Documente Academic
Documente Profesional
Documente Cultură
of India as per CEA Regulation 2010)
Short‐term Training Calendar‐2018‐2019
Short‐term Training Programmes for
the Engineers & Supervisors
from Power & Process Industries
L&T Power Training Institute
3rd Floor, IPM/PTI Building
Knowledge City Residency Campus
Behind L&T Knowledge City
NH‐8, Ajwa – Waghodia Crossing
Vadodara‐300019, Gujarat
Landline: 0265 – 2453177, Mobile: 7567778097
About L&T Power Training Institute
L&T Power Training Institute is a Technical Training Centre under L&T Power which is a business brand
of Larsen & Toubro, with a mandate to integrate L&T’s varied offerings in the thermal power sector.
This Institute was set up with the mission “To design, develop and deliver quality training in the
multidisciplinary areas of power plant value chain, through conventional, simulator based, e‐
learning mode by creating state‐of‐the‐art infrastructure and by providing a knowledge sharing
platform.”
This Institute has a strong foundation and vast expertise to conduct the long‐term induction and
short‐term refresher/customised training courses, Technical Workshop & Seminars for the
professionals from power sector &various process industries.
Main objectives of the training are to disseminate the knowledge and improve the proficiency of
the fresh & experienced power engineers so that they can perform most efficiently for delivering
quality work, minimizing the project set‐up time and optimizing the operating cost & energy
efficiency in powerplants.
Institute Recognition & Membership
• L&T Power Training Institute is a company member of Energy Institute, UK.
Energy Institute • Helps to achieve global standard.
Uk, Membership
• Provide access to EI online Company Member Directory.
• PTI is listed on the EI website.
3
ONE STOP SOLUTION TO ALL TRAINING FOR POWER & PROCESS INDUSTRIES
System and Equipment Engineering & Design
Project Engineering & Management
Procurement & Logistic Management
Equipment Manufacturing
Project Execution – Erection & Construction
Project Execution ‐ Commissioning
Plant Operation & Maintenance
4
Standard Training Offerings of L&T‐PTI
Long Term Induction Program
• Graduate Engineers
• Diploma Engineers
Short term Refresher & Advanced Training
Soft Skill & Leadership Training
Customized Development Training
Simulator Training
Community of Practitioners
Seminar/ Workshop
Academia Training
Core Strength
Expert Faculty with Rich Experience
Live Project Experience
International Product Experience
Global Execution Experience
Proven Database
Quality Learning Material
Modern Training Infrastructure
Excellent Lodging Facility
Training Pedagogy
Digital Classroom
Session
Case Studies /
Group Discussion
Hands on Training
Assignment &
Technical Project
Simulator /
Computer based
Training
On Job Training
Regular
Assessment
7
Code Name of Training Programme Duration Date Registration
Fees (Rs.)
ST01 Power Plant Control & Automation Systems 04 Days 22‐25 May, 2018 12000/‐
ST02 Integrated Operation of Supercritical Power Plant 05 Days 12‐16 Jun, 2018 15000/‐
ST03 Electrical Protection 02 Days 11‐12 Jul, 2018 7000/‐
ST04 Industrial Pumps & Fluid Handling Solutions
04 Days 24‐27 Jul, 2018 12000/‐
ST05 Engineering and Project Execution of LT Switchgears
03 Days 07‐09 Aug, 2018 10000/‐
ST06 Condition Monitoring & Fault Diagnosis of Industrial
04 Days 21‐24 Aug, 2018 15000/‐
Equipment
(With Practical Demonstration & Hands‐on Practice)
ST07 Quality Management in Power Project 02 Days 04‐05 Sep, 2018 7000/‐
ST08 Maintenance Management & Cost Control
02 Days 25‐26 Sep, 2018 7000/‐
ST09 Efficiency & Performance Monitoring of Steam Turbine & 03‐04 Oct, 2018 7000/‐
02 Days
its Auxiliaries
Code Name of Training Programme Duration Date Registration
Fees (Rs.)
