This matlab file shows the operation of above modeled DVR with interconnected with
11 bus Thimi Sallaghari distirbution feeder. After finding the optimal location for
the placement of DVR
the DVR has been operated at the same optimal location with a fault simulated in
the network sucht that the DVR does not lie in the faulted path.
Few very important things to note durint the obeservation of the simulation results
are:
i) The DVR mitigates the voltage sags at the buses that go radaially outwards fromt
he bus where the DVR is interconected.
This is due to the fact that DVR is a series connected device and there is only
unidrectional power flow
ii) DVR should be placed such that it doesnot lie in the faulted path(i.e. the path
of the fault current)
Results are shown in the Scope named output where the voltages of buses that lie
after the DVR interconnection point are shown. Which shows that DVR has mitigated
the voltage sag for the buses that lie after the DVR interconnection point.
MATALB FILE 3: Operation of DVR with IEEE-15 bus radial disribution system:
Similar to MATLAB FILE 2, DVR has been operated in the optimal location that has
been found out as the result of the optimization technique.
Similar to 11 bus sallaghari feeder the notes need to be followed for the
simulation. The OUTPUT scope shows the bus voltages of the buses that lie after
the DVR interconnection point
. Fault has been simulated at for t=0.1s ot t=0.2s and the voltages are observed.
It shows that DVR has mitigated the voltage sag for the buses that lie after the
DVR interconnection point.
The difference between the operation of the system with and without DVR can be
observed by siumlating both files 2 and 3 with DVR ( in the orgininal file) and by
removing the DVR and the reference
generation block from the original file.
Matlab program 4:busvoltages.m
It is a code that takes the RMS bus voltages in p.u. from all the buses in both 15
bus and 11 bus system, only during the fault period.
This MATLAB code then, writes the bus voltages into an excel file, the data
collected in this manner was used to train the ANN tool to find the optimal
location for the
DVR in both 11 bus and 15 bus system.
In order to run this program, we need to first run the matlab simulation, then for
the first run uncomment line 22 and run the code to get three phase rms voltages at
all
buses during the fault period. After that comment out the line 22 and run the
simulation first and the code again to get the bus voltages for all cases in the
single excel file for
the number of simulations carried out.
This file is basically the same as File 1 but with one more load added after the
DVR interconnection node. The power demand of load at node 2 and length of the line
connecting
node 1 and node 2.
variable 'len' and 'S2' have to be assigned before running the simulation. The
output voltage 'V2' has been selected such that it records bus voltages only during
the fault period.
Using the sensitivity analyzer tool in the 'Apps' of matalab toolbar, sensitivity
analysis was carried out by ruunning MC simulation.