WHITE TOILET FOR SPECIAL NEEDS USERS WITH FLOW SYSTEM. INCL. ACCESSORIES ea 2
R-30.19 5.2.1.15.4 WHITE TOILET LOW TANK INCL. ACCESSORIES ea 1
R-30.16 5.2.1.15.5 STAINLESS STEEL SINK OF TWO BARRELS INCL. ACCESSORIES ea 2
R-30.15 5.2.1.15.6 TWO HANDLE SHOWER ea 8
R-30.20 5.2.1.15.7 WHITE SINK RECESSED ea 11
R-30.21 5.2.1.15.8 WHITE SINK FOR SPECIAL NEEDS USERS ea 2
R-30.14 5.2.1.15.9 TOILET PAPER DISPENSER ea 7
R-30.13 5.2.1.15.10 STAINLESS STEEL SOAP DISPENSER 800ml ea 17
R-30.36 5.2.1.15.11 HAND DRIER 120V BL 1850W ea 6
R-26.21 5.2.1.15.12 GALVANIZED STEEL COVER 2.8 mm FRAME ANG. 25*3mm m2 1
5.2.1.16 LANDSCAPE
R-38.13 5.2.1.16.1 PLANTING, DURANTA (bush) ea 688
R-38.8 5.2.1.16.2 TAPE ea 208
R-38.10 5.2.1.16.3 PLANTING, GARDEN CROTON (monalisa) ea 266
R-38.4 5.2.1.16.4 SHORT BAMBOO ea 8
R-38.14 5.2.1.16.5 PLANTING, ESCANCEL (AERVA SANGUINOLENTA ) 20-25cm high ea 439
R-38.25 5.2.1.16.6 PLANTING, PALMERA AZUL (BRAHEA ARMATA) 1.5 M HIGH ea 2
R-38.29 5.2.1.16.7 PLANTING, PALMA ROJA (CYRTOSTACHYS RENDA) 3M HIGH ea 4
R-38.26 5.2.1.16.8 PLANTING, PALMA BOTELLA ENANA (HYOPHORBE LANGENICAULIS) 1.20 M HIGH ea 1
R-38.27 5.2.1.16.9 PLANTING, PALMA BOTELLA GIGANTE (HYOPHORBE VERSCHAFFELTII) 2.5 M HIGH ea 1
R-38.28 5.2.1.16.10 PLANTING, PALMA CICA (CYCAS REVOLUTA) 1.20 M HIGH ea 4
R-38.1 5.2.1.16.11 ALMOND TREE 1.20 m HIGH ea 3
R-38.31 5.2.1.16.12 PLANTING, PINO VELA (CUPRESSUS SEMPERVIRENS) 1.4 M HIGH ea 15
R-38.9 5.2.1.16.13 CITRUS GRAFTS 1.5 m HIGH (TANGARINE, ORANGE, LEMON) ea 6
R-38.16 5.2.1.16.14 WHITE FICUS 2.75m HIGH ea 3
R-38.21 5.2.1.16.15 PLANTING, RED MANGO imported 2.5M HIGH ea 2
R-38.30 5.2.1.16.16 PLANTING, SAN AGUSTIN GRASS m2 850
5.2.1.17 PLANTING
R-38.6 5.2.1.17.1 PLANTING, CEDAR (Cedrela odorata) ea 11
R-38.24 5.2.1.17.2 PLANTING, MORAL FINO (Chlorophora tinctoria) ea 11
R-38.17 5.2.1.17.3 PLANTING, YELLOW GUAYACAN (Handroanthus chrysanthus) ea 11
R-38.18 5.2.1.17.4 PLANTING, PINK GUAYACAN (Tabebuia rosea) ea 11
R-38.5 5.2.1.17.5 MOUNTAIN RUBBER (hevea brasiliensis) ea 11

Hoja 52 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-38.23 5.2.1.17.6 PLANTING, MORAL BOBO (Claricia racemosa) ea 11


R-38.20 5.2.1.17.7 PLANTING, LAUREL (Cordia alliodora ) ea 11
R-38.15 5.2.1.17.8 PLANTING, FERNAN SÁNCHEZ (Triplaris cumingiana) ea 11
R-38.22 5.2.1.17.9 PLANTING, MARAÑÓN (Syzygium malaccense) ea 11
R-38.19 5.2.1.17.10 PLANTING, JIHUA (nectandra hihua) ea 11
R-38.11 5.2.1.17.11 PLANTING, CUCARDA (Hibiscus) ea 490
R-38.32 5.2.1.17.12 PLANTING, YERBA LUISA (Aloysia citrodora) ea 158
R-38.12 5.2.1.17.13 PLANTING, DAMA DE NOCHE (Cestrum nocturnum) ea 25
R-38.30 5.2.1.17.14 PLANTING, SAN AGUSTIN GRASS m2 9384
5.2.2 COMPLEX BUILDING
5.2.2.1 STRUCTURE
R-19.1 5.2.2.1.1 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 52609
R-19.2 5.2.2.1.2 STRUCTURAL STEEL A36, INCLUDES INSTALLATION kg 120100
PERMANENT FORMWORK OF GALVANIZED STEEL PLATE T=0.65mm FOR SLAB, SUPPLY AND
R-19.9 5.2.2.1.3 m2 958
INSTALLATION
R-8.7 5.2.2.1.4 LEAN CONCRETE - (f´c=180 kg/cm2) m3 18
R-8.9 5.2.2.1.5 STRUCTURAL CONCRETE - (f´c=210 kg/cm2) m3 84
R-8.11 5.2.2.1.6 STRUCTURAL CONCRETE - (f´c=240 kg/cm2) m3 351
R-9.3 5.2.2.1.7 FORMWORK OF STRUCTURE m2 690
R-8.19 5.2.2.1.8 SIMPLE CONCRETE SUBFLOOR f'c=240Kg/cm2 T=20cm m2 858
R-8.4 5.2.2.1.9 SIMPLE CONCRETE LINTEL f'c=180Kg/cm2 m 80
5.2.2.2 MASONRY
R-22.5 5.2.2.2.1 BLOCK MASONRY T=15CM WITH MORTAR 1:4 m2 1518
5.2.2.3 PLASTERING AND CAULKING
R-23.2 5.2.2.3.1 PLASTERING OF BORDERS AND STRIPS m 418
R-23.4 5.2.2.3.2 VERTICAL PLASTERING MORTAR 1:4 m2 1060
5.2.2.4 FLOOR LINING
R-24.9 5.2.2.4.1 PASTING AND SMOOTHING OF FLOORS m2 540
R-24.12 5.2.2.4.2 FLOATING FLOOR, SUPPLY AND INSTALLATION m2 277
5.2.2.5 COVERING OF WALL AND ROOF
R-25.9 5.2.2.5.1 SUPPLY AND INSTALL ALUCOBOND m2 99
R-25.3 5.2.2.5.2 EXTERIOR PLASTERING m2 1060
R-25.7 5.2.2.5.3 EXTERIOR PAINT m2 1060
5.2.2.6 STEEL, METAL AND WOOD WORK
R-26.62 5.2.2.6.1 WINDOW V1, Complex Building ea 30
R-26.63 5.2.2.6.2 DOOR P1, Complex Building ea 8
R-26.64 5.2.2.6.3 DOOR P2, Complex Building ea 2
R-26.65 5.2.2.6.4 DOOR P3, Complex Building m2 10.5
R-26.66 5.2.2.6.5 DOOR P4, Complex Building m2 12.25
R-26.67 5.2.2.6.6 DOOR P5, Complex Building ea 1
R-26.68 5.2.2.6.7 DOOR P6, Complex Building m2 7.5
R-26.69 5.2.2.6.8 DOOR P7, Complex Building m2 14
5.2.2.7 COVER
R-25.6 5.2.2.7.1 PASTING AND SMOOTHING THE ROOF SLAB m2 955
R-25.5 5.2.2.7.2 ACRILIC WATERPROOFING FOR ROOF m2 955
5.2.2.8 DRINAGE
R-8.2 5.2.2.8.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 9
R-15.8 5.2.2.8.2 PVC DRAIN PIPE D=110mm m 240
R-30.54 5.2.2.8.3 PVC DRAIN YEE PIPE D=110mm ea 10
R-30.8 5.2.2.8.4 PVC DRAIN ELBOW D=110m x 90 degrees ea 10
R-30.7 5.2.2.8.5 PVC DRAIN ELBOW D=110m x 45 degrees ea 30
R-15.9 5.2.2.8.6 PVC DRAIN PIPE D=160mm m 55
R-30.37 5.2.2.8.7 PVC FLOOR SIFON D=110mm ea 20
R-30.40 5.2.2.8.8 METAL SUMP FOR FLOOR TYPE T D=160-100mm ea 20
5.2.3 SLUDGE DEWATERING BUILDING
5.2.3.1 STRUCTURE
R-19.2 5.2.3.1.1 STRUCTURAL STEEL A36, INCLUDES INSTALLATION kg 52660
PERMANENT FORMWORK OF GALVANIZED STEEL PLATE T=0.65mm FOR SLAB, SUPPLY AND
R-19.9 5.2.3.1.2 m2 480
INSTALLATION
R-8.9 5.2.3.1.3 STRUCTURAL CONCRETE - (f´c=210 kg/cm2) m3 5
R-8.12 5.2.3.1.4 STRUCTURAL CONCRETE - (f´c=280 kg/cm2) m3 42
R-8.4 5.2.3.1.5 SIMPLE CONCRETE LINTEL f'c=180Kg/cm2 m 58
5.2.3.2 MASONRY
R-22.6 5.2.3.2.1 BLOCK MASONRY T=20CM WITH MORTAR 1:4 m2 836
R-22.5 5.2.3.2.2 BLOCK MASONRY T=15CM WITH MORTAR 1:4 m2 14
R-22.8 5.2.3.2.3 GRANITE TOPPED KITCHEN TABLE m 1
5.2.3.3 PLASTERING AND CAULKING
R-23.2 5.2.3.3.1 PLASTERING OF BORDERS AND STRIPS m 349
R-23.4 5.2.3.3.2 VERTICAL PLASTERING MORTAR 1:4 m2 88
R-24.5 5.2.3.3.3 TROWELLED FLOORS FOR RAMP, (MORTAR 1:3, W=1.5CM) m2 41
5.2.3.4 FLOOR LINING
R-24.9 5.2.3.4.1 PASTING AND SMOOTHING OF FLOORS m2 429
R-24.10 5.2.3.4.2 PORCELAIN IN FLOORS m2 14
R-24.7 5.2.3.4.3 FLOOR CERAMIC m2 2
R-24.6 5.2.3.4.4 SKIRTING BOARDS OF PORCELLANATO T=10cm m 15
R-24.8 5.2.3.4.5 PASTING AND SMOOTHING OF STAIRCASE m2 7
R-24.12 5.2.3.4.6 FLOATING FLOOR, SUPPLY AND INSTALLATION m2 43
R-24.5 5.2.3.4.7 TROWELLED FLOORS FOR RAMP, (MORTAR 1:3, W=1.5CM) m2 41
5.2.3.5 COVERING OF WALL AND ROOF
R-25.2 5.2.3.5.1 GYPSUM CEILING m2 16
R-25.1 5.2.3.5.2 WALL CERAMIC m2 6
R-25.4 5.2.3.5.3 INTERIOR PLASTERING m2 82
R-25.8 5.2.3.5.4 INTERIOR PAINT m2 82
5.2.3.6 STEEL, METAL AND WOOD WORK
R-26.70 5.2.3.6.1 WINDOW V1, Sludge Dewatering Building ea 17
R-26.71 5.2.3.6.2 WINDOW V2, Sludge Dewatering Building ea 1
R-26.72 5.2.3.6.3 WINDOW V3, Sludge Dewatering Building ea 1
R-26.73 5.2.3.6.4 WINDOW V4, Sludge Dewatering Building ea 1
R-26.74 5.2.3.6.5 WINDOW V5, Sludge Dewatering Building ea 1
R-26.75 5.2.3.6.6 DOOR P1, Sludge Dewatering Building ea 3
R-26.76 5.2.3.6.7 DOOR P2, Sludge Dewatering Building ea 1
R-26.77 5.2.3.6.8 DOOR P3, Sludge Dewatering Building m2 72
R-26.78 5.2.3.6.9 DOOR P4, Sludge Dewatering Building m2 16
R-26.3 5.2.3.6.10 STAINLESS STEEL HANDRAIL, AISI A304 m 4
5.2.3.7 COVER
R-25.6 5.2.3.7.1 PASTING AND SMOOTHING THE ROOF SLAB m2 487
R-25.5 5.2.3.7.2 ACRILIC WATERPROOFING FOR ROOF m2 487
5.2.3.8 FURNITURE
R-28.8 5.2.3.8.1 OFFICE DESK SUPPLY ea 1
R-28.2 5.2.3.8.2 EXECUTIVE OFFICE CHAIRS ea 1
5.2.3.9 EQUIPMENTS
R-29.1 5.2.3.9.1 OFFICE EQUIPMENT (COMPUTERS ) ea 1
5.2.3.10 COOL WATER
R-15.17 5.2.3.10.1 PVC THREADABLE PIPE FOR COLD WATER D=3/4" m 6
R-15.15 5.2.3.10.2 PVC THREADABLE PIPE FOR COLD WATER D=1/2" m 3
R-30.45 5.2.3.10.3 PP TEE THREADABLE D=3/4" ea 1
R-30.3 5.2.3.10.4 PP THREADABLE ELBOW D=1/2" X90 degree ea 3
R-30.5 5.2.3.10.5 PP THREADABLE ELBOW D=3/4" X90 degree ea 2
R-30.29 5.2.3.10.6 PP THREADABLE REDUCTOR D=3/4" TO 1/2" ea 1
R-30.52 5.2.3.10.7 CONTROL VALVE D= 1/2" ea 2
5.2.3.11 SEWAGE
R-8.2 5.2.3.11.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 1
R-15.8 5.2.3.11.2 PVC DRAIN PIPE D=110mm m 5

Hoja 53 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-15.11 5.2.3.11.3 PVC DRAIN PIPE D=75mm m 1


R-15.10 5.2.3.11.4 PVC DRAIN PIPE D=50mm m 2
R-30.31 5.2.3.11.5 PVC DRAIN REDUCTOR D=110mm to 75mm ea 1
R-30.32 5.2.3.11.6 PVC DRAIN REDUCTOR D=75mm to 50mm ea 1
R-30.8 5.2.3.11.7 PVC DRAIN ELBOW D=110m x 90 degrees ea 2
R-30.10 5.2.3.11.8 PVC DRAIN ELBOW D=50m x 90 degrees ea 2
R-30.39 5.2.3.11.9 PVC FLOOR SIFON D=75mm ea 1
R-30.38 5.2.3.11.10 PVC FLOOR SIFON D=50mm ea 1
5.2.3.12 DRINAGE
R-8.2 5.2.3.12.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 10
R-15.8 5.2.3.12.2 PVC DRAIN PIPE D=110mm m 209
R-30.54 5.2.3.12.3 PVC DRAIN YEE PIPE D=110mm ea 8
R-30.8 5.2.3.12.4 PVC DRAIN ELBOW D=110m x 90 degrees ea 8
R-30.7 5.2.3.12.5 PVC DRAIN ELBOW D=110m x 45 degrees ea 17
R-15.9 5.2.3.12.6 PVC DRAIN PIPE D=160mm m 18
R-30.37 5.2.3.12.7 PVC FLOOR SIFON D=110mm ea 21
R-30.40 5.2.3.12.8 METAL SUMP FOR FLOOR TYPE T D=160-100mm ea 16
R-30.33 5.2.3.12.9 FLOOR METAL GRID D=110mm ea 5
5.2.3.13 SANITARY FACILITIES
R-30.19 5.2.3.13.1 WHITE TOILET LOW TANK INCL. ACCESSORIES ea 1
R-30.20 5.2.3.13.2 WHITE SINK RECESSED ea 1
R-30.14 5.2.3.13.3 TOILET PAPER DISPENSER ea 1
R-30.13 5.2.3.13.4 STAINLESS STEEL SOAP DISPENSER 800ml ea 1
5.2.4 SECURITY OFFICE (GUARD ROOM)
5.2.4.1 STRUCTURE
R-19.1 5.2.4.1.1 STEEL REINFORCEMENT fy=4200 kg/cm2 kg 236
R-19.2 5.2.4.1.2 STRUCTURAL STEEL A36, INCLUDES INSTALLATION kg 1532
PERMANENT FORMWORK OF GALVANIZED STEEL PLATE T=0.65mm FOR SLAB, SUPPLY AND
R-19.9 5.2.4.1.3 m2 53
INSTALLATION
R-8.7 5.2.4.1.4 LEAN CONCRETE - (f´c=180 kg/cm2) m3 1
R-8.9 5.2.4.1.5 STRUCTURAL CONCRETE - (f´c=210 kg/cm2) m3 5
R-8.11 5.2.4.1.6 STRUCTURAL CONCRETE - (f´c=240 kg/cm2) m3 10
R-8.17 5.2.4.1.7 SIMPLE CONCRETE SUBFLOOR f'c=180Kg/cm2 T=6cm m2 30
R-9.3 5.2.4.1.8 FORMWORK OF STRUCTURE m2 71
R-8.4 5.2.4.1.9 SIMPLE CONCRETE LINTEL f'c=180Kg/cm2 m 18
5.2.4.2 MASONRY
R-22.8 5.2.4.2.1 GRANITE TOPPED KITCHEN TABLE m 6
R-22.6 5.2.4.2.2 BLOCK MASONRY T=20CM WITH MORTAR 1:4 m2 30
R-22.5 5.2.4.2.3 BLOCK MASONRY T=15CM WITH MORTAR 1:4 m2 35
5.2.4.3 PLASTERING AND CAULKING
R-23.2 5.2.4.3.1 PLASTERING OF BORDERS AND STRIPS m 91
R-23.4 5.2.4.3.2 VERTICAL PLASTERING MORTAR 1:4 m2 127
R-23.3 5.2.4.3.3 HORIZONTAL PLASTERING MORTAR 1:4 m2 23
5.2.4.4 FLOOR LINING
R-24.9 5.2.4.4.1 PASTING AND SMOOTHING OF FLOORS m2 26
R-24.10 5.2.4.4.2 PORCELAIN IN FLOORS m2 23
R-24.7 5.2.4.4.3 FLOOR CERAMIC m2 2
R-24.6 5.2.4.4.4 SKIRTING BOARDS OF PORCELLANATO T=10cm m 29
5.2.4.5 COVERING OF WALL AND ROOF
R-25.1 5.2.4.5.1 WALL CERAMIC m2 6
R-25.4 5.2.4.5.2 INTERIOR PLASTERING m2 78
R-25.3 5.2.4.5.3 EXTERIOR PLASTERING m2 43
R-25.8 5.2.4.5.4 INTERIOR PAINT m2 78
R-25.7 5.2.4.5.5 EXTERIOR PAINT m2 43
R-25.2 5.2.4.5.6 GYPSUM CEILING m2 27
5.2.4.6 STEEL, METAL AND WOOD WORK
R-26.79 5.2.4.6.1 WINDOW V1, Guard Room ea 1
R-26.80 5.2.4.6.2 WINDOW V2, Guard Room ea 1
R-26.81 5.2.4.6.3 WINDOW V3, Guard Room ea 1
R-26.82 5.2.4.6.4 WINDOW V4, Guard Room ea 1
R-26.83 5.2.4.6.5 DOOR P1, Guard Room ea 1
R-26.84 5.2.4.6.6 DOOR P2, Guard Room ea 1
R-26.85 5.2.4.6.7 DOOR P3, Guard Room ea 1
R-26.86 5.2.4.6.8 DOOR P4, Guard Room ea 1
5.2.4.7 COVER
R-25.6 5.2.4.7.1 PASTING AND SMOOTHING THE ROOF SLAB m2 53
R-25.5 5.2.4.7.2 ACRILIC WATERPROOFING FOR ROOF m2 53
5.2.4.8 FURNITURE
R-28.6 5.2.4.8.1 BED SUPPLY ea 1
R-28.12 5.2.4.8.2 LOCKERS SUPPLY ea 1
R-28.9 5.2.4.8.3 SIMPLE OFFICE DESK SUPPLY ea 1
R-28.3 5.2.4.8.4 VISITORS CHAIRS ea 1
5.2.4.9 EQUIPMENTS
R-29.1 5.2.4.9.1 OFFICE EQUIPMENT (COMPUTERS ) ea 1
5.2.4.10 COOL WATER
R-15.17 5.2.4.10.1 PVC THREADABLE PIPE FOR COLD WATER D=3/4" m 5
R-15.15 5.2.4.10.2 PVC THREADABLE PIPE FOR COLD WATER D=1/2" m 3
R-30.45 5.2.4.10.3 PP TEE THREADABLE D=3/4" ea 1
R-30.3 5.2.4.10.4 PP THREADABLE ELBOW D=1/2" X90 degree ea 2
R-30.5 5.2.4.10.5 PP THREADABLE ELBOW D=3/4" X90 degree ea 2
R-30.29 5.2.4.10.6 PP THREADABLE REDUCTOR D=3/4" TO 1/2" ea 1
R-30.52 5.2.4.10.7 CONTROL VALVE D= 1/2" ea 2
5.2.4.11 SEWAGE
R-8.2 5.2.4.11.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 1
R-15.8 5.2.4.11.2 PVC DRAIN PIPE D=110mm m 6
R-15.11 5.2.4.11.3 PVC DRAIN PIPE D=75mm m 1
R-15.10 5.2.4.11.4 PVC DRAIN PIPE D=50mm m 2
R-30.56 5.2.4.11.5 PVC DRAIN YEE PIPE D=75mm ea 1
R-30.54 5.2.4.11.6 PVC DRAIN YEE PIPE D=110mm ea 1
R-30.31 5.2.4.11.7 PVC DRAIN REDUCTOR D=110mm to 75mm ea 1
R-30.32 5.2.4.11.8 PVC DRAIN REDUCTOR D=75mm to 50mm ea 1
R-30.8 5.2.4.11.9 PVC DRAIN ELBOW D=110m x 90 degrees ea 1
R-30.10 5.2.4.11.10 PVC DRAIN ELBOW D=50m x 90 degrees ea 2
R-30.39 5.2.4.11.11 PVC FLOOR SIFON D=75mm ea 1
R-30.38 5.2.4.11.12 PVC FLOOR SIFON D=50mm ea 1
5.2.4.12 DRINAGE
R-8.2 5.2.4.12.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 1
R-15.8 5.2.4.12.2 PVC DRAIN PIPE D=110mm m 13
R-30.54 5.2.4.12.3 PVC DRAIN YEE PIPE D=110mm ea 1
R-30.8 5.2.4.12.4 PVC DRAIN ELBOW D=110m x 90 degrees ea 1
R-30.7 5.2.4.12.5 PVC DRAIN ELBOW D=110m x 45 degrees ea 3
R-30.37 5.2.4.12.6 PVC FLOOR SIFON D=110mm ea 2
R-30.40 5.2.4.12.7 METAL SUMP FOR FLOOR TYPE T D=160-100mm ea 2
5.2.4.13 SANITARY FACILITIES
R-30.19 5.2.4.13.1 WHITE TOILET LOW TANK INCL. ACCESSORIES ea 1
R-30.20 5.2.4.13.2 WHITE SINK RECESSED ea 1
R-30.14 5.2.4.13.3 TOILET PAPER DISPENSER ea 1
R-30.13 5.2.4.13.4 STAINLESS STEEL SOAP DISPENSER 800ml ea 1
5.3 MECHANICAL WORKS
5.3.1 MECHNICAL WORK_WWTP
5.3.1.1 GRIT REMOVAL AND SCREENING FACILITIES
5.3.1.1.1 SUPPLY AND INSTALL EQUIPMENTS

Hoja 54 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

M-101 MAIN GATE, MOTORIZED SLUICE GATE (EMERGENCY SHUTDOWN GATE), SIZE : W1.0M
R-36.149 5.3.1.1.1.1 set 1
× H1.0M
R-36.150 5.3.1.1.1.2 M-102 DISTRIBUTION GATE, MOTORIZED SLUICE GATE(OPENING CONTROL), SIZE :Φ1.0M set 1
R-36.151 5.3.1.1.1.3 M-103 INLET GATE, MOTORIZED SLUICE GATE, SIZE : W1.0M × H1.0M set 2
M-104 COARSE SCREEN, AUTO BAR SCREEN(FLAT BAR TYPE), BAR SPACING 50MM, SIZE :
R-36.152 5.3.1.1.1.4 set 2
W1.0M × H3.5M
R-36.153 5.3.1.1.1.5 M-105 COARSE SCREENING CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6M × L7.0M set 1
M-106 COARSE SCREENING CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M,
R-36.154 5.3.1.1.1.6 set 1
ANGLE 20˚
R-36.155 5.3.1.1.1.7 M-107 GRIT REMOVER, V-BUCKET ENDLESS CHAIN FLIGHT, SIZE : W1.5M × H4.0M X L10.0M set 2
R-36.156 5.3.1.1.1.8 M-108 GRIT CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6M × L7.0M set 1
R-36.157 5.3.1.1.1.9 M-109 GRIT CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M, ANGLE 20˚ set 1
M-110 FINE SCREEN, AUTO BAR SCREEN(FLAT BAR TYPE), BAR SPACING 10MM, SIZE : W1.0M
R-36.158 5.3.1.1.1.10 set 2
× H3.5M
R-36.159 5.3.1.1.1.10 M-111 FINE SCREENING CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M set 1
M-112 FINE SCREENING CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6 M × L7.0M, ANGLE
R-36.160 5.3.1.1.1.10 set 1
20˚
R-36.161 5.3.1.1.1.10 M-113 CONTAINER, ARM ROLL TYPE, CAPACITY : FOR 11TONS set 3
R-36.162 5.3.1.1.1.10 M-114 OUTLET GATE, MANUAL SLUICE GATE, SIZE : W1.0M × H1.0M set 2
5.3.1.2 PRIMARY CLARIFIER FACILITIES
5.3.1.2.1 SUPPLY AND INSTALL EQUIPMENTS
R-36.163 5.3.1.2.1.1 M-201 INLET GATE, MANUAL SLUICE GATE, SIZE : Φ0.5M set 4
R-36.164 5.3.1.2.1.2 M-202 SLUDGE COLLECTOR, CENTER DRIVE TYPE, SIZE : D16.0M × 4.0MHE set 4
R-36.165 5.3.1.2.1.3 M-203 SLUDGE EXHAUST VALVE, MOTORIZED GATE VALVE, SIZE : Φ200MM × 10 KG/㎠ set 4
M-204 RAW SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER, CAPACITY : 0.21
R-36.166 5.3.1.2.1.4 ea 2
㎥/MIN × 5MH
M-205 RAW SLUDGE OUTLET VALVE, MOTORIZED BUTTERFLY VALVE(OPENING CONTROL),
R-36.167 5.3.1.2.1.5 set 1
SIZE : Φ80MM × 10 KG/㎠
R-36.168 5.3.1.2.1.6 M-206 SCUM HOIST, JIB CRANE 1TON, ARM LENGTH : 2.5M, LIFT HEIGHT : 5.0M set 4
R-36.169 5.3.1.2.1.7 M-207 SCUM CONTAINER, STS MESH BOX, SIZE : 0.1㎥ set 4
R-36.170 5.3.1.2.1.8 M-208 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
R-36.171 5.3.1.2.1.9 M-209 FLOWMETER SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
R-36.172 5.3.1.2.1.10 M-210 MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W0.8M × H0.8M set 1

R-36.173 5.3.1.2.1.11 M-211 MANHOLE PUMP, SUBMERSIBLE MOTOR PUMP(VORTEX TYPE), CAPACITY : 0.1㎥/MIN × set 2
10MH
M-212 CONJUNTION GATE, MOTORIZED SLUICE WEIR GATE(OPENING CONTROL), SIZE :
R-36.174 5.3.1.2.1.12 set 2
W1.5M × H0.8M
5.3.1.2.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.252 5.3.1.2.2.1 PIPE(STS)10S, 50A(2.8T) m 18.4
R-36.253 5.3.1.2.2.2 PIPE(STS)10S, 80A(3.0T) m 13.1
R-36.257 5.3.1.2.2.3 PIPE(STS)10S, 200A(4.0T) m 6.8
R-36.25 5.3.1.2.2.4 90 DEGREE ELBOW(STS)10S, 50A ea 5
R-36.26 5.3.1.2.2.5 90 DEGREE ELBOW(STS)10S, 80A ea 6
R-36.332 5.3.1.2.2.6 TEE(STS)10S, 50A ea 4
R-36.334 5.3.1.2.2.7 TEE(STS)10S, 80A ea 5
R-36.342 5.3.1.2.2.8 TEE(STS)10S, 200A ea 2
R-36.285 5.3.1.2.2.9 REDUCER(STS), 80X50A ea 3
R-36.286 5.3.1.2.2.10 REDUCER(STS), 80X65A ea 2
R-36.289 5.3.1.2.2.11 REDUCER(STS), 100X80A ea 1
R-36.295 5.3.1.2.2.12 REDUCER(STS), 200X125A ea 1
R-36.95 5.3.1.2.2.13 FLANGE(STS)10K, 50A ea 16
R-36.96 5.3.1.2.2.14 FLANGE(STS)10K, 65A ea 2
R-36.97 5.3.1.2.2.15 FLANGE(STS)10K, 80A ea 23
R-36.101 5.3.1.2.2.16 FLANGE(STS)10K, 200A ea 13
R-36.44 5.3.1.2.2.17 BL.FLANGE(STS), 50A ea 2
R-36.45 5.3.1.2.2.18 BL.FLANGE(STS), 80A ea 2
R-36.48 5.3.1.2.2.19 BL.FLANGE(STS), 200A ea 2
R-36.138 5.3.1.2.2.20 GATE VALVE(CAST-IRON)10K, 50A ea 5
R-36.139 5.3.1.2.2.21 GATE VALVE(CAST-IRON)10K, 80A ea 7
R-36.141 5.3.1.2.2.22 GATE VALVE(CAST-IRON)10K, 200A ea 10
R-36.57 5.3.1.2.2.23 CHECK VALVE(CAST-STEEL)10K, 50A ea 5
R-36.58 5.3.1.2.2.24 CHECK VALVE(CAST-STEEL)10K, 80A ea 2
R-36.116 5.3.1.2.2.25 FLEXIBLE JOINT(STS)10K, 50A ea 5
R-36.117 5.3.1.2.2.26 FLEXIBLE JOINT(STS)10K, 80A ea 4
R-36.120 5.3.1.2.2.27 FLEXIBLE JOINT(STS)10K, 200A ea 4
5.3.1.2.3 INSTALLATION RELATED PIPE WORK
R-36.306 5.3.1.2.3.1 STS PIPE INSTALLATION, 50A m 17.5
R-36.307 5.3.1.2.3.2 STS PIPE INSTALLATION, 80A m 12.5
R-36.311 5.3.1.2.3.3 STS PIPE INSTALLATION, 200A m 6.5
R-36.71 5.3.1.2.3.4 FLANGE JOINT, 50A place 27
R-36.72 5.3.1.2.3.5 FLANGE JOINT, 65A place 2
R-36.73 5.3.1.2.3.6 FLANGE JOINT, 80A place 29
R-36.77 5.3.1.2.3.7 FLANGE JOINT, 200A place 31
R-36.362 5.3.1.2.3.8 VALVE INSTALLATION(FLANGE TYPE), 50A ea 10
R-36.363 5.3.1.2.3.9 VALVE INSTALLATION(FLANGE TYPE), 80A ea 9
R-36.366 5.3.1.2.3.10 VALVE INSTALLATION(FLANGE TYPE), 200A ea 10
R-36.105 5.3.1.2.3.11 FLEX. INSTALLATION(FLANGE TYPE), 50A place 5
R-36.106 5.3.1.2.3.12 FLEX. INSTALLATION(FLANGE TYPE), 80A place 4
R-36.109 5.3.1.2.3.13 FLEX. INSTALLATION(FLANGE TYPE), 200A place 4
R-36.390 5.3.1.2.3.14 WELDING(STS), 50A place 38
R-36.391 5.3.1.2.3.15 WELDING(STS), 65A place 2
R-36.392 5.3.1.2.3.16 WELDING(STS), 80A place 42
R-36.393 5.3.1.2.3.17 WELDING(STS), 100A place 1
R-36.396 5.3.1.2.3.18 WELDING(STS), 200A place 15
5.3.1.3 BIO-REACTOR FACILITIES
5.3.1.3.1 SUPPLY AND INSTALL EQUIPMENTS
R-36.175 5.3.1.3.1.1 M-301 INLET GATE, MOTORIZED SLUICE GATE(OPENING CONTROL), SIZE : W1.0M × H1.0M set 4
M-302 BLOWER, TURBO BLOWER( SINGLE STAGE TURBO TYPE,V.V.V.F OPERATNG),
R-36.176 5.3.1.3.1.2 set 3
CAPACITY : 65㎥/MIN X 6,000MMAQ
M-303 AIR CONTROL VALVE, MOTORIZED BUTTERFLY VALVE(OPENING CONTROL), SIZE :
R-36.177 5.3.1.3.1.3 set 4
Φ200MM × 10 KG/㎠
M-304 AIR DIFFUSER, FINE BUBBLE MEMBRANE DISK(WITH DIFFUSER PIPING), CAPACITY:
R-36.178 5.3.1.3.1.4 set 1
120~150ℓ/MIN X 1,120EA
M-305 HOIST OF BLOWER ROOM, MONORAIL HOIST, CAPACITY : 2TON X LENGTH 42M X LIFT
R-36.179 5.3.1.3.1.5 set 1
HEIGHT 4M
R-36.180 5.3.1.3.1.6 M-306 AIR CLEANING FILTER, STATIC ELECTRICITY, TYPE CAPACITY : 130㎥/MIN set 2
R-36.181 5.3.1.3.1.7 M-307 PAC PUMP, DIAPHRAM PUMP, CAPACITY : 0.13L/MIN × 20MH set 2
R-36.182 5.3.1.3.1.8 M-308 PAC TANK, CYLINDRICAL PE TANK, CAPACITY : 1㎥ set 1
R-36.183 5.3.1.3.1.9 M-309 NAOH PUMP, DIAPHRAM PUMP, CAPACITY : 0.75L/MIN × 20MH set 2
R-36.184 5.3.1.3.1.10 M-310 NAOH TANK, CYLINDRICAL PE TANK, CAPACITY : 3㎥ set 1
R-36.185 5.3.1.3.1.11 M-311 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
R-36.186 5.3.1.3.1.12 M-312 FLOWMETERSUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
5.3.1.3.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.250 5.3.1.3.2.1 PIPE(STS)10S, 20A(2.5T) m 36.2
R-36.252 5.3.1.3.2.2 PIPE(STS)10S, 50A(2.8T) m 5.8
R-36.245 5.3.1.3.2.3 PIPE(SPP), 200A m 212.1
R-36.246 5.3.1.3.2.4 PIPE(SPP), 250A m 9.5
R-36.247 5.3.1.3.2.5 PIPE(SPP), 300A m 11
R-36.248 5.3.1.3.2.6 PIPE(SPP), 350A m 10
R-36.249 5.3.1.3.2.7 PIPE(SPP), 400A m 48.3
R-36.241 5.3.1.3.2.8 PIPE(PE), 32A m 226.8
R-36.23 5.3.1.3.2.9 90 DEGREE ELBOW(STS)10S, 20A ea 14
R-36.25 5.3.1.3.2.10 90 DEGREE ELBOW(STS)10S, 50A ea 3
R-36.20 5.3.1.3.2.11 90 DEGREE ELBOW(SPP), 200A ea 16
R-36.21 5.3.1.3.2.12 90 DEGREE ELBOW(SPP), 250A ea 3
R-36.22 5.3.1.3.2.13 90 DEGREE ELBOW(SPP), 400A ea 7
R-36.16 5.3.1.3.2.14 90 DEGREE ELBOW(PE), 32A ea 30
R-36.329 5.3.1.3.2.15 TEE(STS)10S, 20A ea 3

Hoja 55 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-36.332 5.3.1.3.2.16 TEE(STS)10S, 50A ea 1


R-36.321 5.3.1.3.2.17 TEE(SPP), 200A ea 17
R-36.325 5.3.1.3.2.18 TEE(SPP), 300X200A ea 1
R-36.326 5.3.1.3.2.19 TEE(SPP), 350X200A ea 1
R-36.327 5.3.1.3.2.20 TEE(SPP), 400X200A ea 1
R-36.328 5.3.1.3.2.21 TEE(SPP), 400X250A ea 3
R-36.318 5.3.1.3.2.22 TEE(PE), 32A ea 8
R-36.285 5.3.1.3.2.23 REDUCER(STS), 80X50A ea 1
R-36.278 5.3.1.3.2.24 REDUCER(SPP), 300X200A ea 1
R-36.279 5.3.1.3.2.25 REDUCER(SPP), 350X300A ea 1
R-36.280 5.3.1.3.2.26 REDUCER(SPP), 400X350A ea 1
R-36.93 5.3.1.3.2.27 FLANGE(STS)10K, 20A ea 11
R-36.95 5.3.1.3.2.28 FLANGE(STS)10K, 50A ea 6
R-36.97 5.3.1.3.2.29 FLANGE(STS)10K, 80A ea 1
R-36.90 5.3.1.3.2.30 FLANGE(SS400), 200A ea 61
R-36.91 5.3.1.3.2.31 FLANGE(SS400), 250A ea 3
R-36.92 5.3.1.3.2.32 FLANGE(SS400), 400A ea 1
R-36.86 5.3.1.3.2.33 FLANGE(PE), 32A ea 34
R-36.41 5.3.1.3.2.34 BL.FLANGE(SS400), 200A ea 5
R-36.42 5.3.1.3.2.35 BL.FLANGE(SS400), 400A ea 1
R-36.38 5.3.1.3.2.36 BL.FLANGE(PE), 32A ea 4
R-36.138 5.3.1.3.2.37 GATE VALVE(CAST-IRON)10K, 50A ea 2
R-36.57 5.3.1.3.2.38 CHECK VALVE(CAST-STEEL)10K, 50A ea 2
R-36.53 5.3.1.3.2.39 BUTTERFLY VALVE, 200A ea 16
R-36.54 5.3.1.3.2.40 BUTTERFLY VALVE, 250A ea 3
R-36.34 5.3.1.3.2.41 BALL VALVE(BRASS), 20A ea 4
R-36.36 5.3.1.3.2.42 BALL VALVE(PVC), 32A ea 10
R-36.116 5.3.1.3.2.43 FLEXIBLE JOINT(STS)10K, 50A ea 2
5.3.1.3.3 INSTALLATION RELATED PIPE WORK
R-36.304 5.3.1.3.3.1 STS PIPE INSTALLATION, 20A m 34.5
R-36.306 5.3.1.3.3.2 STS PIPE INSTALLATION, 50A m 5.5
R-36.311 5.3.1.3.3.3 STS PIPE INSTALLATION, 200A m 202
R-36.312 5.3.1.3.3.4 STS PIPE INSTALLATION, 250A m 9
R-36.313 5.3.1.3.3.5 STS PIPE INSTALLATION, 300A m 10.5
R-36.314 5.3.1.3.3.6 STS PIPE INSTALLATION, 350A m 9.5
R-36.315 5.3.1.3.3.7 STS PIPE INSTALLATION, 400A m 46
R-36.229 5.3.1.3.3.8 PE PIPE INSTALLATION, 32A m 216
R-36.69 5.3.1.3.3.9 FLANGE JOINT, 20A place 11
R-36.70 5.3.1.3.3.10 FLANGE JOINT, 32A place 34
R-36.71 5.3.1.3.3.11 FLANGE JOINT, 50A place 10
R-36.73 5.3.1.3.3.12 FLANGE JOINT, 80A place 1
R-36.77 5.3.1.3.3.13 FLANGE JOINT, 200A place 61
R-36.78 5.3.1.3.3.14 FLANGE JOINT, 250A place 6
R-36.80 5.3.1.3.3.15 FLANGE JOINT, 400A place 1
R-36.360 5.3.1.3.3.16 VALVE INSTALLATION(FLANGE TYPE), 20A ea 4
R-36.361 5.3.1.3.3.17 VALVE INSTALLATION(FLANGE TYPE), 32A ea 10
R-36.362 5.3.1.3.3.18 VALVE INSTALLATION(FLANGE TYPE), 50A ea 4
R-36.366 5.3.1.3.3.19 VALVE INSTALLATION(FLANGE TYPE), 200A ea 16
R-36.105 5.3.1.3.3.20 FLEX. INSTALLATION(FLANGE TYPE), 50A place 10
R-36.106 5.3.1.3.3.21 FLEX. INSTALLATION(FLANGE TYPE), 80A place 1
R-36.388 5.3.1.3.3.22 WELDING(STS), 20A place 48
R-36.390 5.3.1.3.3.23 WELDING(STS), 50A place 14
R-36.392 5.3.1.3.3.24 WELDING(STS), 80A place 1
R-36.383 5.3.1.3.3.25 WELDING(SPP), 200A place 165
R-36.384 5.3.1.3.3.26 WELDING(STS), 250A place 12
R-36.385 5.3.1.3.3.27 WELDING(SPP), 300A place 5
R-36.386 5.3.1.3.3.28 WELDING(SPP), 350A place 5
R-36.387 5.3.1.3.3.29 WELDING(SPP), 400A place 29
5.3.1.4 SECONDARY CLARIFIER FACILITIES
5.3.1.4.1 SUPPLY AND INSTALL EQUIPMENTS
R-36.187 5.3.1.4.1.1 M-401 INLET GATE, MANUAL SLUICE GATE, SIZE : Φ0.5M set 4
R-36.188 5.3.1.4.1.2 M-402 SLUDGE COLLECTOR, CENTER DRIVE TYPE, SIZE : D17M × 4.5MHE set 4
R-36.189 5.3.1.4.1.3 M-403 SLUDGE EXHAUST VALVE, MOTORIZED GATE VALVE, SIZE : Φ200MM × 10 KG/㎠ set 4
M-404 EXCESS SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER, CAPACITY :
R-36.190 5.3.1.4.1.4 set 2
1.0㎥/MIN × 5MH
M-405 EXCESS SLUDGE OUTLET VALVE, MOTORIZED BUTTERFLY VALVE(OPENING
R-36.191 5.3.1.4.1.5 set 1
CONTROL), SIZE : Φ125MM × 10 KG/㎠
M-406 RETURN SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER(VVVF),
R-36.192 5.3.1.4.1.6 set 2
CAPACITY : 6.4㎥/MIN × 8MH
R-36.193 5.3.1.4.1.7 M-407 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
M-408 MAINTENANCE HOIST, MONORAIL HOIST, CAPACITY : 1TON X LENGTH 10M X LIFT
R-36.194 5.3.1.4.1.8 set 1
HEIGHT 6M
R-36.195 5.3.1.4.1.9 M-409 MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W0.8M × H0.8M set 1
R-36.196 5.3.1.4.1.10 M-410 SCUM HOIST, JIB CRANE 1TON, ARM LENGTH : 2.5M, LIFT HEIGHT : 5.0M set 4
R-36.197 5.3.1.4.1.11 M-411 SCUM CONTAINER, STS MESH BOX, SIZE : 0.1㎥ set 4
5.3.1.4.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.252 5.3.1.4.2.1 PIPE(STS)10S, 50A(2.8T) m 8.4
R-36.255 5.3.1.4.2.2 PIPE(STS)10S, 125A(3.5T) m 19.4
R-36.257 5.3.1.4.2.3 PIPE(STS)10S, 200A(4.0T) m 4.2
R-36.259 5.3.1.4.2.4 PIPE(STS)10S, 300A(4.5T) m 18.4
R-36.260 5.3.1.4.2.5 PIPE(STS)10S, 400A(5.0T) m 3.7
R-36.25 5.3.1.4.2.6 90 DEGREE ELBOW(STS)10S, 50A ea 4
R-36.27 5.3.1.4.2.7 90 DEGREE ELBOW(STS)10S, 125A ea 5
R-36.31 5.3.1.4.2.8 90 DEGREE ELBOW(STS)10S, 300A ea 6
R-36.332 5.3.1.4.2.9 TEE(STS)10S, 50A ea 1
R-36.337 5.3.1.4.2.10 TEE(STS)10S, 125A ea 5
R-36.345 5.3.1.4.2.11 TEE(STS)10S, 300A ea 4
R-36.346 5.3.1.4.2.12 TEE(STS)10S, 400X300A ea 4
R-36.285 5.3.1.4.2.13 REDUCER(STS), 80X50A ea 2
R-36.290 5.3.1.4.2.14 REDUCER(STS), 125X80A ea 2
R-36.291 5.3.1.4.2.15 REDUCER(STS), 125X100A ea 2
R-36.296 5.3.1.4.2.16 REDUCER(STS), 200X100A ea 1
R-36.299 5.3.1.4.2.17 REDUCER(STS), 300X200A ea 2
R-36.300 5.3.1.4.2.18 REDUCER(STS), 300X250A ea 2
R-36.95 5.3.1.4.2.19 FLANGE(STS)10K, 50A ea 9
R-36.97 5.3.1.4.2.20 FLANGE(STS)10K, 80A ea 4
R-36.98 5.3.1.4.2.21 FLANGE(STS)10K, 100A ea 2
R-36.99 5.3.1.4.2.22 FLANGE(STS)10K, 125A ea 20
R-36.101 5.3.1.4.2.23 FLANGE(STS)10K, 200A ea 11
R-36.102 5.3.1.4.2.24 FLANGE(STS)10K, 250A ea 2
R-36.103 5.3.1.4.2.25 FLANGE(STS)10K, 300A ea 18
R-36.104 5.3.1.4.2.26 FLANGE(STS)10K, 400A ea 4
R-36.46 5.3.1.4.2.27 BL.FLANGE(STS), 125A ea 2
R-36.49 5.3.1.4.2.28 BL.FLANGE(STS), 300A ea 1
R-36.50 5.3.1.4.2.29 BL.FLANGE(STS), 400A ea 2
R-36.138 5.3.1.4.2.30 GATE VALVE(CAST-IRON)10K, 50A ea 3
R-36.140 5.3.1.4.2.31 GATE VALVE(CAST-IRON)10K, 125A ea 7
R-36.141 5.3.1.4.2.32 GATE VALVE(CAST-IRON)10K, 200A ea 8
R-36.143 5.3.1.4.2.33 GATE VALVE(CAST-IRON)10K, 300A ea 7
R-36.144 5.3.1.4.2.34 GATE VALVE(CAST-IRON)10K, 400A ea 2
R-36.57 5.3.1.4.2.35 CHECK VALVE(CAST-STEEL)10K, 50A ea 3
R-36.60 5.3.1.4.2.36 CHECK VALVE(CAST-STEEL)10K, 125A ea 2
R-36.61 5.3.1.4.2.37 CHECK VALVE(CAST-STEEL)10K, 300A ea 2
R-36.116 5.3.1.4.2.38 FLEXIBLE JOINT(STS)10K, 50A ea 3

Hoja 56 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-36.119 5.3.1.4.2.39 FLEXIBLE JOINT(STS)10K, 125A ea 4


R-36.120 5.3.1.4.2.40 FLEXIBLE JOINT(STS)10K, 200A ea 4
R-36.122 5.3.1.4.2.41 FLEXIBLE JOINT(STS)10K, 300A ea 4
5.3.1.4.3 INSTALLATION RELATED PIPE WORK
R-36.306 5.3.1.4.3.1 STS PIPE INSTALLATION, 50A m 8
R-36.309 5.3.1.4.3.2 STS PIPE INSTALLATION, 125A m 18.5
R-36.311 5.3.1.4.3.3 STS PIPE INSTALLATION, 200A m 4
R-36.313 5.3.1.4.3.4 STS PIPE INSTALLATION, 300A m 17.5
R-36.315 5.3.1.4.3.5 STS PIPE INSTALLATION, 400A m 3.5
R-36.71 5.3.1.4.3.6 FLANGE JOINT, 50A place 15
R-36.73 5.3.1.4.3.7 FLANGE JOINT, 80A place 4
R-36.74 5.3.1.4.3.8 FLANGE JOINT, 100A place 2
R-36.75 5.3.1.4.3.9 FLANGE JOINT, 125A place 26
R-36.77 5.3.1.4.3.10 FLANGE JOINT, 200A place 27
R-36.78 5.3.1.4.3.11 FLANGE JOINT, 250A place 2
R-36.79 5.3.1.4.3.12 FLANGE JOINT, 300A place 24
R-36.80 5.3.1.4.3.13 FLANGE JOINT, 400A place 6
R-36.362 5.3.1.4.3.14 VALVE INSTALLATION(FLANGE TYPE), 50A ea 6
R-36.365 5.3.1.4.3.15 VALVE INSTALLATION(FLANGE TYPE), 125A ea 9
R-36.366 5.3.1.4.3.16 VALVE INSTALLATION(FLANGE TYPE), 200A ea 8
R-36.368 5.3.1.4.3.17 VALVE INSTALLATION(FLANGE TYPE), 300A ea 9
R-36.369 5.3.1.4.3.18 VALVE INSTALLATION(FLANGE TYPE), 400A ea 2
R-36.105 5.3.1.4.3.19 FLEX. INSTALLATION(FLANGE TYPE), 50A place 3
R-36.108 5.3.1.4.3.20 FLEX. INSTALLATION(FLANGE TYPE), 125A place 4
R-36.109 5.3.1.4.3.21 FLEX. INSTALLATION(FLANGE TYPE), 200A place 4
R-36.111 5.3.1.4.3.22 FLEX. INSTALLATION(FLANGE TYPE), 300A place 4
R-36.390 5.3.1.4.3.23 WELDING(STS), 50A place 20
R-36.392 5.3.1.4.3.24 WELDING(STS), 80A place 4
R-36.393 5.3.1.4.3.25 WELDING(STS), 100A place 2
R-36.394 5.3.1.4.3.26 WELDING(STS), 125A place 39
R-36.396 5.3.1.4.3.27 WELDING(STS), 200A place 11
R-36.397 5.3.1.4.3.28 WELDING(STS), 250A place 2
R-36.398 5.3.1.4.3.29 WELDING(STS), 300A place 35
R-36.399 5.3.1.4.3.30 WELDING(STS), 400A place 10
5.3.1.5 DISINFECTION FACILITIES
5.3.1.5.1 SUPPLY AND INSTALL EQUIPMENTS
R-36.198 5.3.1.5.1.1 M-501 U/V INLET GATE, MOTORIZED SLUICE GATE, SIZE : W0.6M × H0.8M set 2
R-36.199 5.3.1.5.1.2 M-502 U/V OUTLET GATE, MANUAL WEIR GATE, SIZE : W0.6M × H0.8M set 2
M-503 U/V DISINFECTION, HORIZONTAL TYPE ULTRAVIOLET(INCLUDE LIFTING DEVICE),
R-36.200 5.3.1.5.1.3 set 1
CAPACITY : 20,000㎥/DAY
R-36.201 5.3.1.5.1.4 M-504 NAOCL PUMP, DIAPHRAM PUMP, CAPACITY : 1.49L/MIN × 20MH set 2
R-36.202 5.3.1.5.1.5 M-505 NAOCL TANK, CYLINDRICAL PE TANK, CAPACITY : 15㎥ set 1
R-36.203 5.3.1.5.1.6 M-506 MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : 1.0MW X 1.0MH set 2
R-36.204 5.3.1.5.1.7 M-507 FLOWMETER SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
5.3.1.5.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.241 5.3.1.5.2.1 PIPE(PE), 32A m 26.3
R-36.16 5.3.1.5.2.2 90 DEGREE ELBOW(PE), 32A ea 10
R-36.318 5.3.1.5.2.3 TEE(PE), 32A ea 4
R-36.86 5.3.1.5.2.4 FLANGE(PE), 32A ea 17
R-36.38 5.3.1.5.2.5 BL.FLANGE(PE), 32A ea 2
R-36.36 5.3.1.5.2.6 BALL VALVE(PVC), 32A ea 5
5.3.1.5.3 INSTALLATION RELATED PIPE WORK
R-36.229 5.3.1.5.3.1 PE PIPE INSTALLATION, 32A m 25
R-36.70 5.3.1.5.3.2 FLANGE JOINT, 32A place 17
R-36.361 5.3.1.5.3.3 VALVE INSTALLATION(FLANGE TYPE), 32A ea 5
5.3.1.6 TREATED WATER REUSE SUPPLY FACILITIES
5.3.1.6.1 SUPPLY AND INSTALL EQUIPMENTS

R-36.205 5.3.1.6.1.1 M-601 WATER SUPPLY SYSTEM, AUTOMATIC BOOSTER PUMP, CAPACITY : 1.5㎥/MIN × 50MH × set 1
3PUMPS
R-36.206 5.3.1.6.1.2 M-602 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
5.3.1.6.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.250 5.3.1.6.2.1 PIPE(STS)10S, 20A(2.5T) m 39.9
R-36.251 5.3.1.6.2.2 PIPE(STS)10S, 32A(2.8T) m 675.7
R-36.252 5.3.1.6.2.3 PIPE(STS)10S, 50A(2.8T) m 45.7
R-36.253 5.3.1.6.2.4 PIPE(STS)10S, 80A(3.0T) m 44.6
R-36.254 5.3.1.6.2.5 PIPE(STS)10S, 100A(3.0T) m 20.5
R-36.255 5.3.1.6.2.6 PIPE(STS)10S, 125A(3.5T) m 184.3
R-36.256 5.3.1.6.2.7 PIPE(STS)10S, 150A(3.5T) m 41
R-36.258 5.3.1.6.2.8 PIPE(STS)10S, 250A(4.0T) m 1.1
R-36.23 5.3.1.6.2.9 90 DEGREE ELBOW(STS)10S, 20A ea 2
R-36.24 5.3.1.6.2.10 90 DEGREE ELBOW(STS)10S, 32A ea 52
R-36.25 5.3.1.6.2.11 90 DEGREE ELBOW(STS)10S, 50A ea 5
R-36.26 5.3.1.6.2.12 90 DEGREE ELBOW(STS)10S, 80A ea 13
R-36.28 5.3.1.6.2.13 90 DEGREE ELBOW(STS)10S, 150A ea 11
R-36.29 5.3.1.6.2.14 90 DEGREE ELBOW(STS)10S, 200A ea 6
R-36.30 5.3.1.6.2.15 90 DEGREE ELBOW(STS)10S, 250A ea 1
R-36.329 5.3.1.6.2.16 TEE(STS)10S, 20A ea 1
R-36.331 5.3.1.6.2.17 TEE(STS)10S, 32X20A ea 269
R-36.330 5.3.1.6.2.18 TEE(STS)10S, 32A ea 16
R-36.332 5.3.1.6.2.19 TEE(STS)10S, 50A ea 1
R-36.333 5.3.1.6.2.20 TEE(STS)10S, 50X32A ea 2
R-36.334 5.3.1.6.2.21 TEE(STS)10S, 80A ea 4
R-36.336 5.3.1.6.2.22 TEE(STS)10S, 100X80A ea 1
R-36.340 5.3.1.6.2.23 TEE(STS)10S, 150X65A ea 4
R-36.341 5.3.1.6.2.24 TEE(STS)10S, 150X80A ea 2
R-36.338 5.3.1.6.2.25 TEE(STS)10S, 150A ea 1
R-36.343 5.3.1.6.2.26 TEE(STS)10S, 200X100A ea 2
R-36.281 5.3.1.6.2.27 REDUCER(STS), 32X20A ea 15
R-36.282 5.3.1.6.2.28 REDUCER(STS), 50X32A ea 1
R-36.283 5.3.1.6.2.29 REDUCER(STS), 65X32A ea 4
R-36.284 5.3.1.6.2.30 REDUCER(STS), 80X32A ea 8
R-36.285 5.3.1.6.2.31 REDUCER(STS), 80X50A ea 1
R-36.287 5.3.1.6.2.32 REDUCER(STS), 100X32A ea 2
R-36.288 5.3.1.6.2.33 REDUCER(STS), 100X50A ea 1
R-36.289 5.3.1.6.2.34 REDUCER(STS), 100X80A ea 1
R-36.292 5.3.1.6.2.35 REDUCER(STS), 150X80A ea 1
R-36.293 5.3.1.6.2.36 REDUCER(STS), 150X100A ea 2
R-36.297 5.3.1.6.2.37 REDUCER(STS), 250X150A ea 1
R-36.298 5.3.1.6.2.38 REDUCER(STS), 250X200A ea 1
R-36.93 5.3.1.6.2.39 FLANGE(STS)10K, 20A ea 29
R-36.94 5.3.1.6.2.40 FLANGE(STS)10K, 32A ea 29
R-36.95 5.3.1.6.2.41 FLANGE(STS)10K, 50A ea 6
R-36.97 5.3.1.6.2.42 FLANGE(STS)10K, 80A ea 9
R-36.101 5.3.1.6.2.43 FLANGE(STS)10K, 200A ea 4
R-36.102 5.3.1.6.2.44 FLANGE(STS)10K, 250A ea 4
R-36.43 5.3.1.6.2.45 BL.FLANGE(STS), 32A ea 11
R-36.138 5.3.1.6.2.46 GATE VALVE(CAST-IRON)10K, 50A ea 2
R-36.141 5.3.1.6.2.47 GATE VALVE(CAST-IRON)10K, 200A ea 1
R-36.142 5.3.1.6.2.48 GATE VALVE(CAST-IRON)10K, 250A ea 1
R-36.57 5.3.1.6.2.49 CHECK VALVE(CAST-STEEL)10K, 50A ea 2
R-36.34 5.3.1.6.2.50 BALL VALVE(BRASS), 20A ea 20
R-36.35 5.3.1.6.2.51 BALL VALVE(BRASS), 80A ea 4
R-36.116 5.3.1.6.2.52 FLEXIBLE JOINT(STS)10K, 50A ea 2

Hoja 57 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-36.120 5.3.1.6.2.53 FLEXIBLE JOINT(STS)10K, 200A ea 1


R-36.121 5.3.1.6.2.54 FLEXIBLE JOINT(STS)10K, 250A ea 1
R-36.226 5.3.1.6.2.55 NOZZLE, 20A ea 260
5.3.1.6.3 INSTALLATION RELATED PIPE WORK
R-36.304 5.3.1.6.3.1 STS PIPE INSTALLATION, 20A m 38
R-36.305 5.3.1.6.3.2 STS PIPE INSTALLATION, 32A m 723.5
R-36.306 5.3.1.6.3.3 STS PIPE INSTALLATION, 50A m 43.5
R-36.307 5.3.1.6.3.4 STS PIPE INSTALLATION, 80A m 42.5
R-36.310 5.3.1.6.3.5 STS PIPE INSTALLATION, 150A m 195
R-36.311 5.3.1.6.3.6 STS PIPE INSTALLATION, 200A m 39
R-36.312 5.3.1.6.3.7 STS PIPE INSTALLATION, 250A m 1
R-36.69 5.3.1.6.3.8 FLANGE JOINT, 20A place 28
R-36.70 5.3.1.6.3.9 FLANGE JOINT, 32A place 29
R-36.71 5.3.1.6.3.10 FLANGE JOINT, 50A place 10
R-36.73 5.3.1.6.3.11 FLANGE JOINT, 80A place 9
R-36.76 5.3.1.6.3.12 FLANGE JOINT, 150A place 1
R-36.77 5.3.1.6.3.13 FLANGE JOINT, 200A place 4
R-36.78 5.3.1.6.3.14 FLANGE JOINT, 250A place 5
R-36.360 5.3.1.6.3.15 VALVE INSTALLATION(FLANGE TYPE), 20A ea 18
R-36.362 5.3.1.6.3.16 VALVE INSTALLATION(FLANGE TYPE), 50A ea 4
R-36.363 5.3.1.6.3.17 VALVE INSTALLATION(FLANGE TYPE), 80A ea 4
R-36.366 5.3.1.6.3.18 VALVE INSTALLATION(FLANGE TYPE), 200A ea 1
R-36.367 5.3.1.6.3.19 VALVE INSTALLATION(FLANGE TYPE), 250A ea 1
R-36.105 5.3.1.6.3.20 FLEX. INSTALLATION(FLANGE TYPE), 50A place 2
R-36.109 5.3.1.6.3.21 FLEX. INSTALLATION(FLANGE TYPE), 200A place 1
R-36.110 5.3.1.6.3.22 FLEX. INSTALLATION(FLANGE TYPE), 250A place 1
R-36.388 5.3.1.6.3.23 WELDING(STS), 20A place 324
R-36.389 5.3.1.6.3.24 WELDING(STS), 32A place 773
R-36.390 5.3.1.6.3.25 WELDING(STS), 50A place 26
R-36.391 5.3.1.6.3.26 WELDING(STS), 65A place 4
R-36.392 5.3.1.6.3.27 WELDING(STS), 80A place 52
R-36.393 5.3.1.6.3.28 WELDING(STS), 100A place 9
R-36.395 5.3.1.6.3.29 WELDING(STS), 150A place 50
R-36.396 5.3.1.6.3.30 WELDING(STS), 200A place 25
R-36.397 5.3.1.6.3.31 WELDING(STS), 250A place 5
R-36.147 5.3.1.6.3.32 HOSE CONNECTOR INSTALLATION, 20A place 9
5.3.1.7 SLUDGE DEWATERING FACILITIES
5.3.1.7.1 SUPPLY AND INSTALL EQUIPMENTS
M-701 SLUDGE PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER (V.V.V.F OPERATING),
R-36.207 5.3.1.7.1.1 set 3
CAPACITY : 0.7㎥/MIN × 15MH
R-36.208 5.3.1.7.1.2 M-702 DEHYDRATOR, CENTRIFUGE TYPE, CAPACITY : 35㎥/HR set 2
R-36.209 5.3.1.7.1.3 M-703 CAKE CONVEYOR(A), TROUGH BELT TYPE, SIZE : W0.6M × L17.0M set 1
R-36.210 5.3.1.7.1.4 M-704 CAKE CONVEYOR(B), TROUGH BELT TYPE, SIZE : W0.6M × L7.0M, ANGLE 20˚ set 1
R-36.211 5.3.1.7.1.5 M-705 CAKE CONTAINER, ARM ROLL TYPE, CAPACITY : FOR 11TONS set 3

R-36.212 5.3.1.7.1.6 M-706 POLYMER SOLUTION SYSTEM, AUTO SOLUTION SYSTEM, CAPACITY : 7㎏/H (HOPPER, set 1
FEEDER)
M-707 POLYMER FEED PUMP, SINGLE SCREW PUMP(V.V.V.F OPERATING), CAPACITY :
R-36.213 5.3.1.7.1.7 set 3
40L/MIN × 10MH
R-36.214 5.3.1.7.1.8 M-708 BLOWER OF SLUDGE TANK, ROOTS BLOWER, CAPACITY : 7.5㎥/MIN X 6,000MMAQ set 3
R-36.215 5.3.1.7.1.9 M-709 AIR DIFFUSER(A), PIPE TYPE, 50A × 8.4M × 12EA set 2
R-36.216 5.3.1.7.1.10 M-710 AIR DIFFUSER(B), PIPE TYPE, 50A × 1.9M × 8EA set 2
M-711 MAINTENANCE HOIST, MONORAIL HOIST, CAPACITY : 1TON X LENGTH 80M X LIFT
R-36.217 5.3.1.7.1.11 set 1
HEIGHT 8M
M-712 HOIST OF DEHYDRATOR, MONORAIL HOIST, CAPACITY : 7.5TON X LENGTH 50M X LIFT
R-36.218 5.3.1.7.1.12 set 1
HEIGHT 12M
M-713 SUPERNATANT RETURN PUMP, HORIZONTAL CENTRIFUGAL SCREW IMPELLER,
R-36.219 5.3.1.7.1.13 set 2
CAPACITY : 1.1㎥/MIN×13MH
R-36.220 5.3.1.7.1.14 M-714 SLUDGE TANK MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W1.0M × H1.0M set 1
M-715 RETURN WATER TANK MAINTENANCE GATE, MANUAL SLUICE GATE, SIZE : W1.0M ×
R-36.221 5.3.1.7.1.15 set 1
H1.0M
R-36.222 5.3.1.7.1.16 M-716 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
5.3.1.7.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.252 5.3.1.7.2.1 PIPE(STS)10S, 50A(2.8T) m 54.1
R-36.253 5.3.1.7.2.2 PIPE(STS)10S, 80A(3.0T) m 13.1
R-36.255 5.3.1.7.2.3 PIPE(STS)10S, 125A(3.5T) m 55.1
R-36.256 5.3.1.7.2.4 PIPE(STS)10S, 150A(3.5T) m 5.3
R-36.257 5.3.1.7.2.5 PIPE(STS)10S, 200A(4.0T) m 24.7
R-36.242 5.3.1.7.2.6 PIPE(SPP), 80A m 25.2
R-36.243 5.3.1.7.2.7 PIPE(SPP), 100A m 20.5
R-36.244 5.3.1.7.2.8 PIPE(SPP), 125A m 17.9
R-36.25 5.3.1.7.2.9 90 DEGREE ELBOW(STS)10S, 50A ea 23
R-36.26 5.3.1.7.2.10 90 DEGREE ELBOW(STS)10S, 80A ea 7
R-36.27 5.3.1.7.2.11 90 DEGREE ELBOW(STS)10S, 125A ea 16
R-36.17 5.3.1.7.2.12 90 DEGREE ELBOW(SPP), 80A ea 4
R-36.18 5.3.1.7.2.13 90 DEGREE ELBOW(SPP), 100A ea 5
R-36.19 5.3.1.7.2.14 90 DEGREE ELBOW(SPP), 125A ea 3
R-36.332 5.3.1.7.2.15 TEE(STS)10S, 50A ea 8
R-36.335 5.3.1.7.2.16 TEE(STS)10S, 80X50A ea 4
R-36.337 5.3.1.7.2.17 TEE(STS)10S, 125A ea 13
R-36.339 5.3.1.7.2.18 TEE(STS)10S, 150X125A ea 4
R-36.344 5.3.1.7.2.19 TEE(STS)10S, 200X125A ea 5
R-36.342 5.3.1.7.2.20 TEE(STS)10S, 200A ea 5
R-36.319 5.3.1.7.2.21 TEE(SPP), 80A ea 1
R-36.322 5.3.1.7.2.22 TEE(SPP), 100AX80A ea 1
R-36.323 5.3.1.7.2.23 TEE(SPP), 125X80A ea 2
R-36.324 5.3.1.7.2.24 TEE(SPP), 125X100A ea 3
R-36.320 5.3.1.7.2.25 TEE(SPP), 125A ea 1
R-36.285 5.3.1.7.2.26 REDUCER(STS), 80X50A ea 1
R-36.290 5.3.1.7.2.27 REDUCER(STS), 125X80A ea 7
R-36.291 5.3.1.7.2.28 REDUCER(STS), 125X100A ea 5
R-36.294 5.3.1.7.2.29 REDUCER(STS), 150X125A ea 1
R-36.276 5.3.1.7.2.30 REDUCER(SPP), 100X80A ea 1
R-36.277 5.3.1.7.2.31 REDUCER(SPP), 125X100A ea 1
R-36.95 5.3.1.7.2.32 FLANGE(STS)10K, 50A ea 50
R-36.97 5.3.1.7.2.33 FLANGE(STS)10K, 80A ea 10
R-36.98 5.3.1.7.2.34 FLANGE(STS)10K, 100A ea 5
R-36.99 5.3.1.7.2.35 FLANGE(STS)10K, 125A ea 65
R-36.100 5.3.1.7.2.36 FLANGE(STS)10K, 150A ea 3
R-36.101 5.3.1.7.2.37 FLANGE(STS)10K, 200A ea 17
R-36.87 5.3.1.7.2.38 FLANGE(SS400), 80A ea 13
R-36.88 5.3.1.7.2.39 FLANGE(SS400), 100A ea 15
R-36.89 5.3.1.7.2.40 FLANGE(SS400), 125A ea 2
R-36.45 5.3.1.7.2.41 BL.FLANGE(STS), 80A ea 2
R-36.46 5.3.1.7.2.42 BL.FLANGE(STS), 125A ea 3
R-36.47 5.3.1.7.2.43 BL.FLANGE(STS), 150A ea 2
R-36.48 5.3.1.7.2.44 BL.FLANGE(STS), 200A ea 5
R-36.39 5.3.1.7.2.45 BL.FLANGE(SS400), 80A ea 1
R-36.40 5.3.1.7.2.46 BL.FLANGE(SS400), 125A ea 2
R-36.138 5.3.1.7.2.47 GATE VALVE(CAST-IRON)10K, 50A ea 17
R-36.140 5.3.1.7.2.48 GATE VALVE(CAST-IRON)10K, 125A ea 25
R-36.141 5.3.1.7.2.49 GATE VALVE(CAST-IRON)10K, 200A ea 4
R-36.57 5.3.1.7.2.50 CHECK VALVE(CAST-STEEL)10K, 50A ea 5
R-36.59 5.3.1.7.2.51 CHECK VALVE(CAST-STEEL)10K, 100A ea 3
R-36.60 5.3.1.7.2.52 CHECK VALVE(CAST-STEEL)10K, 125A ea 5
R-36.51 5.3.1.7.2.53 BUTTERFLY VALVE, 80A ea 4

Hoja 58 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-36.52 5.3.1.7.2.54 BUTTERFLY VALVE, 100A ea 3


R-36.116 5.3.1.7.2.55 FLEXIBLE JOINT(STS)10K, 50A ea 8
R-36.118 5.3.1.7.2.56 FLEXIBLE JOINT(STS)10K, 100A ea 3
R-36.119 5.3.1.7.2.57 FLEXIBLE JOINT(STS)10K, 125A ea 10
5.3.1.7.3 INSTALLATION RELATED PIPE WORK
R-36.306 5.3.1.7.3.1 STS PIPE INSTALLATION, 50A m 51.5
R-36.307 5.3.1.7.3.2 STS PIPE INSTALLATION, 80A m 36.5
R-36.308 5.3.1.7.3.3 STS PIPE INSTALLATION, 100A m 19.5
R-36.309 5.3.1.7.3.4 STS PIPE INSTALLATION, 125A m 69.5
R-36.310 5.3.1.7.3.5 STS PIPE INSTALLATION, 150A m 5
R-36.311 5.3.1.7.3.6 STS PIPE INSTALLATION, 200A m 23.5
R-36.71 5.3.1.7.3.7 FLANGE JOINT, 50A place 61
R-36.73 5.3.1.7.3.8 FLANGE JOINT, 80A place 23
R-36.74 5.3.1.7.3.9 FLANGE JOINT, 100A place 23
R-36.75 5.3.1.7.3.10 FLANGE JOINT, 125A place 77
R-36.76 5.3.1.7.3.11 FLANGE JOINT, 150A place 3
R-36.77 5.3.1.7.3.12 FLANGE JOINT, 200A place 17
R-36.362 5.3.1.7.3.13 VALVE INSTALLATION(FLANGE TYPE), 50A ea 22
R-36.363 5.3.1.7.3.14 VALVE INSTALLATION(FLANGE TYPE), 80A ea 4
R-36.364 5.3.1.7.3.15 VALVE INSTALLATION(FLANGE TYPE), 100A ea 6
R-36.365 5.3.1.7.3.16 VALVE INSTALLATION(FLANGE TYPE), 125A ea 30
R-36.366 5.3.1.7.3.17 VALVE INSTALLATION(FLANGE TYPE), 200A ea 4
R-36.105 5.3.1.7.3.18 FLEX. INSTALLATION(FLANGE TYPE), 50A place 8
R-36.107 5.3.1.7.3.19 FLEX. INSTALLATION(FLANGE TYPE), 100A place 3
R-36.108 5.3.1.7.3.20 FLEX. INSTALLATION(FLANGE TYPE), 125A place 10
R-36.390 5.3.1.7.3.21 WELDING(STS), 50A place 112
R-36.392 5.3.1.7.3.22 WELDING(STS), 80A place 32
R-36.393 5.3.1.7.3.23 WELDING(STS), 100A place 5
R-36.394 5.3.1.7.3.24 WELDING(STS), 125A place 137
R-36.395 5.3.1.7.3.25 WELDING(STS), 150A place 11
R-36.396 5.3.1.7.3.26 WELDING(STS), 200A place 40
R-36.380 5.3.1.7.3.27 WELDING(SPP), 80A place 29
R-36.381 5.3.1.7.3.28 WELDING(SPP), 100A place 27
R-36.382 5.3.1.7.3.29 WELDING(SPP), 125A place 21
5.3.1.8 DEODORIZATION FACILITIES
5.3.1.8.1 SUPPLY AND INSTALL EQUIPMENTS
R-36.223 5.3.1.8.1.1 M-801 DEODORIZED FAN, HORIZONTAL TURBO, TYPE CAPACITY : 180㎥/MIN × 300MMAQ set 2
R-36.224 5.3.1.8.1.2 M-802 DEODORIZER, BIO-FILTER TYPE, CAPACITY : 180㎥/MIN set 1
R-36.225 5.3.1.8.1.3 M-803 SUMP PUMP, SUBMERSIBLE MOTOR PUMP, CAPACITY : 0.1㎥/MIN × 10MH set 2
5.3.1.8.2 SUPPLY OF THE MATERIALS OF PIPE WORK
R-36.231 5.3.1.8.2.1 PIPE(FRP), 100A m 270.9
R-36.232 5.3.1.8.2.2 PIPE(FRP), 125A m 59.9
R-36.233 5.3.1.8.2.3 PIPE(FRP), 150A m 85.1
R-36.234 5.3.1.8.2.4 PIPE(FRP), 200A m 54.1
R-36.235 5.3.1.8.2.5 PIPE(FRP), 250A m 3.2
R-36.236 5.3.1.8.2.6 PIPE(FRP), 300A m 107.6
R-36.237 5.3.1.8.2.7 PIPE(FRP), 350A m 2.6
R-36.238 5.3.1.8.2.8 PIPE(FRP), 400A m 151.2
R-36.239 5.3.1.8.2.9 PIPE(FRP), 450A m 106.6
R-36.240 5.3.1.8.2.10 PIPE(FRP), 600A m 1.1
R-36.9 5.3.1.8.2.11 90 DEGREE ELBOW(FRP), 125A ea 8
R-36.10 5.3.1.8.2.12 90 DEGREE ELBOW(FRP), 150A ea 8
R-36.11 5.3.1.8.2.13 90 DEGREE ELBOW(FRP), 200A ea 3
R-36.12 5.3.1.8.2.14 90 DEGREE ELBOW(FRP), 300A ea 4
R-36.13 5.3.1.8.2.15 90 DEGREE ELBOW(FRP), 350A ea 3
R-36.14 5.3.1.8.2.16 90 DEGREE ELBOW(FRP), 400A ea 16
R-36.15 5.3.1.8.2.17 90 DEGREE ELBOW(FRP), 450A ea 8
R-36.1 5.3.1.8.2.18 45 DEGREE ELBOW(FRP), 100A ea 103
R-36.2 5.3.1.8.2.19 45 DEGREE ELBOW(FRP), 125A ea 12
R-36.3 5.3.1.8.2.20 45 DEGREE ELBOW(FRP), 150A ea 13
R-36.4 5.3.1.8.2.21 45 DEGREE ELBOW(FRP), 200A ea 4
R-36.5 5.3.1.8.2.22 45 DEGREE ELBOW(FRP), 300A ea 7
R-36.6 5.3.1.8.2.23 45 DEGREE ELBOW(FRP), 350A ea 1
R-36.7 5.3.1.8.2.24 45 DEGREE ELBOW(FRP), 400A ea 2
R-36.8 5.3.1.8.2.25 45 DEGREE ELBOW(FRP), 450A ea 4
R-36.316 5.3.1.8.2.26 TEE(FRP), 450A ea 1
R-36.317 5.3.1.8.2.27 TEE(FRP), 600A ea 1
R-36.400 5.3.1.8.2.28 Y-TEE(FRP), 100X100A ea 10
R-36.401 5.3.1.8.2.29 Y-TEE(FRP), 125X100A ea 15
R-36.402 5.3.1.8.2.30 Y-TEE(FRP), 125X125A ea 1
R-36.403 5.3.1.8.2.31 Y-TEE(FRP), 150X100A ea 4
R-36.404 5.3.1.8.2.32 Y-TEE(FRP), 150X125A ea 5
R-36.405 5.3.1.8.2.33 Y-TEE(FRP), 200X125A ea 2
R-36.406 5.3.1.8.2.34 Y-TEE(FRP), 200X150A ea 2
R-36.407 5.3.1.8.2.35 Y-TEE(FRP), 250X125A ea 1
R-36.408 5.3.1.8.2.36 Y-TEE(FRP), 250X150A ea 1
R-36.409 5.3.1.8.2.37 Y-TEE(FRP), 300X125A ea 3
R-36.410 5.3.1.8.2.38 Y-TEE(FRP), 300X150A ea 2
R-36.411 5.3.1.8.2.39 Y-TEE(FRP), 300X200A ea 1
R-36.412 5.3.1.8.2.40 Y-TEE(FRP), 350X150A ea 2
R-36.413 5.3.1.8.2.41 Y-TEE(FRP), 400X200A ea 1
R-36.414 5.3.1.8.2.42 Y-TEE(FRP), 400X300A ea 1
R-36.415 5.3.1.8.2.43 Y-TEE(FRP), 450X350A ea 1
R-36.261 5.3.1.8.2.44 REDUCER(FRP), 125X100A ea 14
R-36.262 5.3.1.8.2.45 REDUCER(FRP), 150X125A ea 5
R-36.263 5.3.1.8.2.46 REDUCER(FRP), 200X150A ea 2
R-36.264 5.3.1.8.2.47 REDUCER(FRP), 250X125A ea 1
R-36.265 5.3.1.8.2.48 REDUCER(FRP), 250X150A ea 1
R-36.266 5.3.1.8.2.49 REDUCER(FRP), 250X200A ea 2
R-36.267 5.3.1.8.2.50 REDUCER(FRP), 300X200A ea 1
R-36.268 5.3.1.8.2.51 REDUCER(FRP), 300X250A ea 2
R-36.269 5.3.1.8.2.52 REDUCER(FRP), 350X250A ea 1
R-36.270 5.3.1.8.2.53 REDUCER(FRP), 350X300A ea 1
R-36.271 5.3.1.8.2.54 REDUCER(FRP), 400X300A ea 2
R-36.272 5.3.1.8.2.55 REDUCER(FRP), 450X250A ea 1
R-36.273 5.3.1.8.2.56 REDUCER(FRP), 450X400A ea 1
R-36.274 5.3.1.8.2.57 REDUCER(FRP), 600X400A ea 1
R-36.275 5.3.1.8.2.58 REDUCER(FRP), 600X450A ea 1
R-36.81 5.3.1.8.2.59 FLANGE(FRP), 100A ea 115
R-36.82 5.3.1.8.2.60 FLANGE(FRP), 150A ea 13
R-36.83 5.3.1.8.2.61 FLANGE(FRP), 200A ea 6
R-36.84 5.3.1.8.2.62 FLANGE(FRP), 450A ea 1
R-36.85 5.3.1.8.2.63 FLANGE(FRP), 600A ea 1
R-36.66 5.3.1.8.2.64 DAMPER(STS), 100A ea 47
R-36.67 5.3.1.8.2.65 DAMPER(STS), 150A ea 5
R-36.68 5.3.1.8.2.66 DAMPER(STS), 200A ea 3
R-36.114 5.3.1.8.2.67 FLEXIBLE JOINT(RUBBER), 100A ea 47
R-36.115 5.3.1.8.2.68 FLEXIBLE JOINT(RUBBER), 150A ea 5
R-36.146 5.3.1.8.2.69 HOOD(FRP), 500X500A ea 3
5.3.1.8.3 INSTALLATION RELATED PIPE WORK
R-36.128 5.3.1.4.3.1 FRP PIPE INSTALLATION, 100A m 258
R-36.129 5.3.1.4.3.2 FRP PIPE INSTALLATION, 125A m 57

Hoja 59 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-36.130 5.3.1.4.3.3 FRP PIPE INSTALLATION, 150A m 81


R-36.131 5.3.1.4.3.4 FRP PIPE INSTALLATION, 200A m 51.5
R-36.132 5.3.1.4.3.5 FRP PIPE INSTALLATION, 250A m 3
R-36.133 5.3.1.4.3.6 FRP PIPE INSTALLATION, 300A m 102.5
R-36.134 5.3.1.4.3.7 FRP PIPE INSTALLATION, 350A m 3.5
R-36.135 5.3.1.4.3.8 FRP PIPE INSTALLATION, 400A m 144
R-36.136 5.3.1.4.3.9 FRP PIPE INSTALLATION, 450A m 102
R-36.137 5.3.1.4.3.10 FRP PIPE INSTALLATION, 600A m 1
R-36.123 5.3.1.4.3.11 FRP FLANGE JOINT, 100A place 175
R-36.124 5.3.1.4.3.12 FRP FLANGE JOINT, 150A place 19
R-36.125 5.3.1.4.3.13 FRP FLANGE JOINT, 200A place 6
R-36.126 5.3.1.4.3.14 FRP FLANGE JOINT, 400A place 2
R-36.127 5.3.1.4.3.15 FRP FLANGE JOINT, 450A place 2
R-36.63 5.3.1.4.3.16 DAMPER INSTALLATION, 100A place 47
R-36.64 5.3.1.4.3.17 DAMPER INSTALLATION, 150A place 5
R-36.65 5.3.1.4.3.18 DAMPER INSTALLATION, 200A place 3
R-36.112 5.3.1.4.3.19 FLEX. INTALLATION, 100A place 47
R-36.113 5.3.1.4.3.20 FLEX. INTALLATION, 150A place 5
R-36.370 5.3.1.4.3.21 WELDING(FRP), 100A place 360
R-36.371 5.3.1.4.3.22 WELDING(FRP), 125A place 82
R-36.372 5.3.1.4.3.23 WELDING(FRP), 150A place 81
R-36.373 5.3.1.4.3.24 WELDING(FRP), 200A place 34
R-36.374 5.3.1.4.3.25 WELDING(FRP), 250A place 11
R-36.375 5.3.1.4.3.26 WELDING(FRP), 300A place 44
R-36.376 5.3.1.4.3.27 WELDING(FRP), 350A place 11
R-36.377 5.3.1.4.3.5 WELDING(FRP), 400A place 54
R-36.378 5.3.1.4.3.6 WELDING(FRP), 450A place 40
R-36.379 5.3.1.4.3.7 WELDING(FRP), 600A place 4
R-36.230 5.3.1.4.3.8 PERFORATION, 600A place 1
R-36.62 5.3.1.4.3.9 CONDENSATE DRAIN INSTALLATION, 50A place 4
5.3.1.9 LABORATORY EQUIPMENTS
R-36.148 5.3.1.9.1.1 LABORATORY EQUIPMENTS, set 1
5.3.1.10 SUPPLY AND INSTALL STEEL STRUCTURE
R-36.55 5.3.1.10.2.1 CHANNEL(SS400), 200X80X7.5T kg 5292.6
R-36.145 5.3.1.10.2.2 H BEAM(SS400), 200X100X8T kg 14852.6
R-36.33 5.3.1.10.2.3 ANGLE(SS400), 75X75X9T kg 3010.3
R-36.37 5.3.1.10.2.4 BASE PLATE(SS400), 9T kg 5266.4
R-36.301 5.3.1.10.2.5 ROAD STEEL GRATING, 38X5X3 m2 56.2
R-36.56 5.3.1.10.2.6 CHECK PLATE(SS400), 3.2T kg 55.1
R-36.302 5.3.1.10.2.7 STAINLESS STEEL BAR, 32A kg 375
R-36.347 5.3.1.10.2.8 U-BOLT,NUT,WASHER(SS400), (20A)M10X50L set 15
R-36.348 5.3.1.10.2.9 U-BOLT,NUT,WASHER(SS400), (32A)M10X60L set 227
R-36.349 5.3.1.10.2.10 U-BOLT,NUT,WASHER(SS400), (50A)M10X65L set 20
R-36.350 5.3.1.10.2.11 U-BOLT,NUT,WASHER(SS400), (80A)M12X85L set 12
R-36.351 5.3.1.10.2.12 U-BOLT,NUT,WASHER(SS400), (100A)M16X100L set 51
R-36.352 5.3.1.10.2.13 U-BOLT,NUT,WASHER(SS400), (125A)M16X120L set 60
R-36.353 5.3.1.10.2.14 U-BOLT,NUT,WASHER(SS400), (150A)M16X130L set 72
R-36.354 5.3.1.10.2.15 U-BOLT,NUT,WASHER(SS400), (200A)M20X165L set 71
R-36.355 5.3.1.10.2.16 U-BOLT,NUT,WASHER(SS400), (250A)M20X195L set 10
R-36.356 5.3.1.10.2.17 U-BOLT,NUT,WASHER(SS400), (300A)M24X240L set 37
R-36.357 5.3.1.10.2.18 U-BOLT,NUT,WASHER(SS400), (350A)M24X260L set 8
R-36.358 5.3.1.10.2.19 U-BOLT,NUT,WASHER(SS400), (400A)M24X280L set 37
R-36.359 5.3.1.10.2.20 U-BOLT,NUT,WASHER(SS400), (450A)M24X310L set 23
R-36.32 5.3.1.10.2.21 ANCHOR BOLT, M16X190L set 4893
R-36.228 5.3.1.10.2.22 PAINTING(RUST-RESIST), SIDE PER 2 TIMES m2 1150.8
R-36.227 5.3.1.10.2.23 PAINTING(READY MIXED), SIDE PER 2 TIMES m2 1150.8
R-36.303 5.3.1.10.2.24 STEEL STRUCTURE MANUFACTURE AND INSTALLATION, SIMPLE ton 34.6
5.3.2 MECHANICAL WORKS_ADMINISTRATION BUILDING
5.3.2.1 HVAC SYSTEM
5.3.2.1.1 INTERNAL UNITS
R-37.1 5.3.2.1.1.1 CASSETTE UNIT TYPE 12,000 BTU/H, VRV, R410-A set 1
R-37.2 5.3.2.1.1.2 CASSETTE UNIT TYPE 24,000 BTU/H, VRV, R410-A set 2
R-37.3 5.3.2.1.1.3 CASSETTE UNIT TYPE 38,000 BTU/H, VRV, R410-A set 6
5.3.2.1.2 EXTERNAL UNITS
R-37.4 5.3.2.1.2.1 EXTERIOR UNIT VRV 136,500 BTU/H, R410 A set 1
R-37.5 5.3.2.1.2.2 EXTERIOR UNIT VRV 153,600 BTU/H, R410 A set 1
R-37.6 5.3.2.1.2.3 REFRIGERANT 410A kg 22.7137
5.3.2.1.3 AIRCONDITIONING
R-37.7 5.3.2.1.3.1 DERIVATION JOINT FOR SYSTEMS VRV FOR INTERNAL UNITS MINOR TO 112,6 KBTU/H ea 4
R-37.8 5.3.2.1.3.2 DERIVATION JOINT FOR SYSTEMS VRV FOR INTERNAL UNITS MINOR TO 202,6 KBTU/H ea 2
R-37.9 5.3.2.1.3.3 DERIVATION JOINT FOR SYSTEMS VRV FOR INTERNAL UNITS MINOR TO 242,3KBTU/H ea 2
R-37.10 5.3.2.1.3.4 DERIVATION JOINT TO UNIFY VRV CONDENSER UNITS ea 1
R-37.11 5.3.2.1.3.5 INDIVIDUAL CONTROL, UNTIL 16 EQUIPMENTS OF AIR CONDITIONING ea 9
R-37.12 5.3.2.1.3.6 COPPER PIPE TYPE ACR 1/4" INSULATED m 15
R-37.13 5.3.2.1.3.7 COPPER PIPE TYPE ACR 3/8" INSULATED m 35
R-37.14 5.3.2.1.3.8 COPPER PIPE TYPE ACR 1/2" INSULATED m 46
R-37.15 5.3.2.1.3.9 COPPER PIPE TYPE ACR 5/8" INSULATED m 64
R-37.16 5.3.2.1.3.10 COPPER PIPE TYPE ACR 3/4" INSULATED m 29
R-37.17 5.3.2.1.3.11 COPPER PIPE TYPE ACR 1 1/8" INSULATED m 20
R-37.18 5.3.2.1.3.12 COPPER PIPE TYPE ACR 1 3/8" INSULATED m 15
R-37.19 5.3.2.1.3.13 SUPPORT FOR COPPER PIPE TYPE SWING ea 153
5.3.2.1.4 DRAIN
R-37.20 5.3.2.1.4.1 PIPE FOR DRAINAGE OF EVAPORATED UNITS, PVC DIAM. 1" m 57
R-37.21 5.3.2.1.4.2 PUMP FOR CONDENSE EVACUATION ea 9
5.3.2.1.5 VENTILATION
R-37.22 5.3.2.1.5.1 CENTRIFUGE EXTRACTOR FAN 3400 CFM @2" SP set 1
R-37.23 5.3.2.1.5.2 CENTRIFUGE EXTRACTOR FAN 2600 CFM @2 " SP set 1
R-37.24 5.3.2.1.5.3 METAL DUCT FOR MECHANIC VENTILATION kg 750
R-37.25 5.3.2.1.5.4 NO INSULATION SLEEVE DIA. 4 INCHES m 72
R-37.26 5.3.2.1.5.5 NO INSULATION SLEEVE DIA. 8 INCHES m 25
R-37.27 5.3.2.1.5.6 EXTRACTION GRILLE 10"X10" INCLUDES REGULATION DAMPERS ea 2
R-37.28 5.3.2.1.5.7 EXTRACTION GRILLE 12"X12" INCLUDES REGULATION DAMPERS ea 5
R-37.29 5.3.2.1.5.8 EXTRACTION GRILLE 8"X8" INCLUDES REGULATION DAMPERS ea 28
R-37.30 5.3.2.1.5.9 SUPPORT FOR METAL DUCTS (A/C AND MECHANIC VENTILATION) ea 80
5.3.2.1.6 CABLE WORKS
R-37.31 5.3.2.1.6.1 CONTROL CABLE 1030A m 60
R-37.32 5.3.2.1.6.2 POWER CABLE m 20
R-37.33 5.3.2.1.6.3 FANS CONTROL PANEL ea 2
5.3.2.2 FIRE FIGHTING
R-37.34 5.3.2.1.1.1 SUPPLY AND INSTALLATION OF FIRE FIGHTING CASE CLASS II set 2
R-37.35 5.3.2.1.1.1 SUPPLY AND INSTALLATION OF FIRE EXTINGUISHER CO2 10 POUNDS ea 2
R-37.36 5.3.2.1.1.1 SUPPLY AND INSTALLATION OF FIRE EXTINGUISHER PQS ABC 10 POUNDS ea 26
R-37.37 5.3.2.1.1.1 SUPPLY AND INSTALLATION SIAMESA 4" X 2 1/2" X 2 1/2" ea 1
R-37.38 5.3.2.1.1.1 SUPPLY AND INSTALLATION CHECK VALVE 2" ea 1
R-37.39 5.3.2.1.1.1 SUPPLY AND INSTALLATION BLACK STEEL PIPE CH 40, DIA 2" m 42
R-37.40 5.3.2.1.1.1 SUPPLY AND INSTALLATION BLACK STEEL PIPE CH 40, DIA 1/2" m 17
R-37.41 5.3.2.1.1.1 PAINT FOR PIPES WITH ANTICORROSIVE BASE AND RED PAINT m 64.9
R-37.42 5.3.2.1.1.1 SUPPLY AND INSTALLATION OF MAIN PUMP, 15 HP 3F-220/440V, CONTROL PANEL set 1
R-37.43 5.3.2.1.1.1 SUPPLY AND INSTALLATION OF JOCKEY PUMP, 1.5 HP, 3F-220/440V set 1
5.4 ELECTRICAL WORKS
5.4.1 ELECTRICAL WORKS_WWTP
5.4.1.1 POWER SUPPLY (MV), SUBSTATION TO WWTP

