SEQUENCE OF OPERATION
CHILLER CONTROLS
Sequence of Operation-Dubai Marina
Chillers- 3 Nos.
Chilled Water Primary Pumps- 4 Nos.
Chilled Water Secondary Pumps- 4 Nos
Cooling Tower- 3 Nos.
Condenser Water Pump- 4 Nos.
Pressurization Unit
Control Philosophy
It shall be noted that any BMS, gives only an enable/disable (and
monitors chiller HOA, run, trip status), volt free command to the
chillers and does not interfere in any manner, whatsoever, with the
internal operation, factory logic, control of compressors, internal
capacity control, or control of any other component in the chiller.
The BMS system shall be programmed such that it shall provide auto
lead lag control of each piece of equipment. This shall be configured
for both the chillers and all the pumps such that the units with the
least number of run hours, shall be the first to start, which gives
EVEN operation, for each unit.
The primary pumps, condenser pumps, and the cooling towers are
controlled and monitored by the BMS/DDC, and the chillers are
monitored and enabled/disabled based on the building load (main
return header chilled water temperature).
Sequence of Operation-Dubai Marina
Sequence of Operation-Dubai Marina
On initial startup of the system, the DDC will verify the selector
switches of (pumps, chillers, cooling towers) set to auto mode. (The
trip status will be verified of all equipment’s), then the DDC Controller
will initiate the following based on the return header temperature
(which will decide the load requirement of the Building):
a. The butterfly valves for the Lead cooling towers (In & Out)
shall be Switched ON and the open status shall be
verified.
Pri
SN Description Chiller SCWP CDWP CT Remarks
CHWP
Return Header Temp is greater
1 1-2-3 1-2-3 1-2-3 1-2-3 1-2-3
than 21.3 Deg
Week#1
Return Header Temp is greater
2 1-2 1-2 1-2 1-2 1-2
than 17.3 Deg
If any
Pri
SN Description Chiller
CHWP
SCWP CDWP CT equipment
1
Return Header Temp is greater
2-3-1 2-3-1 2-3-1 2-3-1 2-3-1
fails, then
than 21.3 Deg
Week#2
next duty
2
Return Header Temp is greater
than 17.3 Deg
2-3 2-3 2-3 2-3 2-3 equipment
will take
Return Header Temp is greater
3
than 13.3 Deg
2 2 2 2 2 over, by
generating
Pri
SN Description Chiller
CHWP
SCWP CDWP CT alarm to
Return Header Temp is greater
operator.
1 3-2-1 3-2-1 3-2-1 3-2-1 3-2-1
than 21.3 Deg
Week#3
Return Header Temp is greater
2 3-2 3-2 3-2 3-2 3-2
than 17.3 Deg
c. After the desired time delay is over, the off command is given to
the primary pump.
d. Once the pump off status is received by BMS, the PICV in the
evaporator side are then commanded to switch OFF.
e. Once all the operating primary pumps are switched off, and off
status received, the operating secondary pump are
commanded to stop.
Following Points & Alarms shall be generated and recorded in the system: