08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
Note: All the above mentioned items are complete and ready to be released.
08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
Note: All the above mentioned items are complete and ready to be released.
TITLE
REV. APPROVAL
(Specify the document referred DOC. NO.
NO. STATUS
before / during / after inspection)
08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
08572-TRHT-PI-PPFP021-A06-001 D
Drawings 08572-TRHT-PI-PPFP021-A06-002 B APPROVED
08572-TRHT-PI-PPFP021-Q38-001 C
Specifications 08572-TRHT-PI-PPFP021-Q16-001 C APPROVED
08572-TRHT-PI-PPFP021-A06-001 D
08572-TRHT-PI-PPFP021-A06-002 B
REQUIR
OFFERED
PRODUCT/ MATERIAL/ ED ACCEPTED ACCEPTED
ITEM NO. THIS
ITEM NAME QUANTI THIS VISIT TO DATE
VISIT
TY
ADJUSTABLE SUPPORTS
1 TO 7 25 25 25 25
08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
ACOUSTIC PAD
07,39,44,49,53,56,57,60,61,64,65,66,70,71
,98,
99,100,101,102,103,104,106,107,108,113,1 CLAMP 1043 1043 1043 1043
14, 115, 124,125
75,77,78,79,84,90,93,
U BOLT 1082 1082 1082 1082
95,97,
TEFLON &
105,106 ACOUSTIC PAD
06 06 06 06
5.0 INSPECTION DETAILS (Details like Visual, dimensional, NDE, Accepted, Rejected, Under Hold,
etc or some explanation) :
An Inspection visit was conducted to the Kinetic Energy Factory Company, Jubail to carry out the final
inspection of the various structural items as per the notification. The brief description of the activities is as
under:
1. Documents Review………………………………………………………………………………………………………………………..13-08-2020:
All the pending Documents like MTCs , traceability reports and PMI reports for the base order : JI2043-PPF021 &
change order: JI2043-PPF021-C01 were reviewed and signed of accordingly. For the base order of.
VALIDITY
EQUIPMENT / INSTRUMENT DESCRIPTION CALIBRATION CERT. NO.
DATE
N/A
08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
8.0 FLAWLESS PROJECT DELIVERY (FPD) (Details related to actions initiated by Vendor and /or checklists used) :
N/A
N/A
10.0 CONCLUSION :
Final document Review for the base order JI2043-PPF021 and change order JI2043-PPF021 C01 was performed and the
results were acceptable.
Upon concurrence from the Contractor release of the material can only be given.
REPRESENTATIVE
NAME TITLE
(CA / PIUL / MANUFACTURER / OTHERS)
08572-TRHT-AQ-QC-00-OO-206 FRM 02
Inspection &Test Report
Note :
1.Report to be sent after inspection to Petrofac Inspection Co-ordinator.
2.Respective Flash report reference numbers shall be added wherever applicable.
3.Reference of previous inspection activity and report numbers.
FAHAD AHMAD
Name
Signature
13-08-2020
Date
PHOTOGRAPHS:
N/A
08572-TRHT-AQ-QC-00-OO-206 FRM 02