Hoja 60 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-32-1 5.4.1.1.1 CONSTRUCTION OF MEDIUM VOLTAGE UNDERGROUND L/S 1


R-32-2 5.4.1.1.2 CONSTRUCTION OF MEDIUM VOLTAGE, L = 4.7 KM L/S 1
R-33.1 5.4.1.2 POWER CABLE TRUNKING set 1
R-33.2 5.4.1.3 OUTDOOR CONDUIT INSTALLATION set 1
SUPPLY AND INSTALL CABLE, CONDUIT INCLUDING CABLE PULLING, UNDERGROUN
5.4.1.4
CABLING, ETC. AND INSTALL ELECTRICAL EQUIPMENTS
5.4.1.4.1 COMPLEX BUILDING
R-33.3 5.4.1.4.1.1 MCC-A100 set 1
R-33.4 5.4.1.4.1.2 MCC-A200 set 1
R-33.5 5.4.1.4.1.3 MCC-A300 set 1
R-33.6 5.4.1.4.1.4 MCC-A700 set 1
5.4.1.4.2 SLUDGE DEWATERING BUILDING
R-33.7 5.4.1.4.2.1 MCC-A400 set 1
R-33.8 5.4.1.4.2.2 MCC-A500 set 1
R-33.9 5.4.1.4.2.3 MCC-A600 set 1
5.4.1.5 CABLE TRAY
R-33.10 5.4.1.5.1 COMPLEX BUILDING set 1
R-33.11 5.4.1.5.2 PRIMARY CLARIFIER set 1
R-33.12 5.4.1.5.3 SECONDARY CLARIFIER TYPE 1 set 1
R-33.13 5.4.1.5.4 SLUDGE DEWATERING FACILITY set 1
R-33.14 5.4.1.5.5 BIO REACTOR set 1
5.4.1.6 EARTHING
R-33.15 5.4.1.6.1 ADMINISTRATIVE BUILDING set 1
R-33.16 5.4.1.6.2 ELECTRIC ROOM set 1
R-33.17 5.4.1.6.3 SLUDGE DEWATERING set 1
5.4.1.7 SUPPLY AND INSTALL ELECTRICAL EQUIPMENTS
R-33.18 5.4.1.7.1 RING MAIN UNIT set 1
5.4.1.7.2 HV
R-33.19 5.4.1.7.2.1 HV-1 set 1
R-33.20 5.4.1.7.2.2 HV-2 set 1
R-33.21 5.4.1.7.2.3 HV-3 set 1
R-33.22 5.4.1.7.2.4 HV-4 set 1
R-33.23 5.4.1.7.2.5 HV-5 set 1
R-33.24 5.4.1.7.2.6 MTR-1 set 1
R-33.25 5.4.1.7.2.7 MTR-2 set 1
5.4.1.7.3 LV
R-33.26 5.4.1.7.3.1 LV-A1 set 1
R-33.27 5.4.1.7.3.2 LV-A2 set 1
R-33.28 5.4.1.7.3.3 LV-A3 set 1
R-33.29 5.4.1.7.3.4 LV-A4 set 1
R-33.30 5.4.1.7.3.5 LV-A5 set 1
R-33.31 5.4.1.7.4 DC-1 set 1
R-33.32 5.4.1.7.5 BAT-1 set 1
5.4.1.7.6 MCC
R-33.33 5.4.1.7.6.1 MCC-A100 (H) set 1
R-33.34 5.4.1.7.6.2 MCC-A200 (H) set 1
R-33.35 5.4.1.7.6.3 MCC-A300 (H) set 1
R-33.36 5.4.1.7.6.4 MCC-A400 (H) set 1
R-33.37 5.4.1.7.6.5 MCC-A500 (H) set 1
R-33.38 5.4.1.7.6.6 MCC-A600 (H) set 1
R-33.39 5.4.1.7.6.7 MCC-A700 (H) set 1
R-33.40 5.4.1.7.6.8 MCC-A800 (H) set 1
R-33.41 5.4.1.7.6.9 BASE OF MCC set 1
R-33.42 5.4.1.7.7 LIP 1Circuit ea 2
R-33.43 5.4.1.7.8 LIP 2Circuit ea 17
R-33.44 5.4.1.7.9 LIP 3Circuit ea 3
R-33.45 5.4.1.7.10 SPARE PARTS set 1
R-33.46 5.4.1.7.11 DISTRIBUTE POWER TRANSPORT COST set 1
R-33.47 5.4.1.7.12 GENERATOR set 1
R-33.48 5.4.1.7.13 CONTAINER set 1
R-33.49 5.4.1.7.14 FUEL TANK set 1
5.4.2 ELECTRONIC WORKS_ADMINISTRATION BUILDING
5.4.2.1 CABLE WORKS
R-34.4 5.4.2.1.1 STRUCTURAL CABLE CAT 6 m 78
R-34.3 5.4.2.1.2 CENTRAL CHANNEL (LADDER, MESH OR ELECTROCHANNEL TYPE) AND ACCESSORIES m 240
R-34.19 5.4.2.1.3 CABLE UTP CAT 6 m 2423
R-34.20 5.4.2.1.4 FLOOR RACK 44 UR ea 1
R-34.21 5.4.2.1.5 PATCH CORD 3FT CAT 6 ea 78
R-34.22 5.4.2.1.6 PATCH CORD 7FT CAT 6 ea 78
R-34.7 5.4.2.1.7 SWITCH LAYER 2-24 PORTS 10/100/1000 12 POE PORTS 2 SFP PORTS ea 4
R-34.8 5.4.2.1.8 PATCH PANNEL ea 4
R-34.9 5.4.2.1.9 DATA POINT CERTIFICATION ea 78
R-34.24 5.4.2.1.10 CLIME SYSTEM set 1
R-34.25 5.4.2.1.11 FALSE FLOOR SYSTEM m2 40
R-34.23 5.4.2.1.12 ACCESS POINT ea 5
R-34.26 5.4.2.1.13 CONDUIT BY GROUND 2X2" PVC ELECTRONIC M 240
R-34.27 5.4.2.1.14 SIMPLE CONCRETE CHECK BOX WITH COVER (0.60X0.60X0.60) ea 7
R-34.28 5.4.2.1.15 CONDUIT 1" WITH ACCESSORIES m 24
R-34.29 5.4.2.1.16 EMT PIPE 1 1/4" WITH ACCESSORIES M 23
R-34.30 5.4.2.1.17 EMT PIPE 1 1/2" WITH ACCESSORIES M 9
R-34.1 5.4.2.1.18 CONDUIT 1/2" m 36
R-34.2 5.4.2.1.19 CONDUIT 3/4" (SUPPLY AND INSTALLATION) m 130
R-34.31 5.4.2.1.20 PULL BOX (BANDEJA DE PISO) M 80
R-34.32 5.4.2.1.21 IP TELEPHONIC CENTRAL ea 1
R-34.33 5.4.2.1.22 IP TELEPHONE ea 27
R-34.58 5.4.2.1.23 OPTICAL FIBER m 240
R-34.60 5.4.2.1.24 ODF ea 3
UNIDIRECTIONAL TEST OF TRANSMISSION BY OPTICAL FIBER BY POINT AND WINDOW+
R-34.5 5.4.2.1.25 ea 12
FORCE TEST
R-34.6 5.4.2.1.26 INSTALLATION OF WALL RACK 12 UR ea 1
R-34.64 5.4.2.1.27 SATELLITAL INTERNET SERVICE INSTALLATION AND CONNECTIVITY set 1
5.4.2.2 SECURITY AND SURVEILANCE CAMERA SYSTEM
R-34.10 5.4.2.2.1 INSTALLATION AND CONFIGURATION OF IP CAMERA SYSTEM ea 23
R-34.36 5.4.2.2.2 BULLET IP CAMERA, INSTALLATION AND CONFIGURATION ea 11
R-34.4 5.4.2.2.3 STRUCTURAL CABLE CAT 6 m 43
R-34.37 5.4.2.2.4 EXIT BUTTON ea 8
R-34.38 5.4.2.2.5 ELECTROMAGNETIC LOCK ea 5
R-34.39 5.4.2.2.6 MOVEMENT SENSOR ea 7
R-34.40 5.4.2.2.7 DOOR MOTOR ea 2
R-34.41 5.4.2.2.8 ACCESS CONTROL WITH FINGERPRINT INSTALLATION AND CONFIGURATION ea 8
R-34.29 5.4.2.2.9 EMT PIPE 1 1/4" WITH ACCESSORIES M 13
R-34.1 5.4.2.2.10 CONDUIT 1/2" m 205
R-34.2 5.4.2.2.11 CONDUIT 3/4" (SUPPLY AND INSTALLATION) m 59
R-34.28 5.4.2.2.12 CONDUIT 1" WITH ACCESSORIES m 20
R-34.53 5.4.2.2.13 RECORDING SYSTEM NVR set 1
R-34.54 5.4.2.2.14 MONITOR ea 2
R-34.55 5.4.2.2.15 MONITORING TV ea 2
R-34.7 5.4.2.2.16 SWITCH LAYER 2-24 PORTS 10/100/1000 12 POE PORTS 2 SFP PORTS ea 5
R-34.57 5.4.2.2.17 SWITCH 24 PORTS + POE ea 1
R-34.27 5.4.2.2.18 SIMPLE CONCRETE CHECK BOX WITH COVER (0.60X0.60X0.60) ea 11
R-34.20 5.4.2.2.19 FLOOR RACK 44 UR ea 1
R-34.61 5.4.2.2.20 EXTERIOR RACK 12 UR ea 2
R-34.6 5.4.2.2.21 INSTALLATION OF WALL RACK 12 UR ea 2

Hoja 61 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-34.62 5.4.2.2.22 CAMAR TYPE DOME PTZ ea 7


R-34.58 5.4.2.2.23 OPTICAL FIBER m 445
R-34.26 5.4.2.2.24 CONDUIT BY GROUND 2X2" PVC ELECTRONIC M 445
R-34.27 5.4.2.2.25 SIMPLE CONCRETE CHECK BOX WITH COVER (0.60X0.60X0.60) ea 11
5.4.2.3 AUDIO AND SOUND SYSTEM
R-34.43 5.4.2.3.1 SPEAKER TYPE BOX WITH TAP WITH POTENCY F4 ea 32
R-34.48 5.4.2.3.2 SPEAKER TYPE MEGAPHONE EXTERIOR F4 ea 4
R-34.42 5.4.2.3.3 AUDIO EXIT F4 ea 30
R-34.44 5.4.2.3.4 AUDIO F4 AMPLIFIER ea 1
R-34.45 5.4.2.3.5 AUDIO F4 CENTRAL CONTROL ea 1
R-34.47 5.4.2.3.6 ROUTER/ ZONES EXPANSON F4 ea 1
R-34.49 5.4.2.3.7 CALLING STATION F4 ea 1
R-34.46 5.4.2.3.8 AUDIO CABLE F4 ea 292
R-34.50 5.4.2.3.9 REMOTE CONTROL KIT F4 ea 1
R-34.30 5.4.2.3.10 EMT PIPE 1 1/2" WITH ACCESSORIES M 344
R-34.51 5.4.2.3.11 SOUND SOURCE F4 ea 1
R-34.52 5.4.2.3.12 COMMISSIONING AND CONFIGURATION SOUND F4 ea 1
5.4.2.4 FIRE DETECTION
R-34.17 5.4.2.4.1 CONTROL MODULE ea 14
R-34.15 5.4.2.4.2 FIREFIGTHING MANUAL STATION ea 12
R-34.13 5.4.2.4.3 STROB LIGHT WITH ALARM ea 14
R-34.12 5.4.2.4.4 CENTRAL FIRE ALARM PANEL, DIRECTIONABLE ea 1
R-34.11 5.4.2.4.5 ALARM 65dB, 110v ea 1
R-34.18 5.4.2.4.6 ISOLATION MODULE ea 5
R-34.14 5.4.2.4.7 PHOTOELECTRIC SMOKE DETECTOR ea 28
R-34.34 5.4.2.4.8 EMERGENCY LIGHTNING ea 31
R-34.35 5.4.2.4.9 ELECTRIC EXIT SIGN ea 17
R-34.30 5.4.2.4.10 EMT PIPE 1 1/2" WITH ACCESSORIES M 326
R-34.16 5.4.2.4.11 CABLE 2X16 AWG FIRE RETARDANT m 326
R-34.56 5.4.2.4.12 FIREFIGTHING POINT ea 38
R-34.63 5.4.2.4.13 FIREFIGTHING DETECTION INSTALLATION AND COMMISSIONING set 1
5.4.3 ELECTRICAL WORKS_ADMINISTRATION BUILDING
5.4.3.1 CIVIL WORK
R-8.2 5.4.3.1.1 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 6
R-32-3 5.4.3.1.2 CONDUIT BANK- EU0-0B1X2B ea 270
R-32-4 5.4.3.1.3 EXCAVATION BY MACHINE, SOIL, H=2-4M m3 270
R-4.12 5.4.3.1.4 COMPACTING BACKFILL BY LABOUR WITH EXCAVATION MATERIAL m3 270
5.4.3.2 NETWORK OF LOW VOLTAGE
5.4.3.2.1 ADMINISTRATIVE BUILDING
R-32-7 5.4.3.2.1.1 THERMAL BREAKER DEVICE 16 POINTS 125A ea 5
R-32-8 5.4.3.2.1.2 LUMINAIR NORMAL IN EMT UNDER 4m HEIGHT ea 182
R-32-9 5.4.3.2.1.3 POWER OUTLET NORMAL EMT 120V ea 157
R-32-10 5.4.3.2.1.4 POWER OUTLET SPECIALIZED 220v 50A ea 18
R-32-11 5.4.3.2.1.5 POWER OUTLET REGULATED ea 20
R-32-13 5.4.3.2.1.6 LUMINAIRE 60X60CM WITH GRILLE AND LED LIGHT FALSE CEILING ea 79
R-32-14 5.4.3.2.1.7 LUMINAIRE 1.20x.60 LED FOR FALSE CEILING ea 74
R-32-20 5.4.3.2.1.8 DRY TYPE CAST RESING TRANSFORMER 220KVA 460/220/127 set 1
R-32-5 5.4.3.2.1.9 MAIN BOARD 8 POINTS 110/220V 125A ea 3
5.4.3.2.2 EXTERNAL
R-32-12 5.4.3.2.2.1 EXTERIOR LIGHTING DECORATIVE POLE ea 50
R-32-16 5.4.3.2.2.2 LUMINAIRE VEHICLES LIGHTING 150W ea 50
R-32-17 5.4.3.2.2.3 LUMINAIRE LED 90W TYPE ZWECK ea 10
R-32-18 5.4.3.2.2.4 LUMINAIRE PROFILE TYPE, 2.5MM ea 20
R-32-15 5.4.3.2.2.5 TELESCOPIC METAL POLE 10m ea 50
R-32-6 5.4.3.2.2.6 EXCAVATION BY MACHINE m3 1196
R-32-3 5.4.3.2.2.7 CONDUIT BANK- EU0-0B1X2B ea 1196
R-8.2 5.4.3.2.2.8 SIMPLE CONCRETE CHECK BOX F'C=210 kg/cm2 (600x700x1000)mm ea 68
5.4.3.2.3 COMPLEX BUILDING
R-32-7 5.4.3.2.3.1 THERMAL BREAKER DEVICE 16 POINTS 125A ea 1
R-32-8 5.4.3.2.3.2 LUMINAIR NORMAL IN EMT UNDER 4m HEIGHT ea 95
R-32-9 5.4.3.2.3.3 POWER OUTLET NORMAL EMT 120V ea 37
R-32-19 5.4.3.2.3.4 LUMINAIRE HANGING LED IP65 ea 95
R-32-20 5.4.3.2.3.5 DRY TYPE CAST RESING TRANSFORMER 220KVA 460/220/127 set 1
R-32-10 5.4.3.2.3.6 POWER OUTLET SPECIALIZED 220v 50A ea 11
5.4.3.2.4 SLUDGE DEWATERING BUILDING
R-32-7 5.4.3.2.4.1 THERMAL BREAKER DEVICE 16 POINTS 125A ea 1
R-32-8 5.4.3.2.4.2 LUMINAIR NORMAL IN EMT UNDER 4m HEIGHT ea 49
R-32-9 5.4.3.2.4.3 POWER OUTLET NORMAL EMT 120V ea 15
R-32-10 5.4.3.2.4.4 POWER OUTLET SPECIALIZED 220v 50A ea 2
R-32-19 5.4.3.2.4.5 LUMINAIRE HANGING LED IP65 ea 49
5.4.3.2.5 SPITTER TANK 1
R-32-7 5.4.3.2.5.1 THERMAL BREAKER DEVICE 16 POINTS 125A ea 2
R-32-8 5.4.3.2.5.2 LUMINAIR NORMAL IN EMT UNDER 4m HEIGHT ea 6
R-32-9 5.4.3.2.5.3 POWER OUTLET NORMAL EMT 120V ea 8
R-32-10 5.4.3.2.5.4 POWER OUTLET SPECIALIZED 220v 50A ea 2
5.4.3.2.6 SPITTER TANK 2
R-32-8 5.4.3.2.6.1 LUMINAIR NORMAL IN EMT UNDER 4m HEIGHT ea 9
R-32-9 5.4.3.2.6.2 POWER OUTLET NORMAL EMT 120V ea 12
R-32-7 5.4.3.2.6.3 THERMAL BREAKER DEVICE 16 POINTS 125A ea 1
R-32-10 5.4.3.2.6.4 POWER OUTLET SPECIALIZED 220v 50A ea 2
5.5 INSTRUMENTATION AND CONTROL SYSTEM
SUPPLY AND INSTALL CABLE, CONDUIT INCLUDING CABLE PULLING, UNDERGROUN
5.5.1
CABLING, ETC. AND INSTALL INSTRUMENTAL AND CONTROL EQUIPMENTS
R-35.1 5.5.1.1 GRIT REMOVAL & SCREENING TANK FACILITY set 1
R-35.2 5.5.1.2 PRIMARY CLARIFIER set 1
R-35.3 5.5.1.3 BIO REACTOR & COMPLEX BUILDING set 1
R-35.4 5.5.1.4 SECONDARY CLARIFIER TYPE 2 set 1
R-35.5 5.5.1.5 DISINFECTING TREATED WATER REUSE FACILITY set 1
R-35.6 5.5.1.6 SLUDGE DEWATERING FACILITY set 1
R-35.7 5.5.1.7 ADMINISTRATIVE BUILDING AND ETC. set 1
5.5.2 SUPPLY AND INSTAL INSTRUMENTS AND CONTROL SYSTEM EQUIPMENTS
5.5.2.1 CONTROL EQUIPMENTS AND FACILITIES
R-35.8 5.5.2.1.1 POS (PROCESS OPERATOR STATION) set 3
R-35.9 5.5.2.1.2 SOFTWARE HMI PROGRAM set 1
R-35.10 5.5.2.1.3 DATA BASE SERVER set 1
R-35.11 5.5.2.1.4 LED SCREEN -50"(127cm) set 2
R-35.12 5.5.2.1.5 PRINTER set 1
R-35.13 5.5.2.1.6 RCS # 1 (REMOTE CONTROL STATION) set 1
R-35.14 5.5.2.1.7 RCS # 2 (REMOTE CONTROL STATION) set 1
R-35.15 5.5.2.1.8 NETWORK EQUIPMENT set 1
R-35.16 5.5.2.1.9 UPS#M(7.5KV), UPS#1(3KVA), UPS#2(3KVA) set 1
R-35.17 5.5.2.1.10 SPARE PARTS set 1
R-35.18 5.5.2.1.11 MAINTENANCE TOOLS set 1
5.5.2.2 FIELD INSTRUMENTS
R-35.19 5.5.2.2.1 FLOW METER (MAGNETIC TYPE) 50A set 2
R-35.20 5.5.2.2.2 FLOW METER (MAGNETIC TYPE) 80A set 1
R-35.21 5.5.2.2.3 FLOW METER (MAGNETIC TYPE) 125A set 4
R-35.22 5.5.2.2.4 FLOW METER (MAGNETIC TYPE) 300A set 1
R-35.23 5.5.2.2.5 FLOW METER (ULTRASONIC TYPE) 800A set 2
R-35.24 5.5.2.2.6 FLOW METER (ULTRASONIC TYPE) 1000A set 1
R-35.25 5.5.2.2.7 FLOW METER (ORIFICE TYPE) 200 A set 4
R-35.26 5.5.2.2.8 LEVEL METER (ULTRASONIC TYPE) set 9
R-35.27 5.5.2.2.9 PH METER set 7

Hoja 62 de 92
PRESUPUESTO REFERENCIAL

Item Code ITEM DESCRIPTION UNIT QUANTITY FOREIGN U/P FOREIGN AMOUNT LOCAL U/P LOCAL AMOUNT TOTAL U/P TOTAL AMOUNT

R-35.28 5.5.2.2.10 SS METER set 2


R-35.29 5.5.2.2.11 DO METER set 4
R-35.30 5.5.2.2.12 MLSS METER set 4
R-35.31 5.5.2.2.13 BOD METER set 2
R-35.32 5.5.2.2.14 LEVEL SWITCH (QUICK FLOAT TYPE) set 12
R-35.33 5.5.2.2.15 DENSITY METER 80A set 1
R-35.34 5.5.2.2.16 DENSITY METER 200A set 1
R-35.35 5.5.2.2.17 DENSITY METER 300A set 1
R-35.36 5.5.2.2.18 LIP PANEL set 46
R-35.37 5.5.2.2.19 POWER ARRESTER ea 46
R-35.38 5.5.2.2.19 SIGNAL ARRESTER set 131
R-35.39 5.5.2.2.19 FIRST UPS POWER ARREST set 3
5.5.3 ADDITIONAL FEE
R-35.40 5.5.3.1 INSTALLATION FEE set 1
R-35.41 5.5.3.2 INSTRUMENT SETTING & CALIBRATION set 1
R-35.42 5.5.3.3 SUPERVISION AND TRAINING WORK set 1
R-35.43 5.5.3.4 PACKING COST set 1
5.5.4 CCTV FACILITIES
R-35.44 5.5.4.1 INTERIOR CHAMBER AND EXPANSION, INCLINATION set 1
R-35.45 5.5.4.2 OUTDOOR CHAMBER AND EXPANSION, INCLINATION set 4
R-35.46 5.5.4.3 DVR (DIGITAL VIDEO RECORDER) HDD 1TB set 1
R-35.47 5.5.4.4 CONTROLLER set 1
R-35.48 5.5.4.5 MONITOR WWTP set 1
R-35.49 5.5.4.6 POLE 6" X 4m set 4
R-35.50 5.5.4.7 DESK set 1
6 ENVIRONMENTAL MANAGEMENT PLAN
6.1 REDUCTION OF PARTICULATE MATERIAL
R-41.1 6.1.1 WATER APPLICATION TO CONTROL DUST m3 20
6.2 PREVENTION AND CONTROL OF SOIL AND WATER POLLUTION
R-41.2 6.2.1 SEPTIC TANK MAINTENANCE (12M3) m3 3
TEMPORARY FACILITIES
6.3
R-41.3 6.3.1 RENT 2 PORTABLE SINKS ea 15
R-41.4 6.3.2 RENT 2 PORTABLE LAVATORY FACILITIES ea 15
GREASE TRAMP (includes COLLECTING - TRANSPORT AND FINAL DISPOSITION OF RESIDUES
R-41.5 6.3.3 ea 3
4 TIMES A YEAR)
R-41.6 6.3.4 SEPTIC TANK12 M3 ea 1
6.4 WASTE AND MANAGEMENT PROGRAM
R-41.7 6.4.1 METALLIC TANK FOR CLASSIFYING IN THE SOURCE ea 10
R-41.8 6.4.2 PLASTIC TANK FOR RESIDUES OF GREASE AND OILS ea 10
6.5 CONTINGENCY PROGRAM
R-41.9 6.5.1 CONTINGENCIES IN CASE OF EMERGENCY (ANNUAL) ea 3
6.6 SAFETY AND OCCUPATIONAL HEALTH PROGRAM
R-41.10 6.6.1 OCCUPATIONAL HEALTH AND SAFETY L/S 1
ENVIRONMENTAL MONITORING
6.7
R-41.11 6.7.1 MONITORING OF GAS IN AIR ENVIRONMENT AND NOISE ea 12
R-41.12 6.7.2 WATER MONITORING DURING CONSTURCTION PERIOD ea 30
7 SCHEDULE OF DAYWORKS
7.1 DAYWORK-LABOUR
R-42.1 7.1.1 NORMAL LABOURER hour 500
R-42.2 7.1.2 MASON hour 500
R-42.3 7.1.3 CARPENTER hour 500
R-42.4 7.1.4 ELECTRICIAN hour 500
R-42.5 7.1.5 FORM WORKER hour 500
R-42.6 7.1.6 IRON WORKER hour 500
R-42.7 7.1.7 LIGHT EQUIPMENT OPERATOR hour 500
R-42.8 7.1.8 PAINTER hour 500
R-42.9 7.1.9 PLUMBER hour 500
R-42.10 7.1.10 DRIVER hour 500
R-42.11 7.1.11 SPECIALIZED WELDER hour 500
R-42.12 7.1.12 HEAVY EQUIPMENT OPERATOR hour 500
R-42.13 7.1.13 DRILLER hour 500
R-42.14 7.1.14 OPERATOR OF EXCAVATOR hour 500
R-42.15 7.1.15 DRIVER OF DUMPER TRUCKS hour 500
7.2 DAYWORK-MATERIAL
R-42.16 7.2.1 PROVISIONAL SUM FOR MATERIALS TO BE USED IN DAYWORKS P/S 1
7.3 DAYWORK-EQUIPMENT
R-42.17 7.3.1 WATER PUMP hour 1000
R-42.18 7.3.2 TANK TRUCK 10000LT hour 200
R-42.19 7.3.3 CARGO TRUCK hour 500
R-42.20 7.3.4 TRUCK OF 1 TON hour 500
R-42.21 7.3.5 MANUAL COMPRESSOR 5HP hour 500
R-42.22 7.3.6 CONCRETE MIXER 1 SACK hour 500
R-42.23 7.3.7 IRON CUTTER hour 500
R-42.24 7.3.8 METALLIC FORMWORK hour 500
R-42.25 7.3.9 OXY-FUEL WELDING AND CUTTING EQUIPMENT hour 500
R-42.26 7.3.10 EXCAVATOR CRAWLER hour 200
R-42.27 7.3.11 GENERATOR hour 1000
R-42.28 7.3.12 CRANE hour 100
R-42.29 7.3.13 VIBRATORY HAMMER hour 500
R-42.30 7.3.14 DRILLER AKER hour 200
R-42.31 7.3.15 PLATE COMPACTORS 5 HP hour 500
R-42.32 7.3.16 BACKHOE hour 500
R-42.33 7.3.17 VIBRATOR COMPACTOR ROLL hour 100
R-42.34 7.3.18 PNEUMATIC-TIRED ROLLINGRODILLO NEUMATICO 80 HP hour 200
R-42.35 7.3.19 ELECTRIC WELDER 300A hour 200
R-42.36 7.3.20 TRACTOR 165 HP hour 200
R-42.37 7.3.21 CONCRETE VIBRATOR hour 1000
R-42.38 7.3.22 DUMP TRUCK 8M3 hour 1000
8 MISCELLANEOUS ITEMS
R-43.1 8.1 MAINTENANCE VEHICLE (PROVISIONAL SUM) P/S 2
R-43.2 8.2 MINOR OPERATIONS & MAINTENANCE EQUIPMENT (PROVISIONAL SUM) P/S 1
R-43.3 8.3 LABORATORY EQUIPMENT (PROVISIONAL SUM) P/S 1
R-43.4 8.4 OFFICE EXPENDITURE FOR COMPUTER HARDWARE AND SOFTWARE (PROVISIONAL SUM) P/S 1
MANUFACTORY INSPECTION OR CAPACITY BUILDING AT FOREIGN COUNTRY (PROVISIONAL
R-43.5 8.5 P/S 3
SUM)
Costo total de la obra USD $
Porcentaje de moneda

Diferencia

Costo total (C/P)

PRECIO TOTAL DE LA OFERTA:

Hoja 63 de 92
PRESUPUESTO REFERENCIAL

PROYECTO: LA CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE INTERCEPTORES Y COLECTORES ‘A, D, E’ Y LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
& EL MEJORAMIENTO DE LOS RIOS POVE Y CODE EN LA CIUDAD DE SANTO DOMINGO, ECUADOR
UBICACIÓN: INTERCEPTOR "A": L= 2.78 km, INTERCEPTOR "D1" : L= 8.27 km, INTERCEPTOR "E2" : L= 12.78 km, COLECTORES "D1C, D1E, D1a1-D1a17" : L= 8.47 km, COLECTORES ""E2a - E2e" : L= 8.56 km, PTAR : Q=20000m3/d
EMBAULAMIENTO : L= 0.73km, TUNEL : L= 0.38km, MURO DE GAVION : L= 5.21km, ESCOLLERA : L= 6.26km, MEJORAMIENTO LECHO DEL RIO : 34lugares
CONTIENE: CANTIDADES DE OBRA Y PRESUPUESTO REFERENCIAL DE CONSTRUCCIÓN.

PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

1 GENERAL Y PRELIMINARES

R-1.1 1.1 PUESTA EN MARCHA Y ENTRENAMIENTO u 1

2 TRABAJOS DE CARRETERA - LINEA DE CONDUCCIÓN


2.1 DEMOLICIÓN, PREPARACIÓN DEL SITIO
R-2.6 2.1.1 DESBROCE, DESBOSQUE Y LIMPIEZA ha 7.28
R-2.4 2.1.2 DERROCAMIENTO DE ESTRUCTURA EXISTENTE CON MAQUINARIA m3 63
R-2.14 2.1.3 REPLANTEO Y NIVELACION LINEAL km 2.92
R-2.15 2.1.4 REPLANTEO Y NIVELACIÓN PARA ALCANTARILLADO. m 2,783
R-2.8 2.1.5 DESVÍO DE RÍO u 2
TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE
R-21.2 2.1.6 m3-km 50,960
500m)
2.2 MOVIMIENTO DE TIERRA
R-3.8 2.2.1 EXCAVACION EN SUELO m3 120,535
R-4.6 2.2.2 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 123,733
R-2.2 2.2.3 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE m2 18,403
R-3.11 2.2.4 EXCAVACIÓN PARA CONFORMACION DE TALUD - (PEINADO) m3 3,010
R-38.3 2.2.5 AREA SEMBRADA m2 40,439
R-40.6 2.2.6 LIMPIEZA DE DERRUMBES m3 362
2.3 DRENAJES
2.3.1 ALCANTARILLAS DE CAJÓN
R-3.1 2.3.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 3,990
RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.3 2.3.1.2 m3 1,399
CLASE 3)

RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.10 2.3.1.3 m3 156
CLASE 3)
R-5.4 2.3.1.4 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) m3 821
R-19.7 2.3.1.5 MURO DE GAVIONES TRIPLE TORSIÓN (2x1x1) m3 700
R-7.1 2.3.1.6 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 994
R-19.12 2.3.1.7 SUMINISTRO E INSTALACIÓN DE TABLESTACA DE a=801mm, e=6mm m2 347
R-8.12 2.3.1.8 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 4,015
R-8.7 2.3.1.9 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 215
R-19.1 2.3.1.10 ACERO DE REFUERZO fy=4200 kg/cm2 kg 445,911
ENCOFRADO PARA ESTRUCTURAS
R-9.3 2.3.1.11 m2 7,568
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 2.3.1.12 BOMBEO DE AGUA IGUAL/MAYOR 2" m 1,247
R-40.4 2.3.1.13 hora 500
R-21.4 2.3.1.14 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) m3-km 2,745
2.3.2 TUBERÍAS DE HORMIGÓN
R-3.3 2.3.2.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 56
R-4.12 2.3.2.2 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 6
R-8.9 2.3.2.3 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) m3 20
ENCOFRADO PARA ESTRUCTURAS
R-9.3 2.3.2.4 m2 72
R-16.1 2.3.2.5 TUBERÍA DE HORMIGÓN ARMADO PARA ALCANTARILLAS D=800mm m 33
2.3.3 CUNETAS VIALES, SUBDREN
R-3.2 2.3.3.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 679
R-8.15 2.3.3.2 HORMIGÓN SIMPLE 180 kg/cm2 m3 1,596
ENCOFRADO PARA ESTRUCTURAS
R-9.3 2.3.3.3 m2 6,002
R-4.12 2.3.3.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 798
R-4.6 2.3.3.5 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 2,337
R-4.14 2.3.3.6 RELLENO CON MATERIAL FILTRANTE m3 679
2.3.4 SUMIDERO-ENTRADA DE AGUAS LLUVIAS (14 unidades)
R-3.2 2.3.4.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 44
R-8.15 2.3.4.2 HORMIGÓN SIMPLE 180 kg/cm2 m3 1
R-8.16 2.3.4.3 HORMIGÓN SIMPLE 210 kg/cm2 m3 10
R-19.1 2.3.4.4 ACERO DE REFUERZO fy=4200 kg/cm2 kg 1,246
ENCOFRADO PARA ESTRUCTURAS
R-9.3 2.3.4.5 m2 105
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.3 2.3.4.6 m 34
D(i)=300 mm EN RÍO
R-19.11 2.3.4.7 REJILLA TRANSVERSAL DE H.D (580 x 830)mm u 14
2.4 TRABAJOS DE PAVIMENTO
R-7.2 2.4.1 GEOTEXTIL TEJIDO PARA ESTABILIZACIÓN DE LA SUBRASANTE m2 34,766
R-5.7 2.4.2 MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO m3 13,093
R-5.1 2.4.3 BASE CLASE 1A m3 4,083
CAPA DE BASE DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 10cm DE
R-6.4 2.4.4 m2 18,956
ESPESOR
R-6.3 2.4.5 ASFALTO MC PARA IMPRIMACIÓN lt 28,433
R-6.2 2.4.6 ASFALTO EMULSIONADO TIPO SS-1H PARA RIEGO DE ADHERENCIA lt 6,634
CAPA DE RODADURA DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 5cm
R-6.5 2.4.7 m2 18,956
DE ESPESOR

2.5 TRABAJOS MISCELANEOS


2.5.1 CAMINOS EXISTENTES
R-2.2 2.5.1.1 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE m2 450
R-5.1 2.5.1.2 BASE CLASE 1A m3 90
CAPA DE BASE DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 10cm DE
R-6.4 2.5.1.3 m2 450
ESPESOR
R-6.3 2.5.1.4 ASFALTO MC PARA IMPRIMACIÓN lt 675
R-6.2 2.5.1.5 ASFALTO EMULSIONADO TIPO SS-1H PARA RIEGO DE ADHERENCIA lt 158
CAPA DE RODADURA DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 5cm
R-6.5 2.5.1.6 m2 450
DE ESPESOR
R-8.15 2.5.1.7 HORMIGÓN SIMPLE 180 kg/cm2 m3 8
ENCOFRADO PARA ESTRUCTURAS
R-9.3 2.5.1.8 m2 108
2.5.2 MARCAS EN EL PAVIMENTO - SEÑALIZACIÓN HORIZONTAL
MARCAS DE PAVIMENTO - (franja de pintura amarilla, ancho = 15.0 cm / homigón
R-39.3 2.5.2.1 m 2,916
asfáltico)

MARCAS DE PAVIMENTO - (franja de pintura blanca, ancho = 15.0 cm / homigón


R-39.4 2.5.2.2 m 5,832
asfáltico)

R-39.5 2.5.2.3 MARCAS SOBRESALIDAS DE PAVIMENTO - (tachas reflectivas / bidireccionales) u 293

2.5.3 CONTROL DE TRÁNSITO - SEÑALIZACIÓN VERTICAL


SEÑALES AL LADO DE LA CARRETERA - (2.40 m x 1.2 m / informativa / incluye: pórtico
R-39.9 2.5.3.1 u 1
metálico y plinto de cimentación)

Hoja 64 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

SEÑALES AL LADO DE LA CARRETERA - (0.75 m x 0.75 m / señal reglamentaria /


R-39.6 2.5.3.3 u 4
incluye: tubo cuadrado de 2" x y plinto de cimentación)

DELINEADORES CON MATERIAL REFLECTIVO - (postes delineadores h= 1.5 m /


R-39.1 2.5.3.4 u 83
incluye: plinto de cimentación)
2.5.4 GUARDACAMINO
R-39.2 2.5.4.1 GUARDACAMINO SIMPLE m 761

3 INTERCEPTOR Y COLECTORES
3.1 INTERCEPTOR PRINCIPAL "A", L=2.78 km
3.1.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.4 3.1.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M m3 8,855
R-3.6 3.1.1.2 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M m3 56,868
R-10.3 3.1.1.3 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M. m 696
R-10.5 3.1.1.4 BOMBEO DE AGUA
SUMINISTRO, IGUAL/MAYOR
INSTALACIÓN 2"
Y DESINSTALACIÓN DE ENTIBADO 5< H<9 M m 2,087
R-40.4 3.1.1.5 hora 500
R-2.12 3.1.1.6 RASANTEO MANUAL EN ZANJA m2 8,271
R-4.1 3.1.1.7 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 11,857
R-4.12 3.1.1.8 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 35,446
R-5.7 3.1.1.9 MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO m3 12,302
R-21.4 3.1.1.10 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) m3-km 68,175
3.1.2 TUBERÍAS

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA GRP PARA ALCANTARILLADO


R-11.1 3.1.2.1 m 831
D(i)=1500 mm

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA GRP PARA ALCANTARILLADO


R-11.2 3.1.2.2 m 1,915
D(i)=1650 mm

3.1.3 POZOS DE REVISIÓN


R-3.10 3.1.3.1 EXCAVACION MANUAL m3 93
R-4.9 3.1.3.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 43
R-8.7 3.1.3.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 14
R-8.5 3.1.3.4 EMPATE A POZO REVISION MORTERO 1:3 u 38
R-8.24 3.1.3.5 MORTERO 1:4 PARA FONDO DE POZOS m3 5
R-19.13 3.1.3.6 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 19
R-17.11 3.1.3.7 POZO DE REVISIÓN 2< H<4 M (Di=2100mm) u 1
R-17.12 3.1.3.8 POZO DE REVISIÓN 4< H<6 M (Di=2100mm) u 6
R-17.13 3.1.3.9 POZO DE REVISIÓN 6< H<8 M (Di=2100mm) u 3
R-17.14 3.1.3.10 POZO DE REVISIÓN 8< H<10 M (Di=2100mm) u 8
3.2 INTERCEPTOR "E2", L=12.78 km
3.2.1 DEMOLICIÓN, PREPARACIÓN DEL SITIO
R-2.7 3.2.1.1 DESBROCE, DESBOSQUE Y LIMPIEZA EN RÍO ha 10.67
R-2.14 3.2.1.2 REPLANTEO Y NIVELACION LINEAL km 21.34
R-2.4 3.2.1.3 DERROCAMIENTO DE ESTRUCTURA EXISTENTE CON MAQUINARIA m3 60
R-2.10 3.2.1.4 LEVANTADA Y COLOCADA DE ADOQUIN. m2 176
R-2.17 3.2.1.5 ROTURA A MAQUINA DE PAVIMENTO ASFALTICO m2 269
R-2.18 3.2.1.6 ROTURA Y REPOSICION ACERA 7 cm INC. SUB-BASE 15 cm m2 88
R-2.8 3.2.1.7 DESVÍO DE RÍO u 2
TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE
R-21.3 3.2.1.8 m3-km 74,690
500m) EN RÍO
3.2.2 MOVIMIENTO DE TIERRA
R-3.9 3.2.2.1 EXCAVACION EN SUELO EN RÍO m3 17,090

R-4.7 3.2.2.2 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN EN RÍO m3 39,169

R-2.3 3.2.2.3 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE EN RÍO m2 9,299


R-2.1 3.2.2.4 CONFORMACION DE TALUD-PEINADO E= 20 CM. m2 7,198
3.2.3 INTERCEPTOR
3.2.3.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.2 3.2.3.1.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 17,733
R-3.5 3.2.3.1.2 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M EN RÍO m3 21,206
R-3.7 3.2.3.1.3 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M EN RÍO m3 4,296

R-10.2 3.2.3.1.4 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M EN RÍO m 5,415

R-10.4 3.2.3.1.5 SUMINISTRO,


BOMBEO INSTALACIÓN
DE AGUA Y DESINSTALACIÓN
IGUAL/MAYOR 2" DE ENTIBADO 5< H <9 M EN RÍO m 609

R-40.4 3.2.3.1.6 hora 500


R-2.12 3.2.3.1.7 RASANTEO MANUAL EN ZANJA m2 17,085
R-4.2 3.2.3.1.8 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO m3 15,280

R-4.13 3.2.3.1.9 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN EN RÍO m3 24,968

R-21.5 3.2.3.1.10 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 93,969

3.2.3.2 TUBERÍAS
3.2.3.2.1 TUBERÍAS DE PE (POLIETILENO)

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.1 3.2.3.2.1.1 m 2,112
D(i)=200 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.3 3.2.3.2.1.2 m 142
D(i)=300 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.5 3.2.3.2.1.3 D(i)=400 mm EN RÍO m 2,128

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.6 3.2.3.2.1.4 m 768
D(i)=500 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.7 3.2.3.2.1.5 m 2,180
D(i)=600 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.8 3.2.3.2.1.6 m 4,427
D(i)=700 mm EN RÍO

3.2.3.2.2 TUBERÍAS DE DCIP (HIERRO DUCTIL)

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO


R-13.2 3.2.3.2.2.1 m 274
D(i)=500 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO


R-13.3 3.2.3.2.2.2 m 56
D(i)=700 mm EN RÍO

3.2.3.3 POZOS DE REVISIÓN


3.2.3.3.1 POZOS DE HORMIGÓN
R-3.10 3.2.3.3.1.1 EXCAVACION MANUAL m3 1,005
R-4.9 3.2.3.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 464
R-8.8 3.2.3.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 155
R-8.5 3.2.3.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 866
R-8.24 3.2.3.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 35
R-19.13 3.2.3.3.1.6 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 433
R-17.1 3.2.3.3.1.7 POZO DE REVISIÓN 0< H<2 M (Di=900mm) u 31
R-17.2 3.2.3.3.1.8 POZO DE REVISIÓN 2< H<4 M (Di=900mm) u 25
R-17.3 3.2.3.3.1.9 POZO DE REVISIÓN 4< H<6 M (Di=900mm) u 36
R-17.4 3.2.3.3.1.10 POZO DE REVISIÓN 6< H<8 M (Di=900mm) u 9
R-17.5 3.2.3.3.1.11 POZO DE REVISIÓN 8< H<10 M (Di=900mm) u 2
R-17.6 3.2.3.3.1.12 POZO DE REVISIÓN 0< H<2 M (Di=1200mm) u 38
R-17.7 3.2.3.3.1.13 POZO DE REVISIÓN 2< H<4 M (Di=1200mm) u 274
R-17.8 3.2.3.3.1.14 POZO DE REVISIÓN 4< H<6 M (Di=1200mm) u 15
R-17.9 3.2.3.3.1.15 POZO DE REVISIÓN 6< H<8 M (Di=1200mm) u 3

Hoja 65 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

3.2.3.3.2 POZOS PREFABRICADOS


R-18.1 3.2.3.3.2.1 MANHOLE DE PE H=1.70M u 12
R-18.2 3.2.3.3.2.2 MANHOLE DE PE H=2.20M u 96
R-18.3 3.2.3.3.2.3 MANHOLE DE PE 2.20<H<2.7M u 44
R-18.4 3.2.3.3.2.4 MANHOLE DE PE 2.7<H<3.2M u 20
R-18.5 3.2.3.3.2.5 MANHOLE DE PE 3.2<H<3.7M u 18
R-18.6 3.2.3.3.2.6 MANHOLE DE PE 3.7<H<4.2M u 14
LOSA DE TAPA H.A F´C=210KG/CM2 PARA POZO DE REVISION D=1.05M E=0.15M
R-8.23 3.2.3.3.2.7 u 204

R-8.27 3.2.3.3.2.8 TAPA H.A D=0.85M PARA POZO DE REVISION u 204


3.2.4 DRENAJES
3.2.4.1 SUBDRENES
R-3.2 3.2.4.1.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 1,474
R-4.14 3.2.4.1.2 RELLENO CON MATERIAL FILTRANTE m3 1,474

R-21.5 3.2.4.1.3 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 7,582

3.2.4.2 DRENAJE DE REBOSADERO


R-3.2 3.2.4.2.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 342
RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.11 3.2.4.2.2 m3 68
CLASE 3) EN RÍO
R-8.10 3.2.4.2.3 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO m3 105
R-19.1 3.2.4.2.4 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,175
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.2.4.2.5 m2 661
3.2.4.3 SUMIDERO - ENTRADA DE AGUAS LLUVIAS
R-8.10 3.2.4.3.1 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO m3 2,100
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.2.4.3.2 m2 8,475
3.2.5 ESTRUCTURA DE PAVIMENTO
3.2.5.1 CAMINERIA
R-5.2 3.2.5.1.1 BASE CLASE 1A EN RÍO m3 1,480
R-4.2 3.2.5.1.2 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO m3 370
R-6.1 3.2.5.1.3 ADOQUIN 0.28x0.14x0.08M m2 7,400
3.2.5.2 VÍA LASTRADA
R-5.1 3.2.5.2.1 BASE CLASE 1A m3 64
3.2.5.3 VÍA ADOQUÍN
R-5.8 3.2.5.3.1 SUB-BASE CLASE 3 m3 44
R-5.1 3.2.5.3.2 BASE CLASE 1A m3 35
3.2.5.4 VÍA ASFALTO
R-5.1 3.2.5.4.1 BASE CLASE 1A m3 54

CAPA DE BASE DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 10cm DE


R-6.4 3.2.5.4.2 m2 269
ESPESOR

R-6.3 3.2.5.4.3 ASFALTO MC PARA IMPRIMACIÓN lt 403


R-6.2 3.2.5.4.4 ASFALTO EMULSIONADO TIPO SS-1H PARA RIEGO DE ADHERENCIA lt 94

CAPA DE RODADURA DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 5cm


R-6.5 3.2.5.4.5 m2 269
DE ESPESOR

3.2.6 MISCELÁNEOS
3.2.6.1 INSTALACIONES ELÉCTRICAS
R-31.2 3.2.6.1.1 LUMINARIA ORNAMENTAL 175W TIPO PLATO u 133
R-31.1 3.2.6.1.2 ACOM. RED DE ALUMBRADO m 5,285
3.2.6.2 MURO DE MAMPOSTERÍA DE PIEDRA CON MORTERO
R-5.3 3.2.6.2.1 ENROCADO DE PROTECCION CON MORTERO m3 3,744
R-8.10 3.2.6.2.2 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO m3 368
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.2.6.2.3 m2 1,474
3.2.6.3 BARANDAS DE PROTECCIÓN
R-8.1 3.2.6.3.1 BASE DE HORMIGON SIMPLE f`c=180kg/cm2 PARA BARANDALES u 3,525
R-40.2 3.2.6.3.2 BARANDAL DE MADERA MORAL FINO m 5,285
3.2.6.4 MARCAS EN LA CAMINERÍA
R-40.8 3.2.6.4.1 PINTURA EN TAPAS DE H.A EN POZOS u 204
3.2.6.5 ARBORIZACIÓN
R-38.2 3.2.6.5.1 ARBUSTO LIRIOPE u 10,572
R-38.7 3.2.6.5.2 CESPED MANI FORRAJERO m2 2,643
3.2.6.6 POZO DE CAIDA
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.5 3.2.6.6.1 D(i)=400 mm EN RÍO m 2

R-30.46 3.2.6.6.2 TEE PVC D=400 mm u 2


R-30.6 3.2.6.6.3 CODO PVC D=400mm; ø=90 u 2
R-19.5 3.2.6.6.4 CONJUNTO DE ANCLAJE Y SOPORTE DE TUBERIA u 4
3.2.6.7 REVESTIMIENTO DE HORMIGÓN EN TUBERÍA DE PE
R-8.8 3.2.6.7.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 713
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.2.6.7.3 m2 2,292
3.2.6.8 PUENTE METÁLICO PARA PASO DE TUBERÍA DE DCIP
RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.11 3.2.6.8.1 m3 54
CLASE 3) EN RÍO
R-8.15 3.2.6.8.2 HORMIGÓN SIMPLE 180 kg/cm2 m3 1
R-8.16 3.2.6.8.3 HORMIGÓN SIMPLE 210 kg/cm2 m3 6
R-19.1 3.2.6.8.4 ACERO DE REFUERZO fy=4200 kg/cm2 kg 499
R-19.3 3.2.6.8.5 ACERO ESTRUCTURAL EN CERCHA kg 5,727
R-40.9 3.2.6.8.6 PLACAS DE NEOPRENO DUREZA SHORE 60 e=3cm m2 10
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.2.6.8.7 m2 15
3.3 INTERCEPTOR "D1", L=8.27 km
3.3.1 DEMOLICIÓN, PREPARACIÓN DEL SITIO
R-2.7 3.3.1.1 DESBROCE, DESBOSQUE Y LIMPIEZA EN RÍO ha 8.39
R-2.14 3.3.1.2 REPLANTEO Y NIVELACION LINEAL km 16.79
R-2.10 3.3.1.3 LEVANTADA Y COLOCADA DE ADOQUIN. m2 53
R-2.17 3.3.1.4 ROTURA A MAQUINA DE PAVIMENTO ASFALTICO m2 395
R-2.18 3.3.1.5 ROTURA Y REPOSICION ACERA 7 cm INC. SUB-BASE 15 cm m2 620
R-2.8 3.3.1.6 DESVÍO DE RÍO u 2
TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE
R-21.3 3.3.1.7 m3-km 58,730
500m) EN RÍO
3.3.2 MOVIMIENTO DE TIERRA
R-3.9 3.3.2.1 EXCAVACION EN SUELO EN RÍO m3 9,458

R-4.7 3.3.2.2 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN EN RÍO m3 16,460

R-2.3 3.3.2.3 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE EN RÍO m2 14,285


R-2.1 3.3.2.4 CONFORMACION DE TALUD-PEINADO E= 20 CM. m2 4,424
3.3.3 INTERCEPTOR
3.3.3.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.2 3.3.3.1.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 8,104
R-3.5 3.3.3.1.2 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M EN RÍO m3 23,204
R-3.7 3.3.3.1.3 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M EN RÍO m3 7,093

R-10.2 3.3.3.1.4 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M EN RÍO m 4,868

R-10.4 3.3.3.1.5 SUMINISTRO,


BOMBEO INSTALACIÓN
DE AGUA Y DESINSTALACIÓN
IGUAL/MAYOR 2" DE ENTIBADO 5< H <9 M EN RÍO m 702

R-40.4 3.3.3.1.6 hora 500

Hoja 66 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-2.12 3.3.3.1.7 RASANTEO MANUAL EN ZANJA m2 12,316


R-4.2 3.3.3.1.8 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO m3 11,244

R-4.13 3.3.3.1.9 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN EN RÍO m3 25,000

R-21.5 3.3.3.1.10 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 44,609

3.3.3.2 TUBERÍAS

3.3.3.2.1 TUBERÍAS DE PE (POLIETILENO)


SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.1 3.3.3.2.1.1 D(i)=200 mm EN RÍO m 244

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.2 3.3.3.2.1.2 D(i)=250 mm EN RÍO m 419

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.5 3.3.3.2.1.3 D(i)=400 mm EN RÍO m 44

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.6 3.3.3.2.1.4 D(i)=500 mm EN RÍO m 2,902

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.7 3.3.3.2.1.5 D(i)=600 mm EN RÍO m 1,278

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.8 3.3.3.2.1.6 D(i)=700 mm EN RÍO m 2,744

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.9 3.3.3.2.1.6 D(i)=800 mm EN RÍO m 138

3.3.3.2.2 TUBERÍAS DE DCIP (HIERRO DUCTIL)


SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.2 3.3.3.2.2.1 D(i)=500 mm EN RÍO m 250

3.3.3.3 POZOS DE REVISIÓN


3.3.3.3.1 POZOS DE HORMIGÓN
R-3.10 3.3.3.3.1.1 EXCAVACION MANUAL m3 445
R-4.9 3.3.3.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 205
R-8.8 3.3.3.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 68
R-8.5 3.3.3.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 372
R-8.24 3.3.3.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 21
R-19.13 3.3.3.3.1.6 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 252
R-17.2 3.3.3.3.1.7 POZO DE REVISIÓN 2< H<4 M (Di=900mm) u 8
R-17.3 3.3.3.3.1.8 POZO DE REVISIÓN 4< H<6 M (Di=900mm) u 25
R-17.4 3.3.3.3.1.9 POZO DE REVISIÓN 6< H<8 M (Di=900mm) u 9
R-17.5 3.3.3.3.1.10 POZO DE REVISIÓN 8< H<10 M (Di=900mm) u 1
R-17.7 3.3.3.3.1.11 POZO DE REVISIÓN 2< H<4 M (Di=1200mm) u 186
R-17.8 3.3.3.3.1.12 POZO DE REVISIÓN 4< H<6 M (Di=1200mm) u 19
R-17.9 3.3.3.3.1.13 POZO DE REVISIÓN 6< H<8 M (Di=1200mm) u 4
3.3.3.3.2 POZOS PREFABRICADOS
R-18.1 3.3.3.3.2.1 MANHOLE DE PE H=1.70M u 12
R-18.2 3.3.3.3.2.2 MANHOLE DE PE H=2.20M u 25
R-18.3 3.3.3.3.2.3 MANHOLE DE PE 2.20<H<2.7M u 25
R-18.4 3.3.3.3.2.4 MANHOLE DE PE 2.7<H<3.2M u 13
R-18.5 3.3.3.3.2.5 MANHOLE DE PE 3.2<H<3.7M u 15
R-18.6 3.3.3.3.2.6 MANHOLE DE PE 3.7<H<4.2M u 20
LOSA DE TAPA H.A F´C=210KG/CM2 PARA POZO DE REVISION D=1.05M E=0.15M
R-8.23 3.3.3.3.2.7 u 110
TAPA H.A D=0.85M PARA POZO DE REVISION
R-8.27 3.3.3.3.2.8 u 110
3.3.4 DRENAJES
3.3.4.1 SUBDRENES
R-3.2 3.3.4.1.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 1,143
R-4.14 3.3.4.1.2 RELLENO CON MATERIAL FILTRANTE m3 1,143

R-21.5 3.3.4.1.3 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 3,805

3.3.4.2 DRENAJE DE REBOSADERO


R-3.2 3.3.4.2.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 345
RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.11 3.3.4.2.2 m3 69
CLASE 3) EN RÍO
R-8.10 3.3.4.2.3 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO m3 106
R-19.1 3.3.4.2.4 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,086
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.3.4.2.5 m2 663
3.3.4.3 SUMIDERO - ENTRADA DE AGUAS LLUVIAS
R-8.10 3.3.4.3.1 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO m3 1,628
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.3.4.3.2 m2 6,571
3.3.5 ESTRUCTURA DE PAVIMENTO
3.3.5.1 CAMINERIA
R-5.2 3.3.5.1.1 BASE CLASE 1A EN RÍO m3 1,218
R-4.2 3.3.5.1.2 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO m3 305
R-6.1 3.3.5.1.3 ADOQUIN 0.28x0.14x0.08M m2 6,091
3.3.5.2 VÍA LASTRADA
R-5.1 3.3.5.2.1 BASE CLASE 1A m3 14
3.3.5.3 VÍA ADOQUÍN
R-5.8 3.3.5.3.1 SUB-BASE CLASE 3 m3 13
R-5.1 3.3.5.3.2 BASE CLASE 1A m3 11
3.3.5.4 VÍA ASFALTO
R-5.1 3.3.5.4.1 BASE CLASE 1A m3 79

CAPA DE BASE DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 10cm DE


R-6.4 3.3.5.4.2 m2 395
ESPESOR

R-6.3 3.3.5.4.3 ASFALTO MC PARA IMPRIMACIÓN lt 592


R-6.2 3.3.5.4.4 ASFALTO EMULSIONADO TIPO SS-1H PARA RIEGO DE ADHERENCIA lt 138

CAPA DE RODADURA DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 5cm


R-6.5 3.3.5.4.5 m2 395
DE ESPESOR

3.3.6 MISCELÁNEOS
3.3.6.1 INSTALACIONES ELÉCTRICAS
R-31.2 3.3.6.1.1 LUMINARIA ORNAMENTAL 175W TIPO PLATO u 110
R-31.1 3.3.6.1.2 ACOM. RED DE ALUMBRADO m 4,351
3.3.6.2 MURO DE MAMPOSTERÍA DE PIEDRA CON MORTERO
R-5.3 3.3.6.2.1 ENROCADO DE PROTECCION CON MORTERO m3 2,903
R-8.10 3.3.6.2.2 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) EN RÍO m3 286
ENCOFRADO PARA ESTRUCTURAS
R-9.3 3.3.6.2.3 m2 1,143
3.3.6.3 BARANDAS DE PROTECCIÓN
R-8.1 3.3.6.3.1 BASE DE HORMIGON SIMPLE f`c=180kg/cm2 PARA BARANDALES u 2,903
R-40.2 3.3.6.3.2 BARANDAL DE MADERA MORAL FINO m 4,351
3.3.6.4 MARCAS EN LA CAMINERÍA
R-40.8 3.3.6.4.1 PINTURA EN TAPAS DE H.A EN POZOS u 110
3.3.6.5 ARBORIZACIÓN
R-38.2 3.3.6.5.1 ARBUSTO LIRIOPE u 8,703
R-38.7 3.2.6.5.2 CESPED MANI FORRAJERO m2 2,175
3.3.6.6 POZO DE CAIDA
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.5 3.3.6.6.1 D(i)=400 mm EN RÍO m 5

Hoja 67 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-30.46 3.3.6.6.2 TEE PVC D=400 mm u 2


R-30.6 3.3.6.6.3 CODO PVC D=400mm; ø=90 u 2
R-19.5 3.3.6.6.4 CONJUNTO DE ANCLAJE Y SOPORTE DE TUBERIA u 9
3.4 COLECTORES RÍOS POVE Y CODE, L= 17.03 km
3.4.1 COLECTORES "E2a" (Cuenca del Río Pove), L= 8.56 km
3.4.1.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.2 3.4.1.1.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 8,087
R-3.5 3.4.1.1.2 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M EN RÍO m3 6,012
R-3.7 3.4.1.1.3 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M EN RÍO m3 309

R-10.2 3.4.1.1.4 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M EN RÍO m 2,490

R-10.4 3.4.1.1.5 SUMINISTRO,


BOMBEO INSTALACIÓN
DE AGUA Y DESINSTALACIÓN
IGUAL/MAYOR 2" DE ENTIBADO 5< H <9 M EN RÍO m 66

R-40.4 3.4.1.1.6 hora 500


R-2.12 3.4.1.1.7 RASANTEO MANUAL EN ZANJA m2 6,848
R-4.2 3.4.1.1.8 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO m3 4,525

R-4.13 3.4.1.1.9 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN EN RÍO m3 9,615

R-21.5 3.4.1.1.10 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 23,593

3.4.1.2 TUBERÍAS
3.4.1.2.1 TUBERÍAS DE PE
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.1 3.4.1.2.1.1 D(i)=200 mm EN RÍO m 8,235

3.4.1.3 POZOS DE REVISIÓN


3.4.1.3.1 POZOS DE HORMIGÓN
R-3.10 3.4.1.3.1.1 EXCAVACION MANUAL m3 44
R-4.9 3.4.1.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 20
R-8.8 3.4.1.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 7
R-8.5 3.4.1.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 48
R-8.24 3.4.1.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 1
R-40.7 3.4.1.3.1.6 LIMPIEZA DE POZOS u 77
R-19.13 3.4.1.3.1.7 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 24
R-17.1 3.4.1.3.1.8 POZO DE REVISIÓN 0< H<2 M (Di=900mm) u 19
R-17.2 3.4.1.3.1.9 POZO DE REVISIÓN 2< H<4 M (Di=900mm) u 4
R-17.3 3.4.1.3.1.10 POZO DE REVISIÓN 4< H<6 M (Di=900mm) u 1
3.4.1.3.2 POZOS PREFABRICADOS
R-18.1 3.4.1.3.2.1 MANHOLE DE PE H=1.70M u 242
R-18.2 3.4.1.3.2.2 MANHOLE DE PE H=2.20M u 16
R-18.3 3.4.1.3.2.3 MANHOLE DE PE 2.20<H<2.7M u 1
R-18.4 3.4.1.3.2.4 MANHOLE DE PE 2.7<H<3.2M u 1
LOSA DE TAPA H.A F´C=210KG/CM2 PARA POZO DE REVISION D=1.05M E=0.15M
R-8.23 3.4.1.3.2.7 u 260
TAPA H.A D=0.85M PARA POZO DE REVISION
R-8.27 3.4.1.3.2.8 u 260
3.4.2 COLECTORES "D1C, D1E, D1a1-D1a17" (Cuenca del Río Code), L= 8.47 km
3.4.2.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.2 3.4.2.1.1 EXCAVACION DE ZANJAS A MANO EN TIERRA 0< H < 2 M m3 3,683
R-3.5 3.4.2.1.2 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 2< H <5 M EN RÍO m3 15,313
R-3.7 3.4.2.1.3 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA H>5 M EN RÍO m3 2,483

R-10.2 3.4.2.1.4 SUMINISTRO, INSTALACIÓN Y DESINSTALACIÓN DE ENTIBADO 2< H <5 M EN RÍO m 5,748

R-10.4 3.4.2.1.5 SUMINISTRO,


BOMBEO INSTALACIÓN
DE AGUA Y DESINSTALACIÓN
IGUAL/MAYOR 2" DE ENTIBADO 5< H <9 M EN RÍO m 462

R-40.4 3.4.2.1.6 hora 500


R-2.12 3.4.2.1.7 RASANTEO MANUAL EN ZANJA m2 7,221
R-4.2 3.4.2.1.8 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) EN RÍO m3 4,980

R-4.13 3.4.2.1.9 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN EN RÍO m3 16,088

R-21.5 3.4.2.1.10 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 26,255

3.4.2.2 TUBERÍAS
3.4.2.2.1 TUBERÍAS DE PE

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.1 3.4.2.2.1.1 m 4,583
D(i)=200 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.2 3.4.2.2.1.2 m 1,232
D(i)=250 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.3 3.4.2.2.1.3 m 1,759
D(i)=300 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.4 3.4.2.2.1.4 m 227
D(i)=350 mm EN RÍO

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.5 3.4.2.2.1.5 D(i)=400 mm EN RÍO m 359

3.4.2.3 POZOS DE REVISIÓN


3.4.2.3.1 POZOS DE HORMIGÓN
R-3.10 3.4.2.3.1.1 EXCAVACION MANUAL m3 55
R-4.9 3.4.2.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 26
R-8.8 3.4.2.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 9
R-8.5 3.4.2.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 60
R-8.24 3.4.2.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 2
R-40.7 3.4.2.3.1.6 LIMPIEZA DE POZOS u 7
R-19.13 3.4.2.3.1.7 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 30
R-17.1 3.4.2.3.1.8 POZO DE REVISIÓN 0< H<2 M (Di=900mm) u 1
R-17.2 3.4.2.3.1.9 POZO DE REVISIÓN 2< H<4 M (Di=900mm) u 4
R-17.3 3.4.2.3.1.10 POZO DE REVISIÓN 4< H<6 M (Di=900mm) u 19
R-17.4 3.4.2.3.1.11 POZO DE REVISIÓN 6< H<8 M (Di=900mm) u 5
R-17.5 3.4.2.3.1.12 POZO DE REVISIÓN 8< H<10 M (Di=900mm) u 1
3.4.2.3.2 POZOS PREFABRICADOS
R-18.1 3.4.2.3.2.1 MANHOLE DE PE H=1.70M u 64
R-18.2 3.4.2.3.2.2 MANHOLE DE PE H=2.20M u 80
R-18.3 3.4.2.3.2.3 MANHOLE DE PE 2.20<H<2.7M u 67
R-18.4 3.4.2.3.2.4 MANHOLE DE PE 2.7<H<3.2M u 49
R-18.5 3.4.2.3.2.5 MANHOLE DE PE 3.2<H<3.7M u 22
R-18.6 3.4.2.3.2.6 MANHOLE DE PE 3.7<H<4.2M u 21
LOSA DE TAPA H.A F´C=210KG/CM2 PARA POZO DE REVISION D=1.05M E=0.15M
R-8.23 3.4.2.3.2.7 u 303
TAPA H.A D=0.85M PARA POZO DE REVISION
R-8.27 3.4.2.3.2.8 u 303
3.4.2.3.3 POZO DE CAIDA
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.5 3.4.2.3.3.1 D(i)=400 mm EN RÍO m 3

R-30.46 3.4.2.3.3.2 TEE PVC D=400 mm u 2


R-30.6 3.4.2.3.3.3 CODO PVC D=400mm; ø=90 u 2
R-19.5 3.4.2.3.3.4 CONJUNTO DE ANCLAJE Y SOPORTE DE TUBERIA u 6
4 MEJORAMIENTO DE RÍOS
4.1 CUENCA DEL RÍO POVE, ESCOLLERA, L=2.77 km - GAVIÓN L=3.68 km

Hoja 68 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO
DEMOLICIÓN, PREPARACIÓN DEL SITIO
4.1.1
R-2.7 4.1.1.1 DESBROCE, DESBOSQUE Y LIMPIEZA EN RÍO ha 3.22
R-2.14 4.1.1.2 REPLANTEO Y NIVELACION LINEAL km 6.45
TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE
R-21.3 4.1.1.3 m3-km 22,540
500m) EN RÍO
PROTECCIÓN DEL LECHO DEL RÍO
4.1.2
ESCOLLERAS DE PIEDRA SUELTA
4.1.2.1
R-3.1 4.1.2.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 3,321
R-5.5 4.1.2.1.2 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO m3 3,019
R-7.1 4.1.2.1.3 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 3,774
R-19.12 4.1.2.1.4 SUMINISTRO E INSTALACIÓN DE TABLESTACA DE a=801mm, e=6mm m2 435

R-21.5 4.1.2.1.5 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 14,855
PROTECCIÓN DE LADERAS
4.1.3
MUROS DE GAVIÓN
4.1.3.1
R-3.1 4.1.3.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 4,048
R-4.8 4.1.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO m3 13,503
R-7.1 4.1.3.1.3 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 26,597
R-19.8 4.1.3.1.4 MURO DE GAVIONES TRIPLE TORSIÓN (2x1x1) EN RÍO m3 17,342

R-21.5 4.1.3.1.5 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 18,107

4.1.3.2 MUROS DE ESCOLLERAS


R-3.1 4.1.3.2.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 12,076
R-4.14 4.1.3.2.4 RELLENO CON MATERIAL FILTRANTE m3 3,150
R-4.8 4.1.3.2.5 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO m3 7,696
R-5.5 4.1.3.2.2 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO m3 10,501
R-7.1 4.1.3.2.3 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 11,667

R-21.5 4.1.3.2.6 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 54,015
DRENAJES
4.1.4
EMBAULAMIENTO
4.1.4.1
R-3.1 4.1.3.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 4,002
R-4.12 4.1.3.1.2 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 418
R-4.6 4.1.3.1.3 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 3,584
RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.4 4.1.3.1.4 m3 774
CLASE 3) EN RÍO

RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.11 4.1.3.1.5 m3 86
CLASE 3) EN RÍO
R-8.13 4.1.3.1.6 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) EN RÍO m3 696
R-8.8 4.1.3.1.7 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 68
R-19.1 4.1.3.1.8 ACERO DE REFUERZO fy=4200 kg/cm2 kg 78,103
ENCOFRADO PARA ESTRUCTURAS
R-9.3 4.1.3.1.9 m2 2,590
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.1.3.1.10 BOMBEO DE AGUA IGUAL/MAYOR 2" m 616
R-40.4 4.1.3.1.11 hora 100

R-21.5 4.1.3.1.12 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 2,643

4.1.4.2 TUNEL S=2.0 m x 3.0 m; L= 71 m


R-2.16 4.1.4.2.1 REPLANTEO Y NIVELACIÓN TUNEL m 71
R-19.4 4.1.4.2.2 CERCHAS METÁLICAS kg 17,750

EXCAVACIÓN TUNEL A MANO EN TIERRA (INC. DESALOJO HORIZONTAL Y/O


R-3.14 4.1.4.2.3 m3 401
VERTICAL)

EXCAVACIÓN TUNEL A MANO EN CONGLOMERADO (INC. DESALOJO HORIZONTAL


R-3.12 4.1.4.2.4 m3 200
Y/O VERTICAL)

EXCAVACIÓN TUNEL A MANO EN ROCA -COMPRESOR PERFORADOR Y


R-3.13 4.1.4.2.5 EXPLOSIVOS (INC. DESALOJO HORIZONTAL Y/O VERTICAL) m3 67
RASANTEO DE TUNEL A MANO
R-2.11 4.1.4.2.6 m2 192
CONTROL Y DESALOJO DE DERRUMBE POR IMPREVISTO GEOLÓGICO EN TUNEL
R-40.5 4.1.4.2.7 m3 33
BOMBEO DE AGUA IGUAL/MAYOR 2"

R-40.4 4.1.4.2.8 hora 71


JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.1.4.2.9 m 190
POLIETILENO 2 mm
R-40.10 4.1.4.2.10 m2 192
R-5.6 4.1.4.2.11 MATERIAL FILTRANTE EN DRENES EN TUNEL m3 23
R-15.2 4.1.4.2.12 TUBERÍA PARA SUBDRÉN - (PVC PERFORADA, D=110mm) m 72
R-15.1 4.1.4.2.13 TUBERÍA DE DESAGUE PVC DE 50mm x 3m PARA MECHINALES m 36
R-8.25 4.1.4.2.14 SEPARADORES DE MORTERO 1:6 u 710
R-8.7 4.1.4.2.15 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 19
R-8.12 4.1.4.2.16 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 222
R-19.1 4.1.4.2.17 ENCOFRADO/DESENCOFRADO METÁLICO RECTO
ACERO DE REFUERZO fy=4200 kg/cm2 kg 18,342
R-9.5 4.1.4.2.18 m2 284
ENTIBADO CONTINUO PERMANENTE DE TUNEL
R-10.1 4.1.4.2.19 ENCOFRADO/DESENCOFRADO METALICO BOVEDA-ARCO m2 616
R-9.4 4.1.4.2.20 m2 223
R-21.4 4.1.4.2.21 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) m3-km 2,004
R-21.1 4.1.4.2.22 ACARREO MANUAL MATERIAL 100m m3 668
4.1.4.3 TUNEL S=1.5 m x 1.75 m; L= 183 m
R-2.16 4.1.4.3.1 REPLANTEO Y NIVELACIÓN TUNEL m 183
R-19.4 4.1.4.3.2 CERCHAS METÁLICAS kg 11,712

EXCAVACIÓN TUNEL A MANO EN TIERRA (INC. DESALOJO HORIZONTAL Y/O


R-3.14 4.1.4.3.3 m3 564
VERTICAL)

EXCAVACIÓN TUNEL A MANO EN CONGLOMERADO (INC. DESALOJO HORIZONTAL


R-3.12 4.1.4.3.4 m3 282
Y/O VERTICAL)

EXCAVACIÓN TUNEL A MANO EN ROCA -COMPRESOR PERFORADOR Y


R-3.13 4.1.4.3.5 EXPLOSIVOS (INC. DESALOJO HORIZONTAL Y/O VERTICAL) m3 94
RASANTEO DE TUNEL A MANO
R-2.11 4.1.4.3.6 m2 403
CONTROL Y DESALOJO DE DERRUMBE POR IMPREVISTO GEOLÓGICO EN TUNEL
R-40.5 4.1.4.3.7 m3 47
BOMBEO DE AGUA IGUAL/MAYOR 2"

R-40.4 4.1.4.3.8 hora 183


JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.1.4.3.9 m 451
POLIETILENO 2 mm
R-40.10 4.1.4.3.10 m2 406
R-5.6 4.1.4.3.11 MATERIAL FILTRANTE EN DRENES EN TUNEL m3 29
R-15.2 4.1.4.3.12 TUBERÍA PARA SUBDRÉN - (PVC PERFORADA, D=110mm) m 185
R-15.1 4.1.4.3.13 TUBERÍA DE DESAGUE PVC DE 50mm x 3m PARA MECHINALES m 92
R-8.25 4.1.4.3.14 SEPARADORES DE MORTERO 1:6 u 1,830
R-8.7 4.1.4.3.15 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 40
R-8.12 4.1.4.3.16 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 381
R-19.1 4.1.4.3.17 ENCOFRADO/DESENCOFRADO METÁLICO RECTO
ACERO DE REFUERZO fy=4200 kg/cm2 kg 61,305
R-9.5 4.1.4.3.18 m2 366
ENTIBADO CONTINUO PERMANENTE DE TUNEL
R-10.1 4.1.4.3.19 ENCOFRADO/DESENCOFRADO METALICO BOVEDA-ARCO m2 1,146
R-9.4 4.1.4.3.20 m2 432
R-21.4 4.1.4.3.21 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) m3-km 2,822
R-21.1 4.1.4.3.22 ACARREO MANUAL MATERIAL 100m m3 941
4.1.4.4 SOPORTE PARA TUBERIA
R-19.2 4.1.4.3.1 ACERO ESTRUCTURAL A36, INCLUYE MONTAJE kg 4,474
4.2 CUENCA DEL RÍO CODE, ESCOLLERA, L=2.72 km - GAVIÓN L=1.26 km
DEMOLICIÓN, PREPARACIÓN DEL SITIO
4.2.1

Hoja 69 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-2.7 4.2.1.1 DESBROCE, DESBOSQUE Y LIMPIEZA EN RÍO ha 1.99


R-2.14 4.2.1.2 REPLANTEO Y NIVELACION LINEAL km 3.98
TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE
R-21.3 4.2.1.3 m3-km 13,930
500m) EN RÍO
PROTECCIÓN DEL LECHO DEL RÍO
4.2.2
ESCOLLERAS DE PIEDRA SUELTA
4.2.2.1
R-3.1 4.2.2.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 1,026
R-5.5 4.2.2.1.2 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO m3 932
R-7.1 4.2.2.1.3 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 1,166
R-19.12 4.2.2.1.4 SUMINISTRO E INSTALACIÓN DE TABLESTACA DE a=801mm, e=6mm m2 134

R-21.5 4.2.2.1.5 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 3,077
PROTECCIÓN DE LADERAS
4.2.3
MUROS DE GAVIÓN
4.2.3.1
R-3.1 4.2.3.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 1,384
R-4.8 4.2.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO m3 4,591
R-7.1 4.2.3.1.3 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 8,812
R-19.8 4.2.3.1.4 MURO DE GAVIONES TRIPLE TORSIÓN (2x1x1) EN RÍO m3 5,462

R-21.5 4.2.3.1.5 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 4,151
MUROS DE ESCOLLERAS
4.2.3.2
R-3.1 4.2.2.2.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 15,273
R-4.14 4.2.2.2.2 RELLENO CON MATERIAL FILTRANTE m3 3,984
R-4.8 4.2.2.2.3 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO m3 8,919
R-7.1 4.2.2.2.4 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 14,756
R-5.5 4.2.2.2.5 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO m3 13,281

R-21.5 4.2.2.2.6 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 45,818

4.2.4 DRENAJES
EMBAULAMIENTO
4.2.4.1
R-3.1 4.2.4.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 851
R-4.12 4.2.4.1.2 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 75
R-4.6 4.2.4.1.3 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 776
RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.4 4.2.4.1.4 m3 128
CLASE 3) EN RÍO

RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.11 4.2.4.1.5 m3 14
CLASE 3) EN RÍO
R-8.13 4.2.4.1.6 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) EN RÍO m3 157
R-8.8 4.2.4.1.7 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 13
R-19.1 4.2.4.1.8 ACERO DE REFUERZO fy=4200 kg/cm2 kg 19,084
ENCOFRADO PARA ESTRUCTURAS
R-9.3 4.2.4.1.9 m2 571
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.2.4.1.10 BOMBEO DE AGUA IGUAL/MAYOR 2" m 91
R-40.4 4.2.4.1.11 hora 100

R-21.5 4.2.4.1.12 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 467

4.2.4.2 TUNEL S=2.0 m x 3.0 m; L= 40 m


R-2.16 4.2.4.2.1 REPLANTEO Y NIVELACIÓN TUNEL m 40
R-19.4 4.2.4.2.2 CERCHAS METÁLICAS kg 10,000

EXCAVACIÓN TUNEL A MANO EN TIERRA (INC. DESALOJO HORIZONTAL Y/O


R-3.14 4.2.4.2.3 m3 226
VERTICAL)

EXCAVACIÓN TUNEL A MANO EN CONGLOMERADO (INC. DESALOJO HORIZONTAL


R-3.12 4.2.4.2.4 m3 113
Y/O VERTICAL)

EXCAVACIÓN TUNEL A MANO EN ROCA -COMPRESOR PERFORADOR Y


R-3.13 4.2.4.2.5 EXPLOSIVOS (INC. DESALOJO HORIZONTAL Y/O VERTICAL) m3 38
RASANTEO DE TUNEL A MANO
R-2.11 4.2.4.2.6 m2 108
CONTROL Y DESALOJO DE DERRUMBE POR IMPREVISTO GEOLÓGICO EN TUNEL
R-40.5 4.2.4.2.7 m3 19
BOMBEO DE AGUA IGUAL/MAYOR 2"

R-40.4 4.2.4.2.8 hora 40


JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.2.4.2.9 m 107
POLIETILENO 2 mm
R-40.10 4.2.4.2.10 m2 108
R-5.6 4.2.4.2.11 MATERIAL FILTRANTE EN DRENES EN TUNEL m3 13
R-15.2 4.2.4.2.12 TUBERÍA PARA SUBDRÉN - (PVC PERFORADA, D=110mm) m 40
R-15.1 4.2.4.2.13 TUBERÍA DE DESAGUE PVC DE 50mm x 3m PARA MECHINALES m 20
R-8.25 4.2.4.2.14 SEPARADORES DE MORTERO 1:6 u 400
R-8.7 4.2.4.2.15 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 11
R-8.12 4.2.4.2.16 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 125
R-19.1 4.2.4.2.17 ENCOFRADO/DESENCOFRADO METÁLICO RECTO
ACERO DE REFUERZO fy=4200 kg/cm2 kg 10,333
R-9.5 4.2.4.2.18 m2 160
ENTIBADO CONTINUO PERMANENTE DE TUNEL
R-10.1 4.2.4.2.19 ENCOFRADO/DESENCOFRADO METALICO BOVEDA-ARCO m2 347
R-9.4 4.2.4.2.20 m2 126
R-21.4 4.2.4.2.21 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) m3-km 1,129
R-21.1 4.2.4.2.22 ACARREO MANUAL MATERIAL 100m m3 376
4.2.4.3 TUNEL S=1.5 m x 1.75 m; L= 87.5 m

R-2.16 4.2.4.3.1 REPLANTEO Y NIVELACIÓN TUNEL m 87.5


R-19.4 4.2.4.3.2 CERCHAS METÁLICAS kg 5,600
EXCAVACIÓN TUNEL A MANO EN TIERRA (INC. DESALOJO HORIZONTAL Y/O
R-3.14 4.2.4.3.3 VERTICAL) m3 270

EXCAVACIÓN TUNEL A MANO EN CONGLOMERADO (INC. DESALOJO HORIZONTAL


R-3.12 4.2.4.3.4 Y/O VERTICAL) m3 135

EXCAVACIÓN TUNEL A MANO EN ROCA -COMPRESOR PERFORADOR Y


R-3.13 4.2.4.3.5 EXPLOSIVOS (INC. DESALOJO HORIZONTAL Y/O VERTICAL) m3 45

R-2.11 4.2.4.3.6 RASANTEO DE TUNEL A MANO m2 193


CONTROL Y DESALOJO DE DERRUMBE POR IMPREVISTO GEOLÓGICO EN TUNEL
R-40.5 4.2.4.3.7 m3 22
BOMBEO DE AGUA IGUAL/MAYOR 2"

R-40.4 4.2.4.3.8 hora 88


JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.2.4.3.9 m 215
POLIETILENO 2 mm
R-40.10 4.2.4.3.10 m2 194
R-5.6 4.2.4.3.11 MATERIAL FILTRANTE EN DRENES EN TUNEL m3 14
R-15.2 4.2.4.3.12 TUBERÍA PARA SUBDRÉN - (PVC PERFORADA, D=110mm) m 88
R-15.1 4.2.4.3.13 TUBERÍA DE DESAGUE PVC DE 50mm x 3m PARA MECHINALES m 44
R-8.25 4.2.4.3.14 SEPARADORES DE MORTERO 1:6 u 875
R-8.7 4.2.4.3.15 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 19
R-8.12 4.2.4.3.16 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 182
R-19.1 4.2.4.3.17 ENCOFRADO/DESENCOFRADO METÁLICO RECTO
ACERO DE REFUERZO fy=4200 kg/cm2 kg 29,313
R-9.5 4.2.4.3.18 m2 175
ENTIBADO CONTINUO PERMANENTE DE TUNEL
R-10.1 4.2.4.3.19 ENCOFRADO/DESENCOFRADO METALICO BOVEDA-ARCO m2 548
R-9.4 4.2.4.3.20 m2 207
R-21.4 4.2.4.3.21 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) m3-km 1,349
R-21.1 4.2.4.3.22 ACARREO MANUAL MATERIAL 100m m3 450
4.3 CUENCA DEL RÍO CODE - RAMALES, ESCOLLERA, L=0.77 km - GAVIÓN L=0.27 km
DEMOLICIÓN, PREPARACIÓN DEL SITIO
4.3.1
R-2.7 4.3.1.1 DESBROCE, DESBOSQUE Y LIMPIEZA EN RÍO ha 0.52
R-2.14 4.3.1.2 REPLANTEO Y NIVELACION LINEAL km 1.05

Hoja 70 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

TRANSPORTE DEL MATERIAL DE DESBROCE Y DESBOSQUE (TRANSPORTE LIBRE


R-21.3 4.3.1.3 m3-km 3,640
500m) EN RÍO
PROTECCIÓN DEL LECHO DEL RÍO
4.3.2
ESCOLLERAS DE PIEDRA SUELTA
4.3.2.1
R-3.1 4.3.2.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 329
R-5.5 4.3.2.1.2 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO m3 299
R-7.1 4.3.2.1.3 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 374
R-19.12 4.3.2.1.4 SUMINISTRO E INSTALACIÓN DE TABLESTACA DE a=801mm, e=6mm m2 43

R-21.5 4.3.2.1.5 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 987
PROTECCIÓN DE LADERAS
4.3.3
MUROS DE GAVIÓN
4.3.3.1
R-3.1 4.3.3.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 304
R-4.8 4.3.3.1.3 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO m3 974
R-7.1 4.3.3.1.4 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 1,735
R-19.8 4.3.3.1.5 MURO DE GAVIONES TRIPLE TORSIÓN (2x1x1) EN RÍO m3 865

R-21.5 4.3.3.1.2 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 912
MUROS DE ESCOLLERAS
4.3.3.2
R-3.1 4.3.3.2.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 3,120
R-4.14 4.3.3.2.2 RELLENO CON MATERIAL FILTRANTE m3 814
R-4.8 4.3.3.2.3 RELLENO COMPACTADO CON PIEDRA BOLA EN RÍO m3 2,051
R-7.1 4.3.3.2.4 GEOTEXIL NO TEJIDO PARA ESCOLLERAS Y GAVIONES m2 3,014
R-5.5 4.3.3.2.5 ESCOLLERA DE PIEDRA SUELTA - (Diám. >=50 cm) EN RÍO m3 2,713

R-21.5 4.3.3.2.6 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 9,359
DRENAJES
4.3.4
EMBAULAMIENTO
4.3.4.1
R-3.1 4.3.4.1.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 1,519
R-4.12 4.3.4.1.2 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 167
R-4.6 4.3.4.1.3 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 1,352
RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.4 4.3.4.1.4 m3 317
CLASE 3) EN RÍO

RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.11 4.3.4.1.5 m3 35
CLASE 3) EN RÍO
R-8.13 4.3.4.1.6 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) EN RÍO m3 261
R-8.8 4.3.4.1.7 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) EN RÍO m3 26
R-19.1 4.3.4.1.8 ACERO DE REFUERZO fy=4200 kg/cm2 kg 28,741
ENCOFRADO PARA ESTRUCTURAS
R-9.3 4.3.4.1.9 m2 977
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 4.3.4.1.10 BOMBEO DE AGUA IGUAL/MAYOR 2" m 263
R-40.4 4.3.4.1.11 hora 250

R-21.5 4.3.4.1.12 TRANSPORTE DE MATERIAL DE EXCAVACIÓN (TRANSPORTE LIBRE 500m) EN RÍO m3-km 1,070

5 PLANTA DE TRATAMIENTO
5.1 OBRA CIVIL
5.1.1 PREPARACIÓN DEL SITIO
R-2.5 5.1.1.1 DESBROCE Y LIMPIEZA DEL TERRENO m2 58,638
R-2.13 5.1.1.2 REPLANTEO Y NIVELACION m2 58,638
R-2.9 5.1.1.3 LETRERO INFORMATIVO DE OBRA (3.60x2.40)m u 1
5.1.2 MOVIMIENTO DE TIERRA
R-3.8 5.1.2.1 EXCAVACION EN SUELO m3 226,734
R-3.10 5.1.2.2 EXCAVACION MANUAL m3 372

R-4.5 5.1.2.3 RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (LASTRE) m3 111,331

RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.3 5.1.2.4 m3 6,045
CLASE 3)

RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.10 5.1.2.5 m3 318
CLASE 3)
R-2.2 5.1.2.6 CONFORMACIÓN Y COMPACTACIÓN DE LA SUBRASANTE m2 8,919

R-4.15 5.1.2.7 ESCOMBRERA (disposición final y tratamiento paisajístico de zonas de depósito) m3 261,052

5.1.3 IDT / ENTRADA A TANQUE DE DISTRIBUCIÓN


5.1.3.1 ESTRUCTURA
R-8.7 5.1.3.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 4
R-8.14 5.1.3.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 144
R-19.1 5.1.3.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 8,784
5.1.3.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.3.2.1 m2 419
R-9.2 5.1.3.2.2 ENCOFRADO DE APOYO espacio/m3 153
ANDAMIOS
R-9.1 5.1.3.2.3 m2 24
5.1.3.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.3.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 16
R-26.13 5.1.3.3.2 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A u 1
R-26.18 5.1.3.3.3 TAPA DE ACERO INOXIDABLE (600x1200)mm - TIPO A u 2
5.1.3.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.3.4.1 m 24
R-20.2 5.1.3.4.2 IMPERMEABLE EPÓXICO m2 439
R-20.1 5.1.3.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 165
R-20.3 5.1.3.4.4 IMPERMEABLE THOROSEAL m2 233
5.1.4 GRT / DESARENADOR Y TANQUE DE CRIBADO
5.1.4.1 ESTRUCTURA
R-8.7 5.1.4.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 22
R-8.14 5.1.4.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 453
R-19.1 5.1.4.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 41,031
5.1.4.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.4.2.1 m2 1,251
R-9.2 5.1.4.2.2 ENCOFRADO DE APOYO espacio/m3 465
ANDAMIOS
R-9.1 5.1.4.2.3 m2 166
5.1.4.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.4.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 18
R-26.20 5.1.4.3.2 TAPA DE ACERO INOXIDABLE (800x1800)mm - TIPO A u 1
R-26.19 5.1.4.3.3 TAPA DE ACERO INOXIDABLE (800x1500)mm - TIPO A u 4
5.1.4.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.4.4.1 m 84
R-20.2 5.1.4.4.2 IMPERMEABLE EPÓXICO m2 1,282
R-20.1 5.1.4.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 442
R-20.3 5.1.4.4.4 IMPERMEABLE THOROSEAL m2 626
5.1.5 PST / TANQUE DE CLARIFICADOR PRIMARIO
5.1.5.1 ESTRUCTURA
R-8.7 5.1.5.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 114
R-8.14 5.1.5.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 1,691
R-19.1 5.1.5.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 188,162
5.1.5.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.5.2.1 m2 4,649
R-9.2 5.1.5.2.2 ENCOFRADO DE APOYO espacio/m3 470

Hoja 71 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO
ANDAMIOS
R-9.1 5.1.5.2.3 m2 111
5.1.5.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.5.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 64
R-26.7 5.1.5.3.2 SUMINISTRO E INSTALACIÓN DE PASAMANOS, STS m 321
R-26.13 5.1.5.3.3 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A u 9
R-26.14 5.1.5.3.4 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B u 3
R-26.15 5.1.5.3.5 TAPA DE ACERO INOXIDABLE (1000x1000)mm - TIPO A u 5
R-26.16 5.1.5.3.6 TAPA DE ACERO INOXIDABLE (1500x1500)mm - TIPO B u 1
R-27.3 5.1.5.3.7 SUMINISTRO E INSTALACIÓN DE SEPARADOR, T=4mm m 164
R-27.4 5.1.5.3.8 SUMINISTRO E INSTALACIÓN RANURA-V,STS, T=4mm m 356
5.1.5.4 CUBIERTAS
R-27.2 5.1.5.4.1 SUMINISTRO E INSTALACIÓN DE LA CUBIERTA DEL DOMO u 1
5.1.5.5 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.5.5.1 m 351
R-20.2 5.1.5.5.2 IMPERMEABLE EPÓXICO m2 6,803
R-20.1 5.1.5.5.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 1,279
R-20.3 5.1.5.5.4 IMPERMEABLE THOROSEAL m2 4,200
5.1.6 BRT / TANQUE BIORREACTOR
5.1.6.1 ESTRUCTURA
R-8.7 5.1.6.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 245
R-8.14 5.1.6.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 3,297
R-19.1 5.1.6.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 685,297
R-8.26 5.1.6.1.4 SUMINISTRO E INSTALACIÓN DE PILOTE PHC u 396
5.1.6.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.6.2.1 m2 7,036
R-9.2 5.1.6.2.2 ENCOFRADO DE APOYO espacio/m3 10,759
ANDAMIOS
R-9.1 5.1.6.2.3 m2 1,956
5.1.6.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.6.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 37
R-26.7 5.1.6.3.2 SUMINISTRO E INSTALACIÓN DE PASAMANOS, STS m 678
R-19.10 5.1.6.3.3 REJILLA DE ACERO (800x800)mm u 4
R-26.13 5.1.6.3.4 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A u 9
5.1.6.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.6.4.1 m 369
R-20.2 5.1.6.4.2 IMPERMEABLE EPÓXICO m2 10,078
R-20.1 5.1.6.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 1,397
R-20.3 5.1.6.4.4 IMPERMEABLE THOROSEAL m2 6,270
5.1.7 SST / TANQUE DE CLARIFICADOR SECUNDARIO
5.1.7.1 ESTRUCTURA
R-8.7 5.1.7.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 130
R-8.14 5.1.7.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 1,841
R-19.1 5.1.7.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 288,929
R-8.26 5.1.7.1.4 SUMINISTRO E INSTALACIÓN DE PILOTE PHC u 203
5.1.7.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.7.2.1 m2 4,622
R-9.2 5.1.7.2.2 ENCOFRADO DE APOYO espacio/m3 688
ANDAMIOS
R-9.1 5.1.7.2.3 m2 148
5.1.7.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.7.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 57
R-26.7 5.1.7.3.2 SUMINISTRO E INSTALACIÓN DE PASAMANOS, STS m 374
R-26.13 5.1.7.3.3 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A u 8
R-26.14 5.1.7.3.4 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B u 2
R-26.15 5.1.7.3.5 TAPA DE ACERO INOXIDABLE (1000x1000)mm - TIPO A u 6
R-26.16 5.1.7.3.6 TAPA DE ACERO INOXIDABLE (1500x1500)mm - TIPO B u 1
R-27.3 5.1.7.3.7 SUMINISTRO E INSTALACIÓN DE SEPARADOR, T=4mm m 181
R-27.4 5.1.7.3.8 SUMINISTRO E INSTALACIÓN RANURA-V,STS, T=4mm m 382
5.1.7.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.7.4.1 m 359
R-20.2 5.1.7.4.2 IMPERMEABLE EPÓXICO m2 6,855
R-20.1 5.1.7.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 1,448
R-20.3 5.1.7.4.4 IMPERMEABLE THOROSEAL m2 3,911
5.1.8 UV / INSTALACIÓN DE DESINFECCIÓN UV
5.1.8.1 ESTRUCTURA
R-8.7 5.1.8.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 6
R-8.14 5.1.8.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 38
R-19.1 5.1.8.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 7,559
5.1.8.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.8.2.1 m2 180
R-9.2 5.1.8.2.2 ENCOFRADO DE APOYO espacio/m3 31
ANDAMIOS
R-9.1 5.1.8.2.3 m2 18
5.1.8.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.8.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 8
R-26.13 5.1.8.3.2 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A u 1
R-26.11 5.1.8.3.3 TAPA DE ACERO INOXIDABLE (800x1000)mm - TIPO A u 2
R-26.17 5.1.8.3.4 TAPA DE ACERO INOXIDABLE (3300x1000)mm - TIPO A u 2
5.1.8.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.8.4.1 m 30
R-20.2 5.1.8.4.2 IMPERMEABLE EPÓXICO m2 201
R-20.1 5.1.8.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 63
R-20.3 5.1.8.4.4 IMPERMEABLE THOROSEAL m2 105
5.1.9 TWR / INSTALACIÓN DE REUTILIZACIÓN DE AGUAS TRATADAS
5.1.9.1 ESTRUCTURA
R-8.7 5.1.9.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 13
R-8.14 5.1.9.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 90
R-19.1 5.1.9.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 6,590
5.1.9.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.9.2.1 m2 235
R-9.2 5.1.9.2.2 ENCOFRADO DE APOYO espacio/m3 90
ANDAMIOS
R-9.1 5.1.9.2.3 m2 25
5.1.9.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.9.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 7
R-26.11 5.1.9.3.2 TAPA DE ACERO INOXIDABLE (800x1000)mm - TIPO A u 1
R-26.9 5.1.9.3.3 TAPA DE ACERO INOXIDABLE (1200x1200)mm - TIPO B u 1
5.1.9.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.9.4.1 m 28
R-20.2 5.1.9.4.2 IMPERMEABLE EPÓXICO m2 383
R-20.1 5.1.9.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 130
R-20.3 5.1.9.4.4 IMPERMEABLE THOROSEAL m2 188
5.1.10 FMC / CAMARA DE CAUDALIMETRO
5.1.10.1 ESTRUCTURA
R-8.7 5.1.10.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 6

Hoja 72 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-8.14 5.1.10.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 61


R-19.1 5.1.10.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 5,126
5.1.10.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.10.2.1 m2 189
R-9.2 5.1.10.2.2 ENCOFRADO DE APOYO espacio/m3 30
ANDAMIOS
R-9.1 5.1.10.2.3 m2 13
5.1.10.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.10.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 6
R-26.14 5.1.10.3.2 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B u 3
5.1.10.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.10.4.1 m 31
R-20.2 5.1.10.4.2 IMPERMEABLE EPÓXICO m2 254
R-20.1 5.1.10.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 133
R-20.3 5.1.10.4.4 IMPERMEABLE THOROSEAL m2 80
5.1.11 CHLO / INSTALACIÓN DE DESINFECCIÓN POR CLORACIÓN
5.1.11.1 ESTRUCTURA
R-8.7 5.1.11.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 20
R-8.14 5.1.11.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 240
R-19.1 5.1.11.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 50,892
5.1.11.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.11.2.1 m2 997
R-9.2 5.1.11.2.2 ENCOFRADO DE APOYO espacio/m3 450
ANDAMIOS
R-9.1 5.1.11.2.3 m2 113
5.1.11.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.11.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 15
R-26.7 5.1.11.3.2 SUMINISTRO E INSTALACIÓN DE PASAMANOS, STS m 37
R-26.13 5.1.11.3.3 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO A u 3
R-26.12 5.1.11.3.4 TAPA DE ACERO INOXIDABLE (800x3500)mm - TIPO A u 1
5.1.11.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.11.4.1 m 82
R-20.2 5.1.11.4.2 IMPERMEABLE EPÓXICO m2 1,045
R-20.1 5.1.11.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 190
R-20.3 5.1.11.4.4 IMPERMEABLE THOROSEAL m2 705
5.1.12 SDF / INSTALACIÓN DE DESHIDRATACIÓN DE LODOS
5.1.12.1 ESTRUCTURA
R-8.7 5.1.12.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 51
R-8.14 5.1.12.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 947
R-19.1 5.1.12.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 99,974
5.1.12.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.12.2.1 m2 1,805
R-9.2 5.1.12.2.2 ENCOFRADO DE APOYO espacio/m3 1,923
ANDAMIOS
R-9.1 5.1.12.2.3 m2 401
5.1.12.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.7 5.1.12.3.1 SUMINISTRO E INSTALACIÓN DE PASAMANOS, STS m 10
R-26.10 5.1.12.3.2 TAPA DE ACERO INOXIDABLE (1500x1500)mm - TIPO A u 1
5.1.12.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.12.4.1 m 132
R-20.2 5.1.12.4.2 IMPERMEABLE EPÓXICO m2 2,735
R-20.1 5.1.12.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 550
R-20.3 5.1.12.4.4 IMPERMEABLE THOROSEAL m2 1,656
5.1.13 DIM / POZO DE DESCARGA
5.1.13.1 ESTRUCTURA
R-8.7 5.1.13.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 6
R-8.14 5.1.13.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 21
R-19.1 5.1.13.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,832
5.1.13.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.13.2.1 m2 89
R-9.2 5.1.13.2.2 ENCOFRADO DE APOYO espacio/m3 10
ANDAMIOS
R-9.1 5.1.13.2.3 m2 4
5.1.13.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.13.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 6
R-26.14 5.1.13.3.2 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B u 2
5.1.13.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.13.4.1 m 10
R-20.2 5.1.13.4.2 IMPERMEABLE EPÓXICO m2 44
R-20.1 5.1.13.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 85
R-20.3 5.1.13.4.4 IMPERMEABLE THOROSEAL m2 27
5.1.14 PM - CAMARA DE LA BOMBA DE POZO
5.1.14.1 ESTRUCTURA
R-8.7 5.1.14.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 2
R-8.14 5.1.14.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 21
R-19.1 5.1.14.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 1,419
5.1.14.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.14.2.1 m2 89
R-9.2 5.1.14.2.2 ENCOFRADO DE APOYO espacio/m3 10
ANDAMIOS
R-9.1 5.1.14.2.3 m2 4
5.1.14.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.14.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 2
R-26.14 5.1.14.3.2 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B u 1
5.1.14.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.14.4.1 m 10
R-20.2 5.1.14.4.2 IMPERMEABLE EPÓXICO m2 44
R-20.1 5.1.14.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 85
R-20.3 5.1.14.4.4 IMPERMEABLE THOROSEAL m2 27
5.1.15 DPDC - CAMARA DE DESODORIZACION
5.1.15.1 ESTRUCTURA
R-8.7 5.1.15.1.1 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 8
R-8.14 5.1.15.1.2 HORMIGÓN ESTRUCTURAL - (f´c=350 kg/cm2) m3 81
R-19.1 5.1.15.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 kg 5,568
5.1.15.2 ENCOFRADOS
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.15.2.1 m2 252
R-9.2 5.1.15.2.2 ENCOFRADO DE APOYO espacio/m3 40
ANDAMIOS
R-9.1 5.1.15.2.3 m2 17
5.1.15.3 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.6 5.1.15.3.1 SUMINISTRO E INSTALACIÓN DE ESCALERA (TIPO-A), STS m 8
R-26.14 5.1.15.3.2 TAPA DE ACERO INOXIDABLE (800x800)mm - TIPO B u 4
5.1.15.4 IMPERMEABILIZANTES
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.15.4.1 m 41
R-20.2 5.1.15.4.2 IMPERMEABLE EPÓXICO m2 338
R-20.1 5.1.15.4.3 IMPERMEABLE DE GOMA ASFÁLTICA m2 177
R-20.3 5.1.15.4.4 IMPERMEABLE THOROSEAL m2 107

Hoja 73 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

5.1.16 TRABAJOS DE PAVIMENTO


5.1.16.1 PAVIMENTO ASFÁLTICO
R-7.2 5.1.16.1.1 GEOTEXTIL TEJIDO PARA ESTABILIZACIÓN DE LA SUBRASANTE m2 8,920
R-5.7 5.1.16.1.2 MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO m3 8,920
R-5.1 5.1.16.1.3 BASE CLASE 1A m3 1,784
CAPA DE BASE DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 10cm DE
R-6.4 5.1.16.1.4 m2 8,920
ESPESOR
R-6.3 5.1.16.1.5 ASFALTO MC PARA IMPRIMACIÓN lt 13,379
R-6.2 5.1.16.1.6 ASFALTO EMULSIONADO TIPO SS-1H PARA RIEGO DE ADHERENCIA lt 3,122
CAPA DE RODADURA DE HORMIGÓN ASFÁLTICO MEZCLADO EN PLANTA DE 5cm
R-6.5 5.1.16.1.7 m2 8,920
DE ESPESOR
5.1.16.2 PAVIMENTO DE HORMIGÓN
R-7.2 5.1.16.2.1 GEOTEXTIL TEJIDO PARA ESTABILIZACIÓN DE LA SUBRASANTE m2 847
R-5.7 5.1.16.2.2 MEJORAMIENTO DE LA SUBRASANTE CON SUELO SELECCIONADO m3 847
R-5.1 5.1.16.2.3 BASE CLASE 1A m3 169
R-8.12 5.1.16.2.4 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 127
R-19.6 5.1.16.2.5 MALLA ELECTROSOLDADA 5 mm a 10 cm (MALLA R-196). m2 847
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.16.2.6 m2 85
5.1.16.3 CUNETAS VIALES
R-8.15 5.1.16.3.1 HORMIGÓN SIMPLE 180 kg/cm2 m3 513
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.16.3.2 m2 1,889
5.1.17 SISTEMA DE ALCANTARILLADO
5.1.17.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.3 5.1.17.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 1,716
R-2.12 5.1.17.1.2 RASANTEO MANUAL EN ZANJA m2 696
R-4.1 5.1.17.1.3 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 576
R-4.12 5.1.17.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 1,116
5.1.17.2 TUBERÍAS
5.1.17.2.1 TUBERÍAS DE PE (POLIETILENO)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.10 5.1.17.2.1.1 m 396
D(i)=200 mm
5.1.17.2.2 TUBERÍAS DCIP (HIERRO DUCTIL)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.1 5.1.17.2.2.1 D(i)=80 mm m 175

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO


R-13.4 5.1.17.2.2.2 m 342
D(i)=200 mm
5.1.17.3 POZOS DE REVISIÓN
5.1.17.3.1 POZOS DE HORMIGÓN
R-3.10 5.1.17.3.1.1 EXCAVACION MANUAL m3 24
R-4.9 5.1.17.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 11
R-8.7 5.1.17.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 4
R-8.5 5.1.17.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 26
R-8.24 5.1.17.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 1
R-19.13 5.1.17.3.1.6 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 13
R-17.1 5.1.17.3.1.7 POZO DE REVISIÓN 0< H<2 M (Di=900mm) u 13
5.1.18 SISTEMA DE DRENAJE
5.1.18.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.3 5.1.18.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 3,676
R-2.12 5.1.18.1.2 RASANTEO MANUAL EN ZANJA m2 1,414
R-4.1 5.1.18.1.3 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 1,344
R-4.12 5.1.18.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 2,209
5.1.18.2 TUBERÍAS
5.1.18.2.1 TUBERÍAS DE PE (POLIETILENO)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.11 5.1.18.2.1.1 D(i)=250 mm m 631

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.12 5.1.18.2.1.2 D(i)=300 mm m 534

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.13 5.1.18.2.1.3 D(i)=400 mm m 127

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.14 5.1.18.2.1.4 D(i)=450 mm m 96

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO


R-12.15 5.1.18.2.1.5 D(i)=600 mm m 80

5.1.18.3 POZOS DE REVISIÓN


5.1.18.3.1 POZOS DE HORMIGÓN
R-3.10 5.1.18.3.1.1 EXCAVACION MANUAL m3 40
R-4.9 5.1.18.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 18
R-8.7 5.1.18.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 6
R-8.5 5.1.18.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 32
R-8.24 5.1.18.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 1
R-19.13 5.1.18.3.1.6 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 16
R-17.6 5.1.18.3.1.7 POZO DE REVISIÓN 0< H<2 M (Di=1200mm) u 16
5.1.18.4 SUMIDERO-ENTRADA DE AGUAS LLUVIAS (30 unidades)
R-8.16 5.1.18.4.1 HORMIGÓN SIMPLE 210 kg/cm2 m3 15
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.18.4.2 m2 174
R-19.11 5.1.18.4.3 REJILLA TRANSVERSAL DE H.D (580 x 830)mm u 30
5.1.18.5 ALCANTARILLAS DE CAJÓN
R-3.1 5.1.18.5.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 2,597
R-4.12 5.1.18.5.2 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 318
R-4.6 5.1.18.5.3 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 1,271
RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.10 5.1.18.5.4 m3 99
CLASE 3)

RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE


R-4.3 5.1.18.5.5 m3 395
CLASE 3)
R-8.12 5.1.18.5.6 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 524
R-8.7 5.1.18.5.7 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 51
R-19.1 5.1.18.5.8 ACERO DE REFUERZO fy=4200 kg/cm2 kg 57,645
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.18.5.9 m2 1,956
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.18.5.10 m 528
5.1.19 INSTALACIONES DE PLOMERIA
5.1.19.1 INSTALACIONES PARA CAUDAL DE REUTILIZACIÓN
5.1.19.1.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.3 5.1.19.1.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 1,016
R-2.12 5.1.19.1.1.2 RASANTEO MANUAL EN ZANJA m2 323
R-4.1 5.1.19.1.1.3 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 242
R-4.12 5.1.19.1.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 769
5.1.19.1.2 TUBERÍAS
5.1.19.1.2.1 TUBERÍAS DE STS (ACERO INOXIDABLE)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO
R-14.1 5.1.19.1.2.1.1 D(i)=32 mm m 232

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO


R-14.2 5.1.19.1.2.1.2 D(i)=50 mm m 38

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO


R-14.3 5.1.19.1.2.1.3 D(i)=80 mm m 36

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO


R-14.4 5.1.19.1.2.1.4 D(i)=100 mm m 19

Hoja 74 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO
R-14.5 5.1.19.1.2.1.5 D(i)=150 mm m 182

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO


R-14.6 5.1.19.1.2.1.6 D(i)=200 mm m 34

5.1.19.2 INSTALACIONES - CAUDAL DE LODOS


5.1.19.2.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.3 5.1.19.2.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 1,004
R-2.12 5.1.19.2.1.2 RASANTEO MANUAL EN ZANJA m2 478
R-4.1 5.1.19.2.1.3 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 415
R-4.12 5.1.19.2.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 564
5.1.19.2.2 TUBERÍAS
5.1.19.2.2.1 TUBERÍAS DE DCIP (HIERRO DUCTIL)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.4 5.1.19.2.2.1.1 m 418
D(i)=200 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.5 5.1.19.2.2.1.2 D(i)=300 mm m 153

5.1.19.3 INSTALACIONES - CAUDAL DE AGUAS RESIDUALES


5.1.19.3.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.3 5.1.19.3.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 2,262
R-2.12 5.1.19.3.1.2 RASANTEO MANUAL EN ZANJA m2 1,256
R-4.1 5.1.19.3.1.3 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 1,629
R-4.12 5.1.19.3.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 294
5.1.19.3.2 TUBERÍAS
5.1.19.3.2.1 TUBERÍAS DE GRP (FIBRA DE VIDRIO REFORZADO)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA GRP PARA ALCANTARILLADO
R-11.2 5.1.19.3.2.1.1 m 10
D(i)=1650 mm
5.1.19.3.2.2 TUBERÍAS DE PE (POLIETILENO)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA PE PARA ALCANTARILLADO
R-12.16 5.1.19.3.2.2.1 m 160
D(i)=1000 mm
5.1.19.3.2.3 TUBERÍAS DE DCIP (HIERRO DUCTIL)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.6 5.1.19.3.2.3.1 m 65
D(i)=400 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.7 5.1.19.3.2.3.2 D(i)=500 mm m 230

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO


R-13.8 5.1.19.3.2.3.3 m 7
D(i)=600 mm
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO
R-13.9 5.1.19.3.2.3.4 D(i)=800 mm m 114

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA DCIP PARA ALCANTARILLADO


R-13.10 5.1.19.3.2.3.5 D(i)=1000 mm m 103

5.1.19.3.3 POZOS DE REVISIÓN


5.1.19.3.3.1 POZOS DE HORMIGÓN
R-3.10 5.1.19.3.3.1.1 EXCAVACION MANUAL m3 19
R-4.9 5.1.19.3.3.1.2 RELLENO COMPACTADO CON PIEDRA BOLA EN POZOS m3 9
R-8.7 5.1.19.3.3.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 3
R-8.5 5.1.19.3.3.1.4 EMPATE A POZO REVISION MORTERO 1:3 u 12
R-8.24 5.1.19.3.3.1.5 MORTERO 1:4 PARA FONDO DE POZOS m3 1
R-19.13 5.1.19.3.3.1.6 TAPA DE HD D=0.60m PARA POZOS DE REVISION u 6
R-17.10 5.1.19.3.3.1.7 POZO DE REVISIÓN 0< H<2 M (Di=1500mm) u 6
5.1.19.3.4 ALCANTARILLAS DE CAJÓN
R-3.1 5.1.19.3.4.1 EXCAVACION A MAQUINA EN EL LECHO DEL RIO. m3 4,389
R-4.12 5.1.19.3.4.2 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 470
R-4.6 5.1.19.3.4.3 RELLENO COMPACTADO A MÁQUINA CON MATERIAL DE EXCAVACIÓN m3 1,880
R-4.10 5.1.19.3.4.4 RELLENO COMPACTADO MANUAL - MATERIAL DE MEJORAMIENTO (SUBBASE CLASE m3 166
RELLENO COMPACTADO A MÁQUINA - MATERIAL DE MEJORAMIENTO (SUBBASE
R-4.3 5.1.19.3.4.5 m3 661
CLASE 3)
R-8.12 5.1.19.3.4.6 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 809
R-8.7 5.1.19.3.4.7 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 88
R-19.1 5.1.19.3.4.8 ACERO DE REFUERZO fy=4200 kg/cm2 kg 93,128
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.1.19.3.4.9 m2 3,191
JUNTAS IMPERMEABLES PVC 22 CM
R-20.4 5.1.19.3.4.10 m 848
5.1.20 SUMINISTRO DE AGUA POTABLE
5.1.20.1 EXCAVACIÓN DE ZANJAS Y RELLENOS
R-3.3 5.1.20.1.1 EXCAVACIÓN DE ZANJAS A MAQUINA EN TIERRA 0< H <2 M m3 625
R-2.12 5.1.20.1.2 RASANTEO MANUAL EN ZANJA m2 263
R-4.1 5.1.20.1.3 RELLENO COMPACTADO - MATERIAL GRANULAR FINO(ARENA) m3 178
R-4.12 5.1.20.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 447
5.1.20.2 TUBERÍAS
5.1.20.2.1 TUBERÍAS DE STS (ACERO INOXIDABLE)
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO
R-14.1 5.1.20.2.1.1 D(i)=32 mm m 363

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO


R-14.2 5.1.20.2.1.2 D(i)=50 mm m 76

5.1.20.3 POZOS PARA ABASTECIMIENTO DE AGUA


R-40.15 5.1.20.3.1 BARRENADO DE POZO PARA ABASTECIMIENTO DE AGUA u 50
SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO
R-14.2 5.1.20.3.2 m 50
D(i)=50 mm

SUMINISTRO, INSTALACIÓN Y PRUEBA DE TUBERÍA STS PARA ALCANTARILLADO


R-14.4 5.1.20.3.3 m 50
D(i)=100 mm
R-40.13 5.1.20.3.4 BOMBA DE AGUA DE 2HP u 1
R-40.12 5.1.20.3.5 BOMBA DE AGUA DE 3HP u 1
5.1.21 TRABAJOS MISCELANEOS
5.1.21.1 MARCAS EN EL PAVIMENTO - SEÑALIZACIÓN HORIZONTAL
MARCAS DE PAVIMENTO - (franja de pintura amarilla, ancho = 15.0 cm / homigón
R-39.3 5.1.21.1.1 m 2,332
asfáltico)

MARCAS DE PAVIMENTO - (franja de pintura blanca, ancho = 15.0 cm / homigón


R-39.4 5.1.21.1.2 m 1,015
asfáltico)

R-39.5 5.1.21.1.3 MARCAS SOBRESALIDAS DE PAVIMENTO - (tachas reflectivas / bidireccionales) u 233

5.1.21.2 PORTON DE ENTRADA


R-40.14 5.1.21.1.2.1 CASETA PARA PORTICO DE ENTRADA u 2

R-26.8 5.1.21.1.2.2 SUMINISTRO E INSTALACIÓN DE PORTON DE ENTRADA (W=550xH=12000mm, STS) u 1

5.2 OBRA ARQUITECTONICA


5.2.1 EDIFICIO ADMINISTRATIVO
5.2.1.1 ESTRUCTURA
R-19.1 5.2.1.1.1 ACERO DE REFUERZO fy=4200 kg/cm2 kg 133,174
R-19.2 5.2.1.1.2 ACERO ESTRUCTURAL A36, INCLUYE MONTAJE kg 2,378
R-8.7 5.2.1.1.3 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 35
R-8.9 5.2.1.1.4 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) m3 96
R-8.11 5.2.1.1.5 HORMIGÓN ESTRUCTURAL - (f´c=240 kg/cm2) m3 767
R-8.12 5.2.1.1.6 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 1,010
R-9.6 5.2.1.1.7 ENCOFRADO-DESENCOFRADO PARA LOSA m2 1,338
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.2.1.1.8 m2 1,302
R-8.20 5.2.1.1.9 HORMIGON SIMPLE EN ESCALERA DE f´c= 280Kg/cm2 INCL ENCOFRADO m3 3
R-8.18 5.2.1.1.10 HORMIGON SIMPLE EN CONTRAPISO f´c=240Kg/cm2. E = 10 CM m2 660
R-8.22 5.2.1.1.11 HORMIGÓN SIMPLE EN RAMPA f´c=210 Kg/cm2. INCL. ENCOFRADO m3 5
R-8.6 5.2.1.1.12 HORMIGON CICLOPEO 180Kg/cm2 ( 60% HS+40%PIEDRA) m3 18

Hoja 75 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-8.21 5.2.1.1.13 HORMIGON SIMPLE EN PLINTOS f´c=210 Kg/cm2. INCL. ENCOFRADO m3 7


R-8.4 5.2.1.1.14 DINTEL H.S 180Kg/cm2 m 81
5.2.1.2 ALBAÑILERIA
R-22.2 5.2.1.2.1 BORDILLO TINETA BAÑO m 10
R-22.8 5.2.1.2.2 MESON DE COCINA CON RECUBRIMIENTO DE GRANITO m 26
R-22.4 5.2.1.2.3 MAMPOSTERIA DE BLOQUE E=10 CM CON MORTERO 1:6 m2 108
R-22.5 5.2.1.2.4 MAMPOSTERIA DE BLOQUE E=15 CM CON MORTERO 1:4 m2 1,213
5.2.1.3 ENLUCIDOS Y MASILLADOS
R-23.2 5.2.1.3.1 ENLUCIDO DE FILOS Y FAJAS m 686
R-23.4 5.2.1.3.2 ENLUCIDO VERTICAL MORTERO 1:4 m2 3,066
R-23.3 5.2.1.3.3 ENLUCIDO HORIZONTAL MORTERO 1:4 m2 132
R-23.1 5.2.1.3.4 ENLUCIDO CON IMPERMEABILIZANTE MORTERO 1:3 m2 52
R-24.5 5.2.1.3.5 ALISADO DE PISOS PARA RAMPA, (MORTERO 1:3, E = 1.5 CM) m2 26
5.2.1.4 RECUBRIMIENTOS EN PISOS
R-24.9 5.2.1.4.1 MASILLADO Y ALISADO DE PISOS m2 1,219
R-24.10 5.2.1.4.2 PORCELANATO EN PISOS m2 900
R-24.7 5.2.1.4.3 CERAMICA PARA PISOS m2 109
R-24.6 5.2.1.4.4 BARREDERAS DE PORCELANATO e=10cm m 582
R-24.1 5.2.1.4.5 ADOQUIN TIPO ECOLOGICO, 60*40*10cm m2 227
R-24.12 5.2.1.4.6 PISO FLOTANTE, SUMINISTRO Y COLOCACIÓN m2 40
R-24.11 5.2.1.4.7 HORMIGON PULIDO EN PISOS m2 187
5.2.1.5 RECUBRIMIENTOS EN PAREDES Y TECHO
R-25.1 5.2.1.5.1 CERAMICA EN PAREDES m2 281
R-25.4 5.2.1.5.2 EMPASTADO INTERIOR. m2 2,752
R-25.3 5.2.1.5.3 EMPASTADO EXTERIOR. m2 505
R-25.8 5.2.1.5.4 PINTURA INTERIOR m2 2,752
R-25.7 5.2.1.5.5 PINTURA EXTERIOR m2 505
R-25.2 5.2.1.5.6 CIELO RASO FALSO GYPSUM m2 1,026
R-25.11 5.2.1.5.7 REVESTIMIENTO DE PIEDRA PARA EXTERIORES m2 31
R-25.9 5.2.1.5.8 REVESTIMIENTO CON ALUCOBOND m2 267
5.2.1.6 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.22 5.2.1.6.1 VENTANA V1, EDIFICIO ADMINISTRATIVO u 1
R-26.23 5.2.1.6.2 VENTANA V2, EDIFICIO ADMINISTRATIVO u 1
R-26.24 5.2.1.6.3 VENTANA V3, EDIFICIO ADMINISTRATIVO u 16
R-26.25 5.2.1.6.4 VENTANA V4, EDIFICIO ADMINISTRATIVO u 1
R-26.26 5.2.1.6.5 VENTANA V5, EDIFICIO ADMINISTRATIVO u 1
R-26.27 5.2.1.6.6 VENTANA V6, EDIFICIO ADMINISTRATIVO u 1
R-26.28 5.2.1.6.7 VENTANA V7, EDIFICIO ADMINISTRATIVO u 1
R-26.29 5.2.1.6.8 VENTANA V8, EDIFICIO ADMINISTRATIVO u 1
R-26.30 5.2.1.6.9 VENTANA V9, EDIFICIO ADMINISTRATIVO u 1
R-26.31 5.2.1.6.10 VENTANA V10, EDIFICIO ADMINISTRATIVO u 1
R-26.32 5.2.1.6.11 VENTANA V11, EDIFICIO ADMINISTRATIVO u 1
R-26.33 5.2.1.6.12 VENTANA V12, EDIFICIO ADMINISTRATIVO u 2
R-26.34 5.2.1.6.13 VENTANA V13, EDIFICIO ADMINISTRATIVO u 1
R-26.35 5.2.1.6.14 VENTANA V14, EDIFICIO ADMINISTRATIVO u 1
R-26.36 5.2.1.6.15 VENTANA V15, EDIFICIO ADMINISTRATIVO u 1
R-26.37 5.2.1.6.16 PUERTA P1, EDIFICIO ADMINISTRATIVO u 2
R-26.38 5.2.1.6.17 PUERTA P2, EDIFICIO ADMINISTRATIVO u 1
R-26.39 5.2.1.6.18 PUERTA P3, EDIFICIO ADMINISTRATIVO u 9
R-26.40 5.2.1.6.19 PUERTA P4, EDIFICIO ADMINISTRATIVO u 1
R-26.41 5.2.1.6.20 PUERTA P5, EDIFICIO ADMINISTRATIVO u 8
R-26.42 5.2.1.6.21 PUERTA P6, EDIFICIO ADMINISTRATIVO u 4
R-26.43 5.2.1.6.22 PUERTA P7, EDIFICIO ADMINISTRATIVO u 1
R-26.44 5.2.1.6.23 PUERTA P8, EDIFICIO ADMINISTRATIVO u 1
R-26.45 5.2.1.6.24 PUERTA P10, EDIFICIO ADMINISTRATIVO u 2
R-26.46 5.2.1.6.25 PUERTA P11, EDIFICIO ADMINISTRATIVO u 2
R-26.47 5.2.1.6.26 PUERTA P12, EDIFICIO ADMINISTRATIVO u 1
R-26.48 5.2.1.6.27 PUERTA P13, EDIFICIO ADMINISTRATIVO m2 6
R-26.49 5.2.1.6.28 PUERTA P14, EDIFICIO ADMINISTRATIVO u 1
R-26.50 5.2.1.6.29 PUERTA P15, EDIFICIO ADMINISTRATIVO u 1
R-26.51 5.2.1.6.30 PUERTA P16, EDIFICIO ADMINISTRATIVO u 1
R-26.52 5.2.1.6.31 PUERTA P17, EDIFICIO ADMINISTRATIVO u 1
R-26.53 5.2.1.6.32 PUERTA P18, EDIFICIO ADMINISTRATIVO u 1
R-26.54 5.2.1.6.33 PUERTA P19, EDIFICIO ADMINISTRATIVO u 20
R-26.55 5.2.1.6.34 PUERTA P20, EDIFICIO ADMINISTRATIVO u 1
R-26.56 5.2.1.6.35 PUERTA P21, EDIFICIO ADMINISTRATIVO u 3
R-26.57 5.2.1.6.36 PUERTA P22, EDIFICIO ADMINISTRATIVO u 1
R-26.58 5.2.1.6.37 PUERTA P23, EDIFICIO ADMINISTRATIVO u 1
R-26.59 5.2.1.6.38 PUERTA P24, EDIFICIO ADMINISTRATIVO u 1
R-26.60 5.2.1.6.39 PUERTA P25, EDIFICIO ADMINISTRATIVO u 1
R-26.61 5.2.1.6.40 PUERTA P26, EDIFICIO ADMINISTRATIVO u 1
R-26.2 5.2.1.6.41 MAMPARA DE ALUMINIO Y VIDRIO m2 207

R-26.4 5.2.1.6.42 SUMINISTRO E INSTALACIÓN DE DIVISIONES DE BAÑO EN ACERO INOXIDABLE m2 50

SUMINISTRO E INSTALACIÓN DE DIVISIONES PARA URINARIO EN ACERO


R-26.5 5.2.1.6.43 u 6
INOXIDABLE
R-26.3 5.2.1.6.44 PASAMANO PASANTE EN ACERO INOXIDABLE AISI A304 m 58
R-22.7 5.2.1.6.45 MESON DE ACERO INOXIDABLE m2 4
5.2.1.7 CUBIERTA
R-27.1 5.2.1.7.1 SUMINISTRO E INSTALACIÓN DE CUBIERTA DE POLICARBONATO m2 35
R-25.6 5.2.1.7.2 MASILLADO Y ALISADO DE LOSA DE CUBIERTA m2 678
R-25.5 5.2.1.7.3 IMPERMEABILIZANTE ACRILICO PARA CUBIERTAS m2 678
5.2.1.8 MOBILIARIOS
R-28.14 5.2.1.8.1 SUMINISTRO DE MOBILIARIO PARA COMEDOR u 9
R-28.15 5.2.1.8.2 SUMINISTRO DE SELF-SERVICE u 1
SUMINISTRO E INSTALACION DE COCINA DE INDUCCION EMPOTRABLE 5
R-29.4 5.2.1.8.3 u 1
INDUCTORES
R-29.3 5.2.1.8.4 SUMINISTRO E INSTALACIÓN CUARTO DE REFRIGERACIÓN u 1
R-28.1 5.2.1.8.5 MUEBLES DE COCINA m 11
R-28.12 5.2.1.8.6 SUMINISTRO DE LOCKERS u 1
R-28.5 5.2.1.8.7 SUMINISTRO DE BANCA u 1
R-28.7 5.2.1.8.8 SUMINISTRO DE COUNTER 2.00 X 0.60 X 1.25 M u 1
R-28.8 5.2.1.8.9 SUMINISTRO DE ESCRITORIO DE OFICINA u 1
R-28.10 5.2.1.8.10 SUMINISTRO DE ESCRITORIO TIPO L PARA OFICINAS u 20
R-28.4 5.2.1.8.11 SILLON GIRATORIO DE OFICINA u 1
R-28.9 5.2.1.8.12 SUMINISTRO DE ESCRITORIO SENCILLOS DE OFICINA u 3
R-28.2 5.2.1.8.13 SILLAS EJECUTIVAS GIRATORIAS u 24
R-28.13 5.2.1.8.14 SUMINISTRO DE MESA PARA REUNIONES u 2
R-28.3 5.2.1.8.15 SILLAS PARA VISITA u 24
R-28.11 5.2.1.8.16 SUMINISTRO DE JUEGO DE SALA u 1
R-28.6 5.2.1.8.17 SUMINISTRO DE CAMA u 2
5.2.1.9 EQUIPOS

Hoja 76 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-29.1 5.2.1.9.1 EQUIPOS DE OFICINA (COMPUTADORES) u 24


R-29.5 5.2.1.9.2 SUMINISTRO E INSTALACION DE TV DE 42" u 2
R-29.2 5.2.1.9.3 SUMINISTRO DE PROYECTOR u 2
5.2.1.10 OBRAS EXTERIORES
R-8.17 5.2.1.10.1 HORMIGON SIMPLE EN CONTRAPISO f´c=180Kg/cm2. E = 6 CM m2 306
R-24.9 5.2.1.10.2 MASILLADO Y ALISADO DE PISOS m2 306
R-8.3 5.2.1.10.3 CONCRETO ESTAMPADO m2 160
R-24.2 5.2.1.10.4 ADOQUIN TIPO ESPAÑOL, 30*30*8 CM u 835
R-24.3 5.2.1.10.5 ADOQUIN TIPO ESPAÑOL, 30*60*8 CM m2 275
R-24.4 5.2.1.10.6 ADOQUIN TIPO ZARAGOZA, 18*23-18*8cm m2 655
R-24.1 5.2.1.10.7 ADOQUIN TIPO ECOLOGICO, 60*40*10cm m2 320
R-22.3 5.2.1.10.8 BORDILLOS LIVIANOS SECCION CURVA 8*25*100cm m 340
BORDILLO PERDIDO DE H.S. 0.10*0.23 f`c=180 kg/cm2
R-22.1 5.2.1.10.9 m 160
R-40.11 5.2.1.10.10 TOPES PARA VEHÍCULOS u 24
R-23.2 5.2.1.10.11 ENLUCIDO DE FILOS Y FAJAS m 560
R-23.4 5.2.1.10.12 ENLUCIDO VERTICAL MORTERO 1:4 m2 406
R-25.3 5.2.1.10.13 EMPASTADO EXTERIOR. m2 406
R-39.7 5.2.1.10.14 PINTURA DE CAUCHO IMPERMEABILIZANTE PARA BORDILLOS m2 100
R-39.8 5.2.1.10.15 PINTURA SEÑALIZACIÓN PARQUEADEROS m 85
R-25.7 5.2.1.10.16 PINTURA EXTERIOR m2 406
R-25.10 5.2.1.10.17 REVESTIMIENTO DE GRANITO EN MONUMENTO m2 13
R-40.3 5.2.1.10.18 OBELISCO u 1
R-40.1 5.2.1.10.19 ASTAS Y BASE DE HORMIGON PARA BANDERAS u 1
R-26.1 5.2.1.10.20 CERRAMIENTO METALICO CON TUBO GALVANIZADO DE 2" H=2.4 m 208
5.2.1.11 INSTALACIONES DE AGUA FRIA
R-15.16 5.2.1.11.1 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=2" m 37
R-15.12 5.2.1.11.2 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1 1/2" m 13
R-15.13 5.2.1.11.3 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1 1/4" m 31
R-15.14 5.2.1.11.4 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1" m 8
R-15.17 5.2.1.11.5 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=3/4" m 34
R-15.15 5.2.1.11.6 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1/2" m 8
R-30.44 5.2.1.11.7 TEE PP ROSCABLE D=2" u 9
R-30.41 5.2.1.11.8 TEE PP ROSCABLE D=1 1/2" u 3
R-30.42 5.2.1.11.9 TEE PP ROSCABLE D=1 1/4" u 16
R-30.43 5.2.1.11.10 TEE PP ROSCABLE D=1" u 1
R-30.45 5.2.1.11.11 TEE PP ROSCABLE D=3/4" u 14
R-30.4 5.2.1.11.12 CODO PP ROSCABLE D=2" x 90º u 5
R-30.1 5.2.1.11.13 CODO PP ROSCABLE D=1 1/2" x 90º u 4
R-30.2 5.2.1.11.14 CODO PP ROSCABLE D=1" x 90º u 5
R-30.3 5.2.1.11.15 CODO PP ROSCABLE D=1/2" x 90º u 3
R-30.5 5.2.1.11.16 CODO PP ROSCABLE D=3/4" x 90º u 25
R-30.27 5.2.1.11.17 REDUCTOR PP ROSCABLE D=2" A 1" u 4
R-30.25 5.2.1.11.18 REDUCTOR PP ROSCABLE D=2" A 1 1/2" u 1
R-30.26 5.2.1.11.19 REDUCTOR PP ROSCABLE D=2" A 1 1/4" u 4
R-30.28 5.2.1.11.20 REDUCTOR PP ROSCABLE D=2" A 3/4" u 2
R-30.22 5.2.1.11.21 REDUCTOR PP ROSCABLE D=1 1/2" A 1 1/4" u 3
R-30.23 5.2.1.11.22 REDUCTOR PP ROSCABLE D=1 1/2" A 1" u 1
R-30.24 5.2.1.11.23 REDUCTOR PP ROSCABLE D=1" A 3/4" u 6
R-30.29 5.2.1.11.24 REDUCTOR PP ROSCABLE D=3/4" A 1/2" u 23
R-30.50 5.2.1.11.25 VÁLVULA CHECK u 3
R-30.53 5.2.1.11.26 VÁLVULA DE CONTROL D=2" u 2
R-30.51 5.2.1.11.27 VÁLVULA DE CONTROL D=1 1/4" u 8
R-30.52 5.2.1.11.28 VÁLVULA DE CONTROL D=1/2" u 16
5.2.1.12 INSTALACIONES DE AGUA CALIENTE
R-15.6 5.2.1.12.1 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=2" m 18
R-15.4 5.2.1.12.2 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=1 1/2" m 12
R-15.3 5.2.1.12.3 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=1 " m 10
R-15.7 5.2.1.12.4 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=3/4" m 40
R-15.5 5.2.1.12.5 TUBERÍA PP ROSCABLE PARA AGUA CALIENTE D=1/2" m 41
R-30.44 5.2.1.12.6 TEE PP ROSCABLE D=2" u 5
R-30.43 5.2.1.12.7 TEE PP ROSCABLE D=1" u 5
R-30.45 5.2.1.12.8 TEE PP ROSCABLE D=3/4" u 13
R-30.4 5.2.1.12.9 CODO PP ROSCABLE D=2" x 90º u 3
R-30.1 5.2.1.12.10 CODO PP ROSCABLE D=1 1/2" x 90º u 3
R-30.2 5.2.1.12.11 CODO PP ROSCABLE D=1" x 90º u 3
R-30.3 5.2.1.12.12 CODO PP ROSCABLE D=1/2" x 90º u 23
R-30.5 5.2.1.12.13 CODO PP ROSCABLE D=3/4" x 90º u 26
R-30.27 5.2.1.12.14 REDUCTOR PP ROSCABLE D=2" A 1" u 4
R-30.25 5.2.1.12.15 REDUCTOR PP ROSCABLE D=2" A 1 1/2" u 1
R-30.23 5.2.1.12.16 REDUCTOR PP ROSCABLE D=1 1/2" A 1" u 2
R-30.24 5.2.1.12.17 REDUCTOR PP ROSCABLE D=1" A 3/4" u 7
R-30.29 5.2.1.12.18 REDUCTOR PP ROSCABLE D=3/4" A 1/2" u 23
R-30.52 5.2.1.12.19 VÁLVULA DE CONTROL D=1/2" u 15
R-30.47 5.2.1.12.20 TERMOCALENTADOR (ELECTRICO) CAP. 50 LITROS u 2
5.2.1.13 INSTALACIONES SANITARIAS - AGUAS SERVIDAS
R-8.2 5.2.1.13.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 7
R-15.8 5.2.1.13.2 TUBERÍA PVC DE DESAGUE D=110mm m 70
R-15.11 5.2.1.13.3 TUBERÍA PVC DE DESAGUE D=75mm m 34
R-15.10 5.2.1.13.4 TUBERÍA PVC DE DESAGUE D=50mm m 28
R-15.9 5.2.1.13.5 TUBERÍA PVC DE DESAGUE D=160mm m 8
R-30.55 5.2.1.13.6 YEE PVC DE DESAGUE D=50mm u 10
R-30.56 5.2.1.13.7 YEE PVC DE DESAGUE D=75mm u 9
R-30.54 5.2.1.13.8 YEE PVC DE DESAGUE D=110mm u 8
R-30.48 5.2.1.13.9 UNIÓN PVC DE DESAGUE D=110mm u 8
R-30.31 5.2.1.13.10 REDUCTOR PVC DE DESAGUE D=110mm a 75mm u 10
R-30.30 5.2.1.13.11 REDUCTOR PVC DE DESAGUE D=110mm a 50mm u 1
R-30.32 5.2.1.13.12 REDUCTOR PVC DE DESAGUE D=75mm a 50mm u 7
R-30.8 5.2.1.13.13 CODO PVC DE DESAGUE D=110mm x 90º u 13
R-30.7 5.2.1.13.14 CODO PVC DE DESAGUE D=110mm x 45º u 6
R-30.11 5.2.1.13.15 CODO PVC DE DESAGUE D=75mm x 45º u 4
R-30.9 5.2.1.13.16 CODO PVC DE DESAGUE D=50mm x 45º u 3
R-30.12 5.2.1.13.17 CODO PVC DE DESAGUE D=75mm x 90º u 24
R-30.10 5.2.1.13.18 CODO PVC DE DESAGUE D=50mm x 90º u 26
R-30.39 5.2.1.13.19 SIFON PVC DE PISO D=75mm u 12
R-30.38 5.2.1.13.20 SIFON PVC DE PISO D=50mm u 8
R-30.35 5.2.1.13.21 REJILLA METÁLICA DE PISO D=75mm u 12
R-30.34 5.2.1.13.22 REJILLA METÁLICA DE PISO D=50mm u 8
5.2.1.14 INSTALACIONES SANITARIAS - AGUAS LLUVIAS
R-8.2 5.2.1.14.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 19
R-15.8 5.2.1.14.2 TUBERÍA PVC DE DESAGUE D=110mm m 242
R-30.54 5.2.1.14.3 YEE PVC DE DESAGUE D=110mm u 7