ST10 Combustion Mechanism & Fuel Firing Systems in
Pulverised Coal Fired Boiler 02 Days 20‐21 Nov, 2018 7000/‐
ST11 Operation, Control & Protection of Generator & its Auxiliary
03 Days 10000/‐
Systems 27‐29 Nov, 2018
ST12 Efficiency & Performance Monitoring of Boiler & its
Auxiliaries 02 Days 05‐06 Dec, 2018 7000/‐
ST13 Commissioning of Electrical Systems and Equipment
02 Days 09‐10 Jan, 2019 7000/‐
ST14 Environmental Issues & Challenges in India 06‐07 Feb, 2019
02 Days 7000/‐
(Technical Workshop)
ST15 Simulator Training on 700 MW Supercritical Power Plant To be
Operation 05 Days conducted as
25000/‐
per
requirement
Note: Training fees includes cost of training material, tea, snacks & lunch.
ST01 : Power Plant Control & Automation Systems
PROGRAM OBJECTIVE FOCUS AREAS
• To impart the knowledge about • Overview of Instrumentation of Thermal Power Plant,
Control & Instrumentation role in
power plant and various selection • Pressure , Level, Flow & temperature measurement,
& application of Field Instruments, • Introduction to automatic control system,
Analysers and different type of
control valves & actuators used in • Turbine Supervisory (Turbovisory) instruments & analytical instruments,
power plant. • Selection and application of final control element such as control valves, dampers etc.
• To improve the knowledge & skill • Overview of DCS Architecture & Configuration
of the participants on Plant control • Boiler Management & Protection System
Systems like DCS & other
associated systems and Unit • Steam Turbine Control & Protection Systems
Control philosophy so that after • Automatic Plant Stat‐up and Shutdown of a coal based power plant
completion of this training the
participants can work more • Unit Coordinated Control (Turbine Governing Control, Feed water flowcontrol, plant Fuel
efficiently in their respective fields flow control etc.)
during project execution and O&M
of thermal power plant. • Plant Emergency Conditions : Runback, Blackout, House Load Operation
Date & Duration : 4 Days For Whom : Experienced supervisors & engineers working in engineering, installation,
Back to Main Menu
commissioning, operation & maintenance of thermal power plant.
ST02 : Integrated Operation of Supercritical Power Plant
PROGRAM OBJECTIVE FOCUS AREAS
• To build up the knowledge of the Power Cycle systems in Supercritical Power plant
participants on various mode of Features of Supercritical Steam Generator & Steam Turbine
operation of a supercritical power Interlocks & Protection Systems in Supercritical Steam Generator & Steam Turbine
plant and various control‐logics & Coordinated Control System & Integrated Operation of power plant
parameters at different Preparations & readiness of Steam Generator, Steam Turbine, Generator and
conditions/loads and unit operation various other systems before Unit Start up
philosophy, which will help them Boiler Cold Start‐up and raising pressure & temperature of steam
operate the Unit more efficiently Steam Turbine start‐up and speed up
during pre‐commissioning, post‐ Generator Synchronization & minimum load pick up
commissioning periods & normal
Load raising to 30%, Cut‐in Coal Mill & Wet to Dry Change over
operation of the supercritical power
BFP Transfer‐MDBFP to TDBFP
plant.
Load raise up 50%, 75% % 100%
• To acquaint the participants with the
various mal functions & emergency Sliding Pressure & Modified Sliding Pressure Operation
operation of a supercritical power Unit Shut Down Procedures and Load Down‐75%, 50%, 35%, 20%,
plant, which will help them to handle BFP Transfer TDBFP to MDBFP
and tackle any disastrous situations Generator De‐Synchronization
during operation of supercritical Emergency Operation, Run back and Unit Tripping
power plant.
Date & Duration : 5 Days Back to Main Menu
For Whom : Experienced supervisors and engineers working in commissioning &
operation of thermal power plant
ST03 : Electrical Protection
PROGRAM OBJECTIVE FOCUS AREAS
• To enhance knowledge, practical skill • Requirement of electrical protection
and build up confidence of the
engineers working in commissioning, • Selection criteria of protection scheme
operation and maintenance of electrical • Instrument transformers, fault parameters, fault analysis, sequential recorder
systems in power industry
and disturbance recorder.
• To impart the knowledge to the • System Grounding
participants about basics of protection,
selection criteria of various protections. • Generator interlocks & protections.
• Transformers & bus‐bar protection schemes
• Configuration, Construction and
Commissioning of various types of
equipment’s used in protection system
and protections utilized for generator,
transformers, EHT/HT/LT Switchgears
used in Power Plant.
Date & Duration : 2 Days For Whom : Experienced electrical supervisors & engineers working in
Back to Main Menu
commissioning & operation of thermal power plant.
