PROJECT SUMMARY:

1. Location of the project : Chanpara , Medical Road,Uttarkhan ,Uttara,


Dhaka. Adjacent to Uttara Model Town.

2. Corporate Office : House # 43/A (2nd Floor) Sonargaon Janapath Road ,


Sector -12, Uttara, Dhaka.

3. Entrepreneurs:

Chairman : M. Anwar, B.A


Proprietor of Rabeya Enterprise

Managing Director : Ahsanul Bari, FCMA


Chairman, Orange Hub Impex Limited

Directors : Md. Nazmul Alam, FCMA


(Nominated Director of Marufa Begum)

: Samiul Bari
Managing Director, Orange Hub Impex Limited
4. Shareholding:

SL NO. Name of Directors Designation Share Percentage (%)

1 M.Anwar Chairman 20%

2 Ahsanul Bari Managing Director 10%

3 Sultana Razia Lubna Shareholder 10%

4 Marufa Begum Director 25%

5 Mosammat Kulsum Shareholder 15%

6 Samiul Bari Director 10%

7 Rafiqul Islam Shareholder 5%

8 Mahbub Hasan Ridoy Shareholder 5%

5. Product Summary:
EPS Seafood Containers, Packaging Materials, EPS Crab, Meat & Fish Boxes, EPS Cup, and
Plates, EPS Panel, Insulation Wall, Plastic Crate etc.
6. Project Proposal:

Request for sanction of Local Currency Loan of Taka 70.50 million ( including tk. 16.50.00
million for meeting working capital , part cost of building & Civil works and local Machinery
& Equipment ) and Foreign Currency of taka 46.25 Million for imported machinery.

7. Facility Required: (Fig. in Lac)

Term Loan : 165.00


L/C UPAS (for machinery) : 415.00
Working Capital : 250.00
L/C Facility : 100.00
LTR : 90.00
____________________________________________
10,20.00

8. Security against Bank Facility:

A) Land: Factory Land:


i) 19 decimal at Uttarkhan @ 18.91 Lac= 359.29
ii) 17 decimal at Uttarkhan @ 18.91 Lac= 321.47
___________________________________________________________________
Additional Land:
130 decimal @ 2.70 Lac per decimal at Mymensingh= 351.00

B) Land Development = 200.00


C) Factory Shade & Building = 150.00
D) Vehicle = 24.00
___________________________________________________________________
14,05.76
9. Management:

Managing Director, Ahsanul Bari, FCMA is empowered to deal with the bank and other financial
aspects of the project. He is a qualified Cost & Management Accountant, an experienced and
veteran banker with an experience of 32 years in the banking sector. As an entrepreneur, he
has been worked with different manufacturing industry and import-export business.

The Chairman of the company, M. Anwar is capable enough to manage the business with his
vast experience in fish & crab export processing center and export to the foreign country.

Md.Nazmul Alam, FCMA is a professional Cost & Management Account and has vast experience
in this line of business will be engaged in this business for Management, Finance, Accounts,
costing, production & Marketing.

Director of the company, Samiul Bari who studied Electrical and Electronics Engineering, is
experienced in running machineries, production line and international correspondences. He is
entitled to look after the production process, marketing and international correspondences.
9. Present condition of our dream Project:

The Project is located on an industrial plot of land measuring 36 decimals at Uttarkhan ,Uttara,-
3 kilometers away from Uttara Model Town . The promoters purchased the land for the
purpose of setting up this factory. The land is considered adequate enough for setting up the
plant for the present production capacity that is aimed for. The site is well connected by supply,
roads, transport, and market and has the necessary infrastructure facilities like power, gas,
water, etc.
Total land of the project is 15,500 square feet, which is already surrounded by boundary wall
and developed by high land.
Out of 9,500 square feet project land – RCC Construction of the project steel building has
already been completed, out of which 3,000 square feet already steel structure shed completed
which will be a two storied building.
The rest of the 5,000 square feet land development & civil works is almost on the verge of
completion. As soon as the proposed investment is sanctioned by the Bank, rest of the building
construction will be completed within 20 days, and LC will be opened for import of foreign
machineries. It will take 2 (two) months to start production after bank sanction.

Also, keeping in mind the further marketing aspects and expansion of the product range and
project, we have purchased another ……… of industrial land in Valuka, Mymensingh.