Hoja 77 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-30.8 5.2.1.14.4 CODO PVC DE DESAGUE D=110mm x 90º u 4


R-30.7 5.2.1.14.5 CODO PVC DE DESAGUE D=110mm x 45º u 21
R-15.9 5.2.1.14.6 TUBERÍA PVC DE DESAGUE D=160mm m 46
R-30.37 5.2.1.14.7 SIFON PVC DE PISO D=110mm u 40
R-30.40 5.2.1.14.8 SUMIDERO METÁLICO DE PISO TIPO T D=160-100mm u 11
R-30.33 5.2.1.14.9 REJILLA METÁLICA DE PISO D=110mm u 12
5.2.1.15 APARATOS SANITARIOS
INODORO BLANCO CON FLUXOMETRO
R-30.17 5.2.1.15.1 u 10
R-30.49 5.2.1.15.2 URINARIO BLANCO CON FLUXOMETRO u 8
INODORO BLANCO PARA DISCAPACITADOS CON FLUXOMETRO. INCL. ACCESORIOS.
R-30.18 5.2.1.15.3 u 2
R-30.19 5.2.1.15.4 INODORO TANQUE BAJO INCL. ACCESORIOS u 1
R-30.16 5.2.1.15.5 FREGADERO ACERO INOXIDABLE DOS POZOS INCL. ACCESORIOS u 2
R-30.15 5.2.1.15.6 DUCHA BIMANDO u 8
R-30.20 5.2.1.15.7 LAVAMANOS EMPOTRADO BLANCO u 11
R-30.21 5.2.1.15.8 LAVAMANOS PARA DISCAPACITADOS BLANCO u 2
R-30.14 5.2.1.15.9 DISPENSADOR PARA PAPEL HIGIENICO u 7
R-30.13 5.2.1.15.10 DISPENSADOR DE JABON DE ACERO INOXIDABLE 800ML u 17
R-30.36 5.2.1.15.11 SECADOR MANOS 120V BL 1850W u 6
R-26.21 5.2.1.15.12 TAPA DE TOL GALV. 2.8 mm MARCO ANG. 25*3 mm m2 1
5.2.1.16 PAISAJISMO
R-38.13 5.2.1.16.1 DURANTA u 688
R-38.8 5.2.1.16.2 CINTA u 208
R-38.10 5.2.1.16.3 CROTO MONALIZA u 266
R-38.4 5.2.1.16.4 BAMBÚ ENANO u 8
R-38.14 5.2.1.16.5 ESCANCEL u 439
R-38.25 5.2.1.16.6 PALMA AZUL DE 1.5 M DE ALTO u 2
R-38.29 5.2.1.16.7 PALMA ROJA DE 3 M DE ALTO u 4
R-38.26 5.2.1.16.8 PALMA BOTELLA ENANA DE 1.20 M DE ALTO u 1
R-38.27 5.2.1.16.9 PALMA BOTELLA GIGANTE DE 2.5 M DE ALTO u 1
R-38.28 5.2.1.16.10 PALMA CICA DE 1.20 M DE ALTO u 4
R-38.1 5.2.1.16.11 ALMENDRO DE 1.20 M DE ALTO u 3
R-38.31 5.2.1.16.12 PINO VELA DE 1.40 M DE ALTO u 15
R-38.9 5.2.1.16.13 CITRICOS INJERTOS DE 1.50 M DE ALTO (MANDARINA, NARANJA, LIMÓN) u 6
R-38.16 5.2.1.16.14 FICUS BLANCO DE 2.75 M DE ALTO u 3
R-38.21 5.2.1.16.15 MANGO ROJO DE EXPORTACIÓN DE 2.5 M DE ALTO u 2
R-38.30 5.2.1.16.16 PASTO SAN AGUSTIN m2 850
5.2.1.17 CERRAMIENTO VIVO
R-38.6 5.2.1.17.1 CEDRO (Cedrela odorata) u 11
R-38.24 5.2.1.17.2 MORAL FINO (Chlorophora tinctoria) u 11
R-38.17 5.2.1.17.3 GUAYACAN AMARILO (Handroanthus chrysanthus) u 11
R-38.18 5.2.1.17.4 GUAYACAN ROSADO (Tabebuia rosea) u 11
R-38.5 5.2.1.17.5 CAUCHO DE MONTAÑA (hevea brasiliensis) u 11
R-38.23 5.2.1.17.6 MORAL BOBO (Claricia racemosa) u 11
R-38.20 5.2.1.17.7 LAUREL (Cordia alliodora ) u 11
R-38.15 5.2.1.17.8 FERNAN SÁNCHEZ (Triplaris cumingiana) u 11
R-38.22 5.2.1.17.9 MARAÑÓN (Syzygium malaccense) u 11
R-38.19 5.2.1.17.10 JIHUA (nectandra hihua) u 11
R-38.11 5.2.1.17.11 CUCARDA (Hibiscus) u 490
R-38.32 5.2.1.17.12 YERBA LUISA (Aloysia citrodora) u 158
R-38.12 5.2.1.17.13 DAMA DE NOCHE (Cestrum nocturnum) u 25
R-38.30 5.2.1.17.14 PASTO SAN AGUSTIN m2 9,384
5.2.2 EDIFICIO MULTIPROPOSITO
5.2.2.1 ESTRUCTURA
R-19.1 5.2.2.1.1 ACERO DE REFUERZO fy=4200 kg/cm2 kg 52,609
R-19.2 5.2.2.1.2 ACERO ESTRUCTURAL A36, INCLUYE MONTAJE kg 120,100
PLACA COLABORANTE DE ACERO GALVANIZADO e=0.65mm PARA LOSA,
R-19.9 5.2.2.1.3 m2 958
SUMINISTRO Y COLOCACIÓN
R-8.7 5.2.2.1.4 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 18
R-8.9 5.2.2.1.5 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) m3 84
R-8.11 5.2.2.1.6 HORMIGÓN ESTRUCTURAL - (f´c=240 kg/cm2) m3 351
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.2.2.1.7 m2 690
R-8.19 5.2.2.1.8 HORMIGON SIMPLE EN CONTRAPISO f´c=240Kg/cm2. E = 20 CM m2 858
R-8.4 5.2.2.1.9 DINTEL H.S 180Kg/cm2 m 80
5.2.2.2 ALBAÑILERIA
R-22.5 5.2.2.2.1 MAMPOSTERIA DE BLOQUE E=15 CM CON MORTERO 1:4 m2 1,518
5.2.2.3 ENLUCIDOS Y MASILLADOS
R-23.2 5.2.2.3.1 ENLUCIDO DE FILOS Y FAJAS m 418
R-23.4 5.2.2.3.2 ENLUCIDO VERTICAL MORTERO 1:4 m2 1,060
5.2.2.4 RECUBRIMIENTOS EN PISOS
R-24.9 5.2.2.4.1 MASILLADO Y ALISADO DE PISOS m2 540
R-24.12 5.2.2.4.2 PISO FLOTANTE, SUMINISTRO Y COLOCACIÓN m2 277
5.2.2.5 RECUBRIMIENTOS EN PAREDES Y TECHO
R-25.9 5.2.2.5.1 REVESTIMIENTO CON ALUCOBOND m2 99
R-25.3 5.2.2.5.2 EMPASTADO EXTERIOR. m2 1,060
R-25.7 5.2.2.5.3 PINTURA EXTERIOR m2 1,060
5.2.2.6 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.62 5.2.2.6.1 VENTANA V1, EDIFICIO MULTIPROPOSITO u 30
R-26.63 5.2.2.6.2 PUERTA P1, EDIFICIO MULTIPROPOSITO u 8
R-26.64 5.2.2.6.3 PUERTA P2, EDIFICIO MULTIPROPOSITO u 2
R-26.65 5.2.2.6.4 PUERTA P3, EDIFICIO MULTIPROPOSITO m2 11
R-26.66 5.2.2.6.5 PUERTA P4, EDIFICIO MULTIPROPOSITO m2 12
R-26.67 5.2.2.6.6 PUERTA P5, EDIFICIO MULTIPROPOSITO u 1
R-26.68 5.2.2.6.7 PUERTA P6, EDIFICIO MULTIPROPOSITO m2 8
R-26.69 5.2.2.6.8 PUERTA P7, EDIFICIO MULTIPROPOSITO m2 14
5.2.2.7 CUBIERTA
R-25.6 5.2.2.7.1 MASILLADO Y ALISADO DE LOSA DE CUBIERTA m2 955
R-25.5 5.2.2.7.2 IMPERMEABILIZANTE ACRILICO PARA CUBIERTAS m2 955
5.2.2.8 INSTALACIONES SANITARIAS - AGUAS LLUVIAS
R-8.2 5.2.2.8.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 9
R-15.8 5.2.2.8.2 TUBERÍA PVC DE DESAGUE D=110mm m 240
R-30.54 5.2.2.8.3 YEE PVC DE DESAGUE D=110mm u 10
R-30.8 5.2.2.8.4 CODO PVC DE DESAGUE D=110mm x 90º u 10
R-30.7 5.2.2.8.5 CODO PVC DE DESAGUE D=110mm x 45º u 30
R-15.9 5.2.2.8.6 TUBERÍA PVC DE DESAGUE D=160mm m 55
R-30.37 5.2.2.8.7 SIFON PVC DE PISO D=110mm u 20
R-30.40 5.2.2.8.8 SUMIDERO METÁLICO DE PISO TIPO T D=160-100mm u 20
5.2.3 EDIFICIO DESHIDRATACIÓN DE LODOS
5.2.3.1 ESTRUCTURA
R-19.2 5.2.3.1.1 ACERO ESTRUCTURAL A36, INCLUYE MONTAJE kg 52,660
PLACA COLABORANTE DE ACERO GALVANIZADO e=0.65mm PARA LOSA,
R-19.9 5.2.3.1.2 m2 480
SUMINISTRO Y COLOCACIÓN
R-8.9 5.2.3.1.3 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) m3 5

Hoja 78 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-8.12 5.2.3.1.4 HORMIGÓN ESTRUCTURAL - (f´c=280 kg/cm2) m3 42


R-8.4 5.2.3.1.5 DINTEL H.S 180Kg/cm2 m 58
5.2.3.2 ALBAÑILERIA
R-22.6 5.2.3.2.1 MAMPOSTERIA DE BLOQUE E=20 CM CON MORTERO 1:4 m2 836
R-22.5 5.2.3.2.2 MAMPOSTERIA DE BLOQUE E=15 CM CON MORTERO 1:4 m2 14
R-22.8 5.2.3.2.3 MESON DE COCINA CON RECUBRIMIENTO DE GRANITO m 1
5.2.3.3 ENLUCIDOS Y MASILLADOS
R-23.2 5.2.3.3.1 ENLUCIDO DE FILOS Y FAJAS m 349
R-23.4 5.2.3.3.2 ENLUCIDO VERTICAL MORTERO 1:4 m2 88
R-24.5 5.2.3.3.3 ALISADO DE PISOS PARA RAMPA, (MORTERO 1:3, E = 1.5 CM) m2 41
5.2.3.4 RECUBRIMIENTOS EN PISOS
R-24.9 5.2.3.4.1 MASILLADO Y ALISADO DE PISOS m2 429
R-24.10 5.2.3.4.2 PORCELANATO EN PISOS m2 14
R-24.7 5.2.3.4.3 CERAMICA PARA PISOS m2 2
R-24.6 5.2.3.4.4 BARREDERAS DE PORCELANATO e=10cm m 15
R-24.8 5.2.3.4.5 MASILLADO Y ALISADO DE GRADAS m2 7
R-24.12 5.2.3.4.6 PISO FLOTANTE, SUMINISTRO Y COLOCACIÓN m2 43
R-24.5 5.2.3.4.7 ALISADO DE PISOS PARA RAMPA, (MORTERO 1:3, E = 1.5 CM) m2 41
5.2.3.5 RECUBRIMIENTOS EN PAREDES Y TECHO
R-25.2 5.2.3.5.1 CIELO RASO FALSO GYPSUM m2 16
R-25.1 5.2.3.5.2 CERAMICA EN PAREDES m2 6
R-25.4 5.2.3.5.3 EMPASTADO INTERIOR. m2 82
R-25.8 5.2.3.5.4 PINTURA INTERIOR m2 82
5.2.3.6 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.70 5.2.3.6.1 VENTANA V1, EDIFICIO DESHIDRATACIÓN DE LODOS u 17
R-26.71 5.2.3.6.2 VENTANA V2, EDIFICIO DESHIDRATACIÓN DE LODOS u 1
R-26.72 5.2.3.6.3 VENTANA V3, EDIFICIO DESHIDRATACIÓN DE LODOS u 1
R-26.73 5.2.3.6.4 VENTANA V4, EDIFICIO DESHIDRATACIÓN DE LODOS u 1
R-26.74 5.2.3.6.5 VENTANA V5, EDIFICIO DESHIDRATACIÓN DE LODOS u 1
R-26.75 5.2.3.6.6 PUERTA P1, EDIFICIO DESHIDRATACIÓN DE LODOS u 3
R-26.76 5.2.3.6.7 PUERTA P2, EDIFICIO DESHIDRATACIÓN DE LODOS u 1
R-26.77 5.2.3.6.8 PUERTA P3, EDIFICIO DESHIDRATACIÓN DE LODOS m2 72
R-26.78 5.2.3.6.9 PUERTA P4, EDIFICIO DESHIDRATACIÓN DE LODOS m2 16
R-26.3 5.2.3.6.10 PASAMANO PASANTE EN ACERO INOXIDABLE AISI A304 m 4
5.2.3.7 CUBIERTA
R-25.6 5.2.3.7.1 MASILLADO Y ALISADO DE LOSA DE CUBIERTA m2 487
R-25.5 5.2.3.7.2 IMPERMEABILIZANTE ACRILICO PARA CUBIERTAS m2 487
5.2.3.8 MOBILIARIOS
R-28.8 5.2.3.8.1 SUMINISTRO DE ESCRITORIO DE OFICINA u 1
R-28.2 5.2.3.8.2 SILLAS EJECUTIVAS GIRATORIAS u 1
5.2.3.9 EQUIPOS
R-29.1 5.2.3.9.1 EQUIPOS DE OFICINA (COMPUTADORES) u 1
5.2.3.10 INSTALACIONES DE AGUA FRIA
R-15.17 5.2.3.10.1 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=3/4" m 6
R-15.15 5.2.3.10.2 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1/2" m 3
R-30.45 5.2.3.10.3 TEE PP ROSCABLE D=3/4" u 1
R-30.3 5.2.3.10.4 CODO PP ROSCABLE D=1/2" x 90º u 3
R-30.5 5.2.3.10.5 CODO PP ROSCABLE D=3/4" x 90º u 2
R-30.29 5.2.3.10.6 REDUCTOR PP ROSCABLE D=3/4" A 1/2" u 1
R-30.52 5.2.3.10.7 VÁLVULA DE CONTROL D=1/2" u 2
5.2.3.11 INSTALACIONES SANITARIAS - AGUAS SERVIDAS
R-8.2 5.2.3.11.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 1
R-15.8 5.2.3.11.2 TUBERÍA PVC DE DESAGUE D=110mm m 5
R-15.11 5.2.3.11.3 TUBERÍA PVC DE DESAGUE D=75mm m 1
R-15.10 5.2.3.11.4 TUBERÍA PVC DE DESAGUE D=50mm m 2
R-30.31 5.2.3.11.5 REDUCTOR PVC DE DESAGUE D=110mm a 75mm u 1
R-30.32 5.2.3.11.6 REDUCTOR PVC DE DESAGUE D=75mm a 50mm u 1
R-30.8 5.2.3.11.7 CODO PVC DE DESAGUE D=110mm x 90º u 2
R-30.10 5.2.3.11.8 CODO PVC DE DESAGUE D=50mm x 90º u 2
R-30.39 5.2.3.11.9 SIFON PVC DE PISO D=75mm u 1
R-30.38 5.2.3.11.10 SIFON PVC DE PISO D=50mm u 1
5.2.3.12 INSTALACIONES SANITARIAS - AGUAS LLUVIAS
R-8.2 5.2.3.12.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 10
R-15.8 5.2.3.12.2 TUBERÍA PVC DE DESAGUE D=110mm m 209
R-30.54 5.2.3.12.3 YEE PVC DE DESAGUE D=110mm u 8
R-30.8 5.2.3.12.4 CODO PVC DE DESAGUE D=110mm x 90º u 8
R-30.7 5.2.3.12.5 CODO PVC DE DESAGUE D=110mm x 45º u 17
R-15.9 5.2.3.12.6 TUBERÍA PVC DE DESAGUE D=160mm m 18
R-30.37 5.2.3.12.7 SIFON PVC DE PISO D=110mm u 21
R-30.40 5.2.3.12.8 SUMIDERO METÁLICO DE PISO TIPO T D=160-100mm u 16
R-30.33 5.2.3.12.9 REJILLA METÁLICA DE PISO D=110mm u 5
5.2.3.13 APARATOS SANITARIOS
R-30.19 5.2.3.13.1 INODORO TANQUE BAJO INCL. ACCESORIOS u 1
R-30.20 5.2.3.13.2 LAVAMANOS EMPOTRADO BLANCO u 1
R-30.14 5.2.3.13.3 DISPENSADOR PARA PAPEL HIGIENICO u 1
R-30.13 5.2.3.13.4 DISPENSADOR DE JABON DE ACERO INOXIDABLE 800ML u 1
5.2.4 OFICINA DE SEGURIDAD
5.2.4.1 ESTRUCTURA
R-19.1 5.2.4.1.1 ACERO DE REFUERZO fy=4200 kg/cm2 kg 236
R-19.2 5.2.4.1.2 ACERO ESTRUCTURAL A36, INCLUYE MONTAJE kg 1,532
PLACA COLABORANTE DE ACERO GALVANIZADO e=0.65mm PARA LOSA,
R-19.9 5.2.4.1.3 m2 53
SUMINISTRO Y COLOCACIÓN
R-8.7 5.2.4.1.4 HORMIGÓN EN REPLANTILLO - (f´c=180 kg/cm2) m3 1
R-8.9 5.2.4.1.5 HORMIGÓN ESTRUCTURAL - (f´c=210 kg/cm2) m3 5
R-8.11 5.2.4.1.6 HORMIGÓN ESTRUCTURAL - (f´c=240 kg/cm2) m3 10
R-8.17 5.2.4.1.7 HORMIGON SIMPLE EN CONTRAPISO f´c=180Kg/cm2. E = 6 CM m2 30
ENCOFRADO PARA ESTRUCTURAS
R-9.3 5.2.4.1.8 m2 71
R-8.4 5.2.4.1.9 DINTEL H.S 180Kg/cm2 m 18
5.2.4.2 ALBAÑILERIA
R-22.8 5.2.4.2.1 MESON DE COCINA CON RECUBRIMIENTO DE GRANITO m 6
R-22.6 5.2.4.2.2 MAMPOSTERIA DE BLOQUE E=20 CM CON MORTERO 1:4 m2 30
R-22.5 5.2.4.2.3 MAMPOSTERIA DE BLOQUE E=15 CM CON MORTERO 1:4 m2 35
5.2.4.3 ENLUCIDOS Y MASILLADOS
R-23.2 5.2.4.3.1 ENLUCIDO DE FILOS Y FAJAS m 91
R-23.4 5.2.4.3.2 ENLUCIDO VERTICAL MORTERO 1:4 m2 127
R-23.3 5.2.4.3.3 ENLUCIDO HORIZONTAL MORTERO 1:4 m2 23
5.2.4.4 RECUBRIMIENTOS EN PISOS
R-24.9 5.2.4.4.1 MASILLADO Y ALISADO DE PISOS m2 26
R-24.10 5.2.4.4.2 PORCELANATO EN PISOS m2 23
R-24.7 5.2.4.4.3 CERAMICA PARA PISOS m2 2
R-24.6 5.2.4.4.4 BARREDERAS DE PORCELANATO e=10cm m 29
5.2.4.5 RECUBRIMIENTOS EN PAREDES Y TECHO

Hoja 79 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-25.1 5.2.4.5.1 CERAMICA EN PAREDES m2 6


R-25.4 5.2.4.5.2 EMPASTADO INTERIOR. m2 78
R-25.3 5.2.4.5.3 EMPASTADO EXTERIOR. m2 43
R-25.8 5.2.4.5.4 PINTURA INTERIOR m2 78
R-25.7 5.2.4.5.5 PINTURA EXTERIOR m2 43
R-25.2 5.2.4.5.6 CIELO RASO FALSO GYPSUM m2 27
5.2.4.6 CARPINTERIA METÁLICA, MADERA Y ALUMINIO
R-26.79 5.2.4.6.1 VENTANA V1, OFICINA DE SEGURIDAD u 1
R-26.80 5.2.4.6.2 VENTANA V2, OFICINA DE SEGURIDAD u 1
R-26.81 5.2.4.6.3 VENTANA V3, OFICINA DE SEGURIDAD u 1
R-26.82 5.2.4.6.4 VENTANA V4, OFICINA DE SEGURIDAD u 1
R-26.83 5.2.4.6.5 PUERTA P1, OFICINA DE SEGURIDAD u 1
R-26.84 5.2.4.6.6 PUERTA P2, OFICINA DE SEGURIDAD u 1
R-26.85 5.2.4.6.7 PUERTA P3, OFICINA DE SEGURIDAD u 1
R-26.86 5.2.4.6.8 PUERTA P4, OFICINA DE SEGURIDAD u 1
5.2.4.7 CUBIERTA
R-25.6 5.2.4.7.1 MASILLADO Y ALISADO DE LOSA DE CUBIERTA m2 53
R-25.5 5.2.4.7.2 IMPERMEABILIZANTE ACRILICO PARA CUBIERTAS m2 53
5.2.4.8 MOBILIARIOS
R-28.6 5.2.4.8.1 SUMINISTRO DE CAMA u 1
R-28.12 5.2.4.8.2 SUMINISTRO DE LOCKERS u 1
R-28.9 5.2.4.8.3 SUMINISTRO DE ESCRITORIO SENCILLOS DE OFICINA u 1
R-28.3 5.2.4.8.4 SILLAS PARA VISITA u 1
5.2.4.9 EQUIPOS
R-29.1 5.2.4.9.1 EQUIPOS DE OFICINA (COMPUTADORES) u 1
5.2.4.10 INSTALACIONES DE AGUA FRIA
R-15.17 5.2.4.10.1 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=3/4" m 5
R-15.15 5.2.4.10.2 TUBERÍA PVC ROSCABLE PARA AGUA FRÍA D=1/2" m 3
R-30.45 5.2.4.10.3 TEE PP ROSCABLE D=3/4" u 1
R-30.3 5.2.4.10.4 CODO PP ROSCABLE D=1/2" x 90º u 2
R-30.5 5.2.4.10.5 CODO PP ROSCABLE D=3/4" x 90º u 2
R-30.29 5.2.4.10.6 REDUCTOR PP ROSCABLE D=3/4" A 1/2" u 1
R-30.52 5.2.4.10.7 VÁLVULA DE CONTROL D=1/2" u 2
5.2.4.11 INSTALACIONES SANITARIAS - AGUAS SERVIDAS
R-8.2 5.2.4.11.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 1
R-15.8 5.2.4.11.2 TUBERÍA PVC DE DESAGUE D=110mm m 6
R-15.11 5.2.4.11.3 TUBERÍA PVC DE DESAGUE D=75mm m 1
R-15.10 5.2.4.11.4 TUBERÍA PVC DE DESAGUE D=50mm m 2
R-30.56 5.2.4.11.5 YEE PVC DE DESAGUE D=75mm u 1
R-30.54 5.2.4.11.6 YEE PVC DE DESAGUE D=110mm u 1
R-30.31 5.2.4.11.7 REDUCTOR PVC DE DESAGUE D=110mm a 75mm u 1
R-30.32 5.2.4.11.8 REDUCTOR PVC DE DESAGUE D=75mm a 50mm u 1
R-30.8 5.2.4.11.9 CODO PVC DE DESAGUE D=110mm x 90º u 1
R-30.10 5.2.4.11.10 CODO PVC DE DESAGUE D=50mm x 90º u 2
R-30.39 5.2.4.11.11 SIFON PVC DE PISO D=75mm u 1
R-30.38 5.2.4.11.12 SIFON PVC DE PISO D=50mm u 1
5.2.4.12 INSTALACIONES SANITARIAS - AGUAS LLUVIAS
R-8.2 5.2.4.12.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 1
R-15.8 5.2.4.12.2 TUBERÍA PVC DE DESAGUE D=110mm m 13
R-30.54 5.2.4.12.3 YEE PVC DE DESAGUE D=110mm u 1
R-30.8 5.2.4.12.4 CODO PVC DE DESAGUE D=110mm x 90º u 1
R-30.7 5.2.4.12.5 CODO PVC DE DESAGUE D=110mm x 45º u 3
R-30.37 5.2.4.12.6 SIFON PVC DE PISO D=110mm u 2
R-30.40 5.2.4.12.7 SUMIDERO METÁLICO DE PISO TIPO T D=160-100mm u 2
5.2.4.13 APARATOS SANITARIOS
R-30.19 5.2.4.13.1 INODORO TANQUE BAJO INCL. ACCESORIOS u 1
R-30.20 5.2.4.13.2 LAVAMANOS EMPOTRADO BLANCO u 1
R-30.14 5.2.4.13.3 DISPENSADOR PARA PAPEL HIGIENICO u 1
R-30.13 5.2.4.13.4 DISPENSADOR DE JABON DE ACERO INOXIDABLE 800ML u 1
5.3 OBRA MECÁNICA
5.3.1 TRABAJOS MECÁNICOS PTAR
5.3.1.1 DESARENADOR Y TANQUE DE CRIBADO
5.3.1.1.1 COSTOS DE INSTALACIÓN Y EQUIPOS

M-101 PUERTA PRINCIPAL MOTORIZADA (PARADA DE EMERGENCIA), TAMAÑO:


R-36.149 5.3.1.1.1.1 u 1
W1.0M × H1.0M

M-102 COMPUERTA DE DISTRIBUCIÓN MOTORIZADA (CONTROL DE LA


R-36.150 5.3.1.1.1.2 u 1
ABERTURA), TAMAÑO: Φ1,0 M

R-36.151 5.3.1.1.1.3 M-103 COMPUERTA DE ENTRADA MOTORIZADA , TAMAÑO: W1.0M × H1.0M u 2

M-104 CRIBA GRUESA (BARRA TIPO PLANA), LA BARRA ESPACIADO DE 50 MM,


R-36.152 5.3.1.1.1.4 u 2
TAMAÑO: W1.0M × H3.5M

M-105 TRANSPORTADOR DE CRIBADO GRUESO (A) A TRAVÉS DE TIPO CINTA,


R-36.153 5.3.1.1.1.5 u 1
TAMAÑO: W0.6M × L7.0M

M-106 TRANSPORTADOR DE CRIBADO GRUESO (B) A TRAVÉS DE TIPO CINTA,


R-36.154 5.3.1.1.1.6 u 1
TAMAÑO: W0.6 M × L7.0M, ÁNGULO DE 20 °

M-107 DESARENADOR DE CUBO-V Y CADENA INTERMINABLE CON VUELO,


R-36.155 5.3.1.1.1.7 u 2
TAMAÑO: W1.5M X H4.0M X L10.0M

R-36.156 5.3.1.1.1.8 M-108 CANAL TRANSPORTADOR (A) TIPO CINTA, TAMAÑO: W0.6M × L7.0M u 1

M-109 CANAL TRANSPORTADOR (B) TIPO CINTA , TAMAÑO: W0.6 M × L7.0M,


R-36.157 5.3.1.1.1.9 u 1
ÁNGULO DE 20 °

M-110 PANTALLA DE BARRA FINA (BARRA TIPO PLANA), BARRA DE


R-36.158 5.3.1.1.1.10 u 2
ESPACIAMIENTO DE 10 M M, TAMAÑO: W1.0M × H3.5M

M-111 TRANSPORTADOR DE CRIBADO FINA (A) A TRAVÉS DE CINTURÓN DE TIPO,


R-36.159 5.3.1.1.1.10 u 1
TAMAÑO: W0.6 M × L7.0M

M-112 TRANSPORTADOR DE CRIBADO FINA (B) A TRAVÉS DE CINTURÓN DE TIPO,


R-36.160 5.3.1.1.1.10 u 1
TAMAÑO: W0.6 M × L7.0M, ÁNGULO DE 20 °

R-36.161 5.3.1.1.1.10 M-113 CONTENEDOR DE BRAZO TIPO RODILLO, CAPACIDAD: PARA 11TONS u 3

R-36.162 5.3.1.1.1.10 M-114 ESCLUSA DE SALIDA DE COMPUERTA MANUAL, TAMAÑO: W1.0M × H1.0M u 2

5.3.1.2 INSTALACIONES CLARIFICADOR PRIMARIO


5.3.1.2.1 COSTOS DE INSTALACIÓN Y EQUIPOS

R-36.163 5.3.1.2.1.1 M-201 COMPUERTA MANUAL DE PUERTA DE ENTRADA , TAMAÑO: Φ 0,5 M u 4

M-202 CENTRO COLECTOR DE LODOS DE TIPO IMPULSIÓN, TAMAÑO: D16.0M ×


R-36.164 5.3.1.2.1.2 u 4
4.0MHE

M-203 VÁLVULA DE ESCAPE DE LODOS CON PUERTA MOTORIZADA,


R-36.165 5.3.1.2.1.3 u 4
TAMAÑO: Φ 200 MM × 10 KG / ㎠

M-204 BOMBA HORIZONTAL CENTRÍFUGA DE LODOS CRUDOS CON TORNILLO


R-36.166 5.3.1.2.1.4 u 2
IMPULSOR, CAPACIDAD: 0,21 ㎥ / MIN × 5MH

Hoja 80 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

M-205 LODO CRUDO SALIDA VÁLVULA MARIPOSA MOTORIZADA VÁLVULA


R-36.167 5.3.1.2.1.5 u 1
(CONTROL DE LA ABERTURA), TAMAÑO: Φ80 MM × 10 KG / ㎠

M-206 MONTACARGAS DE ESCORIA DE 1 TONELADA, LONGITUD DEL BRAZO: 2,5


R-36.168 5.3.1.2.1.6 u 4
M, ALTURA DE LEVANTE: 5.0 M

R-36.169 5.3.1.2.1.7 M-207 ESPUMA ENVASE CAJA DE ACOPLAMIENTO STS, TAMAÑO: 0.1 ㎥ u 4

R-36.170 5.3.1.2.1.8 M-208 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH u 2

M-209 BOMBA SUMIDERO DE MEDIDOR DE FLUJO SUMERGIBLE, CAPACIDAD: 0,1 ㎥


R-36.171 5.3.1.2.1.9 u 2
 / MIN × 10MH

R-36.172 5.3.1.2.1.10 M-210 COMPUERTAS DE MANTENIMIENTO DE ESCLUSA, TAMAÑO: W0.8M × H0.8M u 1

R-36.173 5.3.1.2.1.11 M-211 BOMBA SUMERGIBLE DE DRENAJE (TIPO VORTEX), CAPACIDAD: 0,1  ㎥ / u 2
MIN × 10MH

M-212 CONJUNTO DE COMPUERTAS MOTORIZADAS DE VERTEDERO (CONTROL


R-36.174 5.3.1.2.1.12 u 2
DE APERTURA), TAMAÑO: W1.5M × H0.8M

5.3.1.2.2 COSTOS DE TUBERÍA


R-36.252 5.3.1.2.2.1 TUBERÍA (STS)10S D(i)=50mm (2.8T) m 18.4
R-36.253 5.3.1.2.2.2 TUBERÍA (STS)10S D(i)=80mm (3.0T) m 13.1
R-36.257 5.3.1.2.2.3 TUBERÍA (STS)10S D(i)=200mm (4.0T) m 6.8
R-36.25 5.3.1.2.2.4 CODO DE 90 GRADOS (STS) 10S D(i)=50mm u 5.0
R-36.26 5.3.1.2.2.5 CODO DE 90 GRADOS (STS) 10S D(i)=80mm u 6.0
R-36.332 5.3.1.2.2.6 TE (STS)10S D(i)=50mm u 4.0
R-36.334 5.3.1.2.2.7 TE (STS)10S D(i)=80mm u 5.0
R-36.342 5.3.1.2.2.8 TE (STS)10S D(i)=200mm u 2.0
R-36.285 5.3.1.2.2.9 REDUCTOR (STS) 80X50mm u 3.0
R-36.286 5.3.1.2.2.10 REDUCTOR (STS) 80X65mm u 2.0
R-36.289 5.3.1.2.2.11 REDUCTOR (STS) 100X80mm u 1.0
R-36.295 5.3.1.2.2.12 REDUCTOR (STS) 200X125mm u 1.0
R-36.95 5.3.1.2.2.13 BRIDA (STS) 10K D(i)=50mm u 16.0
R-36.96 5.3.1.2.2.14 BRIDA (STS) 10K D(i)=65mm u 2.0
R-36.97 5.3.1.2.2.15 BRIDA (STS) 10K D(i)=80mm u 23.0
R-36.101 5.3.1.2.2.16 BRIDA (STS) 10K D(i)=200mm u 13.0
R-36.44 5.3.1.2.2.17 BRIDA BL. (STS) D(i)=50mm u 2.0
R-36.45 5.3.1.2.2.18 BRIDA BL. (STS) D(i)=80mm u 2.0
R-36.48 5.3.1.2.2.19 BRIDA BL. (STS) D(i)=200mm u 2.0
R-36.138 5.3.1.2.2.20 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=50mm u 5.0
R-36.139 5.3.1.2.2.21 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=80mm u 7.0
R-36.141 5.3.1.2.2.22 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=200mm u 10.0
R-36.57 5.3.1.2.2.23 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=50mm u 5.0
R-36.58 5.3.1.2.2.24 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=80mm u 2.0
R-36.116 5.3.1.2.2.25 JUNTA FLEXIBLE (STS) 10K D(i)=50mm u 5.0
R-36.117 5.3.1.2.2.26 JUNTA FLEXIBLE (STS) 10K D(i)=80mm u 4.0
R-36.120 5.3.1.2.2.27 JUNTA FLEXIBLE (STS) 10K D(i)=200mm u 4.0
5.3.1.2.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.306 5.3.1.2.3.1 INSTALACIÓN DE TUBERÍA STS D(i)=50mm m 17.5
R-36.307 5.3.1.2.3.2 INSTALACIÓN DE TUBERÍA STS D(i)=80mm m 12.5
R-36.311 5.3.1.2.3.3 INSTALACIÓN DE TUBERÍA STS D(i)=200mm m 6.5
R-36.71 5.3.1.2.3.4 JUNTA CONTRABRIDA D(i)=50mm u 27.0
R-36.72 5.3.1.2.3.5 JUNTA CONTRABRIDA D(i)=65mm u 2.0
R-36.73 5.3.1.2.3.6 JUNTA CONTRABRIDA D(i)=80mm u 29.0
R-36.77 5.3.1.2.3.7 JUNTA CONTRABRIDA D(i)=200mm u 31.0
R-36.362 5.3.1.2.3.8 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=50mm u 10.0
R-36.363 5.3.1.2.3.9 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=80mm u 9.0
R-36.366 5.3.1.2.3.10 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=200mm u 10.0
R-36.105 5.3.1.2.3.11 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=50mm u 5.0
R-36.106 5.3.1.2.3.12 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=80mm u 4.0
R-36.109 5.3.1.2.3.13 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=200mm u 4.0
R-36.390 5.3.1.2.3.14 SOLDADURA (STS) D(i)=50mm u 38.0
R-36.391 5.3.1.2.3.15 SOLDADURA (STS) D(i)=65mm u 2.0
R-36.392 5.3.1.2.3.16 SOLDADURA (STS) D(i)=80mm u 42.0
R-36.393 5.3.1.2.3.17 SOLDADURA (STS) D(i)=100mm u 1.0
R-36.396 5.3.1.2.3.18 SOLDADURA (STS) D(i)=200mm u 15.0
5.3.1.3 INSTALACIONES BIORREACTOR
5.3.1.3.1 COSTOS DE INSTALACIÓN Y EQUIPOS

M-301 VLAVULA DE COMPUERTA MOTORIZADA (CONTROL DE APERTURA),


R-36.175 5.3.1.3.1.1 u 4
TAMAÑO: W1.0M × H1.0M

M-302 SOPLADOR TURBO (SOLA OPERANDO ETAPA TURBO TYPE,V.V.V.F),


R-36.176 5.3.1.3.1.2 u 3
CAPACIDAD: 65 ㎥ / MIN X 6, 000MMAQ

M-303 VÁLVULA MARIPOSA DE CONTROL DE AIRE MOTORIZADA (CONTROL DE LA


R-36.177 5.3.1.3.1.3 u 4
ABERTURA), TAMAÑO: Φ 200 MM × 10 KG / ㎠

M-304 DIFUSOR DE AIRE CON MEMBRANA DISCO FINO (CON EL DIFUSOR DE


R-36.178 5.3.1.3.1.4 u 1
TUBERÍA), CAPACIDAD: 120 ~ 150ℓ/MIN X 1, 120U

M-305 CUARTO DEL POLIPASTO MONORAIL DEL VENTILADOR , CAPACIDAD: 2


R-36.179 5.3.1.3.1.5 u 1
TONELADAS X LARGO 42 M X 4 M DE ALTURA

R-36.180 5.3.1.3.1.6 M-306 SISTEMA DE LIMPIEZA FILTRO DE AIRE, TIPO CAPACIDAD: 130 ㎥ / MIN u 2

R-36.181 5.3.1.3.1.7 M-307 PAC BOMBA DE DIAFRAGMA, CAPACIDAD: 0.13 L / MIN × 20MH u 2

R-36.182 5.3.1.3.1.8 M-308 PAC TANQUE CILINDRICO PE, CAPACIDAD: 1 ㎥ u 1

R-36.183 5.3.1.3.1.9 M-309 BOMBA DE DIAFRAGMA DE NAOH , CAPACIDAD: 0.75 L / MIN × 20MH u 2

R-36.184 5.3.1.3.1.10 M-310 TANQUE CILÍNDRICO DE PE PARA NAOH, CAPACIDAD: 3 ㎥ u 1

R-36.185 5.3.1.3.1.11 M-311 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH u 2

M-312 BOMBA SUMERGIBLE SUMIDERO PARA MEDICIÓN DE FLUJO, CAPACIDAD:


R-36.186 5.3.1.3.1.12 u 2
0,1 ㎥ / MIN × 10MH

5.3.1.3.2 COSTOS DE TUBERÍA


R-36.250 5.3.1.3.2.1 TUBERÍA (STS)10S D(i)=20mm (2.5T) m 36.2
R-36.252 5.3.1.3.2.2 TUBERÍA (STS)10S D(i)=50mm (2.8T) m 5.8
R-36.245 5.3.1.3.2.3 TUBERÍA (SPP) D(i)=200mm m 212.1
R-36.246 5.3.1.3.2.4 TUBERÍA (SPP) D(i)=250mm m 9.5
R-36.247 5.3.1.3.2.5 TUBERÍA (SPP) D(i)=300mm m 11.0
R-36.248 5.3.1.3.2.6 TUBERÍA (SPP) D(i)=350mm m 10.0
R-36.249 5.3.1.3.2.7 TUBERÍA (SPP) D(i)=400mm m 48.3
R-36.241 5.3.1.3.2.8 TUBERÍA (PE) D(i)=32mm m 226.8
R-36.23 5.3.1.3.2.9 CODO DE 90 GRADOS (STS) 10S D(i)=20mm u 14.0
R-36.25 5.3.1.3.2.10 CODO DE 90 GRADOS (STS) 10S D(i)=50mm u 3.0
R-36.20 5.3.1.3.2.11 CODO DE 90 GRADOS (SPP) D(i)=200mm u 16.0

Hoja 81 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-36.21 5.3.1.3.2.12 CODO DE 90 GRADOS (SPP) D(i)=250mm u 3.0


R-36.22 5.3.1.3.2.13 CODO DE 90 GRADOS (SPP) D(i)=400mm u 7.0
R-36.16 5.3.1.3.2.14 CODO DE 90 GRADOS (PE) D(i)=32mm u 30.0
R-36.329 5.3.1.3.2.15 TE (STS)10S D(i)=20mm u 3.0
R-36.332 5.3.1.3.2.16 TE (STS)10S D(i)=50mm u 1.0
R-36.321 5.3.1.3.2.17 TE (SPP) D(i)=200mm u 17.0
R-36.325 5.3.1.3.2.18 TE (SPP) 300X200mm u 1.0
R-36.326 5.3.1.3.2.19 TE (SPP) 350X200mm u 1.0
R-36.327 5.3.1.3.2.20 TE (SPP) 400X200mm u 1.0
R-36.328 5.3.1.3.2.21 TE (SPP) 400X250mm u 3.0
R-36.318 5.3.1.3.2.22 TE (PE) D(i)=32mm u 8.0
R-36.285 5.3.1.3.2.23 REDUCTOR (STS) 80X50mm u 1.0
R-36.278 5.3.1.3.2.24 REDUCTOR (SPP) 300X200mm u 1.0
R-36.279 5.3.1.3.2.25 REDUCTOR (SPP) 350X300mm u 1.0
R-36.280 5.3.1.3.2.26 REDUCTOR (SPP) 400X350mm u 1.0
R-36.93 5.3.1.3.2.27 BRIDA (STS) 10K D(i)=20mm u 11.0
R-36.95 5.3.1.3.2.28 BRIDA (STS) 10K D(i)=50mm u 6.0
R-36.97 5.3.1.3.2.29 BRIDA (STS) 10K D(i)=80mm u 1.0
R-36.90 5.3.1.3.2.30 BRIDA (SS400) D(i)=200mm u 61.0
R-36.91 5.3.1.3.2.31 BRIDA (SS400) D(i)=250mm u 3.0
R-36.92 5.3.1.3.2.32 BRIDA (SS400) D(i)=400mm u 1.0
R-36.86 5.3.1.3.2.33 BRIDA (PE) D(i)=32mm u 34.0
R-36.41 5.3.1.3.2.34 BRIDA BL. (SS400) D(i)=200mm u 5.0
R-36.42 5.3.1.3.2.35 BRIDA BL. (SS400) D(i)=400mm u 1.0
R-36.38 5.3.1.3.2.36 BRIDA BL. (PE) D(i)=32mm u 4.0
R-36.138 5.3.1.3.2.37 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=50mm u 2.0
R-36.57 5.3.1.3.2.38 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=50mm u 2.0
R-36.53 5.3.1.3.2.39 VÁLVULA DE MARIPOSA D(i)=200mm u 16.0
R-36.54 5.3.1.3.2.40 VÁLVULA DE MARIPOSA D(i)=250mm u 3.0
R-36.34 5.3.1.3.2.41 VÁLVULA DE BOLA (LATÓN) D(i)=20mm u 4.0
R-36.36 5.3.1.3.2.42 VÁLVULA DE BOLA (PVC) D(i)=32mm u 10.0
R-36.116 5.3.1.3.2.43 JUNTA FLEXIBLE (STS) 10K D(i)=50mm u 2.0
5.3.1.3.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.304 5.3.1.3.3.1 INSTALACIÓN DE TUBERÍA STS D(i)=20mm m 34.5
R-36.306 5.3.1.3.3.2 INSTALACIÓN DE TUBERÍA STS D(i)=50mm m 5.5
R-36.311 5.3.1.3.3.3 INSTALACIÓN DE TUBERÍA STS D(i)=200mm m 202.0
R-36.312 5.3.1.3.3.4 INSTALACIÓN DE TUBERÍA STS D(i)=250mm m 9.0
R-36.313 5.3.1.3.3.5 INSTALACIÓN DE TUBERÍA STS D(i)=300mm m 10.5
R-36.314 5.3.1.3.3.6 INSTALACIÓN DE TUBERÍA STS D(i)=350mm m 9.5
R-36.315 5.3.1.3.3.7 INSTALACIÓN DE TUBERÍA STS D(i)=400mm m 46.0
R-36.229 5.3.1.3.3.8 INSTALACIÓN DE TUBERÍA DE PE D(i)=32mm m 216.0
R-36.69 5.3.1.3.3.9 JUNTA CONTRABRIDA D(i)=20mm u 11.0
R-36.70 5.3.1.3.3.10 JUNTA CONTRABRIDA D(i)=32mm u 34.0
R-36.71 5.3.1.3.3.11 JUNTA CONTRABRIDA D(i)=50mm u 10.0
R-36.73 5.3.1.3.3.12 JUNTA CONTRABRIDA D(i)=80mm u 1.0
R-36.77 5.3.1.3.3.13 JUNTA CONTRABRIDA D(i)=200mm u 61.0
R-36.78 5.3.1.3.3.14 JUNTA CONTRABRIDA D(i)=250mm u 6.0
R-36.80 5.3.1.3.3.15 JUNTA CONTRABRIDA D(i)=400mm u 1.0
R-36.360 5.3.1.3.3.16 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=20mm u 4.0
R-36.361 5.3.1.3.3.17 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=32mm u 10.0
R-36.362 5.3.1.3.3.18 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=50mm u 4.0
R-36.366 5.3.1.3.3.19 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=200mm u 16.0
R-36.105 5.3.1.3.3.20 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=50mm u 10.0
R-36.106 5.3.1.3.3.21 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=80mm u 1.0
R-36.388 5.3.1.3.3.22 SOLDADURA (STS) D(i)=20mm u 48.0
R-36.390 5.3.1.3.3.23 SOLDADURA (STS) D(i)=50mm u 14.0
R-36.392 5.3.1.3.3.24 SOLDADURA (STS) D(i)=80mm u 1.0
R-36.383 5.3.1.3.3.25 SOLDADURA (SPP) D(i)=200mm u 165.0
R-36.384 5.3.1.3.3.26 SOLDADURA (SPP) D(i)=250mm u 12.0
R-36.385 5.3.1.3.3.27 SOLDADURA (SPP) D(i)=300mm u 5.0
R-36.386 5.3.1.3.3.28 SOLDADURA (SPP) D(i)=350mm u 5.0
R-36.387 5.3.1.3.3.29 SOLDADURA (SPP) D(i)=400mm u 29.0
5.3.1.4 INSTALACIONES CLARIFICADOR SECUNDARIO
5.3.1.4.1 COSTOS DE INSTALACIÓN Y EQUIPOS