ST04 : Industrial Pumps & Fluid Handling Solutions
PROGRAM OBJECTIVE FOCUS AREAS
To acquaint the participants with the Classifications of pumps, Selection, Applications & Design Aspects of Rotodynamic
real‐life applications of pumping pumps (Centrifugal, Axial & Mixed Flow) and Rotary Pumps‐ Gear, Screw, Vanes etc.
theories, engineering & design aspects Orientation of Pumps & Pumping Systems
of various pumps used in power, process NPSH & Cavitation in Pumps
& other engineering industries. Constructional Features of various Rotodynamic Pumps and Rotary Pumps
To impart the knowledge about the Pump‐Auxiliary Systems & Instruments‐ Bearings & Lubrication, Cooling Systems,
codes & standards and various testing Pump Drives and Pump Speed Control Mechanisms (VSD & VFD)
procedures which are essential during various Factory Tests for Quality Assurance
procurement, installing and Inspection & Testing before Commissioning, Commissioning of Pumps
commissioning of pumps in industry. Operation & Control Philosophy of various Pumps
Performance Monitoring & Energy Efficiency of Pumps
To improve the practical skill of the Failure Characteristics Various Pumps
participants on the proper operational Maintenance Policies & Practices of various Pumps & pumping Systems
procedures and systematic maintenance Preventive Maintenance & Inspection Schedules of Pumps & pumping Systems
practices of various pumps, which will in Breakdown Maintenance & Trouble Shooting of Pumps
turn help them increase the availability Condition Based maintenance
of the pumps in the respective processes
and reduce the plant maintenance
downtime.
Date & Duration : 4 Days For Whom : Experienced mech. engineers & professionals working in operation &
Back to Main Menu maintenance of power plant, Oil, Gas, chemical & other industries )
ST05 : Engineering and Project Execution of LT Switchgears
PROGRAM OBJECTIVE FOCUS AREAS
• To impart the knowledge • Different types of switchgears, features and Selection criteria. Role, Selection, and
to the participants about applications. LT Switchgear terminologies,
Engineering, • SDF, MCCB, ACB, Contactor, Relays etc. ACB / MCCB
• Construction, Erection, • Design & constructional details of LT Switchgears.
Commissioning ,Type‐2 • Typical ACB Specifications, ACB part identification, Breaker mounted accessories, Cradle
coordination and forms mounted accessories, Good Termination practices, Setting and testing of protection releases
of separation for MCC, • Fault level calculations, Switchgear Sizing criteria
PMCC, PCC etc. of LT • Protection release coordination for LT Switchgears and testing procedures.
Switchgears used in • Fuses, SDF, MCB etc.
Power Plant. • Types, selection, cost considerations, and sizing criteria.
• Switch –fuse units‐ role. Types, selection, cost considerations, and sizing criteria.
• To improve the practical • DOL & star delta starters, Contactors, Relays, Types, Selection criteria
skill and build up • Type tests and routine tests on LT Switchgears
confidence of the • Types of Switchgear panels, Standard panel sizes,
participants by Hands on • Ingress protection
Training on LT • Selection Current transformers
Switchgears, associated • Sizing of control Voltage transformers, Bus bar sizing
accessories, protections .
Date & Duration : 3 Days For Whom : Experienced electrical engineers & supervisors working in commissioning, operation
Back to Main Menu
& maintenance of thermal power plant and other industries.
ST06 : Condition Monitoring & Fault Diagnosis of Industrial Equipment
(WITH PRACTICAL DEMONSTRATION & HANDS‐ON PRACTICE)
PROGRAM OBJECTIVE FOCUS AREAS
• To acquaint the participants with the • Condition Monitoring Techniques & their industrial applications
Various Condition Monitoring techniques
for assessing & predicting the current & • Fault Diagnosis Techniques in various Equipment,
future health and operating conditions of • Vibration ‐ Fundamentals & Measuring Techniques
different equipment during commissioning
and after commissioning in Power Plant, • Causes of Vibration of Rotary Equipment
Process Plant & any Engineering Industries. • Vibration Signature Analysis of rotary equipment and Failure Identification
• To build up knowledge on multiple data • Anti‐friction Bearing Condition Analysis‐ Shock Pulse Monitoring
collection, diagnosis & analysis of various
of faults in equipment without disturbing • Thermography and its industrial applications for identifying the various faults
its productivity. • Tribology & Ferrography
• To provide the information on the
Integrated Architecture of reducing
maintenance cost by preventing collateral
damages of equipment
Date & Duration : 4 Days For Whom : Experienced Supervisors and Engineers working in commissioning,
Back to Main Menu
operation & maintenance of power & process plants.
ST07 : Quality Management System In Power Project
PROGRAM OBJECTIVE FOCUS AREAS
• To acquaint the participants with Overview of Quality management System(QMS) and its role in Power Project, Vision
the Quality Assurance planning, & Quality Systems & e‐Quality, ISO 9001:28008‐QMS
documenting and agreeing on a set Quality Assurance and Quality Control during execution of Civil construction in
of guidelines that are necessary at Power Project including Non Destructive Testing
the beginning of the project to Quality Monitoring and Quality Control in Welding
assure quality of project‐work Quality plan and Quality Control Technologies for STG‐island in a power Project,
• To impart the knowledge to the including Quality assurance & Improvement by inspection and testing of rotary
participants about the inspection equipment, static equipment, valves, critical piping during supply and erection.
and test plans, the selection of Quality Monitoring, Quality Control and Quality Assurance in various Mechanical‐
defect tracking tools, methods and BOP in Power Projects including inspection and testing during supply and erection of
processes for maintaining during rotary equipment & static equipment of various Mechanical BOP systems.
power project execution Quality Assurance and Quality Control in Electrical and C&I equipment during
• To familiarize the participants with powerhouse & erection including Motor, Transformer, switchgears, Switchyard, PLC
the all operational techniques and & instruments etc.
activities of quality control Quality Control and Quality Assurance during execution and maintenance of Boiler,
applicable to fulfil requirements for Inspection and Testing of materials & equipment, Checking Welder’s qualifications,
quality assurance and determine Welding Quality Inspection, IBR Guidelines & its Significance for erection of Boiler for
the level of quality of the work in quality control Various other Inspections for quality assessment
power project
Date & Duration : 2 Days Back to Main Menu For Whom : Experienced engineers working in erection & commissioning of power
project and operation & maintenance of thermal power plant
ST08 : Maintenance Management & Cost Control
PROGRAM OBJECTIVE FOCUS AREAS
• To impart the knowledge to • Introduction to Maintenance Management and its importance in running plant & industry.
the participants about the • Integration of maintenance with operational requirements of highest plant availability and
latest Maintenance best performance
Management & Technology • Maintenance Reliability for controlling Downtime Losses and increasing Plant Productivity
and make them enable to • Maintenance policies and their selection criteria
develop their own plant • Latest maintenance technology & practices ‐ Preventive, Corrective, Schedule & Break
maintenance unit perfectly Down Maintenance and their work‐schedule
for ensuring high availability • Condition based maintenance management.
and reliability of plant & • Total productive maintenance and pro‐active maintenance practices & their applications.
machineries in their • Maintenance planning‐ short term, long –term and emergency works and their road maps
industries. & work‐flows
• Maintenance Data Collection, Documentation and Data Analysis for assessing Failure
• To improve the skill of the Characteristics & MTTF of equipment & components
participating engineers on • Purchasing spare parts, consumables & maintenance tools & tackles and inventory control.
the Systematic Maintenance • Cost control technology in maintenance ‐ Direct Costs, Indirect Costs
Planning & Maintenance • Budgeting and Costing Maintenance work.
Practices for reducing • Concept of Computerized maintenance management system
downtime and increasing
plant productivity.
Date & Duration : 02 Days For Whom : Experienced engineers & Supervisors working in maintenance of power &
Back to Main Menu process plants
ST09 : Efficiency & Performance Monitoring of Steam Turbine & its Auxiliaries
PROGRAM OBJECTIVE FOCUS AREAS
• To understand the major performance • Thermodynamic Aspects of Steam Turbine Design
parameters of Steam Turbine and the
ways to optimise these parameters for • Performance parameters of Steam Turbine and their Assessment
achieving the highest heat rate • Various Losses in Steam Turbine and their control
improvement.
• Heat Rate Calculation
• To acquaint the participants with the • Factors affecting Performance of Steam Turbine
various operational aspects of Steam
Turbine which can be monitored to • Influence of Feed Water & Steam Quality on Turbine Performance
optimise the power cycle efficiency. • Performance Monitoring techniques for optimizing the Turbine Heat Rate &
efficiency
• Performance Assessment of Condenser for Turbine Heat Rate Improvement
• Impact of Design Aspects for performance & Heat Rate improvement of Steam
Turbine
• Performance Monitoring of Turbine Auxiliary Systems
• Seal Oil System Operation & control
• Gas & Cooling Water system‐operation & control
• Technical Overview of Generator Interlocks & Protection
Date & Duration : 2 Days For Whom : Experienced engineers working in commissioning, operation &
Back to Main Menu maintenance of thermal power plant
ST12 : Efficiency & Performance Monitoring of Boiler & its Auxiliaries
PROGRAM OBJECTIVE FOCUS AREAS
• To understand the major performance • Performance Parameters of Boiler and their Assessment
parameters of PC Boiler and the ways to
optimise these parameters for a • Factors affecting Boiler efficiency & Performance
achieving the highest efficiency of the • Losses in Boiler, their causes and Identification
PC Boiler.
• Fuel Firing Systems , Combustion & Boiler Performance‐interrelation
• To acquaint the participants with the • Best Performance Monitoring techniques of Boiler for optimizing its efficiency
various operational aspects of PC Boiler
which can be monitored to optimise the • Role of Operation in Monitoring & Controlling Efficiency & Performance of
Boiler efficiency. Boiler
• Factors influencing performance & efficiency Boiler Auxiliary Systems &
Equipment including Pulveriser
• Best Performance Monitoring Techniques of various Boiler Auxiliary Systems for
optimizing their as well as boiler efficiency
Date & Duration : 2 Days For Whom : Experienced electrical engineers working in commissioning & operation of
Back to Main Menu
thermal power plant
ST14 : Environmental Issues & Challenges in India
(A TECHNICAL WORKSHOP)
PROGRAM OBJECTIVE FOCUS AREAS
• To acquaint the participant • Identification of sources of Air, Water & Land Pollution from Power plant, Oil. Gas &
with the present scenario of Chemical Industries
environmental issues in India, • Industrial Nitrogen Oxide (NOx) & Sulphur Dioxide/Oxide (SO2 / SOx) Emission and Air
various sources of pollution Pollution, Greenhouse Effects
and Govt. Regulations & • Suspended Particulate Matter Pollution & Sources
Norms for pollution control • Emission of Mercury from coal based power plant
which will make them alert for • Solid Waste from Power plant, Oil. Gas & Chemical Industries
taking proper measures to • Environmental Policies, Govt. Rules, Regulation & Norms for Power Sector, Oil, Gas &
mitigate all these issues. Chemical Industries in India
• Air & Water Quality Criteria, Monitoring & various Emission Standard
• To impart the knowledge • Various Techniques for reducing NOx Emission before & during combustion of Fuel in
about the latest & emerging Steam Generator & Furnace
environmental technologies • SCR Technology for controlling NOx Emission
that might help solve all these • Various Techniques for reducing SOx Emission before & during combustion of Fuel in
environmental problems and Steam Generator & Furnace
make the world a little • FGD Technology for controlling SOx Emission
brighter. • Control of suspended particulate matter & latest technology ‐ESP
Back to Main Menu • Recycle and Reuse of waste water, Waste Water Treatment‐ ETP, STP
Date & Duration : 2 Days For Whom : Engineers, professionals & researchers working in power & other industries
and R & D organisations dealing with the environmental issues.
ST15 : Simulator Training on 700 MW Supercritical Power Plant Operation
PROGRAM OBJECTIVE FOCUS AREAS
To develop the practical knowledge on • Overview of Supercritical Power Plant
operating procedures, sequences and
parameters for start‐up, loading and • Familiarization with Simulator Features and Screens
shutdown of MHI Super critical BTG unit. • Walk Through and Study of All Schemes and Graphics of Boiler, Turbine
Model Digital Class Rooms
Stocked Library SimulatorTraining
VideoConference e‐Library
Registration
Registration for the respective training programme can be made by sending the filled up Registration Form
(attached) along with Registration fee + Applicable GST (presently 18%) by Demand Draft in favour of “Larsen &
Toubro Limited” payable at Vadodara.
Participants from any organisation have to provide their official GSTIN which will help in deriving correct tax liability
under GST regime. GSTIN is not required for the individual participants who are out of GST regime. Registration fee
may also be transferred through NEFT and delegates have to provide Transaction reference number, Amount
transferred & date of transfer to ensure NEFT is received by us. Wire transfer details are as follows:
Account No: 000305015957
IFS Code: ICIC0000003
Bank Name: ICICI Bank
Please fill the registration form and mail or send it along with demand draft or NEFT transaction receipt to the
institute address or below mentioned Email ID.