R-36.187 5.3.1.4.1.1 M-401 COMPUERTA MANUAL DE PUERTA DE ENTRADA , TAMAÑO: Φ 0,5 M u 4

R-36.188 5.3.1.4.1.2 M-402 CENTRO COLECTOR DE IMPULSIÓN DE LODOS, TAMAÑO: D17M × 4.5MHE u 4

M-403 VÁLVULA DE ESCAPE DE LODO CON PUERTA MOTORIZADA, TAMAÑO: Φ 200


R-36.189 5.3.1.4.1.3 u 4
MM × 10 KG / ㎠

M-404 BOMBA HORIZONTAL CENTRÍFUGA CON TORNILLO IMPULSOR PARA


R-36.190 5.3.1.4.1.4 u 2
EXCESO DE LODOS , CAPACIDAD: 1.0 ㎥ / MIN ×5MH

M-405 VÁLVULA MARIPOSA MOTORIZADA PARA SALIDA DE EXCESO DE LODOS


R-36.191 5.3.1.4.1.5 u 1
(CONTROL DE LA ABERTURA), TAMAÑO: Φ 125 MM × 10 KG / ㎠

M-406 BOMBA PARA RETORNO DE LODOS CON TORNILLO CENTRÍFUGO


R-36.192 5.3.1.4.1.6 u 2
HORIZONTAL (VVVF), CAPACIDAD: 6.4 ㎥ / MIN × 8MH

R-36.193 5.3.1.4.1.7 M-407 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH u 2

M-408 MANTENIMIENTO POLIPASTO MONORRIEL, CAPACIDAD: 1 TONELADA X


R-36.194 5.3.1.4.1.8 u 1
LONGITUD 10 M X 6 M DE ALTURA

M-409 PUERTA MANUAL DE MANTENIMIENTO CON COMPUERTAS DE ESCLUSA,


R-36.195 5.3.1.4.1.9 u 1
TAMAÑO: W0.8M × H0.8M

M-410 MONTACARGAS DE ESCORIA 1 TONELADA, LONGITUD DEL BRAZO: 2,5 M,


R-36.196 5.3.1.4.1.10 u 4
ALTURA DE LEVANTE: 5.0 M

R-36.197 5.3.1.4.1.11 M-411 ESPUMA ENVASE CAJA DE ACOPLAMIENTO STS, TAMAÑO: 0.1 ㎥ u 4

5.3.1.4.2 COSTOS DE TUBERÍA


R-36.252 5.3.1.4.2.1 TUBERÍA (STS)10S D(i)=50mm (2.8T) m 8.4
R-36.255 5.3.1.4.2.2 TUBERÍA (STS)10S D(i)=125mm (3.5T) m 19.4
R-36.257 5.3.1.4.2.3 TUBERÍA (STS)10S D(i)=200mm (4.0T) m 4.2
R-36.259 5.3.1.4.2.4 TUBERÍA (STS)10S D(i)=300mm (4.5T) m 18.4
R-36.260 5.3.1.4.2.5 TUBERÍA (STS)10S D(i)=400mm (5.0T) m 3.7
R-36.25 5.3.1.4.2.6 CODO DE 90 GRADOS (STS) 10S D(i)=50mm u 4.0
R-36.27 5.3.1.4.2.7 CODO DE 90 GRADOS (STS) 10S D(i)=125mm u 5.0
R-36.31 5.3.1.4.2.8 CODO DE 90 GRADOS (STS) 10S D(i)=300mm u 6.0
R-36.332 5.3.1.4.2.9 TE (STS)10S D(i)=50mm u 1.0
R-36.337 5.3.1.4.2.10 TE (STS)10S D(i)=125mm u 5.0
R-36.345 5.3.1.4.2.11 TE (STS)10S D(i)=300mm u 4.0
R-36.346 5.3.1.4.2.12 TE (STS)10S 400X300mm u 4.0
R-36.285 5.3.1.4.2.13 REDUCTOR (STS) 80X50mm u 2.0
R-36.290 5.3.1.4.2.14 REDUCTOR (STS) 125X80mm u 2.0

Hoja 82 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-36.291 5.3.1.4.2.15 REDUCTOR (STS) 125X100mm u 2.0


R-36.296 5.3.1.4.2.16 REDUCTOR (STS) 200X100mm u 1.0
R-36.299 5.3.1.4.2.17 REDUCTOR (STS) 300X200mm u 2.0
R-36.300 5.3.1.4.2.18 REDUCTOR (STS) 300X250mm u 2.0
R-36.95 5.3.1.4.2.19 BRIDA (STS) 10K D(i)=50mm u 9.0
R-36.97 5.3.1.4.2.20 BRIDA (STS) 10K D(i)=80mm u 4.0
R-36.98 5.3.1.4.2.21 BRIDA (STS) 10K D(i)=100mm u 2.0
R-36.99 5.3.1.4.2.22 BRIDA (STS) 10K D(i)=125mm u 20.0
R-36.101 5.3.1.4.2.23 BRIDA (STS) 10K D(i)=200mm u 11.0
R-36.102 5.3.1.4.2.24 BRIDA (STS) 10K D(i)=250mm u 2.0
R-36.103 5.3.1.4.2.25 BRIDA (STS) 10K D(i)=300mm u 18.0
R-36.104 5.3.1.4.2.26 BRIDA (STS) 10K D(i)=400mm u 4.0
R-36.46 5.3.1.4.2.27 BRIDA BL. (STS) D(i)=125mm u 2.0
R-36.49 5.3.1.4.2.28 BRIDA BL. (STS) D(i)=300mm u 1.0
R-36.50 5.3.1.4.2.29 BRIDA BL. (STS) D(i)=400mm u 2.0
R-36.138 5.3.1.4.2.30 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=50mm u 3.0
R-36.140 5.3.1.4.2.31 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=125mm u 7.0
R-36.141 5.3.1.4.2.32 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=200mm u 8.0
R-36.143 5.3.1.4.2.33 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=300mm u 7.0
R-36.144 5.3.1.4.2.34 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=400mm u 2.0
R-36.57 5.3.1.4.2.35 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=50mm u 3.0
R-36.60 5.3.1.4.2.36 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=125mm u 2.0
R-36.61 5.3.1.4.2.37 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=300mm u 2.0
R-36.116 5.3.1.4.2.38 JUNTA FLEXIBLE (STS) 10K D(i)=50mm u 3.0
R-36.119 5.3.1.4.2.39 JUNTA FLEXIBLE (STS) 10K D(i)=125mm u 4.0
R-36.120 5.3.1.4.2.40 JUNTA FLEXIBLE (STS) 10K D(i)=200mm u 4.0
R-36.122 5.3.1.4.2.41 JUNTA FLEXIBLE (STS) 10K D(i)=300mm u 4.0
5.3.1.4.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.306 5.3.1.4.3.1 INSTALACIÓN DE TUBERÍA STS D(i)=50mm m 8.0
R-36.309 5.3.1.4.3.2 INSTALACIÓN DE TUBERÍA STS D(i)=125mm m 18.5
R-36.311 5.3.1.4.3.3 INSTALACIÓN DE TUBERÍA STS D(i)=200mm m 4.0
R-36.313 5.3.1.4.3.4 INSTALACIÓN DE TUBERÍA STS D(i)=300mm m 17.5
R-36.315 5.3.1.4.3.5 INSTALACIÓN DE TUBERÍA STS D(i)=400mm m 3.5
R-36.71 5.3.1.4.3.6 JUNTA CONTRABRIDA D(i)=50mm u 15.0
R-36.73 5.3.1.4.3.7 JUNTA CONTRABRIDA D(i)=80mm u 4.0
R-36.74 5.3.1.4.3.8 JUNTA CONTRABRIDA D(i)=100mm u 2.0
R-36.75 5.3.1.4.3.9 JUNTA CONTRABRIDA D(i)=125mm u 26.0
R-36.77 5.3.1.4.3.10 JUNTA CONTRABRIDA D(i)=200mm u 27.0
R-36.78 5.3.1.4.3.11 JUNTA CONTRABRIDA D(i)=250mm u 2.0
R-36.79 5.3.1.4.3.12 JUNTA CONTRABRIDA D(i)=300mm u 24.0
R-36.80 5.3.1.4.3.13 JUNTA CONTRABRIDA D(i)=400mm u 6.0
R-36.362 5.3.1.4.3.14 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=50mm u 6.0
R-36.365 5.3.1.4.3.15 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=125mm u 9.0
R-36.366 5.3.1.4.3.16 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=200mm u 8.0
R-36.368 5.3.1.4.3.17 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=300mm u 9.0
R-36.369 5.3.1.4.3.18 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=400mm u 2.0
R-36.105 5.3.1.4.3.19 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=50mm u 3.0
R-36.108 5.3.1.4.3.20 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=125mm u 4.0
R-36.109 5.3.1.4.3.21 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=200mm u 4.0
R-36.111 5.3.1.4.3.22 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=300mm u 4.0
R-36.390 5.3.1.4.3.23 SOLDADURA (STS) D(i)=50mm u 20.0
R-36.392 5.3.1.4.3.24 SOLDADURA (STS) D(i)=80mm u 4.0
R-36.393 5.3.1.4.3.25 SOLDADURA (STS) D(i)=100mm u 2.0
R-36.394 5.3.1.4.3.26 SOLDADURA (STS) D(i)=125mm u 39.0
R-36.396 5.3.1.4.3.27 SOLDADURA (STS) D(i)=200mm u 11.0
R-36.397 5.3.1.4.3.28 SOLDADURA (STS) D(i)=250mm u 2.0
R-36.398 5.3.1.4.3.29 SOLDADURA (STS) D(i)=300mm u 35.0
R-36.399 5.3.1.4.3.30 SOLDADURA (STS) D(i)=400mm u 10.0
5.3.1.5 INSTALACIONES DE DESINFECCION
5.3.1.5.1 COSTOS DE INSTALACIÓN Y EQUIPOS

R-36.198 5.3.1.5.1.1 M-501 PUERTA DE ENTRADA MOTORIZADA PARA U/V, TAMAÑO: W0.6M × H0.8M u 2

M-502 PUERTA DE SALIDA MANUAL PARA VERTEDERO U/V, TAMAÑO: W0.6M ×


R-36.199 5.3.1.5.1.2 u 2
H0.8M

M-503 DESINFECCIÓN HORIZONTAL TIPO ULTRAVIOLETA (U/V)(INCLUDE LIFTING


R-36.200 5.3.1.5.1.3 u 1
DEVICE), CAPACIDAD: 20.000 ㎥ / DÍA

R-36.201 5.3.1.5.1.4 M-504 BOMBA DE DIAFRAGMA DE NAOCL , CAPACIDAD: 1,49 L / MIN × 20MH u 2

R-36.202 5.3.1.5.1.5 M-505 TANQUE CILINDRICO DE PE PARA NAOCL, CAPACIDAD: 15 ㎥ u 1

M-506 MANTENIMIENTO PUERTA MANUAL COMPUERTAS DE ESCLUSA, TAMAÑO:


R-36.203 5.3.1.5.1.6 u 2
1.0MW X 1.0MH

R-36.204 5.3.1.5.1.7 M-507 BOMBA SUMIDERO SUMERGIBLE DE FLUJÓMETRO, CAPACIDAD: 0,1 ㎥ / u 2


MIN × 10MH

5.3.1.5.2 COSTOS DE TUBERÍA


R-36.241 5.3.1.5.2.1 TUBERÍA (PE) D(i)=32mm m 26.3
R-36.16 5.3.1.5.2.2 CODO DE 90 GRADOS (PE) D(i)=32mm u 10.0
R-36.318 5.3.1.5.2.3 TE (PE) D(i)=32mm u 4.0
R-36.86 5.3.1.5.2.4 BRIDA (PE) D(i)=32mm u 17.0
R-36.38 5.3.1.5.2.5 BRIDA BL. (PE) D(i)=32mm u 2.0
R-36.36 5.3.1.5.2.6 VÁLVULA DE BOLA (PVC) D(i)=32mm u 5.0
5.3.1.5.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.229 5.3.1.5.3.1 INSTALACIÓN DE TUBERÍA DE PE D(i)=32mm m 25.0
R-36.70 5.3.1.5.3.2 JUNTA CONTRABRIDA D(i)=32mm u 17.0
R-36.361 5.3.1.5.3.3 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=32mm u 5.0
5.3.1.6 INSTALACIONES REUTILIZACIÓN DE AGUAS TRATADAS
5.3.1.6.1 COSTOS DE INSTALACIÓN Y EQUIPOS

M-601 BOMBA DE REFUERZO AUTOMÁTICO PARA SISTEMA DE SUMINISTRO DE


R-36.205 5.3.1.6.1.1 u 1
AGUA, CAPACIDAD: 1.5 ㎥ / MIN× 50MH × 3PUMPS

R-36.206 5.3.1.6.1.2 M-602 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH u 2

5.3.1.6.2 COSTOS DE TUBERÍA


R-36.250 5.3.1.6.2.1 TUBERÍA (STS)10S D(i)=20mm (2.5T) m 39.9
R-36.251 5.3.1.6.2.2 TUBERÍA (STS)10S D(i)=32mm (2.8T) m 675.7
R-36.252 5.3.1.6.2.3 TUBERÍA (STS)10S D(i)=50mm (2.8T) m 45.7
R-36.253 5.3.1.6.2.4 TUBERÍA (STS)10S D(i)=80mm (3.0T) m 44.6
R-36.254 5.3.1.6.2.5 TUBERÍA (STS)10S D(i)=100mm (3.0T) m 20.5
R-36.255 5.3.1.6.2.6 TUBERÍA (STS)10S D(i)=125mm (3.5T) m 184.3
R-36.256 5.3.1.6.2.7 TUBERÍA (STS)10S D(i)=150mm (3.5T) m 41.0
R-36.258 5.3.1.6.2.8 TUBERÍA (STS)10S D(i)=250mm (4.0T) m 1.1
R-36.23 5.3.1.6.2.9 CODO DE 90 GRADOS (STS) 10S D(i)=20mm u 2.0

Hoja 83 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-36.24 5.3.1.6.2.10 CODO DE 90 GRADOS (STS) 10S D(i)=32mm u 52.0


R-36.25 5.3.1.6.2.11 CODO DE 90 GRADOS (STS) 10S D(i)=50mm u 5.0
R-36.26 5.3.1.6.2.12 CODO DE 90 GRADOS (STS) 10S D(i)=80mm u 13.0
R-36.28 5.3.1.6.2.13 CODO DE 90 GRADOS (STS) 10S D(i)=150mm u 11.0
R-36.29 5.3.1.6.2.14 CODO DE 90 GRADOS (STS) 10S D(i)=200mm u 6.0
R-36.30 5.3.1.6.2.15 CODO DE 90 GRADOS (STS) 10S D(i)=250mm u 1.0
R-36.329 5.3.1.6.2.16 TE (STS)10S D(i)=20mm u 1.0
R-36.331 5.3.1.6.2.17 TE (STS)10S 32X20mm u 269.0
R-36.330 5.3.1.6.2.18 TE (STS)10S D(i)=32mm u 16.0
R-36.332 5.3.1.6.2.19 TE (STS)10S D(i)=50mm u 1.0
R-36.333 5.3.1.6.2.20 TE (STS)10S 50X32mm u 2.0
R-36.334 5.3.1.6.2.21 TE (STS)10S D(i)=80mm u 4.0
R-36.336 5.3.1.6.2.22 TE (STS)10S 100X80mm u 1.0
R-36.340 5.3.1.6.2.23 TE (STS)10S 150X65mm u 4.0
R-36.341 5.3.1.6.2.24 TE (STS)10S 150X80mm u 2.0
R-36.338 5.3.1.6.2.25 TE (STS)10S D(i)=150mm u 1.0
R-36.343 5.3.1.6.2.26 TE (STS)10S 200X100mm u 2.0
R-36.281 5.3.1.6.2.27 REDUCTOR (STS) 32X20mm u 15.0
R-36.282 5.3.1.6.2.28 REDUCTOR (STS) 50X32mm u 1.0
R-36.283 5.3.1.6.2.29 REDUCTOR (STS) 65X32mm u 4.0
R-36.284 5.3.1.6.2.30 REDUCTOR (STS) 80X32mm u 8.0
R-36.285 5.3.1.6.2.31 REDUCTOR (STS) 80X50mm u 1.0
R-36.287 5.3.1.6.2.32 REDUCTOR (STS) 100X32mm u 2.0
R-36.288 5.3.1.6.2.33 REDUCTOR (STS) 100X50mm u 1.0
R-36.289 5.3.1.6.2.34 REDUCTOR (STS) 100X80mm u 1.0
R-36.292 5.3.1.6.2.35 REDUCTOR (STS) 150X80mm u 1.0
R-36.293 5.3.1.6.2.36 REDUCTOR (STS) 150X100mm u 2.0
R-36.297 5.3.1.6.2.37 REDUCTOR (STS) 250X150mm u 1.0
R-36.298 5.3.1.6.2.38 REDUCTOR (STS) 250X200mm u 1.0
R-36.93 5.3.1.6.2.39 BRIDA (STS) 10K D(i)=20mm u 29.0
R-36.94 5.3.1.6.2.40 BRIDA (STS) 10K D(i)=32mm u 29.0
R-36.95 5.3.1.6.2.41 BRIDA (STS) 10K D(i)=50mm u 6.0
R-36.97 5.3.1.6.2.42 BRIDA (STS) 10K D(i)=80mm u 9.0
R-36.101 5.3.1.6.2.43 BRIDA (STS) 10K D(i)=200mm u 4.0
R-36.102 5.3.1.6.2.44 BRIDA (STS) 10K D(i)=250mm u 4.0
R-36.43 5.3.1.6.2.45 BRIDA BL. (STS) D(i)=32mm u 11.0
R-36.138 5.3.1.6.2.46 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=50mm u 2.0
R-36.141 5.3.1.6.2.47 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=200mm u 1.0
R-36.142 5.3.1.6.2.48 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=250mm u 1.0
R-36.57 5.3.1.6.2.49 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=50mm u 2.0
R-36.34 5.3.1.6.2.50 VÁLVULA DE BOLA (LATÓN) D(i)=20mm u 20.0
R-36.35 5.3.1.6.2.51 VÁLVULA DE BOLA (LATÓN) D(i)=80mm u 4.0
R-36.116 5.3.1.6.2.52 JUNTA FLEXIBLE (STS) 10K D(i)=50mm u 2.0
R-36.120 5.3.1.6.2.53 JUNTA FLEXIBLE (STS) 10K D(i)=200mm u 1.0
R-36.121 5.3.1.6.2.54 JUNTA FLEXIBLE (STS) 10K D(i)=250mm u 1.0
R-36.226 5.3.1.6.2.55 BOQUILLA DE D(i)=20mm u 260.0
5.3.1.6.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.304 5.3.1.6.3.1 INSTALACIÓN DE TUBERÍA STS D(i)=20mm m 38.0
R-36.305 5.3.1.6.3.2 INSTALACIÓN DE TUBERÍA STS D(i)=32mm m 723.5
R-36.306 5.3.1.6.3.3 INSTALACIÓN DE TUBERÍA STS D(i)=50mm m 43.5
R-36.307 5.3.1.6.3.4 INSTALACIÓN DE TUBERÍA STS D(i)=80mm m 42.5
R-36.310 5.3.1.6.3.5 INSTALACIÓN DE TUBERÍA STS D(i)=150mm m 195.0
R-36.311 5.3.1.6.3.6 INSTALACIÓN DE TUBERÍA STS D(i)=200mm m 39.0
R-36.312 5.3.1.6.3.7 INSTALACIÓN DE TUBERÍA STS D(i)=250mm m 1.0
R-36.69 5.3.1.6.3.8 JUNTA CONTRABRIDA D(i)=20mm u 28.0
R-36.70 5.3.1.6.3.9 JUNTA CONTRABRIDA D(i)=32mm u 29.0
R-36.71 5.3.1.6.3.10 JUNTA CONTRABRIDA D(i)=50mm u 10.0
R-36.73 5.3.1.6.3.11 JUNTA CONTRABRIDA D(i)=80mm u 9.0
R-36.76 5.3.1.6.3.12 JUNTA CONTRABRIDA D(i)=150mm u 1.0
R-36.77 5.3.1.6.3.13 JUNTA CONTRABRIDA D(i)=200mm u 4.0
R-36.78 5.3.1.6.3.14 JUNTA CONTRABRIDA D(i)=250mm u 5.0
R-36.360 5.3.1.6.3.15 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=20mm u 18.0
R-36.362 5.3.1.6.3.16 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=50mm u 4.0
R-36.363 5.3.1.6.3.17 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=80mm u 4.0
R-36.366 5.3.1.6.3.18 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=200mm u 1.0
R-36.367 5.3.1.6.3.19 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=250mm u 1.0
R-36.105 5.3.1.6.3.20 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=50mm u 2.0
R-36.109 5.3.1.6.3.21 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=200mm u 1.0
R-36.110 5.3.1.6.3.22 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=250mm u 1.0
R-36.388 5.3.1.6.3.23 SOLDADURA (STS) D(i)=20mm u 324.0
R-36.389 5.3.1.6.3.24 SOLDADURA (STS) D(i)=32mm u 773.0
R-36.390 5.3.1.6.3.25 SOLDADURA (STS) D(i)=50mm u 26.0
R-36.391 5.3.1.6.3.26 SOLDADURA (STS) D(i)=65mm u 4.0
R-36.392 5.3.1.6.3.27 SOLDADURA (STS) D(i)=80mm u 52.0
R-36.393 5.3.1.6.3.28 SOLDADURA (STS) D(i)=100mm u 9.0
R-36.395 5.3.1.6.3.29 SOLDADURA (STS) D(i)=150mm u 50.0
R-36.396 5.3.1.6.3.30 SOLDADURA (STS) D(i)=200mm u 25.0
R-36.397 5.3.1.6.3.31 SOLDADURA (STS) D(i)=250mm u 5.0
R-36.147 5.3.1.6.3.32 INSTALACIÓN DEL CONECTOR DE MANGUERA D(i)=20mm u 9.0
5.3.1.7 INSTALACIONES DESHIDRATACIÓN DE LODOS
5.3.1.7.1 COSTOS DE INSTALACIÓN Y EQUIPOS

M-701 BOMBA PARA LODOS CON IMPULSOR DE TORNILLO CENTRÍFUGO


R-36.207 5.3.1.7.1.1 u 3
HORIZONTAL (OPERACIÓN V.V.V.F), CAPACIDAD: 0,7㎥ / MIN × 15MH

R-36.208 5.3.1.7.1.2 M-702 DESHIDRATADOR TIPO CENTRÍFUGO, CAPACIDAD: 35 ㎥ / H u 2

M-703 TRANPORTADOR DE TORTA (A) CINTA TIPO CANAL, TAMAÑO: W0.6M ×


R-36.209 5.3.1.7.1.3 u 1
L17.0M

M-704 TRANPORTADOR DE TORTA (B) CINTA TIPO CANAL, TAMAÑO: W0.6M ×


R-36.210 5.3.1.7.1.4 u 1
L7.0M, ÁNGULO DE 20 °

M-705 CONTENEDOR DE TORTA CON BRAZO TIPO RODILLO, CAPACIDAD: PARA


R-36.211 5.3.1.7.1.5 u 3
11TONS

M-706 SISTEMA AUTOMATICO DE SOLUCIÓN DE POLÍMERO, CAPACIDAD:


R-36.212 5.3.1.7.1.6 u 1
7ANTIADHERENTE /H (TOLVA, ALIMENTADOR)

M-707 BOMBA DE ALIMENTACIÓN DE POLÍMERO TIPO TORNILLO (OPERACIÓN


R-36.213 5.3.1.7.1.7 u 3
V.V.V.F), CAPACIDAD: 40 L / MIN × 10MH

R-36.214 5.3.1.7.1.8 M-708 VENTILADOR DEL TANQUE DE FOSAS DE LODOS, CAPACIDAD: 7.5 ㎥ / MIN X u 3
6, 000MMAQ

R-36.215 5.3.1.7.1.9 M-709 DIFUSOR DE AIRE (A) TIPO TUBERÍA, 50A X 8,4 M × 12U u 2

R-36.216 5.3.1.7.1.10 M-710 DIFUSOR DE AIRE (B) TIPO TUBERÍA, 50A X 1,9 M × 8U u 2

Hoja 84 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

M-711 POLIPASTO MONORAIL DE MANTENIMIENTO, CAPACIDAD: 1 TONELADA X


R-36.217 5.3.1.7.1.11 u 1
LARGO 80 M X ALTURA 8 M

M-712 POLIPASTO MONORRIEL DEL DESHIDRATADOR , CAPACIDAD: 7,5


R-36.218 5.3.1.7.1.12 u 1
TONELADAS X LONGITUD 50 M X 12 M DE ALTURA

M-713 BOMBA FLOTANTE DE RETORNO HORIZONTAL CON TORNILLO CENTRIFUGO


R-36.219 5.3.1.7.1.13 u 2
IMPULSOR, CAPACIDAD: 1.1 ㎥ / MIN ×13MH

M-714 ESCLUSA DE COMPUERTA MANUAL PARA MANTENIMIENTO DE TANQUE DE


R-36.220 5.3.1.7.1.14 u 1
LODOS, TAMAÑO: W1.0M × H1.0M

M-715 ESCLUSA DE COMPUERTA PARA MANTENIMIENTO DEL TANQUE AGUA DE


R-36.221 5.3.1.7.1.15 u 1
RETORNO, TAMAÑO: W1.0M × H1.0M

R-36.222 5.3.1.7.1.16 M-716 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH u 2

5.3.1.7.2 COSTOS DE TUBERÍA


R-36.252 5.3.1.7.2.1 TUBERÍA (STS)10S D(i)=50mm (2.8T) m 54.1
R-36.253 5.3.1.7.2.2 TUBERÍA (STS)10S D(i)=80mm (3.0T) m 13.1
R-36.255 5.3.1.7.2.3 TUBERÍA (STS)10S D(i)=125mm (3.5T) m 55.1
R-36.256 5.3.1.7.2.4 TUBERÍA (STS)10S D(i)=150mm (3.5T) m 5.3
R-36.257 5.3.1.7.2.5 TUBERÍA (STS)10S D(i)=200mm (4.0T) m 24.7
R-36.242 5.3.1.7.2.6 TUBERÍA (SPP) D(i)=80mm m 25.2
R-36.243 5.3.1.7.2.7 TUBERÍA (SPP) D(i)=100mm m 20.5
R-36.244 5.3.1.7.2.8 TUBERÍA (SPP) D(i)=125mm m 17.9
R-36.25 5.3.1.7.2.9 CODO DE 90 GRADOS (STS) 10S D(i)=50mm u 23.0
R-36.26 5.3.1.7.2.10 CODO DE 90 GRADOS (STS) 10S D(i)=80mm u 7.0
R-36.27 5.3.1.7.2.11 CODO DE 90 GRADOS (STS) 10S D(i)=125mm u 16.0
R-36.17 5.3.1.7.2.12 CODO DE 90 GRADOS (SPP) D(i)=80mm u 4.0
R-36.18 5.3.1.7.2.13 CODO DE 90 GRADOS (SPP) D(i)=100mm u 5.0
R-36.19 5.3.1.7.2.14 CODO DE 90 GRADOS (SPP) D(i)=125mm u 3.0
R-36.332 5.3.1.7.2.15 TE (STS)10S D(i)=50mm u 8.0
R-36.335 5.3.1.7.2.16 TE (STS)10S 80X50mm u 4.0
R-36.337 5.3.1.7.2.17 TE (STS)10S D(i)=125mm u 13.0
R-36.339 5.3.1.7.2.18 TE (STS)10S 150X125mm u 4.0
R-36.344 5.3.1.7.2.19 TE (STS)10S 200X125mm u 5.0
R-36.342 5.3.1.7.2.20 TE (STS)10S D(i)=200mm u 5.0
R-36.319 5.3.1.7.2.21 TE (SPP) D(i)=80mm u 1.0
R-36.322 5.3.1.7.2.22 TE (SPP) 100X80mm u 1.0
R-36.323 5.3.1.7.2.23 TE (SPP) 125X80mm u 2.0
R-36.324 5.3.1.7.2.24 TE (SPP) 125X100mm u 3.0
R-36.320 5.3.1.7.2.25 TE (SPP) D(i)=125mm u 1.0
R-36.285 5.3.1.7.2.26 REDUCTOR (STS) 80X50mm u 1.0
R-36.290 5.3.1.7.2.27 REDUCTOR (STS) 125X80mm u 7.0
R-36.291 5.3.1.7.2.28 REDUCTOR (STS) 125X100mm u 5.0
R-36.294 5.3.1.7.2.29 REDUCTOR (STS) 150X125mm u 1.0
R-36.276 5.3.1.7.2.30 REDUCTOR (SPP) 100X80mm u 1.0
R-36.277 5.3.1.7.2.31 REDUCTOR (SPP) 125X100mm u 1.0
R-36.95 5.3.1.7.2.32 BRIDA (STS) 10K D(i)=50mm u 50.0
R-36.97 5.3.1.7.2.33 BRIDA (STS) 10K D(i)=80mm u 10.0
R-36.98 5.3.1.7.2.34 BRIDA (STS) 10K D(i)=100mm u 5.0
R-36.99 5.3.1.7.2.35 BRIDA (STS) 10K D(i)=125mm u 65.0
R-36.100 5.3.1.7.2.36 BRIDA (STS) 10K D(i)=150mm u 3.0
R-36.101 5.3.1.7.2.37 BRIDA (STS) 10K D(i)=200mm u 17.0
R-36.87 5.3.1.7.2.38 BRIDA (SS400) D(i)=80mm u 13.0
R-36.88 5.3.1.7.2.39 BRIDA (SS400) D(i)=100mm u 15.0
R-36.89 5.3.1.7.2.40 BRIDA (SS400) D(i)=125mm u 2.0
R-36.45 5.3.1.7.2.41 BRIDA BL. (STS) D(i)=80mm u 2.0
R-36.46 5.3.1.7.2.42 BRIDA BL. (STS) D(i)=125mm u 3.0
R-36.47 5.3.1.7.2.43 BRIDA BL. (STS) D(i)=150mm u 2.0
R-36.48 5.3.1.7.2.44 BRIDA BL. (STS) D(i)=200mm u 5.0
R-36.39 5.3.1.7.2.45 BRIDA BL. (SS400) D(i)=80mm u 1.0
R-36.40 5.3.1.7.2.46 BRIDA BL. (SS400) D(i)=125mm u 2.0
R-36.138 5.3.1.7.2.47 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=50mm u 17.0
R-36.140 5.3.1.7.2.48 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=125mm u 25.0
R-36.141 5.3.1.7.2.49 VÁLVULA DE COMPUERTA (HIERRO FUNDIDO) 10 K D(i)=200mm u 4.0
R-36.57 5.3.1.7.2.50 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=50mm u 5.0
R-36.59 5.3.1.7.2.51 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=100mm u 3.0
R-36.60 5.3.1.7.2.52 VÁLVULA DE COMPROBACIÓN (ACERO FUNDIDO) 10 K D(i)=125mm u 5.0
R-36.51 5.3.1.7.2.53 VÁLVULA DE MARIPOSA D(i)=80mm u 4.0
R-36.52 5.3.1.7.2.54 VÁLVULA DE MARIPOSA D(i)=100mm u 3.0
R-36.116 5.3.1.7.2.55 JUNTA FLEXIBLE (STS) 10K D(i)=50mm u 8.0
R-36.118 5.3.1.7.2.56 JUNTA FLEXIBLE (STS) 10K D(i)=100mm u 3.0
R-36.119 5.3.1.7.2.57 JUNTA FLEXIBLE (STS) 10K D(i)=125mm u 10.0
5.3.1.7.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.306 5.3.1.7.3.1 INSTALACIÓN DE TUBERÍA STS D(i)=50mm m 51.5
R-36.307 5.3.1.7.3.2 INSTALACIÓN DE TUBERÍA STS D(i)=80mm m 36.5
R-36.308 5.3.1.7.3.3 INSTALACIÓN DE TUBERÍA STS D(i)=100mm m 19.5
R-36.309 5.3.1.7.3.4 INSTALACIÓN DE TUBERÍA STS D(i)=125mm m 69.5
R-36.310 5.3.1.7.3.5 INSTALACIÓN DE TUBERÍA STS D(i)=150mm m 5.0
R-36.311 5.3.1.7.3.6 INSTALACIÓN DE TUBERÍA STS D(i)=200mm m 23.5
R-36.71 5.3.1.7.3.7 JUNTA CONTRABRIDA D(i)=50mm u 61.0
R-36.73 5.3.1.7.3.8 JUNTA CONTRABRIDA D(i)=80mm u 23.0
R-36.74 5.3.1.7.3.9 JUNTA CONTRABRIDA D(i)=100mm u 23.0
R-36.75 5.3.1.7.3.10 JUNTA CONTRABRIDA D(i)=125mm u 77.0
R-36.76 5.3.1.7.3.11 JUNTA CONTRABRIDA D(i)=150mm u 3.0
R-36.77 5.3.1.7.3.12 JUNTA CONTRABRIDA D(i)=200mm u 17.0
R-36.362 5.3.1.7.3.13 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=50mm u 22.0
R-36.363 5.3.1.7.3.14 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=80mm u 4.0
R-36.364 5.3.1.7.3.15 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=100mm u 6.0
R-36.365 5.3.1.7.3.16 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=125mm u 30.0
R-36.366 5.3.1.7.3.17 INSTALACIÓN DE VÁLVULA (TIPO BRIDA) D(i)=200mm u 4.0
R-36.105 5.3.1.7.3.18 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=50mm u 8.0
R-36.107 5.3.1.7.3.19 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=100mm u 3.0
R-36.108 5.3.1.7.3.20 INSTALACIÓN JUNTA FLEXIBLE (TIPO BRIDA) D(i)=125mm u 10.0
R-36.390 5.3.1.7.3.21 SOLDADURA (STS) D(i)=50mm u 112.0
R-36.392 5.3.1.7.3.22 SOLDADURA (STS) D(i)=80mm u 32.0
R-36.393 5.3.1.7.3.23 SOLDADURA (STS) D(i)=100mm u 5.0
R-36.394 5.3.1.7.3.24 SOLDADURA (STS) D(i)=125mm u 137.0
R-36.395 5.3.1.7.3.25 SOLDADURA (STS) D(i)=150mm u 11.0
R-36.396 5.3.1.7.3.26 SOLDADURA (STS) D(i)=200mm u 40.0
R-36.380 5.3.1.7.3.27 SOLDADURA (SPP) D(i)=80mm u 29.0
R-36.381 5.3.1.7.3.28 SOLDADURA (SPP) D(i)=100mm u 27.0
R-36.382 5.3.1.7.3.29 SOLDADURA (SPP) D(i)=125mm u 21.0
5.3.1.8 INSTALACIONES DESODORIZACIÓN

Hoja 85 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

5.3.1.8.1 COSTOS DE INSTALACIÓN Y EQUIPOS

M-801 VENTILADOR DESODORIZADOR TURBO HORIZONTAL, TIPO CAPACIDAD:


R-36.223 5.3.1.8.1.1 u 2
180 ㎥ / MIN × 300MMAQ

R-36.224 5.3.1.8.1.2 M-802 DESODORIZADPR TIPO BIO-FILTRO, CAPACIDAD: 180 ㎥ / MIN u 1

R-36.225 5.3.1.8.1.3 M-803 BOMBA SUMIDERO SUMERGIBLE, CAPACIDAD: 0,1 ㎥ / MIN × 10MH u 2

5.3.1.8.2 COSTOS DE TUBERÍA


R-36.231 5.3.1.8.2.1 TUBERÍA (FRP) D(i)=100mm m 270.9
R-36.232 5.3.1.8.2.2 TUBERÍA (FRP) D(i)=125mm m 59.9
R-36.233 5.3.1.8.2.3 TUBERÍA (FRP) D(i)=150mm m 85.1
R-36.234 5.3.1.8.2.4 TUBERÍA (FRP) D(i)=200mm m 54.1
R-36.235 5.3.1.8.2.5 TUBERÍA (FRP) D(i)=250mm m 3.2
R-36.236 5.3.1.8.2.6 TUBERÍA (FRP) D(i)=300mm m 107.6
R-36.237 5.3.1.8.2.7 TUBERÍA (FRP) D(i)=350mm m 2.6
R-36.238 5.3.1.8.2.8 TUBERÍA (FRP) D(i)=400mm m 151.2
R-36.239 5.3.1.8.2.9 TUBERÍA (FRP) D(i)=450mm m 106.6
R-36.240 5.3.1.8.2.10 TUBERÍA (FRP) D(i)=600mm m 1.1
R-36.9 5.3.1.8.2.11 CODO DE 90 GRADOS (FRP) D(i)=125mm u 8.0
R-36.10 5.3.1.8.2.12 CODO DE 90 GRADOS (FRP) D(i)=150mm u 8.0
R-36.11 5.3.1.8.2.13 CODO DE 90 GRADOS (FRP) D(i)=200mm u 3.0
R-36.12 5.3.1.8.2.14 CODO DE 90 GRADOS (FRP) D(i)=300mm u 4.0
R-36.13 5.3.1.8.2.15 CODO DE 90 GRADOS (FRP) D(i)=350mm u 3.0
R-36.14 5.3.1.8.2.16 CODO DE 90 GRADOS (FRP) D(i)=400mm u 16.0
R-36.15 5.3.1.8.2.17 CODO DE 90 GRADOS (FRP) D(i)=450mm u 8.0
R-36.1 5.3.1.8.2.18 CODO DE 45 GRADOS (FRP) D(i)=100mm u 103.0
R-36.2 5.3.1.8.2.19 CODO DE 45 GRADOS (FRP) D(i)=125mm u 12.0
R-36.3 5.3.1.8.2.20 CODO DE 45 GRADOS (FRP) D(i)=150mm u 13.0
R-36.4 5.3.1.8.2.21 CODO DE 45 GRADOS (FRP) D(i)=200mm u 4.0
R-36.5 5.3.1.8.2.22 CODO DE 45 GRADOS (FRP) D(i)=300mm u 7.0
R-36.6 5.3.1.8.2.23 CODO DE 45 GRADOS (FRP) D(i)=350mm u 1.0
R-36.7 5.3.1.8.2.24 CODO DE 45 GRADOS (FRP) D(i)=400mm u 2.0
R-36.8 5.3.1.8.2.25 CODO DE 45 GRADOS (FRP) D(i)=450mm u 4.0
R-36.316 5.3.1.8.2.26 TE (FRP) D(i)=450mm u 1.0
R-36.317 5.3.1.8.2.27 TE (FRP) D(i)=600mm u 1.0
R-36.400 5.3.1.8.2.28 Y-TE (FRP) 100X100mm u 10.0
R-36.401 5.3.1.8.2.29 Y-TE (FRP) 125X100mm u 15.0
R-36.402 5.3.1.8.2.30 Y-TE (FRP) 125X125mm u 1.0
R-36.403 5.3.1.8.2.31 Y-TE (FRP) 150X100mm u 4.0
R-36.404 5.3.1.8.2.32 Y-TE (FRP) 150X125mm u 5.0
R-36.405 5.3.1.8.2.33 Y-TE (FRP) 200X125mm u 2.0
R-36.406 5.3.1.8.2.34 Y-TE (FRP) 200X150mm u 2.0
R-36.407 5.3.1.8.2.35 Y-TE (FRP) 250X125mm u 1.0
R-36.408 5.3.1.8.2.36 Y-TE (FRP) 250X150mm u 1.0
R-36.409 5.3.1.8.2.37 Y-TE (FRP) 300X125mm u 3.0
R-36.410 5.3.1.8.2.38 Y-TE (FRP) 300X150mm u 2.0
R-36.411 5.3.1.8.2.39 Y-TE (FRP) 300X200mm u 1.0
R-36.412 5.3.1.8.2.40 Y-TE (FRP) 350X150mm u 2.0
R-36.413 5.3.1.8.2.41 Y-TE (FRP) 400X200mm u 1.0
R-36.414 5.3.1.8.2.42 Y-TE (FRP) 400X300mm u 1.0
R-36.415 5.3.1.8.2.43 Y-TE (FRP) 450X350mm u 1.0
R-36.261 5.3.1.8.2.44 REDUCTOR (FRP) 125X100mm u 14.0
R-36.262 5.3.1.8.2.45 REDUCTOR (FRP) 150X125mm u 5.0
R-36.263 5.3.1.8.2.46 REDUCTOR (FRP) 200X150mm u 2.0
R-36.264 5.3.1.8.2.47 REDUCTOR (FRP) 250X125mm u 1.0
R-36.265 5.3.1.8.2.48 REDUCTOR (FRP) 250X150mm u 1.0
R-36.266 5.3.1.8.2.49 REDUCTOR (FRP) 250X200mm u 2.0
R-36.267 5.3.1.8.2.50 REDUCTOR (FRP) 300X200mm u 1.0
R-36.268 5.3.1.8.2.51 REDUCTOR (FRP) 300X250mm u 2.0
R-36.269 5.3.1.8.2.52 REDUCTOR (FRP) 350X250mm u 1.0
R-36.270 5.3.1.8.2.53 REDUCTOR (FRP) 350X300mm u 1.0
R-36.271 5.3.1.8.2.54 REDUCTOR (FRP) 400X300mm u 2.0
R-36.272 5.3.1.8.2.55 REDUCTOR (FRP) 450X250mm u 1.0
R-36.273 5.3.1.8.2.56 REDUCTOR (FRP) 450X400mm u 1.0
R-36.274 5.3.1.8.2.57 REDUCTOR (FRP) 600X400mm u 1.0
R-36.275 5.3.1.8.2.58 REDUCTOR (FRP) 600X450mm u 1.0
R-36.81 5.3.1.8.2.59 BRIDA (FRP) D(i)=100mm u 115.0
R-36.82 5.3.1.8.2.60 BRIDA (FRP) D(i)=150mm u 13.0
R-36.83 5.3.1.8.2.61 BRIDA (FRP) D(i)=200mm u 6.0
R-36.84 5.3.1.8.2.62 BRIDA (FRP) D(i)=450mm u 1.0
R-36.85 5.3.1.8.2.63 BRIDA (FRP) D(i)=600mm u 1.0
R-36.66 5.3.1.8.2.64 AMORTIGUADOR (STS) D(i)=100mm u 47.0
R-36.67 5.3.1.8.2.65 AMORTIGUADOR (STS) D(i)=150mm u 5.0
R-36.68 5.3.1.8.2.66 AMORTIGUADOR (STS) D(i)=200mm u 3.0
R-36.114 5.3.1.8.2.67 JUNTA FLEXIBLE (GOMA) D(i)=100mm u 47.0
R-36.115 5.3.1.8.2.68 JUNTA FLEXIBLE (GOMA) D(i)=150mm u 5.0
R-36.146 5.3.1.8.2.69 CAMPANA (FRP) 500X500mm u 3.0
5.3.1.8.3 COSTOS DE INSTALACIÓN DE LA TUBERÍA
R-36.128 5.3.1.4.3.1 INSTALACIÓN DE TUBERÍA FRP D(i)=100mm m 258.0
R-36.129 5.3.1.4.3.2 INSTALACIÓN DE TUBERÍA FRP D(i)=125mm m 57.0
R-36.130 5.3.1.4.3.3 INSTALACIÓN DE TUBERÍA FRP D(i)=150mm m 81.0
R-36.131 5.3.1.4.3.4 INSTALACIÓN DE TUBERÍA FRP D(i)=200mm m 51.5
R-36.132 5.3.1.4.3.5 INSTALACIÓN DE TUBERÍA FRP D(i)=250mm m 3.0
R-36.133 5.3.1.4.3.6 INSTALACIÓN DE TUBERÍA FRP D(i)=300mm m 102.5
R-36.134 5.3.1.4.3.7 INSTALACIÓN DE TUBERÍA FRP D(i)=350mm m 3.5
R-36.135 5.3.1.4.3.8 INSTALACIÓN DE TUBERÍA FRP D(i)=400mm m 144.0
R-36.136 5.3.1.4.3.9 INSTALACIÓN DE TUBERÍA FRP D(i)=450mm m 102.0
R-36.137 5.3.1.4.3.10 INSTALACIÓN DE TUBERÍA FRP D(i)=600mm m 1.0
R-36.123 5.3.1.4.3.11 JUNTA CONTRABRIDA FRP D(i)=100mm u 175.0
R-36.124 5.3.1.4.3.12 JUNTA CONTRABRIDA FRP D(i)=150mm u 19.0
R-36.125 5.3.1.4.3.13 JUNTA CONTRABRIDA FRP D(i)=200mm u 6.0
R-36.126 5.3.1.4.3.14 JUNTA CONTRABRIDA FRP D(i)=400mm u 2.0
R-36.127 5.3.1.4.3.15 JUNTA CONTRABRIDA FRP D(i)=450mm u 2.0
R-36.63 5.3.1.4.3.16 INSTALACIÓN AMORTIGUADOR D(i)=100mm u 47.0
R-36.64 5.3.1.4.3.17 INSTALACIÓN AMORTIGUADOR D(i)=150mm u 5.0
R-36.65 5.3.1.4.3.18 INSTALACIÓN AMORTIGUADOR D(i)=200mm u 3.0
R-36.112 5.3.1.4.3.19 INSTALACIÓN JUNTA FLEXIBLE DE D(i)=100mm u 47.0
R-36.113 5.3.1.4.3.20 INSTALACIÓN JUNTA FLEXIBLE DE D(i)=150mm u 5.0
R-36.370 5.3.1.4.3.21 SOLDADURA (FRP) D(i)=100mm u 360.0
R-36.371 5.3.1.4.3.22 SOLDADURA (FRP) D(i)=125mm u 82.0
R-36.372 5.3.1.4.3.23 SOLDADURA (FRP) D(i)=150mm u 81.0

Hoja 86 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-36.373 5.3.1.4.3.24 SOLDADURA (FRP) D(i)=200mm u 34.0


R-36.374 5.3.1.4.3.25 SOLDADURA (FRP) D(i)=250mm u 11.0
R-36.375 5.3.1.4.3.26 SOLDADURA (FRP) D(i)=300mm u 44.0
R-36.376 5.3.1.4.3.27 SOLDADURA (FRP) D(i)=350mm u 11.0
R-36.377 5.3.1.4.3.5 SOLDADURA (FRP) D(i)=400mm u 54.0
R-36.378 5.3.1.4.3.6 SOLDADURA (FRP) D(i)=450mm u 40.0
R-36.379 5.3.1.4.3.7 SOLDADURA (FRP) D(i)=600mm u 4.0
R-36.230 5.3.1.4.3.8 PERFORACIÓN DE D(i)=600mm u 1.0
R-36.62 5.3.1.4.3.9 INSTALACIÓN DE DRENAJE DE CONDENSADO D(i)=50mm u 4.0
5.3.1.9 EQUIPOS DE LABORATORIO
R-36.148 5.3.1.9.1.1 EQUIPOS DE LABORATORIO juego 1
5.3.1.10 ESTRUCTURA DE ACERO FABRICACIÓN E INSTALACIÓN
R-36.55 5.3.1.10.2.1 CANAL 200X80X7.5T (SS400) kg 5,292.6
R-36.145 5.3.1.10.2.2 VIGA H (SS400) 200X100X8mm kg 14,852.6
R-36.33 5.3.1.10.2.3 75X75X9T ANGULO (SS400) kg 3,010.3
R-36.37 5.3.1.10.2.4 PLACA BASE (SS400) 9T kg 5,266.4
R-36.301 5.3.1.10.2.5 REJILLA PARA CARRETERA DE ACERO DE 38 X 5 X 3mm m2 56.2
R-36.56 5.3.1.10.2.6 PLACA CHECK (SS400) 3.2T kg 55.1
R-36.302 5.3.1.10.2.7 BARRA DE ACERO INOXIDABLE D(i)=32mm kg 375.0
R-36.347 5.3.1.10.2.8 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=20mm) M10X50L juego 15.0
R-36.348 5.3.1.10.2.9 U-PERNO, TUERCA, ARANDELA (SS400) M10X60L (D(i)=32mm) juego 227.0
R-36.349 5.3.1.10.2.10 U-PERNO, TUERCA, ARANDELA (SS400) M10X65L (D(i)=50mm) juego 20.0
R-36.350 5.3.1.10.2.11 U-PERNO, TUERCA, ARANDELA (SS400) M12X85L (D(i)=80mm) juego 12.0
R-36.351 5.3.1.10.2.12 U-PERNO, TUERCA, ARANDELA (SS400) M16X100L (D(i)=100mm) juego 51.0
R-36.352 5.3.1.10.2.13 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=125mm) M16X120L juego 60.0
R-36.353 5.3.1.10.2.14 U-PERNO, TUERCA, ARANDELA (SS400) M16X130L (D(i)=150mm) juego 72.0
R-36.354 5.3.1.10.2.15 U-PERNO, TUERCA, ARANDELA (SS400) M20X165L (D(i)=200mm) juego 71.0
R-36.355 5.3.1.10.2.16 U-PERNO, TUERCA, ARANDELA (SS400) M20X195L (D(i)=250mm) juego 10.0
R-36.356 5.3.1.10.2.17 U-PERNO, TUERCA, ARANDELA (SS400) M24X240L (D(i)=300mm) juego 37.0
R-36.357 5.3.1.10.2.18 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=350mm) M24X260L juego 8.0
R-36.358 5.3.1.10.2.19 U-PERNO, TUERCA, ARANDELA (SS400) M24X280L (D(i)=400mm) juego 37.0
R-36.359 5.3.1.10.2.20 U-PERNO, TUERCA, ARANDELA (SS400) (D(i)=450mm) M24X310L juego 23.0
R-36.32 5.3.1.10.2.21 M16X190L PERNO DE ANCLAJE juego 4,893.0
R-36.228 5.3.1.10.2.22 PINTURA (MOHO-RESISTIR) 2 VECES POR LADO m2 1,150.8
R-36.227 5.3.1.10.2.23 PINTURA (MEZCLA LISTA) 2 VECES POR LADO m2 1,150.8
R-36.303 5.3.1.10.2.24 FABRICACIÓN DE ESTRUCTURA DE ACERO INSTALACIÓN SIMPLE ton 34.6
5.3.2 TRABAJOS MECÁNICOS EDIFICIO ADMINISTRATIVO
5.3.2.1 SISTEMA DE CLIMATIZACIÓN Y VENTILACIÓN MECÁNICA
5.3.2.1.1 UNIDADES INTERIORES
R-37.1 5.3.2.1.1.1 UNIDAD TIPO CASSETTE 12,000 BTU/H, VRV, R410-A u 1
R-37.2 5.3.2.1.1.2 UNIDAD TIPO CASSETTE 24,000 BTU/H, VRV, R410-A u 2
R-37.3 5.3.2.1.1.3 UNIDAD TIPO CASSETTE 38,000 BTU/H, VRV, R410-A u 6
5.3.2.1.2 UNIDADES EXTERIORES
R-37.4 5.3.2.1.2.1 UNIDAD EXTERIOR VRV 136,500 BTU/H, R410 A u 1
R-37.5 5.3.2.1.2.2 UNIDAD EXTERIOR VRV 153,600 BTU/H, R410 A u 1
R-37.6 5.3.2.1.2.3 REFRIGERANTE 410 A kg 23
5.3.2.1.3 TUBERÍA DE AIRE ACONDICIONADO
JUNTA DE DERIVACION PARA SISTEMAS VRV PARA UNIDADES INTERNA MENOR A
R-37.7 5.3.2.1.3.1 u 4
112,6 KBTU/H

JUNTA DE DERIVACIÓN PARA SISTEMAS VRV PARA UNIDADES INTERNA MENOR A


R-37.8 5.3.2.1.3.2 u 2
202,6 KBTU/H

JUNTA DE DERIVACIÓN PARA SISTEMAS VRV PARA UNIDADES INTERNA MENOR A


R-37.9 5.3.2.1.3.3 u 2
242,3KBTU/H
R-37.10 5.3.2.1.3.4 JUNTA DE DERIVACIÓN PARA JUNTAR UNIDADES CONDENSADORAS VRV u 1
R-37.11 5.3.2.1.3.5 CONTROL INDIVIDUAL , HASTA 16 EQUIPOS AIRE ACONDICIONADO u 9
R-37.12 5.3.2.1.3.6 TUBERÍA COBRE TIPO ACR 1/4" AISLADA m 15
R-37.13 5.3.2.1.3.7 TUBERÍA COBRE TIPO ACR 3/8" AISLADA m 35
R-37.14 5.3.2.1.3.8 TUBERÍA COBRE TIPO ACR 1/2" AISLADA m 46
R-37.15 5.3.2.1.3.9 TUBERÍA COBRE TIPO ACR 5/8" AISLADA m 64
R-37.16 5.3.2.1.3.10 TUBERÍA COBRE TIPO ACR 3/4" AISLADA m 29
R-37.17 5.3.2.1.3.11 TUBERÍA COBRE TIPO ACR 1 1/8" AISLADA m 20
R-37.18 5.3.2.1.3.12 TUBERÍA COBRE TIPO ACR 1 3/8" AISLADA m 15
R-37.19 5.3.2.1.3.13 SOPORTE TIPO COLUMPIO PARA TUBERÍA COBRE u 153
5.3.2.1.4 TUBERÍA PARA DESAGUE
R-37.20 5.3.2.1.4.1 TUBERÍA PARA DESAGUE DE UNIDADES EVAPORADORAS, PVC DIAM. 1" m 57
R-37.21 5.3.2.1.4.2 BOMBA PARA EVACUACIÓN DE CONDENSADO u 9
5.3.2.1.5 VENTILACIÓN MECÁNICA
R-37.22 5.3.2.1.5.1 VENTILADOR EXTRACTOR CENTRIFUGO 3400 CFM @2" SP u 1
R-37.23 5.3.2.1.5.2 VENTILADOR EXTRACTOR CENTRIFUGO 2600 CFM @2 " SP u 1
R-37.24 5.3.2.1.5.3 DUCTERIA METALICA PARA VENTILACIÓN MECÁNICA kg 750
R-37.25 5.3.2.1.5.4 MANGAS SIN AISLAMIENTO DIAMETRO 4 PULGADAS m 72
R-37.26 5.3.2.1.5.5 MANGAS SIN AISLAMIENTO DIAMETRO 8 PULGADAS m 25
R-37.27 5.3.2.1.5.6 REJILLA DE EXTRACCIÓN DE 10"X10" INCLUYE DAMPERS DE REGULACIÓN u 2
R-37.28 5.3.2.1.5.7 REJILLA DE EXTRACCIÓN DE 12"X12" INCLUYE DAMPERS DE REGULACIÓN u 5
R-37.29 5.3.2.1.5.8 REJILLA DE EXTRACCIÓN 8"X8" INCLUYE DAMPERS DE REGULACIÓN u 28
SOPORTE PARA DUCTERIA METÁLICA (PARA AIRE ACONDICIONADO Y
R-37.30 5.3.2.1.5.9 u 80
VENTILACIÓN MECÁNICA)
5.3.2.1.6 CABLES CONTROL Y FUERZA
R-37.31 5.3.2.1.6.1 CABLE DE CONTROL 1030A m 60
R-37.32 5.3.2.1.6.2 CABLE DE FUERZA m 20
R-37.33 5.3.2.1.6.3 CUADRO DE CONTROL PARA VENTILADORES u 2
5.3.2.2 RED CONTRA INCENDIOS
R-37.34 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE GABINETE CONTRA INCENDIOS CLASE II u 2
R-37.35 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE EXTINTOR CO2 10 LIBRAS u 2
R-37.36 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE EXTINTOR PQS ABC 10 LIBRAS u 26
R-37.37 5.3.2.1.1.1 SUMINISTRO E INSTALACION DE SIAMESA 4" X 2 1/2" X 2 1/2" u 1
R-37.38 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE VÁLVULA CHECK 2" u 1
R-37.39 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE TUBERÍA ACERO NEGRO SCH 40, DIAM 2 " m 42

R-37.40 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE TUBERÍA ACERO NEGRO SCH 40, DIAM 1 1/2" m 17

R-37.41 5.3.2.1.1.1 PINTURA PARA TUBERÍAS CON FONDO ANTICORROSIVO Y PINTURA ROJA. m 65
SUMINISTRO E INSTALACIÓN BOMBA PRINCIPAL , 15 HP 3F-220/440V, TABLERO DE
R-37.42 5.3.2.1.1.1 u 1
CONTROL
R-37.43 5.3.2.1.1.1 SUMINISTRO E INSTALACIÓN DE BOMBA JOCKEY, 1.5 HP, 3F-220/440V u 1
5.4 OBRA ELÉCTRICA
5.4.1 OBRA ELÉCTRICA PARA LAS INSTALACIONES DE LA PTAR
5.4.1.1 SUMINISTRO ELÉCTRICO (MV) DESDE LA SUBESTACION A LA PTAR
R-32-1 5.4.1.1.1 CONSTRUCCION RED DE MEDIO VOLTAJE SUBTERRANEO u 1
R-32-2 5.4.1.1.2 CONSTRUCCION DE RED DE MEDIO VOLTAJE 4.7Km AEREO u 1
R-33.1 5.4.1.2 CANAL DE CABLES DE ENERGÍA juego 1
R-33.2 5.4.1.3 INSTALACIÓN DE CONDUCTO EN EXTERIORES juego 1
SUMINISTRO E INSTALACIÓN CABLE, INCLUYENDO EXTENSIÓN DE CABLE,
5.4.1.4 CABLEADO SUBTERRÁNEO, ETC. INSTALAR EQUIPO ELÉCTRICO Y CONDUCTO

Hoja 87 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

5.4.1.4.1 EDIFICIO MULTIPROPOSITO


R-33.3 5.4.1.4.1.1 MCC-A100 juego 1
R-33.4 5.4.1.4.1.2 MCC-A200 juego 1
R-33.5 5.4.1.4.1.3 MCC-A300 juego 1
R-33.6 5.4.1.4.1.4 MCC-A700 juego 1
5.4.1.4.2 EDIFICIO DESHIDRATACION DE LODOS

R-33.7 5.4.1.4.2.1 MCC-A400 juego 1


R-33.8 5.4.1.4.2.2 MCC-A500 juego 1
R-33.9 5.4.1.4.2.3 MCC-A600 juego 1
5.4.1.5 BANDEJA DE CABLES
R-33.10 5.4.1.5.1 EDIFICIO MULTIPROPOSITO juego 1
R-33.11 5.4.1.5.2 CLARIFICADOR PRIMARIO. juego 1
R-33.12 5.4.1.5.3 CLARIFICADOR SECUNDARIO TIPO 1 juego 1
R-33.13 5.4.1.5.4 EDIFICIO DE DESHIDRATACIÓN DE LODOS juego 1
R-33.14 5.4.1.5.5 BIO REACTOR juego 1
5.4.1.6 CONSTRUCCIÓN DE PUESTA A TIERRA

R-33.15 5.4.1.6.1 EDIFICIO ADMINISTRATIVO juego 1


R-33.16 5.4.1.6.2 EDIFICIO ELÉCTRICO juego 1
R-33.17 5.4.1.6.3 DESHIDRATACIÓN DE LODOS juego 1
5.4.1.7 SUMINISTRO DE EQUIPO ELÉCTRICO

R-33.18 5.4.1.7.1 UNIDAD PRINCIPAL DEL ANILLO (RMU) juego 1


5.4.1.7.2 HV
R-33.19 5.4.1.7.2.1 HV-1 u 1
R-33.20 5.4.1.7.2.2 HV-2 u 1
R-33.21 5.4.1.7.2.3 HV-3 u 1
R-33.22 5.4.1.7.2.4 HV-4 u 1
R-33.23 5.4.1.7.2.5 HV-5 u 1
R-33.24 5.4.1.7.2.6 MTR-1 u 1
R-33.25 5.4.1.7.2.7 MTR-2 u 1
5.4.1.7.3 LV

R-33.26 5.4.1.7.3.1 LV-A1 u 1


R-33.27 5.4.1.7.3.2 LV-A2 u 1
R-33.28 5.4.1.7.3.3 LV-A3 u 1
R-33.29 5.4.1.7.3.4 LV-A4 u 1
R-33.30 5.4.1.7.3.5 LV-A5 u 1
R-33.31 5.4.1.7.4 DC-1 u 1
R-33.32 5.4.1.7.5 BAT-1 u 1
5.4.1.7.6 MCC

R-33.33 5.4.1.7.6.1 MCC-A100 (H) u 1


R-33.34 5.4.1.7.6.2 MCC-A200 (H) u 1
R-33.35 5.4.1.7.6.3 MCC-A300 (H) u 1
R-33.36 5.4.1.7.6.4 MCC-A400 (H) u 1
R-33.37 5.4.1.7.6.5 MCC-A500 (H) u 1
R-33.38 5.4.1.7.6.6 MCC-A600 (H) u 1
R-33.39 5.4.1.7.6.7 MCC-A700 (H) u 1
R-33.40 5.4.1.7.6.8 MCC-A800 (H) u 1
R-33.41 5.4.1.7.6.9 BASE DE MCC juego 1
R-33.42 5.4.1.7.7 CIRCUITO LIP 1 u 2
R-33.43 5.4.1.7.8 CIRCUITO LIP 2 u 17
R-33.44 5.4.1.7.9 CIRCUITO LIP 3 u 3
R-33.45 5.4.1.7.10 PIEZAS DE REPUESTO juego 1
R-33.46 5.4.1.7.11 DISTRIBUTE POWER TRANSPORT COST juego 1
R-33.47 5.4.1.7.12 GENERADOR DE ENERGÍA u 1
R-33.48 5.4.1.7.13 CONTENEDOR u 1
R-33.49 5.4.1.7.14 TANQUE COMBUSTIBLE u 1
5.4.2 ELECTRÓNICO - EDIFICIO ADMINISTRATIVO
5.4.2.1 CABLEADO ESTRUCTURADO
R-34.4 5.4.2.1.1 CABLEADO ESTRUCTURADO CAT 6 m 78
CANALIZACIÓN CENTRAL (ESCALERRILLA, TIPO MALLA Ó ELECTROCANAL) Y
R-34.3 5.4.2.1.2 ACCESORIOS m 240

R-34.19 5.4.2.1.3 CABLE UTP CAT 6 m 2,423


R-34.20 5.4.2.1.4 RACK DE PISO 44 UR u 1
R-34.21 5.4.2.1.5 PATCH CORD 3FT CAT 6 U 78
R-34.22 5.4.2.1.6 PATCH CORD 7FT CAT 6 U 78
SWITCH CAPA 2-24 PUERTOS 10/100/1000 12 PUERTOS POE 2 PUERTOS SFP
R-34.7 5.4.2.1.7 u 4

R-34.8 5.4.2.1.8 PATCH PANEL u 4


R-34.9 5.4.2.1.9 CERTIFICACION DE PUNTOS DE DATOS u 78
R-34.24 5.4.2.1.10 SISTEMA DE CLIMATIZACION U 1
R-34.25 5.4.2.1.11 SISTEMA PISO FALSO m2 40
R-34.23 5.4.2.1.12 ACCESS POINT U 5
R-34.26 5.4.2.1.13 CANALIZACION POR TIERRA 2X2" PVC ELECTRONICO M 240
R-34.27 5.4.2.1.14 CAJA DE REVISION HORMIGON CON TAPA (0.60X0.60X0.60) U 7
R-34.28 5.4.2.1.15 TUBERIA CONDUIT 1" CON ACCESORIOS m 24
R-34.29 5.4.2.1.16 TUBERÍA EMT DE 1 1/4" CON ACCESORIOS M 23
R-34.30 5.4.2.1.17 TUBERIA EMT DE 1 1/2" CON ACCESORIOS M 9
R-34.1 5.4.2.1.18 TUBERIA CONDUIT 1/2" m 36
R-34.2 5.4.2.1.19 TUBERIA CONDUIT 3/4" (PROVISION E INSTALACION) m 130
R-34.31 5.4.2.1.20 BANDEJA DE PISO M 80
R-34.32 5.4.2.1.21 CENTRAL TELEFÓNICA IP U 1
R-34.33 5.4.2.1.22 TELÉFONO IP U 27
R-34.58 5.4.2.1.23 FIBRA OPTICA m 240
R-34.60 5.4.2.1.24 ODF U 3
PRUEBA UNIDIRECCIONAL DE TRANSMISIÓN FIBRA ÓPTICA POR PUNTA Y
R-34.5 5.4.2.1.25 VENTANA + PRUEBA DE POTENCIA u 12

R-34.6 5.4.2.1.26 INSTALACION DE RACK DE PARED 12 UR u 1


R-34.64 5.4.2.1.27 INSTALACIÓN Y CONECTIVIDAD PARA SERVICIO DE INTERNET SATELITAL U 1
5.4.2.2 SISTEMA DE CAMARAS DE VIGILANCIA
R-34.10 5.4.2.2.1 INSTALACION Y CONFIGURACION DEL SISTEMA CAMARAS IP u 23
R-34.36 5.4.2.2.2 INSTALACIÓN Y CONFIGURACIÓN CAMARA IP BALA U 11
R-34.4 5.4.2.2.3 CABLEADO ESTRUCTURADO CAT 6 m 43
R-34.37 5.4.2.2.4 BOTON DE SALIDA U 8
R-34.38 5.4.2.2.5 CERRADURA ELECTROMAGNETICA U 5
R-34.39 5.4.2.2.6 SENSOR DE MOVIMIENTO U 7
R-34.40 5.4.2.2.7 MOTOR PUERTA U 2
R-34.41 5.4.2.2.8 INSTALACIÓN Y CONFIGURACIÓN CONTROL DE ACCESO CON HUELLA U 8
R-34.29 5.4.2.2.9 TUBERÍA EMT DE 1 1/4" CON ACCESORIOS M 13
R-34.1 5.4.2.2.10 TUBERIA CONDUIT 1/2" m 205
R-34.2 5.4.2.2.11 TUBERIA CONDUIT 3/4" (PROVISION E INSTALACION) m 59
R-34.28 5.4.2.2.12 TUBERIA CONDUIT 1" CON ACCESORIOS m 20
R-34.53 5.4.2.2.13 SISTEMA DE GRABACION NVR U 1
R-34.54 5.4.2.2.14 MONITOR U 2

Hoja 88 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-34.55 5.4.2.2.15 TV MONITOREO U 2


SWITCH CAPA 2-24 PUERTOS 10/100/1000 12 PUERTOS POE 2 PUERTOS SFP
R-34.7 5.4.2.2.16 u 5

R-34.57 5.4.2.2.17 SWITCH 24 PUERTOS + POE U 1


R-34.27 5.4.2.2.18 CAJA DE REVISION HORMIGON CON TAPA (0.60X0.60X0.60) U 11
R-34.20 5.4.2.2.19 RACK DE PISO 44 UR u 1
R-34.61 5.4.2.2.20 Rack para exterior 12 ur U 2
R-34.6 5.4.2.2.21 INSTALACION DE RACK DE PARED 12 UR u 2
R-34.62 5.4.2.2.22 CÁMARA TIPO DOMO PTZ U 7
R-34.58 5.4.2.2.23 FIBRA OPTICA m 445
R-34.26 5.4.2.2.24 CANALIZACION POR TIERRA 2X2" PVC ELECTRONICO M 445
R-34.27 5.4.2.2.25 CAJA DE REVISION HORMIGON CON TAPA (0.60X0.60X0.60) U 11
5.4.2.3 SONORIZACIÓN
R-34.43 5.4.2.3.1 PARLANTE TIPO CAJA CON TAP DE POTENCIA F4 U 32
R-34.48 5.4.2.3.2 PARLANTE TIPO MEGAFONO EXTERIOR F4 U 4
R-34.42 5.4.2.3.3 SALIDA PARA AUDIO F4 U 30
R-34.44 5.4.2.3.4 AMPLIFICADOR DE AUDIO F4 U 1
R-34.45 5.4.2.3.5 CENTRAL CONTROLADORA AUDIO F4 U 1
R-34.47 5.4.2.3.6 ENRUTADOR / EXPANSOR DE ZONAS F4 U 1
R-34.49 5.4.2.3.7 ESTACION DE LLAMADA F4 U 1
R-34.46 5.4.2.3.8 CABLE DE AUDIO F4 U 292
R-34.50 5.4.2.3.9 KIT CONTROL REMOTO F4 U 1
R-34.30 5.4.2.3.10 TUBERIA EMT DE 1 1/2" CON ACCESORIOS M 344
R-34.51 5.4.2.3.11 FUENTE DE SONIDO F4 U 1
R-34.52 5.4.2.3.12 PUESTA EN MARCHA Y CONFIGURACION SONIDO F4 U 1
5.4.2.4 DETECCIÓN DE INCENDIOS
R-34.17 5.4.2.4.1 MODULO DE CONTROL u 14
R-34.15 5.4.2.4.2 ESTACION MANUAL DE INCENDIOS u 12
R-34.13 5.4.2.4.3 LUZ ESTROBOSCOPICA CON SIRENA u 14
R-34.12 5.4.2.4.4 PANEL DE ALARMA CENTRAL DE INCENDIO DIRECCIONABLE u 1
R-34.11 5.4.2.4.5 SIRENA 65dB, 110V pto 1
R-34.18 5.4.2.4.6 MODULO AISLAMIENTO u 5
R-34.14 5.4.2.4.7 DETECTOR HUMO FOTOELÉCTRICO u 28
R-34.34 5.4.2.4.8 LUZ DE EMERGENCIA U 31
R-34.35 5.4.2.4.9 LETRERO LUMINOSO DE SALIDA U 17
R-34.30 5.4.2.4.10 TUBERIA EMT DE 1 1/2" CON ACCESORIOS M 326
R-34.16 5.4.2.4.11 CABLE 2X16 AWG ANTIFLAMA m 326
R-34.56 5.4.2.4.12 PUNTO DE INCENDIO U 38
R-34.63 5.4.2.4.13 INSTALACIÓN Y PUESTAEN MARCHA DETECCION DE INCENDIOS U 1
5.4.3 ELÉCTRICO - EDIFICIO ADMINISTRATIVO
5.4.3.1 OBRA CIVIL
R-8.2 5.4.3.1.1 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 6
R-32-3 5.4.3.1.2 BANCO DE DUCTOS - EU0-0B1X2B u 270
R-32-4 5.4.3.1.3 EXCAVACIÓN A MÁQUINA EN TIERRA H=2-4M m3 270
R-4.12 5.4.3.1.4 RELLENO COMPACTADO MANUAL CON MATERIAL DE EXCAVACIÓN m3 270
5.4.3.2 RED DE BAJO VOLTAJE
5.4.3.2.1 EDIFICIO ADMINISTRATIVO
R-32-7 5.4.3.2.1.1 CAJA TERMICA 16 PUNTOS 125A u 5
R-32-8 5.4.3.2.1.2 PUNTO DE ILUMINACIÓN NORMAL EN EMT BAJO 4m ALTURA pto 182
R-32-9 5.4.3.2.1.3 PUNTO DE TOMACORRRIENTE NORMAL EMT 120V pto 157
R-32-10 5.4.3.2.1.4 PUNTO DE TOMACORRIENTE ESPECIAL220v 50A pto 18
R-32-11 5.4.3.2.1.5 PUNTO DE TOMACORRIENTE REGULADO pto 20
R-32-13 5.4.3.2.1.6 LUMINARIA 60X60CM CON REJILLA Y FOCOS LED CIELO FALSO u 79
R-32-14 5.4.3.2.1.7 LUMINARIA 1.20x.60 LED PARA CIELO FALSO u 74
R-32-20 5.4.3.2.1.8 TRANSFORMADOR SECO 220KVA 460/220/127 u 1
R-32-5 5.4.3.2.1.9 TABLERO PRINCIPAL 8 PUNTOS 110/220V 125A u 3
5.4.3.2.2 EXTERIORES
R-32-12 5.4.3.2.2.1 PUNTO DE ILUMINACION EXTERIOR EN POSTE ORNAMENTAL pto 50
R-32-16 5.4.3.2.2.2 LUMINARIA ALUMBRADO VEHICULAR 150W u 50
R-32-17 5.4.3.2.2.3 LUMINARIA LED 90W TIPO ZWECK u 10
R-32-18 5.4.3.2.2.4 LUMINARIA TIPO PERFIL 2.5MM u 20
R-32-15 5.4.3.2.2.5 POSTE METALICO TELESCOPICO 10m u 50
R-32-6 5.4.3.2.2.6 EXCAVACION A MAQUINA m3 1,196
R-32-3 5.4.3.2.2.7 BANCO DE DUCTOS - EU0-0B1X2B u 1,196
R-8.2 5.4.3.2.2.8 CAJA DE REVISIÓN DE H.S. f´c=210 kg/cm2 (600x700x1000)mm u 68
5.4.3.2.3 EDIFICIO MULTIPROPOSITO
R-32-7 5.4.3.2.3.1 CAJA TERMICA 16 PUNTOS 125A u 1
R-32-8 5.4.3.2.3.2 PUNTO DE ILUMINACIÓN NORMAL EN EMT BAJO 4m ALTURA pto 95
R-32-9 5.4.3.2.3.3 PUNTO DE TOMACORRRIENTE NORMAL EMT 120V pto 37
R-32-19 5.4.3.2.3.4 LUMINARIA TIPO LED COLGANTE IP65 u 95
R-32-20 5.4.3.2.3.5 TRANSFORMADOR SECO 220KVA 460/220/127 u 1
R-32-10 5.4.3.2.3.6 PUNTO DE TOMACORRIENTE ESPECIAL220v 50A pto 11
5.4.3.2.4 EDIFICIO DESHIDRATACION DE LODOS
R-32-7 5.4.3.2.4.1 CAJA TERMICA 16 PUNTOS 125A u 1
R-32-8 5.4.3.2.4.2 PUNTO DE ILUMINACIÓN NORMAL EN EMT BAJO 4m ALTURA pto 49
R-32-9 5.4.3.2.4.3 PUNTO DE TOMACORRRIENTE NORMAL EMT 120V pto 15
R-32-10 5.4.3.2.4.4 PUNTO DE TOMACORRIENTE ESPECIAL220v 50A pto 2
R-32-19 5.4.3.2.4.5 LUMINARIA TIPO LED COLGANTE IP65 u 49
5.4.3.2.5 CUARTO DE BOMBAS 1
R-32-7 5.4.3.2.5.1 CAJA TERMICA 16 PUNTOS 125A u 2
R-32-8 5.4.3.2.5.2 PUNTO DE ILUMINACIÓN NORMAL EN EMT BAJO 4m ALTURA pto 6
R-32-9 5.4.3.2.5.3 PUNTO DE TOMACORRRIENTE NORMAL EMT 120V pto 8
R-32-10 5.4.3.2.5.4 PUNTO DE TOMACORRIENTE ESPECIAL220v 50A pto 2
5.4.3.2.6 CUARTO DE BOMBAS 2
R-32-8 5.4.3.2.6.1 PUNTO DE ILUMINACIÓN NORMAL EN EMT BAJO 4m ALTURA pto 9
R-32-9 5.4.3.2.6.2 PUNTO DE TOMACORRRIENTE NORMAL EMT 120V pto 12
R-32-7 5.4.3.2.6.3 CAJA TERMICA 16 PUNTOS 125A u 1
R-32-10 5.4.3.2.6.4 PUNTO DE TOMACORRIENTE ESPECIAL220v 50A pto 2
5.5 INSTRUMENTACIÓN Y SISTEMA DE CONTROL
SUMINISTRO E INSTALACIÓN DE CABLE, CONDUCTO INCLUYENDO TIRAR EL
CABLE, CABLEADO SUBTERRÁNEO, CABLE BANDEJA, ETC. E INSTALACIÓN
5.5.1
INSTRUMENTAL Y EQUIPOS DE CONTROL

R-35.1 5.5.1.1 INSTALACIÓN DE TANQUES DE DESARENADOR & CRIBADO juego 1


R-35.2 5.5.1.2 CLARIFICADOR PRIMARIO juego 1
R-35.3 5.5.1.3 BIO REACTOR Y EDIFICIO MULTIPROPOSITO juego 1
R-35.4 5.5.1.4 CLARIFICADOR SECUNDARIO TIPO 2 juego 1

R-35.5 5.5.1.5 INSTALACIÓN DE DESINFECIÓN PARA LA REUTILIZACIÓN DE AGUAS TRATADAS juego 1

R-35.6 5.5.1.6 INSTALACIÓN DE DESHIDRATACION DE LODOS juego 1


R-35.7 5.5.1.7 EDIFICIO ADMINISTRATIVO Y ETC. juego 1
5.5.2 SUMINISTRO DE INSTRUMENTAL Y EQUIPO DE SISTEMA DE CONTROL
5.5.2.1 EQUIPO DE CONTROL Y EDIFICIO

Hoja 89 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-35.8 5.5.2.1.1 POS (Estación de trabajo) juego 3


R-35.9 5.5.2.1.2 PROGRAMA DE SOFTWARE HMI juego 1
R-35.10 5.5.2.1.3 SERVIDOR DE BASE DE DATOS juego 1
R-35.11 5.5.2.1.4 PANTALLA LED - 50"(127cm) juego 2
R-35.12 5.5.2.1.5 IMPRESORA juego 1
R-35.13 5.5.2.1.6 RCS #1 (ESTACIÓN DE CONTROL REMOTO) juego 1
R-35.14 5.5.2.1.7 RCS #2 (ESTACIÓN DE CONTROL REMOTO) juego 1
R-35.15 5.5.2.1.8 EQUIPO DE RED juego 1
R-35.16 5.5.2.1.9 UPS #M,1,2 juego 1
R-35.17 5.5.2.1.10 PIEZA DE REPUESTO juego 1
R-35.18 5.5.2.1.11 HERRAMIENTAS DE MANTENIMIENTO juego 1
5.5.2.2 INSTRUMENTOS DE CAMPO

R-35.19 5.5.2.2.1 MEDICIÓN DE CAUDAL ( Tipo magnético ) 50A juego 2


R-35.20 5.5.2.2.2 MEDICIÓN DE CAUDAL ( Tipo magnético ) 80A juego 1
R-35.21 5.5.2.2.3 MEDICIÓN DE CAUDAL ( Tipo magnético ) 125A juego 4
R-35.22 5.5.2.2.4 MEDICIÓN DE CAUDAL ( Tipo magnético ) 300A juego 1
R-35.23 5.5.2.2.5 MEDICIÓN DE CAUDAL ( Ultrasovic Tipo ) 800A juego 2
R-35.24 5.5.2.2.6 MEDIDOR DE FLUJO juego 1
R-35.25 5.5.2.2.7 MEDICIÓN DE CAUDAL (Tipo de orificio ) 200A juego 4
R-35.26 5.5.2.2.8 MEDICIÓN DE NIVEL ( Ultrasovic Tipo ) juego 9
R-35.27 5.5.2.2.9 MEDIDOR DE PH juego 7
R-35.28 5.5.2.2.10 MEDIDOR DE SS juego 2
R-35.29 5.5.2.2.11 MEDIDOR DO juego 4
R-35.30 5.5.2.2.12 MEDIDOR DE MLSS juego 4
R-35.31 5.5.2.2.13 MEDIDOR DE DBO juego 2
R-35.32 5.5.2.2.14 INTERRUPTOR DE NIVEL ( Tipo flotador rápido ) juego 12
R-35.33 5.5.2.2.15 MDIDOR DE DENSIDAD juego 1
R-35.34 5.5.2.2.16 MEDIDOR DE DENSIDAD 200A juego 1
R-35.35 5.5.2.2.17 MEDIDOR DE DENSIDAD 300A juego 1
R-35.36 5.5.2.2.18 PANEL LIP juego 46
R-35.37 5.5.2.2.19 PROTECTOR DE ENERGÍA u 46
R-35.38 5.5.2.2.19 PARARRAYOS DE LA SEÑAL juego 131
R-35.39 5.5.2.2.19 PARARRAYOS DE ENERGÍA UPS juego 3
5.5.3 CARGO ADICIONAL
R-35.40 5.5.3.1 TARIFA DE INSTALACIÓN juego 1
R-35.41 5.5.3.2 CALIBRACIÓN Y AJUSTE DEL INSTRUMENTO juego 1
R-35.42 5.5.3.3 SUPERVISIÓN Y CAPACITACIÓN juego 1
R-35.43 5.5.3.4 COSTO DE EMBALAJE juego 1
5.5.4 INSTALACIÓN DE CCTV

R-35.44 5.5.4.1 CÁMARA INTERIOR Y AMPLIACIÓN, INCLINACIÓN juego 1


R-35.45 5.5.4.2 CÁMARA AL AIRE LIBRE Y AMPLIACIÓN, INCLINACIÓN juego 4
R-35.46 5.5.4.3 DVR (DIGITAL VIDEO RECORDER) HDD 1TB juego 1
R-35.47 5.5.4.4 CONTROLADOR juego 1
R-35.48 5.5.4.5 MONITOR PTAR juego 1
R-35.49 5.5.4.6 POLO 6" X 4m juego 4
R-35.50 5.5.4.7 ESCRITORIO juego 1
6 PLAN DE MANEJO AMBIENTAL
6.1 REDUCCIÓN DE MATERIAL PARTICULADO
R-41.1 6.1.1 APLICACIÓN DE AGUA_CONTROL DE POLVO m3 20
6.2 PREVENCIÓN Y CONTROL DE CONTAMINACIÓN DE SUELO Y AGUA
R-41.2 6.2.1 MANTENIMIENTO DE FOSA SÉPTICA (12M3) m3 3
6.3 INSTALACIONES PROVISIONALES
R-41.3 6.3.1 ALQUILER DE 2 LAVAMANOS PORTÁTILES (MES) u 15
R-41.4 6.3.2 ALQUILER DE 2 BATERÍAS SANITARIAS MÓBILES (MES) u 15
TRAMPA DE GRASA (INCLUYE RECOLECCIÓN - TRANSPORTE Y DISPOSICIÓN
R-41.5 6.3.3 FINAL DE RESIDUOS 4 VECES AL AÑO) u 3

R-41.6 6.3.4 FOSA SÉPTICA 12 M3 u 1


6.4 PROGRAMA DE GESTIÓN DE RESIDUOS
R-41.7 6.4.1 TANQUE METÁLICO PARA CLASIFICACIÓN EN LA FUENTE u 10
R-41.8 6.4.2 TANQUE PLASTICO PARA RESIDUOS DE GRASA Y ACEITES u 10
6.5 PROGRAMA DE CONTINGENCIAS
R-41.9 6.5.1 CONTINGENCIAS EN CASO DE EMERGENCIA (ANUAL) u 3
6.6 PROGRAMA DE SEGURIDAD Y SALUD OCUPACIONAL
R-41.10 6.6.1 SALUD Y SEGURIDAD OCUPACIONAL u 1
6.7 MONITOREO AMBIENTAL
R-41.11 6.7.1 MONITOREO DE GASES EN AIRE AMBIENTE Y RUIDO (NO INCLUYE IVA) u 12
R-41.12 6.7.2 MONITOREO DE AGUAS EN CUERPOS HÍDRICOS (NO INCLUYE IVA) u 30

7 TRABAJOS INESPERADOS
7.1 TRABAJOS INESPERADOS DE MANO DE OBRA
R-42.1 7.1.1 PEÓN hora 500
R-42.2 7.1.2 ALBAÑIL hora 500
R-42.3 7.1.3 CARPINTERO hora 500
R-42.4 7.1.4 ELECTRICISTA hora 500
R-42.5 7.1.5 ENCOFRADOR hora 500
R-42.6 7.1.6 FIERRERO hora 500
R-42.7 7.1.7 OPERADOR DE EQUIPO LIVIANO hora 500
R-42.8 7.1.8 PINTOR hora 500
R-42.9 7.1.9 PLOMERO hora 500
R-42.10 7.1.10 CHOFER hora 500
R-42.11 7.1.11 MAESTRO SOLDADOR ESPECIALIZADO hora 500
R-42.12 7.1.12 OPERADOR DE EQUIPO PESADO hora 500
R-42.13 7.1.13 PERFORADOR hora 500
R-42.14 7.1.14 OPERADOR EXCAVADORA hora 500
R-42.15 7.1.15 CHOFER DE VOLQUETA hora 500
7.2 TRABAJOS INESPERADOSDE MATERIALES
SUMA PROVISIONAL DE MATERIALES UTILIZADOS EN TRABAJOS INESPERADOS
R-42.16 7.2.1 S.P 1

7.3 TRABAJOS INESPERADOS DE EQUIPOS


R-42.17 7.3.1 BOMBA DE AGUA hora 1,000
R-42.18 7.3.2 CAMION CISTERNA 10000 LT hora 200
R-42.19 7.3.3 CAMION DE CARGA hora 500
R-42.20 7.3.4 CAMIONETA DE 1 TONELADA hora 500
R-42.21 7.3.5 COMPACTADOR MANUAL 5HP hora 500
R-42.22 7.3.6 CONCRETERA 1 SACO hora 500
R-42.23 7.3.7 CORTADORA DE HIERRO hora 500
R-42.24 7.3.8 ENCOFRADO METÁLICO hora 500
R-42.25 7.3.9 EQUIPO OXICORTE hora 500
R-42.26 7.3.10 EXCAVADORA SOBRE ORUGAS hora 200
R-42.27 7.3.11 GENERADOR hora 1,000
R-42.28 7.3.12 GRÚA hora 100
R-42.29 7.3.13 MARTILLO VIBRATORIO hora 500
R-42.30 7.3.14 PERFORADORA AKER hora 200

Hoja 90 de 92
PRESUPUESTO REFERENCIAL
PRECIO
CÓDIGO DEL PRECIO PRECIO PRECIO
ITEM DESCRIPCIÓN DEL RUBRO UNIDAD CANTIDAD UNITARIO PRECIO LOCAL PRECIO TOTAL
RUBRO EXTRANJERO UNITARIO LOCAL UNITARIO
EXTRANJERO

R-42.31 7.3.15 PLANCHA COMPACTADORA 5 HP hora 500


R-42.32 7.3.16 RETROEXCAVADORA hora 500
R-42.33 7.3.17 RODILLO COMPACTADOR VIBRATORIO hora 100
R-42.34 7.3.18 RODILLO NEUMATICO 80 HP hora 200
R-42.35 7.3.19 SOLDADORA ELÉCTRICA 300A hora 200
R-42.36 7.3.20 TRACTOR 165 HP hora 200
R-42.37 7.3.21 VIBRADOR DE HORMIGÓN hora 1,000
R-42.38 7.3.22 VOLQUETA 8M3 hora 1,000
8 ITEM MICELANEOS
R-43.1 8.1 ADQUISICION DE VEHICULOS (SUMA PROVISIONAL) u 2
OPERACIONES Y MANTENIMIENTO DE EQUIPOS DE MENOR IMPORTANCIA (SUMA
R-43.2 8.2 PROVISIONAL) suma 1

R-43.3 8.3 EQUIPOS DE LABORATORIO (SUMA PROVISIONAL) suma 1


GASTO DE OFICINA PARA COMPUTADORES HARDWARE Y SOFTWARE (SUMA
R-43.4 8.4 PROVISIONAL) suma 1

INSPECCIÓN DE MANUFACTURA O FOMENTO DE LA CAPACIDAD EN EL PAÍS


R-43.5 8.5 EXTRANJERO (SUMA PROVISIONAL) suma 3

Costo total de la obra USD $


Porcentaje de moneda

Diferencia

Costo total (C/P)

PRECIO TOTAL DE LA OFERTA:

Hoja 91 de 92
DETALLE DE FACTURA
PAQUETE N° DESCRIPCION DE LOS PRODUCTOS CANTIDAD UNIDAD PRECIO PRECIO LONGITUD
UNITARIO TOTAL (M)
MRE-1-001
MRE-1-056 TUBERIA DOBLE PARED PE D=800*5.7M 24 U 430 10320.00 136.80
TUBERIA DOBLE PARED PE D=800*3.2M 1 U 234.87 234.87 3.20
TUBERIA DOBLE PARED PE D=700*5.7M 320 U 285.5 91360.00 1824.00
TUBERIA DOBLE PARED PE D=600*5.7M 320 U 220 70400.00 1824.00
TUBERIA DOBLE PARED PE D=500*5.7M 320 U 140 44800.00 1824.00
TUBERIA DOBLE PARED PE D=200*5.7M 320 U 26 8320.00 1824.00 7436.00

MRE-1-057-01 UNION STS D=800 21 U 53 1113.00


MRE-1-057-16 UNION STS D=700 321 U 47 15087.00
UNION STS D=600 321 U 41 13161.00
UNION STS D=500 321 U 31 9951.00
UNION STS D=200 324 U 9.85 3191.40
CAUCHO D=800 21 U 2.1 44.10
CAUCHO D=700 321 U 2 642.00
CAUCHO D=600 321 U 1.9 609.90
CAUCHO D=500 321 U 1.8 577.80
CAUCHO D=200 324 U 1.7 550.80
TUERCAS Y PERNOS M12*150 4941 U 0.25 1235.25
TUERCAS Y PERNOS M12*130 972 U 0.2 194.40

SUMAN: 271792.52